- Ammonia (NH3 as N), FIL, COL -
Blind Blank Results
Lab: NWQL, PCode: 00608, MCode: CL037
Analysis dates: 11/13/01 through 05/25/06
Open Data Set

 Analysis Date = 06/12/2003 
 Lab Value = 0.033 
 RPT Level = 0.021 
 Lab Sample ID = 20031400115  Analysis Date = 05/25/2006 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20061370016  Analysis Date = 05/22/2006 
 Lab Value = -0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20061280111  Analysis Date = 05/11/2006 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20061220099  Analysis Date = 09/27/2005 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20052590035  Analysis Date = 09/20/2005 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20052520006  Analysis Date = 09/12/2005 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20052430006  Analysis Date = 09/07/2005 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20052370002  Analysis Date = 08/31/2005 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20052300009  Analysis Date = 08/16/2005 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20052210012  Analysis Date = 08/10/2005 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20052160007  Analysis Date = 08/10/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20052160005  Analysis Date = 07/26/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20052010007  Analysis Date = 07/15/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20051940015  Analysis Date = 07/12/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20051880018  Analysis Date = 07/01/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20051800189  Analysis Date = 06/27/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20051740019  Analysis Date = 06/20/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20051660174  Analysis Date = 06/14/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20051590025  Analysis Date = 06/06/2005 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20051530021  Analysis Date = 05/26/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20051440043  Analysis Date = 05/24/2005 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20051380014  Analysis Date = 05/16/2005 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20051320029  Analysis Date = 05/10/2005 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20051250003  Analysis Date = 04/28/2005 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20051170012  Analysis Date = 04/26/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20051110007  Analysis Date = 04/14/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20051020018  Analysis Date = 04/07/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20050950044  Analysis Date = 03/31/2005 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20050880116  Analysis Date = 03/30/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20050840096  Analysis Date = 03/21/2005 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20050750004  Analysis Date = 03/15/2005 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20050700007  Analysis Date = 03/15/2005 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20050700004  Analysis Date = 03/09/2005 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20050670011  Analysis Date = 03/01/2005 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20050550024  Analysis Date = 02/24/2005 
 Lab Value = -0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20050480005  Analysis Date = 02/15/2005 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20050410004  Analysis Date = 02/09/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20050340020  Analysis Date = 01/31/2005 
 Lab Value = -0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20050260024  Analysis Date = 01/26/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20050200048  Analysis Date = 01/25/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20050130091  Analysis Date = 01/18/2005 
 Lab Value = -0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20050070016  Analysis Date = 01/11/2005 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20043650002  Analysis Date = 12/27/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20043580037  Analysis Date = 12/27/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20043580035  Analysis Date = 01/04/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20043520023  Analysis Date = 12/23/2004 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20043510018  Analysis Date = 12/21/2004 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20043450069  Analysis Date = 12/21/2004 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20043440147  Analysis Date = 12/15/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20043380005  Analysis Date = 12/15/2004 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20043380002  Analysis Date = 12/14/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20043310059  Analysis Date = 12/13/2004 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20043280048  Analysis Date = 12/08/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20043240012  Analysis Date = 09/15/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20042450138  Analysis Date = 09/09/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20042400089  Analysis Date = 09/08/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20042370105  Analysis Date = 09/02/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20042330206  Analysis Date = 09/01/2004 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20042320136  Analysis Date = 09/01/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20042320138  Analysis Date = 08/19/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20042240114  Analysis Date = 08/11/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20042170123  Analysis Date = 08/05/2004 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20042110015  Analysis Date = 07/27/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20042040039  Analysis Date = 07/19/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20041960050  Analysis Date = 07/14/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20041900062  Analysis Date = 07/13/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20041820035  Analysis Date = 07/08/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20041750057  Analysis Date = 07/06/2004 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20041700080  Analysis Date = 06/24/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20041610055  Analysis Date = 06/23/2004 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20041550019  Analysis Date = 06/16/2004 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20041470132  Analysis Date = 06/08/2004 
 Lab Value = 0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20041400016  Analysis Date = 05/17/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20041260099  Analysis Date = 05/11/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20041200046  Analysis Date = 05/06/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20041130016  Analysis Date = 04/22/2004 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20041050022  Analysis Date = 04/13/2004 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20040980007  Analysis Date = 04/15/2004 
 Lab Value = -0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20040930009  Analysis Date = 04/14/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20040910012  Analysis Date = 04/07/2004 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20040850021  Analysis Date = 04/07/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040830056  Analysis Date = 04/05/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20040790023  Analysis Date = 04/02/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20040760010  Analysis Date = 03/30/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040720029  Analysis Date = 03/23/2004 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20040710005  Analysis Date = 03/23/2004 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20040680093  Analysis Date = 03/23/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20040650001  Analysis Date = 03/16/2004 
 Lab Value = -0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20040580032  Analysis Date = 03/16/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20040550018  Analysis Date = 03/15/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040510134  Analysis Date = 03/15/2004 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20040490025  Analysis Date = 03/09/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040440035  Analysis Date = 02/26/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20040420001  Analysis Date = 02/17/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20040370017  Analysis Date = 02/10/2004 
 Lab Value = -0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20040340024  Analysis Date = 02/10/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20040300012  Analysis Date = 02/03/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040270036  Analysis Date = 02/02/2004 
 Lab Value = -0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20040230030  Analysis Date = 01/29/2004 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20040210154  Analysis Date = 01/29/2004 
 Lab Value = -0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20040200023  Analysis Date = 01/28/2004 
 Lab Value = -0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20040150075  Analysis Date = 01/27/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040090020  Analysis Date = 01/20/2004 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20040070032  Analysis Date = 01/06/2004 
 Lab Value = -0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20040050016  Analysis Date = 10/03/2003 
 Lab Value = -0.001 
 RPT Level = 0.021 
 Lab Sample ID = 20032660009  Analysis Date = 10/02/2003 
 Lab Value = 0 
 RPT Level = 0.021 
 Lab Sample ID = 20032600107  Analysis Date = 09/23/2003 
 Lab Value = -0.001 
 RPT Level = 0.021 
 Lab Sample ID = 20032520179  Analysis Date = 09/22/2003 
 Lab Value = 0.002 
 RPT Level = 0.021 
 Lab Sample ID = 20032450195  Analysis Date = 09/16/2003 
 Lab Value = 0.006 
 RPT Level = 0.021 
 Lab Sample ID = 20032380029  Analysis Date = 09/11/2003 
 Lab Value = 0.002 
 RPT Level = 0.021 
 Lab Sample ID = 20032310028  Analysis Date = 09/10/2003 
 Lab Value = 0.005 
 RPT Level = 0.021 
 Lab Sample ID = 20032250256  Analysis Date = 08/26/2003 
 Lab Value = -0.023 
 RPT Level = 0.021 
 Lab Sample ID = 20032180019  Analysis Date = 08/21/2003 
 Lab Value = -0.001 
 RPT Level = 0.021 
 Lab Sample ID = 20032100004  Analysis Date = 08/13/2003 
 Lab Value = 0.001 
 RPT Level = 0.021 
 Lab Sample ID = 20032040043  Analysis Date = 08/08/2003 
 Lab Value = -0.008 
 RPT Level = 0.021 
 Lab Sample ID = 20031960025  Analysis Date = 08/04/2003 
 Lab Value = 0.009 
 RPT Level = 0.021 
 Lab Sample ID = 20031900098  Analysis Date = 07/25/2003 
 Lab Value = 0.003 
 RPT Level = 0.021 
 Lab Sample ID = 20031820037  Analysis Date = 07/22/2003 
 Lab Value = -0.005 
 RPT Level = 0.021 
 Lab Sample ID = 20031770041  Analysis Date = 07/15/2003 
 Lab Value = 0.001 
 RPT Level = 0.021 
 Lab Sample ID = 20031700013  Analysis Date = 07/09/2003 
 Lab Value = -0.002 
 RPT Level = 0.021 
 Lab Sample ID = 20031630053  Analysis Date = 06/24/2003 
 Lab Value = 0 
 RPT Level = 0.021 
 Lab Sample ID = 20031600109  Analysis Date = 06/16/2003 
 Lab Value = 0.007 
 RPT Level = 0.021 
 Lab Sample ID = 20031480059  Analysis Date = 06/17/2003 
 Lab Value = -0.002 
 RPT Level = 0.021 
 Lab Sample ID = 20031430019  Analysis Date = 05/21/2003 
 Lab Value = -0.013 
 RPT Level = 0.021 
 Lab Sample ID = 20031290084  Analysis Date = 05/13/2003 
 Lab Value = -0.001 
 RPT Level = 0.021 
 Lab Sample ID = 20031220070  Analysis Date = 05/12/2003 
 Lab Value = 0.013 
 RPT Level = 0.021 
 Lab Sample ID = 20031200043  Analysis Date = 04/24/2003 
 Lab Value = 0.001 
 RPT Level = 0.021 
 Lab Sample ID = 20031080208  Analysis Date = 04/09/2003 
 Lab Value = -0.003 
 RPT Level = 0.021 
 Lab Sample ID = 20030970018  Analysis Date = 04/03/2003 
 Lab Value = -0.008 
 RPT Level = 0.021 
 Lab Sample ID = 20030920027  Analysis Date = 04/01/2003 
 Lab Value = -0.018 
 RPT Level = 0.021 
 Lab Sample ID = 20030900015  Analysis Date = 03/31/2003 
 Lab Value = 0.002 
 RPT Level = 0.021 
 Lab Sample ID = 20030860023  Analysis Date = 03/27/2003 
 Lab Value = 0.005 
 RPT Level = 0.021 
 Lab Sample ID = 20030710021  Analysis Date = 03/27/2003 
 Lab Value = -0.009 
 RPT Level = 0.021 
 Lab Sample ID = 20030660148  Analysis Date = 03/06/2003 
 Lab Value = 0.007 
 RPT Level = 0.021 
 Lab Sample ID = 20030590040  Analysis Date = 03/06/2003 
 Lab Value = 0.013 
 RPT Level = 0.021 
 Lab Sample ID = 20030570061  Analysis Date = 02/12/2003 
 Lab Value = -0.004 
 RPT Level = 0.021 
 Lab Sample ID = 20030410034  Analysis Date = 02/11/2003 
 Lab Value = -0.001 
 RPT Level = 0.021 
 Lab Sample ID = 20030350008  Analysis Date = 02/06/2003 
 Lab Value = -0.004 
 RPT Level = 0.021 
 Lab Sample ID = 20030310028  Analysis Date = 02/06/2003 
 Lab Value = 0.006 
 RPT Level = 0.021 
 Lab Sample ID = 20030300004  Analysis Date = 01/16/2003 
 Lab Value = 0.004 
 RPT Level = 0.021 
 Lab Sample ID = 20030150009  Analysis Date = 01/16/2003 
 Lab Value = -0.002 
 RPT Level = 0.021 
 Lab Sample ID = 20030140019  Analysis Date = 01/09/2003 
 Lab Value = -0.003 
 RPT Level = 0.021 
 Lab Sample ID = 20030020002  Analysis Date = 01/09/2003 
 Lab Value = 0.001 
 RPT Level = 0.021 
 Lab Sample ID = 20023650009  Analysis Date = 12/24/2002 
 Lab Value = 0.012 
 RPT Level = 0.021 
 Lab Sample ID = 20023500166  Analysis Date = 12/24/2002 
 Lab Value = 0.009 
 RPT Level = 0.021 
 Lab Sample ID = 20023500092  Analysis Date = 12/04/2002 
 Lab Value = 0.014 
 RPT Level = 0.021 
 Lab Sample ID = 20023370026  Analysis Date = 12/04/2002 
 Lab Value = 0.015 
 RPT Level = 0.021 
 Lab Sample ID = 20023370025  Analysis Date = 12/04/2002 
 Lab Value = 0.004 
 RPT Level = 0.021 
 Lab Sample ID = 20023330096  Analysis Date = 12/04/2002 
 Lab Value = -0.001 
 RPT Level = 0.021 
 Lab Sample ID = 20023360020  Analysis Date = 12/04/2002 
 Lab Value = -0.003 
 RPT Level = 0.021 
 Lab Sample ID = 20023310020  Analysis Date = 11/05/2002 
 Lab Value = -0.007 
 RPT Level = 0.021 
 Lab Sample ID = 20023040033  Analysis Date = 11/07/2002 
 Lab Value = -0.02 
 RPT Level = 0.021 
 Lab Sample ID = 20022970050  Analysis Date = 11/07/2002 
 Lab Value = -0.014 
 RPT Level = 0.021 
 Lab Sample ID = 20022970049  Analysis Date = 11/07/2002 
 Lab Value = -0.011 
 RPT Level = 0.021 
 Lab Sample ID = 20022970048  Analysis Date = 11/14/2002 
 Lab Value = 0.002 
 RPT Level = 0.021 
 Lab Sample ID = 20022960022  Analysis Date = 09/25/2002 
 Lab Value = 0.017 
 RPT Level = 0.021 
 Lab Sample ID = 20022470018  Analysis Date = 09/24/2002 
 Lab Value = 0.005 
 RPT Level = 0.021 
 Lab Sample ID = 20022460135  Analysis Date = 09/04/2002 
 Lab Value = 0.017 
 RPT Level = 0.021 
 Lab Sample ID = 20022340186  Analysis Date = 09/03/2002 
 Lab Value = 0.004 
 RPT Level = 0.021 
 Lab Sample ID = 20022280008  Analysis Date = 08/21/2002 
 Lab Value = 0.01 
 RPT Level = 0.021 
 Lab Sample ID = 20022210007  Analysis Date = 08/19/2002 
 Lab Value = 0.012 
 RPT Level = 0.021 
 Lab Sample ID = 20022170107  Analysis Date = 08/07/2002 
 Lab Value = -0.001 
 RPT Level = 0.021 
 Lab Sample ID = 20022060077  Analysis Date = 07/29/2002 
 Lab Value = -0.005 
 RPT Level = 0.021 
 Lab Sample ID = 20021970116  Analysis Date = 07/29/2002 
 Lab Value = 0 
 RPT Level = 0.021 
 Lab Sample ID = 20021960234  Analysis Date = 07/16/2002 
 Lab Value = 0.001 
 RPT Level = 0.021 
 Lab Sample ID = 20021830026  Analysis Date = 07/11/2002 
 Lab Value = -0.001 
 RPT Level = 0.021 
 Lab Sample ID = 20021790006  Analysis Date = 06/25/2002 
 Lab Value = 0.011 
 RPT Level = 0.021 
 Lab Sample ID = 20021690011  Analysis Date = 06/24/2002 
 Lab Value = 0.008 
 RPT Level = 0.021 
 Lab Sample ID = 20021650005  Analysis Date = 06/12/2002 
 Lab Value = 0.018 
 RPT Level = 0.021 
 Lab Sample ID = 20021550019  Analysis Date = 06/12/2002 
 Lab Value = 0.018 
 RPT Level = 0.021 
 Lab Sample ID = 20021510057  Analysis Date = 06/11/2002 
 Lab Value = 0.009 
 RPT Level = 0.021 
 Lab Sample ID = 20021420157  Analysis Date = 05/28/2002 
 Lab Value = -0.002 
 RPT Level = 0.021 
 Lab Sample ID = 20021330223  Analysis Date = 05/23/2002 
 Lab Value = 0.006 
 RPT Level = 0.021 
 Lab Sample ID = 20021300001  Analysis Date = 05/02/2002 
 Lab Value = 0.003 
 RPT Level = 0.021 
 Lab Sample ID = 20021210086  Analysis Date = 04/26/2002 
 Lab Value = 0 
 RPT Level = 0.021 
 Lab Sample ID = 20021140037  Analysis Date = 04/26/2002 
 Lab Value = 0.002 
 RPT Level = 0.021 
 Lab Sample ID = 20021140036  Analysis Date = 04/17/2002 
 Lab Value = 0 
 RPT Level = 0.021 
 Lab Sample ID = 20021010016  Analysis Date = 04/09/2002 
 Lab Value = -0.012 
 RPT Level = 0.021 
 Lab Sample ID = 20020930112  Analysis Date = 03/27/2002 
 Lab Value = 0.005 
 RPT Level = 0.021 
 Lab Sample ID = 20020850091  Analysis Date = 04/01/2002 
 Lab Value = 0.005 
 RPT Level = 0.021 
 Lab Sample ID = 20020810192  Analysis Date = 03/21/2002 
 Lab Value = -0.007 
 RPT Level = 0.021 
 Lab Sample ID = 20020730104  Analysis Date = 03/13/2002 
 Lab Value = 0.013 
 RPT Level = 0.021 
 Lab Sample ID = 20020670021  Analysis Date = 03/19/2002 
 Lab Value = 0.006 
 RPT Level = 0.021 
 Lab Sample ID = 20020600005  Analysis Date = 03/14/2002 
 Lab Value = 0.005 
 RPT Level = 0.021 
 Lab Sample ID = 20020570018  Analysis Date = 03/04/2002 
 Lab Value = 0.014 
 RPT Level = 0.021 
 Lab Sample ID = 20020460048  Analysis Date = 02/06/2002 
 Lab Value = 0.01 
 RPT Level = 0.021 
 Lab Sample ID = 20020360005  Analysis Date = 02/06/2002 
 Lab Value = 0.017 
 RPT Level = 0.021 
 Lab Sample ID = 20020320102  Analysis Date = 01/30/2002 
 Lab Value = 0.021 
 RPT Level = 0.021 
 Lab Sample ID = 20020220079  Analysis Date = 01/16/2002 
 Lab Value = 0.024 
 RPT Level = 0.021 
 Lab Sample ID = 20020110003  Analysis Date = 01/08/2002 
 Lab Value = 0.007 
 RPT Level = 0.021 
 Lab Sample ID = 20020020005  Analysis Date = 01/03/2002 
 Lab Value = 0.007 
 RPT Level = 0.021 
 Lab Sample ID = 20013600207  Analysis Date = 12/20/2001 
 Lab Value = 0.009 
 RPT Level = 0.021 
 Lab Sample ID = 20013520042  Analysis Date = 12/17/2001 
 Lab Value = 0.012 
 RPT Level = 0.021 
 Lab Sample ID = 20013480008  Analysis Date = 12/13/2001 
 Lab Value = 0.009 
 RPT Level = 0.021 
 Lab Sample ID = 20013390010  Analysis Date = 11/13/2001 
 Lab Value = 0.011 
 RPT Level = 0.021 
 Lab Sample ID = 20013110130  Analysis Date = 05/25/2006 
 RPT Level = 0.02  Analysis Date = 05/22/2006 
 RPT Level = 0.02  Analysis Date = 05/22/2006 
 RPT Level = 0.02  Analysis Date = 05/11/2006 
 RPT Level = 0.02  Analysis Date = 05/11/2006 
 RPT Level = 0.02  Analysis Date = 09/27/2005 
 RPT Level = 0.02  Analysis Date = 09/27/2005 
 RPT Level = 0.02  Analysis Date = 09/20/2005 
 RPT Level = 0.02  Analysis Date = 09/20/2005 
 RPT Level = 0.02  Analysis Date = 09/12/2005 
 RPT Level = 0.02  Analysis Date = 09/12/2005 
 RPT Level = 0.02  Analysis Date = 09/07/2005 
 RPT Level = 0.02  Analysis Date = 09/07/2005 
 RPT Level = 0.02  Analysis Date = 08/31/2005 
 RPT Level = 0.02  Analysis Date = 08/31/2005 
 RPT Level = 0.02  Analysis Date = 08/16/2005 
 RPT Level = 0.02  Analysis Date = 08/16/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 07/26/2005 
 RPT Level = 0.02  Analysis Date = 07/26/2005 
 RPT Level = 0.02  Analysis Date = 07/15/2005 
 RPT Level = 0.02  Analysis Date = 07/15/2005 
 RPT Level = 0.02  Analysis Date = 07/12/2005 
 RPT Level = 0.02  Analysis Date = 07/12/2005 
 RPT Level = 0.02  Analysis Date = 07/01/2005 
 RPT Level = 0.02  Analysis Date = 07/01/2005 
 RPT Level = 0.02  Analysis Date = 06/27/2005 
 RPT Level = 0.02  Analysis Date = 06/27/2005 
 RPT Level = 0.02  Analysis Date = 06/20/2005 
 RPT Level = 0.02  Analysis Date = 06/20/2005 
 RPT Level = 0.02  Analysis Date = 06/14/2005 
 RPT Level = 0.02  Analysis Date = 06/14/2005 
 RPT Level = 0.02  Analysis Date = 06/06/2005 
 RPT Level = 0.02  Analysis Date = 06/06/2005 
 RPT Level = 0.02  Analysis Date = 05/26/2005 
 RPT Level = 0.02  Analysis Date = 05/26/2005 
 RPT Level = 0.02  Analysis Date = 05/24/2005 
 RPT Level = 0.02  Analysis Date = 05/24/2005 
 RPT Level = 0.02  Analysis Date = 05/16/2005 
 RPT Level = 0.02  Analysis Date = 05/16/2005 
 RPT Level = 0.02  Analysis Date = 05/10/2005 
 RPT Level = 0.02  Analysis Date = 05/10/2005 
 RPT Level = 0.02  Analysis Date = 04/28/2005 
 RPT Level = 0.02  Analysis Date = 04/28/2005 
 RPT Level = 0.02  Analysis Date = 04/26/2005 
 RPT Level = 0.02  Analysis Date = 04/26/2005 
 RPT Level = 0.02  Analysis Date = 04/14/2005 
 RPT Level = 0.02  Analysis Date = 04/14/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 03/31/2005 
 RPT Level = 0.02  Analysis Date = 03/31/2005 
 RPT Level = 0.02  Analysis Date = 03/30/2005 
 RPT Level = 0.02  Analysis Date = 03/30/2005 
 RPT Level = 0.02  Analysis Date = 03/21/2005 
 RPT Level = 0.02  Analysis Date = 03/21/2005 
 RPT Level = 0.02  Analysis Date = 03/15/2005 
 RPT Level = 0.02  Analysis Date = 03/15/2005 
 RPT Level = 0.02  Analysis Date = 03/15/2005 
 RPT Level = 0.02  Analysis Date = 03/15/2005 
 RPT Level = 0.02  Analysis Date = 03/09/2005 
 RPT Level = 0.02  Analysis Date = 03/09/2005 
 RPT Level = 0.02  Analysis Date = 03/01/2005 
 RPT Level = 0.02  Analysis Date = 03/01/2005 
 RPT Level = 0.02  Analysis Date = 02/24/2005 
 RPT Level = 0.02  Analysis Date = 02/24/2005 
 RPT Level = 0.02  Analysis Date = 02/15/2005 
 RPT Level = 0.02  Analysis Date = 02/15/2005 
 RPT Level = 0.02  Analysis Date = 02/09/2005 
 RPT Level = 0.02  Analysis Date = 02/09/2005 
 RPT Level = 0.02  Analysis Date = 01/31/2005 
 RPT Level = 0.02  Analysis Date = 01/31/2005 
 RPT Level = 0.02  Analysis Date = 01/26/2005 
 RPT Level = 0.02  Analysis Date = 01/26/2005 
 RPT Level = 0.02  Analysis Date = 01/25/2005 
 RPT Level = 0.02  Analysis Date = 01/25/2005 
 RPT Level = 0.02  Analysis Date = 01/18/2005 
 RPT Level = 0.02  Analysis Date = 01/18/2005 
 RPT Level = 0.02  Analysis Date = 01/11/2005 
 RPT Level = 0.02  Analysis Date = 01/11/2005 
 RPT Level = 0.02  Analysis Date = 12/27/2004 
 RPT Level = 0.02  Analysis Date = 12/27/2004 
 RPT Level = 0.02  Analysis Date = 12/27/2004 
 RPT Level = 0.02  Analysis Date = 12/27/2004 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 12/23/2004 
 RPT Level = 0.02  Analysis Date = 12/23/2004 
 RPT Level = 0.02  Analysis Date = 12/21/2004 
 RPT Level = 0.02  Analysis Date = 12/21/2004 
 RPT Level = 0.02  Analysis Date = 12/21/2004 
 RPT Level = 0.02  Analysis Date = 12/21/2004 
 RPT Level = 0.02  Analysis Date = 12/15/2004 
 RPT Level = 0.02  Analysis Date = 12/15/2004 
 RPT Level = 0.02  Analysis Date = 12/15/2004 
 RPT Level = 0.02  Analysis Date = 12/15/2004 
 RPT Level = 0.02  Analysis Date = 12/14/2004 
 RPT Level = 0.02  Analysis Date = 12/14/2004 
 RPT Level = 0.02  Analysis Date = 12/13/2004 
 RPT Level = 0.02  Analysis Date = 12/13/2004 
 RPT Level = 0.02  Analysis Date = 12/08/2004 
 RPT Level = 0.02  Analysis Date = 12/08/2004 
 RPT Level = 0.02  Analysis Date = 09/15/2004 
 RPT Level = 0.02  Analysis Date = 09/15/2004 
 RPT Level = 0.02  Analysis Date = 09/09/2004 
 RPT Level = 0.02  Analysis Date = 09/09/2004 
 RPT Level = 0.02  Analysis Date = 09/08/2004 
 RPT Level = 0.02  Analysis Date = 09/08/2004 
 RPT Level = 0.02  Analysis Date = 09/02/2004 
 RPT Level = 0.02  Analysis Date = 09/02/2004 
 RPT Level = 0.02  Analysis Date = 09/01/2004 
 RPT Level = 0.02  Analysis Date = 09/01/2004 
 RPT Level = 0.02  Analysis Date = 09/01/2004 
 RPT Level = 0.02  Analysis Date = 09/01/2004 
 RPT Level = 0.02  Analysis Date = 08/19/2004 
 RPT Level = 0.02  Analysis Date = 08/19/2004 
 RPT Level = 0.02  Analysis Date = 08/11/2004 
 RPT Level = 0.02  Analysis Date = 08/11/2004 
 RPT Level = 0.02  Analysis Date = 08/05/2004 
 RPT Level = 0.02  Analysis Date = 08/05/2004 
 RPT Level = 0.02  Analysis Date = 07/27/2004 
 RPT Level = 0.02  Analysis Date = 07/27/2004 
 RPT Level = 0.02  Analysis Date = 07/19/2004 
 RPT Level = 0.02  Analysis Date = 07/19/2004 
 RPT Level = 0.02  Analysis Date = 07/14/2004 
 RPT Level = 0.02  Analysis Date = 07/14/2004 
 RPT Level = 0.02  Analysis Date = 07/13/2004 
 RPT Level = 0.02  Analysis Date = 07/13/2004 
 RPT Level = 0.02  Analysis Date = 07/08/2004 
 RPT Level = 0.02  Analysis Date = 07/08/2004 
 RPT Level = 0.02  Analysis Date = 07/06/2004 
 RPT Level = 0.02  Analysis Date = 07/06/2004 
 RPT Level = 0.02  Analysis Date = 06/24/2004 
 RPT Level = 0.02  Analysis Date = 06/24/2004 
 RPT Level = 0.02  Analysis Date = 06/23/2004 
 RPT Level = 0.02  Analysis Date = 06/23/2004 
 RPT Level = 0.02  Analysis Date = 06/16/2004 
 RPT Level = 0.02  Analysis Date = 06/16/2004 
 RPT Level = 0.02  Analysis Date = 06/08/2004 
 RPT Level = 0.02  Analysis Date = 06/08/2004 
 RPT Level = 0.02  Analysis Date = 05/17/2004 
 RPT Level = 0.02  Analysis Date = 05/17/2004 
 RPT Level = 0.02  Analysis Date = 05/11/2004 
 RPT Level = 0.02  Analysis Date = 05/11/2004 
 RPT Level = 0.02  Analysis Date = 05/06/2004 
 RPT Level = 0.02  Analysis Date = 05/06/2004 
 RPT Level = 0.02  Analysis Date = 04/22/2004 
 RPT Level = 0.02  Analysis Date = 04/22/2004 
 RPT Level = 0.02  Analysis Date = 04/13/2004 
 RPT Level = 0.02  Analysis Date = 04/13/2004 
 RPT Level = 0.02  Analysis Date = 04/15/2004 
 RPT Level = 0.02  Analysis Date = 04/15/2004 
 RPT Level = 0.02  Analysis Date = 04/14/2004 
 RPT Level = 0.02  Analysis Date = 04/14/2004 
 RPT Level = 0.02  Analysis Date = 04/07/2004 
 RPT Level = 0.02  Analysis Date = 04/07/2004 
 RPT Level = 0.02  Analysis Date = 04/07/2004 
 RPT Level = 0.02  Analysis Date = 04/07/2004 
 RPT Level = 0.02  Analysis Date = 04/05/2004 
 RPT Level = 0.02  Analysis Date = 04/05/2004 
 RPT Level = 0.02  Analysis Date = 04/02/2004 
 RPT Level = 0.02  Analysis Date = 04/02/2004 
 RPT Level = 0.02  Analysis Date = 03/30/2004 
 RPT Level = 0.02  Analysis Date = 03/30/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/16/2004 
 RPT Level = 0.02  Analysis Date = 03/16/2004 
 RPT Level = 0.02  Analysis Date = 03/16/2004 
 RPT Level = 0.02  Analysis Date = 03/16/2004 
 RPT Level = 0.02  Analysis Date = 03/15/2004 
 RPT Level = 0.02  Analysis Date = 03/15/2004 
 RPT Level = 0.02  Analysis Date = 03/15/2004 
 RPT Level = 0.02  Analysis Date = 03/15/2004 
 RPT Level = 0.02  Analysis Date = 03/09/2004 
 RPT Level = 0.02  Analysis Date = 03/09/2004 
 RPT Level = 0.02  Analysis Date = 02/26/2004 
 RPT Level = 0.02  Analysis Date = 02/26/2004 
 RPT Level = 0.02  Analysis Date = 02/17/2004 
 RPT Level = 0.02  Analysis Date = 02/17/2004 
 RPT Level = 0.02  Analysis Date = 02/10/2004 
 RPT Level = 0.02  Analysis Date = 02/10/2004 
 RPT Level = 0.02  Analysis Date = 02/10/2004 
 RPT Level = 0.02  Analysis Date = 02/10/2004 
 RPT Level = 0.02  Analysis Date = 02/03/2004 
 RPT Level = 0.02  Analysis Date = 02/03/2004 
 RPT Level = 0.02  Analysis Date = 02/02/2004 
 RPT Level = 0.02  Analysis Date = 02/02/2004 
 RPT Level = 0.02  Analysis Date = 01/29/2004 
 RPT Level = 0.02  Analysis Date = 01/29/2004 
 RPT Level = 0.02  Analysis Date = 01/29/2004 
 RPT Level = 0.02  Analysis Date = 01/29/2004 
 RPT Level = 0.02  Analysis Date = 01/28/2004 
 RPT Level = 0.02  Analysis Date = 01/28/2004 
 RPT Level = 0.02  Analysis Date = 01/27/2004 
 RPT Level = 0.02  Analysis Date = 01/27/2004 
 RPT Level = 0.02  Analysis Date = 01/20/2004 
 RPT Level = 0.02  Analysis Date = 01/20/2004 
 RPT Level = 0.02  Analysis Date = 01/06/2004 
 RPT Level = 0.02  Analysis Date = 01/06/2004 
 RPT Level = 0.02  Analysis Date = 10/03/2003 
 RPT Level = 0.021  Analysis Date = 10/03/2003 
 RPT Level = 0.021  Analysis Date = 10/02/2003 
 RPT Level = 0.021  Analysis Date = 10/02/2003 
 RPT Level = 0.021  Analysis Date = 09/23/2003 
 RPT Level = 0.021  Analysis Date = 09/23/2003 
 RPT Level = 0.021  Analysis Date = 09/22/2003 
 RPT Level = 0.021  Analysis Date = 09/22/2003 
 RPT Level = 0.021  Analysis Date = 09/16/2003 
 RPT Level = 0.021  Analysis Date = 09/16/2003 
 RPT Level = 0.021  Analysis Date = 09/11/2003 
 RPT Level = 0.021  Analysis Date = 09/11/2003 
 RPT Level = 0.021  Analysis Date = 09/10/2003 
 RPT Level = 0.021  Analysis Date = 09/10/2003 
 RPT Level = 0.021  Analysis Date = 08/26/2003 
 RPT Level = 0.021  Analysis Date = 08/26/2003 
 RPT Level = 0.021  Analysis Date = 08/21/2003 
 RPT Level = 0.021  Analysis Date = 08/21/2003 
 RPT Level = 0.021  Analysis Date = 08/13/2003 
 RPT Level = 0.021  Analysis Date = 08/13/2003 
 RPT Level = 0.021  Analysis Date = 08/08/2003 
 RPT Level = 0.021  Analysis Date = 08/08/2003 
 RPT Level = 0.021  Analysis Date = 08/04/2003 
 RPT Level = 0.021  Analysis Date = 08/04/2003 
 RPT Level = 0.021  Analysis Date = 07/25/2003 
 RPT Level = 0.021  Analysis Date = 07/25/2003 
 RPT Level = 0.021  Analysis Date = 07/22/2003 
 RPT Level = 0.021  Analysis Date = 07/22/2003 
 RPT Level = 0.021  Analysis Date = 07/15/2003 
 RPT Level = 0.021  Analysis Date = 07/15/2003 
 RPT Level = 0.021  Analysis Date = 07/09/2003 
 RPT Level = 0.021  Analysis Date = 07/09/2003 
 RPT Level = 0.021  Analysis Date = 06/24/2003 
 RPT Level = 0.021  Analysis Date = 06/24/2003 
 RPT Level = 0.021  Analysis Date = 06/16/2003 
 RPT Level = 0.021  Analysis Date = 06/16/2003 
 RPT Level = 0.021  Analysis Date = 06/17/2003 
 RPT Level = 0.021  Analysis Date = 06/17/2003 
 RPT Level = 0.021  Analysis Date = 06/12/2003 
 RPT Level = 0.021  Analysis Date = 06/12/2003 
 RPT Level = 0.021  Analysis Date = 05/21/2003 
 RPT Level = 0.021  Analysis Date = 05/21/2003 
 RPT Level = 0.021  Analysis Date = 05/13/2003 
 RPT Level = 0.021  Analysis Date = 05/13/2003 
 RPT Level = 0.021  Analysis Date = 05/12/2003 
 RPT Level = 0.021  Analysis Date = 05/12/2003 
 RPT Level = 0.021  Analysis Date = 04/24/2003 
 RPT Level = 0.021  Analysis Date = 04/24/2003 
 RPT Level = 0.021  Analysis Date = 04/09/2003 
 RPT Level = 0.021  Analysis Date = 04/09/2003 
 RPT Level = 0.021  Analysis Date = 04/03/2003 
 RPT Level = 0.021  Analysis Date = 04/03/2003 
 RPT Level = 0.021  Analysis Date = 04/01/2003 
 RPT Level = 0.021  Analysis Date = 04/01/2003 
 RPT Level = 0.021  Analysis Date = 03/31/2003 
 RPT Level = 0.021  Analysis Date = 03/31/2003 
 RPT Level = 0.021  Analysis Date = 03/27/2003 
 RPT Level = 0.021  Analysis Date = 03/27/2003 
 RPT Level = 0.021  Analysis Date = 03/27/2003 
 RPT Level = 0.021  Analysis Date = 03/27/2003 
 RPT Level = 0.021  Analysis Date = 03/06/2003 
 RPT Level = 0.021  Analysis Date = 03/06/2003 
 RPT Level = 0.021  Analysis Date = 03/06/2003 
 RPT Level = 0.021  Analysis Date = 03/06/2003 
 RPT Level = 0.021  Analysis Date = 02/12/2003 
 RPT Level = 0.021  Analysis Date = 02/12/2003 
 RPT Level = 0.021  Analysis Date = 02/11/2003 
 RPT Level = 0.021  Analysis Date = 02/11/2003 
 RPT Level = 0.021  Analysis Date = 02/06/2003 
 RPT Level = 0.021  Analysis Date = 02/06/2003 
 RPT Level = 0.021  Analysis Date = 02/06/2003 
 RPT Level = 0.021  Analysis Date = 02/06/2003 
 RPT Level = 0.021  Analysis Date = 01/16/2003 
 RPT Level = 0.021  Analysis Date = 01/16/2003 
 RPT Level = 0.021  Analysis Date = 01/16/2003 
 RPT Level = 0.021  Analysis Date = 01/16/2003 
 RPT Level = 0.021  Analysis Date = 01/09/2003 
 RPT Level = 0.021  Analysis Date = 01/09/2003 
 RPT Level = 0.021  Analysis Date = 01/09/2003 
 RPT Level = 0.021  Analysis Date = 01/09/2003 
 RPT Level = 0.021  Analysis Date = 12/24/2002 
 RPT Level = 0.021  Analysis Date = 12/24/2002 
 RPT Level = 0.021  Analysis Date = 12/24/2002 
 RPT Level = 0.021  Analysis Date = 12/24/2002 
 RPT Level = 0.021  Analysis Date = 12/04/2002 
 RPT Level = 0.021  Analysis Date = 12/04/2002 
 RPT Level = 0.021  Analysis Date = 12/04/2002 
 RPT Level = 0.021  Analysis Date = 12/04/2002 
 RPT Level = 0.021  Analysis Date = 12/04/2002 
 RPT Level = 0.021  Analysis Date = 12/04/2002 
 RPT Level = 0.021  Analysis Date = 12/04/2002 
 RPT Level = 0.021  Analysis Date = 12/04/2002 
 RPT Level = 0.021  Analysis Date = 12/04/2002 
 RPT Level = 0.021  Analysis Date = 12/04/2002 
 RPT Level = 0.021  Analysis Date = 11/05/2002 
 RPT Level = 0.021  Analysis Date = 11/05/2002 
 RPT Level = 0.021  Analysis Date = 11/07/2002 
 RPT Level = 0.021  Analysis Date = 11/07/2002 
 RPT Level = 0.021  Analysis Date = 11/07/2002 
 RPT Level = 0.021  Analysis Date = 11/07/2002 
 RPT Level = 0.021  Analysis Date = 11/07/2002 
 RPT Level = 0.021  Analysis Date = 11/07/2002 
 RPT Level = 0.021  Analysis Date = 11/14/2002 
 RPT Level = 0.021  Analysis Date = 11/14/2002 
 RPT Level = 0.021  Analysis Date = 09/25/2002 
 RPT Level = 0.021  Analysis Date = 09/25/2002 
 RPT Level = 0.021  Analysis Date = 09/24/2002 
 RPT Level = 0.021  Analysis Date = 09/24/2002 
 RPT Level = 0.021  Analysis Date = 09/04/2002 
 RPT Level = 0.021  Analysis Date = 09/04/2002 
 RPT Level = 0.021  Analysis Date = 09/03/2002 
 RPT Level = 0.021  Analysis Date = 09/03/2002 
 RPT Level = 0.021  Analysis Date = 08/21/2002 
 RPT Level = 0.021  Analysis Date = 08/21/2002 
 RPT Level = 0.021  Analysis Date = 08/19/2002 
 RPT Level = 0.021  Analysis Date = 08/19/2002 
 RPT Level = 0.021  Analysis Date = 08/07/2002 
 RPT Level = 0.021  Analysis Date = 08/07/2002 
 RPT Level = 0.021  Analysis Date = 07/29/2002 
 RPT Level = 0.021  Analysis Date = 07/29/2002 
 RPT Level = 0.021  Analysis Date = 07/29/2002 
 RPT Level = 0.021  Analysis Date = 07/29/2002 
 RPT Level = 0.021  Analysis Date = 07/16/2002 
 RPT Level = 0.021  Analysis Date = 07/16/2002 
 RPT Level = 0.021  Analysis Date = 07/11/2002 
 RPT Level = 0.021  Analysis Date = 07/11/2002 
 RPT Level = 0.021  Analysis Date = 06/25/2002 
 RPT Level = 0.021  Analysis Date = 06/25/2002 
 RPT Level = 0.021  Analysis Date = 06/24/2002 
 RPT Level = 0.021  Analysis Date = 06/24/2002 
 RPT Level = 0.021  Analysis Date = 06/12/2002 
 RPT Level = 0.021  Analysis Date = 06/12/2002 
 RPT Level = 0.021  Analysis Date = 06/12/2002 
 RPT Level = 0.021  Analysis Date = 06/12/2002 
 RPT Level = 0.021  Analysis Date = 06/11/2002 
 RPT Level = 0.021  Analysis Date = 06/11/2002 
 RPT Level = 0.021  Analysis Date = 05/28/2002 
 RPT Level = 0.021  Analysis Date = 05/28/2002 
 RPT Level = 0.021  Analysis Date = 05/23/2002 
 RPT Level = 0.021  Analysis Date = 05/23/2002 
 RPT Level = 0.021  Analysis Date = 05/02/2002 
 RPT Level = 0.021  Analysis Date = 05/02/2002 
 RPT Level = 0.021  Analysis Date = 04/26/2002 
 RPT Level = 0.021  Analysis Date = 04/26/2002 
 RPT Level = 0.021  Analysis Date = 04/26/2002 
 RPT Level = 0.021  Analysis Date = 04/26/2002 
 RPT Level = 0.021  Analysis Date = 04/17/2002 
 RPT Level = 0.021  Analysis Date = 04/17/2002 
 RPT Level = 0.021  Analysis Date = 04/09/2002 
 RPT Level = 0.021  Analysis Date = 04/09/2002 
 RPT Level = 0.021  Analysis Date = 03/27/2002 
 RPT Level = 0.021  Analysis Date = 03/27/2002 
 RPT Level = 0.021  Analysis Date = 04/01/2002 
 RPT Level = 0.021  Analysis Date = 04/01/2002 
 RPT Level = 0.021  Analysis Date = 03/21/2002 
 RPT Level = 0.021  Analysis Date = 03/21/2002 
 RPT Level = 0.021  Analysis Date = 03/13/2002 
 RPT Level = 0.021  Analysis Date = 03/13/2002 
 RPT Level = 0.021  Analysis Date = 03/19/2002 
 RPT Level = 0.021  Analysis Date = 03/19/2002 
 RPT Level = 0.021  Analysis Date = 03/14/2002 
 RPT Level = 0.021  Analysis Date = 03/14/2002 
 RPT Level = 0.021  Analysis Date = 03/04/2002 
 RPT Level = 0.021  Analysis Date = 03/04/2002 
 RPT Level = 0.021  Analysis Date = 02/06/2002 
 RPT Level = 0.021  Analysis Date = 02/06/2002 
 RPT Level = 0.021  Analysis Date = 02/06/2002 
 RPT Level = 0.021  Analysis Date = 02/06/2002 
 RPT Level = 0.021  Analysis Date = 01/30/2002 
 RPT Level = 0.021  Analysis Date = 01/30/2002 
 RPT Level = 0.021  Analysis Date = 01/16/2002 
 RPT Level = 0.021  Analysis Date = 01/16/2002 
 RPT Level = 0.021  Analysis Date = 01/08/2002 
 RPT Level = 0.021  Analysis Date = 01/08/2002 
 RPT Level = 0.021  Analysis Date = 01/03/2002 
 RPT Level = 0.021  Analysis Date = 01/03/2002 
 RPT Level = 0.021  Analysis Date = 12/20/2001 
 RPT Level = 0.021  Analysis Date = 12/20/2001 
 RPT Level = 0.021  Analysis Date = 12/17/2001 
 RPT Level = 0.021  Analysis Date = 12/17/2001 
 RPT Level = 0.021  Analysis Date = 12/13/2001 
 RPT Level = 0.021  Analysis Date = 12/13/2001 
 RPT Level = 0.021  Analysis Date = 11/13/2001 
 RPT Level = 0.021  Y = 0
The SGPlot Procedure

False Positive Rate for Ammonia (NH3 as N), FIL, COL

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Ammonia (NH3 as N), FIL, COL 00608CL037 2002 40 1 3%
    2003 52 1 2%
    2004 51 0 0%
    2005 50 0 0%
    2006 3 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Ammonia (NH3 as N), FIL, COL, LL -
Blind Blank Results
Lab: NWQL, PCode: 00608, MCode: CL039
Analysis dates: 11/15/01 through 05/19/06
Open Data Set

 Analysis Date = 03/09/2005 
 Lab Value = 0.029 
 RPT Level = 0.005 
 Lab Sample ID = 20050670011  Analysis Date = 02/05/2003 
 Lab Value = 0.01 
 RPT Level = 0.008 
 Lab Sample ID = 20030300004  Analysis Date = 05/19/2006 
 Lab Value = -0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20061370016  Analysis Date = 05/10/2006 
 Lab Value = -0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20061280111  Analysis Date = 05/04/2006 
 Lab Value = -0.003 
 RPT Level = 0.005 
 Lab Sample ID = 20061220099  Analysis Date = 09/19/2005 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20052590035  Analysis Date = 09/12/2005 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20052520006  Analysis Date = 09/01/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20052430006  Analysis Date = 08/29/2005 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20052370002  Analysis Date = 08/23/2005 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20052300009  Analysis Date = 08/15/2005 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20052210012  Analysis Date = 08/11/2005 
 Lab Value = 0.003 
 RPT Level = 0.005 
 Lab Sample ID = 20052160007  Analysis Date = 08/11/2005 
 Lab Value = 0.003 
 RPT Level = 0.005 
 Lab Sample ID = 20052160005  Analysis Date = 07/21/2005 
 Lab Value = 0.003 
 RPT Level = 0.005 
 Lab Sample ID = 20052010007  Analysis Date = 07/14/2005 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20051940015  Analysis Date = 07/08/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20051880018  Analysis Date = 06/30/2005 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20051800189  Analysis Date = 06/24/2005 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20051740019  Analysis Date = 06/16/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20051660174  Analysis Date = 06/09/2005 
 Lab Value = -0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20051590025  Analysis Date = 06/03/2005 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20051530021  Analysis Date = 05/25/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20051440043  Analysis Date = 05/19/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20051380014  Analysis Date = 05/13/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20051320029  Analysis Date = 05/06/2005 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20051250003  Analysis Date = 04/28/2005 
 Lab Value = 0.003 
 RPT Level = 0.005 
 Lab Sample ID = 20051170012  Analysis Date = 04/22/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20051110007  Analysis Date = 04/13/2005 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20051020018  Analysis Date = 04/06/2005 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20050950044  Analysis Date = 03/30/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20050880116  Analysis Date = 03/28/2005 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20050840096  Analysis Date = 03/17/2005 
 Lab Value = 0.004 
 RPT Level = 0.005 
 Lab Sample ID = 20050750004  Analysis Date = 03/14/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20050700007  Analysis Date = 03/14/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20050700004  Analysis Date = 02/25/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20050550024  Analysis Date = 02/22/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20050480005  Analysis Date = 02/14/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20050410004  Analysis Date = 02/04/2005 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20050340020  Analysis Date = 01/28/2005 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20050260024  Analysis Date = 01/21/2005 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20050200048  Analysis Date = 01/14/2005 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20050130091  Analysis Date = 01/10/2005 
 Lab Value = -0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20050070016  Analysis Date = 01/03/2005 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20043650002  Analysis Date = 01/03/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20043580037  Analysis Date = 01/03/2005 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20043580035  Analysis Date = 12/20/2004 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20043520023  Analysis Date = 12/20/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20043510018  Analysis Date = 12/13/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20043450069  Analysis Date = 12/13/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20043440147  Analysis Date = 12/06/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20043380005  Analysis Date = 12/06/2004 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20043380002  Analysis Date = 12/01/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20043310059  Analysis Date = 12/02/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20043280048  Analysis Date = 11/22/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20043240012  Analysis Date = 09/02/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20042450138  Analysis Date = 08/30/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20042400089  Analysis Date = 08/25/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20042370105  Analysis Date = 08/23/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20042330206  Analysis Date = 08/20/2004 
 Lab Value = -0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20042320136  Analysis Date = 08/20/2004 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20042320138  Analysis Date = 08/12/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20042240114  Analysis Date = 08/05/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20042170123  Analysis Date = 07/30/2004 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20042110015  Analysis Date = 07/23/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20042040039  Analysis Date = 07/15/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20041960050  Analysis Date = 07/09/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20041900062  Analysis Date = 07/01/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20041820035  Analysis Date = 06/24/2004 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20041750057  Analysis Date = 06/21/2004 
 Lab Value = -0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20041700080  Analysis Date = 06/10/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20041610055  Analysis Date = 06/08/2004 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20041550019  Analysis Date = 06/02/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20041470132  Analysis Date = 05/25/2004 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20041400016  Analysis Date = 05/12/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20041260099  Analysis Date = 05/07/2004 
 Lab Value = 0.003 
 RPT Level = 0.005 
 Lab Sample ID = 20041200046  Analysis Date = 05/04/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20041130016  Analysis Date = 04/23/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20041050022  Analysis Date = 04/20/2004 
 Lab Value = -0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20040980007  Analysis Date = 04/15/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20040930009  Analysis Date = 04/12/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20040910012  Analysis Date = 04/09/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20040850021  Analysis Date = 04/08/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20040830056  Analysis Date = 04/06/2004 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20040790023  Analysis Date = 03/31/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20040760010  Analysis Date = 03/23/2004 
 Lab Value = -0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20040720029  Analysis Date = 03/16/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20040710005  Analysis Date = 03/12/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20040680093  Analysis Date = 03/11/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20040650001  Analysis Date = 03/03/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20040580032  Analysis Date = 03/01/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20040550018  Analysis Date = 02/27/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20040510134  Analysis Date = 02/25/2004 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20040490025  Analysis Date = 02/19/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20040440035  Analysis Date = 02/13/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20040420001  Analysis Date = 02/12/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20040370017  Analysis Date = 02/11/2004 
 Lab Value = -0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20040340024  Analysis Date = 02/06/2004 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20040300012  Analysis Date = 02/04/2004 
 Lab Value = -0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20040270036  Analysis Date = 01/30/2004 
 Lab Value = -0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20040230030  Analysis Date = 01/28/2004 
 Lab Value = -0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20040210154  Analysis Date = 01/27/2004 
 Lab Value = 0.003 
 RPT Level = 0.005 
 Lab Sample ID = 20040200023  Analysis Date = 01/21/2004 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20040150075  Analysis Date = 01/14/2004 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20040090020  Analysis Date = 01/08/2004 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20040070032  Analysis Date = 01/08/2004 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20040050016  Analysis Date = 10/10/2003 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20032660009  Analysis Date = 10/08/2003 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20032600107  Analysis Date = 09/26/2003 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20032520179  Analysis Date = 09/24/2003 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20032450195  Analysis Date = 09/17/2003 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20032380029  Analysis Date = 09/10/2003 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20032310028  Analysis Date = 08/29/2003 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20032250256  Analysis Date = 08/19/2003 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20032180019  Analysis Date = 08/06/2003 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20032100004  Analysis Date = 08/01/2003 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20032040043  Analysis Date = 07/23/2003 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20031960025  Analysis Date = 07/21/2003 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20031900098  Analysis Date = 07/17/2003 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20031820037  Analysis Date = 07/15/2003 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20031770041  Analysis Date = 07/07/2003 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20031700013  Analysis Date = 07/02/2003 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20031630053  Analysis Date = 07/01/2003 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20031600109  Analysis Date = 06/04/2003 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20031480059  Analysis Date = 06/03/2003 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20031430019  Analysis Date = 05/30/2003 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20031400115  Analysis Date = 05/16/2003 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20031290084  Analysis Date = 05/13/2003 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20031220070  Analysis Date = 05/12/2003 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20031200043  Analysis Date = 04/29/2003 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20031080208  Analysis Date = 04/16/2003 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20030970018  Analysis Date = 04/10/2003 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20030920027  Analysis Date = 04/10/2003 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20030900015  Analysis Date = 04/08/2003 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20030860023  Analysis Date = 03/21/2003 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20030710021  Analysis Date = 03/21/2003 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20030660148  Analysis Date = 03/12/2003 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20030590040  Analysis Date = 03/07/2003 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20030570061  Analysis Date = 02/27/2003 
 Lab Value = 0.005 
 RPT Level = 0.008 
 Lab Sample ID = 20030410034  Analysis Date = 02/05/2003 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20030350008  Analysis Date = 02/05/2003 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20030310028  Analysis Date = 01/17/2003 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20030150009  Analysis Date = 01/17/2003 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20030140019  Analysis Date = 01/07/2003 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20030020002  Analysis Date = 01/07/2003 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20023650009  Analysis Date = 12/23/2002 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20023500166  Analysis Date = 12/18/2002 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20023500092  Analysis Date = 12/10/2002 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20023370026  Analysis Date = 12/10/2002 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20023370025  Analysis Date = 12/06/2002 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20023330096  Analysis Date = 12/06/2002 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20023360020  Analysis Date = 12/06/2002 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20023310020  Analysis Date = 11/14/2002 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20023040033  Analysis Date = 10/30/2002 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20022970050  Analysis Date = 10/30/2002 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20022970049  Analysis Date = 10/30/2002 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20022970048  Analysis Date = 10/30/2002 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20022960022  Analysis Date = 09/10/2002 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20022470018  Analysis Date = 09/10/2002 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20022460135  Analysis Date = 08/29/2002 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20022340186  Analysis Date = 08/27/2002 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20022280008  Analysis Date = 08/20/2002 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20022210007  Analysis Date = 08/16/2002 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20022170107  Analysis Date = 08/01/2002 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20022060077  Analysis Date = 07/17/2002 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20021970116  Analysis Date = 07/16/2002 
 Lab Value = -0.005 
 RPT Level = 0.008 
 Lab Sample ID = 20021960234  Analysis Date = 07/09/2002 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20021830026  Analysis Date = 07/02/2002 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20021790006  Analysis Date = 06/21/2002 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20021690011  Analysis Date = 06/20/2002 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20021650005  Analysis Date = 06/11/2002 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20021550019  Analysis Date = 06/10/2002 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20021510057  Analysis Date = 05/30/2002 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20021420157  Analysis Date = 05/22/2002 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20021330224  Analysis Date = 05/17/2002 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20021300018  Analysis Date = 05/13/2002 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20021210087  Analysis Date = 04/26/2002 
 Lab Value = -0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20021140035  Analysis Date = 04/26/2002 
 Lab Value = -0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20021140034  Analysis Date = 04/17/2002 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20021010014  Analysis Date = 04/05/2002 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20020930111  Analysis Date = 04/03/2002 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20020850093  Analysis Date = 04/03/2002 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20020810193  Analysis Date = 04/01/2002 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20020730106  Analysis Date = 03/29/2002 
 Lab Value = 0.006 
 RPT Level = 0.008 
 Lab Sample ID = 20020670024  Analysis Date = 03/22/2002 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20020600007  Analysis Date = 03/04/2002 
 Lab Value = 0.007 
 RPT Level = 0.008 
 Lab Sample ID = 20020570017  Analysis Date = 02/20/2002 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20020460046  Analysis Date = 02/08/2002 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20020360013  Analysis Date = 02/08/2002 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20020320103  Analysis Date = 01/23/2002 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20020220080  Analysis Date = 01/17/2002 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20020110004  Analysis Date = 01/09/2002 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20020020006  Analysis Date = 01/03/2002 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20013600208  Analysis Date = 12/20/2001 
 Lab Value = -0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20013520043  Analysis Date = 12/14/2001 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20013480009  Analysis Date = 12/07/2001 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20013390004  Analysis Date = 11/15/2001 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20013110128  Analysis Date = 05/19/2006 
 RPT Level = 0.005  Analysis Date = 05/10/2006 
 RPT Level = 0.005  Analysis Date = 05/10/2006 
 RPT Level = 0.005  Analysis Date = 05/04/2006 
 RPT Level = 0.005  Analysis Date = 05/04/2006 
 RPT Level = 0.005  Analysis Date = 09/19/2005 
 RPT Level = 0.005  Analysis Date = 09/19/2005 
 RPT Level = 0.005  Analysis Date = 09/12/2005 
 RPT Level = 0.005  Analysis Date = 09/12/2005 
 RPT Level = 0.005  Analysis Date = 09/01/2005 
 RPT Level = 0.005  Analysis Date = 09/01/2005 
 RPT Level = 0.005  Analysis Date = 08/29/2005 
 RPT Level = 0.005  Analysis Date = 08/29/2005 
 RPT Level = 0.005  Analysis Date = 08/23/2005 
 RPT Level = 0.005  Analysis Date = 08/23/2005 
 RPT Level = 0.005  Analysis Date = 08/15/2005 
 RPT Level = 0.005  Analysis Date = 08/15/2005 
 RPT Level = 0.005  Analysis Date = 08/11/2005 
 RPT Level = 0.005  Analysis Date = 08/11/2005 
 RPT Level = 0.005  Analysis Date = 08/11/2005 
 RPT Level = 0.005  Analysis Date = 08/11/2005 
 RPT Level = 0.005  Analysis Date = 07/21/2005 
 RPT Level = 0.005  Analysis Date = 07/21/2005 
 RPT Level = 0.005  Analysis Date = 07/14/2005 
 RPT Level = 0.005  Analysis Date = 07/14/2005 
 RPT Level = 0.005  Analysis Date = 07/08/2005 
 RPT Level = 0.005  Analysis Date = 07/08/2005 
 RPT Level = 0.005  Analysis Date = 06/30/2005 
 RPT Level = 0.005  Analysis Date = 06/30/2005 
 RPT Level = 0.005  Analysis Date = 06/24/2005 
 RPT Level = 0.005  Analysis Date = 06/24/2005 
 RPT Level = 0.005  Analysis Date = 06/16/2005 
 RPT Level = 0.005  Analysis Date = 06/16/2005 
 RPT Level = 0.005  Analysis Date = 06/09/2005 
 RPT Level = 0.005  Analysis Date = 06/09/2005 
 RPT Level = 0.005  Analysis Date = 06/03/2005 
 RPT Level = 0.005  Analysis Date = 06/03/2005 
 RPT Level = 0.005  Analysis Date = 05/25/2005 
 RPT Level = 0.005  Analysis Date = 05/25/2005 
 RPT Level = 0.005  Analysis Date = 05/19/2005 
 RPT Level = 0.005  Analysis Date = 05/19/2005 
 RPT Level = 0.005  Analysis Date = 05/13/2005 
 RPT Level = 0.005  Analysis Date = 05/13/2005 
 RPT Level = 0.005  Analysis Date = 05/06/2005 
 RPT Level = 0.005  Analysis Date = 05/06/2005 
 RPT Level = 0.005  Analysis Date = 04/28/2005 
 RPT Level = 0.005  Analysis Date = 04/28/2005 
 RPT Level = 0.005  Analysis Date = 04/22/2005 
 RPT Level = 0.005  Analysis Date = 04/22/2005 
 RPT Level = 0.005  Analysis Date = 04/13/2005 
 RPT Level = 0.005  Analysis Date = 04/13/2005 
 RPT Level = 0.005  Analysis Date = 04/06/2005 
 RPT Level = 0.005  Analysis Date = 04/06/2005 
 RPT Level = 0.005  Analysis Date = 03/30/2005 
 RPT Level = 0.005  Analysis Date = 03/30/2005 
 RPT Level = 0.005  Analysis Date = 03/28/2005 
 RPT Level = 0.005  Analysis Date = 03/28/2005 
 RPT Level = 0.005  Analysis Date = 03/17/2005 
 RPT Level = 0.005  Analysis Date = 03/17/2005 
 RPT Level = 0.005  Analysis Date = 03/14/2005 
 RPT Level = 0.005  Analysis Date = 03/14/2005 
 RPT Level = 0.005  Analysis Date = 03/14/2005 
 RPT Level = 0.005  Analysis Date = 03/14/2005 
 RPT Level = 0.005  Analysis Date = 03/09/2005 
 RPT Level = 0.005  Analysis Date = 03/09/2005 
 RPT Level = 0.005  Analysis Date = 02/25/2005 
 RPT Level = 0.005  Analysis Date = 02/25/2005 
 RPT Level = 0.005  Analysis Date = 02/22/2005 
 RPT Level = 0.005  Analysis Date = 02/22/2005 
 RPT Level = 0.005  Analysis Date = 02/14/2005 
 RPT Level = 0.005  Analysis Date = 02/14/2005 
 RPT Level = 0.005  Analysis Date = 02/04/2005 
 RPT Level = 0.005  Analysis Date = 02/04/2005 
 RPT Level = 0.005  Analysis Date = 01/28/2005 
 RPT Level = 0.005  Analysis Date = 01/28/2005 
 RPT Level = 0.005  Analysis Date = 01/21/2005 
 RPT Level = 0.005  Analysis Date = 01/21/2005 
 RPT Level = 0.005  Analysis Date = 01/14/2005 
 RPT Level = 0.005  Analysis Date = 01/14/2005 
 RPT Level = 0.005  Analysis Date = 01/10/2005 
 RPT Level = 0.005  Analysis Date = 01/10/2005 
 RPT Level = 0.005  Analysis Date = 01/03/2005 
 RPT Level = 0.005  Analysis Date = 01/03/2005 
 RPT Level = 0.005  Analysis Date = 01/03/2005 
 RPT Level = 0.005  Analysis Date = 01/03/2005 
 RPT Level = 0.005  Analysis Date = 01/03/2005 
 RPT Level = 0.005  Analysis Date = 01/03/2005 
 RPT Level = 0.005  Analysis Date = 12/20/2004 
 RPT Level = 0.005  Analysis Date = 12/20/2004 
 RPT Level = 0.005  Analysis Date = 12/20/2004 
 RPT Level = 0.005  Analysis Date = 12/20/2004 
 RPT Level = 0.005  Analysis Date = 12/13/2004 
 RPT Level = 0.005  Analysis Date = 12/13/2004 
 RPT Level = 0.005  Analysis Date = 12/13/2004 
 RPT Level = 0.005  Analysis Date = 12/13/2004 
 RPT Level = 0.005  Analysis Date = 12/06/2004 
 RPT Level = 0.005  Analysis Date = 12/06/2004 
 RPT Level = 0.005  Analysis Date = 12/06/2004 
 RPT Level = 0.005  Analysis Date = 12/06/2004 
 RPT Level = 0.005  Analysis Date = 12/01/2004 
 RPT Level = 0.005  Analysis Date = 12/01/2004 
 RPT Level = 0.005  Analysis Date = 12/02/2004 
 RPT Level = 0.005  Analysis Date = 12/02/2004 
 RPT Level = 0.005  Analysis Date = 11/22/2004 
 RPT Level = 0.005  Analysis Date = 11/22/2004 
 RPT Level = 0.005  Analysis Date = 09/02/2004 
 RPT Level = 0.005  Analysis Date = 09/02/2004 
 RPT Level = 0.005  Analysis Date = 08/30/2004 
 RPT Level = 0.005  Analysis Date = 08/30/2004 
 RPT Level = 0.005  Analysis Date = 08/25/2004 
 RPT Level = 0.005  Analysis Date = 08/25/2004 
 RPT Level = 0.005  Analysis Date = 08/23/2004 
 RPT Level = 0.005  Analysis Date = 08/23/2004 
 RPT Level = 0.005  Analysis Date = 08/20/2004 
 RPT Level = 0.005  Analysis Date = 08/20/2004 
 RPT Level = 0.005  Analysis Date = 08/20/2004 
 RPT Level = 0.005  Analysis Date = 08/20/2004 
 RPT Level = 0.005  Analysis Date = 08/12/2004 
 RPT Level = 0.005  Analysis Date = 08/12/2004 
 RPT Level = 0.005  Analysis Date = 08/05/2004 
 RPT Level = 0.005  Analysis Date = 08/05/2004 
 RPT Level = 0.005  Analysis Date = 07/30/2004 
 RPT Level = 0.005  Analysis Date = 07/30/2004 
 RPT Level = 0.005  Analysis Date = 07/23/2004 
 RPT Level = 0.005  Analysis Date = 07/23/2004 
 RPT Level = 0.005  Analysis Date = 07/15/2004 
 RPT Level = 0.005  Analysis Date = 07/15/2004 
 RPT Level = 0.005  Analysis Date = 07/09/2004 
 RPT Level = 0.005  Analysis Date = 07/09/2004 
 RPT Level = 0.005  Analysis Date = 07/01/2004 
 RPT Level = 0.005  Analysis Date = 07/01/2004 
 RPT Level = 0.005  Analysis Date = 06/24/2004 
 RPT Level = 0.005  Analysis Date = 06/24/2004 
 RPT Level = 0.005  Analysis Date = 06/21/2004 
 RPT Level = 0.005  Analysis Date = 06/21/2004 
 RPT Level = 0.005  Analysis Date = 06/10/2004 
 RPT Level = 0.005  Analysis Date = 06/10/2004 
 RPT Level = 0.005  Analysis Date = 06/08/2004 
 RPT Level = 0.005  Analysis Date = 06/08/2004 
 RPT Level = 0.005  Analysis Date = 06/02/2004 
 RPT Level = 0.005  Analysis Date = 06/02/2004 
 RPT Level = 0.005  Analysis Date = 05/25/2004 
 RPT Level = 0.005  Analysis Date = 05/25/2004 
 RPT Level = 0.005  Analysis Date = 05/12/2004 
 RPT Level = 0.005  Analysis Date = 05/12/2004 
 RPT Level = 0.005  Analysis Date = 05/07/2004 
 RPT Level = 0.005  Analysis Date = 05/07/2004 
 RPT Level = 0.005  Analysis Date = 05/04/2004 
 RPT Level = 0.005  Analysis Date = 05/04/2004 
 RPT Level = 0.005  Analysis Date = 04/23/2004 
 RPT Level = 0.005  Analysis Date = 04/23/2004 
 RPT Level = 0.005  Analysis Date = 04/20/2004 
 RPT Level = 0.005  Analysis Date = 04/20/2004 
 RPT Level = 0.005  Analysis Date = 04/15/2004 
 RPT Level = 0.005  Analysis Date = 04/15/2004 
 RPT Level = 0.005  Analysis Date = 04/12/2004 
 RPT Level = 0.005  Analysis Date = 04/12/2004 
 RPT Level = 0.005  Analysis Date = 04/09/2004 
 RPT Level = 0.005  Analysis Date = 04/09/2004 
 RPT Level = 0.005  Analysis Date = 04/08/2004 
 RPT Level = 0.005  Analysis Date = 04/08/2004 
 RPT Level = 0.005  Analysis Date = 04/06/2004 
 RPT Level = 0.005  Analysis Date = 04/06/2004 
 RPT Level = 0.005  Analysis Date = 03/31/2004 
 RPT Level = 0.005  Analysis Date = 03/31/2004 
 RPT Level = 0.005  Analysis Date = 03/23/2004 
 RPT Level = 0.005  Analysis Date = 03/23/2004 
 RPT Level = 0.005  Analysis Date = 03/16/2004 
 RPT Level = 0.005  Analysis Date = 03/16/2004 
 RPT Level = 0.005  Analysis Date = 03/12/2004 
 RPT Level = 0.005  Analysis Date = 03/12/2004 
 RPT Level = 0.005  Analysis Date = 03/11/2004 
 RPT Level = 0.005  Analysis Date = 03/11/2004 
 RPT Level = 0.005  Analysis Date = 03/03/2004 
 RPT Level = 0.005  Analysis Date = 03/03/2004 
 RPT Level = 0.005  Analysis Date = 03/01/2004 
 RPT Level = 0.005  Analysis Date = 03/01/2004 
 RPT Level = 0.005  Analysis Date = 02/27/2004 
 RPT Level = 0.005  Analysis Date = 02/27/2004 
 RPT Level = 0.005  Analysis Date = 02/25/2004 
 RPT Level = 0.005  Analysis Date = 02/25/2004 
 RPT Level = 0.005  Analysis Date = 02/19/2004 
 RPT Level = 0.005  Analysis Date = 02/19/2004 
 RPT Level = 0.005  Analysis Date = 02/13/2004 
 RPT Level = 0.005  Analysis Date = 02/13/2004 
 RPT Level = 0.005  Analysis Date = 02/12/2004 
 RPT Level = 0.005  Analysis Date = 02/12/2004 
 RPT Level = 0.005  Analysis Date = 02/11/2004 
 RPT Level = 0.005  Analysis Date = 02/11/2004 
 RPT Level = 0.005  Analysis Date = 02/06/2004 
 RPT Level = 0.005  Analysis Date = 02/06/2004 
 RPT Level = 0.005  Analysis Date = 02/04/2004 
 RPT Level = 0.005  Analysis Date = 02/04/2004 
 RPT Level = 0.005  Analysis Date = 01/30/2004 
 RPT Level = 0.005  Analysis Date = 01/30/2004 
 RPT Level = 0.005  Analysis Date = 01/28/2004 
 RPT Level = 0.005  Analysis Date = 01/28/2004 
 RPT Level = 0.005  Analysis Date = 01/27/2004 
 RPT Level = 0.005  Analysis Date = 01/27/2004 
 RPT Level = 0.005  Analysis Date = 01/21/2004 
 RPT Level = 0.005  Analysis Date = 01/21/2004 
 RPT Level = 0.005  Analysis Date = 01/14/2004 
 RPT Level = 0.005  Analysis Date = 01/14/2004 
 RPT Level = 0.005  Analysis Date = 01/08/2004 
 RPT Level = 0.005  Analysis Date = 01/08/2004 
 RPT Level = 0.005  Analysis Date = 01/08/2004 
 RPT Level = 0.005  Analysis Date = 01/08/2004 
 RPT Level = 0.005  Analysis Date = 10/10/2003 
 RPT Level = 0.008  Analysis Date = 10/10/2003 
 RPT Level = 0.008  Analysis Date = 10/08/2003 
 RPT Level = 0.008  Analysis Date = 10/08/2003 
 RPT Level = 0.008  Analysis Date = 09/26/2003 
 RPT Level = 0.008  Analysis Date = 09/26/2003 
 RPT Level = 0.008  Analysis Date = 09/24/2003 
 RPT Level = 0.008  Analysis Date = 09/24/2003 
 RPT Level = 0.008  Analysis Date = 09/17/2003 
 RPT Level = 0.008  Analysis Date = 09/17/2003 
 RPT Level = 0.008  Analysis Date = 09/10/2003 
 RPT Level = 0.008  Analysis Date = 09/10/2003 
 RPT Level = 0.008  Analysis Date = 08/29/2003 
 RPT Level = 0.008  Analysis Date = 08/29/2003 
 RPT Level = 0.008  Analysis Date = 08/19/2003 
 RPT Level = 0.008  Analysis Date = 08/19/2003 
 RPT Level = 0.008  Analysis Date = 08/06/2003 
 RPT Level = 0.008  Analysis Date = 08/06/2003 
 RPT Level = 0.008  Analysis Date = 08/01/2003 
 RPT Level = 0.008  Analysis Date = 08/01/2003 
 RPT Level = 0.008  Analysis Date = 07/23/2003 
 RPT Level = 0.008  Analysis Date = 07/23/2003 
 RPT Level = 0.008  Analysis Date = 07/21/2003 
 RPT Level = 0.008  Analysis Date = 07/21/2003 
 RPT Level = 0.008  Analysis Date = 07/17/2003 
 RPT Level = 0.008  Analysis Date = 07/17/2003 
 RPT Level = 0.008  Analysis Date = 07/15/2003 
 RPT Level = 0.008  Analysis Date = 07/15/2003 
 RPT Level = 0.008  Analysis Date = 07/07/2003 
 RPT Level = 0.008  Analysis Date = 07/07/2003 
 RPT Level = 0.008  Analysis Date = 07/02/2003 
 RPT Level = 0.008  Analysis Date = 07/02/2003 
 RPT Level = 0.008  Analysis Date = 07/01/2003 
 RPT Level = 0.008  Analysis Date = 07/01/2003 
 RPT Level = 0.008  Analysis Date = 06/04/2003 
 RPT Level = 0.008  Analysis Date = 06/04/2003 
 RPT Level = 0.008  Analysis Date = 06/03/2003 
 RPT Level = 0.008  Analysis Date = 06/03/2003 
 RPT Level = 0.008  Analysis Date = 05/30/2003 
 RPT Level = 0.008  Analysis Date = 05/30/2003 
 RPT Level = 0.008  Analysis Date = 05/16/2003 
 RPT Level = 0.008  Analysis Date = 05/16/2003 
 RPT Level = 0.008  Analysis Date = 05/13/2003 
 RPT Level = 0.008  Analysis Date = 05/13/2003 
 RPT Level = 0.008  Analysis Date = 05/12/2003 
 RPT Level = 0.008  Analysis Date = 05/12/2003 
 RPT Level = 0.008  Analysis Date = 04/29/2003 
 RPT Level = 0.008  Analysis Date = 04/29/2003 
 RPT Level = 0.008  Analysis Date = 04/16/2003 
 RPT Level = 0.008  Analysis Date = 04/16/2003 
 RPT Level = 0.008  Analysis Date = 04/10/2003 
 RPT Level = 0.008  Analysis Date = 04/10/2003 
 RPT Level = 0.008  Analysis Date = 04/10/2003 
 RPT Level = 0.008  Analysis Date = 04/10/2003 
 RPT Level = 0.008  Analysis Date = 04/08/2003 
 RPT Level = 0.008  Analysis Date = 04/08/2003 
 RPT Level = 0.008  Analysis Date = 03/21/2003 
 RPT Level = 0.008  Analysis Date = 03/21/2003 
 RPT Level = 0.008  Analysis Date = 03/21/2003 
 RPT Level = 0.008  Analysis Date = 03/21/2003 
 RPT Level = 0.008  Analysis Date = 03/12/2003 
 RPT Level = 0.008  Analysis Date = 03/12/2003 
 RPT Level = 0.008  Analysis Date = 03/07/2003 
 RPT Level = 0.008  Analysis Date = 03/07/2003 
 RPT Level = 0.008  Analysis Date = 02/27/2003 
 RPT Level = 0.008  Analysis Date = 02/27/2003 
 RPT Level = 0.008  Analysis Date = 02/05/2003 
 RPT Level = 0.008  Analysis Date = 02/05/2003 
 RPT Level = 0.008  Analysis Date = 02/05/2003 
 RPT Level = 0.008  Analysis Date = 02/05/2003 
 RPT Level = 0.008  Analysis Date = 02/05/2003 
 RPT Level = 0.008  Analysis Date = 02/05/2003 
 RPT Level = 0.008  Analysis Date = 01/17/2003 
 RPT Level = 0.008  Analysis Date = 01/17/2003 
 RPT Level = 0.008  Analysis Date = 01/17/2003 
 RPT Level = 0.008  Analysis Date = 01/17/2003 
 RPT Level = 0.008  Analysis Date = 01/07/2003 
 RPT Level = 0.008  Analysis Date = 01/07/2003 
 RPT Level = 0.008  Analysis Date = 01/07/2003 
 RPT Level = 0.008  Analysis Date = 01/07/2003 
 RPT Level = 0.008  Analysis Date = 12/23/2002 
 RPT Level = 0.008  Analysis Date = 12/23/2002 
 RPT Level = 0.008  Analysis Date = 12/18/2002 
 RPT Level = 0.008  Analysis Date = 12/18/2002 
 RPT Level = 0.008  Analysis Date = 12/10/2002 
 RPT Level = 0.008  Analysis Date = 12/10/2002 
 RPT Level = 0.008  Analysis Date = 12/10/2002 
 RPT Level = 0.008  Analysis Date = 12/10/2002 
 RPT Level = 0.008  Analysis Date = 12/06/2002 
 RPT Level = 0.008  Analysis Date = 12/06/2002 
 RPT Level = 0.008  Analysis Date = 12/06/2002 
 RPT Level = 0.008  Analysis Date = 12/06/2002 
 RPT Level = 0.008  Analysis Date = 12/06/2002 
 RPT Level = 0.008  Analysis Date = 12/06/2002 
 RPT Level = 0.008  Analysis Date = 11/14/2002 
 RPT Level = 0.008  Analysis Date = 11/14/2002 
 RPT Level = 0.008  Analysis Date = 10/30/2002 
 RPT Level = 0.008  Analysis Date = 10/30/2002 
 RPT Level = 0.008  Analysis Date = 10/30/2002 
 RPT Level = 0.008  Analysis Date = 10/30/2002 
 RPT Level = 0.008  Analysis Date = 10/30/2002 
 RPT Level = 0.008  Analysis Date = 10/30/2002 
 RPT Level = 0.008  Analysis Date = 10/30/2002 
 RPT Level = 0.008  Analysis Date = 10/30/2002 
 RPT Level = 0.008  Analysis Date = 09/10/2002 
 RPT Level = 0.008  Analysis Date = 09/10/2002 
 RPT Level = 0.008  Analysis Date = 09/10/2002 
 RPT Level = 0.008  Analysis Date = 09/10/2002 
 RPT Level = 0.008  Analysis Date = 08/29/2002 
 RPT Level = 0.008  Analysis Date = 08/29/2002 
 RPT Level = 0.008  Analysis Date = 08/27/2002 
 RPT Level = 0.008  Analysis Date = 08/27/2002 
 RPT Level = 0.008  Analysis Date = 08/20/2002 
 RPT Level = 0.008  Analysis Date = 08/20/2002 
 RPT Level = 0.008  Analysis Date = 08/16/2002 
 RPT Level = 0.008  Analysis Date = 08/16/2002 
 RPT Level = 0.008  Analysis Date = 08/01/2002 
 RPT Level = 0.008  Analysis Date = 08/01/2002 
 RPT Level = 0.008  Analysis Date = 07/17/2002 
 RPT Level = 0.008  Analysis Date = 07/17/2002 
 RPT Level = 0.008  Analysis Date = 07/16/2002 
 RPT Level = 0.008  Analysis Date = 07/16/2002 
 RPT Level = 0.008  Analysis Date = 07/09/2002 
 RPT Level = 0.008  Analysis Date = 07/09/2002 
 RPT Level = 0.008  Analysis Date = 07/02/2002 
 RPT Level = 0.008  Analysis Date = 07/02/2002 
 RPT Level = 0.008  Analysis Date = 06/21/2002 
 RPT Level = 0.008  Analysis Date = 06/21/2002 
 RPT Level = 0.008  Analysis Date = 06/20/2002 
 RPT Level = 0.008  Analysis Date = 06/20/2002 
 RPT Level = 0.008  Analysis Date = 06/11/2002 
 RPT Level = 0.008  Analysis Date = 06/11/2002 
 RPT Level = 0.008  Analysis Date = 06/10/2002 
 RPT Level = 0.008  Analysis Date = 06/10/2002 
 RPT Level = 0.008  Analysis Date = 05/30/2002 
 RPT Level = 0.008  Analysis Date = 05/30/2002 
 RPT Level = 0.008  Analysis Date = 05/22/2002 
 RPT Level = 0.008  Analysis Date = 05/22/2002 
 RPT Level = 0.008  Analysis Date = 05/17/2002 
 RPT Level = 0.008  Analysis Date = 05/17/2002 
 RPT Level = 0.008  Analysis Date = 05/13/2002 
 RPT Level = 0.008  Analysis Date = 05/13/2002 
 RPT Level = 0.008  Analysis Date = 04/26/2002 
 RPT Level = 0.008  Analysis Date = 04/26/2002 
 RPT Level = 0.008  Analysis Date = 04/26/2002 
 RPT Level = 0.008  Analysis Date = 04/26/2002 
 RPT Level = 0.008  Analysis Date = 04/17/2002 
 RPT Level = 0.008  Analysis Date = 04/17/2002 
 RPT Level = 0.008  Analysis Date = 04/05/2002 
 RPT Level = 0.008  Analysis Date = 04/05/2002 
 RPT Level = 0.008  Analysis Date = 04/03/2002 
 RPT Level = 0.008  Analysis Date = 04/03/2002 
 RPT Level = 0.008  Analysis Date = 04/03/2002 
 RPT Level = 0.008  Analysis Date = 04/03/2002 
 RPT Level = 0.008  Analysis Date = 04/01/2002 
 RPT Level = 0.008  Analysis Date = 04/01/2002 
 RPT Level = 0.008  Analysis Date = 03/29/2002 
 RPT Level = 0.008  Analysis Date = 03/29/2002 
 RPT Level = 0.008  Analysis Date = 03/22/2002 
 RPT Level = 0.008  Analysis Date = 03/22/2002 
 RPT Level = 0.008  Analysis Date = 03/04/2002 
 RPT Level = 0.008  Analysis Date = 03/04/2002 
 RPT Level = 0.008  Analysis Date = 02/20/2002 
 RPT Level = 0.008  Analysis Date = 02/20/2002 
 RPT Level = 0.008  Analysis Date = 02/08/2002 
 RPT Level = 0.008  Analysis Date = 02/08/2002 
 RPT Level = 0.008  Analysis Date = 02/08/2002 
 RPT Level = 0.008  Analysis Date = 02/08/2002 
 RPT Level = 0.008  Analysis Date = 01/23/2002 
 RPT Level = 0.008  Analysis Date = 01/23/2002 
 RPT Level = 0.008  Analysis Date = 01/17/2002 
 RPT Level = 0.008  Analysis Date = 01/17/2002 
 RPT Level = 0.008  Analysis Date = 01/09/2002 
 RPT Level = 0.008  Analysis Date = 01/09/2002 
 RPT Level = 0.008  Analysis Date = 01/03/2002 
 RPT Level = 0.008  Analysis Date = 01/03/2002 
 RPT Level = 0.008  Analysis Date = 12/20/2001 
 RPT Level = 0.008  Analysis Date = 12/20/2001 
 RPT Level = 0.008  Analysis Date = 12/14/2001 
 RPT Level = 0.008  Analysis Date = 12/14/2001 
 RPT Level = 0.008  Analysis Date = 12/07/2001 
 RPT Level = 0.008  Analysis Date = 12/07/2001 
 RPT Level = 0.008  Analysis Date = 11/15/2001 
 RPT Level = 0.008  Y = 0
The SGPlot Procedure

False Positive Rate for Ammonia (NH3 as N), FIL, COL, LL

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Ammonia (NH3 as N), FIL, COL, LL 00608CL039 2002 40 0 0%
    2003 52 1 2%
    2004 51 0 0%
    2005 50 1 2%
    2006 3 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Ammonia (NH3 as N), FIL, DA -
Blind Blank Results
Lab: NWQL, PCode: 00608, MCode: SHC02
Analysis dates: 06/13/06 through 09/30/16
Open Data Set

 Analysis Date = 05/27/2010 
 Lab Value = -0.014 
 RPT Level = 0.01 
 Lab Sample ID = 20101310098  Analysis Date = 09/12/2006 
 Lab Value = -0.012 
 RPT Level = 0.005 
 Lab Sample ID = 20062350182  Analysis Date = 05/27/2010 
 Lab Value = -0.014 
 RPT Level = 0.01 
 Lab Sample ID = 20101310098  Analysis Date = 09/12/2006 
 Lab Value = -0.012 
 RPT Level = 0.005 
 Lab Sample ID = 20062350182  Analysis Date = 04/29/2014 
 Lab Value = 0.105 
 RPT Level = 0.01 
 Lab Sample ID = 20141130021  Analysis Date = 09/12/2012 
 Lab Value = 0.1728 
 RPT Level = 0.01 
 Lab Sample ID = 20122350175  Analysis Date = 04/29/2014 
 Lab Value = 0.105 
 RPT Level = 0.01 
 Lab Sample ID = 20141130021  Analysis Date = 09/12/2012 
 Lab Value = 0.1728 
 RPT Level = 0.01 
 Lab Sample ID = 20122350175  Analysis Date = 09/30/2016 
 Lab Value = 0.014 
 RPT Level = 0.01 
 Lab Sample ID = 20162710098  Analysis Date = 09/23/2016 
 Lab Value = 0.0042 
 RPT Level = 0.01 
 Lab Sample ID = 20162640173  Analysis Date = 09/16/2016 
 Lab Value = 0.0025 
 RPT Level = 0.01 
 Lab Sample ID = 20162580012  Analysis Date = 09/13/2016 
 Lab Value = 0.0025 
 RPT Level = 0.01 
 Lab Sample ID = 20162520025  Analysis Date = 09/09/2016 
 Lab Value = .00098 
 RPT Level = 0.01 
 Lab Sample ID = 20162440121  Analysis Date = 08/26/2016 
 Lab Value = 0.0028 
 RPT Level = 0.01 
 Lab Sample ID = 20162360195  Analysis Date = 08/19/2016 
 Lab Value = 0.0033 
 RPT Level = 0.01 
 Lab Sample ID = 20162290137  Analysis Date = 08/12/2016 
 Lab Value = -96E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20162230008  Analysis Date = 08/08/2016 
 Lab Value = .00045 
 RPT Level = 0.01 
 Lab Sample ID = 20162150204  Analysis Date = 08/02/2016 
 Lab Value = 0.0043 
 RPT Level = 0.01 
 Lab Sample ID = 20162080232  Analysis Date = 07/26/2016 
 Lab Value = 0.0053 
 RPT Level = 0.01 
 Lab Sample ID = 20162010257  Analysis Date = 07/14/2016 
 Lab Value = 0.0052 
 RPT Level = 0.01 
 Lab Sample ID = 20161940107  Analysis Date = 07/12/2016 
 Lab Value = 0.0064 
 RPT Level = 0.01 
 Lab Sample ID = 20161870031  Analysis Date = 07/07/2016 
 Lab Value = 0.0024 
 RPT Level = 0.01 
 Lab Sample ID = 20161800082  Analysis Date = 06/29/2016 
 Lab Value = 0.0038 
 RPT Level = 0.01 
 Lab Sample ID = 20161740071  Analysis Date = 06/20/2016 
 Lab Value = 0.0085 
 RPT Level = 0.01 
 Lab Sample ID = 20161660156  Analysis Date = 06/09/2016 
 Lab Value = 0.0037 
 RPT Level = 0.01 
 Lab Sample ID = 20161590152  Analysis Date = 06/02/2016 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20161520025  Analysis Date = 06/02/2016 
 Lab Value = -27E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20161480189  Analysis Date = 05/10/2016 
 Lab Value = 0.0101 
 RPT Level = 0.01 
 Lab Sample ID = 20161270006  Analysis Date = 05/04/2016 
 Lab Value = 0.0099 
 RPT Level = 0.01 
 Lab Sample ID = 20161230045  Analysis Date = 04/28/2016 
 Lab Value = 0.0011 
 RPT Level = 0.01 
 Lab Sample ID = 20161160091  Analysis Date = 04/22/2016 
 Lab Value = 0.0029 
 RPT Level = 0.01 
 Lab Sample ID = 20161100126  Analysis Date = 04/13/2016 
 Lab Value = 0.0038 
 RPT Level = 0.01 
 Lab Sample ID = 20161020027  Analysis Date = 04/07/2016 
 Lab Value = 0.0013 
 RPT Level = 0.01 
 Lab Sample ID = 20160950044  Analysis Date = 03/31/2016 
 Lab Value = 0.0046 
 RPT Level = 0.01 
 Lab Sample ID = 20160880040  Analysis Date = 03/25/2016 
 Lab Value = 0.0049 
 RPT Level = 0.01 
 Lab Sample ID = 20160810065  Analysis Date = 03/17/2016 
 Lab Value = 0.0052 
 RPT Level = 0.01 
 Lab Sample ID = 20160740013  Analysis Date = 03/08/2016 
 Lab Value = .00079 
 RPT Level = 0.01 
 Lab Sample ID = 20160670014  Analysis Date = 03/02/2016 
 Lab Value = 0.0146 
 RPT Level = 0.01 
 Lab Sample ID = 20160600013  Analysis Date = 02/25/2016 
 Lab Value = 0.0027 
 RPT Level = 0.01 
 Lab Sample ID = 20160530013  Analysis Date = 02/23/2016 
 Lab Value = 0.0064 
 RPT Level = 0.01 
 Lab Sample ID = 20160470015  Analysis Date = 02/19/2016 
 Lab Value = .00004 
 RPT Level = 0.01 
 Lab Sample ID = 20160400084  Analysis Date = 02/03/2016 
 Lab Value = 0.0065 
 RPT Level = 0.01 
 Lab Sample ID = 20160320011  Analysis Date = 01/27/2016 
 Lab Value = 0.0056 
 RPT Level = 0.01 
 Lab Sample ID = 20160250031  Analysis Date = 01/25/2016 
 Lab Value = .00031 
 RPT Level = 0.01 
 Lab Sample ID = 20160190011  Analysis Date = 01/14/2016 
 Lab Value = 0.0025 
 RPT Level = 0.01 
 Lab Sample ID = 20160110011  Analysis Date = 01/06/2016 
 Lab Value = 0.0048 
 RPT Level = 0.01 
 Lab Sample ID = 20160050030  Analysis Date = 01/05/2016 
 Lab Value = 0.0012 
 RPT Level = 0.01 
 Lab Sample ID = 20153630045  Analysis Date = 12/28/2015 
 Lab Value = 0.0046 
 RPT Level = 0.01 
 Lab Sample ID = 20153550011  Analysis Date = 12/22/2015 
 Lab Value = 0.0017 
 RPT Level = 0.01 
 Lab Sample ID = 20153500160  Analysis Date = 12/14/2015 
 Lab Value = .00045 
 RPT Level = 0.01 
 Lab Sample ID = 20153420017  Analysis Date = 12/02/2015 
 Lab Value = 0.0059 
 RPT Level = 0.01 
 Lab Sample ID = 20153340016  Analysis Date = 11/27/2015 
 Lab Value = 0.0047 
 RPT Level = 0.01 
 Lab Sample ID = 20153270012  Analysis Date = 11/24/2015 
 Lab Value = 0.0085 
 RPT Level = 0.01 
 Lab Sample ID = 20153200025  Analysis Date = 11/16/2015 
 Lab Value = 0.0051 
 RPT Level = 0.01 
 Lab Sample ID = 20153140011  Analysis Date = 11/04/2015 
 Lab Value = 0.0018 
 RPT Level = 0.01 
 Lab Sample ID = 20153060033  Analysis Date = 10/28/2015 
 Lab Value = 0.0058 
 RPT Level = 0.01 
 Lab Sample ID = 20152990066  Analysis Date = 10/20/2015 
 Lab Value = -.0007 
 RPT Level = 0.01 
 Lab Sample ID = 20152920036  Analysis Date = 10/14/2015 
 Lab Value = .00084 
 RPT Level = 0.01 
 Lab Sample ID = 20152860152  Analysis Date = 10/06/2015 
 Lab Value = 0.0044 
 RPT Level = 0.01 
 Lab Sample ID = 20152780012  Analysis Date = 09/29/2015 
 Lab Value = 0.0079 
 RPT Level = 0.01 
 Lab Sample ID = 20152710066  Analysis Date = 09/23/2015 
 Lab Value = 0.0015 
 RPT Level = 0.01 
 Lab Sample ID = 20152640026  Analysis Date = 09/21/2015 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20152590157  Analysis Date = 09/09/2015 
 Lab Value = .00089 
 RPT Level = 0.01 
 Lab Sample ID = 20152510009  Analysis Date = 09/02/2015 
 Lab Value = 0.0085 
 RPT Level = 0.01 
 Lab Sample ID = 20152430096  Analysis Date = 08/26/2015 
 Lab Value = 0.0036 
 RPT Level = 0.01 
 Lab Sample ID = 20152360157  Analysis Date = 08/26/2015 
 Lab Value = 0.0297 
 RPT Level = 0.01 
 Lab Sample ID = 20152330007  Analysis Date = 08/13/2015 
 Lab Value = .00056 
 RPT Level = 0.01 
 Lab Sample ID = 20152230132  Analysis Date = 08/04/2015 
 Lab Value = .00094 
 RPT Level = 0.01 
 Lab Sample ID = 20152150073  Analysis Date = 07/28/2015 
 Lab Value = 0.0027 
 RPT Level = 0.01 
 Lab Sample ID = 20152080065  Analysis Date = 07/22/2015 
 Lab Value = 0.0023 
 RPT Level = 0.01 
 Lab Sample ID = 20152010051  Analysis Date = 07/15/2015 
 Lab Value = 0.0044 
 RPT Level = 0.01 
 Lab Sample ID = 20151940024  Analysis Date = 07/08/2015 
 Lab Value = 0.0052 
 RPT Level = 0.01 
 Lab Sample ID = 20151870009  Analysis Date = 07/01/2015 
 Lab Value = 0.0061 
 RPT Level = 0.01 
 Lab Sample ID = 20151800049  Analysis Date = 06/24/2015 
 Lab Value = 0.0048 
 RPT Level = 0.01 
 Lab Sample ID = 20151730016  Analysis Date = 06/17/2015 
 Lab Value = 0.0055 
 RPT Level = 0.01 
 Lab Sample ID = 20151660034  Analysis Date = 06/12/2015 
 Lab Value = 0.0059 
 RPT Level = 0.01 
 Lab Sample ID = 20151620213  Analysis Date = 06/04/2015 
 Lab Value = 0.0034 
 RPT Level = 0.01 
 Lab Sample ID = 20151530198  Analysis Date = 05/28/2015 
 Lab Value = 0.0048 
 RPT Level = 0.01 
 Lab Sample ID = 20151460121  Analysis Date = 05/21/2015 
 Lab Value = 0.0038 
 RPT Level = 0.01 
 Lab Sample ID = 20151390198  Analysis Date = 05/15/2015 
 Lab Value = 0.0051 
 RPT Level = 0.01 
 Lab Sample ID = 20151310070  Analysis Date = 05/08/2015 
 Lab Value = 0.0044 
 RPT Level = 0.01 
 Lab Sample ID = 20151240065  Analysis Date = 05/04/2015 
 Lab Value = 0.0018 
 RPT Level = 0.01 
 Lab Sample ID = 20151180073  Analysis Date = 04/27/2015 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20151140024  Analysis Date = 04/17/2015 
 Lab Value = 0.0015 
 RPT Level = 0.01 
 Lab Sample ID = 20151050039  Analysis Date = 04/10/2015 
 Lab Value = .00003 
 RPT Level = 0.01 
 Lab Sample ID = 20150970052  Analysis Date = 04/06/2015 
 Lab Value = 0.0028 
 RPT Level = 0.01 
 Lab Sample ID = 20150900037  Analysis Date = 03/30/2015 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20150850041  Analysis Date = 03/19/2015 
 Lab Value = 0.0066 
 RPT Level = 0.01 
 Lab Sample ID = 20150770031  Analysis Date = 03/11/2015 
 Lab Value = 0.0066 
 RPT Level = 0.01 
 Lab Sample ID = 20150690109  Analysis Date = 03/06/2015 
 Lab Value = 0.0022 
 RPT Level = 0.01 
 Lab Sample ID = 20150610104  Analysis Date = 02/24/2015 
 Lab Value = .00011 
 RPT Level = 0.01 
 Lab Sample ID = 20150540029  Analysis Date = 02/19/2015 
 Lab Value = .00096 
 RPT Level = 0.01 
 Lab Sample ID = 20150490025  Analysis Date = 02/17/2015 
 Lab Value = 0.0008 
 RPT Level = 0.01 
 Lab Sample ID = 20150400033  Analysis Date = 02/04/2015 
 Lab Value = 0.0069 
 RPT Level = 0.01 
 Lab Sample ID = 20150330024  Analysis Date = 02/04/2015 
 Lab Value = 0.0057 
 RPT Level = 0.01 
 Lab Sample ID = 20150260015  Analysis Date = 02/03/2015 
 Lab Value = 0.0061 
 RPT Level = 0.01 
 Lab Sample ID = 20150200036  Analysis Date = 01/16/2015 
 Lab Value = 0.0126 
 RPT Level = 0.01 
 Lab Sample ID = 20150120017  Analysis Date = 01/08/2015 
 Lab Value = 0.0086 
 RPT Level = 0.01 
 Lab Sample ID = 20150050006  Analysis Date = 01/08/2015 
 Lab Value = 0.0075 
 RPT Level = 0.01 
 Lab Sample ID = 20143630008  Analysis Date = 01/07/2015 
 Lab Value = 0.0102 
 RPT Level = 0.01 
 Lab Sample ID = 20143560049  Analysis Date = 01/06/2015 
 Lab Value = 0.0081 
 RPT Level = 0.01 
 Lab Sample ID = 20143490026  Analysis Date = 12/17/2014 
 Lab Value = 0.0049 
 RPT Level = 0.01 
 Lab Sample ID = 20143420020  Analysis Date = 12/15/2014 
 Lab Value = 0.0039 
 RPT Level = 0.01 
 Lab Sample ID = 20143360073  Analysis Date = 12/15/2014 
 Lab Value = 0.0064 
 RPT Level = 0.01 
 Lab Sample ID = 20143300036  Analysis Date = 11/25/2014 
 Lab Value = 0.0041 
 RPT Level = 0.01 
 Lab Sample ID = 20143230047  Analysis Date = 11/21/2014 
 Lab Value = 0.0012 
 RPT Level = 0.01 
 Lab Sample ID = 20143160029  Analysis Date = 11/21/2014 
 Lab Value = 0.0012 
 RPT Level = 0.01 
 Lab Sample ID = 20143160029  Analysis Date = 11/19/2014 
 Lab Value = 0.0065 
 RPT Level = 0.01 
 Lab Sample ID = 20143080087  Analysis Date = 11/19/2014 
 Lab Value = 0.0065 
 RPT Level = 0.01 
 Lab Sample ID = 20143080087  Analysis Date = 11/17/2014 
 Lab Value = 0.0074 
 RPT Level = 0.01 
 Lab Sample ID = 20143010065  Analysis Date = 11/17/2014 
 Lab Value = 0.0074 
 RPT Level = 0.01 
 Lab Sample ID = 20143010065  Analysis Date = 11/06/2014 
 Lab Value = 0.0073 
 RPT Level = 0.01 
 Lab Sample ID = 20142950122  Analysis Date = 11/06/2014 
 Lab Value = 0.0073 
 RPT Level = 0.01 
 Lab Sample ID = 20142950122  Analysis Date = 10/23/2014 
 Lab Value = 0.0022 
 RPT Level = 0.01 
 Lab Sample ID = 20142880084  Analysis Date = 10/23/2014 
 Lab Value = 0.0022 
 RPT Level = 0.01 
 Lab Sample ID = 20142880084  Analysis Date = 10/14/2014 
 Lab Value = 0.0037 
 RPT Level = 0.01 
 Lab Sample ID = 20142790031  Analysis Date = 10/14/2014 
 Lab Value = 0.0037 
 RPT Level = 0.01 
 Lab Sample ID = 20142790031  Analysis Date = 10/01/2014 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20142720101  Analysis Date = 10/01/2014 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20142720101  Analysis Date = 09/23/2014 
 Lab Value = 0.0087 
 RPT Level = 0.01 
 Lab Sample ID = 20142650106  Analysis Date = 09/23/2014 
 Lab Value = 0.0087 
 RPT Level = 0.01 
 Lab Sample ID = 20142650106  Analysis Date = 09/22/2014 
 Lab Value = 0.0056 
 RPT Level = 0.01 
 Lab Sample ID = 20142590046  Analysis Date = 09/22/2014 
 Lab Value = 0.0056 
 RPT Level = 0.01 
 Lab Sample ID = 20142590046  Analysis Date = 09/12/2014 
 Lab Value = 0.0018 
 RPT Level = 0.01 
 Lab Sample ID = 20142520024  Analysis Date = 09/12/2014 
 Lab Value = 0.0018 
 RPT Level = 0.01 
 Lab Sample ID = 20142520024  Analysis Date = 09/08/2014 
 Lab Value = 0.0021 
 RPT Level = 0.01 
 Lab Sample ID = 20142470052  Analysis Date = 09/08/2014 
 Lab Value = 0.0021 
 RPT Level = 0.01 
 Lab Sample ID = 20142470052  Analysis Date = 08/13/2014 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20142230082  Analysis Date = 08/13/2014 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20142230082  Analysis Date = 08/06/2014 
 Lab Value = 0.0059 
 RPT Level = 0.01 
 Lab Sample ID = 20142160063  Analysis Date = 08/06/2014 
 Lab Value = 0.0059 
 RPT Level = 0.01 
 Lab Sample ID = 20142160063  Analysis Date = 07/31/2014 
 Lab Value = 0.0177 
 RPT Level = 0.01 
 Lab Sample ID = 20142090217  Analysis Date = 07/31/2014 
 Lab Value = 0.0177 
 RPT Level = 0.01 
 Lab Sample ID = 20142090217  Analysis Date = 07/23/2014 
 Lab Value = 0.0082 
 RPT Level = 0.01 
 Lab Sample ID = 20142030069  Analysis Date = 07/17/2014 
 Lab Value = 0.0013 
 RPT Level = 0.01 
 Lab Sample ID = 20141960042  Analysis Date = 07/10/2014 
 Lab Value = 0.0042 
 RPT Level = 0.01 
 Lab Sample ID = 20141890083  Analysis Date = 07/02/2014 
 Lab Value = .00022 
 RPT Level = 0.01 
 Lab Sample ID = 20141820118  Analysis Date = 06/25/2014 
 Lab Value = 0.0072 
 RPT Level = 0.01 
 Lab Sample ID = 20141750143  Analysis Date = 06/19/2014 
 Lab Value = 0.0058 
 RPT Level = 0.01 
 Lab Sample ID = 20141680085  Analysis Date = 06/16/2014 
 Lab Value = 0.0037 
 RPT Level = 0.01 
 Lab Sample ID = 20141620033  Analysis Date = 06/06/2014 
 Lab Value = 0.0023 
 RPT Level = 0.01 
 Lab Sample ID = 20141550058  Analysis Date = 06/03/2014 
 Lab Value = 0.0036 
 RPT Level = 0.01 
 Lab Sample ID = 20141470144  Analysis Date = 05/27/2014 
 Lab Value = 0.0057 
 RPT Level = 0.01 
 Lab Sample ID = 20141400011  Analysis Date = 05/15/2014 
 Lab Value = 0.0079 
 RPT Level = 0.01 
 Lab Sample ID = 20141340002  Analysis Date = 05/07/2014 
 Lab Value = -.0006 
 RPT Level = 0.01 
 Lab Sample ID = 20141250086  Analysis Date = 05/02/2014 
 Lab Value = 0.0036 
 RPT Level = 0.01 
 Lab Sample ID = 20141190022  Analysis Date = 04/17/2014 
 Lab Value = 0.0068 
 RPT Level = 0.01 
 Lab Sample ID = 20141050008  Analysis Date = 04/10/2014 
 Lab Value = 0.0068 
 RPT Level = 0.01 
 Lab Sample ID = 20140970044  Analysis Date = 04/02/2014 
 Lab Value = 0.0021 
 RPT Level = 0.01 
 Lab Sample ID = 20140900020  Analysis Date = 03/26/2014 
 Lab Value = 0.0031 
 RPT Level = 0.01 
 Lab Sample ID = 20140840099  Analysis Date = 03/19/2014 
 Lab Value = .00086 
 RPT Level = 0.01 
 Lab Sample ID = 20140760039  Analysis Date = 03/12/2014 
 Lab Value = 0.0019 
 RPT Level = 0.01 
 Lab Sample ID = 20140690021  Analysis Date = 03/06/2014 
 Lab Value = 0.0021 
 RPT Level = 0.01 
 Lab Sample ID = 20140630120  Analysis Date = 02/27/2014 
 Lab Value = 0.0045 
 RPT Level = 0.01 
 Lab Sample ID = 20140550042  Analysis Date = 02/24/2014 
 Lab Value = .00079 
 RPT Level = 0.01 
 Lab Sample ID = 20140490012  Analysis Date = 02/18/2014 
 Lab Value = 0.0012 
 RPT Level = 0.01 
 Lab Sample ID = 20140410005  Analysis Date = 02/13/2014 
 Lab Value = .00069 
 RPT Level = 0.01 
 Lab Sample ID = 20140340022  Analysis Date = 02/06/2014 
 Lab Value = .00017 
 RPT Level = 0.01 
 Lab Sample ID = 20140270193  Analysis Date = 01/22/2014 
 Lab Value = 0.0018 
 RPT Level = 0.01 
 Lab Sample ID = 20140210036  Analysis Date = 01/15/2014 
 Lab Value = -79E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20140130049  Analysis Date = 01/10/2014 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20140070067  Analysis Date = 01/08/2014 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20133580053  Analysis Date = 12/17/2013 
 Lab Value = 0.0011 
 RPT Level = 0.01 
 Lab Sample ID = 20133500067  Analysis Date = 12/17/2013 
 Lab Value = -79E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20133430107  Analysis Date = 12/06/2013 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20133360022  Analysis Date = 12/03/2013 
 Lab Value = 0.0015 
 RPT Level = 0.01 
 Lab Sample ID = 20133300012  Analysis Date = 11/20/2013 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20133230003  Analysis Date = 11/14/2013 
 Lab Value = 0.0113 
 RPT Level = 0.01 
 Lab Sample ID = 20133170105  Analysis Date = 11/12/2013 
 Lab Value = 0.0018 
 RPT Level = 0.01 
 Lab Sample ID = 20133090098  Analysis Date = 10/31/2013 
 Lab Value = 0.0012 
 RPT Level = 0.01 
 Lab Sample ID = 20133030027  Analysis Date = 10/28/2013 
 Lab Value = 0.0063 
 RPT Level = 0.01 
 Lab Sample ID = 20132970027  Analysis Date = 10/17/2013 
 Lab Value = 0.0001 
 RPT Level = 0.01 
 Lab Sample ID = 20132730140  Analysis Date = 09/24/2013 
 Lab Value = 0.0061 
 RPT Level = 0.01 
 Lab Sample ID = 20132660104  Analysis Date = 09/18/2013 
 Lab Value = 0.0031 
 RPT Level = 0.01 
 Lab Sample ID = 20132600015  Analysis Date = 10/24/2013 
 Lab Value = 0.0079 
 RPT Level = 0.01 
 Lab Sample ID = 20132530113  Analysis Date = 09/04/2013 
 Lab Value = 0.0095 
 RPT Level = 0.01 
 Lab Sample ID = 20132410009  Analysis Date = 08/28/2013 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20132390012  Analysis Date = 08/26/2013 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20132350027  Analysis Date = 08/19/2013 
 Lab Value = 0.0019 
 RPT Level = 0.01 
 Lab Sample ID = 20132270018  Analysis Date = 08/09/2013 
 Lab Value = 0.0013 
 RPT Level = 0.01 
 Lab Sample ID = 20132180181  Analysis Date = 08/02/2013 
 Lab Value = 0.0115 
 RPT Level = 0.01 
 Lab Sample ID = 20132120027  Analysis Date = 07/25/2013 
 Lab Value = 0.0023 
 RPT Level = 0.01 
 Lab Sample ID = 20132040021  Analysis Date = 07/17/2013 
 Lab Value = 0.0039 
 RPT Level = 0.01 
 Lab Sample ID = 20131970028  Analysis Date = 07/11/2013 
 Lab Value = 0.0038 
 RPT Level = 0.01 
 Lab Sample ID = 20131900090  Analysis Date = 07/08/2013 
 Lab Value = 0.0139 
 RPT Level = 0.01 
 Lab Sample ID = 20131830073  Analysis Date = 06/28/2013 
 Lab Value = 0.0025 
 RPT Level = 0.01 
 Lab Sample ID = 20131770013  Analysis Date = 06/21/2013 
 Lab Value = 0.0059 
 RPT Level = 0.01 
 Lab Sample ID = 20131700038  Analysis Date = 06/18/2013 
 Lab Value = 0.0036 
 RPT Level = 0.01 
 Lab Sample ID = 20131640004  Analysis Date = 06/05/2013 
 Lab Value = 0.0011 
 RPT Level = 0.01 
 Lab Sample ID = 20131550029  Analysis Date = 06/03/2013 
 Lab Value = -99E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20131500013  Analysis Date = 05/24/2013 
 Lab Value = 0.0036 
 RPT Level = 0.01 
 Lab Sample ID = 20131430198  Analysis Date = 05/16/2013 
 Lab Value = 0.0056 
 RPT Level = 0.01 
 Lab Sample ID = 20131350129  Analysis Date = 05/10/2013 
 Lab Value = 0.0016 
 RPT Level = 0.01 
 Lab Sample ID = 20131270022  Analysis Date = 05/03/2013 
 Lab Value = 0.0042 
 RPT Level = 0.01 
 Lab Sample ID = 20131220014  Analysis Date = 04/26/2013 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20131150015  Analysis Date = 04/24/2013 
 Lab Value = 0.0023 
 RPT Level = 0.01 
 Lab Sample ID = 20131120125  Analysis Date = 04/24/2013 
 Lab Value = 0.0034 
 RPT Level = 0.01 
 Lab Sample ID = 20131090030  Analysis Date = 04/04/2013 
 Lab Value = 0.0024 
 RPT Level = 0.01 
 Lab Sample ID = 20130930087  Analysis Date = 03/27/2013 
 Lab Value = 0.0025 
 RPT Level = 0.01 
 Lab Sample ID = 20130840058  Analysis Date = 03/21/2013 
 Lab Value = 0.0064 
 RPT Level = 0.01 
 Lab Sample ID = 20130770160  Analysis Date = 03/14/2013 
 Lab Value = 0.0043 
 RPT Level = 0.01 
 Lab Sample ID = 20130700013  Analysis Date = 03/07/2013 
 Lab Value = 0.0044 
 RPT Level = 0.01 
 Lab Sample ID = 20130630124  Analysis Date = 02/28/2013 
 Lab Value = -.0006 
 RPT Level = 0.01 
 Lab Sample ID = 20130570007  Analysis Date = 02/25/2013 
 Lab Value = 0.0054 
 RPT Level = 0.01 
 Lab Sample ID = 20130520006  Analysis Date = 02/13/2013 
 Lab Value = 0.0063 
 RPT Level = 0.01 
 Lab Sample ID = 20130420052  Analysis Date = 02/05/2013 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20130350029  Analysis Date = 02/01/2013 
 Lab Value = .00035 
 RPT Level = 0.01 
 Lab Sample ID = 20130280039  Analysis Date = 01/24/2013 
 Lab Value = 0.0036 
 RPT Level = 0.01 
 Lab Sample ID = 20130230099  Analysis Date = 01/17/2013 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20130140071  Analysis Date = 01/10/2013 
 Lab Value = 0.0021 
 RPT Level = 0.01 
 Lab Sample ID = 20130070056  Analysis Date = 01/04/2013 
 Lab Value = -.0005 
 RPT Level = 0.01 
 Lab Sample ID = 20130020010  Analysis Date = 01/04/2013 
 Lab Value = 0.0003 
 RPT Level = 0.01 
 Lab Sample ID = 20123620011  Analysis Date = 12/21/2012 
 Lab Value = .00014 
 RPT Level = 0.01 
 Lab Sample ID = 20123530084  Analysis Date = 12/18/2012 
 Lab Value = 0.0012 
 RPT Level = 0.01 
 Lab Sample ID = 20123480061  Analysis Date = 12/07/2012 
 Lab Value = 0.0022 
 RPT Level = 0.01 
 Lab Sample ID = 20123390115  Analysis Date = 11/29/2012 
 Lab Value = .00067 
 RPT Level = 0.01 
 Lab Sample ID = 20123330010  Analysis Date = 11/29/2012 
 Lab Value = .00044 
 RPT Level = 0.01 
 Lab Sample ID = 20123250063  Analysis Date = 11/20/2012 
 Lab Value = -9E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20123200054  Analysis Date = 11/09/2012 
 Lab Value = 0.0029 
 RPT Level = 0.01 
 Lab Sample ID = 20123120066  Analysis Date = 10/31/2012 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20123040119  Analysis Date = 10/29/2012 
 Lab Value = 0.0023 
 RPT Level = 0.01 
 Lab Sample ID = 20122980126  Analysis Date = 10/18/2012 
 Lab Value = 0.0058 
 RPT Level = 0.01 
 Lab Sample ID = 20122900096  Analysis Date = 10/15/2012 
 Lab Value = 0.0206 
 RPT Level = 0.01 
 Lab Sample ID = 20122830034  Analysis Date = 10/10/2012 
 Lab Value = 0.0021 
 RPT Level = 0.01 
 Lab Sample ID = 20122750025  Analysis Date = 10/10/2012 
 Lab Value = 0.0031 
 RPT Level = 0.01 
 Lab Sample ID = 20122700110  Analysis Date = 10/10/2012 
 Lab Value = 0.0019 
 RPT Level = 0.01 
 Lab Sample ID = 20122690153  Analysis Date = 09/21/2012 
 Lab Value = 0.0017 
 RPT Level = 0.01 
 Lab Sample ID = 20122550016  Analysis Date = 09/18/2012 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20122490102  Analysis Date = 09/14/2012 
 Lab Value = 0.0583 
 RPT Level = 0.01 
 Lab Sample ID = 20122410013  Analysis Date = 08/29/2012 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20122280090  Analysis Date = 08/23/2012 
 Lab Value = 0.0044 
 RPT Level = 0.01 
 Lab Sample ID = 20122190099  Analysis Date = 08/16/2012 
 Lab Value = 0.0092 
 RPT Level = 0.01 
 Lab Sample ID = 20122140050  Analysis Date = 08/01/2012 
 Lab Value = 0.0027 
 RPT Level = 0.01 
 Lab Sample ID = 20122050101  Analysis Date = 07/20/2012 
 Lab Value = -.0001 
 RPT Level = 0.01 
 Lab Sample ID = 20121990080  Analysis Date = 07/13/2012 
 Lab Value = 0.0069 
 RPT Level = 0.01 
 Lab Sample ID = 20121910041  Analysis Date = 07/13/2012 
 Lab Value = 0.0145 
 RPT Level = 0.01 
 Lab Sample ID = 20121870014  Analysis Date = 07/06/2012 
 Lab Value = 0.0031 
 RPT Level = 0.01 
 Lab Sample ID = 20121780033  Analysis Date = 06/22/2012 
 Lab Value = 0.0019 
 RPT Level = 0.01 
 Lab Sample ID = 20121710006  Analysis Date = 06/14/2012 
 Lab Value = 0.0029 
 RPT Level = 0.01 
 Lab Sample ID = 20121650052  Analysis Date = 06/13/2012 
 Lab Value = 0.0166 
 RPT Level = 0.01 
 Lab Sample ID = 20121560125  Analysis Date = 06/07/2012 
 Lab Value = 0.0048 
 RPT Level = 0.01 
 Lab Sample ID = 20121510037  Analysis Date = 06/06/2012 
 Lab Value = 0.0063 
 RPT Level = 0.01 
 Lab Sample ID = 20121430021  Analysis Date = 05/22/2012 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20121370053  Analysis Date = 05/11/2012 
 Lab Value = 0.0066 
 RPT Level = 0.01 
 Lab Sample ID = 20121290072  Analysis Date = 05/08/2012 
 Lab Value = 0.0081 
 RPT Level = 0.01 
 Lab Sample ID = 20121210123  Analysis Date = 05/01/2012 
 Lab Value = 0.0082 
 RPT Level = 0.01 
 Lab Sample ID = 20121150089  Analysis Date = 04/18/2012 
 Lab Value = 0.0108 
 RPT Level = 0.01 
 Lab Sample ID = 20121080009  Analysis Date = 04/11/2012 
 Lab Value = 0.0031 
 RPT Level = 0.01 
 Lab Sample ID = 20121010029  Analysis Date = 04/04/2012 
 Lab Value = -35E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20120930058  Analysis Date = 03/29/2012 
 Lab Value = 0.0068 
 RPT Level = 0.01 
 Lab Sample ID = 20120870035  Analysis Date = 03/28/2012 
 Lab Value = 0.0096 
 RPT Level = 0.01 
 Lab Sample ID = 20120790085  Analysis Date = 03/21/2012 
 Lab Value = 0.0073 
 RPT Level = 0.01 
 Lab Sample ID = 20120730079  Analysis Date = 03/13/2012 
 Lab Value = 0.0054 
 RPT Level = 0.01 
 Lab Sample ID = 20120660073  Analysis Date = 03/06/2012 
 Lab Value = 0.0044 
 RPT Level = 0.01 
 Lab Sample ID = 20120580047  Analysis Date = 02/23/2012 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20120530099  Analysis Date = 02/23/2012 
 Lab Value = 0.0065 
 RPT Level = 0.01 
 Lab Sample ID = 20120450020  Analysis Date = 02/08/2012 
 Lab Value = 0.0043 
 RPT Level = 0.01 
 Lab Sample ID = 20120370064  Analysis Date = 02/02/2012 
 Lab Value = 0.0024 
 RPT Level = 0.01 
 Lab Sample ID = 20120310012  Analysis Date = 01/25/2012 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20120230046  Analysis Date = 01/19/2012 
 Lab Value = 0.0019 
 RPT Level = 0.01 
 Lab Sample ID = 20120180013  Analysis Date = 01/12/2012 
 Lab Value = 0.0042 
 RPT Level = 0.01 
 Lab Sample ID = 20120090052  Analysis Date = 01/09/2012 
 Lab Value = .00017 
 RPT Level = 0.01 
 Lab Sample ID = 20120030028  Analysis Date = 01/09/2012 
 Lab Value = 0.0038 
 RPT Level = 0.01 
 Lab Sample ID = 20113610089  Analysis Date = 12/21/2011 
 Lab Value = 0.0078 
 RPT Level = 0.01 
 Lab Sample ID = 20113530139  Analysis Date = 12/20/2011 
 Lab Value = 0.0084 
 RPT Level = 0.01 
 Lab Sample ID = 20113490075  Analysis Date = 12/15/2011 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20113460137  Analysis Date = 12/02/2011 
 Lab Value = 0.0085 
 RPT Level = 0.01 
 Lab Sample ID = 20113320115  Analysis Date = 12/01/2011 
 Lab Value = 0.0092 
 RPT Level = 0.01 
 Lab Sample ID = 20113250126  Analysis Date = 11/28/2011 
 Lab Value = 0.0133 
 RPT Level = 0.01 
 Lab Sample ID = 20113180164  Analysis Date = 11/09/2011 
 Lab Value = 0.0063 
 RPT Level = 0.01 
 Lab Sample ID = 20113110062  Analysis Date = 11/08/2011 
 Lab Value = 0.0036 
 RPT Level = 0.01 
 Lab Sample ID = 20113050092  Analysis Date = 10/26/2011 
 Lab Value = 0.0091 
 RPT Level = 0.01 
 Lab Sample ID = 20112970118  Analysis Date = 10/25/2011 
 Lab Value = 0.0074 
 RPT Level = 0.01 
 Lab Sample ID = 20112910137  Analysis Date = 10/14/2011 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20112840071  Analysis Date = 10/04/2011 
 Lab Value = 0.0052 
 RPT Level = 0.01 
 Lab Sample ID = 20112760061  Analysis Date = 09/29/2011 
 Lab Value = 0.0049 
 RPT Level = 0.01 
 Lab Sample ID = 20112690123  Analysis Date = 09/22/2011 
 Lab Value = 0.0063 
 RPT Level = 0.01 
 Lab Sample ID = 20112630061  Analysis Date = 09/16/2011 
 Lab Value = 0.0084 
 RPT Level = 0.01 
 Lab Sample ID = 20112560021  Analysis Date = 09/12/2011 
 Lab Value = 0.0059 
 RPT Level = 0.01 
 Lab Sample ID = 20112510037  Analysis Date = 09/08/2011 
 Lab Value = 0.0022 
 RPT Level = 0.01 
 Lab Sample ID = 20112500188  Analysis Date = 08/25/2011 
 Lab Value = 0.0044 
 RPT Level = 0.01 
 Lab Sample ID = 20112360063  Analysis Date = 08/19/2011 
 Lab Value = 0.0021 
 RPT Level = 0.01 
 Lab Sample ID = 20112300036  Analysis Date = 08/10/2011 
 Lab Value = .00051 
 RPT Level = 0.01 
 Lab Sample ID = 20112200051  Analysis Date = 08/02/2011 
 Lab Value = 0.0024 
 RPT Level = 0.01 
 Lab Sample ID = 20112130154  Analysis Date = 07/28/2011 
 Lab Value = 0.0036 
 RPT Level = 0.01 
 Lab Sample ID = 20112060094  Analysis Date = 07/21/2011 
 Lab Value = 0.0023 
 RPT Level = 0.01 
 Lab Sample ID = 20112010020  Analysis Date = 07/13/2011 
 Lab Value = 0.0038 
 RPT Level = 0.01 
 Lab Sample ID = 20111920099  Analysis Date = 07/08/2011 
 Lab Value = .00023 
 RPT Level = 0.01 
 Lab Sample ID = 20111860062  Analysis Date = 06/29/2011 
 Lab Value = 0.0066 
 RPT Level = 0.01 
 Lab Sample ID = 20111780166  Analysis Date = 06/22/2011 
 Lab Value = 0.0048 
 RPT Level = 0.01 
 Lab Sample ID = 20111710111  Analysis Date = 06/15/2011 
 Lab Value = -91E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20111640067  Analysis Date = 06/07/2011 
 Lab Value = 0.0047 
 RPT Level = 0.01 
 Lab Sample ID = 20111570061  Analysis Date = 06/03/2011 
 Lab Value = 0.0056 
 RPT Level = 0.01 
 Lab Sample ID = 20111510151  Analysis Date = 05/25/2011 
 Lab Value = 0.0063 
 RPT Level = 0.01 
 Lab Sample ID = 20111430203  Analysis Date = 05/19/2011 
 Lab Value = 0.0118 
 RPT Level = 0.01 
 Lab Sample ID = 20111360146  Analysis Date = 05/11/2011 
 Lab Value = 0.0072 
 RPT Level = 0.01 
 Lab Sample ID = 20111290046  Analysis Date = 05/05/2011 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20111220086  Analysis Date = 04/27/2011 
 Lab Value = 0.0019 
 RPT Level = 0.01 
 Lab Sample ID = 20111150114  Analysis Date = 04/20/2011 
 Lab Value = 0.0047 
 RPT Level = 0.01 
 Lab Sample ID = 20111080073  Analysis Date = 04/13/2011 
 Lab Value = 0.0016 
 RPT Level = 0.01 
 Lab Sample ID = 20111010118  Analysis Date = 04/07/2011 
 Lab Value = 0.0049 
 RPT Level = 0.01 
 Lab Sample ID = 20110950054  Analysis Date = 03/30/2011 
 Lab Value = .00022 
 RPT Level = 0.01 
 Lab Sample ID = 20110870089  Analysis Date = 03/22/2011 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20110800059  Analysis Date = 03/18/2011 
 Lab Value = 0.0071 
 RPT Level = 0.01 
 Lab Sample ID = 20110750067  Analysis Date = 03/09/2011 
 Lab Value = 0.0028 
 RPT Level = 0.01 
 Lab Sample ID = 20110660032  Analysis Date = 03/01/2011 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20110590070  Analysis Date = 02/24/2011 
 Lab Value = 0.0016 
 RPT Level = 0.01 
 Lab Sample ID = 20110530105  Analysis Date = 02/16/2011 
 Lab Value = 0.0033 
 RPT Level = 0.01 
 Lab Sample ID = 20110450036  Analysis Date = 02/15/2011 
 Lab Value = 0.0071 
 RPT Level = 0.01 
 Lab Sample ID = 20110410098  Analysis Date = 02/15/2011 
 Lab Value = 0.0057 
 RPT Level = 0.01 
 Lab Sample ID = 20110400069  Analysis Date = 02/02/2011 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20110240065  Analysis Date = 02/01/2011 
 Lab Value = 0.0017 
 RPT Level = 0.01 
 Lab Sample ID = 20110180057  Analysis Date = 01/20/2011 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20110110016  Analysis Date = 01/10/2011 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20110030021  Analysis Date = 01/10/2011 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20103610054  Analysis Date = 01/14/2011 
 Lab Value = .00015 
 RPT Level = 0.01 
 Lab Sample ID = 20103540047  Analysis Date = 01/06/2011 
 Lab Value = -.0007 
 RPT Level = 0.01 
 Lab Sample ID = 20103470078  Analysis Date = 12/15/2010 
 Lab Value = 0.0043 
 RPT Level = 0.01 
 Lab Sample ID = 20103400086  Analysis Date = 12/09/2010 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20103330099  Analysis Date = 12/09/2010 
 Lab Value = 0.0023 
 RPT Level = 0.01 
 Lab Sample ID = 20103260065  Analysis Date = 12/02/2010 
 Lab Value = 0.0059 
 RPT Level = 0.01 
 Lab Sample ID = 20103190064  Analysis Date = 11/18/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20103120026  Analysis Date = 11/09/2010 
 Lab Value = 0.0028 
 RPT Level = 0.01 
 Lab Sample ID = 20103060008  Analysis Date = 11/09/2010 
 Lab Value = .00077 
 RPT Level = 0.01 
 Lab Sample ID = 20102990006  Analysis Date = 11/04/2010 
 Lab Value = -74E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20102920006  Analysis Date = 10/27/2010 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20102850132  Analysis Date = 10/26/2010 
 Lab Value = 0.0085 
 RPT Level = 0.01 
 Lab Sample ID = 20102770110  Analysis Date = 10/14/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20102700152  Analysis Date = 10/14/2010 
 Lab Value = 0.0028 
 RPT Level = 0.01 
 Lab Sample ID = 20102640136  Analysis Date = 09/30/2010 
 Lab Value = 0.0083 
 RPT Level = 0.01 
 Lab Sample ID = 20102570015  Analysis Date = 09/29/2010 
 Lab Value = 0.0033 
 RPT Level = 0.01 
 Lab Sample ID = 20102510062  Analysis Date = 09/16/2010 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20102430249  Analysis Date = 09/15/2010 
 Lab Value = 0.0057 
 RPT Level = 0.01 
 Lab Sample ID = 20102350196  Analysis Date = 08/31/2010 
 Lab Value = 0.0086 
 RPT Level = 0.01 
 Lab Sample ID = 20102290049  Analysis Date = 08/26/2010 
 Lab Value = 0.0098 
 RPT Level = 0.01 
 Lab Sample ID = 20102230041  Analysis Date = 08/17/2010 
 Lab Value = 0.0046 
 RPT Level = 0.01 
 Lab Sample ID = 20102140090  Analysis Date = 08/12/2010 
 Lab Value = 0.0054 
 RPT Level = 0.01 
 Lab Sample ID = 20102080005  Analysis Date = 08/05/2010 
 Lab Value = 0.0023 
 RPT Level = 0.01 
 Lab Sample ID = 20102000188  Analysis Date = 07/16/2010 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20101930104  Analysis Date = 07/16/2010 
 Lab Value = 0.0093 
 RPT Level = 0.01 
 Lab Sample ID = 20101870059  Analysis Date = 07/16/2010 
 Lab Value = 0.0056 
 RPT Level = 0.01 
 Lab Sample ID = 20101790124  Analysis Date = 07/14/2010 
 Lab Value = 0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20101730068  Analysis Date = 07/13/2010 
 Lab Value = 0.0011 
 RPT Level = 0.01 
 Lab Sample ID = 20101660061  Analysis Date = 06/28/2010 
 Lab Value = 0.0051 
 RPT Level = 0.01 
 Lab Sample ID = 20101590005  Analysis Date = 06/25/2010 
 Lab Value = 0.0062 
 RPT Level = 0.01 
 Lab Sample ID = 20101530090  Analysis Date = 06/24/2010 
 Lab Value = 0.0051 
 RPT Level = 0.01 
 Lab Sample ID = 20101440165  Analysis Date = 06/17/2010 
 Lab Value = .00017 
 RPT Level = 0.01 
 Lab Sample ID = 20101380021  Analysis Date = 05/11/2010 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20101240080  Analysis Date = 05/11/2010 
 Lab Value = 0.0012 
 RPT Level = 0.01 
 Lab Sample ID = 20101180043  Analysis Date = 05/10/2010 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20101090063  Analysis Date = 04/26/2010 
 Lab Value = .00087 
 RPT Level = 0.01 
 Lab Sample ID = 20101020075  Analysis Date = 04/14/2010 
 Lab Value = 0.0015 
 RPT Level = 0.01 
 Lab Sample ID = 20100950036  Analysis Date = 04/12/2010 
 Lab Value = 0.0059 
 RPT Level = 0.01 
 Lab Sample ID = 20100880044  Analysis Date = 04/12/2010 
 Lab Value = -65E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20100850066  Analysis Date = 04/06/2010 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20100750002  Analysis Date = 03/31/2010 
 Lab Value = 0.0032 
 RPT Level = 0.01 
 Lab Sample ID = 20100680014  Analysis Date = 03/11/2010 
 Lab Value = 0.0011 
 RPT Level = 0.01 
 Lab Sample ID = 20100600067  Analysis Date = 02/23/2010 
 Lab Value = 0.0061 
 RPT Level = 0.01 
 Lab Sample ID = 20100530048  Analysis Date = 02/22/2010 
 Lab Value = .00091 
 RPT Level = 0.01 
 Lab Sample ID = 20100470025  Analysis Date = 02/22/2010 
 Lab Value = .00029 
 RPT Level = 0.01 
 Lab Sample ID = 20100390038  Analysis Date = 02/18/2010 
 Lab Value = 0.0103 
 RPT Level = 0.01 
 Lab Sample ID = 20100320023  Analysis Date = 02/11/2010 
 Lab Value = .00033 
 RPT Level = 0.01 
 Lab Sample ID = 20100260065  Analysis Date = 01/28/2010 
 Lab Value = 0.0024 
 RPT Level = 0.01 
 Lab Sample ID = 20100190102  Analysis Date = 01/14/2010 
 Lab Value = 0.0039 
 RPT Level = 0.01 
 Lab Sample ID = 20100110099  Analysis Date = 01/12/2010 
 Lab Value = .00066 
 RPT Level = 0.01 
 Lab Sample ID = 20100050014  Analysis Date = 01/12/2010 
 Lab Value = .00047 
 RPT Level = 0.01 
 Lab Sample ID = 20093620042  Analysis Date = 01/12/2010 
 Lab Value = 0.0045 
 RPT Level = 0.01 
 Lab Sample ID = 20093560033  Analysis Date = 01/07/2010 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20093480064  Analysis Date = 01/06/2010 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20093420004  Analysis Date = 01/06/2010 
 Lab Value = -91E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20093350070  Analysis Date = 11/27/2009 
 Lab Value = 0.0051 
 RPT Level = 0.01 
 Lab Sample ID = 20093280015  Analysis Date = 11/27/2009 
 Lab Value = 0.0123 
 RPT Level = 0.01 
 Lab Sample ID = 20093200062  Analysis Date = 11/25/2009 
 Lab Value = 0.0021 
 RPT Level = 0.01 
 Lab Sample ID = 20093130061  Analysis Date = 11/24/2009 
 Lab Value = 0.0028 
 RPT Level = 0.01 
 Lab Sample ID = 20093070201  Analysis Date = 11/19/2009 
 Lab Value = 0.0161 
 RPT Level = 0.01 
 Lab Sample ID = 20093000106  Analysis Date = 11/06/2009 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20092920096  Analysis Date = 11/05/2009 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20092870073  Analysis Date = 10/22/2009 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20092780071  Analysis Date = 10/21/2009 
 Lab Value = .00055 
 RPT Level = 0.01 
 Lab Sample ID = 20092720011  Analysis Date = 10/15/2009 
 Lab Value = 0.0093 
 RPT Level = 0.01 
 Lab Sample ID = 20092640026  Analysis Date = 09/30/2009 
 Lab Value = 0.0035 
 RPT Level = 0.01 
 Lab Sample ID = 20092570049  Analysis Date = 09/30/2009 
 Lab Value = 0.0024 
 RPT Level = 0.01 
 Lab Sample ID = 20092520132  Analysis Date = 09/23/2009 
 Lab Value = .00033 
 RPT Level = 0.01 
 Lab Sample ID = 20092430155  Analysis Date = 09/10/2009 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20092360171  Analysis Date = 09/02/2009 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20092290211  Analysis Date = 08/26/2009 
 Lab Value = 0.0042 
 RPT Level = 0.01 
 Lab Sample ID = 20092220169  Analysis Date = 08/20/2009 
 Lab Value = 0.0028 
 RPT Level = 0.01 
 Lab Sample ID = 20092150073  Analysis Date = 08/12/2009 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20092090263  Analysis Date = 07/29/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20092010116  Analysis Date = 07/23/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20091950026  Analysis Date = 07/16/2009 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20091870025  Analysis Date = 07/09/2009 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20091800174  Analysis Date = 06/30/2009 
 Lab Value = 0.0021 
 RPT Level = 0.01 
 Lab Sample ID = 20091730218  Analysis Date = 06/25/2009 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20091660206  Analysis Date = 06/17/2009 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20091590088  Analysis Date = 06/10/2009 
 Lab Value = 0.0067 
 RPT Level = 0.01 
 Lab Sample ID = 20091520151  Analysis Date = 06/03/2009 
 Lab Value = .00012 
 RPT Level = 0.01 
 Lab Sample ID = 20091460188  Analysis Date = 05/21/2009 
 Lab Value = 0.0098 
 RPT Level = 0.01 
 Lab Sample ID = 20091380122  Analysis Date = 05/20/2009 
 Lab Value = .00062 
 RPT Level = 0.01 
 Lab Sample ID = 20091320020  Analysis Date = 05/14/2009 
 Lab Value = .00073 
 RPT Level = 0.01 
 Lab Sample ID = 20091240123  Analysis Date = 05/06/2009 
 Lab Value = 0.0027 
 RPT Level = 0.01 
 Lab Sample ID = 20091170110  Analysis Date = 04/30/2009 
 Lab Value = 0.0172 
 RPT Level = 0.01 
 Lab Sample ID = 20091110135  Analysis Date = 04/15/2009 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20091030081  Analysis Date = 04/08/2009 
 Lab Value = 0.0051 
 RPT Level = 0.01 
 Lab Sample ID = 20090960054  Analysis Date = 04/08/2009 
 Lab Value = 0.0055 
 RPT Level = 0.01 
 Lab Sample ID = 20090890069  Analysis Date = 04/07/2009 
 Lab Value = 0.0084 
 RPT Level = 0.01 
 Lab Sample ID = 20090820029  Analysis Date = 03/31/2009 
 Lab Value = 0.0013 
 RPT Level = 0.01 
 Lab Sample ID = 20090750048  Analysis Date = 03/10/2009 
 Lab Value = 0.0111 
 RPT Level = 0.01 
 Lab Sample ID = 20090680045  Analysis Date = 03/04/2009 
 Lab Value = 0.0031 
 RPT Level = 0.01 
 Lab Sample ID = 20090610057  Analysis Date = 03/04/2009 
 Lab Value = 0.0058 
 RPT Level = 0.01 
 Lab Sample ID = 20090540030  Analysis Date = 03/03/2009 
 Lab Value = 0.0014 
 RPT Level = 0.01 
 Lab Sample ID = 20090480058  Analysis Date = 02/18/2009 
 Lab Value = 0.0012 
 RPT Level = 0.01 
 Lab Sample ID = 20090400032  Analysis Date = 02/03/2009 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20090330037  Analysis Date = 02/03/2009 
 Lab Value = .00017 
 RPT Level = 0.01 
 Lab Sample ID = 20090260027  Analysis Date = 01/28/2009 
 Lab Value = .00039 
 RPT Level = 0.01 
 Lab Sample ID = 20090200036  Analysis Date = 01/22/2009 
 Lab Value = 0.0052 
 RPT Level = 0.01 
 Lab Sample ID = 20090120049  Analysis Date = 01/08/2009 
 Lab Value = -.0004 
 RPT Level = 0.01 
 Lab Sample ID = 20090050019  Analysis Date = 01/08/2009 
 Lab Value = .00058 
 RPT Level = 0.01 
 Lab Sample ID = 20083650083  Analysis Date = 01/07/2009 
 Lab Value = 0.0013 
 RPT Level = 0.01 
 Lab Sample ID = 20083570034  Analysis Date = 12/22/2008 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20083500071  Analysis Date = 12/18/2008 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20083450064  Analysis Date = 12/09/2008 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20083360040  Analysis Date = 12/04/2008 
 Lab Value = 0.0018 
 RPT Level = 0.01 
 Lab Sample ID = 20083290062  Analysis Date = 12/03/2008 
 Lab Value = 0.0027 
 RPT Level = 0.01 
 Lab Sample ID = 20083220064  Analysis Date = 12/18/2008 
 Lab Value = 0.0018 
 RPT Level = 0.01 
 Lab Sample ID = 20083150065  Analysis Date = 11/13/2008 
 Lab Value = .00082 
 RPT Level = 0.01 
 Lab Sample ID = 20083080100  Analysis Date = 11/12/2008 
 Lab Value = .00073 
 RPT Level = 0.01 
 Lab Sample ID = 20083010109  Analysis Date = 11/04/2008 
 Lab Value = 0.0007 
 RPT Level = 0.01 
 Lab Sample ID = 20082940063  Analysis Date = 10/16/2008 
 Lab Value = 0.0067 
 RPT Level = 0.01 
 Lab Sample ID = 20082880040  Analysis Date = 10/15/2008 
 Lab Value = 0.0064 
 RPT Level = 0.01 
 Lab Sample ID = 20082800042  Analysis Date = 10/08/2008 
 Lab Value = 0.0001 
 RPT Level = 0.01 
 Lab Sample ID = 20082730062  Analysis Date = 09/30/2008 
 Lab Value = 0.0044 
 RPT Level = 0.01 
 Lab Sample ID = 20082660047  Analysis Date = 09/24/2008 
 Lab Value = 0.0038 
 RPT Level = 0.01 
 Lab Sample ID = 20082590105  Analysis Date = 09/23/2008 
 Lab Value = 0.0057 
 RPT Level = 0.01 
 Lab Sample ID = 20082520008  Analysis Date = 09/16/2008 
 Lab Value = 0.0044 
 RPT Level = 0.01 
 Lab Sample ID = 20082460098  Analysis Date = 09/10/2008 
 Lab Value = .00086 
 RPT Level = 0.01 
 Lab Sample ID = 20082380080  Analysis Date = 08/26/2008 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20082310131  Analysis Date = 08/28/2008 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20082250010  Analysis Date = 08/28/2008 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20082190011  Analysis Date = 07/24/2008 
 Lab Value = 0.0069 
 RPT Level = 0.01 
 Lab Sample ID = 20082030127  Analysis Date = 07/17/2008 
 Lab Value = 0.0029 
 RPT Level = 0.01 
 Lab Sample ID = 20081970139  Analysis Date = 07/14/2008 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20081890044  Analysis Date = 07/07/2008 
 Lab Value = .00037 
 RPT Level = 0.01 
 Lab Sample ID = 20081820059  Analysis Date = 07/02/2008 
 Lab Value = 0.0073 
 RPT Level = 0.01 
 Lab Sample ID = 20081750128  Analysis Date = 06/24/2008 
 Lab Value = .00036 
 RPT Level = 0.01 
 Lab Sample ID = 20081680067  Analysis Date = 06/18/2008 
 Lab Value = -67E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20081620017  Analysis Date = 06/11/2008 
 Lab Value = 0.0017 
 RPT Level = 0.01 
 Lab Sample ID = 20081540109  Analysis Date = 06/09/2008 
 Lab Value = -64E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20081480068  Analysis Date = 05/21/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20081400061  Analysis Date = 05/20/2008 
 Lab Value = 0.0015 
 RPT Level = 0.01 
 Lab Sample ID = 20081330112  Analysis Date = 05/13/2008 
 Lab Value = 0.0042 
 RPT Level = 0.01 
 Lab Sample ID = 20081260070  Analysis Date = 05/06/2008 
 Lab Value = 0.0026 
 RPT Level = 0.01 
 Lab Sample ID = 20081190055  Analysis Date = 04/30/2008 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20081120033  Analysis Date = 04/29/2008 
 Lab Value = 0.0096 
 RPT Level = 0.01 
 Lab Sample ID = 20081050114  Analysis Date = 04/15/2008 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20080980084  Analysis Date = 04/15/2008 
 Lab Value = 0.0003 
 RPT Level = 0.01 
 Lab Sample ID = 20080920083  Analysis Date = 03/31/2008 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20080840064  Analysis Date = 03/26/2008 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20080770124  Analysis Date = 03/20/2008 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20080700074  Analysis Date = 03/06/2008 
 Lab Value = 0.0114 
 RPT Level = 0.01 
 Lab Sample ID = 20080630067  Analysis Date = 03/05/2008 
 Lab Value = 0.0052 
 RPT Level = 0.01 
 Lab Sample ID = 20080560070  Analysis Date = 02/28/2008 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20080510055  Analysis Date = 02/12/2008 
 Lab Value = 0.0035 
 RPT Level = 0.01 
 Lab Sample ID = 20080420072  Analysis Date = 02/06/2008 
 Lab Value = -55E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20080360051  Analysis Date = 01/29/2008 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20080280050  Analysis Date = 01/24/2008 
 Lab Value = 0.0069 
 RPT Level = 0.01 
 Lab Sample ID = 20080230021  Analysis Date = 01/23/2008 
 Lab Value = 0.0034 
 RPT Level = 0.01 
 Lab Sample ID = 20080140027  Analysis Date = 01/17/2008 
 Lab Value = 0.0079 
 RPT Level = 0.01 
 Lab Sample ID = 20080070023  Analysis Date = 01/08/2008 
 Lab Value = 0.0066 
 RPT Level = 0.01 
 Lab Sample ID = 20073620004  Analysis Date = 01/03/2008 
 Lab Value = 0.0107 
 RPT Level = 0.01 
 Lab Sample ID = 20073510098  Analysis Date = 12/13/2007 
 Lab Value = 0.0017 
 RPT Level = 0.01 
 Lab Sample ID = 20073440039  Analysis Date = 12/04/2007 
 Lab Value = 0.0018 
 RPT Level = 0.01 
 Lab Sample ID = 20073370069  Analysis Date = 11/27/2007 
 Lab Value = 0.0021 
 RPT Level = 0.01 
 Lab Sample ID = 20073300042  Analysis Date = 11/21/2007 
 Lab Value = 0.0035 
 RPT Level = 0.01 
 Lab Sample ID = 20073230113  Analysis Date = 11/15/2007 
 Lab Value = 0.0067 
 RPT Level = 0.01 
 Lab Sample ID = 20073170062  Analysis Date = 11/15/2007 
 Lab Value = 0.0026 
 RPT Level = 0.01 
 Lab Sample ID = 20073100012  Analysis Date = 10/30/2007 
 Lab Value = 0.0022 
 RPT Level = 0.01 
 Lab Sample ID = 20073020065  Analysis Date = 10/26/2007 
 Lab Value = 0.0022 
 RPT Level = 0.01 
 Lab Sample ID = 20072960186  Analysis Date = 10/23/2007 
 Lab Value = 0.0049 
 RPT Level = 0.01 
 Lab Sample ID = 20072890056  Analysis Date = 10/22/2007 
 Lab Value = -.0008 
 RPT Level = 0.01 
 Lab Sample ID = 20072850025  Analysis Date = 10/10/2007 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20072670056  Analysis Date = 10/10/2007 
 Lab Value = 0.0025 
 RPT Level = 0.01 
 Lab Sample ID = 20072600129  Analysis Date = 10/05/2007 
 Lab Value = 0.0045 
 RPT Level = 0.01 
 Lab Sample ID = 20072540015  Analysis Date = 09/28/2007 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20072480018  Analysis Date = 08/30/2007 
 Lab Value = 0.0208 
 RPT Level = 0.01 
 Lab Sample ID = 20072400035  Analysis Date = 08/27/2007 
 Lab Value = 0.0016 
 RPT Level = 0.01 
 Lab Sample ID = 20072330109  Analysis Date = 08/24/2007 
 Lab Value = 0.0032 
 RPT Level = 0.01 
 Lab Sample ID = 20072260198  Analysis Date = 08/22/2007 
 Lab Value = 0.0022 
 RPT Level = 0.01 
 Lab Sample ID = 20072210252  Analysis Date = 08/20/2007 
 Lab Value = 0.0015 
 RPT Level = 0.01 
 Lab Sample ID = 20072110162  Analysis Date = 08/15/2007 
 Lab Value = 0.0049 
 RPT Level = 0.01 
 Lab Sample ID = 20072040101  Analysis Date = 07/24/2007 
 Lab Value = 0.0038 
 RPT Level = 0.01 
 Lab Sample ID = 20071900105  Analysis Date = 07/23/2007 
 Lab Value = 0.0101 
 RPT Level = 0.01 
 Lab Sample ID = 20071830158  Analysis Date = 07/03/2007 
 Lab Value = 0.0056 
 RPT Level = 0.01 
 Lab Sample ID = 20071770201  Analysis Date = 06/22/2007 
 Lab Value = 0.0075 
 RPT Level = 0.01 
 Lab Sample ID = 20071690119  Analysis Date = 06/22/2007 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20071620045  Analysis Date = 06/21/2007 
 Lab Value = 0.0052 
 RPT Level = 0.01 
 Lab Sample ID = 20071560026  Analysis Date = 06/20/2007 
 Lab Value = 0.0001 
 RPT Level = 0.01 
 Lab Sample ID = 20071500033  Analysis Date = 06/07/2007 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20071410089  Analysis Date = 05/17/2007 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20071340113  Analysis Date = 05/16/2007 
 Lab Value = 0.0017 
 RPT Level = 0.01 
 Lab Sample ID = 20071280019  Analysis Date = 05/08/2007 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20071200089  Analysis Date = 05/03/2007 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20071130120  Analysis Date = 05/01/2007 
 Lab Value = 0.0027 
 RPT Level = 0.01 
 Lab Sample ID = 20071070021  Analysis Date = 04/26/2007 
 Lab Value = .00031 
 RPT Level = 0.01 
 Lab Sample ID = 20070990050  Analysis Date = 04/24/2007 
 Lab Value = -.0006 
 RPT Level = 0.01 
 Lab Sample ID = 20070930070  Analysis Date = 04/19/2007 
 Lab Value = .00087 
 RPT Level = 0.01 
 Lab Sample ID = 20070860217  Analysis Date = 03/26/2007 
 Lab Value = 0.0125 
 RPT Level = 0.01 
 Lab Sample ID = 20070780128  Analysis Date = 03/20/2007 
 Lab Value = 0.0016 
 RPT Level = 0.01 
 Lab Sample ID = 20070710075  Analysis Date = 03/15/2007 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20070650009  Analysis Date = 03/14/2007 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20070580141  Analysis Date = 02/27/2007 
 Lab Value = 0.0081 
 RPT Level = 0.01 
 Lab Sample ID = 20070540023  Analysis Date = 02/21/2007 
 Lab Value = 0.0118 
 RPT Level = 0.01 
 Lab Sample ID = 20070460015  Analysis Date = 02/13/2007 
 Lab Value = .00023 
 RPT Level = 0.01 
 Lab Sample ID = 20070400103  Analysis Date = 02/01/2007 
 Lab Value = -33E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20070250023  Analysis Date = 02/01/2007 
 Lab Value = .00099 
 RPT Level = 0.01 
 Lab Sample ID = 20070180071  Analysis Date = 01/18/2007 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20070120012  Analysis Date = 01/09/2007 
 Lab Value = 0.0012 
 RPT Level = 0.01 
 Lab Sample ID = 20070040013  Analysis Date = 12/28/2006 
 Lab Value = 0.0033 
 RPT Level = 0.01 
 Lab Sample ID = 20063610084  Analysis Date = 12/27/2006 
 Lab Value = 0.0031 
 RPT Level = 0.01 
 Lab Sample ID = 20063520072  Analysis Date = 12/26/2006 
 Lab Value = 0.0068 
 RPT Level = 0.01 
 Lab Sample ID = 20063450081  Analysis Date = 12/05/2006 
 Lab Value = .00046 
 RPT Level = 0.01 
 Lab Sample ID = 20063380055  Analysis Date = 11/29/2006 
 Lab Value = .00064 
 RPT Level = 0.01 
 Lab Sample ID = 20063310047  Analysis Date = 11/28/2006 
 Lab Value = 0.0006 
 RPT Level = 0.01 
 Lab Sample ID = 20063240079  Analysis Date = 11/27/2006 
 Lab Value = 0.0011 
 RPT Level = 0.01 
 Lab Sample ID = 20063180103  Analysis Date = 11/22/2006 
 Lab Value = 0.0026 
 RPT Level = 0.01 
 Lab Sample ID = 20063100080  Analysis Date = 11/22/2006 
 Lab Value = 0.0036 
 RPT Level = 0.01 
 Lab Sample ID = 20063030096  Analysis Date = 11/16/2006 
 Lab Value = 0.0079 
 RPT Level = 0.01 
 Lab Sample ID = 20062960133  Analysis Date = 11/07/2006 
 Lab Value = -43E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20062910013  Analysis Date = 11/07/2006 
 Lab Value = .00058 
 RPT Level = 0.01 
 Lab Sample ID = 20062850014  Analysis Date = 10/26/2006 
 Lab Value = 0.0061 
 RPT Level = 0.01 
 Lab Sample ID = 20062780050  Analysis Date = 10/03/2006 
 Lab Value = 0.0013 
 RPT Level = 0.005 
 Lab Sample ID = 20062620013  Analysis Date = 09/25/2006 
 Lab Value = 0.0043 
 RPT Level = 0.005 
 Lab Sample ID = 20062540016  Analysis Date = 09/20/2006 
 Lab Value = 0.0063 
 RPT Level = 0.005 
 Lab Sample ID = 20062500008  Analysis Date = 08/24/2006 
 Lab Value = 0.0079 
 RPT Level = 0.005 
 Lab Sample ID = 20062270273  Analysis Date = 08/18/2006 
 Lab Value = 0.0021 
 RPT Level = 0.005 
 Lab Sample ID = 20062220039  Analysis Date = 08/07/2006 
 Lab Value = -85E-5 
 RPT Level = 0.005 
 Lab Sample ID = 20062020314  Analysis Date = 07/19/2006 
 Lab Value = 0.0102 
 RPT Level = 0.005 
 Lab Sample ID = 20061950007  Analysis Date = 07/14/2006 
 Lab Value = 0.0045 
 RPT Level = 0.005 
 Lab Sample ID = 20061880009  Analysis Date = 06/27/2006 
 Lab Value = -6E-5 
 RPT Level = 0.005 
 Lab Sample ID = 20061730014  Analysis Date = 06/21/2006 
 Lab Value = 0.0039 
 RPT Level = 0.005 
 Lab Sample ID = 20061670021  Analysis Date = 06/13/2006 
 Lab Value = .00082 
 RPT Level = 0.005 
 Lab Sample ID = 20061580018  Analysis Date = 09/30/2016 
 RPT Level = 0.01  Analysis Date = 09/23/2016 
 RPT Level = 0.01  Analysis Date = 09/23/2016 
 RPT Level = 0.01  Analysis Date = 09/16/2016 
 RPT Level = 0.01  Analysis Date = 09/16/2016 
 RPT Level = 0.01  Analysis Date = 09/13/2016 
 RPT Level = 0.01  Analysis Date = 09/13/2016 
 RPT Level = 0.01  Analysis Date = 09/09/2016 
 RPT Level = 0.01  Analysis Date = 09/09/2016 
 RPT Level = 0.01  Analysis Date = 08/26/2016 
 RPT Level = 0.01  Analysis Date = 08/26/2016 
 RPT Level = 0.01  Analysis Date = 08/19/2016 
 RPT Level = 0.01  Analysis Date = 08/19/2016 
 RPT Level = 0.01  Analysis Date = 08/12/2016 
 RPT Level = 0.01  Analysis Date = 08/12/2016 
 RPT Level = 0.01  Analysis Date = 08/08/2016 
 RPT Level = 0.01  Analysis Date = 08/08/2016 
 RPT Level = 0.01  Analysis Date = 08/02/2016 
 RPT Level = 0.01  Analysis Date = 08/02/2016 
 RPT Level = 0.01  Analysis Date = 07/26/2016 
 RPT Level = 0.01  Analysis Date = 07/26/2016 
 RPT Level = 0.01  Analysis Date = 07/14/2016 
 RPT Level = 0.01  Analysis Date = 07/14/2016 
 RPT Level = 0.01  Analysis Date = 07/12/2016 
 RPT Level = 0.01  Analysis Date = 07/12/2016 
 RPT Level = 0.01  Analysis Date = 07/07/2016 
 RPT Level = 0.01  Analysis Date = 07/07/2016 
 RPT Level = 0.01  Analysis Date = 06/29/2016 
 RPT Level = 0.01  Analysis Date = 06/29/2016 
 RPT Level = 0.01  Analysis Date = 06/20/2016 
 RPT Level = 0.01  Analysis Date = 06/20/2016 
 RPT Level = 0.01  Analysis Date = 06/09/2016 
 RPT Level = 0.01  Analysis Date = 06/09/2016 
 RPT Level = 0.01  Analysis Date = 06/02/2016 
 RPT Level = 0.01  Analysis Date = 06/02/2016 
 RPT Level = 0.01  Analysis Date = 06/02/2016 
 RPT Level = 0.01  Analysis Date = 06/02/2016 
 RPT Level = 0.01  Analysis Date = 05/10/2016 
 RPT Level = 0.01  Analysis Date = 05/10/2016 
 RPT Level = 0.01  Analysis Date = 05/04/2016 
 RPT Level = 0.01  Analysis Date = 05/04/2016 
 RPT Level = 0.01  Analysis Date = 04/28/2016 
 RPT Level = 0.01  Analysis Date = 04/28/2016 
 RPT Level = 0.01  Analysis Date = 04/22/2016 
 RPT Level = 0.01  Analysis Date = 04/22/2016 
 RPT Level = 0.01  Analysis Date = 04/13/2016 
 RPT Level = 0.01  Analysis Date = 04/13/2016 
 RPT Level = 0.01  Analysis Date = 04/07/2016 
 RPT Level = 0.01  Analysis Date = 04/07/2016 
 RPT Level = 0.01  Analysis Date = 03/31/2016 
 RPT Level = 0.01  Analysis Date = 03/31/2016 
 RPT Level = 0.01  Analysis Date = 03/25/2016 
 RPT Level = 0.01  Analysis Date = 03/25/2016 
 RPT Level = 0.01  Analysis Date = 03/17/2016 
 RPT Level = 0.01  Analysis Date = 03/17/2016 
 RPT Level = 0.01  Analysis Date = 03/08/2016 
 RPT Level = 0.01  Analysis Date = 03/08/2016 
 RPT Level = 0.01  Analysis Date = 03/02/2016 
 RPT Level = 0.01  Analysis Date = 03/02/2016 
 RPT Level = 0.01  Analysis Date = 02/25/2016 
 RPT Level = 0.01  Analysis Date = 02/25/2016 
 RPT Level = 0.01  Analysis Date = 02/23/2016 
 RPT Level = 0.01  Analysis Date = 02/23/2016 
 RPT Level = 0.01  Analysis Date = 02/19/2016 
 RPT Level = 0.01  Analysis Date = 02/19/2016 
 RPT Level = 0.01  Analysis Date = 02/03/2016 
 RPT Level = 0.01  Analysis Date = 02/03/2016 
 RPT Level = 0.01  Analysis Date = 01/27/2016 
 RPT Level = 0.01  Analysis Date = 01/27/2016 
 RPT Level = 0.01  Analysis Date = 01/25/2016 
 RPT Level = 0.01  Analysis Date = 01/25/2016 
 RPT Level = 0.01  Analysis Date = 01/14/2016 
 RPT Level = 0.01  Analysis Date = 01/14/2016 
 RPT Level = 0.01  Analysis Date = 01/06/2016 
 RPT Level = 0.01  Analysis Date = 01/06/2016 
 RPT Level = 0.01  Analysis Date = 01/05/2016 
 RPT Level = 0.01  Analysis Date = 01/05/2016 
 RPT Level = 0.01  Analysis Date = 12/28/2015 
 RPT Level = 0.01  Analysis Date = 12/28/2015 
 RPT Level = 0.01  Analysis Date = 12/22/2015 
 RPT Level = 0.01  Analysis Date = 12/22/2015 
 RPT Level = 0.01  Analysis Date = 12/14/2015 
 RPT Level = 0.01  Analysis Date = 12/14/2015 
 RPT Level = 0.01  Analysis Date = 12/02/2015 
 RPT Level = 0.01  Analysis Date = 12/02/2015 
 RPT Level = 0.01  Analysis Date = 11/27/2015 
 RPT Level = 0.01  Analysis Date = 11/27/2015 
 RPT Level = 0.01  Analysis Date = 11/24/2015 
 RPT Level = 0.01  Analysis Date = 11/24/2015 
 RPT Level = 0.01  Analysis Date = 11/16/2015 
 RPT Level = 0.01  Analysis Date = 11/16/2015 
 RPT Level = 0.01  Analysis Date = 11/04/2015 
 RPT Level = 0.01  Analysis Date = 11/04/2015 
 RPT Level = 0.01  Analysis Date = 10/28/2015 
 RPT Level = 0.01  Analysis Date = 10/28/2015 
 RPT Level = 0.01  Analysis Date = 10/20/2015 
 RPT Level = 0.01  Analysis Date = 10/20/2015 
 RPT Level = 0.01  Analysis Date = 10/14/2015 
 RPT Level = 0.01  Analysis Date = 10/14/2015 
 RPT Level = 0.01  Analysis Date = 10/06/2015 
 RPT Level = 0.01  Analysis Date = 10/06/2015 
 RPT Level = 0.01  Analysis Date = 09/29/2015 
 RPT Level = 0.01  Analysis Date = 09/29/2015 
 RPT Level = 0.01  Analysis Date = 09/23/2015 
 RPT Level = 0.01  Analysis Date = 09/23/2015 
 RPT Level = 0.01  Analysis Date = 09/21/2015 
 RPT Level = 0.01  Analysis Date = 09/21/2015 
 RPT Level = 0.01  Analysis Date = 09/09/2015 
 RPT Level = 0.01  Analysis Date = 09/09/2015 
 RPT Level = 0.01  Analysis Date = 09/02/2015 
 RPT Level = 0.01  Analysis Date = 09/02/2015 
 RPT Level = 0.01  Analysis Date = 08/26/2015 
 RPT Level = 0.01  Analysis Date = 08/26/2015 
 RPT Level = 0.01  Analysis Date = 08/26/2015 
 RPT Level = 0.01  Analysis Date = 08/26/2015 
 RPT Level = 0.01  Analysis Date = 08/13/2015 
 RPT Level = 0.01  Analysis Date = 08/13/2015 
 RPT Level = 0.01  Analysis Date = 08/04/2015 
 RPT Level = 0.01  Analysis Date = 08/04/2015 
 RPT Level = 0.01  Analysis Date = 07/28/2015 
 RPT Level = 0.01  Analysis Date = 07/28/2015 
 RPT Level = 0.01  Analysis Date = 07/22/2015 
 RPT Level = 0.01  Analysis Date = 07/22/2015 
 RPT Level = 0.01  Analysis Date = 07/15/2015 
 RPT Level = 0.01  Analysis Date = 07/15/2015 
 RPT Level = 0.01  Analysis Date = 07/08/2015 
 RPT Level = 0.01  Analysis Date = 07/08/2015 
 RPT Level = 0.01  Analysis Date = 07/01/2015 
 RPT Level = 0.01  Analysis Date = 07/01/2015 
 RPT Level = 0.01  Analysis Date = 06/24/2015 
 RPT Level = 0.01  Analysis Date = 06/24/2015 
 RPT Level = 0.01  Analysis Date = 06/17/2015 
 RPT Level = 0.01  Analysis Date = 06/17/2015 
 RPT Level = 0.01  Analysis Date = 06/12/2015 
 RPT Level = 0.01  Analysis Date = 06/12/2015 
 RPT Level = 0.01  Analysis Date = 06/04/2015 
 RPT Level = 0.01  Analysis Date = 06/04/2015 
 RPT Level = 0.01  Analysis Date = 05/28/2015 
 RPT Level = 0.01  Analysis Date = 05/28/2015 
 RPT Level = 0.01  Analysis Date = 05/21/2015 
 RPT Level = 0.01  Analysis Date = 05/21/2015 
 RPT Level = 0.01  Analysis Date = 05/15/2015 
 RPT Level = 0.01  Analysis Date = 05/15/2015 
 RPT Level = 0.01  Analysis Date = 05/08/2015 
 RPT Level = 0.01  Analysis Date = 05/08/2015 
 RPT Level = 0.01  Analysis Date = 05/04/2015 
 RPT Level = 0.01  Analysis Date = 05/04/2015 
 RPT Level = 0.01  Analysis Date = 04/27/2015 
 RPT Level = 0.01  Analysis Date = 04/27/2015 
 RPT Level = 0.01  Analysis Date = 04/17/2015 
 RPT Level = 0.01  Analysis Date = 04/17/2015 
 RPT Level = 0.01  Analysis Date = 04/10/2015 
 RPT Level = 0.01  Analysis Date = 04/10/2015 
 RPT Level = 0.01  Analysis Date = 04/06/2015 
 RPT Level = 0.01  Analysis Date = 04/06/2015 
 RPT Level = 0.01  Analysis Date = 03/30/2015 
 RPT Level = 0.01  Analysis Date = 03/30/2015 
 RPT Level = 0.01  Analysis Date = 03/19/2015 
 RPT Level = 0.01  Analysis Date = 03/19/2015 
 RPT Level = 0.01  Analysis Date = 03/11/2015 
 RPT Level = 0.01  Analysis Date = 03/11/2015 
 RPT Level = 0.01  Analysis Date = 03/06/2015 
 RPT Level = 0.01  Analysis Date = 03/06/2015 
 RPT Level = 0.01  Analysis Date = 02/24/2015 
 RPT Level = 0.01  Analysis Date = 02/24/2015 
 RPT Level = 0.01  Analysis Date = 02/19/2015 
 RPT Level = 0.01  Analysis Date = 02/19/2015 
 RPT Level = 0.01  Analysis Date = 02/17/2015 
 RPT Level = 0.01  Analysis Date = 02/17/2015 
 RPT Level = 0.01  Analysis Date = 02/04/2015 
 RPT Level = 0.01  Analysis Date = 02/04/2015 
 RPT Level = 0.01  Analysis Date = 02/04/2015 
 RPT Level = 0.01  Analysis Date = 02/04/2015 
 RPT Level = 0.01  Analysis Date = 02/03/2015 
 RPT Level = 0.01  Analysis Date = 02/03/2015 
 RPT Level = 0.01  Analysis Date = 01/16/2015 
 RPT Level = 0.01  Analysis Date = 01/16/2015 
 RPT Level = 0.01  Analysis Date = 01/08/2015 
 RPT Level = 0.01  Analysis Date = 01/08/2015 
 RPT Level = 0.01  Analysis Date = 01/08/2015 
 RPT Level = 0.01  Analysis Date = 01/08/2015 
 RPT Level = 0.01  Analysis Date = 01/07/2015 
 RPT Level = 0.01  Analysis Date = 01/07/2015 
 RPT Level = 0.01  Analysis Date = 01/06/2015 
 RPT Level = 0.01  Analysis Date = 01/06/2015 
 RPT Level = 0.01  Analysis Date = 12/17/2014 
 RPT Level = 0.01  Analysis Date = 12/17/2014 
 RPT Level = 0.01  Analysis Date = 12/15/2014 
 RPT Level = 0.01  Analysis Date = 12/15/2014 
 RPT Level = 0.01  Analysis Date = 12/15/2014 
 RPT Level = 0.01  Analysis Date = 12/15/2014 
 RPT Level = 0.01  Analysis Date = 11/25/2014 
 RPT Level = 0.01  Analysis Date = 11/25/2014 
 RPT Level = 0.01  Analysis Date = 11/21/2014 
 RPT Level = 0.01  Analysis Date = 11/21/2014 
 RPT Level = 0.01  Analysis Date = 11/21/2014 
 RPT Level = 0.01  Analysis Date = 11/21/2014 
 RPT Level = 0.01  Analysis Date = 11/19/2014 
 RPT Level = 0.01  Analysis Date = 11/19/2014 
 RPT Level = 0.01  Analysis Date = 11/19/2014 
 RPT Level = 0.01  Analysis Date = 11/19/2014 
 RPT Level = 0.01  Analysis Date = 11/17/2014 
 RPT Level = 0.01  Analysis Date = 11/17/2014 
 RPT Level = 0.01  Analysis Date = 11/17/2014 
 RPT Level = 0.01  Analysis Date = 11/17/2014 
 RPT Level = 0.01  Analysis Date = 11/06/2014 
 RPT Level = 0.01  Analysis Date = 11/06/2014 
 RPT Level = 0.01  Analysis Date = 11/06/2014 
 RPT Level = 0.01  Analysis Date = 11/06/2014 
 RPT Level = 0.01  Analysis Date = 10/23/2014 
 RPT Level = 0.01  Analysis Date = 10/23/2014 
 RPT Level = 0.01  Analysis Date = 10/23/2014 
 RPT Level = 0.01  Analysis Date = 10/23/2014 
 RPT Level = 0.01  Analysis Date = 10/14/2014 
 RPT Level = 0.01  Analysis Date = 10/14/2014 
 RPT Level = 0.01  Analysis Date = 10/14/2014 
 RPT Level = 0.01  Analysis Date = 10/14/2014 
 RPT Level = 0.01  Analysis Date = 10/01/2014 
 RPT Level = 0.01  Analysis Date = 10/01/2014 
 RPT Level = 0.01  Analysis Date = 10/01/2014 
 RPT Level = 0.01  Analysis Date = 10/01/2014 
 RPT Level = 0.01  Analysis Date = 09/23/2014 
 RPT Level = 0.01  Analysis Date = 09/23/2014 
 RPT Level = 0.01  Analysis Date = 09/23/2014 
 RPT Level = 0.01  Analysis Date = 09/23/2014 
 RPT Level = 0.01  Analysis Date = 09/22/2014 
 RPT Level = 0.01  Analysis Date = 09/22/2014 
 RPT Level = 0.01  Analysis Date = 09/22/2014 
 RPT Level = 0.01  Analysis Date = 09/22/2014 
 RPT Level = 0.01  Analysis Date = 09/12/2014 
 RPT Level = 0.01  Analysis Date = 09/12/2014 
 RPT Level = 0.01  Analysis Date = 09/12/2014 
 RPT Level = 0.01  Analysis Date = 09/12/2014 
 RPT Level = 0.01  Analysis Date = 09/08/2014 
 RPT Level = 0.01  Analysis Date = 09/08/2014 
 RPT Level = 0.01  Analysis Date = 09/08/2014 
 RPT Level = 0.01  Analysis Date = 09/08/2014 
 RPT Level = 0.01  Analysis Date = 08/13/2014 
 RPT Level = 0.01  Analysis Date = 08/13/2014 
 RPT Level = 0.01  Analysis Date = 08/13/2014 
 RPT Level = 0.01  Analysis Date = 08/13/2014 
 RPT Level = 0.01  Analysis Date = 08/06/2014 
 RPT Level = 0.01  Analysis Date = 08/06/2014 
 RPT Level = 0.01  Analysis Date = 08/06/2014 
 RPT Level = 0.01  Analysis Date = 08/06/2014 
 RPT Level = 0.01  Analysis Date = 07/31/2014 
 RPT Level = 0.01  Analysis Date = 07/31/2014 
 RPT Level = 0.01  Analysis Date = 07/31/2014 
 RPT Level = 0.01  Analysis Date = 07/31/2014 
 RPT Level = 0.01  Analysis Date = 07/23/2014 
 RPT Level = 0.01  Analysis Date = 07/23/2014 
 RPT Level = 0.01  Analysis Date = 07/17/2014 
 RPT Level = 0.01  Analysis Date = 07/17/2014 
 RPT Level = 0.01  Analysis Date = 07/10/2014 
 RPT Level = 0.01  Analysis Date = 07/10/2014 
 RPT Level = 0.01  Analysis Date = 07/02/2014 
 RPT Level = 0.01  Analysis Date = 07/02/2014 
 RPT Level = 0.01  Analysis Date = 06/25/2014 
 RPT Level = 0.01  Analysis Date = 06/25/2014 
 RPT Level = 0.01  Analysis Date = 06/19/2014 
 RPT Level = 0.01  Analysis Date = 06/19/2014 
 RPT Level = 0.01  Analysis Date = 06/16/2014 
 RPT Level = 0.01  Analysis Date = 06/16/2014 
 RPT Level = 0.01  Analysis Date = 06/06/2014 
 RPT Level = 0.01  Analysis Date = 06/06/2014 
 RPT Level = 0.01  Analysis Date = 06/03/2014 
 RPT Level = 0.01  Analysis Date = 06/03/2014 
 RPT Level = 0.01  Analysis Date = 05/27/2014 
 RPT Level = 0.01  Analysis Date = 05/27/2014 
 RPT Level = 0.01  Analysis Date = 05/15/2014 
 RPT Level = 0.01  Analysis Date = 05/15/2014 
 RPT Level = 0.01  Analysis Date = 05/07/2014 
 RPT Level = 0.01  Analysis Date = 05/07/2014 
 RPT Level = 0.01  Analysis Date = 05/02/2014 
 RPT Level = 0.01  Analysis Date = 05/02/2014 
 RPT Level = 0.01  Analysis Date = 04/29/2014 
 RPT Level = 0.01  Analysis Date = 04/29/2014 
 RPT Level = 0.01  Analysis Date = 04/17/2014 
 RPT Level = 0.01  Analysis Date = 04/17/2014 
 RPT Level = 0.01  Analysis Date = 04/10/2014 
 RPT Level = 0.01  Analysis Date = 04/10/2014 
 RPT Level = 0.01  Analysis Date = 04/02/2014 
 RPT Level = 0.01  Analysis Date = 04/02/2014 
 RPT Level = 0.01  Analysis Date = 03/26/2014 
 RPT Level = 0.01  Analysis Date = 03/26/2014 
 RPT Level = 0.01  Analysis Date = 03/19/2014 
 RPT Level = 0.01  Analysis Date = 03/19/2014 
 RPT Level = 0.01  Analysis Date = 03/12/2014 
 RPT Level = 0.01  Analysis Date = 03/12/2014 
 RPT Level = 0.01  Analysis Date = 03/06/2014 
 RPT Level = 0.01  Analysis Date = 03/06/2014 
 RPT Level = 0.01  Analysis Date = 02/27/2014 
 RPT Level = 0.01  Analysis Date = 02/27/2014 
 RPT Level = 0.01  Analysis Date = 02/24/2014 
 RPT Level = 0.01  Analysis Date = 02/24/2014 
 RPT Level = 0.01  Analysis Date = 02/18/2014 
 RPT Level = 0.01  Analysis Date = 02/18/2014 
 RPT Level = 0.01  Analysis Date = 02/13/2014 
 RPT Level = 0.01  Analysis Date = 02/13/2014 
 RPT Level = 0.01  Analysis Date = 02/06/2014 
 RPT Level = 0.01  Analysis Date = 02/06/2014 
 RPT Level = 0.01  Analysis Date = 01/22/2014 
 RPT Level = 0.01  Analysis Date = 01/22/2014 
 RPT Level = 0.01  Analysis Date = 01/15/2014 
 RPT Level = 0.01  Analysis Date = 01/15/2014 
 RPT Level = 0.01  Analysis Date = 01/10/2014 
 RPT Level = 0.01  Analysis Date = 01/10/2014 
 RPT Level = 0.01  Analysis Date = 01/08/2014 
 RPT Level = 0.01  Analysis Date = 01/08/2014 
 RPT Level = 0.01  Analysis Date = 12/17/2013 
 RPT Level = 0.01  Analysis Date = 12/17/2013 
 RPT Level = 0.01  Analysis Date = 12/17/2013 
 RPT Level = 0.01  Analysis Date = 12/17/2013 
 RPT Level = 0.01  Analysis Date = 12/06/2013 
 RPT Level = 0.01  Analysis Date = 12/06/2013 
 RPT Level = 0.01  Analysis Date = 12/03/2013 
 RPT Level = 0.01  Analysis Date = 12/03/2013 
 RPT Level = 0.01  Analysis Date = 11/20/2013 
 RPT Level = 0.01  Analysis Date = 11/20/2013 
 RPT Level = 0.01  Analysis Date = 11/14/2013 
 RPT Level = 0.01  Analysis Date = 11/14/2013 
 RPT Level = 0.01  Analysis Date = 11/12/2013 
 RPT Level = 0.01  Analysis Date = 11/12/2013 
 RPT Level = 0.01  Analysis Date = 10/31/2013 
 RPT Level = 0.01  Analysis Date = 10/31/2013 
 RPT Level = 0.01  Analysis Date = 10/28/2013 
 RPT Level = 0.01  Analysis Date = 10/28/2013 
 RPT Level = 0.01  Analysis Date = 10/17/2013 
 RPT Level = 0.01  Analysis Date = 10/17/2013 
 RPT Level = 0.01  Analysis Date = 09/24/2013 
 RPT Level = 0.01  Analysis Date = 09/24/2013 
 RPT Level = 0.01  Analysis Date = 09/18/2013 
 RPT Level = 0.01  Analysis Date = 09/18/2013 
 RPT Level = 0.01  Analysis Date = 10/24/2013 
 RPT Level = 0.01  Analysis Date = 10/24/2013 
 RPT Level = 0.01  Analysis Date = 09/04/2013 
 RPT Level = 0.01  Analysis Date = 09/04/2013 
 RPT Level = 0.01  Analysis Date = 08/28/2013 
 RPT Level = 0.01  Analysis Date = 08/28/2013 
 RPT Level = 0.01  Analysis Date = 08/26/2013 
 RPT Level = 0.01  Analysis Date = 08/26/2013 
 RPT Level = 0.01  Analysis Date = 08/19/2013 
 RPT Level = 0.01  Analysis Date = 08/19/2013 
 RPT Level = 0.01  Analysis Date = 08/09/2013 
 RPT Level = 0.01  Analysis Date = 08/09/2013 
 RPT Level = 0.01  Analysis Date = 08/02/2013 
 RPT Level = 0.01  Analysis Date = 08/02/2013 
 RPT Level = 0.01  Analysis Date = 07/25/2013 
 RPT Level = 0.01  Analysis Date = 07/25/2013 
 RPT Level = 0.01  Analysis Date = 07/17/2013 
 RPT Level = 0.01  Analysis Date = 07/17/2013 
 RPT Level = 0.01  Analysis Date = 07/11/2013 
 RPT Level = 0.01  Analysis Date = 07/11/2013 
 RPT Level = 0.01  Analysis Date = 07/08/2013 
 RPT Level = 0.01  Analysis Date = 07/08/2013 
 RPT Level = 0.01  Analysis Date = 06/28/2013 
 RPT Level = 0.01  Analysis Date = 06/28/2013 
 RPT Level = 0.01  Analysis Date = 06/21/2013 
 RPT Level = 0.01  Analysis Date = 06/21/2013 
 RPT Level = 0.01  Analysis Date = 06/18/2013 
 RPT Level = 0.01  Analysis Date = 06/18/2013 
 RPT Level = 0.01  Analysis Date = 06/05/2013 
 RPT Level = 0.01  Analysis Date = 06/05/2013 
 RPT Level = 0.01  Analysis Date = 06/03/2013 
 RPT Level = 0.01  Analysis Date = 06/03/2013 
 RPT Level = 0.01  Analysis Date = 05/24/2013 
 RPT Level = 0.01  Analysis Date = 05/24/2013 
 RPT Level = 0.01  Analysis Date = 05/16/2013 
 RPT Level = 0.01  Analysis Date = 05/16/2013 
 RPT Level = 0.01  Analysis Date = 05/10/2013 
 RPT Level = 0.01  Analysis Date = 05/10/2013 
 RPT Level = 0.01  Analysis Date = 05/03/2013 
 RPT Level = 0.01  Analysis Date = 05/03/2013 
 RPT Level = 0.01  Analysis Date = 04/26/2013 
 RPT Level = 0.01  Analysis Date = 04/26/2013 
 RPT Level = 0.01  Analysis Date = 04/24/2013 
 RPT Level = 0.01  Analysis Date = 04/24/2013 
 RPT Level = 0.01  Analysis Date = 04/24/2013 
 RPT Level = 0.01  Analysis Date = 04/24/2013 
 RPT Level = 0.01  Analysis Date = 04/04/2013 
 RPT Level = 0.01  Analysis Date = 04/04/2013 
 RPT Level = 0.01  Analysis Date = 03/27/2013 
 RPT Level = 0.01  Analysis Date = 03/27/2013 
 RPT Level = 0.01  Analysis Date = 03/21/2013 
 RPT Level = 0.01  Analysis Date = 03/21/2013 
 RPT Level = 0.01  Analysis Date = 03/14/2013 
 RPT Level = 0.01  Analysis Date = 03/14/2013 
 RPT Level = 0.01  Analysis Date = 03/07/2013 
 RPT Level = 0.01  Analysis Date = 03/07/2013 
 RPT Level = 0.01  Analysis Date = 02/28/2013 
 RPT Level = 0.01  Analysis Date = 02/28/2013 
 RPT Level = 0.01  Analysis Date = 02/25/2013 
 RPT Level = 0.01  Analysis Date = 02/25/2013 
 RPT Level = 0.01  Analysis Date = 02/13/2013 
 RPT Level = 0.01  Analysis Date = 02/13/2013 
 RPT Level = 0.01  Analysis Date = 02/05/2013 
 RPT Level = 0.01  Analysis Date = 02/05/2013 
 RPT Level = 0.01  Analysis Date = 02/01/2013 
 RPT Level = 0.01  Analysis Date = 02/01/2013 
 RPT Level = 0.01  Analysis Date = 01/24/2013 
 RPT Level = 0.01  Analysis Date = 01/24/2013 
 RPT Level = 0.01  Analysis Date = 01/17/2013 
 RPT Level = 0.01  Analysis Date = 01/17/2013 
 RPT Level = 0.01  Analysis Date = 01/10/2013 
 RPT Level = 0.01  Analysis Date = 01/10/2013 
 RPT Level = 0.01  Analysis Date = 01/04/2013 
 RPT Level = 0.01  Analysis Date = 01/04/2013 
 RPT Level = 0.01  Analysis Date = 01/04/2013 
 RPT Level = 0.01  Analysis Date = 01/04/2013 
 RPT Level = 0.01  Analysis Date = 12/21/2012 
 RPT Level = 0.01  Analysis Date = 12/21/2012 
 RPT Level = 0.01  Analysis Date = 12/18/2012 
 RPT Level = 0.01  Analysis Date = 12/18/2012 
 RPT Level = 0.01  Analysis Date = 12/07/2012 
 RPT Level = 0.01  Analysis Date = 12/07/2012 
 RPT Level = 0.01  Analysis Date = 11/29/2012 
 RPT Level = 0.01  Analysis Date = 11/29/2012 
 RPT Level = 0.01  Analysis Date = 11/29/2012 
 RPT Level = 0.01  Analysis Date = 11/29/2012 
 RPT Level = 0.01  Analysis Date = 11/20/2012 
 RPT Level = 0.01  Analysis Date = 11/20/2012 
 RPT Level = 0.01  Analysis Date = 11/09/2012 
 RPT Level = 0.01  Analysis Date = 11/09/2012 
 RPT Level = 0.01  Analysis Date = 10/31/2012 
 RPT Level = 0.01  Analysis Date = 10/31/2012 
 RPT Level = 0.01  Analysis Date = 10/29/2012 
 RPT Level = 0.01  Analysis Date = 10/29/2012 
 RPT Level = 0.01  Analysis Date = 10/18/2012 
 RPT Level = 0.01  Analysis Date = 10/18/2012 
 RPT Level = 0.01  Analysis Date = 10/15/2012 
 RPT Level = 0.01  Analysis Date = 10/15/2012 
 RPT Level = 0.01  Analysis Date = 10/10/2012 
 RPT Level = 0.01  Analysis Date = 10/10/2012 
 RPT Level = 0.01  Analysis Date = 10/10/2012 
 RPT Level = 0.01  Analysis Date = 10/10/2012 
 RPT Level = 0.01  Analysis Date = 10/10/2012 
 RPT Level = 0.01  Analysis Date = 10/10/2012 
 RPT Level = 0.01  Analysis Date = 09/21/2012 
 RPT Level = 0.01  Analysis Date = 09/21/2012 
 RPT Level = 0.01  Analysis Date = 09/18/2012 
 RPT Level = 0.01  Analysis Date = 09/18/2012 
 RPT Level = 0.01  Analysis Date = 09/14/2012 
 RPT Level = 0.01  Analysis Date = 09/14/2012 
 RPT Level = 0.01  Analysis Date = 09/12/2012 
 RPT Level = 0.01  Analysis Date = 09/12/2012 
 RPT Level = 0.01  Analysis Date = 08/29/2012 
 RPT Level = 0.01  Analysis Date = 08/29/2012 
 RPT Level = 0.01  Analysis Date = 08/23/2012 
 RPT Level = 0.01  Analysis Date = 08/23/2012 
 RPT Level = 0.01  Analysis Date = 08/16/2012 
 RPT Level = 0.01  Analysis Date = 08/16/2012 
 RPT Level = 0.01  Analysis Date = 08/01/2012 
 RPT Level = 0.01  Analysis Date = 08/01/2012 
 RPT Level = 0.01  Analysis Date = 07/20/2012 
 RPT Level = 0.01  Analysis Date = 07/20/2012 
 RPT Level = 0.01  Analysis Date = 07/13/2012 
 RPT Level = 0.01  Analysis Date = 07/13/2012 
 RPT Level = 0.01  Analysis Date = 07/13/2012 
 RPT Level = 0.01  Analysis Date = 07/13/2012 
 RPT Level = 0.01  Analysis Date = 07/06/2012 
 RPT Level = 0.01  Analysis Date = 07/06/2012 
 RPT Level = 0.01  Analysis Date = 06/22/2012 
 RPT Level = 0.01  Analysis Date = 06/22/2012 
 RPT Level = 0.01  Analysis Date = 06/14/2012 
 RPT Level = 0.01  Analysis Date = 06/14/2012 
 RPT Level = 0.01  Analysis Date = 06/13/2012 
 RPT Level = 0.01  Analysis Date = 06/13/2012 
 RPT Level = 0.01  Analysis Date = 06/07/2012 
 RPT Level = 0.01  Analysis Date = 06/07/2012 
 RPT Level = 0.01  Analysis Date = 06/06/2012 
 RPT Level = 0.01  Analysis Date = 06/06/2012 
 RPT Level = 0.01  Analysis Date = 05/22/2012 
 RPT Level = 0.01  Analysis Date = 05/22/2012 
 RPT Level = 0.01  Analysis Date = 05/11/2012 
 RPT Level = 0.01  Analysis Date = 05/11/2012 
 RPT Level = 0.01  Analysis Date = 05/08/2012 
 RPT Level = 0.01  Analysis Date = 05/08/2012 
 RPT Level = 0.01  Analysis Date = 05/01/2012 
 RPT Level = 0.01  Analysis Date = 05/01/2012 
 RPT Level = 0.01  Analysis Date = 04/18/2012 
 RPT Level = 0.01  Analysis Date = 04/18/2012 
 RPT Level = 0.01  Analysis Date = 04/11/2012 
 RPT Level = 0.01  Analysis Date = 04/11/2012 
 RPT Level = 0.01  Analysis Date = 04/04/2012 
 RPT Level = 0.01  Analysis Date = 04/04/2012 
 RPT Level = 0.01  Analysis Date = 03/29/2012 
 RPT Level = 0.01  Analysis Date = 03/29/2012 
 RPT Level = 0.01  Analysis Date = 03/28/2012 
 RPT Level = 0.01  Analysis Date = 03/28/2012 
 RPT Level = 0.01  Analysis Date = 03/21/2012 
 RPT Level = 0.01  Analysis Date = 03/21/2012 
 RPT Level = 0.01  Analysis Date = 03/13/2012 
 RPT Level = 0.01  Analysis Date = 03/13/2012 
 RPT Level = 0.01  Analysis Date = 03/06/2012 
 RPT Level = 0.01  Analysis Date = 03/06/2012 
 RPT Level = 0.01  Analysis Date = 02/23/2012 
 RPT Level = 0.01  Analysis Date = 02/23/2012 
 RPT Level = 0.01  Analysis Date = 02/23/2012 
 RPT Level = 0.01  Analysis Date = 02/23/2012 
 RPT Level = 0.01  Analysis Date = 02/08/2012 
 RPT Level = 0.01  Analysis Date = 02/08/2012 
 RPT Level = 0.01  Analysis Date = 02/02/2012 
 RPT Level = 0.01  Analysis Date = 02/02/2012 
 RPT Level = 0.01  Analysis Date = 01/25/2012 
 RPT Level = 0.01  Analysis Date = 01/25/2012 
 RPT Level = 0.01  Analysis Date = 01/19/2012 
 RPT Level = 0.01  Analysis Date = 01/19/2012 
 RPT Level = 0.01  Analysis Date = 01/12/2012 
 RPT Level = 0.01  Analysis Date = 01/12/2012 
 RPT Level = 0.01  Analysis Date = 01/09/2012 
 RPT Level = 0.01  Analysis Date = 01/09/2012 
 RPT Level = 0.01  Analysis Date = 01/09/2012 
 RPT Level = 0.01  Analysis Date = 01/09/2012 
 RPT Level = 0.01  Analysis Date = 12/21/2011 
 RPT Level = 0.01  Analysis Date = 12/21/2011 
 RPT Level = 0.01  Analysis Date = 12/20/2011 
 RPT Level = 0.01  Analysis Date = 12/20/2011 
 RPT Level = 0.01  Analysis Date = 12/15/2011 
 RPT Level = 0.01  Analysis Date = 12/15/2011 
 RPT Level = 0.01  Analysis Date = 12/02/2011 
 RPT Level = 0.01  Analysis Date = 12/02/2011 
 RPT Level = 0.01  Analysis Date = 12/01/2011 
 RPT Level = 0.01  Analysis Date = 12/01/2011 
 RPT Level = 0.01  Analysis Date = 11/28/2011 
 RPT Level = 0.01  Analysis Date = 11/28/2011 
 RPT Level = 0.01  Analysis Date = 11/09/2011 
 RPT Level = 0.01  Analysis Date = 11/09/2011 
 RPT Level = 0.01  Analysis Date = 11/08/2011 
 RPT Level = 0.01  Analysis Date = 11/08/2011 
 RPT Level = 0.01  Analysis Date = 10/26/2011 
 RPT Level = 0.01  Analysis Date = 10/26/2011 
 RPT Level = 0.01  Analysis Date = 10/25/2011 
 RPT Level = 0.01  Analysis Date = 10/25/2011 
 RPT Level = 0.01  Analysis Date = 10/14/2011 
 RPT Level = 0.01  Analysis Date = 10/14/2011 
 RPT Level = 0.01  Analysis Date = 10/04/2011 
 RPT Level = 0.01  Analysis Date = 10/04/2011 
 RPT Level = 0.01  Analysis Date = 09/29/2011 
 RPT Level = 0.01  Analysis Date = 09/29/2011 
 RPT Level = 0.01  Analysis Date = 09/22/2011 
 RPT Level = 0.01  Analysis Date = 09/22/2011 
 RPT Level = 0.01  Analysis Date = 09/16/2011 
 RPT Level = 0.01  Analysis Date = 09/16/2011 
 RPT Level = 0.01  Analysis Date = 09/12/2011 
 RPT Level = 0.01  Analysis Date = 09/12/2011 
 RPT Level = 0.01  Analysis Date = 09/08/2011 
 RPT Level = 0.01  Analysis Date = 09/08/2011 
 RPT Level = 0.01  Analysis Date = 08/25/2011 
 RPT Level = 0.01  Analysis Date = 08/25/2011 
 RPT Level = 0.01  Analysis Date = 08/19/2011 
 RPT Level = 0.01  Analysis Date = 08/19/2011 
 RPT Level = 0.01  Analysis Date = 08/10/2011 
 RPT Level = 0.01  Analysis Date = 08/10/2011 
 RPT Level = 0.01  Analysis Date = 08/02/2011 
 RPT Level = 0.01  Analysis Date = 08/02/2011 
 RPT Level = 0.01  Analysis Date = 07/28/2011 
 RPT Level = 0.01  Analysis Date = 07/28/2011 
 RPT Level = 0.01  Analysis Date = 07/21/2011 
 RPT Level = 0.01  Analysis Date = 07/21/2011 
 RPT Level = 0.01  Analysis Date = 07/13/2011 
 RPT Level = 0.01  Analysis Date = 07/13/2011 
 RPT Level = 0.01  Analysis Date = 07/08/2011 
 RPT Level = 0.01  Analysis Date = 07/08/2011 
 RPT Level = 0.01  Analysis Date = 06/29/2011 
 RPT Level = 0.01  Analysis Date = 06/29/2011 
 RPT Level = 0.01  Analysis Date = 06/22/2011 
 RPT Level = 0.01  Analysis Date = 06/22/2011 
 RPT Level = 0.01  Analysis Date = 06/15/2011 
 RPT Level = 0.01  Analysis Date = 06/15/2011 
 RPT Level = 0.01  Analysis Date = 06/07/2011 
 RPT Level = 0.01  Analysis Date = 06/07/2011 
 RPT Level = 0.01  Analysis Date = 06/03/2011 
 RPT Level = 0.01  Analysis Date = 06/03/2011 
 RPT Level = 0.01  Analysis Date = 05/25/2011 
 RPT Level = 0.01  Analysis Date = 05/25/2011 
 RPT Level = 0.01  Analysis Date = 05/19/2011 
 RPT Level = 0.01  Analysis Date = 05/19/2011 
 RPT Level = 0.01  Analysis Date = 05/11/2011 
 RPT Level = 0.01  Analysis Date = 05/11/2011 
 RPT Level = 0.01  Analysis Date = 05/05/2011 
 RPT Level = 0.01  Analysis Date = 05/05/2011 
 RPT Level = 0.01  Analysis Date = 04/27/2011 
 RPT Level = 0.01  Analysis Date = 04/27/2011 
 RPT Level = 0.01  Analysis Date = 04/20/2011 
 RPT Level = 0.01  Analysis Date = 04/20/2011 
 RPT Level = 0.01  Analysis Date = 04/13/2011 
 RPT Level = 0.01  Analysis Date = 04/13/2011 
 RPT Level = 0.01  Analysis Date = 04/07/2011 
 RPT Level = 0.01  Analysis Date = 04/07/2011 
 RPT Level = 0.01  Analysis Date = 03/30/2011 
 RPT Level = 0.01  Analysis Date = 03/30/2011 
 RPT Level = 0.01  Analysis Date = 03/22/2011 
 RPT Level = 0.01  Analysis Date = 03/22/2011 
 RPT Level = 0.01  Analysis Date = 03/18/2011 
 RPT Level = 0.01  Analysis Date = 03/18/2011 
 RPT Level = 0.01  Analysis Date = 03/09/2011 
 RPT Level = 0.01  Analysis Date = 03/09/2011 
 RPT Level = 0.01  Analysis Date = 03/01/2011 
 RPT Level = 0.01  Analysis Date = 03/01/2011 
 RPT Level = 0.01  Analysis Date = 02/24/2011 
 RPT Level = 0.01  Analysis Date = 02/24/2011 
 RPT Level = 0.01  Analysis Date = 02/16/2011 
 RPT Level = 0.01  Analysis Date = 02/16/2011 
 RPT Level = 0.01  Analysis Date = 02/15/2011 
 RPT Level = 0.01  Analysis Date = 02/15/2011 
 RPT Level = 0.01  Analysis Date = 02/15/2011 
 RPT Level = 0.01  Analysis Date = 02/15/2011 
 RPT Level = 0.01  Analysis Date = 02/02/2011 
 RPT Level = 0.01  Analysis Date = 02/02/2011 
 RPT Level = 0.01  Analysis Date = 02/01/2011 
 RPT Level = 0.01  Analysis Date = 02/01/2011 
 RPT Level = 0.01  Analysis Date = 01/20/2011 
 RPT Level = 0.01  Analysis Date = 01/20/2011 
 RPT Level = 0.01  Analysis Date = 01/10/2011 
 RPT Level = 0.01  Analysis Date = 01/10/2011 
 RPT Level = 0.01  Analysis Date = 01/10/2011 
 RPT Level = 0.01  Analysis Date = 01/10/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 01/06/2011 
 RPT Level = 0.01  Analysis Date = 01/06/2011 
 RPT Level = 0.01  Analysis Date = 12/15/2010 
 RPT Level = 0.01  Analysis Date = 12/15/2010 
 RPT Level = 0.01  Analysis Date = 12/09/2010 
 RPT Level = 0.01  Analysis Date = 12/09/2010 
 RPT Level = 0.01  Analysis Date = 12/09/2010 
 RPT Level = 0.01  Analysis Date = 12/09/2010 
 RPT Level = 0.01  Analysis Date = 12/02/2010 
 RPT Level = 0.01  Analysis Date = 12/02/2010 
 RPT Level = 0.01  Analysis Date = 11/18/2010 
 RPT Level = 0.01  Analysis Date = 11/18/2010 
 RPT Level = 0.01  Analysis Date = 11/09/2010 
 RPT Level = 0.01  Analysis Date = 11/09/2010 
 RPT Level = 0.01  Analysis Date = 11/09/2010 
 RPT Level = 0.01  Analysis Date = 11/09/2010 
 RPT Level = 0.01  Analysis Date = 11/04/2010 
 RPT Level = 0.01  Analysis Date = 11/04/2010 
 RPT Level = 0.01  Analysis Date = 10/27/2010 
 RPT Level = 0.01  Analysis Date = 10/27/2010 
 RPT Level = 0.01  Analysis Date = 10/26/2010 
 RPT Level = 0.01  Analysis Date = 10/26/2010 
 RPT Level = 0.01  Analysis Date = 10/14/2010 
 RPT Level = 0.01  Analysis Date = 10/14/2010 
 RPT Level = 0.01  Analysis Date = 10/14/2010 
 RPT Level = 0.01  Analysis Date = 10/14/2010 
 RPT Level = 0.01  Analysis Date = 09/30/2010 
 RPT Level = 0.01  Analysis Date = 09/30/2010 
 RPT Level = 0.01  Analysis Date = 09/29/2010 
 RPT Level = 0.01  Analysis Date = 09/29/2010 
 RPT Level = 0.01  Analysis Date = 09/16/2010 
 RPT Level = 0.01  Analysis Date = 09/16/2010 
 RPT Level = 0.01  Analysis Date = 09/15/2010 
 RPT Level = 0.01  Analysis Date = 09/15/2010 
 RPT Level = 0.01  Analysis Date = 08/31/2010 
 RPT Level = 0.01  Analysis Date = 08/31/2010 
 RPT Level = 0.01  Analysis Date = 08/26/2010 
 RPT Level = 0.01  Analysis Date = 08/26/2010 
 RPT Level = 0.01  Analysis Date = 08/17/2010 
 RPT Level = 0.01  Analysis Date = 08/17/2010 
 RPT Level = 0.01  Analysis Date = 08/12/2010 
 RPT Level = 0.01  Analysis Date = 08/12/2010 
 RPT Level = 0.01  Analysis Date = 08/05/2010 
 RPT Level = 0.01  Analysis Date = 08/05/2010 
 RPT Level = 0.01  Analysis Date = 07/16/2010 
 RPT Level = 0.01  Analysis Date = 07/16/2010 
 RPT Level = 0.01  Analysis Date = 07/16/2010 
 RPT Level = 0.01  Analysis Date = 07/16/2010 
 RPT Level = 0.01  Analysis Date = 07/16/2010 
 RPT Level = 0.01  Analysis Date = 07/16/2010 
 RPT Level = 0.01  Analysis Date = 07/14/2010 
 RPT Level = 0.01  Analysis Date = 07/14/2010 
 RPT Level = 0.01  Analysis Date = 07/13/2010 
 RPT Level = 0.01  Analysis Date = 07/13/2010 
 RPT Level = 0.01  Analysis Date = 06/28/2010 
 RPT Level = 0.01  Analysis Date = 06/28/2010 
 RPT Level = 0.01  Analysis Date = 06/25/2010 
 RPT Level = 0.01  Analysis Date = 06/25/2010 
 RPT Level = 0.01  Analysis Date = 06/24/2010 
 RPT Level = 0.01  Analysis Date = 06/24/2010 
 RPT Level = 0.01  Analysis Date = 06/17/2010 
 RPT Level = 0.01  Analysis Date = 06/17/2010 
 RPT Level = 0.01  Analysis Date = 05/27/2010 
 RPT Level = 0.01  Analysis Date = 05/27/2010 
 RPT Level = 0.01  Analysis Date = 05/11/2010 
 RPT Level = 0.01  Analysis Date = 05/11/2010 
 RPT Level = 0.01  Analysis Date = 05/11/2010 
 RPT Level = 0.01  Analysis Date = 05/11/2010 
 RPT Level = 0.01  Analysis Date = 05/10/2010 
 RPT Level = 0.01  Analysis Date = 05/10/2010 
 RPT Level = 0.01  Analysis Date = 04/26/2010 
 RPT Level = 0.01  Analysis Date = 04/26/2010 
 RPT Level = 0.01  Analysis Date = 04/14/2010 
 RPT Level = 0.01  Analysis Date = 04/14/2010 
 RPT Level = 0.01  Analysis Date = 04/12/2010 
 RPT Level = 0.01  Analysis Date = 04/12/2010 
 RPT Level = 0.01  Analysis Date = 04/12/2010 
 RPT Level = 0.01  Analysis Date = 04/12/2010 
 RPT Level = 0.01  Analysis Date = 04/06/2010 
 RPT Level = 0.01  Analysis Date = 04/06/2010 
 RPT Level = 0.01  Analysis Date = 03/31/2010 
 RPT Level = 0.01  Analysis Date = 03/31/2010 
 RPT Level = 0.01  Analysis Date = 03/11/2010 
 RPT Level = 0.01  Analysis Date = 03/11/2010 
 RPT Level = 0.01  Analysis Date = 02/23/2010 
 RPT Level = 0.01  Analysis Date = 02/23/2010 
 RPT Level = 0.01  Analysis Date = 02/22/2010 
 RPT Level = 0.01  Analysis Date = 02/22/2010 
 RPT Level = 0.01  Analysis Date = 02/22/2010 
 RPT Level = 0.01  Analysis Date = 02/22/2010 
 RPT Level = 0.01  Analysis Date = 02/18/2010 
 RPT Level = 0.01  Analysis Date = 02/18/2010 
 RPT Level = 0.01  Analysis Date = 02/11/2010 
 RPT Level = 0.01  Analysis Date = 02/11/2010 
 RPT Level = 0.01  Analysis Date = 01/28/2010 
 RPT Level = 0.01  Analysis Date = 01/28/2010 
 RPT Level = 0.01  Analysis Date = 01/14/2010 
 RPT Level = 0.01  Analysis Date = 01/14/2010 
 RPT Level = 0.01  Analysis Date = 01/12/2010 
 RPT Level = 0.01  Analysis Date = 01/12/2010 
 RPT Level = 0.01  Analysis Date = 01/12/2010 
 RPT Level = 0.01  Analysis Date = 01/12/2010 
 RPT Level = 0.01  Analysis Date = 01/12/2010 
 RPT Level = 0.01  Analysis Date = 01/12/2010 
 RPT Level = 0.01  Analysis Date = 01/07/2010 
 RPT Level = 0.01  Analysis Date = 01/07/2010 
 RPT Level = 0.01  Analysis Date = 01/06/2010 
 RPT Level = 0.01  Analysis Date = 01/06/2010 
 RPT Level = 0.01  Analysis Date = 01/06/2010 
 RPT Level = 0.01  Analysis Date = 01/06/2010 
 RPT Level = 0.01  Analysis Date = 11/27/2009 
 RPT Level = 0.01  Analysis Date = 11/27/2009 
 RPT Level = 0.01  Analysis Date = 11/27/2009 
 RPT Level = 0.01  Analysis Date = 11/27/2009 
 RPT Level = 0.01  Analysis Date = 11/25/2009 
 RPT Level = 0.01  Analysis Date = 11/25/2009 
 RPT Level = 0.01  Analysis Date = 11/24/2009 
 RPT Level = 0.01  Analysis Date = 11/24/2009 
 RPT Level = 0.01  Analysis Date = 11/19/2009 
 RPT Level = 0.01  Analysis Date = 11/19/2009 
 RPT Level = 0.01  Analysis Date = 11/06/2009 
 RPT Level = 0.01  Analysis Date = 11/06/2009 
 RPT Level = 0.01  Analysis Date = 11/05/2009 
 RPT Level = 0.01  Analysis Date = 11/05/2009 
 RPT Level = 0.01  Analysis Date = 10/22/2009 
 RPT Level = 0.01  Analysis Date = 10/22/2009 
 RPT Level = 0.01  Analysis Date = 10/21/2009 
 RPT Level = 0.01  Analysis Date = 10/21/2009 
 RPT Level = 0.01  Analysis Date = 10/15/2009 
 RPT Level = 0.01  Analysis Date = 10/15/2009 
 RPT Level = 0.01  Analysis Date = 09/30/2009 
 RPT Level = 0.01  Analysis Date = 09/30/2009 
 RPT Level = 0.01  Analysis Date = 09/30/2009 
 RPT Level = 0.01  Analysis Date = 09/30/2009 
 RPT Level = 0.01  Analysis Date = 09/23/2009 
 RPT Level = 0.01  Analysis Date = 09/23/2009 
 RPT Level = 0.01  Analysis Date = 09/10/2009 
 RPT Level = 0.01  Analysis Date = 09/10/2009 
 RPT Level = 0.01  Analysis Date = 09/02/2009 
 RPT Level = 0.01  Analysis Date = 09/02/2009 
 RPT Level = 0.01  Analysis Date = 08/26/2009 
 RPT Level = 0.01  Analysis Date = 08/26/2009 
 RPT Level = 0.01  Analysis Date = 08/20/2009 
 RPT Level = 0.01  Analysis Date = 08/20/2009 
 RPT Level = 0.01  Analysis Date = 08/12/2009 
 RPT Level = 0.01  Analysis Date = 08/12/2009 
 RPT Level = 0.01  Analysis Date = 07/29/2009 
 RPT Level = 0.01  Analysis Date = 07/29/2009 
 RPT Level = 0.01  Analysis Date = 07/23/2009 
 RPT Level = 0.01  Analysis Date = 07/23/2009 
 RPT Level = 0.01  Analysis Date = 07/16/2009 
 RPT Level = 0.01  Analysis Date = 07/16/2009 
 RPT Level = 0.01  Analysis Date = 07/09/2009 
 RPT Level = 0.01  Analysis Date = 07/09/2009 
 RPT Level = 0.01  Analysis Date = 06/30/2009 
 RPT Level = 0.01  Analysis Date = 06/30/2009 
 RPT Level = 0.01  Analysis Date = 06/25/2009 
 RPT Level = 0.01  Analysis Date = 06/25/2009 
 RPT Level = 0.01  Analysis Date = 06/17/2009 
 RPT Level = 0.01  Analysis Date = 06/17/2009 
 RPT Level = 0.01  Analysis Date = 06/10/2009 
 RPT Level = 0.01  Analysis Date = 06/10/2009 
 RPT Level = 0.01  Analysis Date = 06/03/2009 
 RPT Level = 0.01  Analysis Date = 06/03/2009 
 RPT Level = 0.01  Analysis Date = 05/21/2009 
 RPT Level = 0.01  Analysis Date = 05/21/2009 
 RPT Level = 0.01  Analysis Date = 05/20/2009 
 RPT Level = 0.01  Analysis Date = 05/20/2009 
 RPT Level = 0.01  Analysis Date = 05/14/2009 
 RPT Level = 0.01  Analysis Date = 05/14/2009 
 RPT Level = 0.01  Analysis Date = 05/06/2009 
 RPT Level = 0.01  Analysis Date = 05/06/2009 
 RPT Level = 0.01  Analysis Date = 04/30/2009 
 RPT Level = 0.01  Analysis Date = 04/30/2009 
 RPT Level = 0.01  Analysis Date = 04/15/2009 
 RPT Level = 0.01  Analysis Date = 04/15/2009 
 RPT Level = 0.01  Analysis Date = 04/08/2009 
 RPT Level = 0.01  Analysis Date = 04/08/2009 
 RPT Level = 0.01  Analysis Date = 04/08/2009 
 RPT Level = 0.01  Analysis Date = 04/08/2009 
 RPT Level = 0.01  Analysis Date = 04/07/2009 
 RPT Level = 0.01  Analysis Date = 04/07/2009 
 RPT Level = 0.01  Analysis Date = 03/31/2009 
 RPT Level = 0.01  Analysis Date = 03/31/2009 
 RPT Level = 0.01  Analysis Date = 03/10/2009 
 RPT Level = 0.01  Analysis Date = 03/10/2009 
 RPT Level = 0.01  Analysis Date = 03/04/2009 
 RPT Level = 0.01  Analysis Date = 03/04/2009 
 RPT Level = 0.01  Analysis Date = 03/04/2009 
 RPT Level = 0.01  Analysis Date = 03/04/2009 
 RPT Level = 0.01  Analysis Date = 03/03/2009 
 RPT Level = 0.01  Analysis Date = 03/03/2009 
 RPT Level = 0.01  Analysis Date = 02/18/2009 
 RPT Level = 0.01  Analysis Date = 02/18/2009 
 RPT Level = 0.01  Analysis Date = 02/03/2009 
 RPT Level = 0.01  Analysis Date = 02/03/2009 
 RPT Level = 0.01  Analysis Date = 02/03/2009 
 RPT Level = 0.01  Analysis Date = 02/03/2009 
 RPT Level = 0.01  Analysis Date = 01/28/2009 
 RPT Level = 0.01  Analysis Date = 01/28/2009 
 RPT Level = 0.01  Analysis Date = 01/22/2009 
 RPT Level = 0.01  Analysis Date = 01/22/2009 
 RPT Level = 0.01  Analysis Date = 01/08/2009 
 RPT Level = 0.01  Analysis Date = 01/08/2009 
 RPT Level = 0.01  Analysis Date = 01/08/2009 
 RPT Level = 0.01  Analysis Date = 01/08/2009 
 RPT Level = 0.01  Analysis Date = 01/07/2009 
 RPT Level = 0.01  Analysis Date = 01/07/2009 
 RPT Level = 0.01  Analysis Date = 12/22/2008 
 RPT Level = 0.01  Analysis Date = 12/22/2008 
 RPT Level = 0.01  Analysis Date = 12/18/2008 
 RPT Level = 0.01  Analysis Date = 12/18/2008 
 RPT Level = 0.01  Analysis Date = 12/09/2008 
 RPT Level = 0.01  Analysis Date = 12/09/2008 
 RPT Level = 0.01  Analysis Date = 12/04/2008 
 RPT Level = 0.01  Analysis Date = 12/04/2008 
 RPT Level = 0.01  Analysis Date = 12/03/2008 
 RPT Level = 0.01  Analysis Date = 12/03/2008 
 RPT Level = 0.01  Analysis Date = 12/18/2008 
 RPT Level = 0.01  Analysis Date = 12/18/2008 
 RPT Level = 0.01  Analysis Date = 11/13/2008 
 RPT Level = 0.01  Analysis Date = 11/13/2008 
 RPT Level = 0.01  Analysis Date = 11/12/2008 
 RPT Level = 0.01  Analysis Date = 11/12/2008 
 RPT Level = 0.01  Analysis Date = 11/04/2008 
 RPT Level = 0.01  Analysis Date = 11/04/2008 
 RPT Level = 0.01  Analysis Date = 10/16/2008 
 RPT Level = 0.01  Analysis Date = 10/16/2008 
 RPT Level = 0.01  Analysis Date = 10/15/2008 
 RPT Level = 0.01  Analysis Date = 10/15/2008 
 RPT Level = 0.01  Analysis Date = 10/08/2008 
 RPT Level = 0.01  Analysis Date = 10/08/2008 
 RPT Level = 0.01  Analysis Date = 09/30/2008 
 RPT Level = 0.01  Analysis Date = 09/30/2008 
 RPT Level = 0.01  Analysis Date = 09/24/2008 
 RPT Level = 0.01  Analysis Date = 09/24/2008 
 RPT Level = 0.01  Analysis Date = 09/23/2008 
 RPT Level = 0.01  Analysis Date = 09/23/2008 
 RPT Level = 0.01  Analysis Date = 09/16/2008 
 RPT Level = 0.01  Analysis Date = 09/16/2008 
 RPT Level = 0.01  Analysis Date = 09/10/2008 
 RPT Level = 0.01  Analysis Date = 09/10/2008 
 RPT Level = 0.01  Analysis Date = 08/26/2008 
 RPT Level = 0.01  Analysis Date = 08/26/2008 
 RPT Level = 0.01  Analysis Date = 08/28/2008 
 RPT Level = 0.01  Analysis Date = 08/28/2008 
 RPT Level = 0.01  Analysis Date = 08/28/2008 
 RPT Level = 0.01  Analysis Date = 08/28/2008 
 RPT Level = 0.01  Analysis Date = 07/24/2008 
 RPT Level = 0.01  Analysis Date = 07/24/2008 
 RPT Level = 0.01  Analysis Date = 07/17/2008 
 RPT Level = 0.01  Analysis Date = 07/17/2008 
 RPT Level = 0.01  Analysis Date = 07/14/2008 
 RPT Level = 0.01  Analysis Date = 07/14/2008 
 RPT Level = 0.01  Analysis Date = 07/07/2008 
 RPT Level = 0.01  Analysis Date = 07/07/2008 
 RPT Level = 0.01  Analysis Date = 07/02/2008 
 RPT Level = 0.01  Analysis Date = 07/02/2008 
 RPT Level = 0.01  Analysis Date = 06/24/2008 
 RPT Level = 0.01  Analysis Date = 06/24/2008 
 RPT Level = 0.01  Analysis Date = 06/18/2008 
 RPT Level = 0.01  Analysis Date = 06/18/2008 
 RPT Level = 0.01  Analysis Date = 06/11/2008 
 RPT Level = 0.01  Analysis Date = 06/11/2008 
 RPT Level = 0.01  Analysis Date = 06/09/2008 
 RPT Level = 0.01  Analysis Date = 06/09/2008 
 RPT Level = 0.01  Analysis Date = 05/21/2008 
 RPT Level = 0.01  Analysis Date = 05/21/2008 
 RPT Level = 0.01  Analysis Date = 05/20/2008 
 RPT Level = 0.01  Analysis Date = 05/20/2008 
 RPT Level = 0.01  Analysis Date = 05/13/2008 
 RPT Level = 0.01  Analysis Date = 05/13/2008 
 RPT Level = 0.01  Analysis Date = 05/06/2008 
 RPT Level = 0.01  Analysis Date = 05/06/2008 
 RPT Level = 0.01  Analysis Date = 04/30/2008 
 RPT Level = 0.01  Analysis Date = 04/30/2008 
 RPT Level = 0.01  Analysis Date = 04/29/2008 
 RPT Level = 0.01  Analysis Date = 04/29/2008 
 RPT Level = 0.01  Analysis Date = 04/15/2008 
 RPT Level = 0.01  Analysis Date = 04/15/2008 
 RPT Level = 0.01  Analysis Date = 04/15/2008 
 RPT Level = 0.01  Analysis Date = 04/15/2008 
 RPT Level = 0.01  Analysis Date = 03/31/2008 
 RPT Level = 0.01  Analysis Date = 03/31/2008 
 RPT Level = 0.01  Analysis Date = 03/26/2008 
 RPT Level = 0.01  Analysis Date = 03/26/2008 
 RPT Level = 0.01  Analysis Date = 03/20/2008 
 RPT Level = 0.01  Analysis Date = 03/20/2008 
 RPT Level = 0.01  Analysis Date = 03/06/2008 
 RPT Level = 0.01  Analysis Date = 03/06/2008 
 RPT Level = 0.01  Analysis Date = 03/05/2008 
 RPT Level = 0.01  Analysis Date = 03/05/2008 
 RPT Level = 0.01  Analysis Date = 02/28/2008 
 RPT Level = 0.01  Analysis Date = 02/28/2008 
 RPT Level = 0.01  Analysis Date = 02/12/2008 
 RPT Level = 0.01  Analysis Date = 02/12/2008 
 RPT Level = 0.01  Analysis Date = 02/06/2008 
 RPT Level = 0.01  Analysis Date = 02/06/2008 
 RPT Level = 0.01  Analysis Date = 01/29/2008 
 RPT Level = 0.01  Analysis Date = 01/29/2008 
 RPT Level = 0.01  Analysis Date = 01/24/2008 
 RPT Level = 0.01  Analysis Date = 01/24/2008 
 RPT Level = 0.01  Analysis Date = 01/23/2008 
 RPT Level = 0.01  Analysis Date = 01/23/2008 
 RPT Level = 0.01  Analysis Date = 01/17/2008 
 RPT Level = 0.01  Analysis Date = 01/17/2008 
 RPT Level = 0.01  Analysis Date = 01/08/2008 
 RPT Level = 0.01  Analysis Date = 01/08/2008 
 RPT Level = 0.01  Analysis Date = 01/03/2008 
 RPT Level = 0.01  Analysis Date = 01/03/2008 
 RPT Level = 0.01  Analysis Date = 12/13/2007 
 RPT Level = 0.01  Analysis Date = 12/13/2007 
 RPT Level = 0.01  Analysis Date = 12/04/2007 
 RPT Level = 0.01  Analysis Date = 12/04/2007 
 RPT Level = 0.01  Analysis Date = 11/27/2007 
 RPT Level = 0.01  Analysis Date = 11/27/2007 
 RPT Level = 0.01  Analysis Date = 11/21/2007 
 RPT Level = 0.01  Analysis Date = 11/21/2007 
 RPT Level = 0.01  Analysis Date = 11/15/2007 
 RPT Level = 0.01  Analysis Date = 11/15/2007 
 RPT Level = 0.01  Analysis Date = 11/15/2007 
 RPT Level = 0.01  Analysis Date = 11/15/2007 
 RPT Level = 0.01  Analysis Date = 10/30/2007 
 RPT Level = 0.01  Analysis Date = 10/30/2007 
 RPT Level = 0.01  Analysis Date = 10/26/2007 
 RPT Level = 0.01  Analysis Date = 10/26/2007 
 RPT Level = 0.01  Analysis Date = 10/23/2007 
 RPT Level = 0.01  Analysis Date = 10/23/2007 
 RPT Level = 0.01  Analysis Date = 10/22/2007 
 RPT Level = 0.01  Analysis Date = 10/22/2007 
 RPT Level = 0.01  Analysis Date = 10/10/2007 
 RPT Level = 0.01  Analysis Date = 10/10/2007 
 RPT Level = 0.01  Analysis Date = 10/10/2007 
 RPT Level = 0.01  Analysis Date = 10/10/2007 
 RPT Level = 0.01  Analysis Date = 10/05/2007 
 RPT Level = 0.01  Analysis Date = 10/05/2007 
 RPT Level = 0.01  Analysis Date = 09/28/2007 
 RPT Level = 0.01  Analysis Date = 09/28/2007 
 RPT Level = 0.01  Analysis Date = 08/30/2007 
 RPT Level = 0.01  Analysis Date = 08/30/2007 
 RPT Level = 0.01  Analysis Date = 08/27/2007 
 RPT Level = 0.01  Analysis Date = 08/27/2007 
 RPT Level = 0.01  Analysis Date = 08/24/2007 
 RPT Level = 0.01  Analysis Date = 08/24/2007 
 RPT Level = 0.01  Analysis Date = 08/22/2007 
 RPT Level = 0.01  Analysis Date = 08/22/2007 
 RPT Level = 0.01  Analysis Date = 08/20/2007 
 RPT Level = 0.01  Analysis Date = 08/20/2007 
 RPT Level = 0.01  Analysis Date = 08/15/2007 
 RPT Level = 0.01  Analysis Date = 08/15/2007 
 RPT Level = 0.01  Analysis Date = 07/24/2007 
 RPT Level = 0.01  Analysis Date = 07/24/2007 
 RPT Level = 0.01  Analysis Date = 07/23/2007 
 RPT Level = 0.01  Analysis Date = 07/23/2007 
 RPT Level = 0.01  Analysis Date = 07/03/2007 
 RPT Level = 0.01  Analysis Date = 07/03/2007 
 RPT Level = 0.01  Analysis Date = 06/22/2007 
 RPT Level = 0.01  Analysis Date = 06/22/2007 
 RPT Level = 0.01  Analysis Date = 06/22/2007 
 RPT Level = 0.01  Analysis Date = 06/22/2007 
 RPT Level = 0.01  Analysis Date = 06/21/2007 
 RPT Level = 0.01  Analysis Date = 06/21/2007 
 RPT Level = 0.01  Analysis Date = 06/20/2007 
 RPT Level = 0.01  Analysis Date = 06/20/2007 
 RPT Level = 0.01  Analysis Date = 06/07/2007 
 RPT Level = 0.01  Analysis Date = 06/07/2007 
 RPT Level = 0.01  Analysis Date = 05/17/2007 
 RPT Level = 0.01  Analysis Date = 05/17/2007 
 RPT Level = 0.01  Analysis Date = 05/16/2007 
 RPT Level = 0.01  Analysis Date = 05/16/2007 
 RPT Level = 0.01  Analysis Date = 05/08/2007 
 RPT Level = 0.01  Analysis Date = 05/08/2007 
 RPT Level = 0.01  Analysis Date = 05/03/2007 
 RPT Level = 0.01  Analysis Date = 05/03/2007 
 RPT Level = 0.01  Analysis Date = 05/01/2007 
 RPT Level = 0.01  Analysis Date = 05/01/2007 
 RPT Level = 0.01  Analysis Date = 04/26/2007 
 RPT Level = 0.01  Analysis Date = 04/26/2007 
 RPT Level = 0.01  Analysis Date = 04/24/2007 
 RPT Level = 0.01  Analysis Date = 04/24/2007 
 RPT Level = 0.01  Analysis Date = 04/19/2007 
 RPT Level = 0.01  Analysis Date = 04/19/2007 
 RPT Level = 0.01  Analysis Date = 03/26/2007 
 RPT Level = 0.01  Analysis Date = 03/26/2007 
 RPT Level = 0.01  Analysis Date = 03/20/2007 
 RPT Level = 0.01  Analysis Date = 03/20/2007 
 RPT Level = 0.01  Analysis Date = 03/15/2007 
 RPT Level = 0.01  Analysis Date = 03/15/2007 
 RPT Level = 0.01  Analysis Date = 03/14/2007 
 RPT Level = 0.01  Analysis Date = 03/14/2007 
 RPT Level = 0.01  Analysis Date = 02/27/2007 
 RPT Level = 0.01  Analysis Date = 02/27/2007 
 RPT Level = 0.01  Analysis Date = 02/21/2007 
 RPT Level = 0.01  Analysis Date = 02/21/2007 
 RPT Level = 0.01  Analysis Date = 02/13/2007 
 RPT Level = 0.01  Analysis Date = 02/13/2007 
 RPT Level = 0.01  Analysis Date = 02/01/2007 
 RPT Level = 0.01  Analysis Date = 02/01/2007 
 RPT Level = 0.01  Analysis Date = 02/01/2007 
 RPT Level = 0.01  Analysis Date = 02/01/2007 
 RPT Level = 0.01  Analysis Date = 01/18/2007 
 RPT Level = 0.01  Analysis Date = 01/18/2007 
 RPT Level = 0.01  Analysis Date = 01/09/2007 
 RPT Level = 0.01  Analysis Date = 01/09/2007 
 RPT Level = 0.01  Analysis Date = 12/28/2006 
 RPT Level = 0.01  Analysis Date = 12/28/2006 
 RPT Level = 0.01  Analysis Date = 12/27/2006 
 RPT Level = 0.01  Analysis Date = 12/27/2006 
 RPT Level = 0.01  Analysis Date = 12/26/2006 
 RPT Level = 0.01  Analysis Date = 12/26/2006 
 RPT Level = 0.01  Analysis Date = 12/05/2006 
 RPT Level = 0.01  Analysis Date = 12/05/2006 
 RPT Level = 0.01  Analysis Date = 11/29/2006 
 RPT Level = 0.01  Analysis Date = 11/29/2006 
 RPT Level = 0.01  Analysis Date = 11/28/2006 
 RPT Level = 0.01  Analysis Date = 11/28/2006 
 RPT Level = 0.01  Analysis Date = 11/27/2006 
 RPT Level = 0.01  Analysis Date = 11/27/2006 
 RPT Level = 0.01  Analysis Date = 11/22/2006 
 RPT Level = 0.01  Analysis Date = 11/22/2006 
 RPT Level = 0.01  Analysis Date = 11/22/2006 
 RPT Level = 0.01  Analysis Date = 11/22/2006 
 RPT Level = 0.01  Analysis Date = 11/16/2006 
 RPT Level = 0.01  Analysis Date = 11/16/2006 
 RPT Level = 0.01  Analysis Date = 11/07/2006 
 RPT Level = 0.01  Analysis Date = 11/07/2006 
 RPT Level = 0.01  Analysis Date = 11/07/2006 
 RPT Level = 0.01  Analysis Date = 11/07/2006 
 RPT Level = 0.01  Analysis Date = 10/26/2006 
 RPT Level = 0.01  Analysis Date = 10/26/2006 
 RPT Level = 0.01  Analysis Date = 10/03/2006 
 RPT Level = 0.005  Analysis Date = 10/03/2006 
 RPT Level = 0.005  Analysis Date = 09/25/2006 
 RPT Level = 0.005  Analysis Date = 09/25/2006 
 RPT Level = 0.005  Analysis Date = 09/20/2006 
 RPT Level = 0.005  Analysis Date = 09/20/2006 
 RPT Level = 0.005  Analysis Date = 09/12/2006 
 RPT Level = 0.005  Analysis Date = 09/12/2006 
 RPT Level = 0.005  Analysis Date = 08/24/2006 
 RPT Level = 0.005  Analysis Date = 08/24/2006 
 RPT Level = 0.005  Analysis Date = 08/18/2006 
 RPT Level = 0.005  Analysis Date = 08/18/2006 
 RPT Level = 0.005  Analysis Date = 08/07/2006 
 RPT Level = 0.005  Analysis Date = 08/07/2006 
 RPT Level = 0.005  Analysis Date = 07/19/2006 
 RPT Level = 0.005  Analysis Date = 07/19/2006 
 RPT Level = 0.005  Analysis Date = 07/14/2006 
 RPT Level = 0.005  Analysis Date = 07/14/2006 
 RPT Level = 0.005  Analysis Date = 06/27/2006 
 RPT Level = 0.005  Analysis Date = 06/27/2006 
 RPT Level = 0.005  Analysis Date = 06/21/2006 
 RPT Level = 0.005  Analysis Date = 06/21/2006 
 RPT Level = 0.005  Analysis Date = 06/13/2006 
 RPT Level = 0.005  Y = 0
The SGPlot Procedure

False Positive Rate for Ammonia (NH3 as N), FIL, DA

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Ammonia (NH3 as N), FIL, DA 00608SHC02 2006 12 3 25%
    2007 50 4 8%
    2008 50 2 4%
    2009 52 2 4%
    2010 52 4 8%
    2011 52 1 2%
    2012 52 6 12%
    2013 53 3 6%
    2014 55 4 7%
    2015 58 3 5%
    2016 51 3 6%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Ammonia (NH3 as N), FIL, EPA -
Blind Blank Results
Lab: NWQL, PCode: 00608, MCode: CL036
Analysis dates: 11/14/01 through 03/08/13
Open Data Set

 Analysis Date = 03/08/2013 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20130420052  Analysis Date = 02/15/2013 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20130350029  Analysis Date = 02/15/2013 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20130280039  Analysis Date = 01/25/2013 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20130230099  Analysis Date = 01/25/2013 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20130140071  Analysis Date = 01/25/2013 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20130070056  Analysis Date = 01/25/2013 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20130020010  Analysis Date = 01/25/2013 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20123620011  Analysis Date = 12/20/2012 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20123530084  Analysis Date = 12/20/2012 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20123480061  Analysis Date = 12/05/2012 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20123390115  Analysis Date = 12/05/2012 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20123330010  Analysis Date = 11/27/2012 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20123250063  Analysis Date = 11/27/2012 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20123200054  Analysis Date = 11/27/2012 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20123120066  Analysis Date = 11/27/2012 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20123040119  Analysis Date = 10/30/2012 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20122980126  Analysis Date = 10/30/2012 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20122900096  Analysis Date = 10/19/2012 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20122830034  Analysis Date = 10/19/2012 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20122750025  Analysis Date = 09/27/2012 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20122700110  Analysis Date = 09/27/2012 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20122690153  Analysis Date = 09/27/2012 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20122550016  Analysis Date = 09/27/2012 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20122490102  Analysis Date = 09/27/2012 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20122410013  Analysis Date = 09/27/2012 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20122350175  Analysis Date = 09/13/2012 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20122280090  Analysis Date = 09/06/2012 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20122190099  Analysis Date = 09/06/2012 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20122140050  Analysis Date = 08/02/2012 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20122050101  Analysis Date = 08/02/2012 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20121990080  Analysis Date = 07/10/2012 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20121910041  Analysis Date = 07/10/2012 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20121870014  Analysis Date = 06/28/2012 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20121780033  Analysis Date = 06/28/2012 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20121710006  Analysis Date = 06/18/2012 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20121650052  Analysis Date = 06/18/2012 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20121560125  Analysis Date = 06/28/2012 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20121510037  Analysis Date = 06/04/2012 
 Lab Value = 0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20121430021  Analysis Date = 05/24/2012 
 Lab Value = -0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20121370053  Analysis Date = 05/18/2012 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20121290072  Analysis Date = 05/04/2012 
 Lab Value = -0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20121210123  Analysis Date = 05/04/2012 
 Lab Value = -0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20121150089  Analysis Date = 05/04/2012 
 Lab Value = -0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20121080009  Analysis Date = 05/04/2012 
 Lab Value = -0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20121010029  Analysis Date = 04/09/2012 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20120930058  Analysis Date = 04/09/2012 
 Lab Value = -0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20120870035  Analysis Date = 03/20/2012 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20120790085  Analysis Date = 03/20/2012 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20120730079  Analysis Date = 03/20/2012 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20120660073  Analysis Date = 03/06/2012 
 Lab Value = -0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20120580047  Analysis Date = 03/06/2012 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20120530099  Analysis Date = 03/06/2012 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20120450020  Analysis Date = 03/02/2012 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20120370064  Analysis Date = 03/02/2012 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20120310012  Analysis Date = 01/30/2012 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20120230046  Analysis Date = 01/30/2012 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20120180013  Analysis Date = 01/17/2012 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20120090052  Analysis Date = 01/17/2012 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20120030028  Analysis Date = 01/17/2012 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20113610089  Analysis Date = 01/17/2012 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20113530139  Analysis Date = 12/16/2011 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20113490075  Analysis Date = 12/16/2011 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20113460137  Analysis Date = 12/09/2011 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20113320115  Analysis Date = 12/09/2011 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20113250126  Analysis Date = 12/01/2011 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20113180164  Analysis Date = 11/10/2011 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20113110062  Analysis Date = 11/03/2011 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20113050092  Analysis Date = 11/03/2011 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20112970118  Analysis Date = 11/03/2011 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20112910137  Analysis Date = 10/14/2011 
 Lab Value = -0.023 
 RPT Level = 0.02 
 Lab Sample ID = 20112840071  Analysis Date = 10/14/2011 
 Lab Value = -0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20112760061  Analysis Date = 09/28/2011 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20112690123  Analysis Date = 09/28/2011 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20112630061  Analysis Date = 09/28/2011 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20112560021  Analysis Date = 09/28/2011 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20112510037  Analysis Date = 09/28/2011 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20112500188  Analysis Date = 09/07/2011 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20112360063  Analysis Date = 09/07/2011 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20112300036  Analysis Date = 08/12/2011 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20112200051  Analysis Date = 08/12/2011 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20112130154  Analysis Date = 07/28/2011 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20112060094  Analysis Date = 07/28/2011 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20112010020  Analysis Date = 07/28/2011 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20111920099  Analysis Date = 07/08/2011 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20111860062  Analysis Date = 07/01/2011 
 Lab Value = -0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20111780166  Analysis Date = 07/01/2011 
 Lab Value = -0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20111710111  Analysis Date = 07/01/2011 
 Lab Value = -0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20111640067  Analysis Date = 06/10/2011 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20111570061  Analysis Date = 06/10/2011 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20111510151  Analysis Date = 06/10/2011 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20111430203  Analysis Date = 05/23/2011 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20111360146  Analysis Date = 05/23/2011 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20111290046  Analysis Date = 05/09/2011 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20111220086  Analysis Date = 05/09/2011 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20111150114  Analysis Date = 04/25/2011 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20111080073  Analysis Date = 04/25/2011 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20111010118  Analysis Date = 04/06/2011 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20110950054  Analysis Date = 04/06/2011 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20110870089  Analysis Date = 03/22/2011 
 Lab Value = -0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20110800059  Analysis Date = 03/22/2011 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20110750067  Analysis Date = 03/22/2011 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20110660032  Analysis Date = 03/03/2011 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20110590070  Analysis Date = 02/23/2011 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20110530105  Analysis Date = 02/23/2011 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20110450036  Analysis Date = 02/23/2011 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20110410098  Analysis Date = 02/23/2011 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20110400069  Analysis Date = 02/09/2011 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20110240065  Analysis Date = 01/24/2011 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20110180057  Analysis Date = 01/24/2011 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20110110016  Analysis Date = 01/05/2011 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20110030021  Analysis Date = 01/05/2011 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20103610054  Analysis Date = 01/05/2011 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20103540047  Analysis Date = 01/05/2011 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20103470078  Analysis Date = 12/07/2010 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20103400086  Analysis Date = 12/07/2010 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20103330099  Analysis Date = 11/23/2010 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20103260065  Analysis Date = 11/23/2010 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20103190064  Analysis Date = 11/09/2010 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20103120026  Analysis Date = 11/09/2010 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20103060008  Analysis Date = 10/27/2010 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20102990006  Analysis Date = 10/27/2010 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20102920006  Analysis Date = 10/27/2010 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20102850132  Analysis Date = 10/08/2010 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20102770110  Analysis Date = 10/08/2010 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20102700152  Analysis Date = 10/08/2010 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20102640136  Analysis Date = 09/21/2010 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20102570015  Analysis Date = 09/09/2010 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20102510062  Analysis Date = 09/09/2010 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20102430249  Analysis Date = 08/27/2010 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20102350196  Analysis Date = 08/27/2010 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20102290049  Analysis Date = 08/16/2010 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20102230041  Analysis Date = 08/16/2010 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20102140090  Analysis Date = 07/28/2010 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20102080005  Analysis Date = 07/20/2010 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20102000188  Analysis Date = 07/20/2010 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20101930104  Analysis Date = 07/07/2010 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20101870059  Analysis Date = 07/07/2010 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20101790124  Analysis Date = 07/07/2010 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20101730068  Analysis Date = 07/07/2010 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20101660061  Analysis Date = 06/10/2010 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20101590005  Analysis Date = 06/10/2010 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20101530090  Analysis Date = 05/25/2010 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20101440165  Analysis Date = 05/25/2010 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20101380021  Analysis Date = 05/25/2010 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20101310098  Analysis Date = 05/05/2010 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20101240080  Analysis Date = 05/05/2010 
 Lab Value = -0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20101180043  Analysis Date = 04/23/2010 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20101090063  Analysis Date = 04/13/2010 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20101020075  Analysis Date = 04/13/2010 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20100950036  Analysis Date = 03/30/2010 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20100880044  Analysis Date = 03/30/2010 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20100850066  Analysis Date = 03/19/2010 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20100750002  Analysis Date = 03/12/2010 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20100680014  Analysis Date = 03/03/2010 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20100600067  Analysis Date = 03/03/2010 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20100530048  Analysis Date = 02/19/2010 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20100470025  Analysis Date = 02/11/2010 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20100390038  Analysis Date = 02/03/2010 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20100320023  Analysis Date = 02/03/2010 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20100260065  Analysis Date = 02/03/2010 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20100190102  Analysis Date = 01/13/2010 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20100110099  Analysis Date = 01/13/2010 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20100050014  Analysis Date = 01/13/2010 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20093620042  Analysis Date = 01/13/2010 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20093560033  Analysis Date = 12/22/2009 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20093480064  Analysis Date = 12/22/2009 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20093420004  Analysis Date = 12/04/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20093350070  Analysis Date = 12/04/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20093280015  Analysis Date = 11/20/2009 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20093200062  Analysis Date = 11/20/2009 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20093130061  Analysis Date = 11/05/2009 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20093070201  Analysis Date = 11/05/2009 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20093000106  Analysis Date = 11/05/2009 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20092920096  Analysis Date = 10/22/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20092870073  Analysis Date = 10/09/2009 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20092780071  Analysis Date = 10/07/2005 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20052590035  Analysis Date = 09/16/2005 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20052520006  Analysis Date = 09/09/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20052430006  Analysis Date = 09/09/2005 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20052370002  Analysis Date = 08/31/2005 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20052300009  Analysis Date = 08/10/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20052210012  Analysis Date = 08/10/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20052160007  Analysis Date = 08/10/2005 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20052160005  Analysis Date = 07/27/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20052010007  Analysis Date = 07/19/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20051940015  Analysis Date = 07/08/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20051880018  Analysis Date = 06/30/2005 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20051800189  Analysis Date = 06/30/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20051740019  Analysis Date = 06/22/2005 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20051660174  Analysis Date = 06/10/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20051590025  Analysis Date = 06/10/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20051530021  Analysis Date = 06/01/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20051440043  Analysis Date = 05/26/2005 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20051380014  Analysis Date = 05/18/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20051320029  Analysis Date = 05/06/2005 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20051250003  Analysis Date = 05/06/2005 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20051170012  Analysis Date = 04/26/2005 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20051110007  Analysis Date = 04/15/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20051020018  Analysis Date = 04/07/2005 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20050950044  Analysis Date = 04/07/2005 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20050880116  Analysis Date = 04/07/2005 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20050840096  Analysis Date = 03/18/2005 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20050750004  Analysis Date = 03/18/2005 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20050700007  Analysis Date = 03/18/2005 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20050700004  Analysis Date = 03/11/2005 
 Lab Value = 0.036 
 RPT Level = 0.02 
 Lab Sample ID = 20050670011  Analysis Date = 03/02/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20050550024  Analysis Date = 02/18/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20050480005  Analysis Date = 02/15/2005 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20050410004  Analysis Date = 02/08/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20050340020  Analysis Date = 02/02/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20050260024  Analysis Date = 02/02/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20050200048  Analysis Date = 01/14/2005 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20050130091  Analysis Date = 01/14/2005 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20050070016  Analysis Date = 01/04/2005 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20043650002  Analysis Date = 01/04/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20043580037  Analysis Date = 01/04/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20043580035  Analysis Date = 01/04/2005 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20043520023  Analysis Date = 12/17/2004 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20043510018  Analysis Date = 12/17/2004 
 Lab Value = 0.023 
 RPT Level = 0.02 
 Lab Sample ID = 20043450069  Analysis Date = 12/17/2004 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20043440147  Analysis Date = 12/17/2004 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20043380005  Analysis Date = 12/17/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20043380002  Analysis Date = 12/03/2004 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20043310059  Analysis Date = 12/03/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20043280048  Analysis Date = 12/03/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20043240012  Analysis Date = 09/09/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20042450138  Analysis Date = 09/09/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20042400089  Analysis Date = 08/27/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20042370105  Analysis Date = 08/27/2004 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20042330206  Analysis Date = 08/20/2004 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20042320136  Analysis Date = 08/20/2004 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20042320138  Analysis Date = 08/20/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20042240114  Analysis Date = 08/12/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20042170123  Analysis Date = 08/12/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20042110015  Analysis Date = 07/29/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20042040039  Analysis Date = 07/15/2004 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20041960050  Analysis Date = 07/15/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20041900062  Analysis Date = 07/15/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20041820035  Analysis Date = 07/02/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20041750057  Analysis Date = 07/02/2004 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20041700080  Analysis Date = 06/18/2004 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20041610055  Analysis Date = 06/09/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20041550019  Analysis Date = 05/27/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20041470132  Analysis Date = 05/27/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20041400016  Analysis Date = 05/11/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20041260099  Analysis Date = 05/03/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20041200046  Analysis Date = 04/26/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20041130016  Analysis Date = 04/21/2004 
 Lab Value = -0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20041050022  Analysis Date = 04/14/2004 
 Lab Value = -0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20040980007  Analysis Date = 04/14/2004 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20040930009  Analysis Date = 04/14/2004 
 Lab Value = -0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20040910012  Analysis Date = 04/14/2004 
 Lab Value = -0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20040850021  Analysis Date = 03/24/2004 
 Lab Value = -0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20040830056  Analysis Date = 03/24/2004 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20040790023  Analysis Date = 03/23/2004 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20040760010  Analysis Date = 03/23/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040720029  Analysis Date = 03/23/2004 
 Lab Value = -0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20040710005  Analysis Date = 03/23/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040680093  Analysis Date = 03/23/2004 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20040650001  Analysis Date = 03/23/2004 
 Lab Value = 0.028 
 RPT Level = 0.02 
 Lab Sample ID = 20040580032  Analysis Date = 03/23/2004 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20040550018  Analysis Date = 02/23/2004 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20040510134  Analysis Date = 02/23/2004 
 Lab Value = -0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20040490025  Analysis Date = 02/23/2004 
 Lab Value = -0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20040440035  Analysis Date = 02/23/2004 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20040420001  Analysis Date = 02/09/2004 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20040370017  Analysis Date = 02/09/2004 
 Lab Value = -0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20040340024  Analysis Date = 02/09/2004 
 Lab Value = -0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20040300012  Analysis Date = 02/09/2004 
 Lab Value = -0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20040270036  Analysis Date = 01/26/2004 
 Lab Value = -0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20040230030  Analysis Date = 01/26/2004 
 Lab Value = -0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20040210154  Analysis Date = 01/26/2004 
 Lab Value = -0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20040200023  Analysis Date = 01/26/2004 
 Lab Value = -0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20040150075  Analysis Date = 01/14/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20040090020  Analysis Date = 01/08/2004 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20040070032  Analysis Date = 01/08/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20040050016  Analysis Date = 10/02/2003 
 Lab Value = -0.011 
 RPT Level = 0.024 
 Lab Sample ID = 20032660009  Analysis Date = 10/02/2003 
 Lab Value = -0.009 
 RPT Level = 0.024 
 Lab Sample ID = 20032600107  Analysis Date = 10/01/2003 
 Lab Value = -0.024 
 RPT Level = 0.024 
 Lab Sample ID = 20032520179  Analysis Date = 09/16/2003 
 Lab Value = -0.019 
 RPT Level = 0.024 
 Lab Sample ID = 20032450195  Analysis Date = 09/03/2003 
 Lab Value = -0.023 
 RPT Level = 0.024 
 Lab Sample ID = 20032380029  Analysis Date = 09/04/2003 
 Lab Value = -0.004 
 RPT Level = 0.024 
 Lab Sample ID = 20032310028  Analysis Date = 08/25/2003 
 Lab Value = -0.008 
 RPT Level = 0.024 
 Lab Sample ID = 20032250256  Analysis Date = 08/14/2003 
 Lab Value = -0.016 
 RPT Level = 0.024 
 Lab Sample ID = 20032180019  Analysis Date = 08/06/2003 
 Lab Value = 0 
 RPT Level = 0.024 
 Lab Sample ID = 20032100004  Analysis Date = 08/06/2003 
 Lab Value = -0.009 
 RPT Level = 0.024 
 Lab Sample ID = 20032040043  Analysis Date = 07/23/2003 
 Lab Value = -0.017 
 RPT Level = 0.024 
 Lab Sample ID = 20031960025  Analysis Date = 07/16/2003 
 Lab Value = -0.022 
 RPT Level = 0.024 
 Lab Sample ID = 20031900098  Analysis Date = 07/16/2003 
 Lab Value = -0.014 
 RPT Level = 0.024 
 Lab Sample ID = 20031820037  Analysis Date = 07/16/2003 
 Lab Value = -0.008 
 RPT Level = 0.024 
 Lab Sample ID = 20031770041  Analysis Date = 06/24/2003 
 Lab Value = -0.009 
 RPT Level = 0.024 
 Lab Sample ID = 20031700013  Analysis Date = 06/18/2003 
 Lab Value = 0.01 
 RPT Level = 0.024 
 Lab Sample ID = 20031630053  Analysis Date = 06/18/2003 
 Lab Value = 0.008 
 RPT Level = 0.024 
 Lab Sample ID = 20031600109  Analysis Date = 06/05/2003 
 Lab Value = 0.002 
 RPT Level = 0.024 
 Lab Sample ID = 20031480059  Analysis Date = 06/05/2003 
 Lab Value = 0.006 
 RPT Level = 0.024 
 Lab Sample ID = 20031430019  Analysis Date = 05/27/2003 
 Lab Value = 0.008 
 RPT Level = 0.024 
 Lab Sample ID = 20031400115  Analysis Date = 05/22/2003 
 Lab Value = 0.013 
 RPT Level = 0.024 
 Lab Sample ID = 20031290084  Analysis Date = 05/06/2003 
 Lab Value = 0.005 
 RPT Level = 0.024 
 Lab Sample ID = 20031220070  Analysis Date = 05/22/2003 
 Lab Value = 0.017 
 RPT Level = 0.024 
 Lab Sample ID = 20031200043  Analysis Date = 05/06/2003 
 Lab Value = 0.001 
 RPT Level = 0.024 
 Lab Sample ID = 20031080208  Analysis Date = 04/09/2003 
 Lab Value = -0.006 
 RPT Level = 0.024 
 Lab Sample ID = 20030970018  Analysis Date = 04/10/2003 
 Lab Value = -0.007 
 RPT Level = 0.024 
 Lab Sample ID = 20030920027  Analysis Date = 04/10/2003 
 Lab Value = -0.004 
 RPT Level = 0.024 
 Lab Sample ID = 20030900015  Analysis Date = 04/10/2003 
 Lab Value = -0.003 
 RPT Level = 0.024 
 Lab Sample ID = 20030860023  Analysis Date = 04/10/2003 
 Lab Value = -0.003 
 RPT Level = 0.024 
 Lab Sample ID = 20030710021  Analysis Date = 04/10/2003 
 Lab Value = 0.01 
 RPT Level = 0.024 
 Lab Sample ID = 20030660148  Analysis Date = 03/06/2003 
 Lab Value = -0.024 
 RPT Level = 0.024 
 Lab Sample ID = 20030590040  Analysis Date = 02/27/2003 
 Lab Value = -0.002 
 RPT Level = 0.024 
 Lab Sample ID = 20030570061  Analysis Date = 02/19/2003 
 Lab Value = -0.006 
 RPT Level = 0.024 
 Lab Sample ID = 20030410034  Analysis Date = 02/05/2003 
 Lab Value = 0.002 
 RPT Level = 0.024 
 Lab Sample ID = 20030350008  Analysis Date = 02/05/2003 
 Lab Value = 0.003 
 RPT Level = 0.024 
 Lab Sample ID = 20030310028  Analysis Date = 02/19/2003 
 Lab Value = -0.01 
 RPT Level = 0.024 
 Lab Sample ID = 20030300004  Analysis Date = 01/23/2003 
 Lab Value = 0.004 
 RPT Level = 0.024 
 Lab Sample ID = 20030150009  Analysis Date = 01/15/2003 
 Lab Value = 0.001 
 RPT Level = 0.024 
 Lab Sample ID = 20030140019  Analysis Date = 01/15/2003 
 Lab Value = -0.002 
 RPT Level = 0.024 
 Lab Sample ID = 20030020002  Analysis Date = 01/15/2003 
 Lab Value = -0.007 
 RPT Level = 0.024 
 Lab Sample ID = 20023650009  Analysis Date = 12/31/2002 
 Lab Value = 0.003 
 RPT Level = 0.024 
 Lab Sample ID = 20023500166  Analysis Date = 12/31/2002 
 Lab Value = 0.002 
 RPT Level = 0.024 
 Lab Sample ID = 20023500092  Analysis Date = 12/31/2002 
 Lab Value = 0.002 
 RPT Level = 0.024 
 Lab Sample ID = 20023370026  Analysis Date = 12/31/2002 
 Lab Value = -0.002 
 RPT Level = 0.024 
 Lab Sample ID = 20023370025  Analysis Date = 12/31/2002 
 Lab Value = 0.02 
 RPT Level = 0.024 
 Lab Sample ID = 20023330096  Analysis Date = 12/31/2002 
 Lab Value = 0 
 RPT Level = 0.024 
 Lab Sample ID = 20023360020  Analysis Date = 12/31/2002 
 Lab Value = 0.016 
 RPT Level = 0.024 
 Lab Sample ID = 20023310020  Analysis Date = 11/07/2002 
 Lab Value = 0.009 
 RPT Level = 0.024 
 Lab Sample ID = 20023040033  Analysis Date = 11/07/2002 
 Lab Value = -0.005 
 RPT Level = 0.024 
 Lab Sample ID = 20022970050  Analysis Date = 11/07/2002 
 Lab Value = -0.007 
 RPT Level = 0.024 
 Lab Sample ID = 20022970049  Analysis Date = 11/07/2002 
 Lab Value = -0.008 
 RPT Level = 0.024 
 Lab Sample ID = 20022970048  Analysis Date = 11/07/2002 
 Lab Value = -0.005 
 RPT Level = 0.024 
 Lab Sample ID = 20022960022  Analysis Date = 05/22/2002 
 Lab Value = 0.006 
 RPT Level = 0.024 
 Lab Sample ID = 20021300002  Analysis Date = 05/03/2002 
 Lab Value = 0 
 RPT Level = 0.024 
 Lab Sample ID = 20021140038  Analysis Date = 04/18/2002 
 Lab Value = -0.01 
 RPT Level = 0.024 
 Lab Sample ID = 20021010015  Analysis Date = 03/27/2002 
 Lab Value = -0.01 
 RPT Level = 0.024 
 Lab Sample ID = 20020850092  Analysis Date = 03/27/2002 
 Lab Value = 0.007 
 RPT Level = 0.024 
 Lab Sample ID = 20020730105  Analysis Date = 03/14/2002 
 Lab Value = -0.013 
 RPT Level = 0.024 
 Lab Sample ID = 20020600006  Analysis Date = 02/21/2002 
 Lab Value = -0.014 
 RPT Level = 0.024 
 Lab Sample ID = 20020460047  Analysis Date = 02/07/2002 
 Lab Value = 0.006 
 RPT Level = 0.024 
 Lab Sample ID = 20020320104  Analysis Date = 01/18/2002 
 Lab Value = 0.044 
 RPT Level = 0.024 
 Lab Sample ID = 20020110002  Analysis Date = 01/18/2002 
 Lab Value = 0.009 
 RPT Level = 0.024 
 Lab Sample ID = 20013600206  Analysis Date = 12/21/2001 
 Lab Value = 0.01 
 RPT Level = 0.024 
 Lab Sample ID = 20013480007  Analysis Date = 11/14/2001 
 Lab Value = 0.025 
 RPT Level = 0.024 
 Lab Sample ID = 20013110129  Analysis Date = 03/08/2013 
 RPT Level = 0.02  Analysis Date = 02/15/2013 
 RPT Level = 0.02  Analysis Date = 02/15/2013 
 RPT Level = 0.02  Analysis Date = 02/15/2013 
 RPT Level = 0.02  Analysis Date = 02/15/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 12/20/2012 
 RPT Level = 0.02  Analysis Date = 12/20/2012 
 RPT Level = 0.02  Analysis Date = 12/20/2012 
 RPT Level = 0.02  Analysis Date = 12/20/2012 
 RPT Level = 0.02  Analysis Date = 12/05/2012 
 RPT Level = 0.02  Analysis Date = 12/05/2012 
 RPT Level = 0.02  Analysis Date = 12/05/2012 
 RPT Level = 0.02  Analysis Date = 12/05/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 10/30/2012 
 RPT Level = 0.02  Analysis Date = 10/30/2012 
 RPT Level = 0.02  Analysis Date = 10/30/2012 
 RPT Level = 0.02  Analysis Date = 10/30/2012 
 RPT Level = 0.02  Analysis Date = 10/19/2012 
 RPT Level = 0.02  Analysis Date = 10/19/2012 
 RPT Level = 0.02  Analysis Date = 10/19/2012 
 RPT Level = 0.02  Analysis Date = 10/19/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/13/2012 
 RPT Level = 0.02  Analysis Date = 09/13/2012 
 RPT Level = 0.02  Analysis Date = 09/06/2012 
 RPT Level = 0.02  Analysis Date = 09/06/2012 
 RPT Level = 0.02  Analysis Date = 09/06/2012 
 RPT Level = 0.02  Analysis Date = 09/06/2012 
 RPT Level = 0.02  Analysis Date = 08/02/2012 
 RPT Level = 0.02  Analysis Date = 08/02/2012 
 RPT Level = 0.02  Analysis Date = 08/02/2012 
 RPT Level = 0.02  Analysis Date = 08/02/2012 
 RPT Level = 0.02  Analysis Date = 07/10/2012 
 RPT Level = 0.02  Analysis Date = 07/10/2012 
 RPT Level = 0.02  Analysis Date = 07/10/2012 
 RPT Level = 0.02  Analysis Date = 07/10/2012 
 RPT Level = 0.02  Analysis Date = 06/28/2012 
 RPT Level = 0.02  Analysis Date = 06/28/2012 
 RPT Level = 0.02  Analysis Date = 06/28/2012 
 RPT Level = 0.02  Analysis Date = 06/28/2012 
 RPT Level = 0.02  Analysis Date = 06/18/2012 
 RPT Level = 0.02  Analysis Date = 06/18/2012 
 RPT Level = 0.02  Analysis Date = 06/18/2012 
 RPT Level = 0.02  Analysis Date = 06/18/2012 
 RPT Level = 0.02  Analysis Date = 06/28/2012 
 RPT Level = 0.02  Analysis Date = 06/28/2012 
 RPT Level = 0.02  Analysis Date = 06/04/2012 
 RPT Level = 0.02  Analysis Date = 06/04/2012 
 RPT Level = 0.02  Analysis Date = 05/24/2012 
 RPT Level = 0.02  Analysis Date = 05/24/2012 
 RPT Level = 0.02  Analysis Date = 05/18/2012 
 RPT Level = 0.02  Analysis Date = 05/18/2012 
 RPT Level = 0.02  Analysis Date = 05/04/2012 
 RPT Level = 0.02  Analysis Date = 05/04/2012 
 RPT Level = 0.02  Analysis Date = 05/04/2012 
 RPT Level = 0.02  Analysis Date = 05/04/2012 
 RPT Level = 0.02  Analysis Date = 05/04/2012 
 RPT Level = 0.02  Analysis Date = 05/04/2012 
 RPT Level = 0.02  Analysis Date = 05/04/2012 
 RPT Level = 0.02  Analysis Date = 05/04/2012 
 RPT Level = 0.02  Analysis Date = 04/09/2012 
 RPT Level = 0.02  Analysis Date = 04/09/2012 
 RPT Level = 0.02  Analysis Date = 04/09/2012 
 RPT Level = 0.02  Analysis Date = 04/09/2012 
 RPT Level = 0.02  Analysis Date = 03/20/2012 
 RPT Level = 0.02  Analysis Date = 03/20/2012 
 RPT Level = 0.02  Analysis Date = 03/20/2012 
 RPT Level = 0.02  Analysis Date = 03/20/2012 
 RPT Level = 0.02  Analysis Date = 03/20/2012 
 RPT Level = 0.02  Analysis Date = 03/20/2012 
 RPT Level = 0.02  Analysis Date = 03/06/2012 
 RPT Level = 0.02  Analysis Date = 03/06/2012 
 RPT Level = 0.02  Analysis Date = 03/06/2012 
 RPT Level = 0.02  Analysis Date = 03/06/2012 
 RPT Level = 0.02  Analysis Date = 03/06/2012 
 RPT Level = 0.02  Analysis Date = 03/06/2012 
 RPT Level = 0.02  Analysis Date = 03/02/2012 
 RPT Level = 0.02  Analysis Date = 03/02/2012 
 RPT Level = 0.02  Analysis Date = 03/02/2012 
 RPT Level = 0.02  Analysis Date = 03/02/2012 
 RPT Level = 0.02  Analysis Date = 01/30/2012 
 RPT Level = 0.02  Analysis Date = 01/30/2012 
 RPT Level = 0.02  Analysis Date = 01/30/2012 
 RPT Level = 0.02  Analysis Date = 01/30/2012 
 RPT Level = 0.02  Analysis Date = 01/17/2012 
 RPT Level = 0.02  Analysis Date = 01/17/2012 
 RPT Level = 0.02  Analysis Date = 01/17/2012 
 RPT Level = 0.02  Analysis Date = 01/17/2012 
 RPT Level = 0.02  Analysis Date = 01/17/2012 
 RPT Level = 0.02  Analysis Date = 01/17/2012 
 RPT Level = 0.02  Analysis Date = 01/17/2012 
 RPT Level = 0.02  Analysis Date = 01/17/2012 
 RPT Level = 0.02  Analysis Date = 12/16/2011 
 RPT Level = 0.02  Analysis Date = 12/16/2011 
 RPT Level = 0.02  Analysis Date = 12/16/2011 
 RPT Level = 0.02  Analysis Date = 12/16/2011 
 RPT Level = 0.02  Analysis Date = 12/09/2011 
 RPT Level = 0.02  Analysis Date = 12/09/2011 
 RPT Level = 0.02  Analysis Date = 12/09/2011 
 RPT Level = 0.02  Analysis Date = 12/09/2011 
 RPT Level = 0.02  Analysis Date = 12/01/2011 
 RPT Level = 0.02  Analysis Date = 12/01/2011 
 RPT Level = 0.02  Analysis Date = 11/10/2011 
 RPT Level = 0.02  Analysis Date = 11/10/2011 
 RPT Level = 0.02  Analysis Date = 11/03/2011 
 RPT Level = 0.02  Analysis Date = 11/03/2011 
 RPT Level = 0.02  Analysis Date = 11/03/2011 
 RPT Level = 0.02  Analysis Date = 11/03/2011 
 RPT Level = 0.02  Analysis Date = 11/03/2011 
 RPT Level = 0.02  Analysis Date = 11/03/2011 
 RPT Level = 0.02  Analysis Date = 10/14/2011 
 RPT Level = 0.02  Analysis Date = 10/14/2011 
 RPT Level = 0.02  Analysis Date = 10/14/2011 
 RPT Level = 0.02  Analysis Date = 10/14/2011 
 RPT Level = 0.02  Analysis Date = 09/28/2011 
 RPT Level = 0.02  Analysis Date = 09/28/2011 
 RPT Level = 0.02  Analysis Date = 09/28/2011 
 RPT Level = 0.02  Analysis Date = 09/28/2011 
 RPT Level = 0.02  Analysis Date = 09/28/2011 
 RPT Level = 0.02  Analysis Date = 09/28/2011 
 RPT Level = 0.02  Analysis Date = 09/28/2011 
 RPT Level = 0.02  Analysis Date = 09/28/2011 
 RPT Level = 0.02  Analysis Date = 09/28/2011 
 RPT Level = 0.02  Analysis Date = 09/28/2011 
 RPT Level = 0.02  Analysis Date = 09/07/2011 
 RPT Level = 0.02  Analysis Date = 09/07/2011 
 RPT Level = 0.02  Analysis Date = 09/07/2011 
 RPT Level = 0.02  Analysis Date = 09/07/2011 
 RPT Level = 0.02  Analysis Date = 08/12/2011 
 RPT Level = 0.02  Analysis Date = 08/12/2011 
 RPT Level = 0.02  Analysis Date = 08/12/2011 
 RPT Level = 0.02  Analysis Date = 08/12/2011 
 RPT Level = 0.02  Analysis Date = 07/28/2011 
 RPT Level = 0.02  Analysis Date = 07/28/2011 
 RPT Level = 0.02  Analysis Date = 07/28/2011 
 RPT Level = 0.02  Analysis Date = 07/28/2011 
 RPT Level = 0.02  Analysis Date = 07/28/2011 
 RPT Level = 0.02  Analysis Date = 07/28/2011 
 RPT Level = 0.02  Analysis Date = 07/08/2011 
 RPT Level = 0.02  Analysis Date = 07/08/2011 
 RPT Level = 0.02  Analysis Date = 07/01/2011 
 RPT Level = 0.02  Analysis Date = 07/01/2011 
 RPT Level = 0.02  Analysis Date = 07/01/2011 
 RPT Level = 0.02  Analysis Date = 07/01/2011 
 RPT Level = 0.02  Analysis Date = 07/01/2011 
 RPT Level = 0.02  Analysis Date = 07/01/2011 
 RPT Level = 0.02  Analysis Date = 06/10/2011 
 RPT Level = 0.02  Analysis Date = 06/10/2011 
 RPT Level = 0.02  Analysis Date = 06/10/2011 
 RPT Level = 0.02  Analysis Date = 06/10/2011 
 RPT Level = 0.02  Analysis Date = 06/10/2011 
 RPT Level = 0.02  Analysis Date = 06/10/2011 
 RPT Level = 0.02  Analysis Date = 05/23/2011 
 RPT Level = 0.02  Analysis Date = 05/23/2011 
 RPT Level = 0.02  Analysis Date = 05/23/2011 
 RPT Level = 0.02  Analysis Date = 05/23/2011 
 RPT Level = 0.02  Analysis Date = 05/09/2011 
 RPT Level = 0.02  Analysis Date = 05/09/2011 
 RPT Level = 0.02  Analysis Date = 05/09/2011 
 RPT Level = 0.02  Analysis Date = 05/09/2011 
 RPT Level = 0.02  Analysis Date = 04/25/2011 
 RPT Level = 0.02  Analysis Date = 04/25/2011 
 RPT Level = 0.02  Analysis Date = 04/25/2011 
 RPT Level = 0.02  Analysis Date = 04/25/2011 
 RPT Level = 0.02  Analysis Date = 04/06/2011 
 RPT Level = 0.02  Analysis Date = 04/06/2011 
 RPT Level = 0.02  Analysis Date = 04/06/2011 
 RPT Level = 0.02  Analysis Date = 04/06/2011 
 RPT Level = 0.02  Analysis Date = 03/22/2011 
 RPT Level = 0.02  Analysis Date = 03/22/2011 
 RPT Level = 0.02  Analysis Date = 03/22/2011 
 RPT Level = 0.02  Analysis Date = 03/22/2011 
 RPT Level = 0.02  Analysis Date = 03/22/2011 
 RPT Level = 0.02  Analysis Date = 03/22/2011 
 RPT Level = 0.02  Analysis Date = 03/03/2011 
 RPT Level = 0.02  Analysis Date = 03/03/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/09/2011 
 RPT Level = 0.02  Analysis Date = 02/09/2011 
 RPT Level = 0.02  Analysis Date = 01/24/2011 
 RPT Level = 0.02  Analysis Date = 01/24/2011 
 RPT Level = 0.02  Analysis Date = 01/24/2011 
 RPT Level = 0.02  Analysis Date = 01/24/2011 
 RPT Level = 0.02  Analysis Date = 01/05/2011 
 RPT Level = 0.02  Analysis Date = 01/05/2011 
 RPT Level = 0.02  Analysis Date = 01/05/2011 
 RPT Level = 0.02  Analysis Date = 01/05/2011 
 RPT Level = 0.02  Analysis Date = 01/05/2011 
 RPT Level = 0.02  Analysis Date = 01/05/2011 
 RPT Level = 0.02  Analysis Date = 01/05/2011 
 RPT Level = 0.02  Analysis Date = 01/05/2011 
 RPT Level = 0.02  Analysis Date = 12/07/2010 
 RPT Level = 0.02  Analysis Date = 12/07/2010 
 RPT Level = 0.02  Analysis Date = 12/07/2010 
 RPT Level = 0.02  Analysis Date = 12/07/2010 
 RPT Level = 0.02  Analysis Date = 11/23/2010 
 RPT Level = 0.02  Analysis Date = 11/23/2010 
 RPT Level = 0.02  Analysis Date = 11/23/2010 
 RPT Level = 0.02  Analysis Date = 11/23/2010 
 RPT Level = 0.02  Analysis Date = 11/09/2010 
 RPT Level = 0.02  Analysis Date = 11/09/2010 
 RPT Level = 0.02  Analysis Date = 11/09/2010 
 RPT Level = 0.02  Analysis Date = 11/09/2010 
 RPT Level = 0.02  Analysis Date = 10/27/2010 
 RPT Level = 0.02  Analysis Date = 10/27/2010 
 RPT Level = 0.02  Analysis Date = 10/27/2010 
 RPT Level = 0.02  Analysis Date = 10/27/2010 
 RPT Level = 0.02  Analysis Date = 10/27/2010 
 RPT Level = 0.02  Analysis Date = 10/27/2010 
 RPT Level = 0.02  Analysis Date = 10/08/2010 
 RPT Level = 0.02  Analysis Date = 10/08/2010 
 RPT Level = 0.02  Analysis Date = 10/08/2010 
 RPT Level = 0.02  Analysis Date = 10/08/2010 
 RPT Level = 0.02  Analysis Date = 10/08/2010 
 RPT Level = 0.02  Analysis Date = 10/08/2010 
 RPT Level = 0.02  Analysis Date = 09/21/2010 
 RPT Level = 0.02  Analysis Date = 09/21/2010 
 RPT Level = 0.02  Analysis Date = 09/09/2010 
 RPT Level = 0.02  Analysis Date = 09/09/2010 
 RPT Level = 0.02  Analysis Date = 09/09/2010 
 RPT Level = 0.02  Analysis Date = 09/09/2010 
 RPT Level = 0.02  Analysis Date = 08/27/2010 
 RPT Level = 0.02  Analysis Date = 08/27/2010 
 RPT Level = 0.02  Analysis Date = 08/27/2010 
 RPT Level = 0.02  Analysis Date = 08/27/2010 
 RPT Level = 0.02  Analysis Date = 08/16/2010 
 RPT Level = 0.02  Analysis Date = 08/16/2010 
 RPT Level = 0.02  Analysis Date = 08/16/2010 
 RPT Level = 0.02  Analysis Date = 08/16/2010 
 RPT Level = 0.02  Analysis Date = 07/28/2010 
 RPT Level = 0.02  Analysis Date = 07/28/2010 
 RPT Level = 0.02  Analysis Date = 07/20/2010 
 RPT Level = 0.02  Analysis Date = 07/20/2010 
 RPT Level = 0.02  Analysis Date = 07/20/2010 
 RPT Level = 0.02  Analysis Date = 07/20/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 06/10/2010 
 RPT Level = 0.02  Analysis Date = 06/10/2010 
 RPT Level = 0.02  Analysis Date = 06/10/2010 
 RPT Level = 0.02  Analysis Date = 06/10/2010 
 RPT Level = 0.02  Analysis Date = 05/25/2010 
 RPT Level = 0.02  Analysis Date = 05/25/2010 
 RPT Level = 0.02  Analysis Date = 05/25/2010 
 RPT Level = 0.02  Analysis Date = 05/25/2010 
 RPT Level = 0.02  Analysis Date = 05/25/2010 
 RPT Level = 0.02  Analysis Date = 05/25/2010 
 RPT Level = 0.02  Analysis Date = 05/05/2010 
 RPT Level = 0.02  Analysis Date = 05/05/2010 
 RPT Level = 0.02  Analysis Date = 05/05/2010 
 RPT Level = 0.02  Analysis Date = 05/05/2010 
 RPT Level = 0.02  Analysis Date = 04/23/2010 
 RPT Level = 0.02  Analysis Date = 04/23/2010 
 RPT Level = 0.02  Analysis Date = 04/13/2010 
 RPT Level = 0.02  Analysis Date = 04/13/2010 
 RPT Level = 0.02  Analysis Date = 04/13/2010 
 RPT Level = 0.02  Analysis Date = 04/13/2010 
 RPT Level = 0.02  Analysis Date = 03/30/2010 
 RPT Level = 0.02  Analysis Date = 03/30/2010 
 RPT Level = 0.02  Analysis Date = 03/30/2010 
 RPT Level = 0.02  Analysis Date = 03/30/2010 
 RPT Level = 0.02  Analysis Date = 03/19/2010 
 RPT Level = 0.02  Analysis Date = 03/19/2010 
 RPT Level = 0.02  Analysis Date = 03/12/2010 
 RPT Level = 0.02  Analysis Date = 03/12/2010 
 RPT Level = 0.02  Analysis Date = 03/03/2010 
 RPT Level = 0.02  Analysis Date = 03/03/2010 
 RPT Level = 0.02  Analysis Date = 03/03/2010 
 RPT Level = 0.02  Analysis Date = 03/03/2010 
 RPT Level = 0.02  Analysis Date = 02/19/2010 
 RPT Level = 0.02  Analysis Date = 02/19/2010 
 RPT Level = 0.02  Analysis Date = 02/11/2010 
 RPT Level = 0.02  Analysis Date = 02/11/2010 
 RPT Level = 0.02  Analysis Date = 02/03/2010 
 RPT Level = 0.02  Analysis Date = 02/03/2010 
 RPT Level = 0.02  Analysis Date = 02/03/2010 
 RPT Level = 0.02  Analysis Date = 02/03/2010 
 RPT Level = 0.02  Analysis Date = 02/03/2010 
 RPT Level = 0.02  Analysis Date = 02/03/2010 
 RPT Level = 0.02  Analysis Date = 01/13/2010 
 RPT Level = 0.02  Analysis Date = 01/13/2010 
 RPT Level = 0.02  Analysis Date = 01/13/2010 
 RPT Level = 0.02  Analysis Date = 01/13/2010 
 RPT Level = 0.02  Analysis Date = 01/13/2010 
 RPT Level = 0.02  Analysis Date = 01/13/2010 
 RPT Level = 0.02  Analysis Date = 01/13/2010 
 RPT Level = 0.02  Analysis Date = 01/13/2010 
 RPT Level = 0.02  Analysis Date = 12/22/2009 
 RPT Level = 0.02  Analysis Date = 12/22/2009 
 RPT Level = 0.02  Analysis Date = 12/22/2009 
 RPT Level = 0.02  Analysis Date = 12/22/2009 
 RPT Level = 0.02  Analysis Date = 12/04/2009 
 RPT Level = 0.02  Analysis Date = 12/04/2009 
 RPT Level = 0.02  Analysis Date = 12/04/2009 
 RPT Level = 0.02  Analysis Date = 12/04/2009 
 RPT Level = 0.02  Analysis Date = 11/20/2009 
 RPT Level = 0.02  Analysis Date = 11/20/2009 
 RPT Level = 0.02  Analysis Date = 11/20/2009 
 RPT Level = 0.02  Analysis Date = 11/20/2009 
 RPT Level = 0.02  Analysis Date = 11/05/2009 
 RPT Level = 0.02  Analysis Date = 11/05/2009 
 RPT Level = 0.02  Analysis Date = 11/05/2009 
 RPT Level = 0.02  Analysis Date = 11/05/2009 
 RPT Level = 0.02  Analysis Date = 11/05/2009 
 RPT Level = 0.02  Analysis Date = 11/05/2009 
 RPT Level = 0.02  Analysis Date = 10/22/2009 
 RPT Level = 0.02  Analysis Date = 10/22/2009 
 RPT Level = 0.02  Analysis Date = 10/09/2009 
 RPT Level = 0.02  Analysis Date = 10/09/2009 
 RPT Level = 0.02  Analysis Date = 10/07/2005 
 RPT Level = 0.02  Analysis Date = 10/07/2005 
 RPT Level = 0.02  Analysis Date = 09/16/2005 
 RPT Level = 0.02  Analysis Date = 09/16/2005 
 RPT Level = 0.02  Analysis Date = 09/09/2005 
 RPT Level = 0.02  Analysis Date = 09/09/2005 
 RPT Level = 0.02  Analysis Date = 09/09/2005 
 RPT Level = 0.02  Analysis Date = 09/09/2005 
 RPT Level = 0.02  Analysis Date = 08/31/2005 
 RPT Level = 0.02  Analysis Date = 08/31/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 07/27/2005 
 RPT Level = 0.02  Analysis Date = 07/27/2005 
 RPT Level = 0.02  Analysis Date = 07/19/2005 
 RPT Level = 0.02  Analysis Date = 07/19/2005 
 RPT Level = 0.02  Analysis Date = 07/08/2005 
 RPT Level = 0.02  Analysis Date = 07/08/2005 
 RPT Level = 0.02  Analysis Date = 06/30/2005 
 RPT Level = 0.02  Analysis Date = 06/30/2005 
 RPT Level = 0.02  Analysis Date = 06/30/2005 
 RPT Level = 0.02  Analysis Date = 06/30/2005 
 RPT Level = 0.02  Analysis Date = 06/22/2005 
 RPT Level = 0.02  Analysis Date = 06/22/2005 
 RPT Level = 0.02  Analysis Date = 06/10/2005 
 RPT Level = 0.02  Analysis Date = 06/10/2005 
 RPT Level = 0.02  Analysis Date = 06/10/2005 
 RPT Level = 0.02  Analysis Date = 06/10/2005 
 RPT Level = 0.02  Analysis Date = 06/01/2005 
 RPT Level = 0.02  Analysis Date = 06/01/2005 
 RPT Level = 0.02  Analysis Date = 05/26/2005 
 RPT Level = 0.02  Analysis Date = 05/26/2005 
 RPT Level = 0.02  Analysis Date = 05/18/2005 
 RPT Level = 0.02  Analysis Date = 05/18/2005 
 RPT Level = 0.02  Analysis Date = 05/06/2005 
 RPT Level = 0.02  Analysis Date = 05/06/2005 
 RPT Level = 0.02  Analysis Date = 05/06/2005 
 RPT Level = 0.02  Analysis Date = 05/06/2005 
 RPT Level = 0.02  Analysis Date = 04/26/2005 
 RPT Level = 0.02  Analysis Date = 04/26/2005 
 RPT Level = 0.02  Analysis Date = 04/15/2005 
 RPT Level = 0.02  Analysis Date = 04/15/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 03/18/2005 
 RPT Level = 0.02  Analysis Date = 03/18/2005 
 RPT Level = 0.02  Analysis Date = 03/18/2005 
 RPT Level = 0.02  Analysis Date = 03/18/2005 
 RPT Level = 0.02  Analysis Date = 03/18/2005 
 RPT Level = 0.02  Analysis Date = 03/18/2005 
 RPT Level = 0.02  Analysis Date = 03/11/2005 
 RPT Level = 0.02  Analysis Date = 03/11/2005 
 RPT Level = 0.02  Analysis Date = 03/02/2005 
 RPT Level = 0.02  Analysis Date = 03/02/2005 
 RPT Level = 0.02  Analysis Date = 02/18/2005 
 RPT Level = 0.02  Analysis Date = 02/18/2005 
 RPT Level = 0.02  Analysis Date = 02/15/2005 
 RPT Level = 0.02  Analysis Date = 02/15/2005 
 RPT Level = 0.02  Analysis Date = 02/08/2005 
 RPT Level = 0.02  Analysis Date = 02/08/2005 
 RPT Level = 0.02  Analysis Date = 02/02/2005 
 RPT Level = 0.02  Analysis Date = 02/02/2005 
 RPT Level = 0.02  Analysis Date = 02/02/2005 
 RPT Level = 0.02  Analysis Date = 02/02/2005 
 RPT Level = 0.02  Analysis Date = 01/14/2005 
 RPT Level = 0.02  Analysis Date = 01/14/2005 
 RPT Level = 0.02  Analysis Date = 01/14/2005 
 RPT Level = 0.02  Analysis Date = 01/14/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/03/2004 
 RPT Level = 0.02  Analysis Date = 12/03/2004 
 RPT Level = 0.02  Analysis Date = 12/03/2004 
 RPT Level = 0.02  Analysis Date = 12/03/2004 
 RPT Level = 0.02  Analysis Date = 12/03/2004 
 RPT Level = 0.02  Analysis Date = 12/03/2004 
 RPT Level = 0.02  Analysis Date = 09/09/2004 
 RPT Level = 0.02  Analysis Date = 09/09/2004 
 RPT Level = 0.02  Analysis Date = 09/09/2004 
 RPT Level = 0.02  Analysis Date = 09/09/2004 
 RPT Level = 0.02  Analysis Date = 08/27/2004 
 RPT Level = 0.02  Analysis Date = 08/27/2004 
 RPT Level = 0.02  Analysis Date = 08/27/2004 
 RPT Level = 0.02  Analysis Date = 08/27/2004 
 RPT Level = 0.02  Analysis Date = 08/20/2004 
 RPT Level = 0.02  Analysis Date = 08/20/2004 
 RPT Level = 0.02  Analysis Date = 08/20/2004 
 RPT Level = 0.02  Analysis Date = 08/20/2004 
 RPT Level = 0.02  Analysis Date = 08/20/2004 
 RPT Level = 0.02  Analysis Date = 08/20/2004 
 RPT Level = 0.02  Analysis Date = 08/12/2004 
 RPT Level = 0.02  Analysis Date = 08/12/2004 
 RPT Level = 0.02  Analysis Date = 08/12/2004 
 RPT Level = 0.02  Analysis Date = 08/12/2004 
 RPT Level = 0.02  Analysis Date = 07/29/2004 
 RPT Level = 0.02  Analysis Date = 07/29/2004 
 RPT Level = 0.02  Analysis Date = 07/15/2004 
 RPT Level = 0.02  Analysis Date = 07/15/2004 
 RPT Level = 0.02  Analysis Date = 07/15/2004 
 RPT Level = 0.02  Analysis Date = 07/15/2004 
 RPT Level = 0.02  Analysis Date = 07/15/2004 
 RPT Level = 0.02  Analysis Date = 07/15/2004 
 RPT Level = 0.02  Analysis Date = 07/02/2004 
 RPT Level = 0.02  Analysis Date = 07/02/2004 
 RPT Level = 0.02  Analysis Date = 07/02/2004 
 RPT Level = 0.02  Analysis Date = 07/02/2004 
 RPT Level = 0.02  Analysis Date = 06/18/2004 
 RPT Level = 0.02  Analysis Date = 06/18/2004 
 RPT Level = 0.02  Analysis Date = 06/09/2004 
 RPT Level = 0.02  Analysis Date = 06/09/2004 
 RPT Level = 0.02  Analysis Date = 05/27/2004 
 RPT Level = 0.02  Analysis Date = 05/27/2004 
 RPT Level = 0.02  Analysis Date = 05/27/2004 
 RPT Level = 0.02  Analysis Date = 05/27/2004 
 RPT Level = 0.02  Analysis Date = 05/11/2004 
 RPT Level = 0.02  Analysis Date = 05/11/2004 
 RPT Level = 0.02  Analysis Date = 05/03/2004 
 RPT Level = 0.02  Analysis Date = 05/03/2004 
 RPT Level = 0.02  Analysis Date = 04/26/2004 
 RPT Level = 0.02  Analysis Date = 04/26/2004 
 RPT Level = 0.02  Analysis Date = 04/21/2004 
 RPT Level = 0.02  Analysis Date = 04/21/2004 
 RPT Level = 0.02  Analysis Date = 04/14/2004 
 RPT Level = 0.02  Analysis Date = 04/14/2004 
 RPT Level = 0.02  Analysis Date = 04/14/2004 
 RPT Level = 0.02  Analysis Date = 04/14/2004 
 RPT Level = 0.02  Analysis Date = 04/14/2004 
 RPT Level = 0.02  Analysis Date = 04/14/2004 
 RPT Level = 0.02  Analysis Date = 04/14/2004 
 RPT Level = 0.02  Analysis Date = 04/14/2004 
 RPT Level = 0.02  Analysis Date = 03/24/2004 
 RPT Level = 0.02  Analysis Date = 03/24/2004 
 RPT Level = 0.02  Analysis Date = 03/24/2004 
 RPT Level = 0.02  Analysis Date = 03/24/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/14/2004 
 RPT Level = 0.02  Analysis Date = 01/14/2004 
 RPT Level = 0.02  Analysis Date = 01/08/2004 
 RPT Level = 0.02  Analysis Date = 01/08/2004 
 RPT Level = 0.02  Analysis Date = 01/08/2004 
 RPT Level = 0.02  Analysis Date = 01/08/2004 
 RPT Level = 0.02  Analysis Date = 10/02/2003 
 RPT Level = 0.024  Analysis Date = 10/02/2003 
 RPT Level = 0.024  Analysis Date = 10/02/2003 
 RPT Level = 0.024  Analysis Date = 10/02/2003 
 RPT Level = 0.024  Analysis Date = 10/01/2003 
 RPT Level = 0.024  Analysis Date = 10/01/2003 
 RPT Level = 0.024  Analysis Date = 09/16/2003 
 RPT Level = 0.024  Analysis Date = 09/16/2003 
 RPT Level = 0.024  Analysis Date = 09/03/2003 
 RPT Level = 0.024  Analysis Date = 09/03/2003 
 RPT Level = 0.024  Analysis Date = 09/04/2003 
 RPT Level = 0.024  Analysis Date = 09/04/2003 
 RPT Level = 0.024  Analysis Date = 08/25/2003 
 RPT Level = 0.024  Analysis Date = 08/25/2003 
 RPT Level = 0.024  Analysis Date = 08/14/2003 
 RPT Level = 0.024  Analysis Date = 08/14/2003 
 RPT Level = 0.024  Analysis Date = 08/06/2003 
 RPT Level = 0.024  Analysis Date = 08/06/2003 
 RPT Level = 0.024  Analysis Date = 08/06/2003 
 RPT Level = 0.024  Analysis Date = 08/06/2003 
 RPT Level = 0.024  Analysis Date = 07/23/2003 
 RPT Level = 0.024  Analysis Date = 07/23/2003 
 RPT Level = 0.024  Analysis Date = 07/16/2003 
 RPT Level = 0.024  Analysis Date = 07/16/2003 
 RPT Level = 0.024  Analysis Date = 07/16/2003 
 RPT Level = 0.024  Analysis Date = 07/16/2003 
 RPT Level = 0.024  Analysis Date = 07/16/2003 
 RPT Level = 0.024  Analysis Date = 07/16/2003 
 RPT Level = 0.024  Analysis Date = 06/24/2003 
 RPT Level = 0.024  Analysis Date = 06/24/2003 
 RPT Level = 0.024  Analysis Date = 06/18/2003 
 RPT Level = 0.024  Analysis Date = 06/18/2003 
 RPT Level = 0.024  Analysis Date = 06/18/2003 
 RPT Level = 0.024  Analysis Date = 06/18/2003 
 RPT Level = 0.024  Analysis Date = 06/05/2003 
 RPT Level = 0.024  Analysis Date = 06/05/2003 
 RPT Level = 0.024  Analysis Date = 06/05/2003 
 RPT Level = 0.024  Analysis Date = 06/05/2003 
 RPT Level = 0.024  Analysis Date = 05/27/2003 
 RPT Level = 0.024  Analysis Date = 05/27/2003 
 RPT Level = 0.024  Analysis Date = 05/22/2003 
 RPT Level = 0.024  Analysis Date = 05/22/2003 
 RPT Level = 0.024  Analysis Date = 05/06/2003 
 RPT Level = 0.024  Analysis Date = 05/06/2003 
 RPT Level = 0.024  Analysis Date = 05/22/2003 
 RPT Level = 0.024  Analysis Date = 05/22/2003 
 RPT Level = 0.024  Analysis Date = 05/06/2003 
 RPT Level = 0.024  Analysis Date = 05/06/2003 
 RPT Level = 0.024  Analysis Date = 04/09/2003 
 RPT Level = 0.024  Analysis Date = 04/09/2003 
 RPT Level = 0.024  Analysis Date = 04/10/2003 
 RPT Level = 0.024  Analysis Date = 04/10/2003 
 RPT Level = 0.024  Analysis Date = 04/10/2003 
 RPT Level = 0.024  Analysis Date = 04/10/2003 
 RPT Level = 0.024  Analysis Date = 04/10/2003 
 RPT Level = 0.024  Analysis Date = 04/10/2003 
 RPT Level = 0.024  Analysis Date = 04/10/2003 
 RPT Level = 0.024  Analysis Date = 04/10/2003 
 RPT Level = 0.024  Analysis Date = 04/10/2003 
 RPT Level = 0.024  Analysis Date = 04/10/2003 
 RPT Level = 0.024  Analysis Date = 03/06/2003 
 RPT Level = 0.024  Analysis Date = 03/06/2003 
 RPT Level = 0.024  Analysis Date = 02/27/2003 
 RPT Level = 0.024  Analysis Date = 02/27/2003 
 RPT Level = 0.024  Analysis Date = 02/19/2003 
 RPT Level = 0.024  Analysis Date = 02/19/2003 
 RPT Level = 0.024  Analysis Date = 02/05/2003 
 RPT Level = 0.024  Analysis Date = 02/05/2003 
 RPT Level = 0.024  Analysis Date = 02/05/2003 
 RPT Level = 0.024  Analysis Date = 02/05/2003 
 RPT Level = 0.024  Analysis Date = 02/19/2003 
 RPT Level = 0.024  Analysis Date = 02/19/2003 
 RPT Level = 0.024  Analysis Date = 01/23/2003 
 RPT Level = 0.024  Analysis Date = 01/23/2003 
 RPT Level = 0.024  Analysis Date = 01/15/2003 
 RPT Level = 0.024  Analysis Date = 01/15/2003 
 RPT Level = 0.024  Analysis Date = 01/15/2003 
 RPT Level = 0.024  Analysis Date = 01/15/2003 
 RPT Level = 0.024  Analysis Date = 01/15/2003 
 RPT Level = 0.024  Analysis Date = 01/15/2003 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 05/22/2002 
 RPT Level = 0.024  Analysis Date = 05/22/2002 
 RPT Level = 0.024  Analysis Date = 05/03/2002 
 RPT Level = 0.024  Analysis Date = 05/03/2002 
 RPT Level = 0.024  Analysis Date = 04/18/2002 
 RPT Level = 0.024  Analysis Date = 04/18/2002 
 RPT Level = 0.024  Analysis Date = 03/27/2002 
 RPT Level = 0.024  Analysis Date = 03/27/2002 
 RPT Level = 0.024  Analysis Date = 03/27/2002 
 RPT Level = 0.024  Analysis Date = 03/27/2002 
 RPT Level = 0.024  Analysis Date = 03/14/2002 
 RPT Level = 0.024  Analysis Date = 03/14/2002 
 RPT Level = 0.024  Analysis Date = 02/21/2002 
 RPT Level = 0.024  Analysis Date = 02/21/2002 
 RPT Level = 0.024  Analysis Date = 02/07/2002 
 RPT Level = 0.024  Analysis Date = 02/07/2002 
 RPT Level = 0.024  Analysis Date = 01/18/2002 
 RPT Level = 0.024  Analysis Date = 01/18/2002 
 RPT Level = 0.024  Analysis Date = 01/18/2002 
 RPT Level = 0.024  Analysis Date = 01/18/2002 
 RPT Level = 0.024  Analysis Date = 12/21/2001 
 RPT Level = 0.024  Analysis Date = 12/21/2001 
 RPT Level = 0.024  Analysis Date = 11/14/2001 
 RPT Level = 0.024  Y = 0
The SGPlot Procedure

False Positive Rate for Ammonia (NH3 as N), FIL, EPA

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Ammonia (NH3 as N), FIL, EPA 00608CL036 2002 12 2 17%
    2003 52 0 0%
    2004 51 1 2%
    2005 50 2 4%
    2010 52 0 0%
    2011 52 0 0%
    2012 52 0 0%
    2013 20 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Ammonia (NH3 as N), UNF, CFA, Acidified -
Blind Blank Results
Lab: NWQL, PCode: 00610, MCode: CL017
Analysis dates: 04/07/05 through 09/22/16
Open Data Set

 Analysis Date = 12/12/2007 
 Lab Value = -0.02 
 RPT Level = 0.02 
 Lab Sample ID = 20073440039  Analysis Date = 12/12/2007 
 Lab Value = -0.02 
 RPT Level = 0.02 
 Lab Sample ID = 20073440039  Analysis Date = 09/18/2007 
 Lab Value = 0.095 
 RPT Level = 0.02 
 Lab Sample ID = 20072540015  Analysis Date = 09/18/2007 
 Lab Value = 0.095 
 RPT Level = 0.02 
 Lab Sample ID = 20072540015  Analysis Date = 09/22/2016 
 Lab Value = -0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20162520021  Analysis Date = 09/02/2016 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20162440129  Analysis Date = 09/02/2016 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20162360202  Analysis Date = 09/02/2016 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20162290136  Analysis Date = 08/15/2016 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20162230012  Analysis Date = 08/15/2016 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20162150194  Analysis Date = 07/29/2016 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20162080237  Analysis Date = 07/22/2016 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20162010261  Analysis Date = 07/22/2016 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20161940115  Analysis Date = 07/06/2016 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20161870038  Analysis Date = 07/06/2016 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20161800089  Analysis Date = 06/29/2016 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20161740080  Analysis Date = 06/29/2016 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20161660157  Analysis Date = 06/29/2016 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20161590161  Analysis Date = 06/29/2016 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20161520029  Analysis Date = 05/31/2016 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20161480203  Analysis Date = 05/11/2016 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20161270015  Analysis Date = 05/11/2016 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20161230047  Analysis Date = 05/11/2016 
 Lab Value = -0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20161160095  Analysis Date = 05/11/2016 
 Lab Value = -0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20161100131  Analysis Date = 04/18/2016 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20161020031  Analysis Date = 04/06/2016 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20160950050  Analysis Date = 04/06/2016 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20160880041  Analysis Date = 04/06/2016 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20160810071  Analysis Date = 04/01/2016 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20160740016  Analysis Date = 03/10/2016 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20160670017  Analysis Date = 03/10/2016 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20160600020  Analysis Date = 03/10/2016 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20160530019  Analysis Date = 03/07/2016 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20160470018  Analysis Date = 03/07/2016 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20160400086  Analysis Date = 02/10/2016 
 Lab Value = -0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20160320014  Analysis Date = 02/10/2016 
 Lab Value = -0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20160250029  Analysis Date = 02/10/2016 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20160190020  Analysis Date = 01/14/2016 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20160110012  Analysis Date = 01/14/2016 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20160050037  Analysis Date = 01/14/2016 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20153630051  Analysis Date = 01/14/2016 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20153550014  Analysis Date = 12/18/2015 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20153500167  Analysis Date = 12/18/2015 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20153420008  Analysis Date = 12/02/2015 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20153340010  Analysis Date = 12/02/2015 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20153270005  Analysis Date = 12/02/2015 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20153200028  Analysis Date = 12/01/2015 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20153140001  Analysis Date = 11/06/2015 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20153060024  Analysis Date = 10/30/2015 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20152990071  Analysis Date = 10/30/2015 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20152920041  Analysis Date = 10/30/2015 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20152860162  Analysis Date = 10/30/2015 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20152780015  Analysis Date = 10/23/2015 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20152710074  Analysis Date = 10/23/2015 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20152640031  Analysis Date = 10/23/2015 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20152590168  Analysis Date = 09/25/2015 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20152510015  Analysis Date = 09/03/2015 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20152430087  Analysis Date = 09/03/2015 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20152360161  Analysis Date = 08/24/2015 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20152330023  Analysis Date = 08/20/2015 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20152230123  Analysis Date = 08/20/2015 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20152150081  Analysis Date = 08/20/2015 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20152080071  Analysis Date = 08/20/2015 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20152010054  Analysis Date = 07/15/2015 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20151940026  Analysis Date = 07/15/2015 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20151870013  Analysis Date = 07/15/2015 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20151800056  Analysis Date = 06/25/2015 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20151730017  Analysis Date = 06/25/2015 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20151660033  Analysis Date = 06/25/2015 
 Lab Value = 0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20151620206  Analysis Date = 06/05/2015 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20151530197  Analysis Date = 06/05/2015 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20151460122  Analysis Date = 05/22/2015 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20151390199  Analysis Date = 05/19/2015 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20151310072  Analysis Date = 05/08/2015 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20151240056  Analysis Date = 10/09/2009 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20092720011  Analysis Date = 09/23/2009 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20092640026  Analysis Date = 09/23/2009 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20092570049  Analysis Date = 09/23/2009 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20092520132  Analysis Date = 09/09/2009 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20092430155  Analysis Date = 08/26/2009 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20092360171  Analysis Date = 08/26/2009 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20092290211  Analysis Date = 08/13/2009 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20092220169  Analysis Date = 08/13/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20092150073  Analysis Date = 08/13/2009 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20092090263  Analysis Date = 07/27/2009 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20092010116  Analysis Date = 07/27/2009 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20091950026  Analysis Date = 07/10/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20091870025  Analysis Date = 07/10/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20091800174  Analysis Date = 06/26/2009 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20091730218  Analysis Date = 06/26/2009 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20091660206  Analysis Date = 06/12/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20091590088  Analysis Date = 06/02/2009 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20091520151  Analysis Date = 06/02/2009 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20091460188  Analysis Date = 05/20/2009 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20091380122  Analysis Date = 05/13/2009 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20091320020  Analysis Date = 05/13/2009 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20091240123  Analysis Date = 04/28/2009 
 Lab Value = -0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20091170110  Analysis Date = 04/28/2009 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20091110135  Analysis Date = 04/21/2009 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20091030081  Analysis Date = 04/08/2009 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20090960054  Analysis Date = 04/08/2009 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20090890069  Analysis Date = 03/25/2009 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20090820029  Analysis Date = 03/17/2009 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20090750048  Analysis Date = 03/11/2009 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20090680045  Analysis Date = 03/03/2009 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20090610057  Analysis Date = 03/03/2009 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20090540030  Analysis Date = 02/20/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20090480058  Analysis Date = 02/11/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20090400032  Analysis Date = 02/11/2009 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20090330037  Analysis Date = 01/28/2009 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20090260027  Analysis Date = 01/28/2009 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20090200036  Analysis Date = 01/28/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20090120049  Analysis Date = 01/08/2009 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20090050019  Analysis Date = 01/08/2009 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20083650083  Analysis Date = 12/24/2008 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20083570034  Analysis Date = 12/18/2008 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20083500071  Analysis Date = 12/11/2008 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20083450064  Analysis Date = 12/11/2008 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20083360040  Analysis Date = 12/01/2008 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20083290062  Analysis Date = 11/18/2008 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20083220064  Analysis Date = 11/18/2008 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20083150065  Analysis Date = 11/18/2008 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20083080100  Analysis Date = 11/18/2008 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20083010109  Analysis Date = 10/23/2008 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20082940063  Analysis Date = 10/23/2008 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20082880040  Analysis Date = 10/14/2008 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20082800042  Analysis Date = 10/03/2008 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20082730062  Analysis Date = 09/24/2008 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20082660047  Analysis Date = 09/24/2008 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20082590105  Analysis Date = 09/09/2008 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20082520008  Analysis Date = 09/03/2008 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20082460098  Analysis Date = 08/27/2008 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20082380080  Analysis Date = 08/27/2008 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20082310131  Analysis Date = 08/18/2008 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20082250010  Analysis Date = 08/18/2008 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20082190011  Analysis Date = 07/23/2008 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20082030127  Analysis Date = 07/23/2008 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20081970139  Analysis Date = 07/11/2008 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20081890044  Analysis Date = 07/11/2008 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20081820059  Analysis Date = 06/27/2008 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20081750128  Analysis Date = 06/17/2008 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20081680067  Analysis Date = 06/17/2008 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20081620017  Analysis Date = 06/03/2008 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20081540109  Analysis Date = 06/03/2008 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20081480068  Analysis Date = 05/20/2008 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20081400061  Analysis Date = 05/20/2008 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20081330112  Analysis Date = 05/08/2008 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20081260070  Analysis Date = 05/08/2008 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20081190055  Analysis Date = 04/28/2008 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20081120033  Analysis Date = 04/28/2008 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20081050114  Analysis Date = 04/14/2008 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20080980084  Analysis Date = 04/14/2008 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20080920083  Analysis Date = 04/01/2008 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20080840064  Analysis Date = 03/20/2008 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20080770124  Analysis Date = 03/20/2008 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20080700074  Analysis Date = 03/07/2008 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20080630067  Analysis Date = 02/27/2008 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20080560070  Analysis Date = 02/27/2008 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20080510055  Analysis Date = 02/20/2008 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20080420072  Analysis Date = 02/20/2008 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20080360051  Analysis Date = 02/05/2008 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20080280050  Analysis Date = 01/24/2008 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20080230021  Analysis Date = 01/24/2008 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20080140027  Analysis Date = 01/08/2008 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20080070023  Analysis Date = 01/08/2008 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20073620004  Analysis Date = 12/21/2007 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20073510098  Analysis Date = 12/12/2007 
 Lab Value = -0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20073370069  Analysis Date = 11/27/2007 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20073300042  Analysis Date = 11/27/2007 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20073230113  Analysis Date = 11/14/2007 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20073170062  Analysis Date = 11/07/2007 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20073100012  Analysis Date = 11/07/2007 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20073020065  Analysis Date = 11/07/2007 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20072960186  Analysis Date = 11/07/2007 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20072890056  Analysis Date = 10/16/2007 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20072850025  Analysis Date = 10/16/2007 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20072670056  Analysis Date = 09/18/2007 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20072600129  Analysis Date = 09/06/2007 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20072480018  Analysis Date = 09/06/2007 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20072400035  Analysis Date = 09/06/2007 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20072330109  Analysis Date = 08/21/2007 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20072260198  Analysis Date = 08/13/2007 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20072210252  Analysis Date = 08/01/2007 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20072110162  Analysis Date = 08/01/2007 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20072040101  Analysis Date = 07/20/2007 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20071900105  Analysis Date = 07/05/2007 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20071830158  Analysis Date = 07/05/2007 
 Lab Value = 0.021 
 RPT Level = 0.02 
 Lab Sample ID = 20071770201  Analysis Date = 06/20/2007 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20071690119  Analysis Date = 06/20/2007 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20071620045  Analysis Date = 06/11/2007 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20071560026  Analysis Date = 06/11/2007 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20071500033  Analysis Date = 05/23/2007 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20071410089  Analysis Date = 05/16/2007 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20071340113  Analysis Date = 05/10/2007 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20071280019  Analysis Date = 05/01/2007 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20071200089  Analysis Date = 04/25/2007 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20071130120  Analysis Date = 04/25/2007 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20071070021  Analysis Date = 04/12/2007 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20070990050  Analysis Date = 04/04/2007 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20070930070  Analysis Date = 03/28/2007 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20070860217  Analysis Date = 03/22/2007 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20070780128  Analysis Date = 03/13/2007 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20070710075  Analysis Date = 03/13/2007 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20070650009  Analysis Date = 02/28/2007 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20070580141  Analysis Date = 02/28/2007 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20070540023  Analysis Date = 02/20/2007 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20070460015  Analysis Date = 02/20/2007 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20070400103  Analysis Date = 01/31/2007 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20070250023  Analysis Date = 01/19/2007 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20070180071  Analysis Date = 01/19/2007 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20070120012  Analysis Date = 09/25/2006 
 Lab Value = -0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20062620013  Analysis Date = 09/25/2006 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20062540016  Analysis Date = 09/25/2006 
 Lab Value = -0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20062500008  Analysis Date = 08/30/2006 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20062350182  Analysis Date = 08/30/2006 
 Lab Value = -0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20062270273  Analysis Date = 08/30/2006 
 Lab Value = -0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20062220039  Analysis Date = 07/26/2006 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20062020314  Analysis Date = 07/26/2006 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20061950007  Analysis Date = 07/26/2006 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20061880009  Analysis Date = 06/27/2006 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20061730014  Analysis Date = 06/27/2006 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20061670021  Analysis Date = 06/08/2006 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20061580018  Analysis Date = 05/18/2006 
 Lab Value = 0.02 
 RPT Level = 0.02 
 Lab Sample ID = 20061370016  Analysis Date = 05/18/2006 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20061280111  Analysis Date = 05/05/2006 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20061220099  Analysis Date = 10/07/2005 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20052590030  Analysis Date = 09/16/2005 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20052520005  Analysis Date = 09/09/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20052430012  Analysis Date = 09/09/2005 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20052370004  Analysis Date = 08/31/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20052300011  Analysis Date = 08/10/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20052210015  Analysis Date = 08/10/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20052160009  Analysis Date = 08/10/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20052160012  Analysis Date = 07/27/2005 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20052010014  Analysis Date = 07/19/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20051940012  Analysis Date = 07/08/2005 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20051880028  Analysis Date = 06/30/2005 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20051800191  Analysis Date = 06/30/2005 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20051740022  Analysis Date = 06/22/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20051660117  Analysis Date = 06/10/2005 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20051590036  Analysis Date = 06/10/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20051530012  Analysis Date = 06/01/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20051440052  Analysis Date = 05/24/2005 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20051380017  Analysis Date = 05/18/2005 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20051320038  Analysis Date = 05/06/2005 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20051250008  Analysis Date = 05/06/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20051170115  Analysis Date = 04/26/2005 
 Lab Value = 0.006 
 RPT Level =  
 Lab Sample ID = 20051110015  Analysis Date = 04/15/2005 
 Lab Value = 0.001 
 RPT Level =  
 Lab Sample ID = 20051020014  Analysis Date = 04/07/2005 
 Lab Value = 0.006 
 RPT Level =  
 Lab Sample ID = 20050950047  Analysis Date = 04/07/2005 
 Lab Value = 0.003 
 RPT Level =  
 Lab Sample ID = 20050880113  Analysis Date = 09/22/2016 
 RPT Level = 0.02  Analysis Date = 09/02/2016 
 RPT Level = 0.02  Analysis Date = 09/02/2016 
 RPT Level = 0.02  Analysis Date = 09/02/2016 
 RPT Level = 0.02  Analysis Date = 09/02/2016 
 RPT Level = 0.02  Analysis Date = 09/02/2016 
 RPT Level = 0.02  Analysis Date = 09/02/2016 
 RPT Level = 0.02  Analysis Date = 08/15/2016 
 RPT Level = 0.02  Analysis Date = 08/15/2016 
 RPT Level = 0.02  Analysis Date = 08/15/2016 
 RPT Level = 0.02  Analysis Date = 08/15/2016 
 RPT Level = 0.02  Analysis Date = 07/29/2016 
 RPT Level = 0.02  Analysis Date = 07/29/2016 
 RPT Level = 0.02  Analysis Date = 07/22/2016 
 RPT Level = 0.02  Analysis Date = 07/22/2016 
 RPT Level = 0.02  Analysis Date = 07/22/2016 
 RPT Level = 0.02  Analysis Date = 07/22/2016 
 RPT Level = 0.02  Analysis Date = 07/06/2016 
 RPT Level = 0.02  Analysis Date = 07/06/2016 
 RPT Level = 0.02  Analysis Date = 07/06/2016 
 RPT Level = 0.02  Analysis Date = 07/06/2016 
 RPT Level = 0.02  Analysis Date = 06/29/2016 
 RPT Level = 0.02  Analysis Date = 06/29/2016 
 RPT Level = 0.02  Analysis Date = 06/29/2016 
 RPT Level = 0.02  Analysis Date = 06/29/2016 
 RPT Level = 0.02  Analysis Date = 06/29/2016 
 RPT Level = 0.02  Analysis Date = 06/29/2016 
 RPT Level = 0.02  Analysis Date = 06/29/2016 
 RPT Level = 0.02  Analysis Date = 06/29/2016 
 RPT Level = 0.02  Analysis Date = 05/31/2016 
 RPT Level = 0.02  Analysis Date = 05/31/2016 
 RPT Level = 0.02  Analysis Date = 05/11/2016 
 RPT Level = 0.02  Analysis Date = 05/11/2016 
 RPT Level = 0.02  Analysis Date = 05/11/2016 
 RPT Level = 0.02  Analysis Date = 05/11/2016 
 RPT Level = 0.02  Analysis Date = 05/11/2016 
 RPT Level = 0.02  Analysis Date = 05/11/2016 
 RPT Level = 0.02  Analysis Date = 05/11/2016 
 RPT Level = 0.02  Analysis Date = 05/11/2016 
 RPT Level = 0.02  Analysis Date = 04/18/2016 
 RPT Level = 0.02  Analysis Date = 04/18/2016 
 RPT Level = 0.02  Analysis Date = 04/06/2016 
 RPT Level = 0.02  Analysis Date = 04/06/2016 
 RPT Level = 0.02  Analysis Date = 04/06/2016 
 RPT Level = 0.02  Analysis Date = 04/06/2016 
 RPT Level = 0.02  Analysis Date = 04/06/2016 
 RPT Level = 0.02  Analysis Date = 04/06/2016 
 RPT Level = 0.02  Analysis Date = 04/01/2016 
 RPT Level = 0.02  Analysis Date = 04/01/2016 
 RPT Level = 0.02  Analysis Date = 03/10/2016 
 RPT Level = 0.02  Analysis Date = 03/10/2016 
 RPT Level = 0.02  Analysis Date = 03/10/2016 
 RPT Level = 0.02  Analysis Date = 03/10/2016 
 RPT Level = 0.02  Analysis Date = 03/10/2016 
 RPT Level = 0.02  Analysis Date = 03/10/2016 
 RPT Level = 0.02  Analysis Date = 03/07/2016 
 RPT Level = 0.02  Analysis Date = 03/07/2016 
 RPT Level = 0.02  Analysis Date = 03/07/2016 
 RPT Level = 0.02  Analysis Date = 03/07/2016 
 RPT Level = 0.02  Analysis Date = 02/10/2016 
 RPT Level = 0.02  Analysis Date = 02/10/2016 
 RPT Level = 0.02  Analysis Date = 02/10/2016 
 RPT Level = 0.02  Analysis Date = 02/10/2016 
 RPT Level = 0.02  Analysis Date = 02/10/2016 
 RPT Level = 0.02  Analysis Date = 02/10/2016 
 RPT Level = 0.02  Analysis Date = 01/14/2016 
 RPT Level = 0.02  Analysis Date = 01/14/2016 
 RPT Level = 0.02  Analysis Date = 01/14/2016 
 RPT Level = 0.02  Analysis Date = 01/14/2016 
 RPT Level = 0.02  Analysis Date = 01/14/2016 
 RPT Level = 0.02  Analysis Date = 01/14/2016 
 RPT Level = 0.02  Analysis Date = 01/14/2016 
 RPT Level = 0.02  Analysis Date = 01/14/2016 
 RPT Level = 0.02  Analysis Date = 12/18/2015 
 RPT Level = 0.02  Analysis Date = 12/18/2015 
 RPT Level = 0.02  Analysis Date = 12/18/2015 
 RPT Level = 0.02  Analysis Date = 12/18/2015 
 RPT Level = 0.02  Analysis Date = 12/02/2015 
 RPT Level = 0.02  Analysis Date = 12/02/2015 
 RPT Level = 0.02  Analysis Date = 12/02/2015 
 RPT Level = 0.02  Analysis Date = 12/02/2015 
 RPT Level = 0.02  Analysis Date = 12/02/2015 
 RPT Level = 0.02  Analysis Date = 12/02/2015 
 RPT Level = 0.02  Analysis Date = 12/01/2015 
 RPT Level = 0.02  Analysis Date = 12/01/2015 
 RPT Level = 0.02  Analysis Date = 11/06/2015 
 RPT Level = 0.02  Analysis Date = 11/06/2015 
 RPT Level = 0.02  Analysis Date = 10/30/2015 
 RPT Level = 0.02  Analysis Date = 10/30/2015 
 RPT Level = 0.02  Analysis Date = 10/30/2015 
 RPT Level = 0.02  Analysis Date = 10/30/2015 
 RPT Level = 0.02  Analysis Date = 10/30/2015 
 RPT Level = 0.02  Analysis Date = 10/30/2015 
 RPT Level = 0.02  Analysis Date = 10/30/2015 
 RPT Level = 0.02  Analysis Date = 10/30/2015 
 RPT Level = 0.02  Analysis Date = 10/23/2015 
 RPT Level = 0.02  Analysis Date = 10/23/2015 
 RPT Level = 0.02  Analysis Date = 10/23/2015 
 RPT Level = 0.02  Analysis Date = 10/23/2015 
 RPT Level = 0.02  Analysis Date = 10/23/2015 
 RPT Level = 0.02  Analysis Date = 10/23/2015 
 RPT Level = 0.02  Analysis Date = 09/25/2015 
 RPT Level = 0.02  Analysis Date = 09/25/2015 
 RPT Level = 0.02  Analysis Date = 09/03/2015 
 RPT Level = 0.02  Analysis Date = 09/03/2015 
 RPT Level = 0.02  Analysis Date = 09/03/2015 
 RPT Level = 0.02  Analysis Date = 09/03/2015 
 RPT Level = 0.02  Analysis Date = 08/24/2015 
 RPT Level = 0.02  Analysis Date = 08/24/2015 
 RPT Level = 0.02  Analysis Date = 08/20/2015 
 RPT Level = 0.02  Analysis Date = 08/20/2015 
 RPT Level = 0.02  Analysis Date = 08/20/2015 
 RPT Level = 0.02  Analysis Date = 08/20/2015 
 RPT Level = 0.02  Analysis Date = 08/20/2015 
 RPT Level = 0.02  Analysis Date = 08/20/2015 
 RPT Level = 0.02  Analysis Date = 08/20/2015 
 RPT Level = 0.02  Analysis Date = 08/20/2015 
 RPT Level = 0.02  Analysis Date = 07/15/2015 
 RPT Level = 0.02  Analysis Date = 07/15/2015 
 RPT Level = 0.02  Analysis Date = 07/15/2015 
 RPT Level = 0.02  Analysis Date = 07/15/2015 
 RPT Level = 0.02  Analysis Date = 07/15/2015 
 RPT Level = 0.02  Analysis Date = 07/15/2015 
 RPT Level = 0.02  Analysis Date = 06/25/2015 
 RPT Level = 0.02  Analysis Date = 06/25/2015 
 RPT Level = 0.02  Analysis Date = 06/25/2015 
 RPT Level = 0.02  Analysis Date = 06/25/2015 
 RPT Level = 0.02  Analysis Date = 06/25/2015 
 RPT Level = 0.02  Analysis Date = 06/25/2015 
 RPT Level = 0.02  Analysis Date = 06/05/2015 
 RPT Level = 0.02  Analysis Date = 06/05/2015 
 RPT Level = 0.02  Analysis Date = 06/05/2015 
 RPT Level = 0.02  Analysis Date = 06/05/2015 
 RPT Level = 0.02  Analysis Date = 05/22/2015 
 RPT Level = 0.02  Analysis Date = 05/22/2015 
 RPT Level = 0.02  Analysis Date = 05/19/2015 
 RPT Level = 0.02  Analysis Date = 05/19/2015 
 RPT Level = 0.02  Analysis Date = 05/08/2015 
 RPT Level = 0.02  Analysis Date = 05/08/2015 
 RPT Level = 0.02  Analysis Date = 10/09/2009 
 RPT Level = 0.02  Analysis Date = 10/09/2009 
 RPT Level = 0.02  Analysis Date = 09/23/2009 
 RPT Level = 0.02  Analysis Date = 09/23/2009 
 RPT Level = 0.02  Analysis Date = 09/23/2009 
 RPT Level = 0.02  Analysis Date = 09/23/2009 
 RPT Level = 0.02  Analysis Date = 09/23/2009 
 RPT Level = 0.02  Analysis Date = 09/23/2009 
 RPT Level = 0.02  Analysis Date = 09/09/2009 
 RPT Level = 0.02  Analysis Date = 09/09/2009 
 RPT Level = 0.02  Analysis Date = 08/26/2009 
 RPT Level = 0.02  Analysis Date = 08/26/2009 
 RPT Level = 0.02  Analysis Date = 08/26/2009 
 RPT Level = 0.02  Analysis Date = 08/26/2009 
 RPT Level = 0.02  Analysis Date = 08/13/2009 
 RPT Level = 0.02  Analysis Date = 08/13/2009 
 RPT Level = 0.02  Analysis Date = 08/13/2009 
 RPT Level = 0.02  Analysis Date = 08/13/2009 
 RPT Level = 0.02  Analysis Date = 08/13/2009 
 RPT Level = 0.02  Analysis Date = 08/13/2009 
 RPT Level = 0.02  Analysis Date = 07/27/2009 
 RPT Level = 0.02  Analysis Date = 07/27/2009 
 RPT Level = 0.02  Analysis Date = 07/27/2009 
 RPT Level = 0.02  Analysis Date = 07/27/2009 
 RPT Level = 0.02  Analysis Date = 07/10/2009 
 RPT Level = 0.02  Analysis Date = 07/10/2009 
 RPT Level = 0.02  Analysis Date = 07/10/2009 
 RPT Level = 0.02  Analysis Date = 07/10/2009 
 RPT Level = 0.02  Analysis Date = 06/26/2009 
 RPT Level = 0.02  Analysis Date = 06/26/2009 
 RPT Level = 0.02  Analysis Date = 06/26/2009 
 RPT Level = 0.02  Analysis Date = 06/26/2009 
 RPT Level = 0.02  Analysis Date = 06/12/2009 
 RPT Level = 0.02  Analysis Date = 06/12/2009 
 RPT Level = 0.02  Analysis Date = 06/02/2009 
 RPT Level = 0.02  Analysis Date = 06/02/2009 
 RPT Level = 0.02  Analysis Date = 06/02/2009 
 RPT Level = 0.02  Analysis Date = 06/02/2009 
 RPT Level = 0.02  Analysis Date = 05/20/2009 
 RPT Level = 0.02  Analysis Date = 05/20/2009 
 RPT Level = 0.02  Analysis Date = 05/13/2009 
 RPT Level = 0.02  Analysis Date = 05/13/2009 
 RPT Level = 0.02  Analysis Date = 05/13/2009 
 RPT Level = 0.02  Analysis Date = 05/13/2009 
 RPT Level = 0.02  Analysis Date = 04/28/2009 
 RPT Level = 0.02  Analysis Date = 04/28/2009 
 RPT Level = 0.02  Analysis Date = 04/28/2009 
 RPT Level = 0.02  Analysis Date = 04/28/2009 
 RPT Level = 0.02  Analysis Date = 04/21/2009 
 RPT Level = 0.02  Analysis Date = 04/21/2009 
 RPT Level = 0.02  Analysis Date = 04/08/2009 
 RPT Level = 0.02  Analysis Date = 04/08/2009 
 RPT Level = 0.02  Analysis Date = 04/08/2009 
 RPT Level = 0.02  Analysis Date = 04/08/2009 
 RPT Level = 0.02  Analysis Date = 03/25/2009 
 RPT Level = 0.02  Analysis Date = 03/25/2009 
 RPT Level = 0.02  Analysis Date = 03/17/2009 
 RPT Level = 0.02  Analysis Date = 03/17/2009 
 RPT Level = 0.02  Analysis Date = 03/11/2009 
 RPT Level = 0.02  Analysis Date = 03/11/2009 
 RPT Level = 0.02  Analysis Date = 03/03/2009 
 RPT Level = 0.02  Analysis Date = 03/03/2009 
 RPT Level = 0.02  Analysis Date = 03/03/2009 
 RPT Level = 0.02  Analysis Date = 03/03/2009 
 RPT Level = 0.02  Analysis Date = 02/20/2009 
 RPT Level = 0.02  Analysis Date = 02/20/2009 
 RPT Level = 0.02  Analysis Date = 02/11/2009 
 RPT Level = 0.02  Analysis Date = 02/11/2009 
 RPT Level = 0.02  Analysis Date = 02/11/2009 
 RPT Level = 0.02  Analysis Date = 02/11/2009 
 RPT Level = 0.02  Analysis Date = 01/28/2009 
 RPT Level = 0.02  Analysis Date = 01/28/2009 
 RPT Level = 0.02  Analysis Date = 01/28/2009 
 RPT Level = 0.02  Analysis Date = 01/28/2009 
 RPT Level = 0.02  Analysis Date = 01/28/2009 
 RPT Level = 0.02  Analysis Date = 01/28/2009 
 RPT Level = 0.02  Analysis Date = 01/08/2009 
 RPT Level = 0.02  Analysis Date = 01/08/2009 
 RPT Level = 0.02  Analysis Date = 01/08/2009 
 RPT Level = 0.02  Analysis Date = 01/08/2009 
 RPT Level = 0.02  Analysis Date = 12/24/2008 
 RPT Level = 0.02  Analysis Date = 12/24/2008 
 RPT Level = 0.02  Analysis Date = 12/18/2008 
 RPT Level = 0.02  Analysis Date = 12/18/2008 
 RPT Level = 0.02  Analysis Date = 12/11/2008 
 RPT Level = 0.02  Analysis Date = 12/11/2008 
 RPT Level = 0.02  Analysis Date = 12/11/2008 
 RPT Level = 0.02  Analysis Date = 12/11/2008 
 RPT Level = 0.02  Analysis Date = 12/01/2008 
 RPT Level = 0.02  Analysis Date = 12/01/2008 
 RPT Level = 0.02  Analysis Date = 11/18/2008 
 RPT Level = 0.02  Analysis Date = 11/18/2008 
 RPT Level = 0.02  Analysis Date = 11/18/2008 
 RPT Level = 0.02  Analysis Date = 11/18/2008 
 RPT Level = 0.02  Analysis Date = 11/18/2008 
 RPT Level = 0.02  Analysis Date = 11/18/2008 
 RPT Level = 0.02  Analysis Date = 11/18/2008 
 RPT Level = 0.02  Analysis Date = 11/18/2008 
 RPT Level = 0.02  Analysis Date = 10/23/2008 
 RPT Level = 0.02  Analysis Date = 10/23/2008 
 RPT Level = 0.02  Analysis Date = 10/23/2008 
 RPT Level = 0.02  Analysis Date = 10/23/2008 
 RPT Level = 0.02  Analysis Date = 10/14/2008 
 RPT Level = 0.02  Analysis Date = 10/14/2008 
 RPT Level = 0.02  Analysis Date = 10/03/2008 
 RPT Level = 0.02  Analysis Date = 10/03/2008 
 RPT Level = 0.02  Analysis Date = 09/24/2008 
 RPT Level = 0.02  Analysis Date = 09/24/2008 
 RPT Level = 0.02  Analysis Date = 09/24/2008 
 RPT Level = 0.02  Analysis Date = 09/24/2008 
 RPT Level = 0.02  Analysis Date = 09/09/2008 
 RPT Level = 0.02  Analysis Date = 09/09/2008 
 RPT Level = 0.02  Analysis Date = 09/03/2008 
 RPT Level = 0.02  Analysis Date = 09/03/2008 
 RPT Level = 0.02  Analysis Date = 08/27/2008 
 RPT Level = 0.02  Analysis Date = 08/27/2008 
 RPT Level = 0.02  Analysis Date = 08/27/2008 
 RPT Level = 0.02  Analysis Date = 08/27/2008 
 RPT Level = 0.02  Analysis Date = 08/18/2008 
 RPT Level = 0.02  Analysis Date = 08/18/2008 
 RPT Level = 0.02  Analysis Date = 08/18/2008 
 RPT Level = 0.02  Analysis Date = 08/18/2008 
 RPT Level = 0.02  Analysis Date = 07/23/2008 
 RPT Level = 0.02  Analysis Date = 07/23/2008 
 RPT Level = 0.02  Analysis Date = 07/23/2008 
 RPT Level = 0.02  Analysis Date = 07/23/2008 
 RPT Level = 0.02  Analysis Date = 07/11/2008 
 RPT Level = 0.02  Analysis Date = 07/11/2008 
 RPT Level = 0.02  Analysis Date = 07/11/2008 
 RPT Level = 0.02  Analysis Date = 07/11/2008 
 RPT Level = 0.02  Analysis Date = 06/27/2008 
 RPT Level = 0.02  Analysis Date = 06/27/2008 
 RPT Level = 0.02  Analysis Date = 06/17/2008 
 RPT Level = 0.02  Analysis Date = 06/17/2008 
 RPT Level = 0.02  Analysis Date = 06/17/2008 
 RPT Level = 0.02  Analysis Date = 06/17/2008 
 RPT Level = 0.02  Analysis Date = 06/03/2008 
 RPT Level = 0.02  Analysis Date = 06/03/2008 
 RPT Level = 0.02  Analysis Date = 06/03/2008 
 RPT Level = 0.02  Analysis Date = 06/03/2008 
 RPT Level = 0.02  Analysis Date = 05/20/2008 
 RPT Level = 0.02  Analysis Date = 05/20/2008 
 RPT Level = 0.02  Analysis Date = 05/20/2008 
 RPT Level = 0.02  Analysis Date = 05/20/2008 
 RPT Level = 0.02  Analysis Date = 05/08/2008 
 RPT Level = 0.02  Analysis Date = 05/08/2008 
 RPT Level = 0.02  Analysis Date = 05/08/2008 
 RPT Level = 0.02  Analysis Date = 05/08/2008 
 RPT Level = 0.02  Analysis Date = 04/28/2008 
 RPT Level = 0.02  Analysis Date = 04/28/2008 
 RPT Level = 0.02  Analysis Date = 04/28/2008 
 RPT Level = 0.02  Analysis Date = 04/28/2008 
 RPT Level = 0.02  Analysis Date = 04/14/2008 
 RPT Level = 0.02  Analysis Date = 04/14/2008 
 RPT Level = 0.02  Analysis Date = 04/14/2008 
 RPT Level = 0.02  Analysis Date = 04/14/2008 
 RPT Level = 0.02  Analysis Date = 04/01/2008 
 RPT Level = 0.02  Analysis Date = 04/01/2008 
 RPT Level = 0.02  Analysis Date = 03/20/2008 
 RPT Level = 0.02  Analysis Date = 03/20/2008 
 RPT Level = 0.02  Analysis Date = 03/20/2008 
 RPT Level = 0.02  Analysis Date = 03/20/2008 
 RPT Level = 0.02  Analysis Date = 03/07/2008 
 RPT Level = 0.02  Analysis Date = 03/07/2008 
 RPT Level = 0.02  Analysis Date = 02/27/2008 
 RPT Level = 0.02  Analysis Date = 02/27/2008 
 RPT Level = 0.02  Analysis Date = 02/27/2008 
 RPT Level = 0.02  Analysis Date = 02/27/2008 
 RPT Level = 0.02  Analysis Date = 02/20/2008 
 RPT Level = 0.02  Analysis Date = 02/20/2008 
 RPT Level = 0.02  Analysis Date = 02/20/2008 
 RPT Level = 0.02  Analysis Date = 02/20/2008 
 RPT Level = 0.02  Analysis Date = 02/05/2008 
 RPT Level = 0.02  Analysis Date = 02/05/2008 
 RPT Level = 0.02  Analysis Date = 01/24/2008 
 RPT Level = 0.02  Analysis Date = 01/24/2008 
 RPT Level = 0.02  Analysis Date = 01/24/2008 
 RPT Level = 0.02  Analysis Date = 01/24/2008 
 RPT Level = 0.02  Analysis Date = 01/08/2008 
 RPT Level = 0.02  Analysis Date = 01/08/2008 
 RPT Level = 0.02  Analysis Date = 01/08/2008 
 RPT Level = 0.02  Analysis Date = 01/08/2008 
 RPT Level = 0.02  Analysis Date = 12/21/2007 
 RPT Level = 0.02  Analysis Date = 12/21/2007 
 RPT Level = 0.02  Analysis Date = 12/12/2007 
 RPT Level = 0.02  Analysis Date = 12/12/2007 
 RPT Level = 0.02  Analysis Date = 12/12/2007 
 RPT Level = 0.02  Analysis Date = 12/12/2007 
 RPT Level = 0.02  Analysis Date = 11/27/2007 
 RPT Level = 0.02  Analysis Date = 11/27/2007 
 RPT Level = 0.02  Analysis Date = 11/27/2007 
 RPT Level = 0.02  Analysis Date = 11/27/2007 
 RPT Level = 0.02  Analysis Date = 11/14/2007 
 RPT Level = 0.02  Analysis Date = 11/14/2007 
 RPT Level = 0.02  Analysis Date = 11/07/2007 
 RPT Level = 0.02  Analysis Date = 11/07/2007 
 RPT Level = 0.02  Analysis Date = 11/07/2007 
 RPT Level = 0.02  Analysis Date = 11/07/2007 
 RPT Level = 0.02  Analysis Date = 11/07/2007 
 RPT Level = 0.02  Analysis Date = 11/07/2007 
 RPT Level = 0.02  Analysis Date = 11/07/2007 
 RPT Level = 0.02  Analysis Date = 11/07/2007 
 RPT Level = 0.02  Analysis Date = 10/16/2007 
 RPT Level = 0.02  Analysis Date = 10/16/2007 
 RPT Level = 0.02  Analysis Date = 10/16/2007 
 RPT Level = 0.02  Analysis Date = 10/16/2007 
 RPT Level = 0.02  Analysis Date = 09/18/2007 
 RPT Level = 0.02  Analysis Date = 09/18/2007 
 RPT Level = 0.02  Analysis Date = 09/18/2007 
 RPT Level = 0.02  Analysis Date = 09/18/2007 
 RPT Level = 0.02  Analysis Date = 09/06/2007 
 RPT Level = 0.02  Analysis Date = 09/06/2007 
 RPT Level = 0.02  Analysis Date = 09/06/2007 
 RPT Level = 0.02  Analysis Date = 09/06/2007 
 RPT Level = 0.02  Analysis Date = 09/06/2007 
 RPT Level = 0.02  Analysis Date = 09/06/2007 
 RPT Level = 0.02  Analysis Date = 08/21/2007 
 RPT Level = 0.02  Analysis Date = 08/21/2007 
 RPT Level = 0.02  Analysis Date = 08/13/2007 
 RPT Level = 0.02  Analysis Date = 08/13/2007 
 RPT Level = 0.02  Analysis Date = 08/01/2007 
 RPT Level = 0.02  Analysis Date = 08/01/2007 
 RPT Level = 0.02  Analysis Date = 08/01/2007 
 RPT Level = 0.02  Analysis Date = 08/01/2007 
 RPT Level = 0.02  Analysis Date = 07/20/2007 
 RPT Level = 0.02  Analysis Date = 07/20/2007 
 RPT Level = 0.02  Analysis Date = 07/05/2007 
 RPT Level = 0.02  Analysis Date = 07/05/2007 
 RPT Level = 0.02  Analysis Date = 07/05/2007 
 RPT Level = 0.02  Analysis Date = 07/05/2007 
 RPT Level = 0.02  Analysis Date = 06/20/2007 
 RPT Level = 0.02  Analysis Date = 06/20/2007 
 RPT Level = 0.02  Analysis Date = 06/20/2007 
 RPT Level = 0.02  Analysis Date = 06/20/2007 
 RPT Level = 0.02  Analysis Date = 06/11/2007 
 RPT Level = 0.02  Analysis Date = 06/11/2007 
 RPT Level = 0.02  Analysis Date = 06/11/2007 
 RPT Level = 0.02  Analysis Date = 06/11/2007 
 RPT Level = 0.02  Analysis Date = 05/23/2007 
 RPT Level = 0.02  Analysis Date = 05/23/2007 
 RPT Level = 0.02  Analysis Date = 05/16/2007 
 RPT Level = 0.02  Analysis Date = 05/16/2007 
 RPT Level = 0.02  Analysis Date = 05/10/2007 
 RPT Level = 0.02  Analysis Date = 05/10/2007 
 RPT Level = 0.02  Analysis Date = 05/01/2007 
 RPT Level = 0.02  Analysis Date = 05/01/2007 
 RPT Level = 0.02  Analysis Date = 04/25/2007 
 RPT Level = 0.02  Analysis Date = 04/25/2007 
 RPT Level = 0.02  Analysis Date = 04/25/2007 
 RPT Level = 0.02  Analysis Date = 04/25/2007 
 RPT Level = 0.02  Analysis Date = 04/12/2007 
 RPT Level = 0.02  Analysis Date = 04/12/2007 
 RPT Level = 0.02  Analysis Date = 04/04/2007 
 RPT Level = 0.02  Analysis Date = 04/04/2007 
 RPT Level = 0.02  Analysis Date = 03/28/2007 
 RPT Level = 0.02  Analysis Date = 03/28/2007 
 RPT Level = 0.02  Analysis Date = 03/22/2007 
 RPT Level = 0.02  Analysis Date = 03/22/2007 
 RPT Level = 0.02  Analysis Date = 03/13/2007 
 RPT Level = 0.02  Analysis Date = 03/13/2007 
 RPT Level = 0.02  Analysis Date = 03/13/2007 
 RPT Level = 0.02  Analysis Date = 03/13/2007 
 RPT Level = 0.02  Analysis Date = 02/28/2007 
 RPT Level = 0.02  Analysis Date = 02/28/2007 
 RPT Level = 0.02  Analysis Date = 02/28/2007 
 RPT Level = 0.02  Analysis Date = 02/28/2007 
 RPT Level = 0.02  Analysis Date = 02/20/2007 
 RPT Level = 0.02  Analysis Date = 02/20/2007 
 RPT Level = 0.02  Analysis Date = 02/20/2007 
 RPT Level = 0.02  Analysis Date = 02/20/2007 
 RPT Level = 0.02  Analysis Date = 01/31/2007 
 RPT Level = 0.02  Analysis Date = 01/31/2007 
 RPT Level = 0.02  Analysis Date = 01/19/2007 
 RPT Level = 0.02  Analysis Date = 01/19/2007 
 RPT Level = 0.02  Analysis Date = 01/19/2007 
 RPT Level = 0.02  Analysis Date = 01/19/2007 
 RPT Level = 0.02  Analysis Date = 09/25/2006 
 RPT Level = 0.02  Analysis Date = 09/25/2006 
 RPT Level = 0.02  Analysis Date = 09/25/2006 
 RPT Level = 0.02  Analysis Date = 09/25/2006 
 RPT Level = 0.02  Analysis Date = 09/25/2006 
 RPT Level = 0.02  Analysis Date = 09/25/2006 
 RPT Level = 0.02  Analysis Date = 08/30/2006 
 RPT Level = 0.02  Analysis Date = 08/30/2006 
 RPT Level = 0.02  Analysis Date = 08/30/2006 
 RPT Level = 0.02  Analysis Date = 08/30/2006 
 RPT Level = 0.02  Analysis Date = 08/30/2006 
 RPT Level = 0.02  Analysis Date = 08/30/2006 
 RPT Level = 0.02  Analysis Date = 07/26/2006 
 RPT Level = 0.02  Analysis Date = 07/26/2006 
 RPT Level = 0.02  Analysis Date = 07/26/2006 
 RPT Level = 0.02  Analysis Date = 07/26/2006 
 RPT Level = 0.02  Analysis Date = 07/26/2006 
 RPT Level = 0.02  Analysis Date = 07/26/2006 
 RPT Level = 0.02  Analysis Date = 06/27/2006 
 RPT Level = 0.02  Analysis Date = 06/27/2006 
 RPT Level = 0.02  Analysis Date = 06/27/2006 
 RPT Level = 0.02  Analysis Date = 06/27/2006 
 RPT Level = 0.02  Analysis Date = 06/08/2006 
 RPT Level = 0.02  Analysis Date = 06/08/2006 
 RPT Level = 0.02  Analysis Date = 05/18/2006 
 RPT Level = 0.02  Analysis Date = 05/18/2006 
 RPT Level = 0.02  Analysis Date = 05/18/2006 
 RPT Level = 0.02  Analysis Date = 05/18/2006 
 RPT Level = 0.02  Analysis Date = 05/05/2006 
 RPT Level = 0.02  Analysis Date = 05/05/2006 
 RPT Level = 0.02  Analysis Date = 10/07/2005 
 RPT Level = 0.02  Analysis Date = 10/07/2005 
 RPT Level = 0.02  Analysis Date = 09/16/2005 
 RPT Level = 0.02  Analysis Date = 09/16/2005 
 RPT Level = 0.02  Analysis Date = 09/09/2005 
 RPT Level = 0.02  Analysis Date = 09/09/2005 
 RPT Level = 0.02  Analysis Date = 09/09/2005 
 RPT Level = 0.02  Analysis Date = 09/09/2005 
 RPT Level = 0.02  Analysis Date = 08/31/2005 
 RPT Level = 0.02  Analysis Date = 08/31/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 07/27/2005 
 RPT Level = 0.02  Analysis Date = 07/27/2005 
 RPT Level = 0.02  Analysis Date = 07/19/2005 
 RPT Level = 0.02  Analysis Date = 07/19/2005 
 RPT Level = 0.02  Analysis Date = 07/08/2005 
 RPT Level = 0.02  Analysis Date = 07/08/2005 
 RPT Level = 0.02  Analysis Date = 06/30/2005 
 RPT Level = 0.02  Analysis Date = 06/30/2005 
 RPT Level = 0.02  Analysis Date = 06/30/2005 
 RPT Level = 0.02  Analysis Date = 06/30/2005 
 RPT Level = 0.02  Analysis Date = 06/22/2005 
 RPT Level = 0.02  Analysis Date = 06/22/2005 
 RPT Level = 0.02  Analysis Date = 06/10/2005 
 RPT Level = 0.02  Analysis Date = 06/10/2005 
 RPT Level = 0.02  Analysis Date = 06/10/2005 
 RPT Level = 0.02  Analysis Date = 06/10/2005 
 RPT Level = 0.02  Analysis Date = 06/01/2005 
 RPT Level = 0.02  Analysis Date = 06/01/2005 
 RPT Level = 0.02  Analysis Date = 05/24/2005 
 RPT Level = 0.02  Analysis Date = 05/24/2005 
 RPT Level = 0.02  Analysis Date = 05/18/2005 
 RPT Level = 0.02  Analysis Date = 05/18/2005 
 RPT Level = 0.02  Analysis Date = 05/06/2005 
 RPT Level = 0.02  Analysis Date = 05/06/2005 
 RPT Level = 0.02  Analysis Date = 05/06/2005 
 RPT Level = 0.02  Y = 0
The SGPlot Procedure

False Positive Rate for Ammonia (NH3 as N), UNF, CFA, Acidified

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Ammonia (NH3 as N), UNF, CFA, Acidified 00610CL017 2005 25 0 0%
    2006 15 0 0%
    2007 36 2 6%
    2008 50 0 0%
    2009 52 0 0%
    2015 22 0 0%
    2016 48 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Kjeldahl Nitrogen (NH3+org N as N), FIL, CFA -
Blind Blank Results
Lab: NWQL, PCode: 00623, MCode: KJ002
Analysis dates: 11/08/01 through 09/30/16
Open Data Set

 Analysis Date = 06/11/2013 
 Lab Value = 0.176 
 RPT Level = 0.07 
 Lab Sample ID = 20131500013  Analysis Date = 12/06/2004 
 Lab Value = 1.142 
 RPT Level = 0.05 
 Lab Sample ID = 20043310059  Analysis Date = 02/03/2003 
 Lab Value = 0.146 
 RPT Level = 0.05 
 Lab Sample ID = 20030310028  Analysis Date = 06/11/2013 
 Lab Value = 0.176 
 RPT Level = 0.07 
 Lab Sample ID = 20131500013  Analysis Date = 12/06/2004 
 Lab Value = 1.142 
 RPT Level = 0.05 
 Lab Sample ID = 20043310059  Analysis Date = 02/03/2003 
 Lab Value = 0.146 
 RPT Level = 0.05 
 Lab Sample ID = 20030310028  Analysis Date = 09/30/2016 
 Lab Value = 0.029 
 RPT Level = 0.07 
 Lab Sample ID = 20162640173  Analysis Date = 09/22/2016 
 Lab Value = -0.042 
 RPT Level = 0.07 
 Lab Sample ID = 20162580012  Analysis Date = 09/15/2016 
 Lab Value = 0.116 
 RPT Level = 0.07 
 Lab Sample ID = 20162520025  Analysis Date = 09/13/2016 
 Lab Value = -0.003 
 RPT Level = 0.07 
 Lab Sample ID = 20162440121  Analysis Date = 08/30/2016 
 Lab Value = -0.034 
 RPT Level = 0.07 
 Lab Sample ID = 20162360195  Analysis Date = 08/22/2016 
 Lab Value = -0.031 
 RPT Level = 0.07 
 Lab Sample ID = 20162290137  Analysis Date = 08/11/2016 
 Lab Value = 0.001 
 RPT Level = 0.07 
 Lab Sample ID = 20162230008  Analysis Date = 08/08/2016 
 Lab Value = -0.037 
 RPT Level = 0.07 
 Lab Sample ID = 20162150204  Analysis Date = 08/02/2016 
 Lab Value = -0.005 
 RPT Level = 0.07 
 Lab Sample ID = 20162080232  Analysis Date = 07/25/2016 
 Lab Value = 0 
 RPT Level = 0.07 
 Lab Sample ID = 20162010257  Analysis Date = 07/15/2016 
 Lab Value = -0.009 
 RPT Level = 0.07 
 Lab Sample ID = 20161940107  Analysis Date = 07/12/2016 
 Lab Value = -0.011 
 RPT Level = 0.07 
 Lab Sample ID = 20161870031  Analysis Date = 07/05/2016 
 Lab Value = -0.033 
 RPT Level = 0.07 
 Lab Sample ID = 20161800082  Analysis Date = 06/24/2016 
 Lab Value = 0.001 
 RPT Level = 0.07 
 Lab Sample ID = 20161740071  Analysis Date = 06/21/2016 
 Lab Value = -0.023 
 RPT Level = 0.07 
 Lab Sample ID = 20161660156  Analysis Date = 06/14/2016 
 Lab Value = 0.003 
 RPT Level = 0.07 
 Lab Sample ID = 20161590152  Analysis Date = 06/10/2016 
 Lab Value = -0.015 
 RPT Level = 0.07 
 Lab Sample ID = 20161520025  Analysis Date = 06/10/2016 
 Lab Value = -0.023 
 RPT Level = 0.07 
 Lab Sample ID = 20161480189  Analysis Date = 05/24/2016 
 Lab Value = -0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20161270006  Analysis Date = 05/10/2016 
 Lab Value = -0.013 
 RPT Level = 0.07 
 Lab Sample ID = 20161230045  Analysis Date = 05/03/2016 
 Lab Value = 0.005 
 RPT Level = 0.07 
 Lab Sample ID = 20161160091  Analysis Date = 04/26/2016 
 Lab Value = 0.015 
 RPT Level = 0.07 
 Lab Sample ID = 20161100126  Analysis Date = 04/18/2016 
 Lab Value = 0.005 
 RPT Level = 0.07 
 Lab Sample ID = 20161020027  Analysis Date = 04/07/2016 
 Lab Value = -0.013 
 RPT Level = 0.07 
 Lab Sample ID = 20160950044  Analysis Date = 03/31/2016 
 Lab Value = 0.041 
 RPT Level = 0.07 
 Lab Sample ID = 20160880040  Analysis Date = 03/28/2016 
 Lab Value = 0.09 
 RPT Level = 0.07 
 Lab Sample ID = 20160810065  Analysis Date = 03/17/2016 
 Lab Value = 0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20160740013  Analysis Date = 03/11/2016 
 Lab Value = 0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20160670014  Analysis Date = 03/04/2016 
 Lab Value = -0.04 
 RPT Level = 0.07 
 Lab Sample ID = 20160600013  Analysis Date = 02/29/2016 
 Lab Value = 0.032 
 RPT Level = 0.07 
 Lab Sample ID = 20160530013  Analysis Date = 02/18/2016 
 Lab Value = 0.021 
 RPT Level = 0.07 
 Lab Sample ID = 20160470015  Analysis Date = 02/16/2016 
 Lab Value = 0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20160400084  Analysis Date = 02/03/2016 
 Lab Value = 0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20160320011  Analysis Date = 02/01/2016 
 Lab Value = 0.026 
 RPT Level = 0.07 
 Lab Sample ID = 20160250031  Analysis Date = 01/21/2016 
 Lab Value = 0.024 
 RPT Level = 0.07 
 Lab Sample ID = 20160190011  Analysis Date = 01/14/2016 
 Lab Value = 0.007 
 RPT Level = 0.07 
 Lab Sample ID = 20160110011  Analysis Date = 01/08/2016 
 Lab Value = 0.01 
 RPT Level = 0.07 
 Lab Sample ID = 20160050030  Analysis Date = 01/04/2016 
 Lab Value = -0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20153630045  Analysis Date = 12/23/2015 
 Lab Value = -0.008 
 RPT Level = 0.07 
 Lab Sample ID = 20153550011  Analysis Date = 12/21/2015 
 Lab Value = 0.027 
 RPT Level = 0.07 
 Lab Sample ID = 20153500160  Analysis Date = 12/15/2015 
 Lab Value = 0.01 
 RPT Level = 0.07 
 Lab Sample ID = 20153420017  Analysis Date = 12/04/2015 
 Lab Value = 0.015 
 RPT Level = 0.07 
 Lab Sample ID = 20153340016  Analysis Date = 12/04/2015 
 Lab Value = 0.016 
 RPT Level = 0.07 
 Lab Sample ID = 20153270012  Analysis Date = 11/24/2015 
 Lab Value = 0.028 
 RPT Level = 0.07 
 Lab Sample ID = 20153200025  Analysis Date = 11/17/2015 
 Lab Value = 0.031 
 RPT Level = 0.07 
 Lab Sample ID = 20153140011  Analysis Date = 11/04/2015 
 Lab Value = 0.032 
 RPT Level = 0.07 
 Lab Sample ID = 20153060033  Analysis Date = 11/02/2015 
 Lab Value = 0.008 
 RPT Level = 0.07 
 Lab Sample ID = 20152990066  Analysis Date = 10/26/2015 
 Lab Value = 0.045 
 RPT Level = 0.07 
 Lab Sample ID = 20152920036  Analysis Date = 10/22/2015 
 Lab Value = -0.018 
 RPT Level = 0.07 
 Lab Sample ID = 20152860152  Analysis Date = 10/14/2015 
 Lab Value = 0.003 
 RPT Level = 0.07 
 Lab Sample ID = 20152780012  Analysis Date = 10/07/2015 
 Lab Value = 0.032 
 RPT Level = 0.07 
 Lab Sample ID = 20152710066  Analysis Date = 09/30/2015 
 Lab Value = 0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20152640026  Analysis Date = 09/28/2015 
 Lab Value = -0.001 
 RPT Level = 0.07 
 Lab Sample ID = 20152590157  Analysis Date = 09/22/2015 
 Lab Value = -0.005 
 RPT Level = 0.07 
 Lab Sample ID = 20152510009  Analysis Date = 09/16/2015 
 Lab Value = -0.013 
 RPT Level = 0.07 
 Lab Sample ID = 20152430096  Analysis Date = 09/01/2015 
 Lab Value = 0.047 
 RPT Level = 0.07 
 Lab Sample ID = 20152360157  Analysis Date = 09/01/2015 
 Lab Value = -0.003 
 RPT Level = 0.07 
 Lab Sample ID = 20152330007  Analysis Date = 08/19/2015 
 Lab Value = 0.012 
 RPT Level = 0.07 
 Lab Sample ID = 20152230132  Analysis Date = 08/10/2015 
 Lab Value = 0.072 
 RPT Level = 0.07 
 Lab Sample ID = 20152150073  Analysis Date = 07/31/2015 
 Lab Value = 0.009 
 RPT Level = 0.07 
 Lab Sample ID = 20152080065  Analysis Date = 07/27/2015 
 Lab Value = -0.013 
 RPT Level = 0.07 
 Lab Sample ID = 20152010051  Analysis Date = 07/23/2015 
 Lab Value = -0.026 
 RPT Level = 0.07 
 Lab Sample ID = 20151940024  Analysis Date = 07/14/2015 
 Lab Value = -0.053 
 RPT Level = 0.07 
 Lab Sample ID = 20151870009  Analysis Date = 07/10/2015 
 Lab Value = -0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20151800049  Analysis Date = 07/01/2015 
 Lab Value = 0.019 
 RPT Level = 0.07 
 Lab Sample ID = 20151730016  Analysis Date = 06/26/2015 
 Lab Value = -0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20151660034  Analysis Date = 06/23/2015 
 Lab Value = 0.027 
 RPT Level = 0.07 
 Lab Sample ID = 20151620213  Analysis Date = 06/16/2015 
 Lab Value = -0.018 
 RPT Level = 0.07 
 Lab Sample ID = 20151530198  Analysis Date = 06/05/2015 
 Lab Value = -0.023 
 RPT Level = 0.07 
 Lab Sample ID = 20151460121  Analysis Date = 05/29/2015 
 Lab Value = 0.091 
 RPT Level = 0.07 
 Lab Sample ID = 20151390198  Analysis Date = 05/20/2015 
 Lab Value = 0.033 
 RPT Level = 0.07 
 Lab Sample ID = 20151310070  Analysis Date = 05/13/2015 
 Lab Value = -0.016 
 RPT Level = 0.07 
 Lab Sample ID = 20151240065  Analysis Date = 05/08/2015 
 Lab Value = -0.025 
 RPT Level = 0.07 
 Lab Sample ID = 20151180073  Analysis Date = 05/01/2015 
 Lab Value = -0.009 
 RPT Level = 0.07 
 Lab Sample ID = 20151140024  Analysis Date = 04/22/2015 
 Lab Value = 0.018 
 RPT Level = 0.07 
 Lab Sample ID = 20151050039  Analysis Date = 04/17/2015 
 Lab Value = 0.022 
 RPT Level = 0.07 
 Lab Sample ID = 20150970052  Analysis Date = 04/02/2015 
 Lab Value = 0.031 
 RPT Level = 0.07 
 Lab Sample ID = 20150900037  Analysis Date = 03/30/2015 
 Lab Value = -0.008 
 RPT Level = 0.07 
 Lab Sample ID = 20150850041  Analysis Date = 03/19/2015 
 Lab Value = -0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20150770031  Analysis Date = 03/13/2015 
 Lab Value = -0.013 
 RPT Level = 0.07 
 Lab Sample ID = 20150690109  Analysis Date = 03/04/2015 
 Lab Value = 0.068 
 RPT Level = 0.07 
 Lab Sample ID = 20150610104  Analysis Date = 02/25/2015 
 Lab Value = -0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20150540029  Analysis Date = 02/20/2015 
 Lab Value = 0.01 
 RPT Level = 0.07 
 Lab Sample ID = 20150490025  Analysis Date = 02/12/2015 
 Lab Value = 0.031 
 RPT Level = 0.07 
 Lab Sample ID = 20150400033  Analysis Date = 02/06/2015 
 Lab Value = 0.005 
 RPT Level = 0.07 
 Lab Sample ID = 20150330024  Analysis Date = 02/03/2015 
 Lab Value = 0.021 
 RPT Level = 0.07 
 Lab Sample ID = 20150260015  Analysis Date = 01/23/2015 
 Lab Value = -0.013 
 RPT Level = 0.07 
 Lab Sample ID = 20150200036  Analysis Date = 01/16/2015 
 Lab Value = -0.016 
 RPT Level = 0.07 
 Lab Sample ID = 20150120017  Analysis Date = 01/08/2015 
 Lab Value = 0.019 
 RPT Level = 0.07 
 Lab Sample ID = 20150050006  Analysis Date = 01/08/2015 
 Lab Value = 0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20143630008  Analysis Date = 12/31/2014 
 Lab Value = -0.013 
 RPT Level = 0.07 
 Lab Sample ID = 20143560049  Analysis Date = 12/19/2014 
 Lab Value = 0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20143490026  Analysis Date = 12/10/2014 
 Lab Value = 0.034 
 RPT Level = 0.07 
 Lab Sample ID = 20143420020  Analysis Date = 12/05/2014 
 Lab Value = 0.008 
 RPT Level = 0.07 
 Lab Sample ID = 20143360073  Analysis Date = 12/05/2014 
 Lab Value = 0.006 
 RPT Level = 0.07 
 Lab Sample ID = 20143300036  Analysis Date = 12/03/2014 
 Lab Value = -0.019 
 RPT Level = 0.07 
 Lab Sample ID = 20143230047  Analysis Date = 11/26/2014 
 Lab Value = 0.018 
 RPT Level = 0.07 
 Lab Sample ID = 20143160029  Analysis Date = 11/18/2014 
 Lab Value = 0.029 
 RPT Level = 0.07 
 Lab Sample ID = 20143080087  Analysis Date = 11/06/2014 
 Lab Value = -0.006 
 RPT Level = 0.07 
 Lab Sample ID = 20143010065  Analysis Date = 11/06/2014 
 Lab Value = 0.008 
 RPT Level = 0.07 
 Lab Sample ID = 20142950122  Analysis Date = 10/31/2014 
 Lab Value = 0.04 
 RPT Level = 0.07 
 Lab Sample ID = 20142880084  Analysis Date = 10/24/2014 
 Lab Value = 0.041 
 RPT Level = 0.07 
 Lab Sample ID = 20142790031  Analysis Date = 10/24/2014 
 Lab Value = 0.042 
 RPT Level = 0.07 
 Lab Sample ID = 20142720101  Analysis Date = 10/21/2014 
 Lab Value = 0.021 
 RPT Level = 0.07 
 Lab Sample ID = 20142650106  Analysis Date = 10/14/2014 
 Lab Value = 0.001 
 RPT Level = 0.07 
 Lab Sample ID = 20142590046  Analysis Date = 10/03/2014 
 Lab Value = -0.005 
 RPT Level = 0.07 
 Lab Sample ID = 20142520024  Analysis Date = 10/08/2014 
 Lab Value = -0.076 
 RPT Level = 0.07 
 Lab Sample ID = 20142470052  Analysis Date = 09/09/2014 
 Lab Value = 0.018 
 RPT Level = 0.07 
 Lab Sample ID = 20142230082  Analysis Date = 08/28/2014 
 Lab Value = 0.019 
 RPT Level = 0.07 
 Lab Sample ID = 20142160063  Analysis Date = 08/21/2014 
 Lab Value = 0.012 
 RPT Level = 0.07 
 Lab Sample ID = 20142090217  Analysis Date = 08/07/2014 
 Lab Value = 0.032 
 RPT Level = 0.07 
 Lab Sample ID = 20142030069  Analysis Date = 08/01/2014 
 Lab Value = -0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20141960042  Analysis Date = 07/29/2014 
 Lab Value = 0.037 
 RPT Level = 0.07 
 Lab Sample ID = 20141890083  Analysis Date = 07/25/2014 
 Lab Value = 0.022 
 RPT Level = 0.07 
 Lab Sample ID = 20141820118  Analysis Date = 07/17/2014 
 Lab Value = 0.025 
 RPT Level = 0.07 
 Lab Sample ID = 20141750143  Analysis Date = 07/10/2014 
 Lab Value = -0.009 
 RPT Level = 0.07 
 Lab Sample ID = 20141680085  Analysis Date = 07/01/2014 
 Lab Value = 0.051 
 RPT Level = 0.07 
 Lab Sample ID = 20141620033  Analysis Date = 06/26/2014 
 Lab Value = 0.024 
 RPT Level = 0.07 
 Lab Sample ID = 20141550058  Analysis Date = 06/17/2014 
 Lab Value = -0.016 
 RPT Level = 0.07 
 Lab Sample ID = 20141470144  Analysis Date = 06/04/2014 
 Lab Value = 0.046 
 RPT Level = 0.07 
 Lab Sample ID = 20141400011  Analysis Date = 05/27/2014 
 Lab Value = 0.089 
 RPT Level = 0.07 
 Lab Sample ID = 20141340002  Analysis Date = 05/07/2014 
 Lab Value = 0.033 
 RPT Level = 0.07 
 Lab Sample ID = 20141250086  Analysis Date = 05/05/2014 
 Lab Value = 0.008 
 RPT Level = 0.07 
 Lab Sample ID = 20141190022  Analysis Date = 04/29/2014 
 Lab Value = 0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20141130021  Analysis Date = 04/21/2014 
 Lab Value = 0.034 
 RPT Level = 0.07 
 Lab Sample ID = 20141050008  Analysis Date = 04/10/2014 
 Lab Value = -0.011 
 RPT Level = 0.07 
 Lab Sample ID = 20140970044  Analysis Date = 04/01/2014 
 Lab Value = 0.041 
 RPT Level = 0.07 
 Lab Sample ID = 20140900020  Analysis Date = 03/28/2014 
 Lab Value = 0.01 
 RPT Level = 0.07 
 Lab Sample ID = 20140840099  Analysis Date = 03/24/2014 
 Lab Value = -0.001 
 RPT Level = 0.07 
 Lab Sample ID = 20140760039  Analysis Date = 03/18/2014 
 Lab Value = 0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20140690021  Analysis Date = 03/13/2014 
 Lab Value = 0.011 
 RPT Level = 0.07 
 Lab Sample ID = 20140630120  Analysis Date = 03/03/2014 
 Lab Value = 0.042 
 RPT Level = 0.07 
 Lab Sample ID = 20140550042  Analysis Date = 02/27/2014 
 Lab Value = 0.015 
 RPT Level = 0.07 
 Lab Sample ID = 20140490012  Analysis Date = 02/25/2014 
 Lab Value = 0.047 
 RPT Level = 0.07 
 Lab Sample ID = 20140410005  Analysis Date = 02/28/2014 
 Lab Value = 0.015 
 RPT Level = 0.07 
 Lab Sample ID = 20140340022  Analysis Date = 02/10/2014 
 Lab Value = -0.022 
 RPT Level = 0.07 
 Lab Sample ID = 20140270193  Analysis Date = 01/27/2014 
 Lab Value = 0.001 
 RPT Level = 0.07 
 Lab Sample ID = 20140210036  Analysis Date = 01/14/2014 
 Lab Value = 0.021 
 RPT Level = 0.07 
 Lab Sample ID = 20140130049  Analysis Date = 01/10/2014 
 Lab Value = 0.09 
 RPT Level = 0.07 
 Lab Sample ID = 20140070067  Analysis Date = 12/31/2013 
 Lab Value = -0.022 
 RPT Level = 0.07 
 Lab Sample ID = 20133580053  Analysis Date = 12/20/2013 
 Lab Value = -0.007 
 RPT Level = 0.07 
 Lab Sample ID = 20133500067  Analysis Date = 12/20/2013 
 Lab Value = -0.012 
 RPT Level = 0.07 
 Lab Sample ID = 20133430107  Analysis Date = 12/06/2013 
 Lab Value = 0.032 
 RPT Level = 0.07 
 Lab Sample ID = 20133360022  Analysis Date = 12/04/2013 
 Lab Value = 0.008 
 RPT Level = 0.07 
 Lab Sample ID = 20133300012  Analysis Date = 11/27/2013 
 Lab Value = -0.022 
 RPT Level = 0.07 
 Lab Sample ID = 20133230003  Analysis Date = 11/22/2013 
 Lab Value = -0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20133170105  Analysis Date = 11/14/2013 
 Lab Value = 0.012 
 RPT Level = 0.07 
 Lab Sample ID = 20133090098  Analysis Date = 11/07/2013 
 Lab Value = 0.018 
 RPT Level = 0.07 
 Lab Sample ID = 20133030027  Analysis Date = 11/01/2013 
 Lab Value = -0.007 
 RPT Level = 0.07 
 Lab Sample ID = 20132970027  Analysis Date = 10/30/2013 
 Lab Value = 0.026 
 RPT Level = 0.07 
 Lab Sample ID = 20132730140  Analysis Date = 10/21/2013 
 Lab Value = 0.022 
 RPT Level = 0.07 
 Lab Sample ID = 20132660104  Analysis Date = 09/24/2013 
 Lab Value = -0.005 
 RPT Level = 0.07 
 Lab Sample ID = 20132600015  Analysis Date = 09/18/2013 
 Lab Value = -0.05 
 RPT Level = 0.07 
 Lab Sample ID = 20132530113  Analysis Date = 09/09/2013 
 Lab Value = -0.035 
 RPT Level = 0.07 
 Lab Sample ID = 20132410009  Analysis Date = 09/03/2013 
 Lab Value = -0.065 
 RPT Level = 0.07 
 Lab Sample ID = 20132390012  Analysis Date = 08/29/2013 
 Lab Value = -0.04 
 RPT Level = 0.07 
 Lab Sample ID = 20132350027  Analysis Date = 08/19/2013 
 Lab Value = -0.03 
 RPT Level = 0.07 
 Lab Sample ID = 20132270018  Analysis Date = 08/15/2013 
 Lab Value = -0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20132180181  Analysis Date = 08/02/2013 
 Lab Value = -0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20132120027  Analysis Date = 07/29/2013 
 Lab Value = -0.005 
 RPT Level = 0.07 
 Lab Sample ID = 20132040021  Analysis Date = 07/17/2013 
 Lab Value = 0.009 
 RPT Level = 0.07 
 Lab Sample ID = 20131970028  Analysis Date = 07/11/2013 
 Lab Value = -0.09 
 RPT Level = 0.07 
 Lab Sample ID = 20131900090  Analysis Date = 07/03/2013 
 Lab Value = 0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20131830073  Analysis Date = 07/02/2013 
 Lab Value = -0.03 
 RPT Level = 0.07 
 Lab Sample ID = 20131770013  Analysis Date = 06/21/2013 
 Lab Value = -0.012 
 RPT Level = 0.07 
 Lab Sample ID = 20131700038  Analysis Date = 06/19/2013 
 Lab Value = -0.037 
 RPT Level = 0.07 
 Lab Sample ID = 20131640004  Analysis Date = 06/12/2013 
 Lab Value = 0.015 
 RPT Level = 0.07 
 Lab Sample ID = 20131550029  Analysis Date = 06/07/2013 
 Lab Value = -0.023 
 RPT Level = 0.07 
 Lab Sample ID = 20131430198  Analysis Date = 05/28/2013 
 Lab Value = -0.057 
 RPT Level = 0.07 
 Lab Sample ID = 20131350129  Analysis Date = 05/16/2013 
 Lab Value = 0.025 
 RPT Level = 0.07 
 Lab Sample ID = 20131270022  Analysis Date = 05/03/2013 
 Lab Value = 0.054 
 RPT Level = 0.07 
 Lab Sample ID = 20131220014  Analysis Date = 04/30/2013 
 Lab Value = 0.018 
 RPT Level = 0.07 
 Lab Sample ID = 20131150015  Analysis Date = 04/26/2013 
 Lab Value = 0.025 
 RPT Level = 0.07 
 Lab Sample ID = 20131120125  Analysis Date = 04/25/2013 
 Lab Value = 0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20131090030  Analysis Date = 04/09/2013 
 Lab Value = -0.006 
 RPT Level = 0.07 
 Lab Sample ID = 20130930087  Analysis Date = 03/28/2013 
 Lab Value = -0.017 
 RPT Level = 0.07 
 Lab Sample ID = 20130840058  Analysis Date = 03/21/2013 
 Lab Value = -0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20130770160  Analysis Date = 03/18/2013 
 Lab Value = 0.019 
 RPT Level = 0.07 
 Lab Sample ID = 20130700013  Analysis Date = 03/12/2013 
 Lab Value = 0.119 
 RPT Level = 0.07 
 Lab Sample ID = 20130630124  Analysis Date = 03/07/2013 
 Lab Value = -0.003 
 RPT Level = 0.07 
 Lab Sample ID = 20130570007  Analysis Date = 03/05/2013 
 Lab Value = -0.009 
 RPT Level = 0.07 
 Lab Sample ID = 20130520006  Analysis Date = 02/26/2013 
 Lab Value = 0.028 
 RPT Level = 0.07 
 Lab Sample ID = 20130420052  Analysis Date = 02/06/2013 
 Lab Value = 0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20130350029  Analysis Date = 01/31/2013 
 Lab Value = -0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20130280039  Analysis Date = 01/28/2013 
 Lab Value = 0.009 
 RPT Level = 0.07 
 Lab Sample ID = 20130230099  Analysis Date = 01/18/2013 
 Lab Value = 0.005 
 RPT Level = 0.07 
 Lab Sample ID = 20130140071  Analysis Date = 01/11/2013 
 Lab Value = -0.01 
 RPT Level = 0.07 
 Lab Sample ID = 20130070056  Analysis Date = 01/07/2013 
 Lab Value = -0.012 
 RPT Level = 0.07 
 Lab Sample ID = 20130020010  Analysis Date = 01/04/2013 
 Lab Value = -0.009 
 RPT Level = 0.07 
 Lab Sample ID = 20123620011  Analysis Date = 12/20/2012 
 Lab Value = 0.032 
 RPT Level = 0.07 
 Lab Sample ID = 20123530084  Analysis Date = 12/20/2012 
 Lab Value = 0.021 
 RPT Level = 0.07 
 Lab Sample ID = 20123480061  Analysis Date = 12/12/2012 
 Lab Value = 0.024 
 RPT Level = 0.07 
 Lab Sample ID = 20123390115  Analysis Date = 12/03/2012 
 Lab Value = -0.008 
 RPT Level = 0.07 
 Lab Sample ID = 20123330010  Analysis Date = 11/27/2012 
 Lab Value = -0.007 
 RPT Level = 0.07 
 Lab Sample ID = 20123250063  Analysis Date = 11/19/2012 
 Lab Value = 0.012 
 RPT Level = 0.07 
 Lab Sample ID = 20123200054  Analysis Date = 11/13/2012 
 Lab Value = -0.025 
 RPT Level = 0.07 
 Lab Sample ID = 20123120066  Analysis Date = 11/05/2012 
 Lab Value = -0.027 
 RPT Level = 0.07 
 Lab Sample ID = 20123040119  Analysis Date = 10/31/2012 
 Lab Value = -0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20122980126  Analysis Date = 10/18/2012 
 Lab Value = -0.015 
 RPT Level = 0.07 
 Lab Sample ID = 20122900096  Analysis Date = 10/11/2012 
 Lab Value = 0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20122830034  Analysis Date = 10/04/2012 
 Lab Value = 0 
 RPT Level = 0.07 
 Lab Sample ID = 20122750025  Analysis Date = 10/04/2012 
 Lab Value = 0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20122700110  Analysis Date = 10/02/2012 
 Lab Value = 0.037 
 RPT Level = 0.07 
 Lab Sample ID = 20122690153  Analysis Date = 09/14/2012 
 Lab Value = 0.055 
 RPT Level = 0.07 
 Lab Sample ID = 20122550016  Analysis Date = 09/12/2012 
 Lab Value = 0 
 RPT Level = 0.07 
 Lab Sample ID = 20122490102  Analysis Date = 09/10/2012 
 Lab Value = 0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20122410013  Analysis Date = 08/30/2012 
 Lab Value = -0.035 
 RPT Level = 0.07 
 Lab Sample ID = 20122350175  Analysis Date = 08/23/2012 
 Lab Value = 0.009 
 RPT Level = 0.07 
 Lab Sample ID = 20122280090  Analysis Date = 08/08/2012 
 Lab Value = 0.013 
 RPT Level = 0.07 
 Lab Sample ID = 20122190099  Analysis Date = 08/03/2012 
 Lab Value = -0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20122140050  Analysis Date = 07/27/2012 
 Lab Value = 0.018 
 RPT Level = 0.07 
 Lab Sample ID = 20122050101  Analysis Date = 07/18/2012 
 Lab Value = 0.005 
 RPT Level = 0.07 
 Lab Sample ID = 20121990080  Analysis Date = 07/10/2012 
 Lab Value = 0.05 
 RPT Level = 0.07 
 Lab Sample ID = 20121910041  Analysis Date = 07/10/2012 
 Lab Value = 0.035 
 RPT Level = 0.07 
 Lab Sample ID = 20121870014  Analysis Date = 06/28/2012 
 Lab Value = 0.011 
 RPT Level = 0.07 
 Lab Sample ID = 20121780033  Analysis Date = 06/20/2012 
 Lab Value = 0.012 
 RPT Level = 0.07 
 Lab Sample ID = 20121710006  Analysis Date = 06/15/2012 
 Lab Value = 0 
 RPT Level = 0.07 
 Lab Sample ID = 20121650052  Analysis Date = 06/07/2012 
 Lab Value = -0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20121560125  Analysis Date = 06/05/2012 
 Lab Value = 0.007 
 RPT Level = 0.07 
 Lab Sample ID = 20121510037  Analysis Date = 05/24/2012 
 Lab Value = -0.006 
 RPT Level = 0.07 
 Lab Sample ID = 20121430021  Analysis Date = 05/18/2012 
 Lab Value = 0.008 
 RPT Level = 0.07 
 Lab Sample ID = 20121370053  Analysis Date = 05/11/2012 
 Lab Value = -0.003 
 RPT Level = 0.07 
 Lab Sample ID = 20121290072  Analysis Date = 05/03/2012 
 Lab Value = -0.029 
 RPT Level = 0.07 
 Lab Sample ID = 20121210123  Analysis Date = 04/27/2012 
 Lab Value = 0.017 
 RPT Level = 0.07 
 Lab Sample ID = 20121150089  Analysis Date = 04/25/2012 
 Lab Value = 0.025 
 RPT Level = 0.07 
 Lab Sample ID = 20121080009  Analysis Date = 04/18/2012 
 Lab Value = 0.016 
 RPT Level = 0.07 
 Lab Sample ID = 20121010029  Analysis Date = 04/13/2012 
 Lab Value = -0.037 
 RPT Level = 0.07 
 Lab Sample ID = 20120930058  Analysis Date = 04/11/2012 
 Lab Value = 0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20120870035  Analysis Date = 04/06/2012 
 Lab Value = 0.043 
 RPT Level = 0.07 
 Lab Sample ID = 20120790085  Analysis Date = 03/15/2012 
 Lab Value = -0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20120730079  Analysis Date = 03/07/2012 
 Lab Value = -0.01 
 RPT Level = 0.07 
 Lab Sample ID = 20120660073  Analysis Date = 02/29/2012 
 Lab Value = 0.011 
 RPT Level = 0.07 
 Lab Sample ID = 20120580047  Analysis Date = 02/24/2012 
 Lab Value = 0.027 
 RPT Level = 0.07 
 Lab Sample ID = 20120530099  Analysis Date = 02/16/2012 
 Lab Value = 0.021 
 RPT Level = 0.07 
 Lab Sample ID = 20120450020  Analysis Date = 02/08/2012 
 Lab Value = 0.05 
 RPT Level = 0.07 
 Lab Sample ID = 20120370064  Analysis Date = 02/07/2012 
 Lab Value = 0.021 
 RPT Level = 0.07 
 Lab Sample ID = 20120310012  Analysis Date = 01/26/2012 
 Lab Value = 0.006 
 RPT Level = 0.07 
 Lab Sample ID = 20120230046  Analysis Date = 01/19/2012 
 Lab Value = 0.036 
 RPT Level = 0.07 
 Lab Sample ID = 20120180013  Analysis Date = 01/17/2012 
 Lab Value = -0.026 
 RPT Level = 0.07 
 Lab Sample ID = 20120090052  Analysis Date = 01/09/2012 
 Lab Value = 0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20120030028  Analysis Date = 12/29/2011 
 Lab Value = 0.021 
 RPT Level = 0.07 
 Lab Sample ID = 20113610089  Analysis Date = 12/22/2011 
 Lab Value = 0.017 
 RPT Level = 0.07 
 Lab Sample ID = 20113530139  Analysis Date = 12/16/2011 
 Lab Value = -0.008 
 RPT Level = 0.07 
 Lab Sample ID = 20113490075  Analysis Date = 12/15/2011 
 Lab Value = 0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20113460137  Analysis Date = 12/02/2011 
 Lab Value = 0 
 RPT Level = 0.07 
 Lab Sample ID = 20113320115  Analysis Date = 11/30/2011 
 Lab Value = 0.006 
 RPT Level = 0.07 
 Lab Sample ID = 20113250126  Analysis Date = 11/23/2011 
 Lab Value = 0 
 RPT Level = 0.07 
 Lab Sample ID = 20113180164  Analysis Date = 11/10/2011 
 Lab Value = 0.012 
 RPT Level = 0.07 
 Lab Sample ID = 20113110062  Analysis Date = 11/08/2011 
 Lab Value = 0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20113050092  Analysis Date = 11/02/2011 
 Lab Value = -0.006 
 RPT Level = 0.07 
 Lab Sample ID = 20112970118  Analysis Date = 10/28/2011 
 Lab Value = 0.052 
 RPT Level = 0.07 
 Lab Sample ID = 20112910137  Analysis Date = 10/18/2011 
 Lab Value = -0.032 
 RPT Level = 0.07 
 Lab Sample ID = 20112840071  Analysis Date = 10/05/2011 
 Lab Value = 0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20112760061  Analysis Date = 09/30/2011 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20112690123  Analysis Date = 09/23/2011 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20112630061  Analysis Date = 09/16/2011 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20112560021  Analysis Date = 09/13/2011 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20112510037  Analysis Date = 09/13/2011 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20112500188  Analysis Date = 08/30/2011 
 Lab Value = 0.04 
 RPT Level = 0.05 
 Lab Sample ID = 20112360063  Analysis Date = 08/23/2011 
 Lab Value = -0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20112300036  Analysis Date = 08/15/2011 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20112200051  Analysis Date = 08/04/2011 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20112130154  Analysis Date = 08/02/2011 
 Lab Value = 0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20112060094  Analysis Date = 07/28/2011 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20112010020  Analysis Date = 07/13/2011 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20111920099  Analysis Date = 07/07/2011 
 Lab Value = 0.079 
 RPT Level = 0.05 
 Lab Sample ID = 20111860062  Analysis Date = 07/01/2011 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20111780166  Analysis Date = 06/23/2011 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20111710111  Analysis Date = 06/17/2011 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20111640067  Analysis Date = 06/15/2011 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20111570061  Analysis Date = 06/08/2011 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20111510151  Analysis Date = 05/26/2011 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20111430203  Analysis Date = 05/19/2011 
 Lab Value = 0.036 
 RPT Level = 0.05 
 Lab Sample ID = 20111360146  Analysis Date = 05/11/2011 
 Lab Value = -0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20111290046  Analysis Date = 05/09/2011 
 Lab Value = -0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20111220086  Analysis Date = 05/03/2011 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20111150114  Analysis Date = 04/20/2011 
 Lab Value = 0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20111080073  Analysis Date = 04/18/2011 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20111010118  Analysis Date = 04/07/2011 
 Lab Value = 0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20110950054  Analysis Date = 03/30/2011 
 Lab Value = 0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20110870089  Analysis Date = 03/22/2011 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20110800059  Analysis Date = 03/17/2011 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20110750067  Analysis Date = 03/09/2011 
 Lab Value = -0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20110660032  Analysis Date = 03/04/2011 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20110590070  Analysis Date = 02/24/2011 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20110530105  Analysis Date = 02/16/2011 
 Lab Value = 0.05 
 RPT Level = 0.05 
 Lab Sample ID = 20110450036  Analysis Date = 02/14/2011 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20110410098  Analysis Date = 02/10/2011 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20110400069  Analysis Date = 01/26/2011 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20110240065  Analysis Date = 01/20/2011 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20110180057  Analysis Date = 01/18/2011 
 Lab Value = 0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20110110016  Analysis Date = 01/06/2011 
 Lab Value = -0.054 
 RPT Level = 0.05 
 Lab Sample ID = 20110030021  Analysis Date = 12/29/2010 
 Lab Value = -0.049 
 RPT Level = 0.05 
 Lab Sample ID = 20103610054  Analysis Date = 12/22/2010 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20103540047  Analysis Date = 12/29/2010 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20103470078  Analysis Date = 12/13/2010 
 Lab Value = 0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20103400086  Analysis Date = 12/07/2010 
 Lab Value = 0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20103330099  Analysis Date = 12/03/2010 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20103260065  Analysis Date = 11/18/2010 
 Lab Value = -0.047 
 RPT Level = 0.05 
 Lab Sample ID = 20103190064  Analysis Date = 11/16/2010 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20103120026  Analysis Date = 11/09/2010 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20103060008  Analysis Date = 11/02/2010 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20102990006  Analysis Date = 10/22/2010 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20102920006  Analysis Date = 10/15/2010 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20102850132  Analysis Date = 10/14/2010 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20102770110  Analysis Date = 10/05/2010 
 Lab Value = 0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20102700152  Analysis Date = 10/01/2010 
 Lab Value = 0.067 
 RPT Level = 0.05 
 Lab Sample ID = 20102640136  Analysis Date = 09/24/2010 
 Lab Value = 0.064 
 RPT Level = 0.05 
 Lab Sample ID = 20102570015  Analysis Date = 09/16/2010 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20102510062  Analysis Date = 09/15/2010 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20102430249  Analysis Date = 09/07/2010 
 Lab Value = -0.056 
 RPT Level = 0.05 
 Lab Sample ID = 20102350196  Analysis Date = 08/20/2010 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20102290049  Analysis Date = 08/16/2010 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20102230041  Analysis Date = 08/05/2010 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20102140090  Analysis Date = 07/28/2010 
 Lab Value = -0.036 
 RPT Level = 0.05 
 Lab Sample ID = 20102080005  Analysis Date = 07/23/2010 
 Lab Value = 0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20102000188  Analysis Date = 07/14/2010 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20101930104  Analysis Date = 07/08/2010 
 Lab Value = -0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20101870059  Analysis Date = 07/07/2010 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20101790124  Analysis Date = 07/01/2010 
 Lab Value = 0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20101730068  Analysis Date = 06/24/2010 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20101660061  Analysis Date = 06/18/2010 
 Lab Value = -0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20101590005  Analysis Date = 06/10/2010 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20101530090  Analysis Date = 05/28/2010 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20101440165  Analysis Date = 05/26/2010 
 Lab Value = 0.05 
 RPT Level = 0.05 
 Lab Sample ID = 20101380021  Analysis Date = 05/19/2010 
 Lab Value = 0.044 
 RPT Level = 0.05 
 Lab Sample ID = 20101310098  Analysis Date = 05/12/2010 
 Lab Value = 0.039 
 RPT Level = 0.05 
 Lab Sample ID = 20101240080  Analysis Date = 05/05/2010 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20101180043  Analysis Date = 04/28/2010 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20101090063  Analysis Date = 04/16/2010 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20101020075  Analysis Date = 04/08/2010 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20100950036  Analysis Date = 04/05/2010 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20100880044  Analysis Date = 03/29/2010 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20100850066  Analysis Date = 03/18/2010 
 Lab Value = 0.052 
 RPT Level = 0.05 
 Lab Sample ID = 20100750002  Analysis Date = 03/11/2010 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20100680014  Analysis Date = 03/03/2010 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20100600067  Analysis Date = 02/25/2010 
 Lab Value = 0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20100530048  Analysis Date = 02/19/2010 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20100470025  Analysis Date = 02/11/2010 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20100390038  Analysis Date = 02/04/2010 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20100320023  Analysis Date = 01/29/2010 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20100260065  Analysis Date = 01/22/2010 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20100190102  Analysis Date = 01/14/2010 
 Lab Value = 0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20100110099  Analysis Date = 01/07/2010 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20100050014  Analysis Date = 01/05/2010 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20093620042  Analysis Date = 01/04/2010 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20093560033  Analysis Date = 12/29/2009 
 Lab Value = 0.07 
 RPT Level = 0.05 
 Lab Sample ID = 20093480064  Analysis Date = 12/16/2009 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20093420004  Analysis Date = 12/15/2009 
 Lab Value = 0.038 
 RPT Level = 0.05 
 Lab Sample ID = 20093350070  Analysis Date = 12/03/2009 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20093280015  Analysis Date = 11/19/2009 
 Lab Value = 0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20093200062  Analysis Date = 11/17/2009 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20093130061  Analysis Date = 11/16/2009 
 Lab Value = 0.043 
 RPT Level = 0.05 
 Lab Sample ID = 20093070201  Analysis Date = 11/10/2009 
 Lab Value = 0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20093000106  Analysis Date = 11/03/2009 
 Lab Value = 0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20092920096  Analysis Date = 10/22/2009 
 Lab Value = 0.052 
 RPT Level = 0.05 
 Lab Sample ID = 20092870073  Analysis Date = 10/08/2009 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20092780071  Analysis Date = 10/08/2009 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20092720011  Analysis Date = 09/29/2009 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20092640026  Analysis Date = 09/22/2009 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20092570049  Analysis Date = 09/16/2009 
 Lab Value = 0.049 
 RPT Level = 0.05 
 Lab Sample ID = 20092520132  Analysis Date = 09/03/2009 
 Lab Value = 0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20092430155  Analysis Date = 08/27/2009 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20092360171  Analysis Date = 08/20/2009 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20092290211  Analysis Date = 08/13/2009 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20092220169  Analysis Date = 08/06/2009 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20092150073  Analysis Date = 07/31/2009 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20092090263  Analysis Date = 07/24/2009 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20092010116  Analysis Date = 07/16/2009 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20091950026  Analysis Date = 07/13/2009 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20091870025  Analysis Date = 07/08/2009 
 Lab Value = 0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20091800174  Analysis Date = 07/07/2009 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20091730218  Analysis Date = 06/17/2009 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20091660206  Analysis Date = 06/10/2009 
 Lab Value = 0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20091590088  Analysis Date = 06/05/2009 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20091520151  Analysis Date = 05/28/2009 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20091460188  Analysis Date = 05/21/2009 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20091380122  Analysis Date = 05/19/2009 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20091320020  Analysis Date = 05/07/2009 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20091240123  Analysis Date = 05/14/2009 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20091170110  Analysis Date = 04/24/2009 
 Lab Value = 0.047 
 RPT Level = 0.05 
 Lab Sample ID = 20091110135  Analysis Date = 04/16/2009 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20091030081  Analysis Date = 04/08/2009 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20090960054  Analysis Date = 04/02/2009 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20090890069  Analysis Date = 03/27/2009 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20090820029  Analysis Date = 03/19/2009 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20090750048  Analysis Date = 03/11/2009 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20090680045  Analysis Date = 03/05/2009 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20090610057  Analysis Date = 02/24/2009 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20090540030  Analysis Date = 02/18/2009 
 Lab Value = 0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20090480058  Analysis Date = 02/17/2009 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20090400032  Analysis Date = 02/05/2009 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20090330037  Analysis Date = 01/29/2009 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20090260027  Analysis Date = 01/22/2009 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20090200036  Analysis Date = 01/15/2009 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20090120049  Analysis Date = 01/13/2009 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20090050019  Analysis Date = 01/13/2009 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20083650083  Analysis Date = 01/05/2009 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20083570034  Analysis Date = 12/18/2008 
 Lab Value = 0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20083500071  Analysis Date = 12/16/2008 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20083450064  Analysis Date = 12/10/2008 
 Lab Value = 0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20083360040  Analysis Date = 12/04/2008 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20083290062  Analysis Date = 11/24/2008 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20083220064  Analysis Date = 11/13/2008 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20083150065  Analysis Date = 11/13/2008 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20083080100  Analysis Date = 10/30/2008 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20083010109  Analysis Date = 10/22/2008 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20082940063  Analysis Date = 10/21/2008 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20082880040  Analysis Date = 10/08/2008 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20082800042  Analysis Date = 10/06/2008 
 Lab Value = 0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20082730062  Analysis Date = 09/30/2008 
 Lab Value = -0.046 
 RPT Level = 0.07 
 Lab Sample ID = 20082660047  Analysis Date = 09/17/2008 
 Lab Value = 0.024 
 RPT Level = 0.07 
 Lab Sample ID = 20082590105  Analysis Date = 09/15/2008 
 Lab Value = 0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20082520008  Analysis Date = 09/10/2008 
 Lab Value = 0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20082460098  Analysis Date = 09/02/2008 
 Lab Value = 0.027 
 RPT Level = 0.07 
 Lab Sample ID = 20082380080  Analysis Date = 08/22/2008 
 Lab Value = 0.028 
 RPT Level = 0.07 
 Lab Sample ID = 20082310131  Analysis Date = 08/18/2008 
 Lab Value = 0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20082250010  Analysis Date = 08/11/2008 
 Lab Value = 0.012 
 RPT Level = 0.07 
 Lab Sample ID = 20082190011  Analysis Date = 07/24/2008 
 Lab Value = 0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20082030127  Analysis Date = 07/22/2008 
 Lab Value = -0.012 
 RPT Level = 0.07 
 Lab Sample ID = 20081970139  Analysis Date = 07/14/2008 
 Lab Value = 0 
 RPT Level = 0.07 
 Lab Sample ID = 20081890044  Analysis Date = 07/07/2008 
 Lab Value = 0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20081820059  Analysis Date = 06/26/2008 
 Lab Value = -0.012 
 RPT Level = 0.07 
 Lab Sample ID = 20081750128  Analysis Date = 06/23/2008 
 Lab Value = 0.001 
 RPT Level = 0.07 
 Lab Sample ID = 20081680067  Analysis Date = 06/11/2008 
 Lab Value = 0.009 
 RPT Level = 0.07 
 Lab Sample ID = 20081620017  Analysis Date = 06/10/2008 
 Lab Value = 0.006 
 RPT Level = 0.07 
 Lab Sample ID = 20081540109  Analysis Date = 06/04/2008 
 Lab Value = 0.115 
 RPT Level = 0.07 
 Lab Sample ID = 20081480068  Analysis Date = 05/29/2008 
 Lab Value = 0.018 
 RPT Level = 0.07 
 Lab Sample ID = 20081400061  Analysis Date = 05/13/2008 
 Lab Value = 0.019 
 RPT Level = 0.07 
 Lab Sample ID = 20081330112  Analysis Date = 05/07/2008 
 Lab Value = 0.043 
 RPT Level = 0.07 
 Lab Sample ID = 20081260070  Analysis Date = 04/29/2008 
 Lab Value = 0 
 RPT Level = 0.07 
 Lab Sample ID = 20081190055  Analysis Date = 04/24/2008 
 Lab Value = -0.01 
 RPT Level = 0.07 
 Lab Sample ID = 20081120033  Analysis Date = 04/22/2008 
 Lab Value = 0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20081050114  Analysis Date = 04/10/2008 
 Lab Value = 0.026 
 RPT Level = 0.07 
 Lab Sample ID = 20080980084  Analysis Date = 04/08/2008 
 Lab Value = -0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20080920083  Analysis Date = 03/31/2008 
 Lab Value = 0.022 
 RPT Level = 0.07 
 Lab Sample ID = 20080840064  Analysis Date = 03/27/2008 
 Lab Value = 0.054 
 RPT Level = 0.07 
 Lab Sample ID = 20080770124  Analysis Date = 03/12/2008 
 Lab Value = 0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20080700074  Analysis Date = 03/05/2008 
 Lab Value = 0.006 
 RPT Level = 0.07 
 Lab Sample ID = 20080630067  Analysis Date = 03/03/2008 
 Lab Value = 0.015 
 RPT Level = 0.07 
 Lab Sample ID = 20080560070  Analysis Date = 02/26/2008 
 Lab Value = -0.001 
 RPT Level = 0.07 
 Lab Sample ID = 20080510055  Analysis Date = 02/19/2008 
 Lab Value = -0.011 
 RPT Level = 0.07 
 Lab Sample ID = 20080420072  Analysis Date = 02/11/2008 
 Lab Value = -0.015 
 RPT Level = 0.07 
 Lab Sample ID = 20080360051  Analysis Date = 02/01/2008 
 Lab Value = -0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20080280050  Analysis Date = 01/24/2008 
 Lab Value = 0.01 
 RPT Level = 0.07 
 Lab Sample ID = 20080230021  Analysis Date = 01/23/2008 
 Lab Value = -0.008 
 RPT Level = 0.07 
 Lab Sample ID = 20080140027  Analysis Date = 01/15/2008 
 Lab Value = 0.018 
 RPT Level = 0.07 
 Lab Sample ID = 20080070023  Analysis Date = 01/15/2008 
 Lab Value = 0.022 
 RPT Level = 0.07 
 Lab Sample ID = 20073620004  Analysis Date = 01/09/2008 
 Lab Value = -0.021 
 RPT Level = 0.07 
 Lab Sample ID = 20073510098  Analysis Date = 12/18/2007 
 Lab Value = 0.032 
 RPT Level = 0.07 
 Lab Sample ID = 20073440039  Analysis Date = 12/05/2007 
 Lab Value = 0.024 
 RPT Level = 0.07 
 Lab Sample ID = 20073370069  Analysis Date = 12/04/2007 
 Lab Value = -0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20073300042  Analysis Date = 11/26/2007 
 Lab Value = 0.015 
 RPT Level = 0.07 
 Lab Sample ID = 20073230113  Analysis Date = 11/19/2007 
 Lab Value = -0.016 
 RPT Level = 0.07 
 Lab Sample ID = 20073170062  Analysis Date = 11/14/2007 
 Lab Value = 0.019 
 RPT Level = 0.07 
 Lab Sample ID = 20073100012  Analysis Date = 11/01/2007 
 Lab Value = 0.007 
 RPT Level = 0.07 
 Lab Sample ID = 20073020065  Analysis Date = 10/29/2007 
 Lab Value = 0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20072960186  Analysis Date = 10/23/2007 
 Lab Value = 0.023 
 RPT Level = 0.07 
 Lab Sample ID = 20072890056  Analysis Date = 10/18/2007 
 Lab Value = -0.021 
 RPT Level = 0.07 
 Lab Sample ID = 20072850025  Analysis Date = 10/02/2007 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20072670056  Analysis Date = 09/24/2007 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20072600129  Analysis Date = 09/20/2007 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20072540015  Analysis Date = 09/17/2007 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20072480018  Analysis Date = 09/10/2007 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20072400035  Analysis Date = 08/28/2007 
 Lab Value = 0.036 
 RPT Level = 0.05 
 Lab Sample ID = 20072330109  Analysis Date = 08/17/2007 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20072260198  Analysis Date = 08/16/2007 
 Lab Value = 0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20072210252  Analysis Date = 08/06/2007 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20072110162  Analysis Date = 07/30/2007 
 Lab Value = -0.052 
 RPT Level = 0.05 
 Lab Sample ID = 20072040101  Analysis Date = 07/17/2007 
 Lab Value = 0.071 
 RPT Level = 0.05 
 Lab Sample ID = 20071900105  Analysis Date = 07/05/2007 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20071830158  Analysis Date = 06/29/2007 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20071770201  Analysis Date = 06/25/2007 
 Lab Value = 0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20071690119  Analysis Date = 06/14/2007 
 Lab Value = 0.045 
 RPT Level = 0.05 
 Lab Sample ID = 20071620045  Analysis Date = 06/12/2007 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20071560026  Analysis Date = 06/04/2007 
 Lab Value = 0.043 
 RPT Level = 0.05 
 Lab Sample ID = 20071500033  Analysis Date = 05/31/2007 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20071410089  Analysis Date = 05/21/2007 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20071340113  Analysis Date = 05/10/2007 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20071280019  Analysis Date = 05/03/2007 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20071200089  Analysis Date = 05/01/2007 
 Lab Value = -0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20071130120  Analysis Date = 04/25/2007 
 Lab Value = 0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20071070021  Analysis Date = 04/12/2007 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20070990050  Analysis Date = 04/10/2007 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20070930070  Analysis Date = 04/04/2007 
 Lab Value = -0.043 
 RPT Level = 0.05 
 Lab Sample ID = 20070860217  Analysis Date = 03/30/2007 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20070780128  Analysis Date = 04/16/2007 
 Lab Value = -0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20070710075  Analysis Date = 03/12/2007 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20070650009  Analysis Date = 03/05/2007 
 Lab Value = -0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20070580141  Analysis Date = 03/01/2007 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20070540023  Analysis Date = 02/26/2007 
 Lab Value = 0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20070460015  Analysis Date = 02/15/2007 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20070400103  Analysis Date = 01/29/2007 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20070250023  Analysis Date = 01/22/2007 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20070180071  Analysis Date = 01/17/2007 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20070120012  Analysis Date = 01/09/2007 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20070040013  Analysis Date = 01/09/2007 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20063610084  Analysis Date = 01/04/2007 
 Lab Value = 0.049 
 RPT Level = 0.05 
 Lab Sample ID = 20063520072  Analysis Date = 12/14/2006 
 Lab Value = 0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20063450081  Analysis Date = 12/07/2006 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20063380055  Analysis Date = 12/01/2006 
 Lab Value = 0.051 
 RPT Level = 0.05 
 Lab Sample ID = 20063310047  Analysis Date = 11/28/2006 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20063240079  Analysis Date = 11/16/2006 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20063180103  Analysis Date = 11/15/2006 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20063100080  Analysis Date = 11/07/2006 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20063030096  Analysis Date = 11/01/2006 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20062960133  Analysis Date = 10/31/2006 
 Lab Value = -0.071 
 RPT Level = 0.05 
 Lab Sample ID = 20062910013  Analysis Date = 10/16/2006 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20062850014  Analysis Date = 10/11/2006 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20062780050  Analysis Date = 09/20/2006 
 Lab Value = 0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20062620013  Analysis Date = 09/15/2006 
 Lab Value = 0.043 
 RPT Level = 0.05 
 Lab Sample ID = 20062540016  Analysis Date = 09/11/2006 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20062500008  Analysis Date = 08/28/2006 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20062350182  Analysis Date = 08/17/2006 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20062270273  Analysis Date = 08/14/2006 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20062220039  Analysis Date = 07/25/2006 
 Lab Value = 0.048 
 RPT Level = 0.05 
 Lab Sample ID = 20062020314  Analysis Date = 07/18/2006 
 Lab Value = 0.046 
 RPT Level = 0.05 
 Lab Sample ID = 20061950007  Analysis Date = 07/11/2006 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20061880009  Analysis Date = 06/23/2006 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20061730014  Analysis Date = 06/19/2006 
 Lab Value = -0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20061670021  Analysis Date = 06/08/2006 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20061580018  Analysis Date = 05/18/2006 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20061370016  Analysis Date = 05/10/2006 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20061280111  Analysis Date = 05/15/2006 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20061220099  Analysis Date = 09/21/2005 
 Lab Value = 0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20052590035  Analysis Date = 09/13/2005 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20052520006  Analysis Date = 09/02/2005 
 Lab Value = 0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20052430006  Analysis Date = 08/29/2005 
 Lab Value = 0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20052370002  Analysis Date = 08/19/2005 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20052300009  Analysis Date = 08/10/2005 
 Lab Value = 0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20052210012  Analysis Date = 08/05/2005 
 Lab Value = 0.049 
 RPT Level = 0.05 
 Lab Sample ID = 20052160007  Analysis Date = 08/05/2005 
 Lab Value = 0.05 
 RPT Level = 0.05 
 Lab Sample ID = 20052160005  Analysis Date = 07/21/2005 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20052010007  Analysis Date = 07/18/2005 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20051940015  Analysis Date = 07/11/2005 
 Lab Value = 0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20051880018  Analysis Date = 06/30/2005 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20051800189  Analysis Date = 06/24/2005 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20051740019  Analysis Date = 06/21/2005 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20051660174  Analysis Date = 06/13/2005 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20051590025  Analysis Date = 06/06/2005 
 Lab Value = 0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20051530021  Analysis Date = 05/25/2005 
 Lab Value = 0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20051440043  Analysis Date = 05/23/2005 
 Lab Value = 0.041 
 RPT Level = 0.05 
 Lab Sample ID = 20051380014  Analysis Date = 05/17/2005 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20051320029  Analysis Date = 05/11/2005 
 Lab Value = 0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20051250003  Analysis Date = 04/28/2005 
 Lab Value = 0.054 
 RPT Level = 0.05 
 Lab Sample ID = 20051170012  Analysis Date = 04/25/2005 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20051110007  Analysis Date = 04/14/2005 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20051020018  Analysis Date = 04/07/2005 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20050950044  Analysis Date = 04/04/2005 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20050880116  Analysis Date = 03/29/2005 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20050840096  Analysis Date = 03/18/2005 
 Lab Value = 0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20050750004  Analysis Date = 03/18/2005 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20050700007  Analysis Date = 03/18/2005 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20050700004  Analysis Date = 03/10/2005 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20050670011  Analysis Date = 03/01/2005 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20050550024  Analysis Date = 02/18/2005 
 Lab Value = 0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20050480005  Analysis Date = 02/15/2005 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20050410004  Analysis Date = 02/04/2005 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20050340020  Analysis Date = 01/27/2005 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20050260024  Analysis Date = 01/21/2005 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20050200048  Analysis Date = 01/18/2005 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20050130091  Analysis Date = 01/10/2005 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20050070016  Analysis Date = 01/04/2005 
 Lab Value = -0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20043650002  Analysis Date = 12/28/2004 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20043580037  Analysis Date = 12/28/2004 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20043580035  Analysis Date = 12/20/2004 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20043520023  Analysis Date = 12/20/2004 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20043510018  Analysis Date = 12/13/2004 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20043450069  Analysis Date = 12/13/2004 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20043440147  Analysis Date = 12/06/2004 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20043380005  Analysis Date = 12/06/2004 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20043380002  Analysis Date = 11/29/2004 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20043280048  Analysis Date = 11/23/2004 
 Lab Value = 0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20043240012  Analysis Date = 09/02/2004 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20042450138  Analysis Date = 08/31/2004 
 Lab Value = -0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20042400089  Analysis Date = 08/25/2004 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20042370105  Analysis Date = 08/23/2004 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20042330206  Analysis Date = 08/23/2004 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20042320136  Analysis Date = 08/23/2004 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20042320138  Analysis Date = 08/13/2004 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20042240114  Analysis Date = 08/05/2004 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20042170123  Analysis Date = 08/03/2004 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20042110015  Analysis Date = 07/26/2004 
 Lab Value = 0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20042040039  Analysis Date = 07/20/2004 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20041960050  Analysis Date = 07/09/2004 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20041900062  Analysis Date = 07/07/2004 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20041820035  Analysis Date = 06/28/2004 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20041750057  Analysis Date = 06/23/2004 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20041700080  Analysis Date = 06/10/2004 
 Lab Value = -0.048 
 RPT Level = 0.05 
 Lab Sample ID = 20041610055  Analysis Date = 06/04/2004 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20041550019  Analysis Date = 06/01/2004 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20041470132  Analysis Date = 05/21/2004 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20041400016  Analysis Date = 05/07/2004 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20041260099  Analysis Date = 05/03/2004 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20041200046  Analysis Date = 04/26/2004 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20041130016  Analysis Date = 04/20/2004 
 Lab Value = -0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20041050022  Analysis Date = 04/12/2004 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20040980007  Analysis Date = 04/05/2004 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20040930009  Analysis Date = 04/05/2004 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20040910012  Analysis Date = 03/30/2004 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20040850021  Analysis Date = 03/30/2004 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20040830056  Analysis Date = 03/23/2004 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20040790023  Analysis Date = 03/18/2004 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20040760010  Analysis Date = 03/16/2004 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20040720029  Analysis Date = 03/16/2004 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20040710005  Analysis Date = 03/12/2004 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20040680093  Analysis Date = 03/12/2004 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20040650001  Analysis Date = 03/01/2004 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20040580032  Analysis Date = 02/26/2004 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20040550018  Analysis Date = 02/24/2004 
 Lab Value = -0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20040510134  Analysis Date = 02/23/2004 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20040490025  Analysis Date = 02/19/2004 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20040440035  Analysis Date = 02/12/2004 
 Lab Value = 0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20040420001  Analysis Date = 02/09/2004 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20040370017  Analysis Date = 02/09/2004 
 Lab Value = -0.045 
 RPT Level = 0.05 
 Lab Sample ID = 20040340024  Analysis Date = 02/03/2004 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20040300012  Analysis Date = 01/30/2004 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20040270036  Analysis Date = 01/26/2004 
 Lab Value = 0.045 
 RPT Level = 0.05 
 Lab Sample ID = 20040230030  Analysis Date = 01/22/2004 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20040210154  Analysis Date = 01/22/2004 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20040200023  Analysis Date = 01/16/2004 
 Lab Value = -0.043 
 RPT Level = 0.05 
 Lab Sample ID = 20040150075  Analysis Date = 01/13/2004 
 Lab Value = 0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20040090020  Analysis Date = 01/13/2004 
 Lab Value = -0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20040070032  Analysis Date = 01/06/2004 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20040050016  Analysis Date = 09/25/2003 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20032660009  Analysis Date = 09/19/2003 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20032600107  Analysis Date = 09/12/2003 
 Lab Value = -0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20032520179  Analysis Date = 09/05/2003 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20032450195  Analysis Date = 08/27/2003 
 Lab Value = 0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20032380029  Analysis Date = 08/21/2003 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20032310028  Analysis Date = 08/14/2003 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20032250256  Analysis Date = 08/08/2003 
 Lab Value = 0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20032180019  Analysis Date = 08/04/2003 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20032100004  Analysis Date = 07/24/2003 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20032040043  Analysis Date = 07/16/2003 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20031960025  Analysis Date = 07/11/2003 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20031900098  Analysis Date = 07/03/2003 
 Lab Value = 0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20031820037  Analysis Date = 07/01/2003 
 Lab Value = -0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20031770041  Analysis Date = 06/23/2003 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20031700013  Analysis Date = 06/16/2003 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20031630053  Analysis Date = 06/13/2003 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20031600109  Analysis Date = 05/29/2003 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20031480059  Analysis Date = 05/28/2003 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20031430019  Analysis Date = 05/22/2003 
 Lab Value = 0.039 
 RPT Level = 0.05 
 Lab Sample ID = 20031400115  Analysis Date = 05/14/2003 
 Lab Value = 0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20031290084  Analysis Date = 05/06/2003 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20031220070  Analysis Date = 05/01/2003 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20031200043  Analysis Date = 04/22/2003 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20031080208  Analysis Date = 04/08/2003 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20030970018  Analysis Date = 04/03/2003 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20030920027  Analysis Date = 04/02/2003 
 Lab Value = 0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20030900015  Analysis Date = 04/02/2003 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20030860023  Analysis Date = 03/14/2003 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20030710021  Analysis Date = 03/12/2003 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20030660148  Analysis Date = 03/04/2003 
 Lab Value = 0.081 
 RPT Level = 0.05 
 Lab Sample ID = 20030590040  Analysis Date = 02/27/2003 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20030570061  Analysis Date = 02/12/2003 
 Lab Value = 0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20030410034  Analysis Date = 02/07/2003 
 Lab Value = 0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20030350008  Analysis Date = 01/31/2003 
 Lab Value = 0.054 
 RPT Level = 0.05 
 Lab Sample ID = 20030300004  Analysis Date = 01/16/2003 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20030150009  Analysis Date = 01/15/2003 
 Lab Value = 0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20030140019  Analysis Date = 01/08/2003 
 Lab Value = 0.039 
 RPT Level = 0.05 
 Lab Sample ID = 20030020002  Analysis Date = 01/06/2003 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20023650009  Analysis Date = 12/18/2002 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20023500166  Analysis Date = 12/18/2002 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20023500092  Analysis Date = 12/06/2002 
 Lab Value = 0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20023370026  Analysis Date = 12/11/2002 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20023370025  Analysis Date = 12/04/2002 
 Lab Value = 0.05 
 RPT Level = 0.05 
 Lab Sample ID = 20023330096  Analysis Date = 12/11/2002 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20023360020  Analysis Date = 12/04/2002 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20023310020  Analysis Date = 11/04/2002 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20023040033  Analysis Date = 10/25/2002 
 Lab Value = 0.038 
 RPT Level = 0.05 
 Lab Sample ID = 20022970050  Analysis Date = 10/25/2002 
 Lab Value = 0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20022970049  Analysis Date = 10/25/2002 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20022970048  Analysis Date = 10/24/2002 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20022960022  Analysis Date = 09/05/2002 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20022470018  Analysis Date = 09/05/2002 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20022460135  Analysis Date = 08/26/2002 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20022340186  Analysis Date = 08/19/2002 
 Lab Value = 0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20022280008  Analysis Date = 08/13/2002 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20022210007  Analysis Date = 08/06/2002 
 Lab Value = 0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20022170107  Analysis Date = 07/29/2002 
 Lab Value = 0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20022060077  Analysis Date = 07/19/2002 
 Lab Value = 0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20021970116  Analysis Date = 07/19/2002 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20021960234  Analysis Date = 07/03/2002 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20021830026  Analysis Date = 07/01/2002 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20021790006  Analysis Date = 06/21/2002 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20021690011  Analysis Date = 06/21/2002 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20021650005  Analysis Date = 06/05/2002 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20021550019  Analysis Date = 06/05/2002 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20021510057  Analysis Date = 05/28/2002 
 Lab Value = 0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20021420157  Analysis Date = 05/16/2002 
 Lab Value = 0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20021330223  Analysis Date = 05/13/2002 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20021300001  Analysis Date = 05/03/2002 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20021210086  Analysis Date = 04/25/2002 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20021140037  Analysis Date = 04/25/2002 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20021140036  Analysis Date = 04/15/2002 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20021010016  Analysis Date = 04/04/2002 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20020930112  Analysis Date = 03/28/2002 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20020850091  Analysis Date = 03/26/2002 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20020810192  Analysis Date = 03/18/2002 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20020730104  Analysis Date = 03/11/2002 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20020670021  Analysis Date = 03/05/2002 
 Lab Value = 0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20020600005  Analysis Date = 02/28/2002 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20020570018  Analysis Date = 02/21/2002 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20020460048  Analysis Date = 02/07/2002 
 Lab Value = 0.041 
 RPT Level = 0.05 
 Lab Sample ID = 20020360005  Analysis Date = 02/07/2002 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20020320102  Analysis Date = 01/24/2002 
 Lab Value = 0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20020220079  Analysis Date = 01/16/2002 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20020110003  Analysis Date = 01/04/2002 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20020020005  Analysis Date = 01/02/2002 
 Lab Value = 0.054 
 RPT Level = 0.05 
 Lab Sample ID = 20013600207  Analysis Date = 12/21/2001 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20013520042  Analysis Date = 12/19/2001 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20013480008  Analysis Date = 12/07/2001 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20013390010  Analysis Date = 11/08/2001 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20013110130  Analysis Date = 09/30/2016 
 RPT Level = 0.07  Analysis Date = 09/22/2016 
 RPT Level = 0.07  Analysis Date = 09/22/2016 
 RPT Level = 0.07  Analysis Date = 09/15/2016 
 RPT Level = 0.07  Analysis Date = 09/15/2016 
 RPT Level = 0.07  Analysis Date = 09/13/2016 
 RPT Level = 0.07  Analysis Date = 09/13/2016 
 RPT Level = 0.07  Analysis Date = 08/30/2016 
 RPT Level = 0.07  Analysis Date = 08/30/2016 
 RPT Level = 0.07  Analysis Date = 08/22/2016 
 RPT Level = 0.07  Analysis Date = 08/22/2016 
 RPT Level = 0.07  Analysis Date = 08/11/2016 
 RPT Level = 0.07  Analysis Date = 08/11/2016 
 RPT Level = 0.07  Analysis Date = 08/08/2016 
 RPT Level = 0.07  Analysis Date = 08/08/2016 
 RPT Level = 0.07  Analysis Date = 08/02/2016 
 RPT Level = 0.07  Analysis Date = 08/02/2016 
 RPT Level = 0.07  Analysis Date = 07/25/2016 
 RPT Level = 0.07  Analysis Date = 07/25/2016 
 RPT Level = 0.07  Analysis Date = 07/15/2016 
 RPT Level = 0.07  Analysis Date = 07/15/2016 
 RPT Level = 0.07  Analysis Date = 07/12/2016 
 RPT Level = 0.07  Analysis Date = 07/12/2016 
 RPT Level = 0.07  Analysis Date = 07/05/2016 
 RPT Level = 0.07  Analysis Date = 07/05/2016 
 RPT Level = 0.07  Analysis Date = 06/24/2016 
 RPT Level = 0.07  Analysis Date = 06/24/2016 
 RPT Level = 0.07  Analysis Date = 06/21/2016 
 RPT Level = 0.07  Analysis Date = 06/21/2016 
 RPT Level = 0.07  Analysis Date = 06/14/2016 
 RPT Level = 0.07  Analysis Date = 06/14/2016 
 RPT Level = 0.07  Analysis Date = 06/10/2016 
 RPT Level = 0.07  Analysis Date = 06/10/2016 
 RPT Level = 0.07  Analysis Date = 06/10/2016 
 RPT Level = 0.07  Analysis Date = 06/10/2016 
 RPT Level = 0.07  Analysis Date = 05/24/2016 
 RPT Level = 0.07  Analysis Date = 05/24/2016 
 RPT Level = 0.07  Analysis Date = 05/10/2016 
 RPT Level = 0.07  Analysis Date = 05/10/2016 
 RPT Level = 0.07  Analysis Date = 05/03/2016 
 RPT Level = 0.07  Analysis Date = 05/03/2016 
 RPT Level = 0.07  Analysis Date = 04/26/2016 
 RPT Level = 0.07  Analysis Date = 04/26/2016 
 RPT Level = 0.07  Analysis Date = 04/18/2016 
 RPT Level = 0.07  Analysis Date = 04/18/2016 
 RPT Level = 0.07  Analysis Date = 04/07/2016 
 RPT Level = 0.07  Analysis Date = 04/07/2016 
 RPT Level = 0.07  Analysis Date = 03/31/2016 
 RPT Level = 0.07  Analysis Date = 03/31/2016 
 RPT Level = 0.07  Analysis Date = 03/28/2016 
 RPT Level = 0.07  Analysis Date = 03/28/2016 
 RPT Level = 0.07  Analysis Date = 03/17/2016 
 RPT Level = 0.07  Analysis Date = 03/17/2016 
 RPT Level = 0.07  Analysis Date = 03/11/2016 
 RPT Level = 0.07  Analysis Date = 03/11/2016 
 RPT Level = 0.07  Analysis Date = 03/04/2016 
 RPT Level = 0.07  Analysis Date = 03/04/2016 
 RPT Level = 0.07  Analysis Date = 02/29/2016 
 RPT Level = 0.07  Analysis Date = 02/29/2016 
 RPT Level = 0.07  Analysis Date = 02/18/2016 
 RPT Level = 0.07  Analysis Date = 02/18/2016 
 RPT Level = 0.07  Analysis Date = 02/16/2016 
 RPT Level = 0.07  Analysis Date = 02/16/2016 
 RPT Level = 0.07  Analysis Date = 02/03/2016 
 RPT Level = 0.07  Analysis Date = 02/03/2016 
 RPT Level = 0.07  Analysis Date = 02/01/2016 
 RPT Level = 0.07  Analysis Date = 02/01/2016 
 RPT Level = 0.07  Analysis Date = 01/21/2016 
 RPT Level = 0.07  Analysis Date = 01/21/2016 
 RPT Level = 0.07  Analysis Date = 01/14/2016 
 RPT Level = 0.07  Analysis Date = 01/14/2016 
 RPT Level = 0.07  Analysis Date = 01/08/2016 
 RPT Level = 0.07  Analysis Date = 01/08/2016 
 RPT Level = 0.07  Analysis Date = 01/04/2016 
 RPT Level = 0.07  Analysis Date = 01/04/2016 
 RPT Level = 0.07  Analysis Date = 12/23/2015 
 RPT Level = 0.07  Analysis Date = 12/23/2015 
 RPT Level = 0.07  Analysis Date = 12/21/2015 
 RPT Level = 0.07  Analysis Date = 12/21/2015 
 RPT Level = 0.07  Analysis Date = 12/15/2015 
 RPT Level = 0.07  Analysis Date = 12/15/2015 
 RPT Level = 0.07  Analysis Date = 12/04/2015 
 RPT Level = 0.07  Analysis Date = 12/04/2015 
 RPT Level = 0.07  Analysis Date = 12/04/2015 
 RPT Level = 0.07  Analysis Date = 12/04/2015 
 RPT Level = 0.07  Analysis Date = 11/24/2015 
 RPT Level = 0.07  Analysis Date = 11/24/2015 
 RPT Level = 0.07  Analysis Date = 11/17/2015 
 RPT Level = 0.07  Analysis Date = 11/17/2015 
 RPT Level = 0.07  Analysis Date = 11/04/2015 
 RPT Level = 0.07  Analysis Date = 11/04/2015 
 RPT Level = 0.07  Analysis Date = 11/02/2015 
 RPT Level = 0.07  Analysis Date = 11/02/2015 
 RPT Level = 0.07  Analysis Date = 10/26/2015 
 RPT Level = 0.07  Analysis Date = 10/26/2015 
 RPT Level = 0.07  Analysis Date = 10/22/2015 
 RPT Level = 0.07  Analysis Date = 10/22/2015 
 RPT Level = 0.07  Analysis Date = 10/14/2015 
 RPT Level = 0.07  Analysis Date = 10/14/2015 
 RPT Level = 0.07  Analysis Date = 10/07/2015 
 RPT Level = 0.07  Analysis Date = 10/07/2015 
 RPT Level = 0.07  Analysis Date = 09/30/2015 
 RPT Level = 0.07  Analysis Date = 09/30/2015 
 RPT Level = 0.07  Analysis Date = 09/28/2015 
 RPT Level = 0.07  Analysis Date = 09/28/2015 
 RPT Level = 0.07  Analysis Date = 09/22/2015 
 RPT Level = 0.07  Analysis Date = 09/22/2015 
 RPT Level = 0.07  Analysis Date = 09/16/2015 
 RPT Level = 0.07  Analysis Date = 09/16/2015 
 RPT Level = 0.07  Analysis Date = 09/01/2015 
 RPT Level = 0.07  Analysis Date = 09/01/2015 
 RPT Level = 0.07  Analysis Date = 09/01/2015 
 RPT Level = 0.07  Analysis Date = 09/01/2015 
 RPT Level = 0.07  Analysis Date = 08/19/2015 
 RPT Level = 0.07  Analysis Date = 08/19/2015 
 RPT Level = 0.07  Analysis Date = 08/10/2015 
 RPT Level = 0.07  Analysis Date = 08/10/2015 
 RPT Level = 0.07  Analysis Date = 07/31/2015 
 RPT Level = 0.07  Analysis Date = 07/31/2015 
 RPT Level = 0.07  Analysis Date = 07/27/2015 
 RPT Level = 0.07  Analysis Date = 07/27/2015 
 RPT Level = 0.07  Analysis Date = 07/23/2015 
 RPT Level = 0.07  Analysis Date = 07/23/2015 
 RPT Level = 0.07  Analysis Date = 07/14/2015 
 RPT Level = 0.07  Analysis Date = 07/14/2015 
 RPT Level = 0.07  Analysis Date = 07/10/2015 
 RPT Level = 0.07  Analysis Date = 07/10/2015 
 RPT Level = 0.07  Analysis Date = 07/01/2015 
 RPT Level = 0.07  Analysis Date = 07/01/2015 
 RPT Level = 0.07  Analysis Date = 06/26/2015 
 RPT Level = 0.07  Analysis Date = 06/26/2015 
 RPT Level = 0.07  Analysis Date = 06/23/2015 
 RPT Level = 0.07  Analysis Date = 06/23/2015 
 RPT Level = 0.07  Analysis Date = 06/16/2015 
 RPT Level = 0.07  Analysis Date = 06/16/2015 
 RPT Level = 0.07  Analysis Date = 06/05/2015 
 RPT Level = 0.07  Analysis Date = 06/05/2015 
 RPT Level = 0.07  Analysis Date = 05/29/2015 
 RPT Level = 0.07  Analysis Date = 05/29/2015 
 RPT Level = 0.07  Analysis Date = 05/20/2015 
 RPT Level = 0.07  Analysis Date = 05/20/2015 
 RPT Level = 0.07  Analysis Date = 05/13/2015 
 RPT Level = 0.07  Analysis Date = 05/13/2015 
 RPT Level = 0.07  Analysis Date = 05/08/2015 
 RPT Level = 0.07  Analysis Date = 05/08/2015 
 RPT Level = 0.07  Analysis Date = 05/01/2015 
 RPT Level = 0.07  Analysis Date = 05/01/2015 
 RPT Level = 0.07  Analysis Date = 04/22/2015 
 RPT Level = 0.07  Analysis Date = 04/22/2015 
 RPT Level = 0.07  Analysis Date = 04/17/2015 
 RPT Level = 0.07  Analysis Date = 04/17/2015 
 RPT Level = 0.07  Analysis Date = 04/02/2015 
 RPT Level = 0.07  Analysis Date = 04/02/2015 
 RPT Level = 0.07  Analysis Date = 03/30/2015 
 RPT Level = 0.07  Analysis Date = 03/30/2015 
 RPT Level = 0.07  Analysis Date = 03/19/2015 
 RPT Level = 0.07  Analysis Date = 03/19/2015 
 RPT Level = 0.07  Analysis Date = 03/13/2015 
 RPT Level = 0.07  Analysis Date = 03/13/2015 
 RPT Level = 0.07  Analysis Date = 03/04/2015 
 RPT Level = 0.07  Analysis Date = 03/04/2015 
 RPT Level = 0.07  Analysis Date = 02/25/2015 
 RPT Level = 0.07  Analysis Date = 02/25/2015 
 RPT Level = 0.07  Analysis Date = 02/20/2015 
 RPT Level = 0.07  Analysis Date = 02/20/2015 
 RPT Level = 0.07  Analysis Date = 02/12/2015 
 RPT Level = 0.07  Analysis Date = 02/12/2015 
 RPT Level = 0.07  Analysis Date = 02/06/2015 
 RPT Level = 0.07  Analysis Date = 02/06/2015 
 RPT Level = 0.07  Analysis Date = 02/03/2015 
 RPT Level = 0.07  Analysis Date = 02/03/2015 
 RPT Level = 0.07  Analysis Date = 01/23/2015 
 RPT Level = 0.07  Analysis Date = 01/23/2015 
 RPT Level = 0.07  Analysis Date = 01/16/2015 
 RPT Level = 0.07  Analysis Date = 01/16/2015 
 RPT Level = 0.07  Analysis Date = 01/08/2015 
 RPT Level = 0.07  Analysis Date = 01/08/2015 
 RPT Level = 0.07  Analysis Date = 01/08/2015 
 RPT Level = 0.07  Analysis Date = 01/08/2015 
 RPT Level = 0.07  Analysis Date = 12/31/2014 
 RPT Level = 0.07  Analysis Date = 12/31/2014 
 RPT Level = 0.07  Analysis Date = 12/19/2014 
 RPT Level = 0.07  Analysis Date = 12/19/2014 
 RPT Level = 0.07  Analysis Date = 12/10/2014 
 RPT Level = 0.07  Analysis Date = 12/10/2014 
 RPT Level = 0.07  Analysis Date = 12/05/2014 
 RPT Level = 0.07  Analysis Date = 12/05/2014 
 RPT Level = 0.07  Analysis Date = 12/05/2014 
 RPT Level = 0.07  Analysis Date = 12/05/2014 
 RPT Level = 0.07  Analysis Date = 12/03/2014 
 RPT Level = 0.07  Analysis Date = 12/03/2014 
 RPT Level = 0.07  Analysis Date = 11/26/2014 
 RPT Level = 0.07  Analysis Date = 11/26/2014 
 RPT Level = 0.07  Analysis Date = 11/18/2014 
 RPT Level = 0.07  Analysis Date = 11/18/2014 
 RPT Level = 0.07  Analysis Date = 11/06/2014 
 RPT Level = 0.07  Analysis Date = 11/06/2014 
 RPT Level = 0.07  Analysis Date = 11/06/2014 
 RPT Level = 0.07  Analysis Date = 11/06/2014 
 RPT Level = 0.07  Analysis Date = 10/31/2014 
 RPT Level = 0.07  Analysis Date = 10/31/2014 
 RPT Level = 0.07  Analysis Date = 10/24/2014 
 RPT Level = 0.07  Analysis Date = 10/24/2014 
 RPT Level = 0.07  Analysis Date = 10/24/2014 
 RPT Level = 0.07  Analysis Date = 10/24/2014 
 RPT Level = 0.07  Analysis Date = 10/21/2014 
 RPT Level = 0.07  Analysis Date = 10/21/2014 
 RPT Level = 0.07  Analysis Date = 10/14/2014 
 RPT Level = 0.07  Analysis Date = 10/14/2014 
 RPT Level = 0.07  Analysis Date = 10/03/2014 
 RPT Level = 0.07  Analysis Date = 10/03/2014 
 RPT Level = 0.07  Analysis Date = 10/08/2014 
 RPT Level = 0.07  Analysis Date = 10/08/2014 
 RPT Level = 0.07  Analysis Date = 09/09/2014 
 RPT Level = 0.07  Analysis Date = 09/09/2014 
 RPT Level = 0.07  Analysis Date = 08/28/2014 
 RPT Level = 0.07  Analysis Date = 08/28/2014 
 RPT Level = 0.07  Analysis Date = 08/21/2014 
 RPT Level = 0.07  Analysis Date = 08/21/2014 
 RPT Level = 0.07  Analysis Date = 08/07/2014 
 RPT Level = 0.07  Analysis Date = 08/07/2014 
 RPT Level = 0.07  Analysis Date = 08/01/2014 
 RPT Level = 0.07  Analysis Date = 08/01/2014 
 RPT Level = 0.07  Analysis Date = 07/29/2014 
 RPT Level = 0.07  Analysis Date = 07/29/2014 
 RPT Level = 0.07  Analysis Date = 07/25/2014 
 RPT Level = 0.07  Analysis Date = 07/25/2014 
 RPT Level = 0.07  Analysis Date = 07/17/2014 
 RPT Level = 0.07  Analysis Date = 07/17/2014 
 RPT Level = 0.07  Analysis Date = 07/10/2014 
 RPT Level = 0.07  Analysis Date = 07/10/2014 
 RPT Level = 0.07  Analysis Date = 07/01/2014 
 RPT Level = 0.07  Analysis Date = 07/01/2014 
 RPT Level = 0.07  Analysis Date = 06/26/2014 
 RPT Level = 0.07  Analysis Date = 06/26/2014 
 RPT Level = 0.07  Analysis Date = 06/17/2014 
 RPT Level = 0.07  Analysis Date = 06/17/2014 
 RPT Level = 0.07  Analysis Date = 06/04/2014 
 RPT Level = 0.07  Analysis Date = 06/04/2014 
 RPT Level = 0.07  Analysis Date = 05/27/2014 
 RPT Level = 0.07  Analysis Date = 05/27/2014 
 RPT Level = 0.07  Analysis Date = 05/07/2014 
 RPT Level = 0.07  Analysis Date = 05/07/2014 
 RPT Level = 0.07  Analysis Date = 05/05/2014 
 RPT Level = 0.07  Analysis Date = 05/05/2014 
 RPT Level = 0.07  Analysis Date = 04/29/2014 
 RPT Level = 0.07  Analysis Date = 04/29/2014 
 RPT Level = 0.07  Analysis Date = 04/21/2014 
 RPT Level = 0.07  Analysis Date = 04/21/2014 
 RPT Level = 0.07  Analysis Date = 04/10/2014 
 RPT Level = 0.07  Analysis Date = 04/10/2014 
 RPT Level = 0.07  Analysis Date = 04/01/2014 
 RPT Level = 0.07  Analysis Date = 04/01/2014 
 RPT Level = 0.07  Analysis Date = 03/28/2014 
 RPT Level = 0.07  Analysis Date = 03/28/2014 
 RPT Level = 0.07  Analysis Date = 03/24/2014 
 RPT Level = 0.07  Analysis Date = 03/24/2014 
 RPT Level = 0.07  Analysis Date = 03/18/2014 
 RPT Level = 0.07  Analysis Date = 03/18/2014 
 RPT Level = 0.07  Analysis Date = 03/13/2014 
 RPT Level = 0.07  Analysis Date = 03/13/2014 
 RPT Level = 0.07  Analysis Date = 03/03/2014 
 RPT Level = 0.07  Analysis Date = 03/03/2014 
 RPT Level = 0.07  Analysis Date = 02/27/2014 
 RPT Level = 0.07  Analysis Date = 02/27/2014 
 RPT Level = 0.07  Analysis Date = 02/25/2014 
 RPT Level = 0.07  Analysis Date = 02/25/2014 
 RPT Level = 0.07  Analysis Date = 02/28/2014 
 RPT Level = 0.07  Analysis Date = 02/28/2014 
 RPT Level = 0.07  Analysis Date = 02/10/2014 
 RPT Level = 0.07  Analysis Date = 02/10/2014 
 RPT Level = 0.07  Analysis Date = 01/27/2014 
 RPT Level = 0.07  Analysis Date = 01/27/2014 
 RPT Level = 0.07  Analysis Date = 01/14/2014 
 RPT Level = 0.07  Analysis Date = 01/14/2014 
 RPT Level = 0.07  Analysis Date = 01/10/2014 
 RPT Level = 0.07  Analysis Date = 01/10/2014 
 RPT Level = 0.07  Analysis Date = 12/31/2013 
 RPT Level = 0.07  Analysis Date = 12/31/2013 
 RPT Level = 0.07  Analysis Date = 12/20/2013 
 RPT Level = 0.07  Analysis Date = 12/20/2013 
 RPT Level = 0.07  Analysis Date = 12/20/2013 
 RPT Level = 0.07  Analysis Date = 12/20/2013 
 RPT Level = 0.07  Analysis Date = 12/06/2013 
 RPT Level = 0.07  Analysis Date = 12/06/2013 
 RPT Level = 0.07  Analysis Date = 12/04/2013 
 RPT Level = 0.07  Analysis Date = 12/04/2013 
 RPT Level = 0.07  Analysis Date = 11/27/2013 
 RPT Level = 0.07  Analysis Date = 11/27/2013 
 RPT Level = 0.07  Analysis Date = 11/22/2013 
 RPT Level = 0.07  Analysis Date = 11/22/2013 
 RPT Level = 0.07  Analysis Date = 11/14/2013 
 RPT Level = 0.07  Analysis Date = 11/14/2013 
 RPT Level = 0.07  Analysis Date = 11/07/2013 
 RPT Level = 0.07  Analysis Date = 11/07/2013 
 RPT Level = 0.07  Analysis Date = 11/01/2013 
 RPT Level = 0.07  Analysis Date = 11/01/2013 
 RPT Level = 0.07  Analysis Date = 10/30/2013 
 RPT Level = 0.07  Analysis Date = 10/30/2013 
 RPT Level = 0.07  Analysis Date = 10/21/2013 
 RPT Level = 0.07  Analysis Date = 10/21/2013 
 RPT Level = 0.07  Analysis Date = 09/24/2013 
 RPT Level = 0.07  Analysis Date = 09/24/2013 
 RPT Level = 0.07  Analysis Date = 09/18/2013 
 RPT Level = 0.07  Analysis Date = 09/18/2013 
 RPT Level = 0.07  Analysis Date = 09/09/2013 
 RPT Level = 0.07  Analysis Date = 09/09/2013 
 RPT Level = 0.07  Analysis Date = 09/03/2013 
 RPT Level = 0.07  Analysis Date = 09/03/2013 
 RPT Level = 0.07  Analysis Date = 08/29/2013 
 RPT Level = 0.07  Analysis Date = 08/29/2013 
 RPT Level = 0.07  Analysis Date = 08/19/2013 
 RPT Level = 0.07  Analysis Date = 08/19/2013 
 RPT Level = 0.07  Analysis Date = 08/15/2013 
 RPT Level = 0.07  Analysis Date = 08/15/2013 
 RPT Level = 0.07  Analysis Date = 08/02/2013 
 RPT Level = 0.07  Analysis Date = 08/02/2013 
 RPT Level = 0.07  Analysis Date = 07/29/2013 
 RPT Level = 0.07  Analysis Date = 07/29/2013 
 RPT Level = 0.07  Analysis Date = 07/17/2013 
 RPT Level = 0.07  Analysis Date = 07/17/2013 
 RPT Level = 0.07  Analysis Date = 07/11/2013 
 RPT Level = 0.07  Analysis Date = 07/11/2013 
 RPT Level = 0.07  Analysis Date = 07/03/2013 
 RPT Level = 0.07  Analysis Date = 07/03/2013 
 RPT Level = 0.07  Analysis Date = 07/02/2013 
 RPT Level = 0.07  Analysis Date = 07/02/2013 
 RPT Level = 0.07  Analysis Date = 06/21/2013 
 RPT Level = 0.07  Analysis Date = 06/21/2013 
 RPT Level = 0.07  Analysis Date = 06/19/2013 
 RPT Level = 0.07  Analysis Date = 06/19/2013 
 RPT Level = 0.07  Analysis Date = 06/12/2013 
 RPT Level = 0.07  Analysis Date = 06/12/2013 
 RPT Level = 0.07  Analysis Date = 06/11/2013 
 RPT Level = 0.07  Analysis Date = 06/11/2013 
 RPT Level = 0.07  Analysis Date = 06/07/2013 
 RPT Level = 0.07  Analysis Date = 06/07/2013 
 RPT Level = 0.07  Analysis Date = 05/28/2013 
 RPT Level = 0.07  Analysis Date = 05/28/2013 
 RPT Level = 0.07  Analysis Date = 05/16/2013 
 RPT Level = 0.07  Analysis Date = 05/16/2013 
 RPT Level = 0.07  Analysis Date = 05/03/2013 
 RPT Level = 0.07  Analysis Date = 05/03/2013 
 RPT Level = 0.07  Analysis Date = 04/30/2013 
 RPT Level = 0.07  Analysis Date = 04/30/2013 
 RPT Level = 0.07  Analysis Date = 04/26/2013 
 RPT Level = 0.07  Analysis Date = 04/26/2013 
 RPT Level = 0.07  Analysis Date = 04/25/2013 
 RPT Level = 0.07  Analysis Date = 04/25/2013 
 RPT Level = 0.07  Analysis Date = 04/09/2013 
 RPT Level = 0.07  Analysis Date = 04/09/2013 
 RPT Level = 0.07  Analysis Date = 03/28/2013 
 RPT Level = 0.07  Analysis Date = 03/28/2013 
 RPT Level = 0.07  Analysis Date = 03/21/2013 
 RPT Level = 0.07  Analysis Date = 03/21/2013 
 RPT Level = 0.07  Analysis Date = 03/18/2013 
 RPT Level = 0.07  Analysis Date = 03/18/2013 
 RPT Level = 0.07  Analysis Date = 03/12/2013 
 RPT Level = 0.07  Analysis Date = 03/12/2013 
 RPT Level = 0.07  Analysis Date = 03/07/2013 
 RPT Level = 0.07  Analysis Date = 03/07/2013 
 RPT Level = 0.07  Analysis Date = 03/05/2013 
 RPT Level = 0.07  Analysis Date = 03/05/2013 
 RPT Level = 0.07  Analysis Date = 02/26/2013 
 RPT Level = 0.07  Analysis Date = 02/26/2013 
 RPT Level = 0.07  Analysis Date = 02/06/2013 
 RPT Level = 0.07  Analysis Date = 02/06/2013 
 RPT Level = 0.07  Analysis Date = 01/31/2013 
 RPT Level = 0.07  Analysis Date = 01/31/2013 
 RPT Level = 0.07  Analysis Date = 01/28/2013 
 RPT Level = 0.07  Analysis Date = 01/28/2013 
 RPT Level = 0.07  Analysis Date = 01/18/2013 
 RPT Level = 0.07  Analysis Date = 01/18/2013 
 RPT Level = 0.07  Analysis Date = 01/11/2013 
 RPT Level = 0.07  Analysis Date = 01/11/2013 
 RPT Level = 0.07  Analysis Date = 01/07/2013 
 RPT Level = 0.07  Analysis Date = 01/07/2013 
 RPT Level = 0.07  Analysis Date = 01/04/2013 
 RPT Level = 0.07  Analysis Date = 01/04/2013 
 RPT Level = 0.07  Analysis Date = 12/20/2012 
 RPT Level = 0.07  Analysis Date = 12/20/2012 
 RPT Level = 0.07  Analysis Date = 12/20/2012 
 RPT Level = 0.07  Analysis Date = 12/20/2012 
 RPT Level = 0.07  Analysis Date = 12/12/2012 
 RPT Level = 0.07  Analysis Date = 12/12/2012 
 RPT Level = 0.07  Analysis Date = 12/03/2012 
 RPT Level = 0.07  Analysis Date = 12/03/2012 
 RPT Level = 0.07  Analysis Date = 11/27/2012 
 RPT Level = 0.07  Analysis Date = 11/27/2012 
 RPT Level = 0.07  Analysis Date = 11/19/2012 
 RPT Level = 0.07  Analysis Date = 11/19/2012 
 RPT Level = 0.07  Analysis Date = 11/13/2012 
 RPT Level = 0.07  Analysis Date = 11/13/2012 
 RPT Level = 0.07  Analysis Date = 11/05/2012 
 RPT Level = 0.07  Analysis Date = 11/05/2012 
 RPT Level = 0.07  Analysis Date = 10/31/2012 
 RPT Level = 0.07  Analysis Date = 10/31/2012 
 RPT Level = 0.07  Analysis Date = 10/18/2012 
 RPT Level = 0.07  Analysis Date = 10/18/2012 
 RPT Level = 0.07  Analysis Date = 10/11/2012 
 RPT Level = 0.07  Analysis Date = 10/11/2012 
 RPT Level = 0.07  Analysis Date = 10/04/2012 
 RPT Level = 0.07  Analysis Date = 10/04/2012 
 RPT Level = 0.07  Analysis Date = 10/04/2012 
 RPT Level = 0.07  Analysis Date = 10/04/2012 
 RPT Level = 0.07  Analysis Date = 10/02/2012 
 RPT Level = 0.07  Analysis Date = 10/02/2012 
 RPT Level = 0.07  Analysis Date = 09/14/2012 
 RPT Level = 0.07  Analysis Date = 09/14/2012 
 RPT Level = 0.07  Analysis Date = 09/12/2012 
 RPT Level = 0.07  Analysis Date = 09/12/2012 
 RPT Level = 0.07  Analysis Date = 09/10/2012 
 RPT Level = 0.07  Analysis Date = 09/10/2012 
 RPT Level = 0.07  Analysis Date = 08/30/2012 
 RPT Level = 0.07  Analysis Date = 08/30/2012 
 RPT Level = 0.07  Analysis Date = 08/23/2012 
 RPT Level = 0.07  Analysis Date = 08/23/2012 
 RPT Level = 0.07  Analysis Date = 08/08/2012 
 RPT Level = 0.07  Analysis Date = 08/08/2012 
 RPT Level = 0.07  Analysis Date = 08/03/2012 
 RPT Level = 0.07  Analysis Date = 08/03/2012 
 RPT Level = 0.07  Analysis Date = 07/27/2012 
 RPT Level = 0.07  Analysis Date = 07/27/2012 
 RPT Level = 0.07  Analysis Date = 07/18/2012 
 RPT Level = 0.07  Analysis Date = 07/18/2012 
 RPT Level = 0.07  Analysis Date = 07/10/2012 
 RPT Level = 0.07  Analysis Date = 07/10/2012 
 RPT Level = 0.07  Analysis Date = 07/10/2012 
 RPT Level = 0.07  Analysis Date = 07/10/2012 
 RPT Level = 0.07  Analysis Date = 06/28/2012 
 RPT Level = 0.07  Analysis Date = 06/28/2012 
 RPT Level = 0.07  Analysis Date = 06/20/2012 
 RPT Level = 0.07  Analysis Date = 06/20/2012 
 RPT Level = 0.07  Analysis Date = 06/15/2012 
 RPT Level = 0.07  Analysis Date = 06/15/2012 
 RPT Level = 0.07  Analysis Date = 06/07/2012 
 RPT Level = 0.07  Analysis Date = 06/07/2012 
 RPT Level = 0.07  Analysis Date = 06/05/2012 
 RPT Level = 0.07  Analysis Date = 06/05/2012 
 RPT Level = 0.07  Analysis Date = 05/24/2012 
 RPT Level = 0.07  Analysis Date = 05/24/2012 
 RPT Level = 0.07  Analysis Date = 05/18/2012 
 RPT Level = 0.07  Analysis Date = 05/18/2012 
 RPT Level = 0.07  Analysis Date = 05/11/2012 
 RPT Level = 0.07  Analysis Date = 05/11/2012 
 RPT Level = 0.07  Analysis Date = 05/03/2012 
 RPT Level = 0.07  Analysis Date = 05/03/2012 
 RPT Level = 0.07  Analysis Date = 04/27/2012 
 RPT Level = 0.07  Analysis Date = 04/27/2012 
 RPT Level = 0.07  Analysis Date = 04/25/2012 
 RPT Level = 0.07  Analysis Date = 04/25/2012 
 RPT Level = 0.07  Analysis Date = 04/18/2012 
 RPT Level = 0.07  Analysis Date = 04/18/2012 
 RPT Level = 0.07  Analysis Date = 04/13/2012 
 RPT Level = 0.07  Analysis Date = 04/13/2012 
 RPT Level = 0.07  Analysis Date = 04/11/2012 
 RPT Level = 0.07  Analysis Date = 04/11/2012 
 RPT Level = 0.07  Analysis Date = 04/06/2012 
 RPT Level = 0.07  Analysis Date = 04/06/2012 
 RPT Level = 0.07  Analysis Date = 03/15/2012 
 RPT Level = 0.07  Analysis Date = 03/15/2012 
 RPT Level = 0.07  Analysis Date = 03/07/2012 
 RPT Level = 0.07  Analysis Date = 03/07/2012 
 RPT Level = 0.07  Analysis Date = 02/29/2012 
 RPT Level = 0.07  Analysis Date = 02/29/2012 
 RPT Level = 0.07  Analysis Date = 02/24/2012 
 RPT Level = 0.07  Analysis Date = 02/24/2012 
 RPT Level = 0.07  Analysis Date = 02/16/2012 
 RPT Level = 0.07  Analysis Date = 02/16/2012 
 RPT Level = 0.07  Analysis Date = 02/08/2012 
 RPT Level = 0.07  Analysis Date = 02/08/2012 
 RPT Level = 0.07  Analysis Date = 02/07/2012 
 RPT Level = 0.07  Analysis Date = 02/07/2012 
 RPT Level = 0.07  Analysis Date = 01/26/2012 
 RPT Level = 0.07  Analysis Date = 01/26/2012 
 RPT Level = 0.07  Analysis Date = 01/19/2012 
 RPT Level = 0.07  Analysis Date = 01/19/2012 
 RPT Level = 0.07  Analysis Date = 01/17/2012 
 RPT Level = 0.07  Analysis Date = 01/17/2012 
 RPT Level = 0.07  Analysis Date = 01/09/2012 
 RPT Level = 0.07  Analysis Date = 01/09/2012 
 RPT Level = 0.07  Analysis Date = 12/29/2011 
 RPT Level = 0.07  Analysis Date = 12/29/2011 
 RPT Level = 0.07  Analysis Date = 12/22/2011 
 RPT Level = 0.07  Analysis Date = 12/22/2011 
 RPT Level = 0.07  Analysis Date = 12/16/2011 
 RPT Level = 0.07  Analysis Date = 12/16/2011 
 RPT Level = 0.07  Analysis Date = 12/15/2011 
 RPT Level = 0.07  Analysis Date = 12/15/2011 
 RPT Level = 0.07  Analysis Date = 12/02/2011 
 RPT Level = 0.07  Analysis Date = 12/02/2011 
 RPT Level = 0.07  Analysis Date = 11/30/2011 
 RPT Level = 0.07  Analysis Date = 11/30/2011 
 RPT Level = 0.07  Analysis Date = 11/23/2011 
 RPT Level = 0.07  Analysis Date = 11/23/2011 
 RPT Level = 0.07  Analysis Date = 11/10/2011 
 RPT Level = 0.07  Analysis Date = 11/10/2011 
 RPT Level = 0.07  Analysis Date = 11/08/2011 
 RPT Level = 0.07  Analysis Date = 11/08/2011 
 RPT Level = 0.07  Analysis Date = 11/02/2011 
 RPT Level = 0.07  Analysis Date = 11/02/2011 
 RPT Level = 0.07  Analysis Date = 10/28/2011 
 RPT Level = 0.07  Analysis Date = 10/28/2011 
 RPT Level = 0.07  Analysis Date = 10/18/2011 
 RPT Level = 0.07  Analysis Date = 10/18/2011 
 RPT Level = 0.07  Analysis Date = 10/05/2011 
 RPT Level = 0.05  Analysis Date = 10/05/2011 
 RPT Level = 0.05  Analysis Date = 09/30/2011 
 RPT Level = 0.05  Analysis Date = 09/30/2011 
 RPT Level = 0.05  Analysis Date = 09/23/2011 
 RPT Level = 0.05  Analysis Date = 09/23/2011 
 RPT Level = 0.05  Analysis Date = 09/16/2011 
 RPT Level = 0.05  Analysis Date = 09/16/2011 
 RPT Level = 0.05  Analysis Date = 09/13/2011 
 RPT Level = 0.05  Analysis Date = 09/13/2011 
 RPT Level = 0.05  Analysis Date = 09/13/2011 
 RPT Level = 0.05  Analysis Date = 09/13/2011 
 RPT Level = 0.05  Analysis Date = 08/30/2011 
 RPT Level = 0.05  Analysis Date = 08/30/2011 
 RPT Level = 0.05  Analysis Date = 08/23/2011 
 RPT Level = 0.05  Analysis Date = 08/23/2011 
 RPT Level = 0.05  Analysis Date = 08/15/2011 
 RPT Level = 0.05  Analysis Date = 08/15/2011 
 RPT Level = 0.05  Analysis Date = 08/04/2011 
 RPT Level = 0.05  Analysis Date = 08/04/2011 
 RPT Level = 0.05  Analysis Date = 08/02/2011 
 RPT Level = 0.05  Analysis Date = 08/02/2011 
 RPT Level = 0.05  Analysis Date = 07/28/2011 
 RPT Level = 0.05  Analysis Date = 07/28/2011 
 RPT Level = 0.05  Analysis Date = 07/13/2011 
 RPT Level = 0.05  Analysis Date = 07/13/2011 
 RPT Level = 0.05  Analysis Date = 07/07/2011 
 RPT Level = 0.05  Analysis Date = 07/07/2011 
 RPT Level = 0.05  Analysis Date = 07/01/2011 
 RPT Level = 0.05  Analysis Date = 07/01/2011 
 RPT Level = 0.05  Analysis Date = 06/23/2011 
 RPT Level = 0.05  Analysis Date = 06/23/2011 
 RPT Level = 0.05  Analysis Date = 06/17/2011 
 RPT Level = 0.05  Analysis Date = 06/17/2011 
 RPT Level = 0.05  Analysis Date = 06/15/2011 
 RPT Level = 0.05  Analysis Date = 06/15/2011 
 RPT Level = 0.05  Analysis Date = 06/08/2011 
 RPT Level = 0.05  Analysis Date = 06/08/2011 
 RPT Level = 0.05  Analysis Date = 05/26/2011 
 RPT Level = 0.05  Analysis Date = 05/26/2011 
 RPT Level = 0.05  Analysis Date = 05/19/2011 
 RPT Level = 0.05  Analysis Date = 05/19/2011 
 RPT Level = 0.05  Analysis Date = 05/11/2011 
 RPT Level = 0.05  Analysis Date = 05/11/2011 
 RPT Level = 0.05  Analysis Date = 05/09/2011 
 RPT Level = 0.05  Analysis Date = 05/09/2011 
 RPT Level = 0.05  Analysis Date = 05/03/2011 
 RPT Level = 0.05  Analysis Date = 05/03/2011 
 RPT Level = 0.05  Analysis Date = 04/20/2011 
 RPT Level = 0.05  Analysis Date = 04/20/2011 
 RPT Level = 0.05  Analysis Date = 04/18/2011 
 RPT Level = 0.05  Analysis Date = 04/18/2011 
 RPT Level = 0.05  Analysis Date = 04/07/2011 
 RPT Level = 0.05  Analysis Date = 04/07/2011 
 RPT Level = 0.05  Analysis Date = 03/30/2011 
 RPT Level = 0.05  Analysis Date = 03/30/2011 
 RPT Level = 0.05  Analysis Date = 03/22/2011 
 RPT Level = 0.05  Analysis Date = 03/22/2011 
 RPT Level = 0.05  Analysis Date = 03/17/2011 
 RPT Level = 0.05  Analysis Date = 03/17/2011 
 RPT Level = 0.05  Analysis Date = 03/09/2011 
 RPT Level = 0.05  Analysis Date = 03/09/2011 
 RPT Level = 0.05  Analysis Date = 03/04/2011 
 RPT Level = 0.05  Analysis Date = 03/04/2011 
 RPT Level = 0.05  Analysis Date = 02/24/2011 
 RPT Level = 0.05  Analysis Date = 02/24/2011 
 RPT Level = 0.05  Analysis Date = 02/16/2011 
 RPT Level = 0.05  Analysis Date = 02/16/2011 
 RPT Level = 0.05  Analysis Date = 02/14/2011 
 RPT Level = 0.05  Analysis Date = 02/14/2011 
 RPT Level = 0.05  Analysis Date = 02/10/2011 
 RPT Level = 0.05  Analysis Date = 02/10/2011 
 RPT Level = 0.05  Analysis Date = 01/26/2011 
 RPT Level = 0.05  Analysis Date = 01/26/2011 
 RPT Level = 0.05  Analysis Date = 01/20/2011 
 RPT Level = 0.05  Analysis Date = 01/20/2011 
 RPT Level = 0.05  Analysis Date = 01/18/2011 
 RPT Level = 0.05  Analysis Date = 01/18/2011 
 RPT Level = 0.05  Analysis Date = 01/06/2011 
 RPT Level = 0.05  Analysis Date = 01/06/2011 
 RPT Level = 0.05  Analysis Date = 12/29/2010 
 RPT Level = 0.05  Analysis Date = 12/29/2010 
 RPT Level = 0.05  Analysis Date = 12/22/2010 
 RPT Level = 0.05  Analysis Date = 12/22/2010 
 RPT Level = 0.05  Analysis Date = 12/29/2010 
 RPT Level = 0.05  Analysis Date = 12/29/2010 
 RPT Level = 0.05  Analysis Date = 12/13/2010 
 RPT Level = 0.05  Analysis Date = 12/13/2010 
 RPT Level = 0.05  Analysis Date = 12/07/2010 
 RPT Level = 0.05  Analysis Date = 12/07/2010 
 RPT Level = 0.05  Analysis Date = 12/03/2010 
 RPT Level = 0.05  Analysis Date = 12/03/2010 
 RPT Level = 0.05  Analysis Date = 11/18/2010 
 RPT Level = 0.05  Analysis Date = 11/18/2010 
 RPT Level = 0.05  Analysis Date = 11/16/2010 
 RPT Level = 0.05  Analysis Date = 11/16/2010 
 RPT Level = 0.05  Analysis Date = 11/09/2010 
 RPT Level = 0.05  Analysis Date = 11/09/2010 
 RPT Level = 0.05  Analysis Date = 11/02/2010 
 RPT Level = 0.05  Analysis Date = 11/02/2010 
 RPT Level = 0.05  Analysis Date = 10/22/2010 
 RPT Level = 0.05  Analysis Date = 10/22/2010 
 RPT Level = 0.05  Analysis Date = 10/15/2010 
 RPT Level = 0.05  Analysis Date = 10/15/2010 
 RPT Level = 0.05  Analysis Date = 10/14/2010 
 RPT Level = 0.05  Analysis Date = 10/14/2010 
 RPT Level = 0.05  Analysis Date = 10/05/2010 
 RPT Level = 0.05  Analysis Date = 10/05/2010 
 RPT Level = 0.05  Analysis Date = 10/01/2010 
 RPT Level = 0.05  Analysis Date = 10/01/2010 
 RPT Level = 0.05  Analysis Date = 09/24/2010 
 RPT Level = 0.05  Analysis Date = 09/24/2010 
 RPT Level = 0.05  Analysis Date = 09/16/2010 
 RPT Level = 0.05  Analysis Date = 09/16/2010 
 RPT Level = 0.05  Analysis Date = 09/15/2010 
 RPT Level = 0.05  Analysis Date = 09/15/2010 
 RPT Level = 0.05  Analysis Date = 09/07/2010 
 RPT Level = 0.05  Analysis Date = 09/07/2010 
 RPT Level = 0.05  Analysis Date = 08/20/2010 
 RPT Level = 0.05  Analysis Date = 08/20/2010 
 RPT Level = 0.05  Analysis Date = 08/16/2010 
 RPT Level = 0.05  Analysis Date = 08/16/2010 
 RPT Level = 0.05  Analysis Date = 08/05/2010 
 RPT Level = 0.05  Analysis Date = 08/05/2010 
 RPT Level = 0.05  Analysis Date = 07/28/2010 
 RPT Level = 0.05  Analysis Date = 07/28/2010 
 RPT Level = 0.05  Analysis Date = 07/23/2010 
 RPT Level = 0.05  Analysis Date = 07/23/2010 
 RPT Level = 0.05  Analysis Date = 07/14/2010 
 RPT Level = 0.05  Analysis Date = 07/14/2010 
 RPT Level = 0.05  Analysis Date = 07/08/2010 
 RPT Level = 0.05  Analysis Date = 07/08/2010 
 RPT Level = 0.05  Analysis Date = 07/07/2010 
 RPT Level = 0.05  Analysis Date = 07/07/2010 
 RPT Level = 0.05  Analysis Date = 07/01/2010 
 RPT Level = 0.05  Analysis Date = 07/01/2010 
 RPT Level = 0.05  Analysis Date = 06/24/2010 
 RPT Level = 0.05  Analysis Date = 06/24/2010 
 RPT Level = 0.05  Analysis Date = 06/18/2010 
 RPT Level = 0.05  Analysis Date = 06/18/2010 
 RPT Level = 0.05  Analysis Date = 06/10/2010 
 RPT Level = 0.05  Analysis Date = 06/10/2010 
 RPT Level = 0.05  Analysis Date = 05/28/2010 
 RPT Level = 0.05  Analysis Date = 05/28/2010 
 RPT Level = 0.05  Analysis Date = 05/26/2010 
 RPT Level = 0.05  Analysis Date = 05/26/2010 
 RPT Level = 0.05  Analysis Date = 05/19/2010 
 RPT Level = 0.05  Analysis Date = 05/19/2010 
 RPT Level = 0.05  Analysis Date = 05/12/2010 
 RPT Level = 0.05  Analysis Date = 05/12/2010 
 RPT Level = 0.05  Analysis Date = 05/05/2010 
 RPT Level = 0.05  Analysis Date = 05/05/2010 
 RPT Level = 0.05  Analysis Date = 04/28/2010 
 RPT Level = 0.05  Analysis Date = 04/28/2010 
 RPT Level = 0.05  Analysis Date = 04/16/2010 
 RPT Level = 0.05  Analysis Date = 04/16/2010 
 RPT Level = 0.05  Analysis Date = 04/08/2010 
 RPT Level = 0.05  Analysis Date = 04/08/2010 
 RPT Level = 0.05  Analysis Date = 04/05/2010 
 RPT Level = 0.05  Analysis Date = 04/05/2010 
 RPT Level = 0.05  Analysis Date = 03/29/2010 
 RPT Level = 0.05  Analysis Date = 03/29/2010 
 RPT Level = 0.05  Analysis Date = 03/18/2010 
 RPT Level = 0.05  Analysis Date = 03/18/2010 
 RPT Level = 0.05  Analysis Date = 03/11/2010 
 RPT Level = 0.05  Analysis Date = 03/11/2010 
 RPT Level = 0.05  Analysis Date = 03/03/2010 
 RPT Level = 0.05  Analysis Date = 03/03/2010 
 RPT Level = 0.05  Analysis Date = 02/25/2010 
 RPT Level = 0.05  Analysis Date = 02/25/2010 
 RPT Level = 0.05  Analysis Date = 02/19/2010 
 RPT Level = 0.05  Analysis Date = 02/19/2010 
 RPT Level = 0.05  Analysis Date = 02/11/2010 
 RPT Level = 0.05  Analysis Date = 02/11/2010 
 RPT Level = 0.05  Analysis Date = 02/04/2010 
 RPT Level = 0.05  Analysis Date = 02/04/2010 
 RPT Level = 0.05  Analysis Date = 01/29/2010 
 RPT Level = 0.05  Analysis Date = 01/29/2010 
 RPT Level = 0.05  Analysis Date = 01/22/2010 
 RPT Level = 0.05  Analysis Date = 01/22/2010 
 RPT Level = 0.05  Analysis Date = 01/14/2010 
 RPT Level = 0.05  Analysis Date = 01/14/2010 
 RPT Level = 0.05  Analysis Date = 01/07/2010 
 RPT Level = 0.05  Analysis Date = 01/07/2010 
 RPT Level = 0.05  Analysis Date = 01/05/2010 
 RPT Level = 0.05  Analysis Date = 01/05/2010 
 RPT Level = 0.05  Analysis Date = 01/04/2010 
 RPT Level = 0.05  Analysis Date = 01/04/2010 
 RPT Level = 0.05  Analysis Date = 12/29/2009 
 RPT Level = 0.05  Analysis Date = 12/29/2009 
 RPT Level = 0.05  Analysis Date = 12/16/2009 
 RPT Level = 0.05  Analysis Date = 12/16/2009 
 RPT Level = 0.05  Analysis Date = 12/15/2009 
 RPT Level = 0.05  Analysis Date = 12/15/2009 
 RPT Level = 0.05  Analysis Date = 12/03/2009 
 RPT Level = 0.05  Analysis Date = 12/03/2009 
 RPT Level = 0.05  Analysis Date = 11/19/2009 
 RPT Level = 0.05  Analysis Date = 11/19/2009 
 RPT Level = 0.05  Analysis Date = 11/17/2009 
 RPT Level = 0.05  Analysis Date = 11/17/2009 
 RPT Level = 0.05  Analysis Date = 11/16/2009 
 RPT Level = 0.05  Analysis Date = 11/16/2009 
 RPT Level = 0.05  Analysis Date = 11/10/2009 
 RPT Level = 0.05  Analysis Date = 11/10/2009 
 RPT Level = 0.05  Analysis Date = 11/03/2009 
 RPT Level = 0.05  Analysis Date = 11/03/2009 
 RPT Level = 0.05  Analysis Date = 10/22/2009 
 RPT Level = 0.05  Analysis Date = 10/22/2009 
 RPT Level = 0.05  Analysis Date = 10/08/2009 
 RPT Level = 0.05  Analysis Date = 10/08/2009 
 RPT Level = 0.05  Analysis Date = 10/08/2009 
 RPT Level = 0.05  Analysis Date = 10/08/2009 
 RPT Level = 0.05  Analysis Date = 09/29/2009 
 RPT Level = 0.05  Analysis Date = 09/29/2009 
 RPT Level = 0.05  Analysis Date = 09/22/2009 
 RPT Level = 0.05  Analysis Date = 09/22/2009 
 RPT Level = 0.05  Analysis Date = 09/16/2009 
 RPT Level = 0.05  Analysis Date = 09/16/2009 
 RPT Level = 0.05  Analysis Date = 09/03/2009 
 RPT Level = 0.05  Analysis Date = 09/03/2009 
 RPT Level = 0.05  Analysis Date = 08/27/2009 
 RPT Level = 0.05  Analysis Date = 08/27/2009 
 RPT Level = 0.05  Analysis Date = 08/20/2009 
 RPT Level = 0.05  Analysis Date = 08/20/2009 
 RPT Level = 0.05  Analysis Date = 08/13/2009 
 RPT Level = 0.05  Analysis Date = 08/13/2009 
 RPT Level = 0.05  Analysis Date = 08/06/2009 
 RPT Level = 0.05  Analysis Date = 08/06/2009 
 RPT Level = 0.05  Analysis Date = 07/31/2009 
 RPT Level = 0.05  Analysis Date = 07/31/2009 
 RPT Level = 0.05  Analysis Date = 07/24/2009 
 RPT Level = 0.05  Analysis Date = 07/24/2009 
 RPT Level = 0.05  Analysis Date = 07/16/2009 
 RPT Level = 0.05  Analysis Date = 07/16/2009 
 RPT Level = 0.05  Analysis Date = 07/13/2009 
 RPT Level = 0.05  Analysis Date = 07/13/2009 
 RPT Level = 0.05  Analysis Date = 07/08/2009 
 RPT Level = 0.05  Analysis Date = 07/08/2009 
 RPT Level = 0.05  Analysis Date = 07/07/2009 
 RPT Level = 0.05  Analysis Date = 07/07/2009 
 RPT Level = 0.05  Analysis Date = 06/17/2009 
 RPT Level = 0.05  Analysis Date = 06/17/2009 
 RPT Level = 0.05  Analysis Date = 06/10/2009 
 RPT Level = 0.05  Analysis Date = 06/10/2009 
 RPT Level = 0.05  Analysis Date = 06/05/2009 
 RPT Level = 0.05  Analysis Date = 06/05/2009 
 RPT Level = 0.05  Analysis Date = 05/28/2009 
 RPT Level = 0.05  Analysis Date = 05/28/2009 
 RPT Level = 0.05  Analysis Date = 05/21/2009 
 RPT Level = 0.05  Analysis Date = 05/21/2009 
 RPT Level = 0.05  Analysis Date = 05/19/2009 
 RPT Level = 0.05  Analysis Date = 05/19/2009 
 RPT Level = 0.05  Analysis Date = 05/07/2009 
 RPT Level = 0.05  Analysis Date = 05/07/2009 
 RPT Level = 0.05  Analysis Date = 05/14/2009 
 RPT Level = 0.05  Analysis Date = 05/14/2009 
 RPT Level = 0.05  Analysis Date = 04/24/2009 
 RPT Level = 0.05  Analysis Date = 04/24/2009 
 RPT Level = 0.05  Analysis Date = 04/16/2009 
 RPT Level = 0.05  Analysis Date = 04/16/2009 
 RPT Level = 0.05  Analysis Date = 04/08/2009 
 RPT Level = 0.05  Analysis Date = 04/08/2009 
 RPT Level = 0.05  Analysis Date = 04/02/2009 
 RPT Level = 0.05  Analysis Date = 04/02/2009 
 RPT Level = 0.05  Analysis Date = 03/27/2009 
 RPT Level = 0.05  Analysis Date = 03/27/2009 
 RPT Level = 0.05  Analysis Date = 03/19/2009 
 RPT Level = 0.05  Analysis Date = 03/19/2009 
 RPT Level = 0.05  Analysis Date = 03/11/2009 
 RPT Level = 0.05  Analysis Date = 03/11/2009 
 RPT Level = 0.05  Analysis Date = 03/05/2009 
 RPT Level = 0.05  Analysis Date = 03/05/2009 
 RPT Level = 0.05  Analysis Date = 02/24/2009 
 RPT Level = 0.05  Analysis Date = 02/24/2009 
 RPT Level = 0.05  Analysis Date = 02/18/2009 
 RPT Level = 0.05  Analysis Date = 02/18/2009 
 RPT Level = 0.05  Analysis Date = 02/17/2009 
 RPT Level = 0.05  Analysis Date = 02/17/2009 
 RPT Level = 0.05  Analysis Date = 02/05/2009 
 RPT Level = 0.05  Analysis Date = 02/05/2009 
 RPT Level = 0.05  Analysis Date = 01/29/2009 
 RPT Level = 0.05  Analysis Date = 01/29/2009 
 RPT Level = 0.05  Analysis Date = 01/22/2009 
 RPT Level = 0.05  Analysis Date = 01/22/2009 
 RPT Level = 0.05  Analysis Date = 01/15/2009 
 RPT Level = 0.05  Analysis Date = 01/15/2009 
 RPT Level = 0.05  Analysis Date = 01/13/2009 
 RPT Level = 0.05  Analysis Date = 01/13/2009 
 RPT Level = 0.05  Analysis Date = 01/13/2009 
 RPT Level = 0.05  Analysis Date = 01/13/2009 
 RPT Level = 0.05  Analysis Date = 01/05/2009 
 RPT Level = 0.05  Analysis Date = 01/05/2009 
 RPT Level = 0.05  Analysis Date = 12/18/2008 
 RPT Level = 0.05  Analysis Date = 12/18/2008 
 RPT Level = 0.05  Analysis Date = 12/16/2008 
 RPT Level = 0.05  Analysis Date = 12/16/2008 
 RPT Level = 0.05  Analysis Date = 12/10/2008 
 RPT Level = 0.05  Analysis Date = 12/10/2008 
 RPT Level = 0.05  Analysis Date = 12/04/2008 
 RPT Level = 0.05  Analysis Date = 12/04/2008 
 RPT Level = 0.05  Analysis Date = 11/24/2008 
 RPT Level = 0.05  Analysis Date = 11/24/2008 
 RPT Level = 0.05  Analysis Date = 11/13/2008 
 RPT Level = 0.05  Analysis Date = 11/13/2008 
 RPT Level = 0.05  Analysis Date = 11/13/2008 
 RPT Level = 0.05  Analysis Date = 11/13/2008 
 RPT Level = 0.05  Analysis Date = 10/30/2008 
 RPT Level = 0.05  Analysis Date = 10/30/2008 
 RPT Level = 0.05  Analysis Date = 10/22/2008 
 RPT Level = 0.05  Analysis Date = 10/22/2008 
 RPT Level = 0.05  Analysis Date = 10/21/2008 
 RPT Level = 0.05  Analysis Date = 10/21/2008 
 RPT Level = 0.05  Analysis Date = 10/08/2008 
 RPT Level = 0.05  Analysis Date = 10/08/2008 
 RPT Level = 0.05  Analysis Date = 10/06/2008 
 RPT Level = 0.07  Analysis Date = 10/06/2008 
 RPT Level = 0.07  Analysis Date = 09/30/2008 
 RPT Level = 0.07  Analysis Date = 09/30/2008 
 RPT Level = 0.07  Analysis Date = 09/17/2008 
 RPT Level = 0.07  Analysis Date = 09/17/2008 
 RPT Level = 0.07  Analysis Date = 09/15/2008 
 RPT Level = 0.07  Analysis Date = 09/15/2008 
 RPT Level = 0.07  Analysis Date = 09/10/2008 
 RPT Level = 0.07  Analysis Date = 09/10/2008 
 RPT Level = 0.07  Analysis Date = 09/02/2008 
 RPT Level = 0.07  Analysis Date = 09/02/2008 
 RPT Level = 0.07  Analysis Date = 08/22/2008 
 RPT Level = 0.07  Analysis Date = 08/22/2008 
 RPT Level = 0.07  Analysis Date = 08/18/2008 
 RPT Level = 0.07  Analysis Date = 08/18/2008 
 RPT Level = 0.07  Analysis Date = 08/11/2008 
 RPT Level = 0.07  Analysis Date = 08/11/2008 
 RPT Level = 0.07  Analysis Date = 07/24/2008 
 RPT Level = 0.07  Analysis Date = 07/24/2008 
 RPT Level = 0.07  Analysis Date = 07/22/2008 
 RPT Level = 0.07  Analysis Date = 07/22/2008 
 RPT Level = 0.07  Analysis Date = 07/14/2008 
 RPT Level = 0.07  Analysis Date = 07/14/2008 
 RPT Level = 0.07  Analysis Date = 07/07/2008 
 RPT Level = 0.07  Analysis Date = 07/07/2008 
 RPT Level = 0.07  Analysis Date = 06/26/2008 
 RPT Level = 0.07  Analysis Date = 06/26/2008 
 RPT Level = 0.07  Analysis Date = 06/23/2008 
 RPT Level = 0.07  Analysis Date = 06/23/2008 
 RPT Level = 0.07  Analysis Date = 06/11/2008 
 RPT Level = 0.07  Analysis Date = 06/11/2008 
 RPT Level = 0.07  Analysis Date = 06/10/2008 
 RPT Level = 0.07  Analysis Date = 06/10/2008 
 RPT Level = 0.07  Analysis Date = 06/04/2008 
 RPT Level = 0.07  Analysis Date = 06/04/2008 
 RPT Level = 0.07  Analysis Date = 05/29/2008 
 RPT Level = 0.07  Analysis Date = 05/29/2008 
 RPT Level = 0.07  Analysis Date = 05/13/2008 
 RPT Level = 0.07  Analysis Date = 05/13/2008 
 RPT Level = 0.07  Analysis Date = 05/07/2008 
 RPT Level = 0.07  Analysis Date = 05/07/2008 
 RPT Level = 0.07  Analysis Date = 04/29/2008 
 RPT Level = 0.07  Analysis Date = 04/29/2008 
 RPT Level = 0.07  Analysis Date = 04/24/2008 
 RPT Level = 0.07  Analysis Date = 04/24/2008 
 RPT Level = 0.07  Analysis Date = 04/22/2008 
 RPT Level = 0.07  Analysis Date = 04/22/2008 
 RPT Level = 0.07  Analysis Date = 04/10/2008 
 RPT Level = 0.07  Analysis Date = 04/10/2008 
 RPT Level = 0.07  Analysis Date = 04/08/2008 
 RPT Level = 0.07  Analysis Date = 04/08/2008 
 RPT Level = 0.07  Analysis Date = 03/31/2008 
 RPT Level = 0.07  Analysis Date = 03/31/2008 
 RPT Level = 0.07  Analysis Date = 03/27/2008 
 RPT Level = 0.07  Analysis Date = 03/27/2008 
 RPT Level = 0.07  Analysis Date = 03/12/2008 
 RPT Level = 0.07  Analysis Date = 03/12/2008 
 RPT Level = 0.07  Analysis Date = 03/05/2008 
 RPT Level = 0.07  Analysis Date = 03/05/2008 
 RPT Level = 0.07  Analysis Date = 03/03/2008 
 RPT Level = 0.07  Analysis Date = 03/03/2008 
 RPT Level = 0.07  Analysis Date = 02/26/2008 
 RPT Level = 0.07  Analysis Date = 02/26/2008 
 RPT Level = 0.07  Analysis Date = 02/19/2008 
 RPT Level = 0.07  Analysis Date = 02/19/2008 
 RPT Level = 0.07  Analysis Date = 02/11/2008 
 RPT Level = 0.07  Analysis Date = 02/11/2008 
 RPT Level = 0.07  Analysis Date = 02/01/2008 
 RPT Level = 0.07  Analysis Date = 02/01/2008 
 RPT Level = 0.07  Analysis Date = 01/24/2008 
 RPT Level = 0.07  Analysis Date = 01/24/2008 
 RPT Level = 0.07  Analysis Date = 01/23/2008 
 RPT Level = 0.07  Analysis Date = 01/23/2008 
 RPT Level = 0.07  Analysis Date = 01/15/2008 
 RPT Level = 0.07  Analysis Date = 01/15/2008 
 RPT Level = 0.07  Analysis Date = 01/15/2008 
 RPT Level = 0.07  Analysis Date = 01/15/2008 
 RPT Level = 0.07  Analysis Date = 01/09/2008 
 RPT Level = 0.07  Analysis Date = 01/09/2008 
 RPT Level = 0.07  Analysis Date = 12/18/2007 
 RPT Level = 0.07  Analysis Date = 12/18/2007 
 RPT Level = 0.07  Analysis Date = 12/05/2007 
 RPT Level = 0.07  Analysis Date = 12/05/2007 
 RPT Level = 0.07  Analysis Date = 12/04/2007 
 RPT Level = 0.07  Analysis Date = 12/04/2007 
 RPT Level = 0.07  Analysis Date = 11/26/2007 
 RPT Level = 0.07  Analysis Date = 11/26/2007 
 RPT Level = 0.07  Analysis Date = 11/19/2007 
 RPT Level = 0.07  Analysis Date = 11/19/2007 
 RPT Level = 0.07  Analysis Date = 11/14/2007 
 RPT Level = 0.07  Analysis Date = 11/14/2007 
 RPT Level = 0.07  Analysis Date = 11/01/2007 
 RPT Level = 0.07  Analysis Date = 11/01/2007 
 RPT Level = 0.07  Analysis Date = 10/29/2007 
 RPT Level = 0.07  Analysis Date = 10/29/2007 
 RPT Level = 0.07  Analysis Date = 10/23/2007 
 RPT Level = 0.07  Analysis Date = 10/23/2007 
 RPT Level = 0.07  Analysis Date = 10/18/2007 
 RPT Level = 0.07  Analysis Date = 10/18/2007 
 RPT Level = 0.07  Analysis Date = 10/02/2007 
 RPT Level = 0.05  Analysis Date = 10/02/2007 
 RPT Level = 0.05  Analysis Date = 09/24/2007 
 RPT Level = 0.05  Analysis Date = 09/24/2007 
 RPT Level = 0.05  Analysis Date = 09/20/2007 
 RPT Level = 0.05  Analysis Date = 09/20/2007 
 RPT Level = 0.05  Analysis Date = 09/17/2007 
 RPT Level = 0.05  Analysis Date = 09/17/2007 
 RPT Level = 0.05  Analysis Date = 09/10/2007 
 RPT Level = 0.05  Analysis Date = 09/10/2007 
 RPT Level = 0.05  Analysis Date = 08/28/2007 
 RPT Level = 0.05  Analysis Date = 08/28/2007 
 RPT Level = 0.05  Analysis Date = 08/17/2007 
 RPT Level = 0.05  Analysis Date = 08/17/2007 
 RPT Level = 0.05  Analysis Date = 08/16/2007 
 RPT Level = 0.05  Analysis Date = 08/16/2007 
 RPT Level = 0.05  Analysis Date = 08/06/2007 
 RPT Level = 0.05  Analysis Date = 08/06/2007 
 RPT Level = 0.05  Analysis Date = 07/30/2007 
 RPT Level = 0.05  Analysis Date = 07/30/2007 
 RPT Level = 0.05  Analysis Date = 07/17/2007 
 RPT Level = 0.05  Analysis Date = 07/17/2007 
 RPT Level = 0.05  Analysis Date = 07/05/2007 
 RPT Level = 0.05  Analysis Date = 07/05/2007 
 RPT Level = 0.05  Analysis Date = 06/29/2007 
 RPT Level = 0.05  Analysis Date = 06/29/2007 
 RPT Level = 0.05  Analysis Date = 06/25/2007 
 RPT Level = 0.05  Analysis Date = 06/25/2007 
 RPT Level = 0.05  Analysis Date = 06/14/2007 
 RPT Level = 0.05  Analysis Date = 06/14/2007 
 RPT Level = 0.05  Analysis Date = 06/12/2007 
 RPT Level = 0.05  Analysis Date = 06/12/2007 
 RPT Level = 0.05  Analysis Date = 06/04/2007 
 RPT Level = 0.05  Analysis Date = 06/04/2007 
 RPT Level = 0.05  Analysis Date = 05/31/2007 
 RPT Level = 0.05  Analysis Date = 05/31/2007 
 RPT Level = 0.05  Analysis Date = 05/21/2007 
 RPT Level = 0.05  Analysis Date = 05/21/2007 
 RPT Level = 0.05  Analysis Date = 05/10/2007 
 RPT Level = 0.05  Analysis Date = 05/10/2007 
 RPT Level = 0.05  Analysis Date = 05/03/2007 
 RPT Level = 0.05  Analysis Date = 05/03/2007 
 RPT Level = 0.05  Analysis Date = 05/01/2007 
 RPT Level = 0.05  Analysis Date = 05/01/2007 
 RPT Level = 0.05  Analysis Date = 04/25/2007 
 RPT Level = 0.05  Analysis Date = 04/25/2007 
 RPT Level = 0.05  Analysis Date = 04/12/2007 
 RPT Level = 0.05  Analysis Date = 04/12/2007 
 RPT Level = 0.05  Analysis Date = 04/10/2007 
 RPT Level = 0.05  Analysis Date = 04/10/2007 
 RPT Level = 0.05  Analysis Date = 04/04/2007 
 RPT Level = 0.05  Analysis Date = 04/04/2007 
 RPT Level = 0.05  Analysis Date = 03/30/2007 
 RPT Level = 0.05  Analysis Date = 03/30/2007 
 RPT Level = 0.05  Analysis Date = 04/16/2007 
 RPT Level = 0.05  Analysis Date = 04/16/2007 
 RPT Level = 0.05  Analysis Date = 03/12/2007 
 RPT Level = 0.05  Analysis Date = 03/12/2007 
 RPT Level = 0.05  Analysis Date = 03/05/2007 
 RPT Level = 0.05  Analysis Date = 03/05/2007 
 RPT Level = 0.05  Analysis Date = 03/01/2007 
 RPT Level = 0.05  Analysis Date = 03/01/2007 
 RPT Level = 0.05  Analysis Date = 02/26/2007 
 RPT Level = 0.05  Analysis Date = 02/26/2007 
 RPT Level = 0.05  Analysis Date = 02/15/2007 
 RPT Level = 0.05  Analysis Date = 02/15/2007 
 RPT Level = 0.05  Analysis Date = 01/29/2007 
 RPT Level = 0.05  Analysis Date = 01/29/2007 
 RPT Level = 0.05  Analysis Date = 01/22/2007 
 RPT Level = 0.05  Analysis Date = 01/22/2007 
 RPT Level = 0.05  Analysis Date = 01/17/2007 
 RPT Level = 0.05  Analysis Date = 01/17/2007 
 RPT Level = 0.05  Analysis Date = 01/09/2007 
 RPT Level = 0.05  Analysis Date = 01/09/2007 
 RPT Level = 0.05  Analysis Date = 01/09/2007 
 RPT Level = 0.05  Analysis Date = 01/09/2007 
 RPT Level = 0.05  Analysis Date = 01/04/2007 
 RPT Level = 0.05  Analysis Date = 01/04/2007 
 RPT Level = 0.05  Analysis Date = 12/14/2006 
 RPT Level = 0.05  Analysis Date = 12/14/2006 
 RPT Level = 0.05  Analysis Date = 12/07/2006 
 RPT Level = 0.05  Analysis Date = 12/07/2006 
 RPT Level = 0.05  Analysis Date = 12/01/2006 
 RPT Level = 0.05  Analysis Date = 12/01/2006 
 RPT Level = 0.05  Analysis Date = 11/28/2006 
 RPT Level = 0.05  Analysis Date = 11/28/2006 
 RPT Level = 0.05  Analysis Date = 11/16/2006 
 RPT Level = 0.05  Analysis Date = 11/16/2006 
 RPT Level = 0.05  Analysis Date = 11/15/2006 
 RPT Level = 0.05  Analysis Date = 11/15/2006 
 RPT Level = 0.05  Analysis Date = 11/07/2006 
 RPT Level = 0.05  Analysis Date = 11/07/2006 
 RPT Level = 0.05  Analysis Date = 11/01/2006 
 RPT Level = 0.05  Analysis Date = 11/01/2006 
 RPT Level = 0.05  Analysis Date = 10/31/2006 
 RPT Level = 0.05  Analysis Date = 10/31/2006 
 RPT Level = 0.05  Analysis Date = 10/16/2006 
 RPT Level = 0.05  Analysis Date = 10/16/2006 
 RPT Level = 0.05  Analysis Date = 10/11/2006 
 RPT Level = 0.05  Analysis Date = 10/11/2006 
 RPT Level = 0.05  Analysis Date = 09/20/2006 
 RPT Level = 0.05  Analysis Date = 09/20/2006 
 RPT Level = 0.05  Analysis Date = 09/15/2006 
 RPT Level = 0.05  Analysis Date = 09/15/2006 
 RPT Level = 0.05  Analysis Date = 09/11/2006 
 RPT Level = 0.05  Analysis Date = 09/11/2006 
 RPT Level = 0.05  Analysis Date = 08/28/2006 
 RPT Level = 0.05  Analysis Date = 08/28/2006 
 RPT Level = 0.05  Analysis Date = 08/17/2006 
 RPT Level = 0.05  Analysis Date = 08/17/2006 
 RPT Level = 0.05  Analysis Date = 08/14/2006 
 RPT Level = 0.05  Analysis Date = 08/14/2006 
 RPT Level = 0.05  Analysis Date = 07/25/2006 
 RPT Level = 0.05  Analysis Date = 07/25/2006 
 RPT Level = 0.05  Analysis Date = 07/18/2006 
 RPT Level = 0.05  Analysis Date = 07/18/2006 
 RPT Level = 0.05  Analysis Date = 07/11/2006 
 RPT Level = 0.05  Analysis Date = 07/11/2006 
 RPT Level = 0.05  Analysis Date = 06/23/2006 
 RPT Level = 0.05  Analysis Date = 06/23/2006 
 RPT Level = 0.05  Analysis Date = 06/19/2006 
 RPT Level = 0.05  Analysis Date = 06/19/2006 
 RPT Level = 0.05  Analysis Date = 06/08/2006 
 RPT Level = 0.05  Analysis Date = 06/08/2006 
 RPT Level = 0.05  Analysis Date = 05/18/2006 
 RPT Level = 0.05  Analysis Date = 05/18/2006 
 RPT Level = 0.05  Analysis Date = 05/10/2006 
 RPT Level = 0.05  Analysis Date = 05/10/2006 
 RPT Level = 0.05  Analysis Date = 05/15/2006 
 RPT Level = 0.05  Analysis Date = 05/15/2006 
 RPT Level = 0.05  Analysis Date = 09/21/2005 
 RPT Level = 0.05  Analysis Date = 09/21/2005 
 RPT Level = 0.05  Analysis Date = 09/13/2005 
 RPT Level = 0.05  Analysis Date = 09/13/2005 
 RPT Level = 0.05  Analysis Date = 09/02/2005 
 RPT Level = 0.05  Analysis Date = 09/02/2005 
 RPT Level = 0.05  Analysis Date = 08/29/2005 
 RPT Level = 0.05  Analysis Date = 08/29/2005 
 RPT Level = 0.05  Analysis Date = 08/19/2005 
 RPT Level = 0.05  Analysis Date = 08/19/2005 
 RPT Level = 0.05  Analysis Date = 08/10/2005 
 RPT Level = 0.05  Analysis Date = 08/10/2005 
 RPT Level = 0.05  Analysis Date = 08/05/2005 
 RPT Level = 0.05  Analysis Date = 08/05/2005 
 RPT Level = 0.05  Analysis Date = 08/05/2005 
 RPT Level = 0.05  Analysis Date = 08/05/2005 
 RPT Level = 0.05  Analysis Date = 07/21/2005 
 RPT Level = 0.05  Analysis Date = 07/21/2005 
 RPT Level = 0.05  Analysis Date = 07/18/2005 
 RPT Level = 0.05  Analysis Date = 07/18/2005 
 RPT Level = 0.05  Analysis Date = 07/11/2005 
 RPT Level = 0.05  Analysis Date = 07/11/2005 
 RPT Level = 0.05  Analysis Date = 06/30/2005 
 RPT Level = 0.05  Analysis Date = 06/30/2005 
 RPT Level = 0.05  Analysis Date = 06/24/2005 
 RPT Level = 0.05  Analysis Date = 06/24/2005 
 RPT Level = 0.05  Analysis Date = 06/21/2005 
 RPT Level = 0.05  Analysis Date = 06/21/2005 
 RPT Level = 0.05  Analysis Date = 06/13/2005 
 RPT Level = 0.05  Analysis Date = 06/13/2005 
 RPT Level = 0.05  Analysis Date = 06/06/2005 
 RPT Level = 0.05  Analysis Date = 06/06/2005 
 RPT Level = 0.05  Analysis Date = 05/25/2005 
 RPT Level = 0.05  Analysis Date = 05/25/2005 
 RPT Level = 0.05  Analysis Date = 05/23/2005 
 RPT Level = 0.05  Analysis Date = 05/23/2005 
 RPT Level = 0.05  Analysis Date = 05/17/2005 
 RPT Level = 0.05  Analysis Date = 05/17/2005 
 RPT Level = 0.05  Analysis Date = 05/11/2005 
 RPT Level = 0.05  Analysis Date = 05/11/2005 
 RPT Level = 0.05  Analysis Date = 04/28/2005 
 RPT Level = 0.05  Analysis Date = 04/28/2005 
 RPT Level = 0.05  Analysis Date = 04/25/2005 
 RPT Level = 0.05  Analysis Date = 04/25/2005 
 RPT Level = 0.05  Analysis Date = 04/14/2005 
 RPT Level = 0.05  Analysis Date = 04/14/2005 
 RPT Level = 0.05  Analysis Date = 04/07/2005 
 RPT Level = 0.05  Analysis Date = 04/07/2005 
 RPT Level = 0.05  Analysis Date = 04/04/2005 
 RPT Level = 0.05  Analysis Date = 04/04/2005 
 RPT Level = 0.05  Analysis Date = 03/29/2005 
 RPT Level = 0.05  Analysis Date = 03/29/2005 
 RPT Level = 0.05  Analysis Date = 03/18/2005 
 RPT Level = 0.05  Analysis Date = 03/18/2005 
 RPT Level = 0.05  Analysis Date = 03/18/2005 
 RPT Level = 0.05  Analysis Date = 03/18/2005 
 RPT Level = 0.05  Analysis Date = 03/18/2005 
 RPT Level = 0.05  Analysis Date = 03/18/2005 
 RPT Level = 0.05  Analysis Date = 03/10/2005 
 RPT Level = 0.05  Analysis Date = 03/10/2005 
 RPT Level = 0.05  Analysis Date = 03/01/2005 
 RPT Level = 0.05  Analysis Date = 03/01/2005 
 RPT Level = 0.05  Analysis Date = 02/18/2005 
 RPT Level = 0.05  Analysis Date = 02/18/2005 
 RPT Level = 0.05  Analysis Date = 02/15/2005 
 RPT Level = 0.05  Analysis Date = 02/15/2005 
 RPT Level = 0.05  Analysis Date = 02/04/2005 
 RPT Level = 0.05  Analysis Date = 02/04/2005 
 RPT Level = 0.05  Analysis Date = 01/27/2005 
 RPT Level = 0.05  Analysis Date = 01/27/2005 
 RPT Level = 0.05  Analysis Date = 01/21/2005 
 RPT Level = 0.05  Analysis Date = 01/21/2005 
 RPT Level = 0.05  Analysis Date = 01/18/2005 
 RPT Level = 0.05  Analysis Date = 01/18/2005 
 RPT Level = 0.05  Analysis Date = 01/10/2005 
 RPT Level = 0.05  Analysis Date = 01/10/2005 
 RPT Level = 0.05  Analysis Date = 01/04/2005 
 RPT Level = 0.05  Analysis Date = 01/04/2005 
 RPT Level = 0.05  Analysis Date = 12/28/2004 
 RPT Level = 0.05  Analysis Date = 12/28/2004 
 RPT Level = 0.05  Analysis Date = 12/28/2004 
 RPT Level = 0.05  Analysis Date = 12/28/2004 
 RPT Level = 0.05  Analysis Date = 12/20/2004 
 RPT Level = 0.05  Analysis Date = 12/20/2004 
 RPT Level = 0.05  Analysis Date = 12/20/2004 
 RPT Level = 0.05  Analysis Date = 12/20/2004 
 RPT Level = 0.05  Analysis Date = 12/13/2004 
 RPT Level = 0.05  Analysis Date = 12/13/2004 
 RPT Level = 0.05  Analysis Date = 12/13/2004 
 RPT Level = 0.05  Analysis Date = 12/13/2004 
 RPT Level = 0.05  Analysis Date = 12/06/2004 
 RPT Level = 0.05  Analysis Date = 12/06/2004 
 RPT Level = 0.05  Analysis Date = 12/06/2004 
 RPT Level = 0.05  Analysis Date = 12/06/2004 
 RPT Level = 0.05  Analysis Date = 12/06/2004 
 RPT Level = 0.05  Analysis Date = 12/06/2004 
 RPT Level = 0.05  Analysis Date = 11/29/2004 
 RPT Level = 0.05  Analysis Date = 11/29/2004 
 RPT Level = 0.05  Analysis Date = 11/23/2004 
 RPT Level = 0.05  Analysis Date = 11/23/2004 
 RPT Level = 0.05  Analysis Date = 09/02/2004 
 RPT Level = 0.05  Analysis Date = 09/02/2004 
 RPT Level = 0.05  Analysis Date = 08/31/2004 
 RPT Level = 0.05  Analysis Date = 08/31/2004 
 RPT Level = 0.05  Analysis Date = 08/25/2004 
 RPT Level = 0.05  Analysis Date = 08/25/2004 
 RPT Level = 0.05  Analysis Date = 08/23/2004 
 RPT Level = 0.05  Analysis Date = 08/23/2004 
 RPT Level = 0.05  Analysis Date = 08/23/2004 
 RPT Level = 0.05  Analysis Date = 08/23/2004 
 RPT Level = 0.05  Analysis Date = 08/23/2004 
 RPT Level = 0.05  Analysis Date = 08/23/2004 
 RPT Level = 0.05  Analysis Date = 08/13/2004 
 RPT Level = 0.05  Analysis Date = 08/13/2004 
 RPT Level = 0.05  Analysis Date = 08/05/2004 
 RPT Level = 0.05  Analysis Date = 08/05/2004 
 RPT Level = 0.05  Analysis Date = 08/03/2004 
 RPT Level = 0.05  Analysis Date = 08/03/2004 
 RPT Level = 0.05  Analysis Date = 07/26/2004 
 RPT Level = 0.05  Analysis Date = 07/26/2004 
 RPT Level = 0.05  Analysis Date = 07/20/2004 
 RPT Level = 0.05  Analysis Date = 07/20/2004 
 RPT Level = 0.05  Analysis Date = 07/09/2004 
 RPT Level = 0.05  Analysis Date = 07/09/2004 
 RPT Level = 0.05  Analysis Date = 07/07/2004 
 RPT Level = 0.05  Analysis Date = 07/07/2004 
 RPT Level = 0.05  Analysis Date = 06/28/2004 
 RPT Level = 0.05  Analysis Date = 06/28/2004 
 RPT Level = 0.05  Analysis Date = 06/23/2004 
 RPT Level = 0.05  Analysis Date = 06/23/2004 
 RPT Level = 0.05  Analysis Date = 06/10/2004 
 RPT Level = 0.05  Analysis Date = 06/10/2004 
 RPT Level = 0.05  Analysis Date = 06/04/2004 
 RPT Level = 0.05  Analysis Date = 06/04/2004 
 RPT Level = 0.05  Analysis Date = 06/01/2004 
 RPT Level = 0.05  Analysis Date = 06/01/2004 
 RPT Level = 0.05  Analysis Date = 05/21/2004 
 RPT Level = 0.05  Analysis Date = 05/21/2004 
 RPT Level = 0.05  Analysis Date = 05/07/2004 
 RPT Level = 0.05  Analysis Date = 05/07/2004 
 RPT Level = 0.05  Analysis Date = 05/03/2004 
 RPT Level = 0.05  Analysis Date = 05/03/2004 
 RPT Level = 0.05  Analysis Date = 04/26/2004 
 RPT Level = 0.05  Analysis Date = 04/26/2004 
 RPT Level = 0.05  Analysis Date = 04/20/2004 
 RPT Level = 0.05  Analysis Date = 04/20/2004 
 RPT Level = 0.05  Analysis Date = 04/12/2004 
 RPT Level = 0.05  Analysis Date = 04/12/2004 
 RPT Level = 0.05  Analysis Date = 04/05/2004 
 RPT Level = 0.05  Analysis Date = 04/05/2004 
 RPT Level = 0.05  Analysis Date = 04/05/2004 
 RPT Level = 0.05  Analysis Date = 04/05/2004 
 RPT Level = 0.05  Analysis Date = 03/30/2004 
 RPT Level = 0.05  Analysis Date = 03/30/2004 
 RPT Level = 0.05  Analysis Date = 03/30/2004 
 RPT Level = 0.05  Analysis Date = 03/30/2004 
 RPT Level = 0.05  Analysis Date = 03/23/2004 
 RPT Level = 0.05  Analysis Date = 03/23/2004 
 RPT Level = 0.05  Analysis Date = 03/18/2004 
 RPT Level = 0.05  Analysis Date = 03/18/2004 
 RPT Level = 0.05  Analysis Date = 03/16/2004 
 RPT Level = 0.05  Analysis Date = 03/16/2004 
 RPT Level = 0.05  Analysis Date = 03/16/2004 
 RPT Level = 0.05  Analysis Date = 03/16/2004 
 RPT Level = 0.05  Analysis Date = 03/12/2004 
 RPT Level = 0.05  Analysis Date = 03/12/2004 
 RPT Level = 0.05  Analysis Date = 03/12/2004 
 RPT Level = 0.05  Analysis Date = 03/12/2004 
 RPT Level = 0.05  Analysis Date = 03/01/2004 
 RPT Level = 0.05  Analysis Date = 03/01/2004 
 RPT Level = 0.05  Analysis Date = 02/26/2004 
 RPT Level = 0.05  Analysis Date = 02/26/2004 
 RPT Level = 0.05  Analysis Date = 02/24/2004 
 RPT Level = 0.05  Analysis Date = 02/24/2004 
 RPT Level = 0.05  Analysis Date = 02/23/2004 
 RPT Level = 0.05  Analysis Date = 02/23/2004 
 RPT Level = 0.05  Analysis Date = 02/19/2004 
 RPT Level = 0.05  Analysis Date = 02/19/2004 
 RPT Level = 0.05  Analysis Date = 02/12/2004 
 RPT Level = 0.05  Analysis Date = 02/12/2004 
 RPT Level = 0.05  Analysis Date = 02/09/2004 
 RPT Level = 0.05  Analysis Date = 02/09/2004 
 RPT Level = 0.05  Analysis Date = 02/09/2004 
 RPT Level = 0.05  Analysis Date = 02/09/2004 
 RPT Level = 0.05  Analysis Date = 02/03/2004 
 RPT Level = 0.05  Analysis Date = 02/03/2004 
 RPT Level = 0.05  Analysis Date = 01/30/2004 
 RPT Level = 0.05  Analysis Date = 01/30/2004 
 RPT Level = 0.05  Analysis Date = 01/26/2004 
 RPT Level = 0.05  Analysis Date = 01/26/2004 
 RPT Level = 0.05  Analysis Date = 01/22/2004 
 RPT Level = 0.05  Analysis Date = 01/22/2004 
 RPT Level = 0.05  Analysis Date = 01/22/2004 
 RPT Level = 0.05  Analysis Date = 01/22/2004 
 RPT Level = 0.05  Analysis Date = 01/16/2004 
 RPT Level = 0.05  Analysis Date = 01/16/2004 
 RPT Level = 0.05  Analysis Date = 01/13/2004 
 RPT Level = 0.05  Analysis Date = 01/13/2004 
 RPT Level = 0.05  Analysis Date = 01/13/2004 
 RPT Level = 0.05  Analysis Date = 01/13/2004 
 RPT Level = 0.05  Analysis Date = 01/06/2004 
 RPT Level = 0.05  Analysis Date = 01/06/2004 
 RPT Level = 0.05  Analysis Date = 09/25/2003 
 RPT Level = 0.05  Analysis Date = 09/25/2003 
 RPT Level = 0.05  Analysis Date = 09/19/2003 
 RPT Level = 0.05  Analysis Date = 09/19/2003 
 RPT Level = 0.05  Analysis Date = 09/12/2003 
 RPT Level = 0.05  Analysis Date = 09/12/2003 
 RPT Level = 0.05  Analysis Date = 09/05/2003 
 RPT Level = 0.05  Analysis Date = 09/05/2003 
 RPT Level = 0.05  Analysis Date = 08/27/2003 
 RPT Level = 0.05  Analysis Date = 08/27/2003 
 RPT Level = 0.05  Analysis Date = 08/21/2003 
 RPT Level = 0.05  Analysis Date = 08/21/2003 
 RPT Level = 0.05  Analysis Date = 08/14/2003 
 RPT Level = 0.05  Analysis Date = 08/14/2003 
 RPT Level = 0.05  Analysis Date = 08/08/2003 
 RPT Level = 0.05  Analysis Date = 08/08/2003 
 RPT Level = 0.05  Analysis Date = 08/04/2003 
 RPT Level = 0.05  Analysis Date = 08/04/2003 
 RPT Level = 0.05  Analysis Date = 07/24/2003 
 RPT Level = 0.05  Analysis Date = 07/24/2003 
 RPT Level = 0.05  Analysis Date = 07/16/2003 
 RPT Level = 0.05  Analysis Date = 07/16/2003 
 RPT Level = 0.05  Analysis Date = 07/11/2003 
 RPT Level = 0.05  Analysis Date = 07/11/2003 
 RPT Level = 0.05  Analysis Date = 07/03/2003 
 RPT Level = 0.05  Analysis Date = 07/03/2003 
 RPT Level = 0.05  Analysis Date = 07/01/2003 
 RPT Level = 0.05  Analysis Date = 07/01/2003 
 RPT Level = 0.05  Analysis Date = 06/23/2003 
 RPT Level = 0.05  Analysis Date = 06/23/2003 
 RPT Level = 0.05  Analysis Date = 06/16/2003 
 RPT Level = 0.05  Analysis Date = 06/16/2003 
 RPT Level = 0.05  Analysis Date = 06/13/2003 
 RPT Level = 0.05  Analysis Date = 06/13/2003 
 RPT Level = 0.05  Analysis Date = 05/29/2003 
 RPT Level = 0.05  Analysis Date = 05/29/2003 
 RPT Level = 0.05  Analysis Date = 05/28/2003 
 RPT Level = 0.05  Analysis Date = 05/28/2003 
 RPT Level = 0.05  Analysis Date = 05/22/2003 
 RPT Level = 0.05  Analysis Date = 05/22/2003 
 RPT Level = 0.05  Analysis Date = 05/14/2003 
 RPT Level = 0.05  Analysis Date = 05/14/2003 
 RPT Level = 0.05  Analysis Date = 05/06/2003 
 RPT Level = 0.05  Analysis Date = 05/06/2003 
 RPT Level = 0.05  Analysis Date = 05/01/2003 
 RPT Level = 0.05  Analysis Date = 05/01/2003 
 RPT Level = 0.05  Analysis Date = 04/22/2003 
 RPT Level = 0.05  Analysis Date = 04/22/2003 
 RPT Level = 0.05  Analysis Date = 04/08/2003 
 RPT Level = 0.05  Analysis Date = 04/08/2003 
 RPT Level = 0.05  Analysis Date = 04/03/2003 
 RPT Level = 0.05  Analysis Date = 04/03/2003 
 RPT Level = 0.05  Analysis Date = 04/02/2003 
 RPT Level = 0.05  Analysis Date = 04/02/2003 
 RPT Level = 0.05  Analysis Date = 04/02/2003 
 RPT Level = 0.05  Analysis Date = 04/02/2003 
 RPT Level = 0.05  Analysis Date = 03/14/2003 
 RPT Level = 0.05  Analysis Date = 03/14/2003 
 RPT Level = 0.05  Analysis Date = 03/12/2003 
 RPT Level = 0.05  Analysis Date = 03/12/2003 
 RPT Level = 0.05  Analysis Date = 03/04/2003 
 RPT Level = 0.05  Analysis Date = 03/04/2003 
 RPT Level = 0.05  Analysis Date = 02/27/2003 
 RPT Level = 0.05  Analysis Date = 02/27/2003 
 RPT Level = 0.05  Analysis Date = 02/12/2003 
 RPT Level = 0.05  Analysis Date = 02/12/2003 
 RPT Level = 0.05  Analysis Date = 02/07/2003 
 RPT Level = 0.05  Analysis Date = 02/07/2003 
 RPT Level = 0.05  Analysis Date = 02/03/2003 
 RPT Level = 0.05  Analysis Date = 02/03/2003 
 RPT Level = 0.05  Analysis Date = 01/31/2003 
 RPT Level = 0.05  Analysis Date = 01/31/2003 
 RPT Level = 0.05  Analysis Date = 01/16/2003 
 RPT Level = 0.05  Analysis Date = 01/16/2003 
 RPT Level = 0.05  Analysis Date = 01/15/2003 
 RPT Level = 0.05  Analysis Date = 01/15/2003 
 RPT Level = 0.05  Analysis Date = 01/08/2003 
 RPT Level = 0.05  Analysis Date = 01/08/2003 
 RPT Level = 0.05  Analysis Date = 01/06/2003 
 RPT Level = 0.05  Analysis Date = 01/06/2003 
 RPT Level = 0.05  Analysis Date = 12/18/2002 
 RPT Level = 0.05  Analysis Date = 12/18/2002 
 RPT Level = 0.05  Analysis Date = 12/18/2002 
 RPT Level = 0.05  Analysis Date = 12/18/2002 
 RPT Level = 0.05  Analysis Date = 12/06/2002 
 RPT Level = 0.05  Analysis Date = 12/06/2002 
 RPT Level = 0.05  Analysis Date = 12/11/2002 
 RPT Level = 0.05  Analysis Date = 12/11/2002 
 RPT Level = 0.05  Analysis Date = 12/04/2002 
 RPT Level = 0.05  Analysis Date = 12/04/2002 
 RPT Level = 0.05  Analysis Date = 12/11/2002 
 RPT Level = 0.05  Analysis Date = 12/11/2002 
 RPT Level = 0.05  Analysis Date = 12/04/2002 
 RPT Level = 0.05  Analysis Date = 12/04/2002 
 RPT Level = 0.05  Analysis Date = 11/04/2002 
 RPT Level = 0.05  Analysis Date = 11/04/2002 
 RPT Level = 0.05  Analysis Date = 10/25/2002 
 RPT Level = 0.05  Analysis Date = 10/25/2002 
 RPT Level = 0.05  Analysis Date = 10/25/2002 
 RPT Level = 0.05  Analysis Date = 10/25/2002 
 RPT Level = 0.05  Analysis Date = 10/25/2002 
 RPT Level = 0.05  Analysis Date = 10/25/2002 
 RPT Level = 0.05  Analysis Date = 10/24/2002 
 RPT Level = 0.05  Analysis Date = 10/24/2002 
 RPT Level = 0.05  Analysis Date = 09/05/2002 
 RPT Level = 0.05  Analysis Date = 09/05/2002 
 RPT Level = 0.05  Analysis Date = 09/05/2002 
 RPT Level = 0.05  Analysis Date = 09/05/2002 
 RPT Level = 0.05  Analysis Date = 08/26/2002 
 RPT Level = 0.05  Analysis Date = 08/26/2002 
 RPT Level = 0.05  Analysis Date = 08/19/2002 
 RPT Level = 0.05  Analysis Date = 08/19/2002 
 RPT Level = 0.05  Analysis Date = 08/13/2002 
 RPT Level = 0.05  Analysis Date = 08/13/2002 
 RPT Level = 0.05  Analysis Date = 08/06/2002 
 RPT Level = 0.05  Analysis Date = 08/06/2002 
 RPT Level = 0.05  Analysis Date = 07/29/2002 
 RPT Level = 0.05  Analysis Date = 07/29/2002 
 RPT Level = 0.05  Analysis Date = 07/19/2002 
 RPT Level = 0.05  Analysis Date = 07/19/2002 
 RPT Level = 0.05  Analysis Date = 07/19/2002 
 RPT Level = 0.05  Analysis Date = 07/19/2002 
 RPT Level = 0.05  Analysis Date = 07/03/2002 
 RPT Level = 0.05  Analysis Date = 07/03/2002 
 RPT Level = 0.05  Analysis Date = 07/01/2002 
 RPT Level = 0.05  Analysis Date = 07/01/2002 
 RPT Level = 0.05  Analysis Date = 06/21/2002 
 RPT Level = 0.05  Analysis Date = 06/21/2002 
 RPT Level = 0.05  Analysis Date = 06/21/2002 
 RPT Level = 0.05  Analysis Date = 06/21/2002 
 RPT Level = 0.05  Analysis Date = 06/05/2002 
 RPT Level = 0.05  Analysis Date = 06/05/2002 
 RPT Level = 0.05  Analysis Date = 06/05/2002 
 RPT Level = 0.05  Analysis Date = 06/05/2002 
 RPT Level = 0.05  Analysis Date = 05/28/2002 
 RPT Level = 0.05  Analysis Date = 05/28/2002 
 RPT Level = 0.05  Analysis Date = 05/16/2002 
 RPT Level = 0.05  Analysis Date = 05/16/2002 
 RPT Level = 0.05  Analysis Date = 05/13/2002 
 RPT Level = 0.05  Analysis Date = 05/13/2002 
 RPT Level = 0.05  Analysis Date = 05/03/2002 
 RPT Level = 0.05  Analysis Date = 05/03/2002 
 RPT Level = 0.05  Analysis Date = 04/25/2002 
 RPT Level = 0.05  Analysis Date = 04/25/2002 
 RPT Level = 0.05  Analysis Date = 04/25/2002 
 RPT Level = 0.05  Analysis Date = 04/25/2002 
 RPT Level = 0.05  Analysis Date = 04/15/2002 
 RPT Level = 0.05  Analysis Date = 04/15/2002 
 RPT Level = 0.05  Analysis Date = 04/04/2002 
 RPT Level = 0.05  Analysis Date = 04/04/2002 
 RPT Level = 0.05  Analysis Date = 03/28/2002 
 RPT Level = 0.05  Analysis Date = 03/28/2002 
 RPT Level = 0.05  Analysis Date = 03/26/2002 
 RPT Level = 0.05  Analysis Date = 03/26/2002 
 RPT Level = 0.05  Analysis Date = 03/18/2002 
 RPT Level = 0.05  Analysis Date = 03/18/2002 
 RPT Level = 0.05  Analysis Date = 03/11/2002 
 RPT Level = 0.05  Analysis Date = 03/11/2002 
 RPT Level = 0.05  Analysis Date = 03/05/2002 
 RPT Level = 0.05  Analysis Date = 03/05/2002 
 RPT Level = 0.05  Analysis Date = 02/28/2002 
 RPT Level = 0.05  Analysis Date = 02/28/2002 
 RPT Level = 0.05  Analysis Date = 02/21/2002 
 RPT Level = 0.05  Analysis Date = 02/21/2002 
 RPT Level = 0.05  Analysis Date = 02/07/2002 
 RPT Level = 0.05  Analysis Date = 02/07/2002 
 RPT Level = 0.05  Analysis Date = 02/07/2002 
 RPT Level = 0.05  Analysis Date = 02/07/2002 
 RPT Level = 0.05  Analysis Date = 01/24/2002 
 RPT Level = 0.05  Analysis Date = 01/24/2002 
 RPT Level = 0.05  Analysis Date = 01/16/2002 
 RPT Level = 0.05  Analysis Date = 01/16/2002 
 RPT Level = 0.05  Analysis Date = 01/04/2002 
 RPT Level = 0.05  Analysis Date = 01/04/2002 
 RPT Level = 0.05  Analysis Date = 01/02/2002 
 RPT Level = 0.05  Analysis Date = 01/02/2002 
 RPT Level = 0.05  Analysis Date = 12/21/2001 
 RPT Level = 0.05  Analysis Date = 12/21/2001 
 RPT Level = 0.05  Analysis Date = 12/19/2001 
 RPT Level = 0.05  Analysis Date = 12/19/2001 
 RPT Level = 0.05  Analysis Date = 12/07/2001 
 RPT Level = 0.05  Analysis Date = 12/07/2001 
 RPT Level = 0.05  Analysis Date = 11/08/2001 
 RPT Level = 0.05  Y = 0
The SGPlot Procedure

False Positive Rate for Kjeldahl Nitrogen (NH3+org N as N), FIL, CFA

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Kjeldahl Nitrogen (NH3+org N as N), FIL, CFA 00623KJ002 2002 40 1 3%
    2003 52 3 6%
    2004 51 0 0%
    2005 50 2 4%
    2006 15 0 0%
    2007 50 2 4%
    2008 50 1 2%
    2009 52 0 0%
    2010 52 5 10%
    2011 52 1 2%
    2012 52 0 0%
    2013 53 2 4%
    2014 47 2 4%
    2015 52 2 4%
    2016 50 2 4%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Kjeldahl Nitrogen (NH3+org N as N), FIL, CFA, ACD -
Blind Blank Results
Lab: NWQL, PCode: 00623, MCode: KJ003
Analysis dates: 11/15/01 through 09/28/05
Open Data Set

 Analysis Date = 01/25/2005 
 Lab Value = 0.281 
 RPT Level = 0.05 
 Lab Sample ID = 20050200048  Analysis Date = 04/07/2004 
 Lab Value = 0.113 
 RPT Level = 0.05 
 Lab Sample ID = 20040930009  Analysis Date = 02/03/2004 
 Lab Value = 0.109 
 RPT Level = 0.05 
 Lab Sample ID = 20040300012  Analysis Date = 09/28/2005 
 Lab Value = 0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20052590035  Analysis Date = 09/16/2005 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20052520006  Analysis Date = 09/02/2005 
 Lab Value = 0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20052430006  Analysis Date = 08/30/2005 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20052370002  Analysis Date = 08/23/2005 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20052300009  Analysis Date = 08/16/2005 
 Lab Value = -0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20052210012  Analysis Date = 08/09/2005 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20052160007  Analysis Date = 08/09/2005 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20052160005  Analysis Date = 07/25/2005 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20052010007  Analysis Date = 07/25/2005 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20051940015  Analysis Date = 07/12/2005 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20051880018  Analysis Date = 07/05/2005 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20051800189  Analysis Date = 07/05/2005 
 Lab Value = 0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20051740019  Analysis Date = 06/16/2005 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20051660174  Analysis Date = 06/16/2005 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20051590025  Analysis Date = 06/08/2005 
 Lab Value = 0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20051530021  Analysis Date = 06/02/2005 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20051440043  Analysis Date = 05/24/2005 
 Lab Value = 0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20051380014  Analysis Date = 05/19/2005 
 Lab Value = -0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20051320029  Analysis Date = 05/10/2005 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20051250003  Analysis Date = 04/29/2005 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20051170012  Analysis Date = 04/29/2005 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20051110007  Analysis Date = 04/19/2005 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20051020018  Analysis Date = 04/07/2005 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20050950044  Analysis Date = 04/07/2005 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20050880116  Analysis Date = 04/07/2005 
 Lab Value = 0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20050840096  Analysis Date = 03/24/2005 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20050750004  Analysis Date = 03/17/2005 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20050700007  Analysis Date = 03/17/2005 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20050700004  Analysis Date = 03/17/2005 
 Lab Value = 0.046 
 RPT Level = 0.05 
 Lab Sample ID = 20050670011  Analysis Date = 02/28/2005 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20050550024  Analysis Date = 02/18/2005 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20050480005  Analysis Date = 02/15/2005 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20050410004  Analysis Date = 02/08/2005 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20050340020  Analysis Date = 02/02/2005 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20050260024  Analysis Date = 01/20/2005 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20050130091  Analysis Date = 01/12/2005 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20050070016  Analysis Date = 01/04/2005 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20043650002  Analysis Date = 12/28/2004 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20043580037  Analysis Date = 12/28/2004 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20043580035  Analysis Date = 12/20/2004 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20043520023  Analysis Date = 12/28/2004 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20043510018  Analysis Date = 12/20/2004 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20043450069  Analysis Date = 12/20/2004 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20043440147  Analysis Date = 12/09/2004 
 Lab Value = 0.104 
 RPT Level = 0.05 
 Lab Sample ID = 20043380005  Analysis Date = 12/09/2004 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20043380002  Analysis Date = 12/02/2004 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20043310059  Analysis Date = 11/24/2004 
 Lab Value = -0.038 
 RPT Level = 0.05 
 Lab Sample ID = 20043280048  Analysis Date = 11/24/2004 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20043240012  Analysis Date = 09/03/2004 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20042450138  Analysis Date = 09/01/2004 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20042400089  Analysis Date = 08/26/2004 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20042370105  Analysis Date = 08/24/2004 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20042330206  Analysis Date = 09/01/2004 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20042320136  Analysis Date = 09/01/2004 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20042320138  Analysis Date = 08/13/2004 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20042240114  Analysis Date = 08/09/2004 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20042170123  Analysis Date = 08/02/2004 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20042110015  Analysis Date = 07/28/2004 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20042040039  Analysis Date = 07/21/2004 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20041960050  Analysis Date = 07/13/2004 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20041900062  Analysis Date = 07/06/2004 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20041820035  Analysis Date = 07/06/2004 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20041750057  Analysis Date = 06/22/2004 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20041700080  Analysis Date = 06/10/2004 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20041610055  Analysis Date = 06/10/2004 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20041550019  Analysis Date = 06/03/2004 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20041470132  Analysis Date = 05/26/2004 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20041400016  Analysis Date = 05/07/2004 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20041260099  Analysis Date = 05/07/2004 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20041200046  Analysis Date = 04/28/2004 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20041130016  Analysis Date = 04/21/2004 
 Lab Value = 0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20041050022  Analysis Date = 04/14/2004 
 Lab Value = 0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20040980007  Analysis Date = 04/01/2004 
 Lab Value = 0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20040910012  Analysis Date = 04/01/2004 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20040850021  Analysis Date = 03/24/2004 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20040830056  Analysis Date = 03/24/2004 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20040790023  Analysis Date = 03/24/2004 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20040760010  Analysis Date = 03/16/2004 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20040720029  Analysis Date = 03/16/2004 
 Lab Value = -0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20040710005  Analysis Date = 03/16/2004 
 Lab Value = 0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20040680093  Analysis Date = 03/16/2004 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20040650001  Analysis Date = 03/03/2004 
 Lab Value = 0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20040580032  Analysis Date = 03/03/2004 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20040550018  Analysis Date = 02/23/2004 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20040510134  Analysis Date = 02/23/2004 
 Lab Value = 0.045 
 RPT Level = 0.05 
 Lab Sample ID = 20040490025  Analysis Date = 02/23/2004 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20040440035  Analysis Date = 02/12/2004 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20040420001  Analysis Date = 02/12/2004 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20040370017  Analysis Date = 02/12/2004 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20040340024  Analysis Date = 01/30/2004 
 Lab Value = 0.044 
 RPT Level = 0.05 
 Lab Sample ID = 20040270036  Analysis Date = 01/30/2004 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20040230030  Analysis Date = 01/22/2004 
 Lab Value = 0.044 
 RPT Level = 0.05 
 Lab Sample ID = 20040210154  Analysis Date = 01/21/2004 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20040200023  Analysis Date = 01/21/2004 
 Lab Value = 0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20040150075  Analysis Date = 01/14/2004 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20040090020  Analysis Date = 01/14/2004 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20040070032  Analysis Date = 01/14/2004 
 Lab Value = 0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20040050016  Analysis Date = 09/29/2003 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20032660009  Analysis Date = 09/19/2003 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20032600107  Analysis Date = 09/12/2003 
 Lab Value = 0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20032520179  Analysis Date = 09/12/2003 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20032450195  Analysis Date = 08/28/2003 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20032380029  Analysis Date = 08/22/2003 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20032310028  Analysis Date = 08/20/2003 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20032250256  Analysis Date = 08/15/2003 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20032180019  Analysis Date = 08/04/2003 
 Lab Value = 0.038 
 RPT Level = 0.05 
 Lab Sample ID = 20032100004  Analysis Date = 07/25/2003 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20032040043  Analysis Date = 07/18/2003 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20031960025  Analysis Date = 07/18/2003 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20031900098  Analysis Date = 07/08/2003 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20031820037  Analysis Date = 07/08/2003 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20031770041  Analysis Date = 06/26/2003 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20031700013  Analysis Date = 06/17/2003 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20031630053  Analysis Date = 06/13/2003 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20031600109  Analysis Date = 05/29/2003 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20031480059  Analysis Date = 05/29/2003 
 Lab Value = 0.038 
 RPT Level = 0.05 
 Lab Sample ID = 20031430019  Analysis Date = 05/28/2003 
 Lab Value = 0.057 
 RPT Level = 0.05 
 Lab Sample ID = 20031400115  Analysis Date = 05/15/2003 
 Lab Value = 0.056 
 RPT Level = 0.05 
 Lab Sample ID = 20031290084  Analysis Date = 05/09/2003 
 Lab Value = 0.041 
 RPT Level = 0.05 
 Lab Sample ID = 20031220070  Analysis Date = 05/05/2003 
 Lab Value = 0.065 
 RPT Level = 0.05 
 Lab Sample ID = 20031200043  Analysis Date = 05/05/2003 
 Lab Value = 0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20031080208  Analysis Date = 04/10/2003 
 Lab Value = 0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20030970018  Analysis Date = 04/03/2003 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20030920027  Analysis Date = 04/03/2003 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20030900015  Analysis Date = 04/03/2003 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20030860023  Analysis Date = 03/24/2003 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20030710021  Analysis Date = 03/24/2003 
 Lab Value = 0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20030660148  Analysis Date = 03/04/2003 
 Lab Value = 0.053 
 RPT Level = 0.05 
 Lab Sample ID = 20030590040  Analysis Date = 02/27/2003 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20030570061  Analysis Date = 02/12/2003 
 Lab Value = 0.04 
 RPT Level = 0.05 
 Lab Sample ID = 20030410034  Analysis Date = 02/07/2003 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20030350008  Analysis Date = 02/07/2003 
 Lab Value = 0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20030310028  Analysis Date = 02/07/2003 
 Lab Value = 0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20030300004  Analysis Date = 01/22/2003 
 Lab Value = 0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20030150009  Analysis Date = 01/22/2003 
 Lab Value = 0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20030140019  Analysis Date = 01/08/2003 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20030020002  Analysis Date = 01/08/2003 
 Lab Value = 0.046 
 RPT Level = 0.05 
 Lab Sample ID = 20023650009  Analysis Date = 12/20/2002 
 Lab Value = 0.043 
 RPT Level = 0.05 
 Lab Sample ID = 20023500166  Analysis Date = 12/20/2002 
 Lab Value = 0.039 
 RPT Level = 0.05 
 Lab Sample ID = 20023500092  Analysis Date = 12/10/2002 
 Lab Value = 0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20023370026  Analysis Date = 12/10/2002 
 Lab Value = 0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20023370025  Analysis Date = 12/03/2002 
 Lab Value = 0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20023330096  Analysis Date = 12/10/2002 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20023360020  Analysis Date = 12/03/2002 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20023310020  Analysis Date = 11/08/2002 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20023040033  Analysis Date = 10/28/2002 
 Lab Value = 0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20022970050  Analysis Date = 10/28/2002 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20022970049  Analysis Date = 10/28/2002 
 Lab Value = 0.046 
 RPT Level = 0.05 
 Lab Sample ID = 20022970048  Analysis Date = 10/28/2002 
 Lab Value = 0.041 
 RPT Level = 0.05 
 Lab Sample ID = 20022960022  Analysis Date = 09/12/2002 
 Lab Value = 0.04 
 RPT Level = 0.05 
 Lab Sample ID = 20022470019  Analysis Date = 08/30/2002 
 Lab Value = 0.041 
 RPT Level = 0.05 
 Lab Sample ID = 20022340185  Analysis Date = 08/14/2002 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20022210006  Analysis Date = 08/14/2002 
 Lab Value = 0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20022170108  Analysis Date = 07/17/2002 
 Lab Value = 0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20021960235  Analysis Date = 07/03/2002 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20021790007  Analysis Date = 06/25/2002 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20021650004  Analysis Date = 06/03/2002 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20021510058  Analysis Date = 05/17/2002 
 Lab Value = 0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20021300002  Analysis Date = 05/02/2002 
 Lab Value = 0.04 
 RPT Level = 0.05 
 Lab Sample ID = 20021140038  Analysis Date = 04/15/2002 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20021010015  Analysis Date = 04/02/2002 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20020850092  Analysis Date = 03/21/2002 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20020730105  Analysis Date = 03/08/2002 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20020600006  Analysis Date = 02/20/2002 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20020460047  Analysis Date = 02/14/2002 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20020320104  Analysis Date = 01/16/2002 
 Lab Value = 0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20020110002  Analysis Date = 12/21/2001 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20013480007  Analysis Date = 11/15/2001 
 Lab Value = 0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20013110129  Analysis Date = 09/28/2005 
 RPT Level = 0.05  Analysis Date = 09/16/2005 
 RPT Level = 0.05  Analysis Date = 09/16/2005 
 RPT Level = 0.05  Analysis Date = 09/02/2005 
 RPT Level = 0.05  Analysis Date = 09/02/2005 
 RPT Level = 0.05  Analysis Date = 08/30/2005 
 RPT Level = 0.05  Analysis Date = 08/30/2005 
 RPT Level = 0.05  Analysis Date = 08/23/2005 
 RPT Level = 0.05  Analysis Date = 08/23/2005 
 RPT Level = 0.05  Analysis Date = 08/16/2005 
 RPT Level = 0.05  Analysis Date = 08/16/2005 
 RPT Level = 0.05  Analysis Date = 08/09/2005 
 RPT Level = 0.05  Analysis Date = 08/09/2005 
 RPT Level = 0.05  Analysis Date = 08/09/2005 
 RPT Level = 0.05  Analysis Date = 08/09/2005 
 RPT Level = 0.05  Analysis Date = 07/25/2005 
 RPT Level = 0.05  Analysis Date = 07/25/2005 
 RPT Level = 0.05  Analysis Date = 07/25/2005 
 RPT Level = 0.05  Analysis Date = 07/25/2005 
 RPT Level = 0.05  Analysis Date = 07/12/2005 
 RPT Level = 0.05  Analysis Date = 07/12/2005 
 RPT Level = 0.05  Analysis Date = 07/05/2005 
 RPT Level = 0.05  Analysis Date = 07/05/2005 
 RPT Level = 0.05  Analysis Date = 07/05/2005 
 RPT Level = 0.05  Analysis Date = 07/05/2005 
 RPT Level = 0.05  Analysis Date = 06/16/2005 
 RPT Level = 0.05  Analysis Date = 06/16/2005 
 RPT Level = 0.05  Analysis Date = 06/16/2005 
 RPT Level = 0.05  Analysis Date = 06/16/2005 
 RPT Level = 0.05  Analysis Date = 06/08/2005 
 RPT Level = 0.05  Analysis Date = 06/08/2005 
 RPT Level = 0.05  Analysis Date = 06/02/2005 
 RPT Level = 0.05  Analysis Date = 06/02/2005 
 RPT Level = 0.05  Analysis Date = 05/24/2005 
 RPT Level = 0.05  Analysis Date = 05/24/2005 
 RPT Level = 0.05  Analysis Date = 05/19/2005 
 RPT Level = 0.05  Analysis Date = 05/19/2005 
 RPT Level = 0.05  Analysis Date = 05/10/2005 
 RPT Level = 0.05  Analysis Date = 05/10/2005 
 RPT Level = 0.05  Analysis Date = 04/29/2005 
 RPT Level = 0.05  Analysis Date = 04/29/2005 
 RPT Level = 0.05  Analysis Date = 04/29/2005 
 RPT Level = 0.05  Analysis Date = 04/29/2005 
 RPT Level = 0.05  Analysis Date = 04/19/2005 
 RPT Level = 0.05  Analysis Date = 04/19/2005 
 RPT Level = 0.05  Analysis Date = 04/07/2005 
 RPT Level = 0.05  Analysis Date = 04/07/2005 
 RPT Level = 0.05  Analysis Date = 04/07/2005 
 RPT Level = 0.05  Analysis Date = 04/07/2005 
 RPT Level = 0.05  Analysis Date = 04/07/2005 
 RPT Level = 0.05  Analysis Date = 04/07/2005 
 RPT Level = 0.05  Analysis Date = 03/24/2005 
 RPT Level = 0.05  Analysis Date = 03/24/2005 
 RPT Level = 0.05  Analysis Date = 03/17/2005 
 RPT Level = 0.05  Analysis Date = 03/17/2005 
 RPT Level = 0.05  Analysis Date = 03/17/2005 
 RPT Level = 0.05  Analysis Date = 03/17/2005 
 RPT Level = 0.05  Analysis Date = 03/17/2005 
 RPT Level = 0.05  Analysis Date = 03/17/2005 
 RPT Level = 0.05  Analysis Date = 02/28/2005 
 RPT Level = 0.05  Analysis Date = 02/28/2005 
 RPT Level = 0.05  Analysis Date = 02/18/2005 
 RPT Level = 0.05  Analysis Date = 02/18/2005 
 RPT Level = 0.05  Analysis Date = 02/15/2005 
 RPT Level = 0.05  Analysis Date = 02/15/2005 
 RPT Level = 0.05  Analysis Date = 02/08/2005 
 RPT Level = 0.05  Analysis Date = 02/08/2005 
 RPT Level = 0.05  Analysis Date = 02/02/2005 
 RPT Level = 0.05  Analysis Date = 02/02/2005 
 RPT Level = 0.05  Analysis Date = 01/25/2005 
 RPT Level = 0.05  Analysis Date = 01/25/2005 
 RPT Level = 0.05  Analysis Date = 01/20/2005 
 RPT Level = 0.05  Analysis Date = 01/20/2005 
 RPT Level = 0.05  Analysis Date = 01/12/2005 
 RPT Level = 0.05  Analysis Date = 01/12/2005 
 RPT Level = 0.05  Analysis Date = 01/04/2005 
 RPT Level = 0.05  Analysis Date = 01/04/2005 
 RPT Level = 0.05  Analysis Date = 12/28/2004 
 RPT Level = 0.05  Analysis Date = 12/28/2004 
 RPT Level = 0.05  Analysis Date = 12/28/2004 
 RPT Level = 0.05  Analysis Date = 12/28/2004 
 RPT Level = 0.05  Analysis Date = 12/20/2004 
 RPT Level = 0.05  Analysis Date = 12/20/2004 
 RPT Level = 0.05  Analysis Date = 12/28/2004 
 RPT Level = 0.05  Analysis Date = 12/28/2004 
 RPT Level = 0.05  Analysis Date = 12/20/2004 
 RPT Level = 0.05  Analysis Date = 12/20/2004 
 RPT Level = 0.05  Analysis Date = 12/20/2004 
 RPT Level = 0.05  Analysis Date = 12/20/2004 
 RPT Level = 0.05  Analysis Date = 12/09/2004 
 RPT Level = 0.05  Analysis Date = 12/09/2004 
 RPT Level = 0.05  Analysis Date = 12/09/2004 
 RPT Level = 0.05  Analysis Date = 12/09/2004 
 RPT Level = 0.05  Analysis Date = 12/02/2004 
 RPT Level = 0.05  Analysis Date = 12/02/2004 
 RPT Level = 0.05  Analysis Date = 11/24/2004 
 RPT Level = 0.05  Analysis Date = 11/24/2004 
 RPT Level = 0.05  Analysis Date = 11/24/2004 
 RPT Level = 0.05  Analysis Date = 11/24/2004 
 RPT Level = 0.05  Analysis Date = 09/03/2004 
 RPT Level = 0.05  Analysis Date = 09/03/2004 
 RPT Level = 0.05  Analysis Date = 09/01/2004 
 RPT Level = 0.05  Analysis Date = 09/01/2004 
 RPT Level = 0.05  Analysis Date = 08/26/2004 
 RPT Level = 0.05  Analysis Date = 08/26/2004 
 RPT Level = 0.05  Analysis Date = 08/24/2004 
 RPT Level = 0.05  Analysis Date = 08/24/2004 
 RPT Level = 0.05  Analysis Date = 09/01/2004 
 RPT Level = 0.05  Analysis Date = 09/01/2004 
 RPT Level = 0.05  Analysis Date = 09/01/2004 
 RPT Level = 0.05  Analysis Date = 09/01/2004 
 RPT Level = 0.05  Analysis Date = 08/13/2004 
 RPT Level = 0.05  Analysis Date = 08/13/2004 
 RPT Level = 0.05  Analysis Date = 08/09/2004 
 RPT Level = 0.05  Analysis Date = 08/09/2004 
 RPT Level = 0.05  Analysis Date = 08/02/2004 
 RPT Level = 0.05  Analysis Date = 08/02/2004 
 RPT Level = 0.05  Analysis Date = 07/28/2004 
 RPT Level = 0.05  Analysis Date = 07/28/2004 
 RPT Level = 0.05  Analysis Date = 07/21/2004 
 RPT Level = 0.05  Analysis Date = 07/21/2004 
 RPT Level = 0.05  Analysis Date = 07/13/2004 
 RPT Level = 0.05  Analysis Date = 07/13/2004 
 RPT Level = 0.05  Analysis Date = 07/06/2004 
 RPT Level = 0.05  Analysis Date = 07/06/2004 
 RPT Level = 0.05  Analysis Date = 07/06/2004 
 RPT Level = 0.05  Analysis Date = 07/06/2004 
 RPT Level = 0.05  Analysis Date = 06/22/2004 
 RPT Level = 0.05  Analysis Date = 06/22/2004 
 RPT Level = 0.05  Analysis Date = 06/10/2004 
 RPT Level = 0.05  Analysis Date = 06/10/2004 
 RPT Level = 0.05  Analysis Date = 06/10/2004 
 RPT Level = 0.05  Analysis Date = 06/10/2004 
 RPT Level = 0.05  Analysis Date = 06/03/2004 
 RPT Level = 0.05  Analysis Date = 06/03/2004 
 RPT Level = 0.05  Analysis Date = 05/26/2004 
 RPT Level = 0.05  Analysis Date = 05/26/2004 
 RPT Level = 0.05  Analysis Date = 05/07/2004 
 RPT Level = 0.05  Analysis Date = 05/07/2004 
 RPT Level = 0.05  Analysis Date = 05/07/2004 
 RPT Level = 0.05  Analysis Date = 05/07/2004 
 RPT Level = 0.05  Analysis Date = 04/28/2004 
 RPT Level = 0.05  Analysis Date = 04/28/2004 
 RPT Level = 0.05  Analysis Date = 04/21/2004 
 RPT Level = 0.05  Analysis Date = 04/21/2004 
 RPT Level = 0.05  Analysis Date = 04/14/2004 
 RPT Level = 0.05  Analysis Date = 04/14/2004 
 RPT Level = 0.05  Analysis Date = 04/07/2004 
 RPT Level = 0.05  Analysis Date = 04/07/2004 
 RPT Level = 0.05  Analysis Date = 04/01/2004 
 RPT Level = 0.05  Analysis Date = 04/01/2004 
 RPT Level = 0.05  Analysis Date = 04/01/2004 
 RPT Level = 0.05  Analysis Date = 04/01/2004 
 RPT Level = 0.05  Analysis Date = 03/24/2004 
 RPT Level = 0.05  Analysis Date = 03/24/2004 
 RPT Level = 0.05  Analysis Date = 03/24/2004 
 RPT Level = 0.05  Analysis Date = 03/24/2004 
 RPT Level = 0.05  Analysis Date = 03/24/2004 
 RPT Level = 0.05  Analysis Date = 03/24/2004 
 RPT Level = 0.05  Analysis Date = 03/16/2004 
 RPT Level = 0.05  Analysis Date = 03/16/2004 
 RPT Level = 0.05  Analysis Date = 03/16/2004 
 RPT Level = 0.05  Analysis Date = 03/16/2004 
 RPT Level = 0.05  Analysis Date = 03/16/2004 
 RPT Level = 0.05  Analysis Date = 03/16/2004 
 RPT Level = 0.05  Analysis Date = 03/16/2004 
 RPT Level = 0.05  Analysis Date = 03/16/2004 
 RPT Level = 0.05  Analysis Date = 03/03/2004 
 RPT Level = 0.05  Analysis Date = 03/03/2004 
 RPT Level = 0.05  Analysis Date = 03/03/2004 
 RPT Level = 0.05  Analysis Date = 03/03/2004 
 RPT Level = 0.05  Analysis Date = 02/23/2004 
 RPT Level = 0.05  Analysis Date = 02/23/2004 
 RPT Level = 0.05  Analysis Date = 02/23/2004 
 RPT Level = 0.05  Analysis Date = 02/23/2004 
 RPT Level = 0.05  Analysis Date = 02/23/2004 
 RPT Level = 0.05  Analysis Date = 02/23/2004 
 RPT Level = 0.05  Analysis Date = 02/12/2004 
 RPT Level = 0.05  Analysis Date = 02/12/2004 
 RPT Level = 0.05  Analysis Date = 02/12/2004 
 RPT Level = 0.05  Analysis Date = 02/12/2004 
 RPT Level = 0.05  Analysis Date = 02/12/2004 
 RPT Level = 0.05  Analysis Date = 02/12/2004 
 RPT Level = 0.05  Analysis Date = 02/03/2004 
 RPT Level = 0.05  Analysis Date = 02/03/2004 
 RPT Level = 0.05  Analysis Date = 01/30/2004 
 RPT Level = 0.05  Analysis Date = 01/30/2004 
 RPT Level = 0.05  Analysis Date = 01/30/2004 
 RPT Level = 0.05  Analysis Date = 01/30/2004 
 RPT Level = 0.05  Analysis Date = 01/22/2004 
 RPT Level = 0.05  Analysis Date = 01/22/2004 
 RPT Level = 0.05  Analysis Date = 01/21/2004 
 RPT Level = 0.05  Analysis Date = 01/21/2004 
 RPT Level = 0.05  Analysis Date = 01/21/2004 
 RPT Level = 0.05  Analysis Date = 01/21/2004 
 RPT Level = 0.05  Analysis Date = 01/14/2004 
 RPT Level = 0.05  Analysis Date = 01/14/2004 
 RPT Level = 0.05  Analysis Date = 01/14/2004 
 RPT Level = 0.05  Analysis Date = 01/14/2004 
 RPT Level = 0.05  Analysis Date = 01/14/2004 
 RPT Level = 0.05  Analysis Date = 01/14/2004 
 RPT Level = 0.05  Analysis Date = 09/29/2003 
 RPT Level = 0.05  Analysis Date = 09/29/2003 
 RPT Level = 0.05  Analysis Date = 09/19/2003 
 RPT Level = 0.05  Analysis Date = 09/19/2003 
 RPT Level = 0.05  Analysis Date = 09/12/2003 
 RPT Level = 0.05  Analysis Date = 09/12/2003 
 RPT Level = 0.05  Analysis Date = 09/12/2003 
 RPT Level = 0.05  Analysis Date = 09/12/2003 
 RPT Level = 0.05  Analysis Date = 08/28/2003 
 RPT Level = 0.05  Analysis Date = 08/28/2003 
 RPT Level = 0.05  Analysis Date = 08/22/2003 
 RPT Level = 0.05  Analysis Date = 08/22/2003 
 RPT Level = 0.05  Analysis Date = 08/20/2003 
 RPT Level = 0.05  Analysis Date = 08/20/2003 
 RPT Level = 0.05  Analysis Date = 08/15/2003 
 RPT Level = 0.05  Analysis Date = 08/15/2003 
 RPT Level = 0.05  Analysis Date = 08/04/2003 
 RPT Level = 0.05  Analysis Date = 08/04/2003 
 RPT Level = 0.05  Analysis Date = 07/25/2003 
 RPT Level = 0.05  Analysis Date = 07/25/2003 
 RPT Level = 0.05  Analysis Date = 07/18/2003 
 RPT Level = 0.05  Analysis Date = 07/18/2003 
 RPT Level = 0.05  Analysis Date = 07/18/2003 
 RPT Level = 0.05  Analysis Date = 07/18/2003 
 RPT Level = 0.05  Analysis Date = 07/08/2003 
 RPT Level = 0.05  Analysis Date = 07/08/2003 
 RPT Level = 0.05  Analysis Date = 07/08/2003 
 RPT Level = 0.05  Analysis Date = 07/08/2003 
 RPT Level = 0.05  Analysis Date = 06/26/2003 
 RPT Level = 0.05  Analysis Date = 06/26/2003 
 RPT Level = 0.05  Analysis Date = 06/17/2003 
 RPT Level = 0.05  Analysis Date = 06/17/2003 
 RPT Level = 0.05  Analysis Date = 06/13/2003 
 RPT Level = 0.05  Analysis Date = 06/13/2003 
 RPT Level = 0.05  Analysis Date = 05/29/2003 
 RPT Level = 0.05  Analysis Date = 05/29/2003 
 RPT Level = 0.05  Analysis Date = 05/29/2003 
 RPT Level = 0.05  Analysis Date = 05/29/2003 
 RPT Level = 0.05  Analysis Date = 05/28/2003 
 RPT Level = 0.05  Analysis Date = 05/28/2003 
 RPT Level = 0.05  Analysis Date = 05/15/2003 
 RPT Level = 0.05  Analysis Date = 05/15/2003 
 RPT Level = 0.05  Analysis Date = 05/09/2003 
 RPT Level = 0.05  Analysis Date = 05/09/2003 
 RPT Level = 0.05  Analysis Date = 05/05/2003 
 RPT Level = 0.05  Analysis Date = 05/05/2003 
 RPT Level = 0.05  Analysis Date = 05/05/2003 
 RPT Level = 0.05  Analysis Date = 05/05/2003 
 RPT Level = 0.05  Analysis Date = 04/10/2003 
 RPT Level = 0.05  Analysis Date = 04/10/2003 
 RPT Level = 0.05  Analysis Date = 04/03/2003 
 RPT Level = 0.05  Analysis Date = 04/03/2003 
 RPT Level = 0.05  Analysis Date = 04/03/2003 
 RPT Level = 0.05  Analysis Date = 04/03/2003 
 RPT Level = 0.05  Analysis Date = 04/03/2003 
 RPT Level = 0.05  Analysis Date = 04/03/2003 
 RPT Level = 0.05  Analysis Date = 03/24/2003 
 RPT Level = 0.05  Analysis Date = 03/24/2003 
 RPT Level = 0.05  Analysis Date = 03/24/2003 
 RPT Level = 0.05  Analysis Date = 03/24/2003 
 RPT Level = 0.05  Analysis Date = 03/04/2003 
 RPT Level = 0.05  Analysis Date = 03/04/2003 
 RPT Level = 0.05  Analysis Date = 02/27/2003 
 RPT Level = 0.05  Analysis Date = 02/27/2003 
 RPT Level = 0.05  Analysis Date = 02/12/2003 
 RPT Level = 0.05  Analysis Date = 02/12/2003 
 RPT Level = 0.05  Analysis Date = 02/07/2003 
 RPT Level = 0.05  Analysis Date = 02/07/2003 
 RPT Level = 0.05  Analysis Date = 02/07/2003 
 RPT Level = 0.05  Analysis Date = 02/07/2003 
 RPT Level = 0.05  Analysis Date = 02/07/2003 
 RPT Level = 0.05  Analysis Date = 02/07/2003 
 RPT Level = 0.05  Analysis Date = 01/22/2003 
 RPT Level = 0.05  Analysis Date = 01/22/2003 
 RPT Level = 0.05  Analysis Date = 01/22/2003 
 RPT Level = 0.05  Analysis Date = 01/22/2003 
 RPT Level = 0.05  Analysis Date = 01/08/2003 
 RPT Level = 0.05  Analysis Date = 01/08/2003 
 RPT Level = 0.05  Analysis Date = 01/08/2003 
 RPT Level = 0.05  Analysis Date = 01/08/2003 
 RPT Level = 0.05  Analysis Date = 12/20/2002 
 RPT Level = 0.05  Analysis Date = 12/20/2002 
 RPT Level = 0.05  Analysis Date = 12/20/2002 
 RPT Level = 0.05  Analysis Date = 12/20/2002 
 RPT Level = 0.05  Analysis Date = 12/10/2002 
 RPT Level = 0.05  Analysis Date = 12/10/2002 
 RPT Level = 0.05  Analysis Date = 12/10/2002 
 RPT Level = 0.05  Analysis Date = 12/10/2002 
 RPT Level = 0.05  Analysis Date = 12/03/2002 
 RPT Level = 0.05  Analysis Date = 12/03/2002 
 RPT Level = 0.05  Analysis Date = 12/10/2002 
 RPT Level = 0.05  Analysis Date = 12/10/2002 
 RPT Level = 0.05  Analysis Date = 12/03/2002 
 RPT Level = 0.05  Analysis Date = 12/03/2002 
 RPT Level = 0.05  Analysis Date = 11/08/2002 
 RPT Level = 0.05  Analysis Date = 11/08/2002 
 RPT Level = 0.05  Analysis Date = 10/28/2002 
 RPT Level = 0.05  Analysis Date = 10/28/2002 
 RPT Level = 0.05  Analysis Date = 10/28/2002 
 RPT Level = 0.05  Analysis Date = 10/28/2002 
 RPT Level = 0.05  Analysis Date = 10/28/2002 
 RPT Level = 0.05  Analysis Date = 10/28/2002 
 RPT Level = 0.05  Analysis Date = 10/28/2002 
 RPT Level = 0.05  Analysis Date = 10/28/2002 
 RPT Level = 0.05  Analysis Date = 09/12/2002 
 RPT Level = 0.05  Analysis Date = 09/12/2002 
 RPT Level = 0.05  Analysis Date = 08/30/2002 
 RPT Level = 0.05  Analysis Date = 08/30/2002 
 RPT Level = 0.05  Analysis Date = 08/14/2002 
 RPT Level = 0.05  Analysis Date = 08/14/2002 
 RPT Level = 0.05  Analysis Date = 08/14/2002 
 RPT Level = 0.05  Analysis Date = 08/14/2002 
 RPT Level = 0.05  Analysis Date = 07/17/2002 
 RPT Level = 0.05  Analysis Date = 07/17/2002 
 RPT Level = 0.05  Analysis Date = 07/03/2002 
 RPT Level = 0.05  Analysis Date = 07/03/2002 
 RPT Level = 0.05  Analysis Date = 06/25/2002 
 RPT Level = 0.05  Analysis Date = 06/25/2002 
 RPT Level = 0.05  Analysis Date = 06/03/2002 
 RPT Level = 0.05  Analysis Date = 06/03/2002 
 RPT Level = 0.05  Analysis Date = 05/17/2002 
 RPT Level = 0.05  Analysis Date = 05/17/2002 
 RPT Level = 0.05  Analysis Date = 05/02/2002 
 RPT Level = 0.05  Analysis Date = 05/02/2002 
 RPT Level = 0.05  Analysis Date = 04/15/2002 
 RPT Level = 0.05  Analysis Date = 04/15/2002 
 RPT Level = 0.05  Analysis Date = 04/02/2002 
 RPT Level = 0.05  Analysis Date = 04/02/2002 
 RPT Level = 0.05  Analysis Date = 03/21/2002 
 RPT Level = 0.05  Analysis Date = 03/21/2002 
 RPT Level = 0.05  Analysis Date = 03/08/2002 
 RPT Level = 0.05  Analysis Date = 03/08/2002 
 RPT Level = 0.05  Analysis Date = 02/20/2002 
 RPT Level = 0.05  Analysis Date = 02/20/2002 
 RPT Level = 0.05  Analysis Date = 02/14/2002 
 RPT Level = 0.05  Analysis Date = 02/14/2002 
 RPT Level = 0.05  Analysis Date = 01/16/2002 
 RPT Level = 0.05  Analysis Date = 01/16/2002 
 RPT Level = 0.05  Analysis Date = 12/21/2001 
 RPT Level = 0.05  Analysis Date = 12/21/2001 
 RPT Level = 0.05  Analysis Date = 11/15/2001 
 RPT Level = 0.05  Y = 0
The SGPlot Procedure

False Positive Rate for Kjeldahl Nitrogen (NH3+org N as N), FIL, CFA, ACD

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Kjeldahl Nitrogen (NH3+org N as N), FIL, CFA, ACD 00623KJ003 2002 19 0 0%
    2003 52 4 8%
    2004 51 2 4%
    2005 50 2 4%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Kjeldahl Nitrogen (NH3+org N as N), UNF, CFA, ACD -
Blind Blank Results
Lab: NWQL, PCode: 00625, MCode: KJ008
Analysis dates: 11/13/01 through 09/30/16
Open Data Set

 Analysis Date = 06/17/2003 
 Lab Value = 1.326 
 RPT Level = 0.05 
 Lab Sample ID = 20031630053  Analysis Date = 07/01/2002 
 Lab Value = 0.169 
 RPT Level = 0.05 
 Lab Sample ID = 20021790005  Analysis Date = 06/17/2003 
 Lab Value = 1.326 
 RPT Level = 0.05 
 Lab Sample ID = 20031630053  Analysis Date = 07/01/2002 
 Lab Value = 0.169 
 RPT Level = 0.05 
 Lab Sample ID = 20021790005  Analysis Date = 09/30/2016 
 Lab Value = -0.003 
 RPT Level = 0.07 
 Lab Sample ID = 20162640178  Analysis Date = 09/23/2016 
 Lab Value = -0.018 
 RPT Level = 0.07 
 Lab Sample ID = 20162580021  Analysis Date = 09/19/2016 
 Lab Value = -0.011 
 RPT Level = 0.07 
 Lab Sample ID = 20162520021  Analysis Date = 09/14/2016 
 Lab Value = 0.003 
 RPT Level = 0.07 
 Lab Sample ID = 20162440129  Analysis Date = 09/01/2016 
 Lab Value = 0.033 
 RPT Level = 0.07 
 Lab Sample ID = 20162360202  Analysis Date = 08/18/2016 
 Lab Value = -0.029 
 RPT Level = 0.07 
 Lab Sample ID = 20162290136  Analysis Date = 08/12/2016 
 Lab Value = 0.052 
 RPT Level = 0.07 
 Lab Sample ID = 20162230012  Analysis Date = 08/09/2016 
 Lab Value = 0.065 
 RPT Level = 0.07 
 Lab Sample ID = 20162150194  Analysis Date = 07/29/2016 
 Lab Value = -0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20162080237  Analysis Date = 07/25/2016 
 Lab Value = -0.007 
 RPT Level = 0.07 
 Lab Sample ID = 20162010261  Analysis Date = 07/15/2016 
 Lab Value = 0.018 
 RPT Level = 0.07 
 Lab Sample ID = 20161940115  Analysis Date = 07/12/2016 
 Lab Value = -0.012 
 RPT Level = 0.07 
 Lab Sample ID = 20161870038  Analysis Date = 07/05/2016 
 Lab Value = -0.061 
 RPT Level = 0.07 
 Lab Sample ID = 20161800089  Analysis Date = 06/27/2016 
 Lab Value = 0.005 
 RPT Level = 0.07 
 Lab Sample ID = 20161740080  Analysis Date = 06/20/2016 
 Lab Value = -0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20161660157  Analysis Date = 06/14/2016 
 Lab Value = -0.011 
 RPT Level = 0.07 
 Lab Sample ID = 20161590161  Analysis Date = 06/09/2016 
 Lab Value = 0.003 
 RPT Level = 0.07 
 Lab Sample ID = 20161520029  Analysis Date = 06/09/2016 
 Lab Value = -0.033 
 RPT Level = 0.07 
 Lab Sample ID = 20161480203  Analysis Date = 05/17/2016 
 Lab Value = -0.045 
 RPT Level = 0.07 
 Lab Sample ID = 20161270015  Analysis Date = 05/11/2016 
 Lab Value = -0.036 
 RPT Level = 0.07 
 Lab Sample ID = 20161230047  Analysis Date = 05/03/2016 
 Lab Value = 0.021 
 RPT Level = 0.07 
 Lab Sample ID = 20161160095  Analysis Date = 04/25/2016 
 Lab Value = -0.003 
 RPT Level = 0.07 
 Lab Sample ID = 20161100131  Analysis Date = 04/18/2016 
 Lab Value = -0.003 
 RPT Level = 0.07 
 Lab Sample ID = 20161020031  Analysis Date = 04/07/2016 
 Lab Value = -0.016 
 RPT Level = 0.07 
 Lab Sample ID = 20160950050  Analysis Date = 03/31/2016 
 Lab Value = -0.005 
 RPT Level = 0.07 
 Lab Sample ID = 20160880041  Analysis Date = 03/25/2016 
 Lab Value = -0.01 
 RPT Level = 0.07 
 Lab Sample ID = 20160810071  Analysis Date = 03/17/2016 
 Lab Value = 0.032 
 RPT Level = 0.07 
 Lab Sample ID = 20160740016  Analysis Date = 03/09/2016 
 Lab Value = 0.051 
 RPT Level = 0.07 
 Lab Sample ID = 20160670017  Analysis Date = 03/03/2016 
 Lab Value = 0.066 
 RPT Level = 0.07 
 Lab Sample ID = 20160600020  Analysis Date = 02/23/2016 
 Lab Value = -0.006 
 RPT Level = 0.07 
 Lab Sample ID = 20160530019  Analysis Date = 02/18/2016 
 Lab Value = -0.003 
 RPT Level = 0.07 
 Lab Sample ID = 20160470018  Analysis Date = 02/16/2016 
 Lab Value = 0.033 
 RPT Level = 0.07 
 Lab Sample ID = 20160400086  Analysis Date = 02/03/2016 
 Lab Value = 0.007 
 RPT Level = 0.07 
 Lab Sample ID = 20160320014  Analysis Date = 01/28/2016 
 Lab Value = 0.007 
 RPT Level = 0.07 
 Lab Sample ID = 20160250029  Analysis Date = 01/22/2016 
 Lab Value = 0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20160190020  Analysis Date = 01/13/2016 
 Lab Value = 0.022 
 RPT Level = 0.07 
 Lab Sample ID = 20160110012  Analysis Date = 01/07/2016 
 Lab Value = -0.009 
 RPT Level = 0.07 
 Lab Sample ID = 20160050037  Analysis Date = 01/05/2016 
 Lab Value = 0.005 
 RPT Level = 0.07 
 Lab Sample ID = 20153630051  Analysis Date = 12/23/2015 
 Lab Value = 0.023 
 RPT Level = 0.07 
 Lab Sample ID = 20153550014  Analysis Date = 12/21/2015 
 Lab Value = 0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20153500167  Analysis Date = 12/14/2015 
 Lab Value = 0.038 
 RPT Level = 0.07 
 Lab Sample ID = 20153420008  Analysis Date = 12/04/2015 
 Lab Value = -0.003 
 RPT Level = 0.07 
 Lab Sample ID = 20153340010  Analysis Date = 12/02/2015 
 Lab Value = 0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20153270005  Analysis Date = 11/24/2015 
 Lab Value = -0.01 
 RPT Level = 0.07 
 Lab Sample ID = 20153200028  Analysis Date = 11/17/2015 
 Lab Value = 0.017 
 RPT Level = 0.07 
 Lab Sample ID = 20153140001  Analysis Date = 11/06/2015 
 Lab Value = -0.053 
 RPT Level = 0.07 
 Lab Sample ID = 20153060024  Analysis Date = 11/02/2015 
 Lab Value = 0.019 
 RPT Level = 0.07 
 Lab Sample ID = 20152990071  Analysis Date = 10/26/2015 
 Lab Value = 0.007 
 RPT Level = 0.07 
 Lab Sample ID = 20152920041  Analysis Date = 10/20/2015 
 Lab Value = 0.045 
 RPT Level = 0.07 
 Lab Sample ID = 20152860162  Analysis Date = 10/14/2015 
 Lab Value = 0.016 
 RPT Level = 0.07 
 Lab Sample ID = 20152780015  Analysis Date = 10/07/2015 
 Lab Value = 0.006 
 RPT Level = 0.07 
 Lab Sample ID = 20152710074  Analysis Date = 09/30/2015 
 Lab Value = 0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20152640031  Analysis Date = 09/28/2015 
 Lab Value = 0.012 
 RPT Level = 0.07 
 Lab Sample ID = 20152590168  Analysis Date = 09/22/2015 
 Lab Value = 0.011 
 RPT Level = 0.07 
 Lab Sample ID = 20152510015  Analysis Date = 09/17/2015 
 Lab Value = -0.025 
 RPT Level = 0.07 
 Lab Sample ID = 20152430087  Analysis Date = 09/08/2015 
 Lab Value = 0.018 
 RPT Level = 0.07 
 Lab Sample ID = 20152360161  Analysis Date = 08/31/2015 
 Lab Value = -0.05 
 RPT Level = 0.07 
 Lab Sample ID = 20152330023  Analysis Date = 08/19/2015 
 Lab Value = -0.013 
 RPT Level = 0.07 
 Lab Sample ID = 20152230123  Analysis Date = 08/12/2015 
 Lab Value = 0.024 
 RPT Level = 0.07 
 Lab Sample ID = 20152150081  Analysis Date = 08/03/2015 
 Lab Value = 0.001 
 RPT Level = 0.07 
 Lab Sample ID = 20152080071  Analysis Date = 07/28/2015 
 Lab Value = 0.075 
 RPT Level = 0.07 
 Lab Sample ID = 20152010054  Analysis Date = 07/22/2015 
 Lab Value = 0.03 
 RPT Level = 0.07 
 Lab Sample ID = 20151940026  Analysis Date = 07/09/2015 
 Lab Value = 0.016 
 RPT Level = 0.07 
 Lab Sample ID = 20151870013  Analysis Date = 07/09/2015 
 Lab Value = 0.035 
 RPT Level = 0.07 
 Lab Sample ID = 20151800056  Analysis Date = 06/29/2015 
 Lab Value = 0.011 
 RPT Level = 0.07 
 Lab Sample ID = 20151730017  Analysis Date = 06/24/2015 
 Lab Value = 0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20151660033  Analysis Date = 06/22/2015 
 Lab Value = 0.052 
 RPT Level = 0.07 
 Lab Sample ID = 20151620206  Analysis Date = 06/12/2015 
 Lab Value = 0.012 
 RPT Level = 0.07 
 Lab Sample ID = 20151530197  Analysis Date = 06/12/2015 
 Lab Value = 0.032 
 RPT Level = 0.07 
 Lab Sample ID = 20151460122  Analysis Date = 06/01/2015 
 Lab Value = -0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20151390199  Analysis Date = 06/01/2015 
 Lab Value = 0.013 
 RPT Level = 0.07 
 Lab Sample ID = 20151310072  Analysis Date = 05/14/2015 
 Lab Value = 0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20151240056  Analysis Date = 05/05/2015 
 Lab Value = 0.039 
 RPT Level = 0.07 
 Lab Sample ID = 20151180075  Analysis Date = 05/04/2015 
 Lab Value = 0.011 
 RPT Level = 0.07 
 Lab Sample ID = 20151140034  Analysis Date = 04/23/2015 
 Lab Value = -0.007 
 RPT Level = 0.07 
 Lab Sample ID = 20151050043  Analysis Date = 04/15/2015 
 Lab Value = 0.049 
 RPT Level = 0.07 
 Lab Sample ID = 20150970077  Analysis Date = 04/02/2015 
 Lab Value = 0.053 
 RPT Level = 0.07 
 Lab Sample ID = 20150900047  Analysis Date = 03/31/2015 
 Lab Value = -0.007 
 RPT Level = 0.07 
 Lab Sample ID = 20150850046  Analysis Date = 03/24/2015 
 Lab Value = -0.01 
 RPT Level = 0.07 
 Lab Sample ID = 20150770030  Analysis Date = 03/12/2015 
 Lab Value = 0.006 
 RPT Level = 0.07 
 Lab Sample ID = 20150690110  Analysis Date = 03/04/2015 
 Lab Value = 0.022 
 RPT Level = 0.07 
 Lab Sample ID = 20150610108  Analysis Date = 02/26/2015 
 Lab Value = -0.047 
 RPT Level = 0.07 
 Lab Sample ID = 20150540035  Analysis Date = 02/23/2015 
 Lab Value = 0.029 
 RPT Level = 0.07 
 Lab Sample ID = 20150490026  Analysis Date = 02/12/2015 
 Lab Value = 0.021 
 RPT Level = 0.07 
 Lab Sample ID = 20150400036  Analysis Date = 02/06/2015 
 Lab Value = 0.046 
 RPT Level = 0.07 
 Lab Sample ID = 20150330028  Analysis Date = 01/29/2015 
 Lab Value = -0.003 
 RPT Level = 0.07 
 Lab Sample ID = 20150260018  Analysis Date = 01/27/2015 
 Lab Value = 0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20150200028  Analysis Date = 01/22/2015 
 Lab Value = 0.007 
 RPT Level = 0.07 
 Lab Sample ID = 20150120025  Analysis Date = 01/08/2015 
 Lab Value = 0.046 
 RPT Level = 0.07 
 Lab Sample ID = 20150050018  Analysis Date = 01/08/2015 
 Lab Value = 0.039 
 RPT Level = 0.07 
 Lab Sample ID = 20143630011  Analysis Date = 01/08/2015 
 Lab Value = 0.023 
 RPT Level = 0.07 
 Lab Sample ID = 20143560053  Analysis Date = 01/05/2015 
 Lab Value = -0.026 
 RPT Level = 0.07 
 Lab Sample ID = 20143490027  Analysis Date = 12/15/2014 
 Lab Value = 0.033 
 RPT Level = 0.07 
 Lab Sample ID = 20143420027  Analysis Date = 12/09/2014 
 Lab Value = 0.041 
 RPT Level = 0.07 
 Lab Sample ID = 20143360081  Analysis Date = 12/08/2014 
 Lab Value = 0.053 
 RPT Level = 0.07 
 Lab Sample ID = 20143300045  Analysis Date = 12/02/2014 
 Lab Value = 0.061 
 RPT Level = 0.07 
 Lab Sample ID = 20143230052  Analysis Date = 11/24/2014 
 Lab Value = 0.041 
 RPT Level = 0.07 
 Lab Sample ID = 20143160021  Analysis Date = 11/18/2014 
 Lab Value = 0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20143080076  Analysis Date = 11/07/2014 
 Lab Value = 0.011 
 RPT Level = 0.07 
 Lab Sample ID = 20143010069  Analysis Date = 11/04/2014 
 Lab Value = 0.052 
 RPT Level = 0.07 
 Lab Sample ID = 20142950130  Analysis Date = 10/31/2014 
 Lab Value = 0 
 RPT Level = 0.07 
 Lab Sample ID = 20142880087  Analysis Date = 10/24/2014 
 Lab Value = 0.017 
 RPT Level = 0.07 
 Lab Sample ID = 20142790035  Analysis Date = 10/23/2014 
 Lab Value = 0.013 
 RPT Level = 0.07 
 Lab Sample ID = 20142720121  Analysis Date = 10/22/2014 
 Lab Value = 0.023 
 RPT Level = 0.07 
 Lab Sample ID = 20142650111  Analysis Date = 10/14/2014 
 Lab Value = 0.005 
 RPT Level = 0.07 
 Lab Sample ID = 20142590052  Analysis Date = 10/08/2014 
 Lab Value = 0.018 
 RPT Level = 0.07 
 Lab Sample ID = 20142520006  Analysis Date = 10/06/2014 
 Lab Value = 0.011 
 RPT Level = 0.07 
 Lab Sample ID = 20142470054  Analysis Date = 09/17/2014 
 Lab Value = 0.005 
 RPT Level = 0.07 
 Lab Sample ID = 20142230083  Analysis Date = 08/27/2014 
 Lab Value = 0.016 
 RPT Level = 0.07 
 Lab Sample ID = 20142160070  Analysis Date = 08/22/2014 
 Lab Value = -0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20142090218  Analysis Date = 08/06/2014 
 Lab Value = -0.011 
 RPT Level = 0.07 
 Lab Sample ID = 20142030078  Analysis Date = 07/31/2014 
 Lab Value = -0.036 
 RPT Level = 0.07 
 Lab Sample ID = 20141960043  Analysis Date = 07/29/2014 
 Lab Value = 0.052 
 RPT Level = 0.07 
 Lab Sample ID = 20141890090  Analysis Date = 07/25/2014 
 Lab Value = 0.008 
 RPT Level = 0.07 
 Lab Sample ID = 20141820108  Analysis Date = 07/16/2014 
 Lab Value = -0.018 
 RPT Level = 0.07 
 Lab Sample ID = 20141750150  Analysis Date = 07/15/2014 
 Lab Value = -0.029 
 RPT Level = 0.07 
 Lab Sample ID = 20141680086  Analysis Date = 07/03/2014 
 Lab Value = -0.008 
 RPT Level = 0.07 
 Lab Sample ID = 20141620051  Analysis Date = 06/24/2014 
 Lab Value = 0.023 
 RPT Level = 0.07 
 Lab Sample ID = 20141550065  Analysis Date = 06/18/2014 
 Lab Value = -0.039 
 RPT Level = 0.07 
 Lab Sample ID = 20141470150  Analysis Date = 06/09/2014 
 Lab Value = 0.026 
 RPT Level = 0.07 
 Lab Sample ID = 20141400016  Analysis Date = 05/28/2014 
 Lab Value = 0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20141340004  Analysis Date = 05/16/2014 
 Lab Value = -0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20141250088  Analysis Date = 05/02/2014 
 Lab Value = -0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20141190018  Analysis Date = 04/25/2014 
 Lab Value = -0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20141130029  Analysis Date = 04/18/2014 
 Lab Value = 0.013 
 RPT Level = 0.07 
 Lab Sample ID = 20141050011  Analysis Date = 04/09/2014 
 Lab Value = -0.007 
 RPT Level = 0.07 
 Lab Sample ID = 20140970031  Analysis Date = 04/03/2014 
 Lab Value = 0.046 
 RPT Level = 0.07 
 Lab Sample ID = 20140900029  Analysis Date = 03/28/2014 
 Lab Value = -0.007 
 RPT Level = 0.07 
 Lab Sample ID = 20140840094  Analysis Date = 03/21/2014 
 Lab Value = -0.025 
 RPT Level = 0.07 
 Lab Sample ID = 20140760030  Analysis Date = 03/17/2014 
 Lab Value = 0.011 
 RPT Level = 0.07 
 Lab Sample ID = 20140690028  Analysis Date = 03/13/2014 
 Lab Value = -0.015 
 RPT Level = 0.07 
 Lab Sample ID = 20140630125  Analysis Date = 03/10/2014 
 Lab Value = -0.009 
 RPT Level = 0.07 
 Lab Sample ID = 20140550053  Analysis Date = 02/20/2014 
 Lab Value = -0.039 
 RPT Level = 0.07 
 Lab Sample ID = 20140490016  Analysis Date = 02/19/2014 
 Lab Value = 0.041 
 RPT Level = 0.07 
 Lab Sample ID = 20140410010  Analysis Date = 02/06/2014 
 Lab Value = -0.015 
 RPT Level = 0.07 
 Lab Sample ID = 20140340025  Analysis Date = 01/30/2014 
 Lab Value = 0.031 
 RPT Level = 0.07 
 Lab Sample ID = 20140270198  Analysis Date = 01/24/2014 
 Lab Value = 0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20140210048  Analysis Date = 01/16/2014 
 Lab Value = -0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20140130052  Analysis Date = 01/13/2014 
 Lab Value = 0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20140070068  Analysis Date = 12/30/2013 
 Lab Value = 0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20133580057  Analysis Date = 12/19/2013 
 Lab Value = 0.054 
 RPT Level = 0.07 
 Lab Sample ID = 20133500079  Analysis Date = 12/16/2013 
 Lab Value = 0.009 
 RPT Level = 0.07 
 Lab Sample ID = 20133430112  Analysis Date = 12/10/2013 
 Lab Value = 0 
 RPT Level = 0.07 
 Lab Sample ID = 20133360023  Analysis Date = 12/05/2013 
 Lab Value = 0.006 
 RPT Level = 0.07 
 Lab Sample ID = 20133300014  Analysis Date = 11/26/2013 
 Lab Value = -0.01 
 RPT Level = 0.07 
 Lab Sample ID = 20133230005  Analysis Date = 11/21/2013 
 Lab Value = 0.009 
 RPT Level = 0.07 
 Lab Sample ID = 20133170106  Analysis Date = 11/18/2013 
 Lab Value = -0.017 
 RPT Level = 0.07 
 Lab Sample ID = 20133090099  Analysis Date = 11/08/2013 
 Lab Value = 0 
 RPT Level = 0.07 
 Lab Sample ID = 20133030024  Analysis Date = 10/31/2013 
 Lab Value = 0.012 
 RPT Level = 0.07 
 Lab Sample ID = 20132970026  Analysis Date = 10/29/2013 
 Lab Value = 0.011 
 RPT Level = 0.07 
 Lab Sample ID = 20132730139  Analysis Date = 10/18/2013 
 Lab Value = -0.027 
 RPT Level = 0.07 
 Lab Sample ID = 20132660105  Analysis Date = 09/23/2013 
 Lab Value = 0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20132600014  Analysis Date = 09/18/2013 
 Lab Value = -0.003 
 RPT Level = 0.07 
 Lab Sample ID = 20132530114  Analysis Date = 09/09/2013 
 Lab Value = -0.023 
 RPT Level = 0.07 
 Lab Sample ID = 20132410016  Analysis Date = 08/30/2013 
 Lab Value = -0.05 
 RPT Level = 0.07 
 Lab Sample ID = 20132390009  Analysis Date = 08/28/2013 
 Lab Value = 0.007 
 RPT Level = 0.07 
 Lab Sample ID = 20132350026  Analysis Date = 08/20/2013 
 Lab Value = 0.009 
 RPT Level = 0.07 
 Lab Sample ID = 20132270020  Analysis Date = 08/14/2013 
 Lab Value = 0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20132180211  Analysis Date = 08/08/2013 
 Lab Value = 0.006 
 RPT Level = 0.07 
 Lab Sample ID = 20132120021  Analysis Date = 07/26/2013 
 Lab Value = 0.043 
 RPT Level = 0.07 
 Lab Sample ID = 20132040023  Analysis Date = 07/17/2013 
 Lab Value = 0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20131970026  Analysis Date = 07/11/2013 
 Lab Value = 0.014 
 RPT Level = 0.07 
 Lab Sample ID = 20131900089  Analysis Date = 07/08/2013 
 Lab Value = 0.002 
 RPT Level = 0.07 
 Lab Sample ID = 20131830080  Analysis Date = 06/28/2013 
 Lab Value = 0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20131770012  Analysis Date = 06/21/2013 
 Lab Value = 0.006 
 RPT Level = 0.07 
 Lab Sample ID = 20131700039  Analysis Date = 06/19/2013 
 Lab Value = 0.018 
 RPT Level = 0.07 
 Lab Sample ID = 20131640007  Analysis Date = 06/12/2013 
 Lab Value = -0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20131550030  Analysis Date = 06/10/2013 
 Lab Value = 0.029 
 RPT Level = 0.07 
 Lab Sample ID = 20131500023  Analysis Date = 06/03/2013 
 Lab Value = -0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20131430201  Analysis Date = 05/22/2013 
 Lab Value = -0.004 
 RPT Level = 0.07 
 Lab Sample ID = 20131350119  Analysis Date = 05/14/2013 
 Lab Value = 0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20131270023  Analysis Date = 05/03/2013 
 Lab Value = -0.005 
 RPT Level = 0.07 
 Lab Sample ID = 20131220013  Analysis Date = 04/29/2013 
 Lab Value = 0.019 
 RPT Level = 0.07 
 Lab Sample ID = 20131150033  Analysis Date = 04/24/2013 
 Lab Value = 0.02 
 RPT Level = 0.07 
 Lab Sample ID = 20131120124  Analysis Date = 04/24/2013 
 Lab Value = 0.022 
 RPT Level = 0.07 
 Lab Sample ID = 20131090031  Analysis Date = 04/04/2013 
 Lab Value = -0.017 
 RPT Level = 0.07 
 Lab Sample ID = 20130930088  Analysis Date = 03/29/2013 
 Lab Value = 0.016 
 RPT Level = 0.07 
 Lab Sample ID = 20130840059  Analysis Date = 03/26/2013 
 Lab Value = -0.012 
 RPT Level = 0.07 
 Lab Sample ID = 20130770159  Analysis Date = 03/15/2013 
 Lab Value = 0.029 
 RPT Level = 0.07 
 Lab Sample ID = 20130700012  Analysis Date = 03/11/2013 
 Lab Value = 0.015 
 RPT Level = 0.07 
 Lab Sample ID = 20130630123  Analysis Date = 03/06/2013 
 Lab Value = 0.027 
 RPT Level = 0.07 
 Lab Sample ID = 20130570008  Analysis Date = 03/05/2013 
 Lab Value = 0.013 
 RPT Level = 0.07 
 Lab Sample ID = 20130520007  Analysis Date = 09/21/2005 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20052590035  Analysis Date = 09/12/2005 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20052520006  Analysis Date = 09/02/2005 
 Lab Value = 0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20052430006  Analysis Date = 08/29/2005 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20052370002  Analysis Date = 08/19/2005 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20052300009  Analysis Date = 08/10/2005 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20052210012  Analysis Date = 08/05/2005 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20052160007  Analysis Date = 08/05/2005 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20052160005  Analysis Date = 07/21/2005 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20052010007  Analysis Date = 07/18/2005 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20051940015  Analysis Date = 07/11/2005 
 Lab Value = 0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20051880018  Analysis Date = 07/05/2005 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20051800189  Analysis Date = 06/24/2005 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20051740019  Analysis Date = 06/20/2005 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20051660174  Analysis Date = 06/10/2005 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20051590025  Analysis Date = 06/06/2005 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20051530021  Analysis Date = 05/27/2005 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20051440043  Analysis Date = 05/19/2005 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20051380014  Analysis Date = 05/17/2005 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20051320029  Analysis Date = 05/09/2005 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20051250003  Analysis Date = 04/28/2005 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20051170012  Analysis Date = 04/25/2005 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20051110007  Analysis Date = 04/14/2005 
 Lab Value = 0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20051020018  Analysis Date = 04/07/2005 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20050950044  Analysis Date = 04/06/2005 
 Lab Value = 0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20050880116  Analysis Date = 03/31/2005 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20050840096  Analysis Date = 03/18/2005 
 Lab Value = 0.047 
 RPT Level = 0.05 
 Lab Sample ID = 20050750004  Analysis Date = 03/16/2005 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20050700007  Analysis Date = 03/16/2005 
 Lab Value = 0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20050700004  Analysis Date = 03/10/2005 
 Lab Value = 0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20050670011  Analysis Date = 02/28/2005 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20050550024  Analysis Date = 02/28/2005 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20050480005  Analysis Date = 02/15/2005 
 Lab Value = -0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20050410004  Analysis Date = 02/04/2005 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20050340020  Analysis Date = 02/01/2005 
 Lab Value = 0.067 
 RPT Level = 0.05 
 Lab Sample ID = 20050260024  Analysis Date = 01/21/2005 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20050200048  Analysis Date = 01/18/2005 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20050130091  Analysis Date = 01/10/2005 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20050070016  Analysis Date = 01/06/2005 
 Lab Value = 0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20043650002  Analysis Date = 12/28/2004 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20043580037  Analysis Date = 12/28/2004 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20043580035  Analysis Date = 12/21/2004 
 Lab Value = 0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20043520023  Analysis Date = 12/20/2004 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20043510018  Analysis Date = 12/13/2004 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20043450069  Analysis Date = 12/13/2004 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20043440147  Analysis Date = 12/09/2004 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20043380005  Analysis Date = 12/09/2004 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20043380002  Analysis Date = 12/02/2004 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20043310059  Analysis Date = 11/29/2004 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20043280048  Analysis Date = 11/23/2004 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20043240012  Analysis Date = 09/02/2004 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20042450138  Analysis Date = 08/31/2004 
 Lab Value = 0.057 
 RPT Level = 0.05 
 Lab Sample ID = 20042400089  Analysis Date = 08/26/2004 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20042370105  Analysis Date = 08/23/2004 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20042330206  Analysis Date = 08/24/2004 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20042320136  Analysis Date = 08/24/2004 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20042320138  Analysis Date = 08/12/2004 
 Lab Value = 0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20042240114  Analysis Date = 08/05/2004 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20042170123  Analysis Date = 08/02/2004 
 Lab Value = -0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20042110015  Analysis Date = 07/23/2004 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20042040039  Analysis Date = 07/20/2004 
 Lab Value = 0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20041960050  Analysis Date = 07/09/2004 
 Lab Value = 0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20041900062  Analysis Date = 07/07/2004 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20041820035  Analysis Date = 06/25/2004 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20041750057  Analysis Date = 06/22/2004 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20041700080  Analysis Date = 06/10/2004 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20041610055  Analysis Date = 06/04/2004 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20041550019  Analysis Date = 06/01/2004 
 Lab Value = 0.055 
 RPT Level = 0.05 
 Lab Sample ID = 20041470132  Analysis Date = 05/21/2004 
 Lab Value = -0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20041400016  Analysis Date = 05/10/2004 
 Lab Value = 0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20041260099  Analysis Date = 05/03/2004 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20041200046  Analysis Date = 04/27/2004 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20041130016  Analysis Date = 04/19/2004 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20041050022  Analysis Date = 04/08/2004 
 Lab Value = 0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20040980007  Analysis Date = 04/06/2004 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20040930009  Analysis Date = 04/01/2004 
 Lab Value = 0.055 
 RPT Level = 0.05 
 Lab Sample ID = 20040910012  Analysis Date = 03/30/2004 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20040850021  Analysis Date = 03/24/2004 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20040830056  Analysis Date = 03/22/2004 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20040790023  Analysis Date = 03/18/2004 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20040760010  Analysis Date = 03/15/2004 
 Lab Value = 0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20040720029  Analysis Date = 03/15/2004 
 Lab Value = 0.036 
 RPT Level = 0.05 
 Lab Sample ID = 20040710005  Analysis Date = 03/12/2004 
 Lab Value = 0.044 
 RPT Level = 0.05 
 Lab Sample ID = 20040680093  Analysis Date = 03/08/2004 
 Lab Value = 0.048 
 RPT Level = 0.05 
 Lab Sample ID = 20040650001  Analysis Date = 03/01/2004 
 Lab Value = 0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20040580032  Analysis Date = 02/26/2004 
 Lab Value = 0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20040550018  Analysis Date = 02/24/2004 
 Lab Value = -0.044 
 RPT Level = 0.05 
 Lab Sample ID = 20040510134  Analysis Date = 02/19/2004 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20040490025  Analysis Date = 02/19/2004 
 Lab Value = 0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20040440035  Analysis Date = 02/12/2004 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20040420001  Analysis Date = 02/09/2004 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20040370017  Analysis Date = 02/09/2004 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20040340024  Analysis Date = 02/03/2004 
 Lab Value = 0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20040300012  Analysis Date = 01/30/2004 
 Lab Value = 0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20040270036  Analysis Date = 01/26/2004 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20040230030  Analysis Date = 01/22/2004 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20040210154  Analysis Date = 01/21/2004 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20040200023  Analysis Date = 01/20/2004 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20040150075  Analysis Date = 01/16/2004 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20040090020  Analysis Date = 01/16/2004 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20040070032  Analysis Date = 01/16/2004 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20040050016  Analysis Date = 09/25/2003 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20032660009  Analysis Date = 09/18/2003 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20032600107  Analysis Date = 09/11/2003 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20032520179  Analysis Date = 09/04/2003 
 Lab Value = -0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20032450195  Analysis Date = 08/27/2003 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20032380029  Analysis Date = 08/21/2003 
 Lab Value = 0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20032310028  Analysis Date = 08/14/2003 
 Lab Value = 0.039 
 RPT Level = 0.05 
 Lab Sample ID = 20032250256  Analysis Date = 08/08/2003 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20032180019  Analysis Date = 08/04/2003 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20032100004  Analysis Date = 07/24/2003 
 Lab Value = 0.048 
 RPT Level = 0.05 
 Lab Sample ID = 20032040043  Analysis Date = 07/17/2003 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20031960025  Analysis Date = 07/10/2003 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20031900098  Analysis Date = 07/03/2003 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20031820037  Analysis Date = 06/30/2003 
 Lab Value = 0.045 
 RPT Level = 0.05 
 Lab Sample ID = 20031770041  Analysis Date = 06/23/2003 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20031700013  Analysis Date = 06/10/2003 
 Lab Value = 0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20031600109  Analysis Date = 05/29/2003 
 Lab Value = 0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20031480059  Analysis Date = 05/27/2003 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20031430019  Analysis Date = 05/22/2003 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20031400115  Analysis Date = 05/12/2003 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20031290084  Analysis Date = 05/07/2003 
 Lab Value = 0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20031220070  Analysis Date = 05/01/2003 
 Lab Value = 0.048 
 RPT Level = 0.05 
 Lab Sample ID = 20031200043  Analysis Date = 04/22/2003 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20031080208  Analysis Date = 04/08/2003 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20030970018  Analysis Date = 04/03/2003 
 Lab Value = 0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20030920027  Analysis Date = 04/02/2003 
 Lab Value = 0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20030900015  Analysis Date = 04/01/2003 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20030860023  Analysis Date = 03/17/2003 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20030710021  Analysis Date = 03/13/2003 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20030660148  Analysis Date = 03/04/2003 
 Lab Value = 0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20030590040  Analysis Date = 02/27/2003 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20030570061  Analysis Date = 02/11/2003 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20030410034  Analysis Date = 02/06/2003 
 Lab Value = 0.065 
 RPT Level = 0.05 
 Lab Sample ID = 20030350008  Analysis Date = 02/03/2003 
 Lab Value = 0.049 
 RPT Level = 0.05 
 Lab Sample ID = 20030310028  Analysis Date = 01/31/2003 
 Lab Value = 0.039 
 RPT Level = 0.05 
 Lab Sample ID = 20030300004  Analysis Date = 01/16/2003 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20030150009  Analysis Date = 01/15/2003 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20030140019  Analysis Date = 01/06/2003 
 Lab Value = 0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20030020002  Analysis Date = 01/06/2003 
 Lab Value = 0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20023650009  Analysis Date = 12/19/2002 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20023500166  Analysis Date = 12/18/2002 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20023500092  Analysis Date = 12/05/2002 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20023370026  Analysis Date = 12/05/2002 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20023370025  Analysis Date = 12/03/2002 
 Lab Value = 0.047 
 RPT Level = 0.05 
 Lab Sample ID = 20023330096  Analysis Date = 12/05/2002 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20023360020  Analysis Date = 12/03/2002 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20023310020  Analysis Date = 11/01/2002 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20023040033  Analysis Date = 10/25/2002 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20022970050  Analysis Date = 10/25/2002 
 Lab Value = 0.048 
 RPT Level = 0.05 
 Lab Sample ID = 20022970049  Analysis Date = 10/25/2002 
 Lab Value = 0.041 
 RPT Level = 0.05 
 Lab Sample ID = 20022970048  Analysis Date = 10/24/2002 
 Lab Value = 0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20022960022  Analysis Date = 09/06/2002 
 Lab Value = 0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20022470017  Analysis Date = 09/06/2002 
 Lab Value = 0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20022460136  Analysis Date = 08/26/2002 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20022340198  Analysis Date = 08/19/2002 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20022280007  Analysis Date = 08/13/2002 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20022210008  Analysis Date = 08/06/2002 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20022170110  Analysis Date = 08/06/2002 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20022170109  Analysis Date = 07/19/2002 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20021970115  Analysis Date = 07/17/2002 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20021960233  Analysis Date = 07/03/2002 
 Lab Value = 0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20021830021  Analysis Date = 06/20/2002 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20021690012  Analysis Date = 06/17/2002 
 Lab Value = 0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20021650006  Analysis Date = 06/05/2002 
 Lab Value = 0.063 
 RPT Level = 0.05 
 Lab Sample ID = 20021550018  Analysis Date = 06/04/2002 
 Lab Value = 0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20021510056  Analysis Date = 05/24/2002 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20021420159  Analysis Date = 05/16/2002 
 Lab Value = 0.05 
 RPT Level = 0.05 
 Lab Sample ID = 20021330223  Analysis Date = 05/13/2002 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20021300001  Analysis Date = 05/06/2002 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20021210086  Analysis Date = 04/25/2002 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20021140037  Analysis Date = 04/25/2002 
 Lab Value = -0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20021140036  Analysis Date = 04/12/2002 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20021010016  Analysis Date = 04/04/2002 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20020930112  Analysis Date = 03/28/2002 
 Lab Value = 0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20020850091  Analysis Date = 03/26/2002 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20020810192  Analysis Date = 03/19/2002 
 Lab Value = 0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20020730104  Analysis Date = 03/11/2002 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20020670021  Analysis Date = 03/04/2002 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20020600005  Analysis Date = 02/27/2002 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20020570018  Analysis Date = 02/20/2002 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20020460048  Analysis Date = 02/06/2002 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20020360005  Analysis Date = 02/06/2002 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20020320102  Analysis Date = 01/24/2002 
 Lab Value = 0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20020220079  Analysis Date = 01/14/2002 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20020110003  Analysis Date = 01/04/2002 
 Lab Value = 0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20020020005  Analysis Date = 01/03/2002 
 Lab Value = 0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20013600207  Analysis Date = 12/20/2001 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20013520042  Analysis Date = 12/19/2001 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20013480008  Analysis Date = 12/07/2001 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20013390010  Analysis Date = 11/13/2001 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20013110130  Analysis Date = 09/30/2016 
 RPT Level = 0.07  Analysis Date = 09/23/2016 
 RPT Level = 0.07  Analysis Date = 09/23/2016 
 RPT Level = 0.07  Analysis Date = 09/19/2016 
 RPT Level = 0.07  Analysis Date = 09/19/2016 
 RPT Level = 0.07  Analysis Date = 09/14/2016 
 RPT Level = 0.07  Analysis Date = 09/14/2016 
 RPT Level = 0.07  Analysis Date = 09/01/2016 
 RPT Level = 0.07  Analysis Date = 09/01/2016 
 RPT Level = 0.07  Analysis Date = 08/18/2016 
 RPT Level = 0.07  Analysis Date = 08/18/2016 
 RPT Level = 0.07  Analysis Date = 08/12/2016 
 RPT Level = 0.07  Analysis Date = 08/12/2016 
 RPT Level = 0.07  Analysis Date = 08/09/2016 
 RPT Level = 0.07  Analysis Date = 08/09/2016 
 RPT Level = 0.07  Analysis Date = 07/29/2016 
 RPT Level = 0.07  Analysis Date = 07/29/2016 
 RPT Level = 0.07  Analysis Date = 07/25/2016 
 RPT Level = 0.07  Analysis Date = 07/25/2016 
 RPT Level = 0.07  Analysis Date = 07/15/2016 
 RPT Level = 0.07  Analysis Date = 07/15/2016 
 RPT Level = 0.07  Analysis Date = 07/12/2016 
 RPT Level = 0.07  Analysis Date = 07/12/2016 
 RPT Level = 0.07  Analysis Date = 07/05/2016 
 RPT Level = 0.07  Analysis Date = 07/05/2016 
 RPT Level = 0.07  Analysis Date = 06/27/2016 
 RPT Level = 0.07  Analysis Date = 06/27/2016 
 RPT Level = 0.07  Analysis Date = 06/20/2016 
 RPT Level = 0.07  Analysis Date = 06/20/2016 
 RPT Level = 0.07  Analysis Date = 06/14/2016 
 RPT Level = 0.07  Analysis Date = 06/14/2016 
 RPT Level = 0.07  Analysis Date = 06/09/2016 
 RPT Level = 0.07  Analysis Date = 06/09/2016 
 RPT Level = 0.07  Analysis Date = 06/09/2016 
 RPT Level = 0.07  Analysis Date = 06/09/2016 
 RPT Level = 0.07  Analysis Date = 05/17/2016 
 RPT Level = 0.07  Analysis Date = 05/17/2016 
 RPT Level = 0.07  Analysis Date = 05/11/2016 
 RPT Level = 0.07  Analysis Date = 05/11/2016 
 RPT Level = 0.07  Analysis Date = 05/03/2016 
 RPT Level = 0.07  Analysis Date = 05/03/2016 
 RPT Level = 0.07  Analysis Date = 04/25/2016 
 RPT Level = 0.07  Analysis Date = 04/25/2016 
 RPT Level = 0.07  Analysis Date = 04/18/2016 
 RPT Level = 0.07  Analysis Date = 04/18/2016 
 RPT Level = 0.07  Analysis Date = 04/07/2016 
 RPT Level = 0.07  Analysis Date = 04/07/2016 
 RPT Level = 0.07  Analysis Date = 03/31/2016 
 RPT Level = 0.07  Analysis Date = 03/31/2016 
 RPT Level = 0.07  Analysis Date = 03/25/2016 
 RPT Level = 0.07  Analysis Date = 03/25/2016 
 RPT Level = 0.07  Analysis Date = 03/17/2016 
 RPT Level = 0.07  Analysis Date = 03/17/2016 
 RPT Level = 0.07  Analysis Date = 03/09/2016 
 RPT Level = 0.07  Analysis Date = 03/09/2016 
 RPT Level = 0.07  Analysis Date = 03/03/2016 
 RPT Level = 0.07  Analysis Date = 03/03/2016 
 RPT Level = 0.07  Analysis Date = 02/23/2016 
 RPT Level = 0.07  Analysis Date = 02/23/2016 
 RPT Level = 0.07  Analysis Date = 02/18/2016 
 RPT Level = 0.07  Analysis Date = 02/18/2016 
 RPT Level = 0.07  Analysis Date = 02/16/2016 
 RPT Level = 0.07  Analysis Date = 02/16/2016 
 RPT Level = 0.07  Analysis Date = 02/03/2016 
 RPT Level = 0.07  Analysis Date = 02/03/2016 
 RPT Level = 0.07  Analysis Date = 01/28/2016 
 RPT Level = 0.07  Analysis Date = 01/28/2016 
 RPT Level = 0.07  Analysis Date = 01/22/2016 
 RPT Level = 0.07  Analysis Date = 01/22/2016 
 RPT Level = 0.07  Analysis Date = 01/13/2016 
 RPT Level = 0.07  Analysis Date = 01/13/2016 
 RPT Level = 0.07  Analysis Date = 01/07/2016 
 RPT Level = 0.07  Analysis Date = 01/07/2016 
 RPT Level = 0.07  Analysis Date = 01/05/2016 
 RPT Level = 0.07  Analysis Date = 01/05/2016 
 RPT Level = 0.07  Analysis Date = 12/23/2015 
 RPT Level = 0.07  Analysis Date = 12/23/2015 
 RPT Level = 0.07  Analysis Date = 12/21/2015 
 RPT Level = 0.07  Analysis Date = 12/21/2015 
 RPT Level = 0.07  Analysis Date = 12/14/2015 
 RPT Level = 0.07  Analysis Date = 12/14/2015 
 RPT Level = 0.07  Analysis Date = 12/04/2015 
 RPT Level = 0.07  Analysis Date = 12/04/2015 
 RPT Level = 0.07  Analysis Date = 12/02/2015 
 RPT Level = 0.07  Analysis Date = 12/02/2015 
 RPT Level = 0.07  Analysis Date = 11/24/2015 
 RPT Level = 0.07  Analysis Date = 11/24/2015 
 RPT Level = 0.07  Analysis Date = 11/17/2015 
 RPT Level = 0.07  Analysis Date = 11/17/2015 
 RPT Level = 0.07  Analysis Date = 11/06/2015 
 RPT Level = 0.07  Analysis Date = 11/06/2015 
 RPT Level = 0.07  Analysis Date = 11/02/2015 
 RPT Level = 0.07  Analysis Date = 11/02/2015 
 RPT Level = 0.07  Analysis Date = 10/26/2015 
 RPT Level = 0.07  Analysis Date = 10/26/2015 
 RPT Level = 0.07  Analysis Date = 10/20/2015 
 RPT Level = 0.07  Analysis Date = 10/20/2015 
 RPT Level = 0.07  Analysis Date = 10/14/2015 
 RPT Level = 0.07  Analysis Date = 10/14/2015 
 RPT Level = 0.07  Analysis Date = 10/07/2015 
 RPT Level = 0.07  Analysis Date = 10/07/2015 
 RPT Level = 0.07  Analysis Date = 09/30/2015 
 RPT Level = 0.07  Analysis Date = 09/30/2015 
 RPT Level = 0.07  Analysis Date = 09/28/2015 
 RPT Level = 0.07  Analysis Date = 09/28/2015 
 RPT Level = 0.07  Analysis Date = 09/22/2015 
 RPT Level = 0.07  Analysis Date = 09/22/2015 
 RPT Level = 0.07  Analysis Date = 09/17/2015 
 RPT Level = 0.07  Analysis Date = 09/17/2015 
 RPT Level = 0.07  Analysis Date = 09/08/2015 
 RPT Level = 0.07  Analysis Date = 09/08/2015 
 RPT Level = 0.07  Analysis Date = 08/31/2015 
 RPT Level = 0.07  Analysis Date = 08/31/2015 
 RPT Level = 0.07  Analysis Date = 08/19/2015 
 RPT Level = 0.07  Analysis Date = 08/19/2015 
 RPT Level = 0.07  Analysis Date = 08/12/2015 
 RPT Level = 0.07  Analysis Date = 08/12/2015 
 RPT Level = 0.07  Analysis Date = 08/03/2015 
 RPT Level = 0.07  Analysis Date = 08/03/2015 
 RPT Level = 0.07  Analysis Date = 07/28/2015 
 RPT Level = 0.07  Analysis Date = 07/28/2015 
 RPT Level = 0.07  Analysis Date = 07/22/2015 
 RPT Level = 0.07  Analysis Date = 07/22/2015 
 RPT Level = 0.07  Analysis Date = 07/09/2015 
 RPT Level = 0.07  Analysis Date = 07/09/2015 
 RPT Level = 0.07  Analysis Date = 07/09/2015 
 RPT Level = 0.07  Analysis Date = 07/09/2015 
 RPT Level = 0.07  Analysis Date = 06/29/2015 
 RPT Level = 0.07  Analysis Date = 06/29/2015 
 RPT Level = 0.07  Analysis Date = 06/24/2015 
 RPT Level = 0.07  Analysis Date = 06/24/2015 
 RPT Level = 0.07  Analysis Date = 06/22/2015 
 RPT Level = 0.07  Analysis Date = 06/22/2015 
 RPT Level = 0.07  Analysis Date = 06/12/2015 
 RPT Level = 0.07  Analysis Date = 06/12/2015 
 RPT Level = 0.07  Analysis Date = 06/12/2015 
 RPT Level = 0.07  Analysis Date = 06/12/2015 
 RPT Level = 0.07  Analysis Date = 06/01/2015 
 RPT Level = 0.07  Analysis Date = 06/01/2015 
 RPT Level = 0.07  Analysis Date = 06/01/2015 
 RPT Level = 0.07  Analysis Date = 06/01/2015 
 RPT Level = 0.07  Analysis Date = 05/14/2015 
 RPT Level = 0.07  Analysis Date = 05/14/2015 
 RPT Level = 0.07  Analysis Date = 05/05/2015 
 RPT Level = 0.07  Analysis Date = 05/05/2015 
 RPT Level = 0.07  Analysis Date = 05/04/2015 
 RPT Level = 0.07  Analysis Date = 05/04/2015 
 RPT Level = 0.07  Analysis Date = 04/23/2015 
 RPT Level = 0.07  Analysis Date = 04/23/2015 
 RPT Level = 0.07  Analysis Date = 04/15/2015 
 RPT Level = 0.07  Analysis Date = 04/15/2015 
 RPT Level = 0.07  Analysis Date = 04/02/2015 
 RPT Level = 0.07  Analysis Date = 04/02/2015 
 RPT Level = 0.07  Analysis Date = 03/31/2015 
 RPT Level = 0.07  Analysis Date = 03/31/2015 
 RPT Level = 0.07  Analysis Date = 03/24/2015 
 RPT Level = 0.07  Analysis Date = 03/24/2015 
 RPT Level = 0.07  Analysis Date = 03/12/2015 
 RPT Level = 0.07  Analysis Date = 03/12/2015 
 RPT Level = 0.07  Analysis Date = 03/04/2015 
 RPT Level = 0.07  Analysis Date = 03/04/2015 
 RPT Level = 0.07  Analysis Date = 02/26/2015 
 RPT Level = 0.07  Analysis Date = 02/26/2015 
 RPT Level = 0.07  Analysis Date = 02/23/2015 
 RPT Level = 0.07  Analysis Date = 02/23/2015 
 RPT Level = 0.07  Analysis Date = 02/12/2015 
 RPT Level = 0.07  Analysis Date = 02/12/2015 
 RPT Level = 0.07  Analysis Date = 02/06/2015 
 RPT Level = 0.07  Analysis Date = 02/06/2015 
 RPT Level = 0.07  Analysis Date = 01/29/2015 
 RPT Level = 0.07  Analysis Date = 01/29/2015 
 RPT Level = 0.07  Analysis Date = 01/27/2015 
 RPT Level = 0.07  Analysis Date = 01/27/2015 
 RPT Level = 0.07  Analysis Date = 01/22/2015 
 RPT Level = 0.07  Analysis Date = 01/22/2015 
 RPT Level = 0.07  Analysis Date = 01/08/2015 
 RPT Level = 0.07  Analysis Date = 01/08/2015 
 RPT Level = 0.07  Analysis Date = 01/08/2015 
 RPT Level = 0.07  Analysis Date = 01/08/2015 
 RPT Level = 0.07  Analysis Date = 01/08/2015 
 RPT Level = 0.07  Analysis Date = 01/08/2015 
 RPT Level = 0.07  Analysis Date = 01/05/2015 
 RPT Level = 0.07  Analysis Date = 01/05/2015 
 RPT Level = 0.07  Analysis Date = 12/15/2014 
 RPT Level = 0.07  Analysis Date = 12/15/2014 
 RPT Level = 0.07  Analysis Date = 12/09/2014 
 RPT Level = 0.07  Analysis Date = 12/09/2014 
 RPT Level = 0.07  Analysis Date = 12/08/2014 
 RPT Level = 0.07  Analysis Date = 12/08/2014 
 RPT Level = 0.07  Analysis Date = 12/02/2014 
 RPT Level = 0.07  Analysis Date = 12/02/2014 
 RPT Level = 0.07  Analysis Date = 11/24/2014 
 RPT Level = 0.07  Analysis Date = 11/24/2014 
 RPT Level = 0.07  Analysis Date = 11/18/2014 
 RPT Level = 0.07  Analysis Date = 11/18/2014 
 RPT Level = 0.07  Analysis Date = 11/07/2014 
 RPT Level = 0.07  Analysis Date = 11/07/2014 
 RPT Level = 0.07  Analysis Date = 11/04/2014 
 RPT Level = 0.07  Analysis Date = 11/04/2014 
 RPT Level = 0.07  Analysis Date = 10/31/2014 
 RPT Level = 0.07  Analysis Date = 10/31/2014 
 RPT Level = 0.07  Analysis Date = 10/24/2014 
 RPT Level = 0.07  Analysis Date = 10/24/2014 
 RPT Level = 0.07  Analysis Date = 10/23/2014 
 RPT Level = 0.07  Analysis Date = 10/23/2014 
 RPT Level = 0.07  Analysis Date = 10/22/2014 
 RPT Level = 0.07  Analysis Date = 10/22/2014 
 RPT Level = 0.07  Analysis Date = 10/14/2014 
 RPT Level = 0.07  Analysis Date = 10/14/2014 
 RPT Level = 0.07  Analysis Date = 10/08/2014 
 RPT Level = 0.07  Analysis Date = 10/08/2014 
 RPT Level = 0.07  Analysis Date = 10/06/2014 
 RPT Level = 0.07  Analysis Date = 10/06/2014 
 RPT Level = 0.07  Analysis Date = 09/17/2014 
 RPT Level = 0.07  Analysis Date = 09/17/2014 
 RPT Level = 0.07  Analysis Date = 08/27/2014 
 RPT Level = 0.07  Analysis Date = 08/27/2014 
 RPT Level = 0.07  Analysis Date = 08/22/2014 
 RPT Level = 0.07  Analysis Date = 08/22/2014 
 RPT Level = 0.07  Analysis Date = 08/06/2014 
 RPT Level = 0.07  Analysis Date = 08/06/2014 
 RPT Level = 0.07  Analysis Date = 07/31/2014 
 RPT Level = 0.07  Analysis Date = 07/31/2014 
 RPT Level = 0.07  Analysis Date = 07/29/2014 
 RPT Level = 0.07  Analysis Date = 07/29/2014 
 RPT Level = 0.07  Analysis Date = 07/25/2014 
 RPT Level = 0.07  Analysis Date = 07/25/2014 
 RPT Level = 0.07  Analysis Date = 07/16/2014 
 RPT Level = 0.07  Analysis Date = 07/16/2014 
 RPT Level = 0.07  Analysis Date = 07/15/2014 
 RPT Level = 0.07  Analysis Date = 07/15/2014 
 RPT Level = 0.07  Analysis Date = 07/03/2014 
 RPT Level = 0.07  Analysis Date = 07/03/2014 
 RPT Level = 0.07  Analysis Date = 06/24/2014 
 RPT Level = 0.07  Analysis Date = 06/24/2014 
 RPT Level = 0.07  Analysis Date = 06/18/2014 
 RPT Level = 0.07  Analysis Date = 06/18/2014 
 RPT Level = 0.07  Analysis Date = 06/09/2014 
 RPT Level = 0.07  Analysis Date = 06/09/2014 
 RPT Level = 0.07  Analysis Date = 05/28/2014 
 RPT Level = 0.07  Analysis Date = 05/28/2014 
 RPT Level = 0.07  Analysis Date = 05/16/2014 
 RPT Level = 0.07  Analysis Date = 05/16/2014 
 RPT Level = 0.07  Analysis Date = 05/02/2014 
 RPT Level = 0.07  Analysis Date = 05/02/2014 
 RPT Level = 0.07  Analysis Date = 04/25/2014 
 RPT Level = 0.07  Analysis Date = 04/25/2014 
 RPT Level = 0.07  Analysis Date = 04/18/2014 
 RPT Level = 0.07  Analysis Date = 04/18/2014 
 RPT Level = 0.07  Analysis Date = 04/09/2014 
 RPT Level = 0.07  Analysis Date = 04/09/2014 
 RPT Level = 0.07  Analysis Date = 04/03/2014 
 RPT Level = 0.07  Analysis Date = 04/03/2014 
 RPT Level = 0.07  Analysis Date = 03/28/2014 
 RPT Level = 0.07  Analysis Date = 03/28/2014 
 RPT Level = 0.07  Analysis Date = 03/21/2014 
 RPT Level = 0.07  Analysis Date = 03/21/2014 
 RPT Level = 0.07  Analysis Date = 03/17/2014 
 RPT Level = 0.07  Analysis Date = 03/17/2014 
 RPT Level = 0.07  Analysis Date = 03/13/2014 
 RPT Level = 0.07  Analysis Date = 03/13/2014 
 RPT Level = 0.07  Analysis Date = 03/10/2014 
 RPT Level = 0.07  Analysis Date = 03/10/2014 
 RPT Level = 0.07  Analysis Date = 02/20/2014 
 RPT Level = 0.07  Analysis Date = 02/20/2014 
 RPT Level = 0.07  Analysis Date = 02/19/2014 
 RPT Level = 0.07  Analysis Date = 02/19/2014 
 RPT Level = 0.07  Analysis Date = 02/06/2014 
 RPT Level = 0.07  Analysis Date = 02/06/2014 
 RPT Level = 0.07  Analysis Date = 01/30/2014 
 RPT Level = 0.07  Analysis Date = 01/30/2014 
 RPT Level = 0.07  Analysis Date = 01/24/2014 
 RPT Level = 0.07  Analysis Date = 01/24/2014 
 RPT Level = 0.07  Analysis Date = 01/16/2014 
 RPT Level = 0.07  Analysis Date = 01/16/2014 
 RPT Level = 0.07  Analysis Date = 01/13/2014 
 RPT Level = 0.07  Analysis Date = 01/13/2014 
 RPT Level = 0.07  Analysis Date = 12/30/2013 
 RPT Level = 0.07  Analysis Date = 12/30/2013 
 RPT Level = 0.07  Analysis Date = 12/19/2013 
 RPT Level = 0.07  Analysis Date = 12/19/2013 
 RPT Level = 0.07  Analysis Date = 12/16/2013 
 RPT Level = 0.07  Analysis Date = 12/16/2013 
 RPT Level = 0.07  Analysis Date = 12/10/2013 
 RPT Level = 0.07  Analysis Date = 12/10/2013 
 RPT Level = 0.07  Analysis Date = 12/05/2013 
 RPT Level = 0.07  Analysis Date = 12/05/2013 
 RPT Level = 0.07  Analysis Date = 11/26/2013 
 RPT Level = 0.07  Analysis Date = 11/26/2013 
 RPT Level = 0.07  Analysis Date = 11/21/2013 
 RPT Level = 0.07  Analysis Date = 11/21/2013 
 RPT Level = 0.07  Analysis Date = 11/18/2013 
 RPT Level = 0.07  Analysis Date = 11/18/2013 
 RPT Level = 0.07  Analysis Date = 11/08/2013 
 RPT Level = 0.07  Analysis Date = 11/08/2013 
 RPT Level = 0.07  Analysis Date = 10/31/2013 
 RPT Level = 0.07  Analysis Date = 10/31/2013 
 RPT Level = 0.07  Analysis Date = 10/29/2013 
 RPT Level = 0.07  Analysis Date = 10/29/2013 
 RPT Level = 0.07  Analysis Date = 10/18/2013 
 RPT Level = 0.07  Analysis Date = 10/18/2013 
 RPT Level = 0.07  Analysis Date = 09/23/2013 
 RPT Level = 0.07  Analysis Date = 09/23/2013 
 RPT Level = 0.07  Analysis Date = 09/18/2013 
 RPT Level = 0.07  Analysis Date = 09/18/2013 
 RPT Level = 0.07  Analysis Date = 09/09/2013 
 RPT Level = 0.07  Analysis Date = 09/09/2013 
 RPT Level = 0.07  Analysis Date = 08/30/2013 
 RPT Level = 0.07  Analysis Date = 08/30/2013 
 RPT Level = 0.07  Analysis Date = 08/28/2013 
 RPT Level = 0.07  Analysis Date = 08/28/2013 
 RPT Level = 0.07  Analysis Date = 08/20/2013 
 RPT Level = 0.07  Analysis Date = 08/20/2013 
 RPT Level = 0.07  Analysis Date = 08/14/2013 
 RPT Level = 0.07  Analysis Date = 08/14/2013 
 RPT Level = 0.07  Analysis Date = 08/08/2013 
 RPT Level = 0.07  Analysis Date = 08/08/2013 
 RPT Level = 0.07  Analysis Date = 07/26/2013 
 RPT Level = 0.07  Analysis Date = 07/26/2013 
 RPT Level = 0.07  Analysis Date = 07/17/2013 
 RPT Level = 0.07  Analysis Date = 07/17/2013 
 RPT Level = 0.07  Analysis Date = 07/11/2013 
 RPT Level = 0.07  Analysis Date = 07/11/2013 
 RPT Level = 0.07  Analysis Date = 07/08/2013 
 RPT Level = 0.07  Analysis Date = 07/08/2013 
 RPT Level = 0.07  Analysis Date = 06/28/2013 
 RPT Level = 0.07  Analysis Date = 06/28/2013 
 RPT Level = 0.07  Analysis Date = 06/21/2013 
 RPT Level = 0.07  Analysis Date = 06/21/2013 
 RPT Level = 0.07  Analysis Date = 06/19/2013 
 RPT Level = 0.07  Analysis Date = 06/19/2013 
 RPT Level = 0.07  Analysis Date = 06/12/2013 
 RPT Level = 0.07  Analysis Date = 06/12/2013 
 RPT Level = 0.07  Analysis Date = 06/10/2013 
 RPT Level = 0.07  Analysis Date = 06/10/2013 
 RPT Level = 0.07  Analysis Date = 06/03/2013 
 RPT Level = 0.07  Analysis Date = 06/03/2013 
 RPT Level = 0.07  Analysis Date = 05/22/2013 
 RPT Level = 0.07  Analysis Date = 05/22/2013 
 RPT Level = 0.07  Analysis Date = 05/14/2013 
 RPT Level = 0.07  Analysis Date = 05/14/2013 
 RPT Level = 0.07  Analysis Date = 05/03/2013 
 RPT Level = 0.07  Analysis Date = 05/03/2013 
 RPT Level = 0.07  Analysis Date = 04/29/2013 
 RPT Level = 0.07  Analysis Date = 04/29/2013 
 RPT Level = 0.07  Analysis Date = 04/24/2013 
 RPT Level = 0.07  Analysis Date = 04/24/2013 
 RPT Level = 0.07  Analysis Date = 04/24/2013 
 RPT Level = 0.07  Analysis Date = 04/24/2013 
 RPT Level = 0.07  Analysis Date = 04/04/2013 
 RPT Level = 0.07  Analysis Date = 04/04/2013 
 RPT Level = 0.07  Analysis Date = 03/29/2013 
 RPT Level = 0.07  Analysis Date = 03/29/2013 
 RPT Level = 0.07  Analysis Date = 03/26/2013 
 RPT Level = 0.07  Analysis Date = 03/26/2013 
 RPT Level = 0.07  Analysis Date = 03/15/2013 
 RPT Level = 0.07  Analysis Date = 03/15/2013 
 RPT Level = 0.07  Analysis Date = 03/11/2013 
 RPT Level = 0.07  Analysis Date = 03/11/2013 
 RPT Level = 0.07  Analysis Date = 03/06/2013 
 RPT Level = 0.07  Analysis Date = 03/06/2013 
 RPT Level = 0.07  Analysis Date = 03/05/2013 
 RPT Level = 0.07  Analysis Date = 03/05/2013 
 RPT Level = 0.07  Analysis Date = 09/21/2005 
 RPT Level = 0.05  Analysis Date = 09/21/2005 
 RPT Level = 0.05  Analysis Date = 09/12/2005 
 RPT Level = 0.05  Analysis Date = 09/12/2005 
 RPT Level = 0.05  Analysis Date = 09/02/2005 
 RPT Level = 0.05  Analysis Date = 09/02/2005 
 RPT Level = 0.05  Analysis Date = 08/29/2005 
 RPT Level = 0.05  Analysis Date = 08/29/2005 
 RPT Level = 0.05  Analysis Date = 08/19/2005 
 RPT Level = 0.05  Analysis Date = 08/19/2005 
 RPT Level = 0.05  Analysis Date = 08/10/2005 
 RPT Level = 0.05  Analysis Date = 08/10/2005 
 RPT Level = 0.05  Analysis Date = 08/05/2005 
 RPT Level = 0.05  Analysis Date = 08/05/2005 
 RPT Level = 0.05  Analysis Date = 08/05/2005 
 RPT Level = 0.05  Analysis Date = 08/05/2005 
 RPT Level = 0.05  Analysis Date = 07/21/2005 
 RPT Level = 0.05  Analysis Date = 07/21/2005 
 RPT Level = 0.05  Analysis Date = 07/18/2005 
 RPT Level = 0.05  Analysis Date = 07/18/2005 
 RPT Level = 0.05  Analysis Date = 07/11/2005 
 RPT Level = 0.05  Analysis Date = 07/11/2005 
 RPT Level = 0.05  Analysis Date = 07/05/2005 
 RPT Level = 0.05  Analysis Date = 07/05/2005 
 RPT Level = 0.05  Analysis Date = 06/24/2005 
 RPT Level = 0.05  Analysis Date = 06/24/2005 
 RPT Level = 0.05  Analysis Date = 06/20/2005 
 RPT Level = 0.05  Analysis Date = 06/20/2005 
 RPT Level = 0.05  Analysis Date = 06/10/2005 
 RPT Level = 0.05  Analysis Date = 06/10/2005 
 RPT Level = 0.05  Analysis Date = 06/06/2005 
 RPT Level = 0.05  Analysis Date = 06/06/2005 
 RPT Level = 0.05  Analysis Date = 05/27/2005 
 RPT Level = 0.05  Analysis Date = 05/27/2005 
 RPT Level = 0.05  Analysis Date = 05/19/2005 
 RPT Level = 0.05  Analysis Date = 05/19/2005 
 RPT Level = 0.05  Analysis Date = 05/17/2005 
 RPT Level = 0.05  Analysis Date = 05/17/2005 
 RPT Level = 0.05  Analysis Date = 05/09/2005 
 RPT Level = 0.05  Analysis Date = 05/09/2005 
 RPT Level = 0.05  Analysis Date = 04/28/2005 
 RPT Level = 0.05  Analysis Date = 04/28/2005 
 RPT Level = 0.05  Analysis Date = 04/25/2005 
 RPT Level = 0.05  Analysis Date = 04/25/2005 
 RPT Level = 0.05  Analysis Date = 04/14/2005 
 RPT Level = 0.05  Analysis Date = 04/14/2005 
 RPT Level = 0.05  Analysis Date = 04/07/2005 
 RPT Level = 0.05  Analysis Date = 04/07/2005 
 RPT Level = 0.05  Analysis Date = 04/06/2005 
 RPT Level = 0.05  Analysis Date = 04/06/2005 
 RPT Level = 0.05  Analysis Date = 03/31/2005 
 RPT Level = 0.05  Analysis Date = 03/31/2005 
 RPT Level = 0.05  Analysis Date = 03/18/2005 
 RPT Level = 0.05  Analysis Date = 03/18/2005 
 RPT Level = 0.05  Analysis Date = 03/16/2005 
 RPT Level = 0.05  Analysis Date = 03/16/2005 
 RPT Level = 0.05  Analysis Date = 03/16/2005 
 RPT Level = 0.05  Analysis Date = 03/16/2005 
 RPT Level = 0.05  Analysis Date = 03/10/2005 
 RPT Level = 0.05  Analysis Date = 03/10/2005 
 RPT Level = 0.05  Analysis Date = 02/28/2005 
 RPT Level = 0.05  Analysis Date = 02/28/2005 
 RPT Level = 0.05  Analysis Date = 02/28/2005 
 RPT Level = 0.05  Analysis Date = 02/28/2005 
 RPT Level = 0.05  Analysis Date = 02/15/2005 
 RPT Level = 0.05  Analysis Date = 02/15/2005 
 RPT Level = 0.05  Analysis Date = 02/04/2005 
 RPT Level = 0.05  Analysis Date = 02/04/2005 
 RPT Level = 0.05  Analysis Date = 02/01/2005 
 RPT Level = 0.05  Analysis Date = 02/01/2005 
 RPT Level = 0.05  Analysis Date = 01/21/2005 
 RPT Level = 0.05  Analysis Date = 01/21/2005 
 RPT Level = 0.05  Analysis Date = 01/18/2005 
 RPT Level = 0.05  Analysis Date = 01/18/2005 
 RPT Level = 0.05  Analysis Date = 01/10/2005 
 RPT Level = 0.05  Analysis Date = 01/10/2005 
 RPT Level = 0.05  Analysis Date = 01/06/2005 
 RPT Level = 0.05  Analysis Date = 01/06/2005 
 RPT Level = 0.05  Analysis Date = 12/28/2004 
 RPT Level = 0.05  Analysis Date = 12/28/2004 
 RPT Level = 0.05  Analysis Date = 12/28/2004 
 RPT Level = 0.05  Analysis Date = 12/28/2004 
 RPT Level = 0.05  Analysis Date = 12/21/2004 
 RPT Level = 0.05  Analysis Date = 12/21/2004 
 RPT Level = 0.05  Analysis Date = 12/20/2004 
 RPT Level = 0.05  Analysis Date = 12/20/2004 
 RPT Level = 0.05  Analysis Date = 12/13/2004 
 RPT Level = 0.05  Analysis Date = 12/13/2004 
 RPT Level = 0.05  Analysis Date = 12/13/2004 
 RPT Level = 0.05  Analysis Date = 12/13/2004 
 RPT Level = 0.05  Analysis Date = 12/09/2004 
 RPT Level = 0.05  Analysis Date = 12/09/2004 
 RPT Level = 0.05  Analysis Date = 12/09/2004 
 RPT Level = 0.05  Analysis Date = 12/09/2004 
 RPT Level = 0.05  Analysis Date = 12/02/2004 
 RPT Level = 0.05  Analysis Date = 12/02/2004 
 RPT Level = 0.05  Analysis Date = 11/29/2004 
 RPT Level = 0.05  Analysis Date = 11/29/2004 
 RPT Level = 0.05  Analysis Date = 11/23/2004 
 RPT Level = 0.05  Analysis Date = 11/23/2004 
 RPT Level = 0.05  Analysis Date = 09/02/2004 
 RPT Level = 0.05  Analysis Date = 09/02/2004 
 RPT Level = 0.05  Analysis Date = 08/31/2004 
 RPT Level = 0.05  Analysis Date = 08/31/2004 
 RPT Level = 0.05  Analysis Date = 08/26/2004 
 RPT Level = 0.05  Analysis Date = 08/26/2004 
 RPT Level = 0.05  Analysis Date = 08/23/2004 
 RPT Level = 0.05  Analysis Date = 08/23/2004 
 RPT Level = 0.05  Analysis Date = 08/24/2004 
 RPT Level = 0.05  Analysis Date = 08/24/2004 
 RPT Level = 0.05  Analysis Date = 08/24/2004 
 RPT Level = 0.05  Analysis Date = 08/24/2004 
 RPT Level = 0.05  Analysis Date = 08/12/2004 
 RPT Level = 0.05  Analysis Date = 08/12/2004 
 RPT Level = 0.05  Analysis Date = 08/05/2004 
 RPT Level = 0.05  Analysis Date = 08/05/2004 
 RPT Level = 0.05  Analysis Date = 08/02/2004 
 RPT Level = 0.05  Analysis Date = 08/02/2004 
 RPT Level = 0.05  Analysis Date = 07/23/2004 
 RPT Level = 0.05  Analysis Date = 07/23/2004 
 RPT Level = 0.05  Analysis Date = 07/20/2004 
 RPT Level = 0.05  Analysis Date = 07/20/2004 
 RPT Level = 0.05  Analysis Date = 07/09/2004 
 RPT Level = 0.05  Analysis Date = 07/09/2004 
 RPT Level = 0.05  Analysis Date = 07/07/2004 
 RPT Level = 0.05  Analysis Date = 07/07/2004 
 RPT Level = 0.05  Analysis Date = 06/25/2004 
 RPT Level = 0.05  Analysis Date = 06/25/2004 
 RPT Level = 0.05  Analysis Date = 06/22/2004 
 RPT Level = 0.05  Analysis Date = 06/22/2004 
 RPT Level = 0.05  Analysis Date = 06/10/2004 
 RPT Level = 0.05  Analysis Date = 06/10/2004 
 RPT Level = 0.05  Analysis Date = 06/04/2004 
 RPT Level = 0.05  Analysis Date = 06/04/2004 
 RPT Level = 0.05  Analysis Date = 06/01/2004 
 RPT Level = 0.05  Analysis Date = 06/01/2004 
 RPT Level = 0.05  Analysis Date = 05/21/2004 
 RPT Level = 0.05  Analysis Date = 05/21/2004 
 RPT Level = 0.05  Analysis Date = 05/10/2004 
 RPT Level = 0.05  Analysis Date = 05/10/2004 
 RPT Level = 0.05  Analysis Date = 05/03/2004 
 RPT Level = 0.05  Analysis Date = 05/03/2004 
 RPT Level = 0.05  Analysis Date = 04/27/2004 
 RPT Level = 0.05  Analysis Date = 04/27/2004 
 RPT Level = 0.05  Analysis Date = 04/19/2004 
 RPT Level = 0.05  Analysis Date = 04/19/2004 
 RPT Level = 0.05  Analysis Date = 04/08/2004 
 RPT Level = 0.05  Analysis Date = 04/08/2004 
 RPT Level = 0.05  Analysis Date = 04/06/2004 
 RPT Level = 0.05  Analysis Date = 04/06/2004 
 RPT Level = 0.05  Analysis Date = 04/01/2004 
 RPT Level = 0.05  Analysis Date = 04/01/2004 
 RPT Level = 0.05  Analysis Date = 03/30/2004 
 RPT Level = 0.05  Analysis Date = 03/30/2004 
 RPT Level = 0.05  Analysis Date = 03/24/2004 
 RPT Level = 0.05  Analysis Date = 03/24/2004 
 RPT Level = 0.05  Analysis Date = 03/22/2004 
 RPT Level = 0.05  Analysis Date = 03/22/2004 
 RPT Level = 0.05  Analysis Date = 03/18/2004 
 RPT Level = 0.05  Analysis Date = 03/18/2004 
 RPT Level = 0.05  Analysis Date = 03/15/2004 
 RPT Level = 0.05  Analysis Date = 03/15/2004 
 RPT Level = 0.05  Analysis Date = 03/15/2004 
 RPT Level = 0.05  Analysis Date = 03/15/2004 
 RPT Level = 0.05  Analysis Date = 03/12/2004 
 RPT Level = 0.05  Analysis Date = 03/12/2004 
 RPT Level = 0.05  Analysis Date = 03/08/2004 
 RPT Level = 0.05  Analysis Date = 03/08/2004 
 RPT Level = 0.05  Analysis Date = 03/01/2004 
 RPT Level = 0.05  Analysis Date = 03/01/2004 
 RPT Level = 0.05  Analysis Date = 02/26/2004 
 RPT Level = 0.05  Analysis Date = 02/26/2004 
 RPT Level = 0.05  Analysis Date = 02/24/2004 
 RPT Level = 0.05  Analysis Date = 02/24/2004 
 RPT Level = 0.05  Analysis Date = 02/19/2004 
 RPT Level = 0.05  Analysis Date = 02/19/2004 
 RPT Level = 0.05  Analysis Date = 02/19/2004 
 RPT Level = 0.05  Analysis Date = 02/19/2004 
 RPT Level = 0.05  Analysis Date = 02/12/2004 
 RPT Level = 0.05  Analysis Date = 02/12/2004 
 RPT Level = 0.05  Analysis Date = 02/09/2004 
 RPT Level = 0.05  Analysis Date = 02/09/2004 
 RPT Level = 0.05  Analysis Date = 02/09/2004 
 RPT Level = 0.05  Analysis Date = 02/09/2004 
 RPT Level = 0.05  Analysis Date = 02/03/2004 
 RPT Level = 0.05  Analysis Date = 02/03/2004 
 RPT Level = 0.05  Analysis Date = 01/30/2004 
 RPT Level = 0.05  Analysis Date = 01/30/2004 
 RPT Level = 0.05  Analysis Date = 01/26/2004 
 RPT Level = 0.05  Analysis Date = 01/26/2004 
 RPT Level = 0.05  Analysis Date = 01/22/2004 
 RPT Level = 0.05  Analysis Date = 01/22/2004 
 RPT Level = 0.05  Analysis Date = 01/21/2004 
 RPT Level = 0.05  Analysis Date = 01/21/2004 
 RPT Level = 0.05  Analysis Date = 01/20/2004 
 RPT Level = 0.05  Analysis Date = 01/20/2004 
 RPT Level = 0.05  Analysis Date = 01/16/2004 
 RPT Level = 0.05  Analysis Date = 01/16/2004 
 RPT Level = 0.05  Analysis Date = 01/16/2004 
 RPT Level = 0.05  Analysis Date = 01/16/2004 
 RPT Level = 0.05  Analysis Date = 01/16/2004 
 RPT Level = 0.05  Analysis Date = 01/16/2004 
 RPT Level = 0.05  Analysis Date = 09/25/2003 
 RPT Level = 0.05  Analysis Date = 09/25/2003 
 RPT Level = 0.05  Analysis Date = 09/18/2003 
 RPT Level = 0.05  Analysis Date = 09/18/2003 
 RPT Level = 0.05  Analysis Date = 09/11/2003 
 RPT Level = 0.05  Analysis Date = 09/11/2003 
 RPT Level = 0.05  Analysis Date = 09/04/2003 
 RPT Level = 0.05  Analysis Date = 09/04/2003 
 RPT Level = 0.05  Analysis Date = 08/27/2003 
 RPT Level = 0.05  Analysis Date = 08/27/2003 
 RPT Level = 0.05  Analysis Date = 08/21/2003 
 RPT Level = 0.05  Analysis Date = 08/21/2003 
 RPT Level = 0.05  Analysis Date = 08/14/2003 
 RPT Level = 0.05  Analysis Date = 08/14/2003 
 RPT Level = 0.05  Analysis Date = 08/08/2003 
 RPT Level = 0.05  Analysis Date = 08/08/2003 
 RPT Level = 0.05  Analysis Date = 08/04/2003 
 RPT Level = 0.05  Analysis Date = 08/04/2003 
 RPT Level = 0.05  Analysis Date = 07/24/2003 
 RPT Level = 0.05  Analysis Date = 07/24/2003 
 RPT Level = 0.05  Analysis Date = 07/17/2003 
 RPT Level = 0.05  Analysis Date = 07/17/2003 
 RPT Level = 0.05  Analysis Date = 07/10/2003 
 RPT Level = 0.05  Analysis Date = 07/10/2003 
 RPT Level = 0.05  Analysis Date = 07/03/2003 
 RPT Level = 0.05  Analysis Date = 07/03/2003 
 RPT Level = 0.05  Analysis Date = 06/30/2003 
 RPT Level = 0.05  Analysis Date = 06/30/2003 
 RPT Level = 0.05  Analysis Date = 06/23/2003 
 RPT Level = 0.05  Analysis Date = 06/23/2003 
 RPT Level = 0.05  Analysis Date = 06/17/2003 
 RPT Level = 0.05  Analysis Date = 06/17/2003 
 RPT Level = 0.05  Analysis Date = 06/10/2003 
 RPT Level = 0.05  Analysis Date = 06/10/2003 
 RPT Level = 0.05  Analysis Date = 05/29/2003 
 RPT Level = 0.05  Analysis Date = 05/29/2003 
 RPT Level = 0.05  Analysis Date = 05/27/2003 
 RPT Level = 0.05  Analysis Date = 05/27/2003 
 RPT Level = 0.05  Analysis Date = 05/22/2003 
 RPT Level = 0.05  Analysis Date = 05/22/2003 
 RPT Level = 0.05  Analysis Date = 05/12/2003 
 RPT Level = 0.05  Analysis Date = 05/12/2003 
 RPT Level = 0.05  Analysis Date = 05/07/2003 
 RPT Level = 0.05  Analysis Date = 05/07/2003 
 RPT Level = 0.05  Analysis Date = 05/01/2003 
 RPT Level = 0.05  Analysis Date = 05/01/2003 
 RPT Level = 0.05  Analysis Date = 04/22/2003 
 RPT Level = 0.05  Analysis Date = 04/22/2003 
 RPT Level = 0.05  Analysis Date = 04/08/2003 
 RPT Level = 0.05  Analysis Date = 04/08/2003 
 RPT Level = 0.05  Analysis Date = 04/03/2003 
 RPT Level = 0.05  Analysis Date = 04/03/2003 
 RPT Level = 0.05  Analysis Date = 04/02/2003 
 RPT Level = 0.05  Analysis Date = 04/02/2003 
 RPT Level = 0.05  Analysis Date = 04/01/2003 
 RPT Level = 0.05  Analysis Date = 04/01/2003 
 RPT Level = 0.05  Analysis Date = 03/17/2003 
 RPT Level = 0.05  Analysis Date = 03/17/2003 
 RPT Level = 0.05  Analysis Date = 03/13/2003 
 RPT Level = 0.05  Analysis Date = 03/13/2003 
 RPT Level = 0.05  Analysis Date = 03/04/2003 
 RPT Level = 0.05  Analysis Date = 03/04/2003 
 RPT Level = 0.05  Analysis Date = 02/27/2003 
 RPT Level = 0.05  Analysis Date = 02/27/2003 
 RPT Level = 0.05  Analysis Date = 02/11/2003 
 RPT Level = 0.05  Analysis Date = 02/11/2003 
 RPT Level = 0.05  Analysis Date = 02/06/2003 
 RPT Level = 0.05  Analysis Date = 02/06/2003 
 RPT Level = 0.05  Analysis Date = 02/03/2003 
 RPT Level = 0.05  Analysis Date = 02/03/2003 
 RPT Level = 0.05  Analysis Date = 01/31/2003 
 RPT Level = 0.05  Analysis Date = 01/31/2003 
 RPT Level = 0.05  Analysis Date = 01/16/2003 
 RPT Level = 0.05  Analysis Date = 01/16/2003 
 RPT Level = 0.05  Analysis Date = 01/15/2003 
 RPT Level = 0.05  Analysis Date = 01/15/2003 
 RPT Level = 0.05  Analysis Date = 01/06/2003 
 RPT Level = 0.05  Analysis Date = 01/06/2003 
 RPT Level = 0.05  Analysis Date = 01/06/2003 
 RPT Level = 0.05  Analysis Date = 01/06/2003 
 RPT Level = 0.05  Analysis Date = 12/19/2002 
 RPT Level = 0.05  Analysis Date = 12/19/2002 
 RPT Level = 0.05  Analysis Date = 12/18/2002 
 RPT Level = 0.05  Analysis Date = 12/18/2002 
 RPT Level = 0.05  Analysis Date = 12/05/2002 
 RPT Level = 0.05  Analysis Date = 12/05/2002 
 RPT Level = 0.05  Analysis Date = 12/05/2002 
 RPT Level = 0.05  Analysis Date = 12/05/2002 
 RPT Level = 0.05  Analysis Date = 12/03/2002 
 RPT Level = 0.05  Analysis Date = 12/03/2002 
 RPT Level = 0.05  Analysis Date = 12/05/2002 
 RPT Level = 0.05  Analysis Date = 12/05/2002 
 RPT Level = 0.05  Analysis Date = 12/03/2002 
 RPT Level = 0.05  Analysis Date = 12/03/2002 
 RPT Level = 0.05  Analysis Date = 11/01/2002 
 RPT Level = 0.05  Analysis Date = 11/01/2002 
 RPT Level = 0.05  Analysis Date = 10/25/2002 
 RPT Level = 0.05  Analysis Date = 10/25/2002 
 RPT Level = 0.05  Analysis Date = 10/25/2002 
 RPT Level = 0.05  Analysis Date = 10/25/2002 
 RPT Level = 0.05  Analysis Date = 10/25/2002 
 RPT Level = 0.05  Analysis Date = 10/25/2002 
 RPT Level = 0.05  Analysis Date = 10/24/2002 
 RPT Level = 0.05  Analysis Date = 10/24/2002 
 RPT Level = 0.05  Analysis Date = 09/06/2002 
 RPT Level = 0.05  Analysis Date = 09/06/2002 
 RPT Level = 0.05  Analysis Date = 09/06/2002 
 RPT Level = 0.05  Analysis Date = 09/06/2002 
 RPT Level = 0.05  Analysis Date = 08/26/2002 
 RPT Level = 0.05  Analysis Date = 08/26/2002 
 RPT Level = 0.05  Analysis Date = 08/19/2002 
 RPT Level = 0.05  Analysis Date = 08/19/2002 
 RPT Level = 0.05  Analysis Date = 08/13/2002 
 RPT Level = 0.05  Analysis Date = 08/13/2002 
 RPT Level = 0.05  Analysis Date = 08/06/2002 
 RPT Level = 0.05  Analysis Date = 08/06/2002 
 RPT Level = 0.05  Analysis Date = 08/06/2002 
 RPT Level = 0.05  Analysis Date = 08/06/2002 
 RPT Level = 0.05  Analysis Date = 07/19/2002 
 RPT Level = 0.05  Analysis Date = 07/19/2002 
 RPT Level = 0.05  Analysis Date = 07/17/2002 
 RPT Level = 0.05  Analysis Date = 07/17/2002 
 RPT Level = 0.05  Analysis Date = 07/03/2002 
 RPT Level = 0.05  Analysis Date = 07/03/2002 
 RPT Level = 0.05  Analysis Date = 07/01/2002 
 RPT Level = 0.05  Analysis Date = 07/01/2002 
 RPT Level = 0.05  Analysis Date = 06/20/2002 
 RPT Level = 0.05  Analysis Date = 06/20/2002 
 RPT Level = 0.05  Analysis Date = 06/17/2002 
 RPT Level = 0.05  Analysis Date = 06/17/2002 
 RPT Level = 0.05  Analysis Date = 06/05/2002 
 RPT Level = 0.05  Analysis Date = 06/05/2002 
 RPT Level = 0.05  Analysis Date = 06/04/2002 
 RPT Level = 0.05  Analysis Date = 06/04/2002 
 RPT Level = 0.05  Analysis Date = 05/24/2002 
 RPT Level = 0.05  Analysis Date = 05/24/2002 
 RPT Level = 0.05  Analysis Date = 05/16/2002 
 RPT Level = 0.05  Analysis Date = 05/16/2002 
 RPT Level = 0.05  Analysis Date = 05/13/2002 
 RPT Level = 0.05  Analysis Date = 05/13/2002 
 RPT Level = 0.05  Analysis Date = 05/06/2002 
 RPT Level = 0.05  Analysis Date = 05/06/2002 
 RPT Level = 0.05  Analysis Date = 04/25/2002 
 RPT Level = 0.05  Analysis Date = 04/25/2002 
 RPT Level = 0.05  Analysis Date = 04/25/2002 
 RPT Level = 0.05  Analysis Date = 04/25/2002 
 RPT Level = 0.05  Analysis Date = 04/12/2002 
 RPT Level = 0.05  Analysis Date = 04/12/2002 
 RPT Level = 0.05  Analysis Date = 04/04/2002 
 RPT Level = 0.05  Analysis Date = 04/04/2002 
 RPT Level = 0.05  Analysis Date = 03/28/2002 
 RPT Level = 0.05  Analysis Date = 03/28/2002 
 RPT Level = 0.05  Analysis Date = 03/26/2002 
 RPT Level = 0.05  Analysis Date = 03/26/2002 
 RPT Level = 0.05  Analysis Date = 03/19/2002 
 RPT Level = 0.05  Analysis Date = 03/19/2002 
 RPT Level = 0.05  Analysis Date = 03/11/2002 
 RPT Level = 0.05  Analysis Date = 03/11/2002 
 RPT Level = 0.05  Analysis Date = 03/04/2002 
 RPT Level = 0.05  Analysis Date = 03/04/2002 
 RPT Level = 0.05  Analysis Date = 02/27/2002 
 RPT Level = 0.05  Analysis Date = 02/27/2002 
 RPT Level = 0.05  Analysis Date = 02/20/2002 
 RPT Level = 0.05  Analysis Date = 02/20/2002 
 RPT Level = 0.05  Analysis Date = 02/06/2002 
 RPT Level = 0.05  Analysis Date = 02/06/2002 
 RPT Level = 0.05  Analysis Date = 02/06/2002 
 RPT Level = 0.05  Analysis Date = 02/06/2002 
 RPT Level = 0.05  Analysis Date = 01/24/2002 
 RPT Level = 0.05  Analysis Date = 01/24/2002 
 RPT Level = 0.05  Analysis Date = 01/14/2002 
 RPT Level = 0.05  Analysis Date = 01/14/2002 
 RPT Level = 0.05  Analysis Date = 01/04/2002 
 RPT Level = 0.05  Analysis Date = 01/04/2002 
 RPT Level = 0.05  Analysis Date = 01/03/2002 
 RPT Level = 0.05  Analysis Date = 01/03/2002 
 RPT Level = 0.05  Analysis Date = 12/20/2001 
 RPT Level = 0.05  Analysis Date = 12/20/2001 
 RPT Level = 0.05  Analysis Date = 12/19/2001 
 RPT Level = 0.05  Analysis Date = 12/19/2001 
 RPT Level = 0.05  Analysis Date = 12/07/2001 
 RPT Level = 0.05  Analysis Date = 12/07/2001 
 RPT Level = 0.05  Analysis Date = 11/13/2001 
 RPT Level = 0.05  Y = 0
The SGPlot Procedure

False Positive Rate for Kjeldahl Nitrogen (NH3+org N as N), UNF, CFA, ACD

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Kjeldahl Nitrogen (NH3+org N as N), UNF, CFA, ACD 00625KJ008 2002 40 2 5%
    2003 52 2 4%
    2004 51 3 6%
    2005 50 1 2%
    2013 33 0 0%
    2014 47 0 0%
    2015 52 1 2%
    2016 50 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Nitrate plus Nitrite (NO3+NO2 as N), FIL, COL -
Blind Blank Results
Lab: NWQL, PCode: 00631, MCode: CL048
Analysis dates: 11/13/01 through 10/12/11
Open Data Set

 Analysis Date = 03/15/2004 
 Lab Value = 0.043 
 RPT Level = 0.03 
 Lab Sample ID = 20040490025  Analysis Date = 01/03/2002 
 Lab Value = 0.062 
 RPT Level = 0.023 
 Lab Sample ID = 20013600207  Analysis Date = 03/15/2004 
 Lab Value = 0.043 
 RPT Level = 0.03 
 Lab Sample ID = 20040490025  Analysis Date = 01/03/2002 
 Lab Value = 0.062 
 RPT Level = 0.023 
 Lab Sample ID = 20013600207  Analysis Date = 10/12/2011 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20112840071  Analysis Date = 10/11/2011 
 Lab Value = 0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20112760061  Analysis Date = 10/04/2011 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20112690123  Analysis Date = 10/03/2011 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20112630061  Analysis Date = 09/30/2011 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20112560021  Analysis Date = 09/26/2011 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20112510037  Analysis Date = 09/26/2011 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20112500188  Analysis Date = 09/09/2011 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20112360063  Analysis Date = 08/30/2011 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20112300036  Analysis Date = 08/19/2011 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20112200051  Analysis Date = 08/11/2011 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20112130154  Analysis Date = 08/09/2011 
 Lab Value = 0.022 
 RPT Level = 0.02 
 Lab Sample ID = 20112060094  Analysis Date = 08/02/2011 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20112010020  Analysis Date = 07/22/2011 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20111920099  Analysis Date = 07/18/2011 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20111860062  Analysis Date = 07/14/2011 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20111780166  Analysis Date = 07/05/2011 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20111710111  Analysis Date = 06/17/2011 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20111640067  Analysis Date = 06/09/2011 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20111570061  Analysis Date = 06/06/2011 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20111510151  Analysis Date = 05/25/2011 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20111430203  Analysis Date = 05/20/2011 
 Lab Value = 0.02 
 RPT Level = 0.02 
 Lab Sample ID = 20111360146  Analysis Date = 05/17/2011 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20111290046  Analysis Date = 05/10/2011 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20111220086  Analysis Date = 04/27/2011 
 Lab Value = 0.018 
 RPT Level = 0.02 
 Lab Sample ID = 20111150114  Analysis Date = 04/20/2011 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20111080073  Analysis Date = 04/13/2011 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20111010118  Analysis Date = 04/08/2011 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20110950054  Analysis Date = 03/31/2011 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20110870089  Analysis Date = 03/24/2011 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20110800059  Analysis Date = 03/22/2011 
 Lab Value = 0.022 
 RPT Level = 0.02 
 Lab Sample ID = 20110750067  Analysis Date = 03/09/2011 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20110660032  Analysis Date = 03/02/2011 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20110590070  Analysis Date = 02/23/2011 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20110530105  Analysis Date = 02/16/2011 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20110450036  Analysis Date = 02/11/2011 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20110410098  Analysis Date = 02/11/2011 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20110400069  Analysis Date = 01/27/2011 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20110240065  Analysis Date = 01/21/2011 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20110180057  Analysis Date = 01/18/2011 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20110110016  Analysis Date = 01/07/2011 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20110030021  Analysis Date = 01/03/2011 
 Lab Value = 0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20103610054  Analysis Date = 12/23/2010 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20103540047  Analysis Date = 12/16/2010 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20103470078  Analysis Date = 12/09/2010 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20103400086  Analysis Date = 11/30/2010 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20103330099  Analysis Date = 11/23/2010 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20103260065  Analysis Date = 11/16/2010 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20103190064  Analysis Date = 11/15/2010 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20103120026  Analysis Date = 11/03/2010 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20103060008  Analysis Date = 10/28/2010 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20102990006  Analysis Date = 10/21/2010 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20102920006  Analysis Date = 10/13/2010 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20102850132  Analysis Date = 10/05/2010 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20102770110  Analysis Date = 10/04/2010 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20102700152  Analysis Date = 09/22/2010 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20102640136  Analysis Date = 09/15/2010 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20102570015  Analysis Date = 09/09/2010 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20102510062  Analysis Date = 09/01/2010 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20102430249  Analysis Date = 08/24/2010 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20102350196  Analysis Date = 08/18/2010 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20102290049  Analysis Date = 08/12/2010 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20102230041  Analysis Date = 08/03/2010 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20102140090  Analysis Date = 07/29/2010 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20102080005  Analysis Date = 07/20/2010 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20102000188  Analysis Date = 07/13/2010 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20101930104  Analysis Date = 07/07/2010 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20101870059  Analysis Date = 06/30/2010 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20101790124  Analysis Date = 06/24/2010 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20101730068  Analysis Date = 06/16/2010 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20101660061  Analysis Date = 06/09/2010 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20101590005  Analysis Date = 06/04/2010 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20101530090  Analysis Date = 05/25/2010 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20101440165  Analysis Date = 05/24/2010 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20101380021  Analysis Date = 05/12/2010 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20101310098  Analysis Date = 05/05/2010 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20101240080  Analysis Date = 04/29/2010 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20101180043  Analysis Date = 04/22/2010 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20101090063  Analysis Date = 04/20/2010 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20101020075  Analysis Date = 04/06/2010 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20100950036  Analysis Date = 04/01/2010 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20100880044  Analysis Date = 03/29/2010 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20100850066  Analysis Date = 03/17/2010 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20100750002  Analysis Date = 03/10/2010 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20100680014  Analysis Date = 03/02/2010 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20100600067  Analysis Date = 02/23/2010 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20100530048  Analysis Date = 02/23/2010 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20100470025  Analysis Date = 02/10/2010 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20100390038  Analysis Date = 02/04/2010 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20100320023  Analysis Date = 01/27/2010 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20100260065  Analysis Date = 01/21/2010 
 Lab Value = 0.029 
 RPT Level = 0.02 
 Lab Sample ID = 20100190102  Analysis Date = 01/12/2010 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20100110099  Analysis Date = 01/06/2010 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20100050014  Analysis Date = 01/04/2010 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20093620042  Analysis Date = 12/24/2009 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20093560033  Analysis Date = 12/16/2009 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20093480064  Analysis Date = 12/09/2009 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20093420004  Analysis Date = 12/03/2009 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20093350070  Analysis Date = 11/25/2009 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20093280015  Analysis Date = 11/23/2009 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20093200062  Analysis Date = 11/12/2009 
 Lab Value = 0.018 
 RPT Level = 0.02 
 Lab Sample ID = 20093130061  Analysis Date = 11/06/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20093070201  Analysis Date = 11/03/2009 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20093000106  Analysis Date = 10/21/2009 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20092920096  Analysis Date = 10/15/2009 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20092870073  Analysis Date = 10/06/2009 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20092780071  Analysis Date = 09/30/2009 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20092720011  Analysis Date = 09/22/2009 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20092640026  Analysis Date = 09/16/2009 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20092570049  Analysis Date = 09/11/2009 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20092520132  Analysis Date = 09/01/2009 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20092430155  Analysis Date = 08/25/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20092360171  Analysis Date = 08/18/2009 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20092290211  Analysis Date = 08/11/2009 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20092220169  Analysis Date = 08/04/2009 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20092150073  Analysis Date = 07/29/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20092090263  Analysis Date = 07/22/2009 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20092010116  Analysis Date = 07/15/2009 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20091950026  Analysis Date = 07/08/2009 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20091870025  Analysis Date = 06/30/2009 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20091800174  Analysis Date = 06/23/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20091730218  Analysis Date = 06/16/2009 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20091660206  Analysis Date = 06/09/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20091590088  Analysis Date = 06/03/2009 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20091520151  Analysis Date = 06/01/2009 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20091460188  Analysis Date = 05/19/2009 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20091380122  Analysis Date = 05/13/2009 
 Lab Value = 0.022 
 RPT Level = 0.02 
 Lab Sample ID = 20091320020  Analysis Date = 05/05/2009 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20091240123  Analysis Date = 04/28/2009 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20091170110  Analysis Date = 04/23/2009 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20091110135  Analysis Date = 04/14/2009 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20091030081  Analysis Date = 04/08/2009 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20090960054  Analysis Date = 03/31/2009 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20090890069  Analysis Date = 03/27/2009 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20090820029  Analysis Date = 03/18/2009 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20090750048  Analysis Date = 03/10/2009 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20090680045  Analysis Date = 03/05/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20090610057  Analysis Date = 02/26/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20090540030  Analysis Date = 02/19/2009 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20090480058  Analysis Date = 02/12/2009 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20090400032  Analysis Date = 02/05/2009 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20090330037  Analysis Date = 01/28/2009 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20090260027  Analysis Date = 01/23/2009 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20090200036  Analysis Date = 01/14/2009 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20090120049  Analysis Date = 01/08/2009 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20090050019  Analysis Date = 01/06/2009 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20083650083  Analysis Date = 12/23/2008 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20083570034  Analysis Date = 12/17/2008 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20083500071  Analysis Date = 12/12/2008 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20083450064  Analysis Date = 12/02/2008 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20083360040  Analysis Date = 11/25/2008 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20083290062  Analysis Date = 11/19/2008 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20083220064  Analysis Date = 11/14/2008 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20083150065  Analysis Date = 11/13/2008 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20083080100  Analysis Date = 10/29/2008 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20083010109  Analysis Date = 10/21/2008 
 Lab Value = 0.0092 
 RPT Level = 0.02 
 Lab Sample ID = 20082940063  Analysis Date = 10/16/2008 
 Lab Value = 0.0092 
 RPT Level = 0.02 
 Lab Sample ID = 20082880040  Analysis Date = 10/09/2008 
 Lab Value = 0.0064 
 RPT Level = 0.02 
 Lab Sample ID = 20082800042  Analysis Date = 10/06/2008 
 Lab Value = 0.0051 
 RPT Level = 0.02 
 Lab Sample ID = 20082730062  Analysis Date = 09/26/2008 
 Lab Value = 0.0028 
 RPT Level = 0.02 
 Lab Sample ID = 20082660047  Analysis Date = 09/22/2008 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20082590105  Analysis Date = 09/18/2008 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20082520008  Analysis Date = 09/16/2008 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20082460098  Analysis Date = 09/04/2008 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20082380080  Analysis Date = 08/22/2008 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20082310131  Analysis Date = 08/13/2008 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20082250010  Analysis Date = 08/11/2008 
 Lab Value = 0.018 
 RPT Level = 0.02 
 Lab Sample ID = 20082190011  Analysis Date = 07/23/2008 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20082030127  Analysis Date = 07/18/2008 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20081970139  Analysis Date = 07/09/2008 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20081890044  Analysis Date = 07/02/2008 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20081820059  Analysis Date = 06/30/2008 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20081750128  Analysis Date = 06/18/2008 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20081680067  Analysis Date = 06/13/2008 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20081620017  Analysis Date = 06/05/2008 
 Lab Value = 0.022 
 RPT Level = 0.02 
 Lab Sample ID = 20081540109  Analysis Date = 06/03/2008 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20081480068  Analysis Date = 05/22/2008 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20081400061  Analysis Date = 05/19/2008 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20081330112  Analysis Date = 05/12/2008 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20081260070  Analysis Date = 04/30/2008 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20081190055  Analysis Date = 04/22/2008 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20081120033  Analysis Date = 04/18/2008 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20081050114  Analysis Date = 04/08/2008 
 Lab Value = 0.02 
 RPT Level = 0.02 
 Lab Sample ID = 20080980084  Analysis Date = 04/08/2008 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20080920083  Analysis Date = 03/25/2008 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20080840064  Analysis Date = 03/20/2008 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20080770124  Analysis Date = 03/13/2008 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20080700074  Analysis Date = 03/07/2008 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20080630067  Analysis Date = 02/27/2008 
 Lab Value = 0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20080560070  Analysis Date = 02/27/2008 
 Lab Value = 0.018 
 RPT Level = 0.02 
 Lab Sample ID = 20080510055  Analysis Date = 02/13/2008 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20080420072  Analysis Date = 02/08/2008 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20080360051  Analysis Date = 01/29/2008 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20080280050  Analysis Date = 01/25/2008 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20080230021  Analysis Date = 01/17/2008 
 Lab Value = 0.018 
 RPT Level = 0.02 
 Lab Sample ID = 20080140027  Analysis Date = 01/08/2008 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20080070023  Analysis Date = 01/08/2008 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20073620004  Analysis Date = 12/19/2007 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20073510098  Analysis Date = 12/11/2007 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20073440039  Analysis Date = 12/04/2007 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20073370069  Analysis Date = 11/28/2007 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20073300042  Analysis Date = 11/20/2007 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20073230113  Analysis Date = 11/20/2007 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20073170062  Analysis Date = 11/13/2007 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20073100012  Analysis Date = 11/02/2007 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20073020065  Analysis Date = 10/30/2007 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20072960186  Analysis Date = 10/17/2007 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20072890056  Analysis Date = 10/16/2007 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20072850025  Analysis Date = 10/01/2007 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20072670056  Analysis Date = 09/18/2007 
 Lab Value = 0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20072600129  Analysis Date = 09/13/2007 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20072540015  Analysis Date = 09/10/2007 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20072480018  Analysis Date = 08/30/2007 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20072400035  Analysis Date = 08/24/2007 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20072330109  Analysis Date = 08/20/2007 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20072260198  Analysis Date = 08/15/2007 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20072210252  Analysis Date = 08/02/2007 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20072110162  Analysis Date = 07/27/2007 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20072040101  Analysis Date = 07/10/2007 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20071900105  Analysis Date = 07/06/2007 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20071830158  Analysis Date = 06/27/2007 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20071770201  Analysis Date = 06/20/2007 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20071690119  Analysis Date = 06/15/2007 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20071620045  Analysis Date = 06/06/2007 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20071560026  Analysis Date = 05/31/2007 
 Lab Value = 0.015 
 RPT Level = 0.03 
 Lab Sample ID = 20071500033  Analysis Date = 05/22/2007 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20071410089  Analysis Date = 05/15/2007 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20071340113  Analysis Date = 05/09/2007 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20071280019  Analysis Date = 05/02/2007 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20071200089  Analysis Date = 04/24/2007 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20071130120  Analysis Date = 04/18/2007 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20071070021  Analysis Date = 04/11/2007 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20070990050  Analysis Date = 04/04/2007 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20070930070  Analysis Date = 03/28/2007 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20070860217  Analysis Date = 03/20/2007 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20070780128  Analysis Date = 03/14/2007 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20070710075  Analysis Date = 03/08/2007 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20070650009  Analysis Date = 02/28/2007 
 Lab Value = 0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20070580141  Analysis Date = 02/26/2007 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20070540023  Analysis Date = 02/16/2007 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20070460015  Analysis Date = 02/12/2007 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20070400103  Analysis Date = 01/26/2007 
 Lab Value = 0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20070250023  Analysis Date = 01/19/2007 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20070180071  Analysis Date = 01/16/2007 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20070120012  Analysis Date = 01/05/2007 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20070040013  Analysis Date = 01/04/2007 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20063610084  Analysis Date = 01/03/2007 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20063520072  Analysis Date = 12/13/2006 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20063450081  Analysis Date = 12/05/2006 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20063380055  Analysis Date = 11/29/2006 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20063310047  Analysis Date = 11/21/2006 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20063240079  Analysis Date = 11/16/2006 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20063180103  Analysis Date = 11/07/2006 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20063100080  Analysis Date = 11/02/2006 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20063030096  Analysis Date = 10/30/2006 
 Lab Value = 0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20062960133  Analysis Date = 10/25/2006 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20062910013  Analysis Date = 10/18/2006 
 Lab Value = 0.022 
 RPT Level = 0.03 
 Lab Sample ID = 20062850014  Analysis Date = 10/12/2006 
 Lab Value = 0.02 
 RPT Level = 0.03 
 Lab Sample ID = 20062780050  Analysis Date = 10/02/2006 
 Lab Value = 0.02 
 RPT Level = 0.03 
 Lab Sample ID = 20062620013  Analysis Date = 09/26/2006 
 Lab Value = 0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20062540016  Analysis Date = 09/21/2006 
 Lab Value = 0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20062500008  Analysis Date = 09/12/2006 
 Lab Value = 0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20062350182  Analysis Date = 08/29/2006 
 Lab Value = 0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20062270273  Analysis Date = 08/17/2006 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20062220039  Analysis Date = 08/01/2006 
 Lab Value = 0.027 
 RPT Level = 0.03 
 Lab Sample ID = 20062020314  Analysis Date = 07/24/2006 
 Lab Value = -0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20061950007  Analysis Date = 07/18/2006 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20061880009  Analysis Date = 07/05/2006 
 Lab Value = -0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20061730014  Analysis Date = 06/29/2006 
 Lab Value = -0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20061670021  Analysis Date = 06/19/2006 
 Lab Value = 0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20061580018  Analysis Date = 05/25/2006 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20061370016  Analysis Date = 05/22/2006 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20061280111  Analysis Date = 05/11/2006 
 Lab Value = 0.015 
 RPT Level = 0.03 
 Lab Sample ID = 20061220099  Analysis Date = 09/27/2005 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20052590035  Analysis Date = 09/20/2005 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20052520006  Analysis Date = 09/12/2005 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20052430006  Analysis Date = 09/07/2005 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20052370002  Analysis Date = 08/31/2005 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20052300009  Analysis Date = 08/16/2005 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20052210012  Analysis Date = 08/10/2005 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20052160007  Analysis Date = 08/10/2005 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20052160005  Analysis Date = 07/26/2005 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20052010007  Analysis Date = 07/15/2005 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20051940015  Analysis Date = 07/12/2005 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20051880018  Analysis Date = 07/01/2005 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20051800189  Analysis Date = 06/27/2005 
 Lab Value = -0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20051740019  Analysis Date = 06/20/2005 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20051660174  Analysis Date = 06/14/2005 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20051590025  Analysis Date = 06/06/2005 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20051530021  Analysis Date = 05/26/2005 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20051440043  Analysis Date = 05/24/2005 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20051380014  Analysis Date = 05/16/2005 
 Lab Value = 0.015 
 RPT Level = 0.03 
 Lab Sample ID = 20051320029  Analysis Date = 05/10/2005 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20051250003  Analysis Date = 04/28/2005 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20051170012  Analysis Date = 04/26/2005 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20051110007  Analysis Date = 04/14/2005 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20051020018  Analysis Date = 04/07/2005 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20050950044  Analysis Date = 03/31/2005 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20050880116  Analysis Date = 03/30/2005 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20050840096  Analysis Date = 03/21/2005 
 Lab Value = -0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20050750004  Analysis Date = 03/15/2005 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20050700007  Analysis Date = 03/15/2005 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20050700004  Analysis Date = 03/09/2005 
 Lab Value = 0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20050670011  Analysis Date = 03/01/2005 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20050550024  Analysis Date = 02/24/2005 
 Lab Value = -0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20050480005  Analysis Date = 02/15/2005 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20050410004  Analysis Date = 02/09/2005 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20050340020  Analysis Date = 01/31/2005 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20050260024  Analysis Date = 01/26/2005 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20050200048  Analysis Date = 01/25/2005 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20050130091  Analysis Date = 01/20/2005 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20050070016  Analysis Date = 01/11/2005 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20043650002  Analysis Date = 12/27/2004 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20043580037  Analysis Date = 12/27/2004 
 Lab Value = 0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20043580035  Analysis Date = 12/21/2004 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20043520023  Analysis Date = 12/21/2004 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20043510018  Analysis Date = 12/21/2004 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20043450069  Analysis Date = 12/21/2004 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20043440147  Analysis Date = 12/15/2004 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20043380005  Analysis Date = 12/15/2004 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20043380002  Analysis Date = 12/14/2004 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20043310059  Analysis Date = 12/09/2004 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20043280048  Analysis Date = 12/08/2004 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20043240012  Analysis Date = 09/15/2004 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20042450138  Analysis Date = 09/09/2004 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20042400089  Analysis Date = 09/08/2004 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20042370105  Analysis Date = 09/02/2004 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20042330206  Analysis Date = 09/01/2004 
 Lab Value = -0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20042320136  Analysis Date = 09/01/2004 
 Lab Value = -0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20042320138  Analysis Date = 08/19/2004 
 Lab Value = -0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20042240114  Analysis Date = 08/11/2004 
 Lab Value = -0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20042170123  Analysis Date = 08/05/2004 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20042110015  Analysis Date = 07/27/2004 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20042040039  Analysis Date = 07/19/2004 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20041960050  Analysis Date = 07/14/2004 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20041900062  Analysis Date = 07/13/2004 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20041820035  Analysis Date = 07/08/2004 
 Lab Value = -0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20041750057  Analysis Date = 07/06/2004 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20041700080  Analysis Date = 06/24/2004 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20041610055  Analysis Date = 06/23/2004 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20041550019  Analysis Date = 06/17/2004 
 Lab Value = 0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20041470132  Analysis Date = 06/08/2004 
 Lab Value = 0.029 
 RPT Level = 0.03 
 Lab Sample ID = 20041400016  Analysis Date = 05/17/2004 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20041260099  Analysis Date = 05/11/2004 
 Lab Value = 0.021 
 RPT Level = 0.03 
 Lab Sample ID = 20041200046  Analysis Date = 05/06/2004 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20041130016  Analysis Date = 04/22/2004 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20041050022  Analysis Date = 04/13/2004 
 Lab Value = 0.034 
 RPT Level = 0.03 
 Lab Sample ID = 20040980007  Analysis Date = 04/13/2004 
 Lab Value = 0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20040930009  Analysis Date = 04/14/2004 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20040910012  Analysis Date = 04/07/2004 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20040850021  Analysis Date = 04/07/2004 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20040830056  Analysis Date = 04/05/2004 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20040790023  Analysis Date = 04/02/2004 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20040760010  Analysis Date = 04/01/2004 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20040720029  Analysis Date = 03/23/2004 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20040710005  Analysis Date = 03/23/2004 
 Lab Value = 0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20040680093  Analysis Date = 03/23/2004 
 Lab Value = 0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20040650001  Analysis Date = 03/16/2004 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20040580032  Analysis Date = 03/16/2004 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20040550018  Analysis Date = 03/15/2004 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20040510134  Analysis Date = 03/09/2004 
 Lab Value = 0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20040440035  Analysis Date = 03/04/2004 
 Lab Value = 0.021 
 RPT Level = 0.03 
 Lab Sample ID = 20040420001  Analysis Date = 02/17/2004 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20040370017  Analysis Date = 02/25/2004 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20040340024  Analysis Date = 02/18/2004 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20040300012  Analysis Date = 02/03/2004 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20040270036  Analysis Date = 02/02/2004 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20040230030  Analysis Date = 01/29/2004 
 Lab Value = 0.031 
 RPT Level = 0.03 
 Lab Sample ID = 20040210154  Analysis Date = 01/29/2004 
 Lab Value = 0.019 
 RPT Level = 0.03 
 Lab Sample ID = 20040200023  Analysis Date = 01/28/2004 
 Lab Value = 0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20040150075  Analysis Date = 01/27/2004 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20040090020  Analysis Date = 01/20/2004 
 Lab Value = 0.018 
 RPT Level = 0.03 
 Lab Sample ID = 20040070032  Analysis Date = 01/06/2004 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20040050016  Analysis Date = 10/03/2003 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20032660009  Analysis Date = 10/02/2003 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20032600107  Analysis Date = 09/23/2003 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20032520179  Analysis Date = 09/22/2003 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20032450195  Analysis Date = 09/16/2003 
 Lab Value = -0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20032380029  Analysis Date = 09/11/2003 
 Lab Value = 0.025 
 RPT Level = 0.03 
 Lab Sample ID = 20032310028  Analysis Date = 09/10/2003 
 Lab Value = -0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20032250256  Analysis Date = 08/26/2003 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20032180019  Analysis Date = 08/21/2003 
 Lab Value = 0.028 
 RPT Level = 0.03 
 Lab Sample ID = 20032100004  Analysis Date = 08/13/2003 
 Lab Value = 0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20032040043  Analysis Date = 08/08/2003 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20031960025  Analysis Date = 08/04/2003 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20031900098  Analysis Date = 07/25/2003 
 Lab Value = -0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20031820037  Analysis Date = 07/22/2003 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20031770041  Analysis Date = 07/15/2003 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20031700013  Analysis Date = 07/09/2003 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20031630053  Analysis Date = 06/24/2003 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20031600109  Analysis Date = 06/16/2003 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20031480059  Analysis Date = 06/17/2003 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20031430019  Analysis Date = 06/12/2003 
 Lab Value = 0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20031400115  Analysis Date = 05/21/2003 
 Lab Value = -0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20031290084  Analysis Date = 05/13/2003 
 Lab Value = 0.021 
 RPT Level = 0.03 
 Lab Sample ID = 20031220070  Analysis Date = 05/12/2003 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20031200043  Analysis Date = 04/24/2003 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20031080208  Analysis Date = 04/09/2003 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20030970018  Analysis Date = 04/03/2003 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20030920027  Analysis Date = 04/01/2003 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20030900015  Analysis Date = 04/01/2003 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20030860023  Analysis Date = 03/27/2003 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20030710021  Analysis Date = 03/27/2003 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20030660148  Analysis Date = 03/06/2003 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20030590040  Analysis Date = 03/06/2003 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20030570061  Analysis Date = 02/12/2003 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20030410034  Analysis Date = 02/11/2003 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20030350008  Analysis Date = 02/06/2003 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20030310028  Analysis Date = 02/06/2003 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20030300004  Analysis Date = 01/16/2003 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20030150009  Analysis Date = 01/16/2003 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20030140019  Analysis Date = 01/09/2003 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20030020002  Analysis Date = 01/09/2003 
 Lab Value = 0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20023650009  Analysis Date = 12/24/2002 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20023500166  Analysis Date = 12/24/2002 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20023500092  Analysis Date = 12/04/2002 
 Lab Value = 0.015 
 RPT Level = 0.03 
 Lab Sample ID = 20023370026  Analysis Date = 12/04/2002 
 Lab Value = 0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20023370025  Analysis Date = 12/04/2002 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20023330096  Analysis Date = 12/04/2002 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20023360020  Analysis Date = 12/04/2002 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20023310020  Analysis Date = 11/05/2002 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20023040033  Analysis Date = 11/07/2002 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20022970050  Analysis Date = 11/07/2002 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20022970049  Analysis Date = 11/07/2002 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20022970048  Analysis Date = 11/07/2002 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20022960022  Analysis Date = 09/25/2002 
 Lab Value = 0.007 
 RPT Level = 0.023 
 Lab Sample ID = 20022470018  Analysis Date = 09/24/2002 
 Lab Value = -0.003 
 RPT Level = 0.023 
 Lab Sample ID = 20022460135  Analysis Date = 09/04/2002 
 Lab Value = 0.004 
 RPT Level = 0.023 
 Lab Sample ID = 20022340186  Analysis Date = 09/03/2002 
 Lab Value = -0.005 
 RPT Level = 0.023 
 Lab Sample ID = 20022280008  Analysis Date = 08/21/2002 
 Lab Value = 0.012 
 RPT Level = 0.023 
 Lab Sample ID = 20022210007  Analysis Date = 08/19/2002 
 Lab Value = 0.029 
 RPT Level = 0.023 
 Lab Sample ID = 20022170107  Analysis Date = 08/07/2002 
 Lab Value = 0.015 
 RPT Level = 0.023 
 Lab Sample ID = 20022060077  Analysis Date = 07/29/2002 
 Lab Value = 0.002 
 RPT Level = 0.023 
 Lab Sample ID = 20021970116  Analysis Date = 07/29/2002 
 Lab Value = 0.01 
 RPT Level = 0.023 
 Lab Sample ID = 20021960234  Analysis Date = 07/16/2002 
 Lab Value = 0.001 
 RPT Level = 0.023 
 Lab Sample ID = 20021830026  Analysis Date = 07/11/2002 
 Lab Value = 0.003 
 RPT Level = 0.023 
 Lab Sample ID = 20021790006  Analysis Date = 06/25/2002 
 Lab Value = 0.003 
 RPT Level = 0.023 
 Lab Sample ID = 20021690011  Analysis Date = 06/24/2002 
 Lab Value = 0.019 
 RPT Level = 0.023 
 Lab Sample ID = 20021650005  Analysis Date = 06/12/2002 
 Lab Value = 0.008 
 RPT Level = 0.023 
 Lab Sample ID = 20021550019  Analysis Date = 06/13/2002 
 Lab Value = 0.039 
 RPT Level = 0.023 
 Lab Sample ID = 20021510057  Analysis Date = 06/11/2002 
 Lab Value = 0.021 
 RPT Level = 0.023 
 Lab Sample ID = 20021420157  Analysis Date = 05/28/2002 
 Lab Value = 0.009 
 RPT Level = 0.023 
 Lab Sample ID = 20021330223  Analysis Date = 05/23/2002 
 Lab Value = 0.013 
 RPT Level = 0.023 
 Lab Sample ID = 20021300001  Analysis Date = 05/02/2002 
 Lab Value = 0.016 
 RPT Level = 0.023 
 Lab Sample ID = 20021210086  Analysis Date = 04/26/2002 
 Lab Value = 0.022 
 RPT Level = 0.023 
 Lab Sample ID = 20021140037  Analysis Date = 04/26/2002 
 Lab Value = 0.023 
 RPT Level = 0.023 
 Lab Sample ID = 20021140036  Analysis Date = 04/17/2002 
 Lab Value = 0.01 
 RPT Level = 0.023 
 Lab Sample ID = 20021010016  Analysis Date = 04/09/2002 
 Lab Value = -0.004 
 RPT Level = 0.023 
 Lab Sample ID = 20020930112  Analysis Date = 03/27/2002 
 Lab Value = -0.001 
 RPT Level = 0.023 
 Lab Sample ID = 20020850091  Analysis Date = 04/01/2002 
 Lab Value = -0.001 
 RPT Level = 0.023 
 Lab Sample ID = 20020810192  Analysis Date = 03/21/2002 
 Lab Value = 0.003 
 RPT Level = 0.023 
 Lab Sample ID = 20020730104  Analysis Date = 03/13/2002 
 Lab Value = 0.002 
 RPT Level = 0.023 
 Lab Sample ID = 20020670021  Analysis Date = 03/07/2002 
 Lab Value = 0.002 
 RPT Level = 0.023 
 Lab Sample ID = 20020600005  Analysis Date = 03/07/2002 
 Lab Value = 0.007 
 RPT Level = 0.023 
 Lab Sample ID = 20020570018  Analysis Date = 03/04/2002 
 Lab Value = 0.003 
 RPT Level = 0.023 
 Lab Sample ID = 20020460048  Analysis Date = 02/06/2002 
 Lab Value = 0 
 RPT Level = 0.023 
 Lab Sample ID = 20020360005  Analysis Date = 02/05/2002 
 Lab Value = 0.001 
 RPT Level = 0.023 
 Lab Sample ID = 20020320102  Analysis Date = 01/30/2002 
 Lab Value = 0.015 
 RPT Level = 0.023 
 Lab Sample ID = 20020220079  Analysis Date = 01/16/2002 
 Lab Value = 0.017 
 RPT Level = 0.023 
 Lab Sample ID = 20020110003  Analysis Date = 01/08/2002 
 Lab Value = 0.014 
 RPT Level = 0.023 
 Lab Sample ID = 20020020005  Analysis Date = 12/20/2001 
 Lab Value = -0.003 
 RPT Level = 0.023 
 Lab Sample ID = 20013520042  Analysis Date = 12/17/2001 
 Lab Value = 0.009 
 RPT Level = 0.023 
 Lab Sample ID = 20013480008  Analysis Date = 12/13/2001 
 Lab Value = 0.011 
 RPT Level = 0.023 
 Lab Sample ID = 20013390010  Analysis Date = 11/13/2001 
 Lab Value = 0.009 
 RPT Level = 0.023 
 Lab Sample ID = 20013110130  Analysis Date = 10/12/2011 
 RPT Level = 0.02  Analysis Date = 10/11/2011 
 RPT Level = 0.02  Analysis Date = 10/11/2011 
 RPT Level = 0.02  Analysis Date = 10/04/2011 
 RPT Level = 0.02  Analysis Date = 10/04/2011 
 RPT Level = 0.02  Analysis Date = 10/03/2011 
 RPT Level = 0.02  Analysis Date = 10/03/2011 
 RPT Level = 0.02  Analysis Date = 09/30/2011 
 RPT Level = 0.02  Analysis Date = 09/30/2011 
 RPT Level = 0.02  Analysis Date = 09/26/2011 
 RPT Level = 0.02  Analysis Date = 09/26/2011 
 RPT Level = 0.02  Analysis Date = 09/26/2011 
 RPT Level = 0.02  Analysis Date = 09/26/2011 
 RPT Level = 0.02  Analysis Date = 09/09/2011 
 RPT Level = 0.02  Analysis Date = 09/09/2011 
 RPT Level = 0.02  Analysis Date = 08/30/2011 
 RPT Level = 0.02  Analysis Date = 08/30/2011 
 RPT Level = 0.02  Analysis Date = 08/19/2011 
 RPT Level = 0.02  Analysis Date = 08/19/2011 
 RPT Level = 0.02  Analysis Date = 08/11/2011 
 RPT Level = 0.02  Analysis Date = 08/11/2011 
 RPT Level = 0.02  Analysis Date = 08/09/2011 
 RPT Level = 0.02  Analysis Date = 08/09/2011 
 RPT Level = 0.02  Analysis Date = 08/02/2011 
 RPT Level = 0.02  Analysis Date = 08/02/2011 
 RPT Level = 0.02  Analysis Date = 07/22/2011 
 RPT Level = 0.02  Analysis Date = 07/22/2011 
 RPT Level = 0.02  Analysis Date = 07/18/2011 
 RPT Level = 0.02  Analysis Date = 07/18/2011 
 RPT Level = 0.02  Analysis Date = 07/14/2011 
 RPT Level = 0.02  Analysis Date = 07/14/2011 
 RPT Level = 0.02  Analysis Date = 07/05/2011 
 RPT Level = 0.02  Analysis Date = 07/05/2011 
 RPT Level = 0.02  Analysis Date = 06/17/2011 
 RPT Level = 0.02  Analysis Date = 06/17/2011 
 RPT Level = 0.02  Analysis Date = 06/09/2011 
 RPT Level = 0.02  Analysis Date = 06/09/2011 
 RPT Level = 0.02  Analysis Date = 06/06/2011 
 RPT Level = 0.02  Analysis Date = 06/06/2011 
 RPT Level = 0.02  Analysis Date = 05/25/2011 
 RPT Level = 0.02  Analysis Date = 05/25/2011 
 RPT Level = 0.02  Analysis Date = 05/20/2011 
 RPT Level = 0.02  Analysis Date = 05/20/2011 
 RPT Level = 0.02  Analysis Date = 05/17/2011 
 RPT Level = 0.02  Analysis Date = 05/17/2011 
 RPT Level = 0.02  Analysis Date = 05/10/2011 
 RPT Level = 0.02  Analysis Date = 05/10/2011 
 RPT Level = 0.02  Analysis Date = 04/27/2011 
 RPT Level = 0.02  Analysis Date = 04/27/2011 
 RPT Level = 0.02  Analysis Date = 04/20/2011 
 RPT Level = 0.02  Analysis Date = 04/20/2011 
 RPT Level = 0.02  Analysis Date = 04/13/2011 
 RPT Level = 0.02  Analysis Date = 04/13/2011 
 RPT Level = 0.02  Analysis Date = 04/08/2011 
 RPT Level = 0.02  Analysis Date = 04/08/2011 
 RPT Level = 0.02  Analysis Date = 03/31/2011 
 RPT Level = 0.02  Analysis Date = 03/31/2011 
 RPT Level = 0.02  Analysis Date = 03/24/2011 
 RPT Level = 0.02  Analysis Date = 03/24/2011 
 RPT Level = 0.02  Analysis Date = 03/22/2011 
 RPT Level = 0.02  Analysis Date = 03/22/2011 
 RPT Level = 0.02  Analysis Date = 03/09/2011 
 RPT Level = 0.02  Analysis Date = 03/09/2011 
 RPT Level = 0.02  Analysis Date = 03/02/2011 
 RPT Level = 0.02  Analysis Date = 03/02/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/16/2011 
 RPT Level = 0.02  Analysis Date = 02/16/2011 
 RPT Level = 0.02  Analysis Date = 02/11/2011 
 RPT Level = 0.02  Analysis Date = 02/11/2011 
 RPT Level = 0.02  Analysis Date = 02/11/2011 
 RPT Level = 0.02  Analysis Date = 02/11/2011 
 RPT Level = 0.02  Analysis Date = 01/27/2011 
 RPT Level = 0.02  Analysis Date = 01/27/2011 
 RPT Level = 0.02  Analysis Date = 01/21/2011 
 RPT Level = 0.02  Analysis Date = 01/21/2011 
 RPT Level = 0.02  Analysis Date = 01/18/2011 
 RPT Level = 0.02  Analysis Date = 01/18/2011 
 RPT Level = 0.02  Analysis Date = 01/07/2011 
 RPT Level = 0.02  Analysis Date = 01/07/2011 
 RPT Level = 0.02  Analysis Date = 01/03/2011 
 RPT Level = 0.02  Analysis Date = 01/03/2011 
 RPT Level = 0.02  Analysis Date = 12/23/2010 
 RPT Level = 0.02  Analysis Date = 12/23/2010 
 RPT Level = 0.02  Analysis Date = 12/16/2010 
 RPT Level = 0.02  Analysis Date = 12/16/2010 
 RPT Level = 0.02  Analysis Date = 12/09/2010 
 RPT Level = 0.02  Analysis Date = 12/09/2010 
 RPT Level = 0.02  Analysis Date = 11/30/2010 
 RPT Level = 0.02  Analysis Date = 11/30/2010 
 RPT Level = 0.02  Analysis Date = 11/23/2010 
 RPT Level = 0.02  Analysis Date = 11/23/2010 
 RPT Level = 0.02  Analysis Date = 11/16/2010 
 RPT Level = 0.02  Analysis Date = 11/16/2010 
 RPT Level = 0.02  Analysis Date = 11/15/2010 
 RPT Level = 0.02  Analysis Date = 11/15/2010 
 RPT Level = 0.02  Analysis Date = 11/03/2010 
 RPT Level = 0.02  Analysis Date = 11/03/2010 
 RPT Level = 0.02  Analysis Date = 10/28/2010 
 RPT Level = 0.02  Analysis Date = 10/28/2010 
 RPT Level = 0.02  Analysis Date = 10/21/2010 
 RPT Level = 0.02  Analysis Date = 10/21/2010 
 RPT Level = 0.02  Analysis Date = 10/13/2010 
 RPT Level = 0.02  Analysis Date = 10/13/2010 
 RPT Level = 0.02  Analysis Date = 10/05/2010 
 RPT Level = 0.02  Analysis Date = 10/05/2010 
 RPT Level = 0.02  Analysis Date = 10/04/2010 
 RPT Level = 0.02  Analysis Date = 10/04/2010 
 RPT Level = 0.02  Analysis Date = 09/22/2010 
 RPT Level = 0.02  Analysis Date = 09/22/2010 
 RPT Level = 0.02  Analysis Date = 09/15/2010 
 RPT Level = 0.02  Analysis Date = 09/15/2010 
 RPT Level = 0.02  Analysis Date = 09/09/2010 
 RPT Level = 0.02  Analysis Date = 09/09/2010 
 RPT Level = 0.02  Analysis Date = 09/01/2010 
 RPT Level = 0.02  Analysis Date = 09/01/2010 
 RPT Level = 0.02  Analysis Date = 08/24/2010 
 RPT Level = 0.02  Analysis Date = 08/24/2010 
 RPT Level = 0.02  Analysis Date = 08/18/2010 
 RPT Level = 0.02  Analysis Date = 08/18/2010 
 RPT Level = 0.02  Analysis Date = 08/12/2010 
 RPT Level = 0.02  Analysis Date = 08/12/2010 
 RPT Level = 0.02  Analysis Date = 08/03/2010 
 RPT Level = 0.02  Analysis Date = 08/03/2010 
 RPT Level = 0.02  Analysis Date = 07/29/2010 
 RPT Level = 0.02  Analysis Date = 07/29/2010 
 RPT Level = 0.02  Analysis Date = 07/20/2010 
 RPT Level = 0.02  Analysis Date = 07/20/2010 
 RPT Level = 0.02  Analysis Date = 07/13/2010 
 RPT Level = 0.02  Analysis Date = 07/13/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 06/30/2010 
 RPT Level = 0.02  Analysis Date = 06/30/2010 
 RPT Level = 0.02  Analysis Date = 06/24/2010 
 RPT Level = 0.02  Analysis Date = 06/24/2010 
 RPT Level = 0.02  Analysis Date = 06/16/2010 
 RPT Level = 0.02  Analysis Date = 06/16/2010 
 RPT Level = 0.02  Analysis Date = 06/09/2010 
 RPT Level = 0.02  Analysis Date = 06/09/2010 
 RPT Level = 0.02  Analysis Date = 06/04/2010 
 RPT Level = 0.02  Analysis Date = 06/04/2010 
 RPT Level = 0.02  Analysis Date = 05/25/2010 
 RPT Level = 0.02  Analysis Date = 05/25/2010 
 RPT Level = 0.02  Analysis Date = 05/24/2010 
 RPT Level = 0.02  Analysis Date = 05/24/2010 
 RPT Level = 0.02  Analysis Date = 05/12/2010 
 RPT Level = 0.02  Analysis Date = 05/12/2010 
 RPT Level = 0.02  Analysis Date = 05/05/2010 
 RPT Level = 0.02  Analysis Date = 05/05/2010 
 RPT Level = 0.02  Analysis Date = 04/29/2010 
 RPT Level = 0.02  Analysis Date = 04/29/2010 
 RPT Level = 0.02  Analysis Date = 04/22/2010 
 RPT Level = 0.02  Analysis Date = 04/22/2010 
 RPT Level = 0.02  Analysis Date = 04/20/2010 
 RPT Level = 0.02  Analysis Date = 04/20/2010 
 RPT Level = 0.02  Analysis Date = 04/06/2010 
 RPT Level = 0.02  Analysis Date = 04/06/2010 
 RPT Level = 0.02  Analysis Date = 04/01/2010 
 RPT Level = 0.02  Analysis Date = 04/01/2010 
 RPT Level = 0.02  Analysis Date = 03/29/2010 
 RPT Level = 0.02  Analysis Date = 03/29/2010 
 RPT Level = 0.02  Analysis Date = 03/17/2010 
 RPT Level = 0.02  Analysis Date = 03/17/2010 
 RPT Level = 0.02  Analysis Date = 03/10/2010 
 RPT Level = 0.02  Analysis Date = 03/10/2010 
 RPT Level = 0.02  Analysis Date = 03/02/2010 
 RPT Level = 0.02  Analysis Date = 03/02/2010 
 RPT Level = 0.02  Analysis Date = 02/23/2010 
 RPT Level = 0.02  Analysis Date = 02/23/2010 
 RPT Level = 0.02  Analysis Date = 02/23/2010 
 RPT Level = 0.02  Analysis Date = 02/23/2010 
 RPT Level = 0.02  Analysis Date = 02/10/2010 
 RPT Level = 0.02  Analysis Date = 02/10/2010 
 RPT Level = 0.02  Analysis Date = 02/04/2010 
 RPT Level = 0.02  Analysis Date = 02/04/2010 
 RPT Level = 0.02  Analysis Date = 01/27/2010 
 RPT Level = 0.02  Analysis Date = 01/27/2010 
 RPT Level = 0.02  Analysis Date = 01/21/2010 
 RPT Level = 0.02  Analysis Date = 01/21/2010 
 RPT Level = 0.02  Analysis Date = 01/12/2010 
 RPT Level = 0.02  Analysis Date = 01/12/2010 
 RPT Level = 0.02  Analysis Date = 01/06/2010 
 RPT Level = 0.02  Analysis Date = 01/06/2010 
 RPT Level = 0.02  Analysis Date = 01/04/2010 
 RPT Level = 0.02  Analysis Date = 01/04/2010 
 RPT Level = 0.02  Analysis Date = 12/24/2009 
 RPT Level = 0.02  Analysis Date = 12/24/2009 
 RPT Level = 0.02  Analysis Date = 12/16/2009 
 RPT Level = 0.02  Analysis Date = 12/16/2009 
 RPT Level = 0.02  Analysis Date = 12/09/2009 
 RPT Level = 0.02  Analysis Date = 12/09/2009 
 RPT Level = 0.02  Analysis Date = 12/03/2009 
 RPT Level = 0.02  Analysis Date = 12/03/2009 
 RPT Level = 0.02  Analysis Date = 11/25/2009 
 RPT Level = 0.02  Analysis Date = 11/25/2009 
 RPT Level = 0.02  Analysis Date = 11/23/2009 
 RPT Level = 0.02  Analysis Date = 11/23/2009 
 RPT Level = 0.02  Analysis Date = 11/12/2009 
 RPT Level = 0.02  Analysis Date = 11/12/2009 
 RPT Level = 0.02  Analysis Date = 11/06/2009 
 RPT Level = 0.02  Analysis Date = 11/06/2009 
 RPT Level = 0.02  Analysis Date = 11/03/2009 
 RPT Level = 0.02  Analysis Date = 11/03/2009 
 RPT Level = 0.02  Analysis Date = 10/21/2009 
 RPT Level = 0.02  Analysis Date = 10/21/2009 
 RPT Level = 0.02  Analysis Date = 10/15/2009 
 RPT Level = 0.02  Analysis Date = 10/15/2009 
 RPT Level = 0.02  Analysis Date = 10/06/2009 
 RPT Level = 0.02  Analysis Date = 10/06/2009 
 RPT Level = 0.02  Analysis Date = 09/30/2009 
 RPT Level = 0.02  Analysis Date = 09/30/2009 
 RPT Level = 0.02  Analysis Date = 09/22/2009 
 RPT Level = 0.02  Analysis Date = 09/22/2009 
 RPT Level = 0.02  Analysis Date = 09/16/2009 
 RPT Level = 0.02  Analysis Date = 09/16/2009 
 RPT Level = 0.02  Analysis Date = 09/11/2009 
 RPT Level = 0.02  Analysis Date = 09/11/2009 
 RPT Level = 0.02  Analysis Date = 09/01/2009 
 RPT Level = 0.02  Analysis Date = 09/01/2009 
 RPT Level = 0.02  Analysis Date = 08/25/2009 
 RPT Level = 0.02  Analysis Date = 08/25/2009 
 RPT Level = 0.02  Analysis Date = 08/18/2009 
 RPT Level = 0.02  Analysis Date = 08/18/2009 
 RPT Level = 0.02  Analysis Date = 08/11/2009 
 RPT Level = 0.02  Analysis Date = 08/11/2009 
 RPT Level = 0.02  Analysis Date = 08/04/2009 
 RPT Level = 0.02  Analysis Date = 08/04/2009 
 RPT Level = 0.02  Analysis Date = 07/29/2009 
 RPT Level = 0.02  Analysis Date = 07/29/2009 
 RPT Level = 0.02  Analysis Date = 07/22/2009 
 RPT Level = 0.02  Analysis Date = 07/22/2009 
 RPT Level = 0.02  Analysis Date = 07/15/2009 
 RPT Level = 0.02  Analysis Date = 07/15/2009 
 RPT Level = 0.02  Analysis Date = 07/08/2009 
 RPT Level = 0.02  Analysis Date = 07/08/2009 
 RPT Level = 0.02  Analysis Date = 06/30/2009 
 RPT Level = 0.02  Analysis Date = 06/30/2009 
 RPT Level = 0.02  Analysis Date = 06/23/2009 
 RPT Level = 0.02  Analysis Date = 06/23/2009 
 RPT Level = 0.02  Analysis Date = 06/16/2009 
 RPT Level = 0.02  Analysis Date = 06/16/2009 
 RPT Level = 0.02  Analysis Date = 06/09/2009 
 RPT Level = 0.02  Analysis Date = 06/09/2009 
 RPT Level = 0.02  Analysis Date = 06/03/2009 
 RPT Level = 0.02  Analysis Date = 06/03/2009 
 RPT Level = 0.02  Analysis Date = 06/01/2009 
 RPT Level = 0.02  Analysis Date = 06/01/2009 
 RPT Level = 0.02  Analysis Date = 05/19/2009 
 RPT Level = 0.02  Analysis Date = 05/19/2009 
 RPT Level = 0.02  Analysis Date = 05/13/2009 
 RPT Level = 0.02  Analysis Date = 05/13/2009 
 RPT Level = 0.02  Analysis Date = 05/05/2009 
 RPT Level = 0.02  Analysis Date = 05/05/2009 
 RPT Level = 0.02  Analysis Date = 04/28/2009 
 RPT Level = 0.02  Analysis Date = 04/28/2009 
 RPT Level = 0.02  Analysis Date = 04/23/2009 
 RPT Level = 0.02  Analysis Date = 04/23/2009 
 RPT Level = 0.02  Analysis Date = 04/14/2009 
 RPT Level = 0.02  Analysis Date = 04/14/2009 
 RPT Level = 0.02  Analysis Date = 04/08/2009 
 RPT Level = 0.02  Analysis Date = 04/08/2009 
 RPT Level = 0.02  Analysis Date = 03/31/2009 
 RPT Level = 0.02  Analysis Date = 03/31/2009 
 RPT Level = 0.02  Analysis Date = 03/27/2009 
 RPT Level = 0.02  Analysis Date = 03/27/2009 
 RPT Level = 0.02  Analysis Date = 03/18/2009 
 RPT Level = 0.02  Analysis Date = 03/18/2009 
 RPT Level = 0.02  Analysis Date = 03/10/2009 
 RPT Level = 0.02  Analysis Date = 03/10/2009 
 RPT Level = 0.02  Analysis Date = 03/05/2009 
 RPT Level = 0.02  Analysis Date = 03/05/2009 
 RPT Level = 0.02  Analysis Date = 02/26/2009 
 RPT Level = 0.02  Analysis Date = 02/26/2009 
 RPT Level = 0.02  Analysis Date = 02/19/2009 
 RPT Level = 0.02  Analysis Date = 02/19/2009 
 RPT Level = 0.02  Analysis Date = 02/12/2009 
 RPT Level = 0.02  Analysis Date = 02/12/2009 
 RPT Level = 0.02  Analysis Date = 02/05/2009 
 RPT Level = 0.02  Analysis Date = 02/05/2009 
 RPT Level = 0.02  Analysis Date = 01/28/2009 
 RPT Level = 0.02  Analysis Date = 01/28/2009 
 RPT Level = 0.02  Analysis Date = 01/23/2009 
 RPT Level = 0.02  Analysis Date = 01/23/2009 
 RPT Level = 0.02  Analysis Date = 01/14/2009 
 RPT Level = 0.02  Analysis Date = 01/14/2009 
 RPT Level = 0.02  Analysis Date = 01/08/2009 
 RPT Level = 0.02  Analysis Date = 01/08/2009 
 RPT Level = 0.02  Analysis Date = 01/06/2009 
 RPT Level = 0.02  Analysis Date = 01/06/2009 
 RPT Level = 0.02  Analysis Date = 12/23/2008 
 RPT Level = 0.02  Analysis Date = 12/23/2008 
 RPT Level = 0.02  Analysis Date = 12/17/2008 
 RPT Level = 0.02  Analysis Date = 12/17/2008 
 RPT Level = 0.02  Analysis Date = 12/12/2008 
 RPT Level = 0.02  Analysis Date = 12/12/2008 
 RPT Level = 0.02  Analysis Date = 12/02/2008 
 RPT Level = 0.02  Analysis Date = 12/02/2008 
 RPT Level = 0.02  Analysis Date = 11/25/2008 
 RPT Level = 0.02  Analysis Date = 11/25/2008 
 RPT Level = 0.02  Analysis Date = 11/19/2008 
 RPT Level = 0.02  Analysis Date = 11/19/2008 
 RPT Level = 0.02  Analysis Date = 11/14/2008 
 RPT Level = 0.02  Analysis Date = 11/14/2008 
 RPT Level = 0.02  Analysis Date = 11/13/2008 
 RPT Level = 0.02  Analysis Date = 11/13/2008 
 RPT Level = 0.02  Analysis Date = 10/29/2008 
 RPT Level = 0.02  Analysis Date = 10/29/2008 
 RPT Level = 0.02  Analysis Date = 10/21/2008 
 RPT Level = 0.02  Analysis Date = 10/21/2008 
 RPT Level = 0.02  Analysis Date = 10/16/2008 
 RPT Level = 0.02  Analysis Date = 10/16/2008 
 RPT Level = 0.02  Analysis Date = 10/09/2008 
 RPT Level = 0.02  Analysis Date = 10/09/2008 
 RPT Level = 0.02  Analysis Date = 10/06/2008 
 RPT Level = 0.02  Analysis Date = 10/06/2008 
 RPT Level = 0.02  Analysis Date = 09/26/2008 
 RPT Level = 0.02  Analysis Date = 09/26/2008 
 RPT Level = 0.02  Analysis Date = 09/22/2008 
 RPT Level = 0.02  Analysis Date = 09/22/2008 
 RPT Level = 0.02  Analysis Date = 09/18/2008 
 RPT Level = 0.02  Analysis Date = 09/18/2008 
 RPT Level = 0.02  Analysis Date = 09/16/2008 
 RPT Level = 0.02  Analysis Date = 09/16/2008 
 RPT Level = 0.02  Analysis Date = 09/04/2008 
 RPT Level = 0.02  Analysis Date = 09/04/2008 
 RPT Level = 0.02  Analysis Date = 08/22/2008 
 RPT Level = 0.02  Analysis Date = 08/22/2008 
 RPT Level = 0.02  Analysis Date = 08/13/2008 
 RPT Level = 0.02  Analysis Date = 08/13/2008 
 RPT Level = 0.02  Analysis Date = 08/11/2008 
 RPT Level = 0.02  Analysis Date = 08/11/2008 
 RPT Level = 0.02  Analysis Date = 07/23/2008 
 RPT Level = 0.02  Analysis Date = 07/23/2008 
 RPT Level = 0.02  Analysis Date = 07/18/2008 
 RPT Level = 0.02  Analysis Date = 07/18/2008 
 RPT Level = 0.02  Analysis Date = 07/09/2008 
 RPT Level = 0.02  Analysis Date = 07/09/2008 
 RPT Level = 0.02  Analysis Date = 07/02/2008 
 RPT Level = 0.02  Analysis Date = 07/02/2008 
 RPT Level = 0.02  Analysis Date = 06/30/2008 
 RPT Level = 0.02  Analysis Date = 06/30/2008 
 RPT Level = 0.02  Analysis Date = 06/18/2008 
 RPT Level = 0.02  Analysis Date = 06/18/2008 
 RPT Level = 0.02  Analysis Date = 06/13/2008 
 RPT Level = 0.02  Analysis Date = 06/13/2008 
 RPT Level = 0.02  Analysis Date = 06/05/2008 
 RPT Level = 0.02  Analysis Date = 06/05/2008 
 RPT Level = 0.02  Analysis Date = 06/03/2008 
 RPT Level = 0.02  Analysis Date = 06/03/2008 
 RPT Level = 0.02  Analysis Date = 05/22/2008 
 RPT Level = 0.02  Analysis Date = 05/22/2008 
 RPT Level = 0.02  Analysis Date = 05/19/2008 
 RPT Level = 0.02  Analysis Date = 05/19/2008 
 RPT Level = 0.02  Analysis Date = 05/12/2008 
 RPT Level = 0.02  Analysis Date = 05/12/2008 
 RPT Level = 0.02  Analysis Date = 04/30/2008 
 RPT Level = 0.02  Analysis Date = 04/30/2008 
 RPT Level = 0.02  Analysis Date = 04/22/2008 
 RPT Level = 0.02  Analysis Date = 04/22/2008 
 RPT Level = 0.02  Analysis Date = 04/18/2008 
 RPT Level = 0.02  Analysis Date = 04/18/2008 
 RPT Level = 0.02  Analysis Date = 04/08/2008 
 RPT Level = 0.02  Analysis Date = 04/08/2008 
 RPT Level = 0.02  Analysis Date = 04/08/2008 
 RPT Level = 0.02  Analysis Date = 04/08/2008 
 RPT Level = 0.02  Analysis Date = 03/25/2008 
 RPT Level = 0.02  Analysis Date = 03/25/2008 
 RPT Level = 0.02  Analysis Date = 03/20/2008 
 RPT Level = 0.02  Analysis Date = 03/20/2008 
 RPT Level = 0.02  Analysis Date = 03/13/2008 
 RPT Level = 0.02  Analysis Date = 03/13/2008 
 RPT Level = 0.02  Analysis Date = 03/07/2008 
 RPT Level = 0.02  Analysis Date = 03/07/2008 
 RPT Level = 0.02  Analysis Date = 02/27/2008 
 RPT Level = 0.02  Analysis Date = 02/27/2008 
 RPT Level = 0.02  Analysis Date = 02/27/2008 
 RPT Level = 0.02  Analysis Date = 02/27/2008 
 RPT Level = 0.02  Analysis Date = 02/13/2008 
 RPT Level = 0.02  Analysis Date = 02/13/2008 
 RPT Level = 0.02  Analysis Date = 02/08/2008 
 RPT Level = 0.02  Analysis Date = 02/08/2008 
 RPT Level = 0.02  Analysis Date = 01/29/2008 
 RPT Level = 0.02  Analysis Date = 01/29/2008 
 RPT Level = 0.02  Analysis Date = 01/25/2008 
 RPT Level = 0.02  Analysis Date = 01/25/2008 
 RPT Level = 0.02  Analysis Date = 01/17/2008 
 RPT Level = 0.02  Analysis Date = 01/17/2008 
 RPT Level = 0.02  Analysis Date = 01/08/2008 
 RPT Level = 0.02  Analysis Date = 01/08/2008 
 RPT Level = 0.02  Analysis Date = 01/08/2008 
 RPT Level = 0.02  Analysis Date = 01/08/2008 
 RPT Level = 0.02  Analysis Date = 12/19/2007 
 RPT Level = 0.02  Analysis Date = 12/19/2007 
 RPT Level = 0.02  Analysis Date = 12/11/2007 
 RPT Level = 0.02  Analysis Date = 12/11/2007 
 RPT Level = 0.02  Analysis Date = 12/04/2007 
 RPT Level = 0.02  Analysis Date = 12/04/2007 
 RPT Level = 0.02  Analysis Date = 11/28/2007 
 RPT Level = 0.02  Analysis Date = 11/28/2007 
 RPT Level = 0.02  Analysis Date = 11/20/2007 
 RPT Level = 0.02  Analysis Date = 11/20/2007 
 RPT Level = 0.02  Analysis Date = 11/20/2007 
 RPT Level = 0.02  Analysis Date = 11/20/2007 
 RPT Level = 0.02  Analysis Date = 11/13/2007 
 RPT Level = 0.02  Analysis Date = 11/13/2007 
 RPT Level = 0.02  Analysis Date = 11/02/2007 
 RPT Level = 0.02  Analysis Date = 11/02/2007 
 RPT Level = 0.02  Analysis Date = 10/30/2007 
 RPT Level = 0.02  Analysis Date = 10/30/2007 
 RPT Level = 0.02  Analysis Date = 10/17/2007 
 RPT Level = 0.02  Analysis Date = 10/17/2007 
 RPT Level = 0.02  Analysis Date = 10/16/2007 
 RPT Level = 0.02  Analysis Date = 10/16/2007 
 RPT Level = 0.02  Analysis Date = 10/01/2007 
 RPT Level = 0.03  Analysis Date = 10/01/2007 
 RPT Level = 0.03  Analysis Date = 09/18/2007 
 RPT Level = 0.03  Analysis Date = 09/18/2007 
 RPT Level = 0.03  Analysis Date = 09/13/2007 
 RPT Level = 0.03  Analysis Date = 09/13/2007 
 RPT Level = 0.03  Analysis Date = 09/10/2007 
 RPT Level = 0.03  Analysis Date = 09/10/2007 
 RPT Level = 0.03  Analysis Date = 08/30/2007 
 RPT Level = 0.03  Analysis Date = 08/30/2007 
 RPT Level = 0.03  Analysis Date = 08/24/2007 
 RPT Level = 0.03  Analysis Date = 08/24/2007 
 RPT Level = 0.03  Analysis Date = 08/20/2007 
 RPT Level = 0.03  Analysis Date = 08/20/2007 
 RPT Level = 0.03  Analysis Date = 08/15/2007 
 RPT Level = 0.03  Analysis Date = 08/15/2007 
 RPT Level = 0.03  Analysis Date = 08/02/2007 
 RPT Level = 0.03  Analysis Date = 08/02/2007 
 RPT Level = 0.03  Analysis Date = 07/27/2007 
 RPT Level = 0.03  Analysis Date = 07/27/2007 
 RPT Level = 0.03  Analysis Date = 07/10/2007 
 RPT Level = 0.03  Analysis Date = 07/10/2007 
 RPT Level = 0.03  Analysis Date = 07/06/2007 
 RPT Level = 0.03  Analysis Date = 07/06/2007 
 RPT Level = 0.03  Analysis Date = 06/27/2007 
 RPT Level = 0.03  Analysis Date = 06/27/2007 
 RPT Level = 0.03  Analysis Date = 06/20/2007 
 RPT Level = 0.03  Analysis Date = 06/20/2007 
 RPT Level = 0.03  Analysis Date = 06/15/2007 
 RPT Level = 0.03  Analysis Date = 06/15/2007 
 RPT Level = 0.03  Analysis Date = 06/06/2007 
 RPT Level = 0.03  Analysis Date = 06/06/2007 
 RPT Level = 0.03  Analysis Date = 05/31/2007 
 RPT Level = 0.03  Analysis Date = 05/31/2007 
 RPT Level = 0.03  Analysis Date = 05/22/2007 
 RPT Level = 0.03  Analysis Date = 05/22/2007 
 RPT Level = 0.03  Analysis Date = 05/15/2007 
 RPT Level = 0.03  Analysis Date = 05/15/2007 
 RPT Level = 0.03  Analysis Date = 05/09/2007 
 RPT Level = 0.03  Analysis Date = 05/09/2007 
 RPT Level = 0.03  Analysis Date = 05/02/2007 
 RPT Level = 0.03  Analysis Date = 05/02/2007 
 RPT Level = 0.03  Analysis Date = 04/24/2007 
 RPT Level = 0.03  Analysis Date = 04/24/2007 
 RPT Level = 0.03  Analysis Date = 04/18/2007 
 RPT Level = 0.03  Analysis Date = 04/18/2007 
 RPT Level = 0.03  Analysis Date = 04/11/2007 
 RPT Level = 0.03  Analysis Date = 04/11/2007 
 RPT Level = 0.03  Analysis Date = 04/04/2007 
 RPT Level = 0.03  Analysis Date = 04/04/2007 
 RPT Level = 0.03  Analysis Date = 03/28/2007 
 RPT Level = 0.03  Analysis Date = 03/28/2007 
 RPT Level = 0.03  Analysis Date = 03/20/2007 
 RPT Level = 0.03  Analysis Date = 03/20/2007 
 RPT Level = 0.03  Analysis Date = 03/14/2007 
 RPT Level = 0.03  Analysis Date = 03/14/2007 
 RPT Level = 0.03  Analysis Date = 03/08/2007 
 RPT Level = 0.03  Analysis Date = 03/08/2007 
 RPT Level = 0.03  Analysis Date = 02/28/2007 
 RPT Level = 0.03  Analysis Date = 02/28/2007 
 RPT Level = 0.03  Analysis Date = 02/26/2007 
 RPT Level = 0.03  Analysis Date = 02/26/2007 
 RPT Level = 0.03  Analysis Date = 02/16/2007 
 RPT Level = 0.03  Analysis Date = 02/16/2007 
 RPT Level = 0.03  Analysis Date = 02/12/2007 
 RPT Level = 0.03  Analysis Date = 02/12/2007 
 RPT Level = 0.03  Analysis Date = 01/26/2007 
 RPT Level = 0.03  Analysis Date = 01/26/2007 
 RPT Level = 0.03  Analysis Date = 01/19/2007 
 RPT Level = 0.03  Analysis Date = 01/19/2007 
 RPT Level = 0.03  Analysis Date = 01/16/2007 
 RPT Level = 0.03  Analysis Date = 01/16/2007 
 RPT Level = 0.03  Analysis Date = 01/05/2007 
 RPT Level = 0.03  Analysis Date = 01/05/2007 
 RPT Level = 0.03  Analysis Date = 01/04/2007 
 RPT Level = 0.03  Analysis Date = 01/04/2007 
 RPT Level = 0.03  Analysis Date = 01/03/2007 
 RPT Level = 0.03  Analysis Date = 01/03/2007 
 RPT Level = 0.03  Analysis Date = 12/13/2006 
 RPT Level = 0.03  Analysis Date = 12/13/2006 
 RPT Level = 0.03  Analysis Date = 12/05/2006 
 RPT Level = 0.03  Analysis Date = 12/05/2006 
 RPT Level = 0.03  Analysis Date = 11/29/2006 
 RPT Level = 0.03  Analysis Date = 11/29/2006 
 RPT Level = 0.03  Analysis Date = 11/21/2006 
 RPT Level = 0.03  Analysis Date = 11/21/2006 
 RPT Level = 0.03  Analysis Date = 11/16/2006 
 RPT Level = 0.03  Analysis Date = 11/16/2006 
 RPT Level = 0.03  Analysis Date = 11/07/2006 
 RPT Level = 0.03  Analysis Date = 11/07/2006 
 RPT Level = 0.03  Analysis Date = 11/02/2006 
 RPT Level = 0.03  Analysis Date = 11/02/2006 
 RPT Level = 0.03  Analysis Date = 10/30/2006 
 RPT Level = 0.03  Analysis Date = 10/30/2006 
 RPT Level = 0.03  Analysis Date = 10/25/2006 
 RPT Level = 0.03  Analysis Date = 10/25/2006 
 RPT Level = 0.03  Analysis Date = 10/18/2006 
 RPT Level = 0.03  Analysis Date = 10/18/2006 
 RPT Level = 0.03  Analysis Date = 10/12/2006 
 RPT Level = 0.03  Analysis Date = 10/12/2006 
 RPT Level = 0.03  Analysis Date = 10/02/2006 
 RPT Level = 0.03  Analysis Date = 10/02/2006 
 RPT Level = 0.03  Analysis Date = 09/26/2006 
 RPT Level = 0.03  Analysis Date = 09/26/2006 
 RPT Level = 0.03  Analysis Date = 09/21/2006 
 RPT Level = 0.03  Analysis Date = 09/21/2006 
 RPT Level = 0.03  Analysis Date = 09/12/2006 
 RPT Level = 0.03  Analysis Date = 09/12/2006 
 RPT Level = 0.03  Analysis Date = 08/29/2006 
 RPT Level = 0.03  Analysis Date = 08/29/2006 
 RPT Level = 0.03  Analysis Date = 08/17/2006 
 RPT Level = 0.03  Analysis Date = 08/17/2006 
 RPT Level = 0.03  Analysis Date = 08/01/2006 
 RPT Level = 0.03  Analysis Date = 08/01/2006 
 RPT Level = 0.03  Analysis Date = 07/24/2006 
 RPT Level = 0.03  Analysis Date = 07/24/2006 
 RPT Level = 0.03  Analysis Date = 07/18/2006 
 RPT Level = 0.03  Analysis Date = 07/18/2006 
 RPT Level = 0.03  Analysis Date = 07/05/2006 
 RPT Level = 0.03  Analysis Date = 07/05/2006 
 RPT Level = 0.03  Analysis Date = 06/29/2006 
 RPT Level = 0.03  Analysis Date = 06/29/2006 
 RPT Level = 0.03  Analysis Date = 06/19/2006 
 RPT Level = 0.03  Analysis Date = 06/19/2006 
 RPT Level = 0.03  Analysis Date = 05/25/2006 
 RPT Level = 0.03  Analysis Date = 05/25/2006 
 RPT Level = 0.03  Analysis Date = 05/22/2006 
 RPT Level = 0.03  Analysis Date = 05/22/2006 
 RPT Level = 0.03  Analysis Date = 05/11/2006 
 RPT Level = 0.03  Analysis Date = 05/11/2006 
 RPT Level = 0.03  Analysis Date = 09/27/2005 
 RPT Level = 0.03  Analysis Date = 09/27/2005 
 RPT Level = 0.03  Analysis Date = 09/20/2005 
 RPT Level = 0.03  Analysis Date = 09/20/2005 
 RPT Level = 0.03  Analysis Date = 09/12/2005 
 RPT Level = 0.03  Analysis Date = 09/12/2005 
 RPT Level = 0.03  Analysis Date = 09/07/2005 
 RPT Level = 0.03  Analysis Date = 09/07/2005 
 RPT Level = 0.03  Analysis Date = 08/31/2005 
 RPT Level = 0.03  Analysis Date = 08/31/2005 
 RPT Level = 0.03  Analysis Date = 08/16/2005 
 RPT Level = 0.03  Analysis Date = 08/16/2005 
 RPT Level = 0.03  Analysis Date = 08/10/2005 
 RPT Level = 0.03  Analysis Date = 08/10/2005 
 RPT Level = 0.03  Analysis Date = 08/10/2005 
 RPT Level = 0.03  Analysis Date = 08/10/2005 
 RPT Level = 0.03  Analysis Date = 07/26/2005 
 RPT Level = 0.03  Analysis Date = 07/26/2005 
 RPT Level = 0.03  Analysis Date = 07/15/2005 
 RPT Level = 0.03  Analysis Date = 07/15/2005 
 RPT Level = 0.03  Analysis Date = 07/12/2005 
 RPT Level = 0.03  Analysis Date = 07/12/2005 
 RPT Level = 0.03  Analysis Date = 07/01/2005 
 RPT Level = 0.03  Analysis Date = 07/01/2005 
 RPT Level = 0.03  Analysis Date = 06/27/2005 
 RPT Level = 0.03  Analysis Date = 06/27/2005 
 RPT Level = 0.03  Analysis Date = 06/20/2005 
 RPT Level = 0.03  Analysis Date = 06/20/2005 
 RPT Level = 0.03  Analysis Date = 06/14/2005 
 RPT Level = 0.03  Analysis Date = 06/14/2005 
 RPT Level = 0.03  Analysis Date = 06/06/2005 
 RPT Level = 0.03  Analysis Date = 06/06/2005 
 RPT Level = 0.03  Analysis Date = 05/26/2005 
 RPT Level = 0.03  Analysis Date = 05/26/2005 
 RPT Level = 0.03  Analysis Date = 05/24/2005 
 RPT Level = 0.03  Analysis Date = 05/24/2005 
 RPT Level = 0.03  Analysis Date = 05/16/2005 
 RPT Level = 0.03  Analysis Date = 05/16/2005 
 RPT Level = 0.03  Analysis Date = 05/10/2005 
 RPT Level = 0.03  Analysis Date = 05/10/2005 
 RPT Level = 0.03  Analysis Date = 04/28/2005 
 RPT Level = 0.03  Analysis Date = 04/28/2005 
 RPT Level = 0.03  Analysis Date = 04/26/2005 
 RPT Level = 0.03  Analysis Date = 04/26/2005 
 RPT Level = 0.03  Analysis Date = 04/14/2005 
 RPT Level = 0.03  Analysis Date = 04/14/2005 
 RPT Level = 0.03  Analysis Date = 04/07/2005 
 RPT Level = 0.03  Analysis Date = 04/07/2005 
 RPT Level = 0.03  Analysis Date = 03/31/2005 
 RPT Level = 0.03  Analysis Date = 03/31/2005 
 RPT Level = 0.03  Analysis Date = 03/30/2005 
 RPT Level = 0.03  Analysis Date = 03/30/2005 
 RPT Level = 0.03  Analysis Date = 03/21/2005 
 RPT Level = 0.03  Analysis Date = 03/21/2005 
 RPT Level = 0.03  Analysis Date = 03/15/2005 
 RPT Level = 0.03  Analysis Date = 03/15/2005 
 RPT Level = 0.03  Analysis Date = 03/15/2005 
 RPT Level = 0.03  Analysis Date = 03/15/2005 
 RPT Level = 0.03  Analysis Date = 03/09/2005 
 RPT Level = 0.03  Analysis Date = 03/09/2005 
 RPT Level = 0.03  Analysis Date = 03/01/2005 
 RPT Level = 0.03  Analysis Date = 03/01/2005 
 RPT Level = 0.03  Analysis Date = 02/24/2005 
 RPT Level = 0.03  Analysis Date = 02/24/2005 
 RPT Level = 0.03  Analysis Date = 02/15/2005 
 RPT Level = 0.03  Analysis Date = 02/15/2005 
 RPT Level = 0.03  Analysis Date = 02/09/2005 
 RPT Level = 0.03  Analysis Date = 02/09/2005 
 RPT Level = 0.03  Analysis Date = 01/31/2005 
 RPT Level = 0.03  Analysis Date = 01/31/2005 
 RPT Level = 0.03  Analysis Date = 01/26/2005 
 RPT Level = 0.03  Analysis Date = 01/26/2005 
 RPT Level = 0.03  Analysis Date = 01/25/2005 
 RPT Level = 0.03  Analysis Date = 01/25/2005 
 RPT Level = 0.03  Analysis Date = 01/20/2005 
 RPT Level = 0.03  Analysis Date = 01/20/2005 
 RPT Level = 0.03  Analysis Date = 01/11/2005 
 RPT Level = 0.03  Analysis Date = 01/11/2005 
 RPT Level = 0.03  Analysis Date = 12/27/2004 
 RPT Level = 0.03  Analysis Date = 12/27/2004 
 RPT Level = 0.03  Analysis Date = 12/27/2004 
 RPT Level = 0.03  Analysis Date = 12/27/2004 
 RPT Level = 0.03  Analysis Date = 12/21/2004 
 RPT Level = 0.03  Analysis Date = 12/21/2004 
 RPT Level = 0.03  Analysis Date = 12/21/2004 
 RPT Level = 0.03  Analysis Date = 12/21/2004 
 RPT Level = 0.03  Analysis Date = 12/21/2004 
 RPT Level = 0.03  Analysis Date = 12/21/2004 
 RPT Level = 0.03  Analysis Date = 12/21/2004 
 RPT Level = 0.03  Analysis Date = 12/21/2004 
 RPT Level = 0.03  Analysis Date = 12/15/2004 
 RPT Level = 0.03  Analysis Date = 12/15/2004 
 RPT Level = 0.03  Analysis Date = 12/15/2004 
 RPT Level = 0.03  Analysis Date = 12/15/2004 
 RPT Level = 0.03  Analysis Date = 12/14/2004 
 RPT Level = 0.03  Analysis Date = 12/14/2004 
 RPT Level = 0.03  Analysis Date = 12/09/2004 
 RPT Level = 0.03  Analysis Date = 12/09/2004 
 RPT Level = 0.03  Analysis Date = 12/08/2004 
 RPT Level = 0.03  Analysis Date = 12/08/2004 
 RPT Level = 0.03  Analysis Date = 09/15/2004 
 RPT Level = 0.03  Analysis Date = 09/15/2004 
 RPT Level = 0.03  Analysis Date = 09/09/2004 
 RPT Level = 0.03  Analysis Date = 09/09/2004 
 RPT Level = 0.03  Analysis Date = 09/08/2004 
 RPT Level = 0.03  Analysis Date = 09/08/2004 
 RPT Level = 0.03  Analysis Date = 09/02/2004 
 RPT Level = 0.03  Analysis Date = 09/02/2004 
 RPT Level = 0.03  Analysis Date = 09/01/2004 
 RPT Level = 0.03  Analysis Date = 09/01/2004 
 RPT Level = 0.03  Analysis Date = 09/01/2004 
 RPT Level = 0.03  Analysis Date = 09/01/2004 
 RPT Level = 0.03  Analysis Date = 08/19/2004 
 RPT Level = 0.03  Analysis Date = 08/19/2004 
 RPT Level = 0.03  Analysis Date = 08/11/2004 
 RPT Level = 0.03  Analysis Date = 08/11/2004 
 RPT Level = 0.03  Analysis Date = 08/05/2004 
 RPT Level = 0.03  Analysis Date = 08/05/2004 
 RPT Level = 0.03  Analysis Date = 07/27/2004 
 RPT Level = 0.03  Analysis Date = 07/27/2004 
 RPT Level = 0.03  Analysis Date = 07/19/2004 
 RPT Level = 0.03  Analysis Date = 07/19/2004 
 RPT Level = 0.03  Analysis Date = 07/14/2004 
 RPT Level = 0.03  Analysis Date = 07/14/2004 
 RPT Level = 0.03  Analysis Date = 07/13/2004 
 RPT Level = 0.03  Analysis Date = 07/13/2004 
 RPT Level = 0.03  Analysis Date = 07/08/2004 
 RPT Level = 0.03  Analysis Date = 07/08/2004 
 RPT Level = 0.03  Analysis Date = 07/06/2004 
 RPT Level = 0.03  Analysis Date = 07/06/2004 
 RPT Level = 0.03  Analysis Date = 06/24/2004 
 RPT Level = 0.03  Analysis Date = 06/24/2004 
 RPT Level = 0.03  Analysis Date = 06/23/2004 
 RPT Level = 0.03  Analysis Date = 06/23/2004 
 RPT Level = 0.03  Analysis Date = 06/17/2004 
 RPT Level = 0.03  Analysis Date = 06/17/2004 
 RPT Level = 0.03  Analysis Date = 06/08/2004 
 RPT Level = 0.03  Analysis Date = 06/08/2004 
 RPT Level = 0.03  Analysis Date = 05/17/2004 
 RPT Level = 0.03  Analysis Date = 05/17/2004 
 RPT Level = 0.03  Analysis Date = 05/11/2004 
 RPT Level = 0.03  Analysis Date = 05/11/2004 
 RPT Level = 0.03  Analysis Date = 05/06/2004 
 RPT Level = 0.03  Analysis Date = 05/06/2004 
 RPT Level = 0.03  Analysis Date = 04/22/2004 
 RPT Level = 0.03  Analysis Date = 04/22/2004 
 RPT Level = 0.03  Analysis Date = 04/13/2004 
 RPT Level = 0.03  Analysis Date = 04/13/2004 
 RPT Level = 0.03  Analysis Date = 04/13/2004 
 RPT Level = 0.03  Analysis Date = 04/13/2004 
 RPT Level = 0.03  Analysis Date = 04/14/2004 
 RPT Level = 0.03  Analysis Date = 04/14/2004 
 RPT Level = 0.03  Analysis Date = 04/07/2004 
 RPT Level = 0.03  Analysis Date = 04/07/2004 
 RPT Level = 0.03  Analysis Date = 04/07/2004 
 RPT Level = 0.03  Analysis Date = 04/07/2004 
 RPT Level = 0.03  Analysis Date = 04/05/2004 
 RPT Level = 0.03  Analysis Date = 04/05/2004 
 RPT Level = 0.03  Analysis Date = 04/02/2004 
 RPT Level = 0.03  Analysis Date = 04/02/2004 
 RPT Level = 0.03  Analysis Date = 04/01/2004 
 RPT Level = 0.03  Analysis Date = 04/01/2004 
 RPT Level = 0.03  Analysis Date = 03/23/2004 
 RPT Level = 0.03  Analysis Date = 03/23/2004 
 RPT Level = 0.03  Analysis Date = 03/23/2004 
 RPT Level = 0.03  Analysis Date = 03/23/2004 
 RPT Level = 0.03  Analysis Date = 03/23/2004 
 RPT Level = 0.03  Analysis Date = 03/23/2004 
 RPT Level = 0.03  Analysis Date = 03/16/2004 
 RPT Level = 0.03  Analysis Date = 03/16/2004 
 RPT Level = 0.03  Analysis Date = 03/16/2004 
 RPT Level = 0.03  Analysis Date = 03/16/2004 
 RPT Level = 0.03  Analysis Date = 03/15/2004 
 RPT Level = 0.03  Analysis Date = 03/15/2004 
 RPT Level = 0.03  Analysis Date = 03/15/2004 
 RPT Level = 0.03  Analysis Date = 03/15/2004 
 RPT Level = 0.03  Analysis Date = 03/09/2004 
 RPT Level = 0.03  Analysis Date = 03/09/2004 
 RPT Level = 0.03  Analysis Date = 03/04/2004 
 RPT Level = 0.03  Analysis Date = 03/04/2004 
 RPT Level = 0.03  Analysis Date = 02/17/2004 
 RPT Level = 0.03  Analysis Date = 02/17/2004 
 RPT Level = 0.03  Analysis Date = 02/25/2004 
 RPT Level = 0.03  Analysis Date = 02/25/2004 
 RPT Level = 0.03  Analysis Date = 02/18/2004 
 RPT Level = 0.03  Analysis Date = 02/18/2004 
 RPT Level = 0.03  Analysis Date = 02/03/2004 
 RPT Level = 0.03  Analysis Date = 02/03/2004 
 RPT Level = 0.03  Analysis Date = 02/02/2004 
 RPT Level = 0.03  Analysis Date = 02/02/2004 
 RPT Level = 0.03  Analysis Date = 01/29/2004 
 RPT Level = 0.03  Analysis Date = 01/29/2004 
 RPT Level = 0.03  Analysis Date = 01/29/2004 
 RPT Level = 0.03  Analysis Date = 01/29/2004 
 RPT Level = 0.03  Analysis Date = 01/28/2004 
 RPT Level = 0.03  Analysis Date = 01/28/2004 
 RPT Level = 0.03  Analysis Date = 01/27/2004 
 RPT Level = 0.03  Analysis Date = 01/27/2004 
 RPT Level = 0.03  Analysis Date = 01/20/2004 
 RPT Level = 0.03  Analysis Date = 01/20/2004 
 RPT Level = 0.03  Analysis Date = 01/06/2004 
 RPT Level = 0.03  Analysis Date = 01/06/2004 
 RPT Level = 0.03  Analysis Date = 10/03/2003 
 RPT Level = 0.03  Analysis Date = 10/03/2003 
 RPT Level = 0.03  Analysis Date = 10/02/2003 
 RPT Level = 0.03  Analysis Date = 10/02/2003 
 RPT Level = 0.03  Analysis Date = 09/23/2003 
 RPT Level = 0.03  Analysis Date = 09/23/2003 
 RPT Level = 0.03  Analysis Date = 09/22/2003 
 RPT Level = 0.03  Analysis Date = 09/22/2003 
 RPT Level = 0.03  Analysis Date = 09/16/2003 
 RPT Level = 0.03  Analysis Date = 09/16/2003 
 RPT Level = 0.03  Analysis Date = 09/11/2003 
 RPT Level = 0.03  Analysis Date = 09/11/2003 
 RPT Level = 0.03  Analysis Date = 09/10/2003 
 RPT Level = 0.03  Analysis Date = 09/10/2003 
 RPT Level = 0.03  Analysis Date = 08/26/2003 
 RPT Level = 0.03  Analysis Date = 08/26/2003 
 RPT Level = 0.03  Analysis Date = 08/21/2003 
 RPT Level = 0.03  Analysis Date = 08/21/2003 
 RPT Level = 0.03  Analysis Date = 08/13/2003 
 RPT Level = 0.03  Analysis Date = 08/13/2003 
 RPT Level = 0.03  Analysis Date = 08/08/2003 
 RPT Level = 0.03  Analysis Date = 08/08/2003 
 RPT Level = 0.03  Analysis Date = 08/04/2003 
 RPT Level = 0.03  Analysis Date = 08/04/2003 
 RPT Level = 0.03  Analysis Date = 07/25/2003 
 RPT Level = 0.03  Analysis Date = 07/25/2003 
 RPT Level = 0.03  Analysis Date = 07/22/2003 
 RPT Level = 0.03  Analysis Date = 07/22/2003 
 RPT Level = 0.03  Analysis Date = 07/15/2003 
 RPT Level = 0.03  Analysis Date = 07/15/2003 
 RPT Level = 0.03  Analysis Date = 07/09/2003 
 RPT Level = 0.03  Analysis Date = 07/09/2003 
 RPT Level = 0.03  Analysis Date = 06/24/2003 
 RPT Level = 0.03  Analysis Date = 06/24/2003 
 RPT Level = 0.03  Analysis Date = 06/16/2003 
 RPT Level = 0.03  Analysis Date = 06/16/2003 
 RPT Level = 0.03  Analysis Date = 06/17/2003 
 RPT Level = 0.03  Analysis Date = 06/17/2003 
 RPT Level = 0.03  Analysis Date = 06/12/2003 
 RPT Level = 0.03  Analysis Date = 06/12/2003 
 RPT Level = 0.03  Analysis Date = 05/21/2003 
 RPT Level = 0.03  Analysis Date = 05/21/2003 
 RPT Level = 0.03  Analysis Date = 05/13/2003 
 RPT Level = 0.03  Analysis Date = 05/13/2003 
 RPT Level = 0.03  Analysis Date = 05/12/2003 
 RPT Level = 0.03  Analysis Date = 05/12/2003 
 RPT Level = 0.03  Analysis Date = 04/24/2003 
 RPT Level = 0.03  Analysis Date = 04/24/2003 
 RPT Level = 0.03  Analysis Date = 04/09/2003 
 RPT Level = 0.03  Analysis Date = 04/09/2003 
 RPT Level = 0.03  Analysis Date = 04/03/2003 
 RPT Level = 0.03  Analysis Date = 04/03/2003 
 RPT Level = 0.03  Analysis Date = 04/01/2003 
 RPT Level = 0.03  Analysis Date = 04/01/2003 
 RPT Level = 0.03  Analysis Date = 04/01/2003 
 RPT Level = 0.03  Analysis Date = 04/01/2003 
 RPT Level = 0.03  Analysis Date = 03/27/2003 
 RPT Level = 0.03  Analysis Date = 03/27/2003 
 RPT Level = 0.03  Analysis Date = 03/27/2003 
 RPT Level = 0.03  Analysis Date = 03/27/2003 
 RPT Level = 0.03  Analysis Date = 03/06/2003 
 RPT Level = 0.03  Analysis Date = 03/06/2003 
 RPT Level = 0.03  Analysis Date = 03/06/2003 
 RPT Level = 0.03  Analysis Date = 03/06/2003 
 RPT Level = 0.03  Analysis Date = 02/12/2003 
 RPT Level = 0.03  Analysis Date = 02/12/2003 
 RPT Level = 0.03  Analysis Date = 02/11/2003 
 RPT Level = 0.03  Analysis Date = 02/11/2003 
 RPT Level = 0.03  Analysis Date = 02/06/2003 
 RPT Level = 0.03  Analysis Date = 02/06/2003 
 RPT Level = 0.03  Analysis Date = 02/06/2003 
 RPT Level = 0.03  Analysis Date = 02/06/2003 
 RPT Level = 0.03  Analysis Date = 01/16/2003 
 RPT Level = 0.03  Analysis Date = 01/16/2003 
 RPT Level = 0.03  Analysis Date = 01/16/2003 
 RPT Level = 0.03  Analysis Date = 01/16/2003 
 RPT Level = 0.03  Analysis Date = 01/09/2003 
 RPT Level = 0.03  Analysis Date = 01/09/2003 
 RPT Level = 0.03  Analysis Date = 01/09/2003 
 RPT Level = 0.03  Analysis Date = 01/09/2003 
 RPT Level = 0.03  Analysis Date = 12/24/2002 
 RPT Level = 0.03  Analysis Date = 12/24/2002 
 RPT Level = 0.03  Analysis Date = 12/24/2002 
 RPT Level = 0.03  Analysis Date = 12/24/2002 
 RPT Level = 0.03  Analysis Date = 12/04/2002 
 RPT Level = 0.03  Analysis Date = 12/04/2002 
 RPT Level = 0.03  Analysis Date = 12/04/2002 
 RPT Level = 0.03  Analysis Date = 12/04/2002 
 RPT Level = 0.03  Analysis Date = 12/04/2002 
 RPT Level = 0.03  Analysis Date = 12/04/2002 
 RPT Level = 0.03  Analysis Date = 12/04/2002 
 RPT Level = 0.03  Analysis Date = 12/04/2002 
 RPT Level = 0.03  Analysis Date = 12/04/2002 
 RPT Level = 0.03  Analysis Date = 12/04/2002 
 RPT Level = 0.03  Analysis Date = 11/05/2002 
 RPT Level = 0.03  Analysis Date = 11/05/2002 
 RPT Level = 0.03  Analysis Date = 11/07/2002 
 RPT Level = 0.03  Analysis Date = 11/07/2002 
 RPT Level = 0.03  Analysis Date = 11/07/2002 
 RPT Level = 0.03  Analysis Date = 11/07/2002 
 RPT Level = 0.03  Analysis Date = 11/07/2002 
 RPT Level = 0.03  Analysis Date = 11/07/2002 
 RPT Level = 0.03  Analysis Date = 11/07/2002 
 RPT Level = 0.03  Analysis Date = 11/07/2002 
 RPT Level = 0.03  Analysis Date = 09/25/2002 
 RPT Level = 0.023  Analysis Date = 09/25/2002 
 RPT Level = 0.023  Analysis Date = 09/24/2002 
 RPT Level = 0.023  Analysis Date = 09/24/2002 
 RPT Level = 0.023  Analysis Date = 09/04/2002 
 RPT Level = 0.023  Analysis Date = 09/04/2002 
 RPT Level = 0.023  Analysis Date = 09/03/2002 
 RPT Level = 0.023  Analysis Date = 09/03/2002 
 RPT Level = 0.023  Analysis Date = 08/21/2002 
 RPT Level = 0.023  Analysis Date = 08/21/2002 
 RPT Level = 0.023  Analysis Date = 08/19/2002 
 RPT Level = 0.023  Analysis Date = 08/19/2002 
 RPT Level = 0.023  Analysis Date = 08/07/2002 
 RPT Level = 0.023  Analysis Date = 08/07/2002 
 RPT Level = 0.023  Analysis Date = 07/29/2002 
 RPT Level = 0.023  Analysis Date = 07/29/2002 
 RPT Level = 0.023  Analysis Date = 07/29/2002 
 RPT Level = 0.023  Analysis Date = 07/29/2002 
 RPT Level = 0.023  Analysis Date = 07/16/2002 
 RPT Level = 0.023  Analysis Date = 07/16/2002 
 RPT Level = 0.023  Analysis Date = 07/11/2002 
 RPT Level = 0.023  Analysis Date = 07/11/2002 
 RPT Level = 0.023  Analysis Date = 06/25/2002 
 RPT Level = 0.023  Analysis Date = 06/25/2002 
 RPT Level = 0.023  Analysis Date = 06/24/2002 
 RPT Level = 0.023  Analysis Date = 06/24/2002 
 RPT Level = 0.023  Analysis Date = 06/12/2002 
 RPT Level = 0.023  Analysis Date = 06/12/2002 
 RPT Level = 0.023  Analysis Date = 06/13/2002 
 RPT Level = 0.023  Analysis Date = 06/13/2002 
 RPT Level = 0.023  Analysis Date = 06/11/2002 
 RPT Level = 0.023  Analysis Date = 06/11/2002 
 RPT Level = 0.023  Analysis Date = 05/28/2002 
 RPT Level = 0.023  Analysis Date = 05/28/2002 
 RPT Level = 0.023  Analysis Date = 05/23/2002 
 RPT Level = 0.023  Analysis Date = 05/23/2002 
 RPT Level = 0.023  Analysis Date = 05/02/2002 
 RPT Level = 0.023  Analysis Date = 05/02/2002 
 RPT Level = 0.023  Analysis Date = 04/26/2002 
 RPT Level = 0.023  Analysis Date = 04/26/2002 
 RPT Level = 0.023  Analysis Date = 04/26/2002 
 RPT Level = 0.023  Analysis Date = 04/26/2002 
 RPT Level = 0.023  Analysis Date = 04/17/2002 
 RPT Level = 0.023  Analysis Date = 04/17/2002 
 RPT Level = 0.023  Analysis Date = 04/09/2002 
 RPT Level = 0.023  Analysis Date = 04/09/2002 
 RPT Level = 0.023  Analysis Date = 03/27/2002 
 RPT Level = 0.023  Analysis Date = 03/27/2002 
 RPT Level = 0.023  Analysis Date = 04/01/2002 
 RPT Level = 0.023  Analysis Date = 04/01/2002 
 RPT Level = 0.023  Analysis Date = 03/21/2002 
 RPT Level = 0.023  Analysis Date = 03/21/2002 
 RPT Level = 0.023  Analysis Date = 03/13/2002 
 RPT Level = 0.023  Analysis Date = 03/13/2002 
 RPT Level = 0.023  Analysis Date = 03/07/2002 
 RPT Level = 0.023  Analysis Date = 03/07/2002 
 RPT Level = 0.023  Analysis Date = 03/07/2002 
 RPT Level = 0.023  Analysis Date = 03/07/2002 
 RPT Level = 0.023  Analysis Date = 03/04/2002 
 RPT Level = 0.023  Analysis Date = 03/04/2002 
 RPT Level = 0.023  Analysis Date = 02/06/2002 
 RPT Level = 0.023  Analysis Date = 02/06/2002 
 RPT Level = 0.023  Analysis Date = 02/05/2002 
 RPT Level = 0.023  Analysis Date = 02/05/2002 
 RPT Level = 0.023  Analysis Date = 01/30/2002 
 RPT Level = 0.023  Analysis Date = 01/30/2002 
 RPT Level = 0.023  Analysis Date = 01/16/2002 
 RPT Level = 0.023  Analysis Date = 01/16/2002 
 RPT Level = 0.023  Analysis Date = 01/08/2002 
 RPT Level = 0.023  Analysis Date = 01/08/2002 
 RPT Level = 0.023  Analysis Date = 01/03/2002 
 RPT Level = 0.023  Analysis Date = 01/03/2002 
 RPT Level = 0.023  Analysis Date = 12/20/2001 
 RPT Level = 0.023  Analysis Date = 12/20/2001 
 RPT Level = 0.023  Analysis Date = 12/17/2001 
 RPT Level = 0.023  Analysis Date = 12/17/2001 
 RPT Level = 0.023  Analysis Date = 12/13/2001 
 RPT Level = 0.023  Analysis Date = 12/13/2001 
 RPT Level = 0.023  Analysis Date = 11/13/2001 
 RPT Level = 0.023  Y = 0
The SGPlot Procedure

False Positive Rate for Nitrate plus Nitrite (NO3+NO2 as N), FIL, COL

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Nitrate plus Nitrite (NO3+NO2 as N), FIL, COL 00631CL048 2002 40 3 8%
    2003 52 0 0%
    2004 51 3 6%
    2005 50 0 0%
    2006 15 0 0%
    2007 50 0 0%
    2008 50 1 2%
    2009 52 1 2%
    2010 52 1 2%
    2011 52 2 4%
    2012 2 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Nitrate plus Nitrite (NO3+NO2 as N), FIL, COL, LL -
Blind Blank Results
Lab: NWQL, PCode: 00631, MCode: CL050
Analysis dates: 11/15/01 through 10/13/11
Open Data Set

 Analysis Date = 03/09/2005 
 Lab Value = 0.023 
 RPT Level = 0.008 
 Lab Sample ID = 20050670011  Analysis Date = 03/09/2005 
 Lab Value = 0.023 
 RPT Level = 0.008 
 Lab Sample ID = 20050670011  Analysis Date = 10/13/2011 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20112840071  Analysis Date = 10/05/2011 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20112760061  Analysis Date = 09/27/2011 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20112690123  Analysis Date = 09/27/2011 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20112630061  Analysis Date = 09/15/2011 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20112560021  Analysis Date = 09/09/2011 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20112510037  Analysis Date = 09/09/2011 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20112500188  Analysis Date = 08/30/2011 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20112360063  Analysis Date = 08/22/2011 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20112300036  Analysis Date = 08/09/2011 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20112200051  Analysis Date = 08/03/2011 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20112130154  Analysis Date = 08/03/2011 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20112060094  Analysis Date = 07/22/2011 
 Lab Value = 0.007 
 RPT Level = 0.008 
 Lab Sample ID = 20112010020  Analysis Date = 07/12/2011 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20111920099  Analysis Date = 07/06/2011 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20111860062  Analysis Date = 06/30/2011 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20111780166  Analysis Date = 06/23/2011 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20111710111  Analysis Date = 06/17/2011 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20111640067  Analysis Date = 06/13/2011 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20111570061  Analysis Date = 06/09/2011 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20111510151  Analysis Date = 06/07/2011 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20111430203  Analysis Date = 05/23/2011 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20111360146  Analysis Date = 05/23/2011 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20111290046  Analysis Date = 05/04/2011 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20111220086  Analysis Date = 04/26/2011 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20111150114  Analysis Date = 04/19/2011 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20111080073  Analysis Date = 04/12/2011 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20111010118  Analysis Date = 04/06/2011 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20110950054  Analysis Date = 03/29/2011 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20110870089  Analysis Date = 03/29/2011 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20110800059  Analysis Date = 03/21/2011 
 Lab Value = -0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20110750067  Analysis Date = 03/21/2011 
 Lab Value = -0.005 
 RPT Level = 0.008 
 Lab Sample ID = 20110660032  Analysis Date = 03/07/2011 
 Lab Value = -.0002 
 RPT Level = 0.008 
 Lab Sample ID = 20110590070  Analysis Date = 02/25/2011 
 Lab Value = -0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20110530105  Analysis Date = 02/28/2011 
 Lab Value = -.0005 
 RPT Level = 0.008 
 Lab Sample ID = 20110450036  Analysis Date = 02/24/2011 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20110410098  Analysis Date = 02/24/2011 
 Lab Value = -0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20110400069  Analysis Date = 02/17/2011 
 Lab Value = 0.0028 
 RPT Level = 0.008 
 Lab Sample ID = 20110240065  Analysis Date = 02/09/2011 
 Lab Value = 0.0034 
 RPT Level = 0.008 
 Lab Sample ID = 20110180057  Analysis Date = 02/02/2011 
 Lab Value = 0.0033 
 RPT Level = 0.008 
 Lab Sample ID = 20110110016  Analysis Date = 01/20/2011 
 Lab Value = 0.0015 
 RPT Level = 0.008 
 Lab Sample ID = 20110030021  Analysis Date = 01/20/2011 
 Lab Value = 0.0026 
 RPT Level = 0.008 
 Lab Sample ID = 20103610054  Analysis Date = 01/13/2011 
 Lab Value = 0.0003 
 RPT Level = 0.008 
 Lab Sample ID = 20103540047  Analysis Date = 12/28/2010 
 Lab Value = 0.0023 
 RPT Level = 0.008 
 Lab Sample ID = 20103470078  Analysis Date = 12/16/2010 
 Lab Value = 0.0019 
 RPT Level = 0.008 
 Lab Sample ID = 20103400086  Analysis Date = 12/16/2010 
 Lab Value = 0.0018 
 RPT Level = 0.008 
 Lab Sample ID = 20103330099  Analysis Date = 12/13/2010 
 Lab Value = -.0005 
 RPT Level = 0.008 
 Lab Sample ID = 20103260065  Analysis Date = 12/08/2010 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20103190064  Analysis Date = 11/23/2010 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20103120026  Analysis Date = 11/23/2010 
 Lab Value = 0.0015 
 RPT Level = 0.008 
 Lab Sample ID = 20103060008  Analysis Date = 11/17/2010 
 Lab Value = 0.0008 
 RPT Level = 0.008 
 Lab Sample ID = 20102990006  Analysis Date = 11/02/2010 
 Lab Value = 0.0015 
 RPT Level = 0.008 
 Lab Sample ID = 20102920006  Analysis Date = 11/02/2010 
 Lab Value = 0.0005 
 RPT Level = 0.008 
 Lab Sample ID = 20102850132  Analysis Date = 10/28/2010 
 Lab Value = 0.0008 
 RPT Level = 0.008 
 Lab Sample ID = 20102770110  Analysis Date = 10/28/2010 
 Lab Value = 0.0027 
 RPT Level = 0.008 
 Lab Sample ID = 20102700152  Analysis Date = 10/07/2010 
 Lab Value = 0.0017 
 RPT Level = 0.008 
 Lab Sample ID = 20102640136  Analysis Date = 10/07/2010 
 Lab Value = 0.0016 
 RPT Level = 0.008 
 Lab Sample ID = 20102570015  Analysis Date = 09/21/2010 
 Lab Value = 0.0013 
 RPT Level = 0.008 
 Lab Sample ID = 20102510062  Analysis Date = 09/21/2010 
 Lab Value = 0.006 
 RPT Level = 0.008 
 Lab Sample ID = 20102430249  Analysis Date = 09/17/2010 
 Lab Value = 0.0019 
 RPT Level = 0.008 
 Lab Sample ID = 20102350196  Analysis Date = 08/24/2010 
 Lab Value = 0.0069 
 RPT Level = 0.008 
 Lab Sample ID = 20102290049  Analysis Date = 08/19/2010 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20102230041  Analysis Date = 08/18/2010 
 Lab Value = 0.0036 
 RPT Level = 0.008 
 Lab Sample ID = 20102140090  Analysis Date = 08/16/2010 
 Lab Value = 0.0021 
 RPT Level = 0.008 
 Lab Sample ID = 20102080005  Analysis Date = 07/29/2010 
 Lab Value = 0.0036 
 RPT Level = 0.008 
 Lab Sample ID = 20102000188  Analysis Date = 07/28/2010 
 Lab Value = 0.0072 
 RPT Level = 0.008 
 Lab Sample ID = 20101930104  Analysis Date = 07/22/2010 
 Lab Value = 0.0031 
 RPT Level = 0.008 
 Lab Sample ID = 20101870059  Analysis Date = 07/21/2010 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20101790124  Analysis Date = 07/15/2010 
 Lab Value = 0.0027 
 RPT Level = 0.008 
 Lab Sample ID = 20101730068  Analysis Date = 07/08/2010 
 Lab Value = 0.0036 
 RPT Level = 0.008 
 Lab Sample ID = 20101660061  Analysis Date = 07/07/2010 
 Lab Value = 0.0018 
 RPT Level = 0.008 
 Lab Sample ID = 20101590005  Analysis Date = 07/02/2010 
 Lab Value = 0.0023 
 RPT Level = 0.008 
 Lab Sample ID = 20101530090  Analysis Date = 06/23/2010 
 Lab Value = 0.0033 
 RPT Level = 0.008 
 Lab Sample ID = 20101440165  Analysis Date = 06/01/2010 
 Lab Value = 0.0025 
 RPT Level = 0.008 
 Lab Sample ID = 20101380021  Analysis Date = 05/26/2010 
 Lab Value = 0.0049 
 RPT Level = 0.008 
 Lab Sample ID = 20101310098  Analysis Date = 05/25/2010 
 Lab Value = 0.0023 
 RPT Level = 0.008 
 Lab Sample ID = 20101240080  Analysis Date = 05/20/2010 
 Lab Value = 0.0036 
 RPT Level = 0.008 
 Lab Sample ID = 20101180043  Analysis Date = 05/12/2010 
 Lab Value = 0.0024 
 RPT Level = 0.008 
 Lab Sample ID = 20101090063  Analysis Date = 04/29/2010 
 Lab Value = 0.0053 
 RPT Level = 0.008 
 Lab Sample ID = 20101020075  Analysis Date = 04/20/2010 
 Lab Value = 0.0019 
 RPT Level = 0.008 
 Lab Sample ID = 20100950036  Analysis Date = 04/08/2010 
 Lab Value = -.0006 
 RPT Level = 0.008 
 Lab Sample ID = 20100880044  Analysis Date = 04/08/2010 
 Lab Value = -.0004 
 RPT Level = 0.008 
 Lab Sample ID = 20100850066  Analysis Date = 03/29/2010 
 Lab Value = -.0007 
 RPT Level = 0.008 
 Lab Sample ID = 20100750002  Analysis Date = 03/25/2010 
 Lab Value = 0.0018 
 RPT Level = 0.008 
 Lab Sample ID = 20100680014  Analysis Date = 03/17/2010 
 Lab Value = -0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20100600067  Analysis Date = 02/25/2010 
 Lab Value = 0.0016 
 RPT Level = 0.008 
 Lab Sample ID = 20100530048  Analysis Date = 02/24/2010 
 Lab Value = 0.0049 
 RPT Level = 0.008 
 Lab Sample ID = 20100470025  Analysis Date = 02/24/2010 
 Lab Value = 0.0085 
 RPT Level = 0.008 
 Lab Sample ID = 20100390038  Analysis Date = 02/17/2010 
 Lab Value = -0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20100320023  Analysis Date = 02/09/2010 
 Lab Value = 0.0012 
 RPT Level = 0.008 
 Lab Sample ID = 20100260065  Analysis Date = 02/09/2010 
 Lab Value = 0.0023 
 RPT Level = 0.008 
 Lab Sample ID = 20100190102  Analysis Date = 01/13/2010 
 Lab Value = 0.0002 
 RPT Level = 0.008 
 Lab Sample ID = 20100110099  Analysis Date = 01/13/2010 
 Lab Value = -.0002 
 RPT Level = 0.008 
 Lab Sample ID = 20100050014  Analysis Date = 01/13/2010 
 Lab Value = -.0001 
 RPT Level = 0.008 
 Lab Sample ID = 20093620042  Analysis Date = 01/13/2010 
 Lab Value = -.0006 
 RPT Level = 0.008 
 Lab Sample ID = 20093560033  Analysis Date = 12/31/2009 
 Lab Value = 0.0003 
 RPT Level = 0.008 
 Lab Sample ID = 20093480064  Analysis Date = 12/17/2009 
 Lab Value = 0.0007 
 RPT Level = 0.008 
 Lab Sample ID = 20093420004  Analysis Date = 12/16/2009 
 Lab Value = -.0003 
 RPT Level = 0.008 
 Lab Sample ID = 20093350070  Analysis Date = 12/16/2009 
 Lab Value = -.0006 
 RPT Level = 0.008 
 Lab Sample ID = 20093280015  Analysis Date = 12/01/2009 
 Lab Value = -.0006 
 RPT Level = 0.008 
 Lab Sample ID = 20093200062  Analysis Date = 12/01/2009 
 Lab Value = 0.0008 
 RPT Level = 0.008 
 Lab Sample ID = 20093130061  Analysis Date = 11/17/2009 
 Lab Value = 0.0049 
 RPT Level = 0.008 
 Lab Sample ID = 20093070201  Analysis Date = 11/16/2009 
 Lab Value = 0.0069 
 RPT Level = 0.008 
 Lab Sample ID = 20093000106  Analysis Date = 11/03/2009 
 Lab Value = 0.0028 
 RPT Level = 0.008 
 Lab Sample ID = 20092920096  Analysis Date = 11/02/2009 
 Lab Value = 0.0019 
 RPT Level = 0.008 
 Lab Sample ID = 20092870073  Analysis Date = 10/27/2009 
 Lab Value = 0.0004 
 RPT Level = 0.008 
 Lab Sample ID = 20092780071  Analysis Date = 10/20/2009 
 Lab Value = 0.0006 
 RPT Level = 0.008 
 Lab Sample ID = 20092720011  Analysis Date = 10/20/2009 
 Lab Value = 0.0003 
 RPT Level = 0.008 
 Lab Sample ID = 20092640026  Analysis Date = 10/06/2009 
 Lab Value = 0.0138 
 RPT Level = 0.008 
 Lab Sample ID = 20092570049  Analysis Date = 09/16/2009 
 Lab Value = 0.0036 
 RPT Level = 0.008 
 Lab Sample ID = 20092520132  Analysis Date = 09/15/2009 
 Lab Value = 0.0015 
 RPT Level = 0.008 
 Lab Sample ID = 20092430155  Analysis Date = 09/15/2009 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20092360171  Analysis Date = 09/01/2009 
 Lab Value = 0.0006 
 RPT Level = 0.008 
 Lab Sample ID = 20092290211  Analysis Date = 08/25/2009 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20092220169  Analysis Date = 08/24/2009 
 Lab Value = 0.0033 
 RPT Level = 0.008 
 Lab Sample ID = 20092150073  Analysis Date = 08/11/2009 
 Lab Value = 0.0062 
 RPT Level = 0.008 
 Lab Sample ID = 20092090263  Analysis Date = 07/30/2009 
 Lab Value = -.0005 
 RPT Level = 0.008 
 Lab Sample ID = 20092010116  Analysis Date = 07/22/2009 
 Lab Value = 0.0029 
 RPT Level = 0.008 
 Lab Sample ID = 20091950026  Analysis Date = 07/07/2009 
 Lab Value = -0.006 
 RPT Level = 0.008 
 Lab Sample ID = 20091870025  Analysis Date = 07/07/2009 
 Lab Value = -0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20091800174  Analysis Date = 06/23/2009 
 Lab Value = -0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20091730218  Analysis Date = 06/22/2009 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20091660206  Analysis Date = 06/18/2009 
 Lab Value = 0.005 
 RPT Level = 0.008 
 Lab Sample ID = 20091590088  Analysis Date = 06/11/2009 
 Lab Value = -0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20091520151  Analysis Date = 06/01/2009 
 Lab Value = 0.0036 
 RPT Level = 0.008 
 Lab Sample ID = 20091460188  Analysis Date = 05/19/2009 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20091380122  Analysis Date = 05/19/2009 
 Lab Value = -0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20091320020  Analysis Date = 05/12/2009 
 Lab Value = 0.0027 
 RPT Level = 0.008 
 Lab Sample ID = 20091240123  Analysis Date = 05/07/2009 
 Lab Value = -0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20091170110  Analysis Date = 04/23/2009 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20091110135  Analysis Date = 04/16/2009 
 Lab Value = -0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20091030081  Analysis Date = 04/09/2009 
 Lab Value = 0.0013 
 RPT Level = 0.008 
 Lab Sample ID = 20090960054  Analysis Date = 04/02/2009 
 Lab Value = -.0008 
 RPT Level = 0.008 
 Lab Sample ID = 20090890069  Analysis Date = 04/02/2009 
 Lab Value = -0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20090820029  Analysis Date = 04/01/2009 
 Lab Value = -0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20090750048  Analysis Date = 03/19/2009 
 Lab Value = 0.0017 
 RPT Level = 0.008 
 Lab Sample ID = 20090680045  Analysis Date = 03/09/2009 
 Lab Value = 0.0004 
 RPT Level = 0.008 
 Lab Sample ID = 20090610057  Analysis Date = 03/05/2009 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20090540030  Analysis Date = 03/05/2009 
 Lab Value = 0.0038 
 RPT Level = 0.008 
 Lab Sample ID = 20090480058  Analysis Date = 02/26/2009 
 Lab Value = 0.0035 
 RPT Level = 0.008 
 Lab Sample ID = 20090400032  Analysis Date = 02/11/2009 
 Lab Value = 0.0022 
 RPT Level = 0.008 
 Lab Sample ID = 20090330037  Analysis Date = 02/09/2009 
 Lab Value = 0.0024 
 RPT Level = 0.008 
 Lab Sample ID = 20090260027  Analysis Date = 01/29/2009 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20090200036  Analysis Date = 01/15/2009 
 Lab Value = -.0009 
 RPT Level = 0.008 
 Lab Sample ID = 20090120049  Analysis Date = 01/15/2009 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20090050019  Analysis Date = 01/15/2009 
 Lab Value = -.0006 
 RPT Level = 0.008 
 Lab Sample ID = 20083650083  Analysis Date = 12/30/2008 
 Lab Value = 0.0028 
 RPT Level = 0.008 
 Lab Sample ID = 20083570034  Analysis Date = 12/29/2008 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20083500071  Analysis Date = 12/29/2008 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20083450064  Analysis Date = 12/23/2008 
 Lab Value = 0.0009 
 RPT Level = 0.008 
 Lab Sample ID = 20083360040  Analysis Date = 12/11/2008 
 Lab Value = 0.0013 
 RPT Level = 0.008 
 Lab Sample ID = 20083290062  Analysis Date = 11/20/2008 
 Lab Value = 0.0015 
 RPT Level = 0.008 
 Lab Sample ID = 20083220064  Analysis Date = 11/20/2008 
 Lab Value = 0.0015 
 RPT Level = 0.008 
 Lab Sample ID = 20083150065  Analysis Date = 11/06/2008 
 Lab Value = -.0007 
 RPT Level = 0.008 
 Lab Sample ID = 20083080100  Analysis Date = 10/31/2008 
 Lab Value = 0.0045 
 RPT Level = 0.008 
 Lab Sample ID = 20083010109  Analysis Date = 10/22/2008 
 Lab Value = 0.0022 
 RPT Level = 0.008 
 Lab Sample ID = 20082940063  Analysis Date = 10/15/2008 
 Lab Value = 0.0047 
 RPT Level = 0.008 
 Lab Sample ID = 20082880040  Analysis Date = 10/07/2008 
 Lab Value = -0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20082800042  Analysis Date = 10/07/2008 
 Lab Value = -0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20082730062  Analysis Date = 09/25/2008 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20082660047  Analysis Date = 09/24/2008 
 Lab Value = -.0003 
 RPT Level = 0.008 
 Lab Sample ID = 20082590105  Analysis Date = 09/17/2008 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20082520008  Analysis Date = 09/09/2008 
 Lab Value = -0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20082460098  Analysis Date = 08/27/2008 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20082380080  Analysis Date = 08/25/2008 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20082310131  Analysis Date = 08/18/2008 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20082250010  Analysis Date = 08/14/2008 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20082190011  Analysis Date = 07/23/2008 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20082030127  Analysis Date = 07/16/2008 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20081970139  Analysis Date = 07/09/2008 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20081890044  Analysis Date = 07/07/2008 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20081820059  Analysis Date = 06/27/2008 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20081750128  Analysis Date = 06/17/2008 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20081680067  Analysis Date = 06/11/2008 
 Lab Value = 0.011 
 RPT Level = 0.008 
 Lab Sample ID = 20081620017  Analysis Date = 06/04/2008 
 Lab Value = 0.005 
 RPT Level = 0.008 
 Lab Sample ID = 20081540109  Analysis Date = 06/04/2008 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20081480068  Analysis Date = 05/22/2008 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20081400061  Analysis Date = 05/16/2008 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20081330112  Analysis Date = 05/08/2008 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20081260070  Analysis Date = 05/01/2008 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20081190055  Analysis Date = 04/24/2008 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20081120033  Analysis Date = 04/15/2008 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20081050114  Analysis Date = 04/10/2008 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20080980084  Analysis Date = 04/07/2008 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20080920083  Analysis Date = 03/27/2008 
 Lab Value = -0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20080840064  Analysis Date = 03/20/2008 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20080770124  Analysis Date = 03/11/2008 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20080700074  Analysis Date = 03/05/2008 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20080630067  Analysis Date = 03/03/2008 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20080560070  Analysis Date = 02/22/2008 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20080510055  Analysis Date = 02/13/2008 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20080420072  Analysis Date = 02/06/2008 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20080360051  Analysis Date = 01/31/2008 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20080280050  Analysis Date = 01/24/2008 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20080230021  Analysis Date = 01/15/2008 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20080140027  Analysis Date = 01/08/2008 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20080070023  Analysis Date = 01/07/2008 
 Lab Value = -0.005 
 RPT Level = 0.008 
 Lab Sample ID = 20073620004  Analysis Date = 12/18/2007 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20073510098  Analysis Date = 12/12/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20073440039  Analysis Date = 12/06/2007 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20073370069  Analysis Date = 11/27/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20073300042  Analysis Date = 11/20/2007 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20073230113  Analysis Date = 11/16/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20073170062  Analysis Date = 11/15/2007 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20073100012  Analysis Date = 11/01/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20073020065  Analysis Date = 10/31/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20072960186  Analysis Date = 10/18/2007 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20072890056  Analysis Date = 10/18/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20072850025  Analysis Date = 10/09/2007 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20072670056  Analysis Date = 09/21/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20072600129  Analysis Date = 09/12/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20072540015  Analysis Date = 09/12/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20072480018  Analysis Date = 09/04/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20072400035  Analysis Date = 08/28/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20072330109  Analysis Date = 08/15/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20072260198  Analysis Date = 08/13/2007 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20072210252  Analysis Date = 08/02/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20072110162  Analysis Date = 07/31/2007 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20072040101  Analysis Date = 07/12/2007 
 Lab Value = 0.007 
 RPT Level = 0.008 
 Lab Sample ID = 20071900105  Analysis Date = 07/09/2007 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20071830158  Analysis Date = 07/05/2007 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20071770201  Analysis Date = 06/20/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20071690119  Analysis Date = 06/18/2007 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20071620045  Analysis Date = 06/07/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20071560026  Analysis Date = 06/01/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20071500033  Analysis Date = 05/22/2007 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20071410089  Analysis Date = 05/21/2007 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20071340113  Analysis Date = 05/10/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20071280019  Analysis Date = 05/01/2007 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20071200089  Analysis Date = 04/24/2007 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20071130120  Analysis Date = 04/19/2007 
 Lab Value = 0.005 
 RPT Level = 0.008 
 Lab Sample ID = 20071070021  Analysis Date = 04/11/2007 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20070990050  Analysis Date = 04/04/2007 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20070930070  Analysis Date = 03/29/2007 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20070860217  Analysis Date = 03/22/2007 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20070780128  Analysis Date = 03/14/2007 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20070710075  Analysis Date = 03/07/2007 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20070650009  Analysis Date = 02/28/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20070580141  Analysis Date = 02/28/2007 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20070540023  Analysis Date = 02/20/2007 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20070460015  Analysis Date = 02/13/2007 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20070400103  Analysis Date = 02/02/2007 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20070250023  Analysis Date = 01/22/2007 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20070180071  Analysis Date = 01/18/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20070120012  Analysis Date = 01/08/2007 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20070040013  Analysis Date = 01/08/2007 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20063610084  Analysis Date = 01/05/2007 
 Lab Value = -0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20063520072  Analysis Date = 12/12/2006 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20063450081  Analysis Date = 12/05/2006 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20063380055  Analysis Date = 12/01/2006 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20063310047  Analysis Date = 11/21/2006 
 Lab Value = -0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20063240079  Analysis Date = 11/15/2006 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20063180103  Analysis Date = 11/08/2006 
 Lab Value = 0.006 
 RPT Level = 0.008 
 Lab Sample ID = 20063100080  Analysis Date = 10/31/2006 
 Lab Value = 0.005 
 RPT Level = 0.008 
 Lab Sample ID = 20063030096  Analysis Date = 10/24/2006 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20062960133  Analysis Date = 10/24/2006 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20062910013  Analysis Date = 10/13/2006 
 Lab Value = 0.007 
 RPT Level = 0.008 
 Lab Sample ID = 20062850014  Analysis Date = 10/06/2006 
 Lab Value = 0.005 
 RPT Level = 0.008 
 Lab Sample ID = 20062780050  Analysis Date = 09/21/2006 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20062620013  Analysis Date = 09/14/2006 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20062540016  Analysis Date = 09/08/2006 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20062500008  Analysis Date = 08/24/2006 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20062350182  Analysis Date = 08/22/2006 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20062270273  Analysis Date = 08/14/2006 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20062220039  Analysis Date = 08/02/2006 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20062020314  Analysis Date = 07/17/2006 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20061950007  Analysis Date = 07/10/2006 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20061880009  Analysis Date = 06/23/2006 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20061730014  Analysis Date = 06/19/2006 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20061670021  Analysis Date = 06/08/2006 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20061580018  Analysis Date = 05/19/2006 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20061370016  Analysis Date = 05/10/2006 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20061280111  Analysis Date = 05/04/2006 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20061220099  Analysis Date = 09/19/2005 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20052590035  Analysis Date = 09/12/2005 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20052520006  Analysis Date = 09/01/2005 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20052430006  Analysis Date = 08/29/2005 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20052370002  Analysis Date = 08/23/2005 
 Lab Value = 0.008 
 RPT Level = 0.008 
 Lab Sample ID = 20052300009  Analysis Date = 08/15/2005 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20052210012  Analysis Date = 08/11/2005 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20052160007  Analysis Date = 08/11/2005 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20052160005  Analysis Date = 07/21/2005 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20052010007  Analysis Date = 07/14/2005 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20051940015  Analysis Date = 07/08/2005 
 Lab Value = 0.005 
 RPT Level = 0.008 
 Lab Sample ID = 20051880018  Analysis Date = 06/30/2005 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20051800189  Analysis Date = 06/24/2005 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20051740019  Analysis Date = 06/16/2005 
 Lab Value = 0.005 
 RPT Level = 0.008 
 Lab Sample ID = 20051660174  Analysis Date = 06/09/2005 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20051590025  Analysis Date = 06/03/2005 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20051530021  Analysis Date = 05/25/2005 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20051440043  Analysis Date = 05/19/2005 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20051380014  Analysis Date = 05/13/2005 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20051320029  Analysis Date = 05/06/2005 
 Lab Value = 0.014 
 RPT Level = 0.008 
 Lab Sample ID = 20051250003  Analysis Date = 04/28/2005 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20051170012  Analysis Date = 04/22/2005 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20051110007  Analysis Date = 04/13/2005 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20051020018  Analysis Date = 04/06/2005 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20050950044  Analysis Date = 03/30/2005 
 Lab Value = 0.007 
 RPT Level = 0.008 
 Lab Sample ID = 20050880116  Analysis Date = 03/28/2005 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20050840096  Analysis Date = 03/17/2005 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20050750004  Analysis Date = 03/14/2005 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20050700007  Analysis Date = 03/14/2005 
 Lab Value = 0.005 
 RPT Level = 0.008 
 Lab Sample ID = 20050700004  Analysis Date = 02/25/2005 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20050550024  Analysis Date = 02/22/2005 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20050480005  Analysis Date = 02/14/2005 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20050410004  Analysis Date = 02/04/2005 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20050340020  Analysis Date = 01/28/2005 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20050260024  Analysis Date = 01/21/2005 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20050200048  Analysis Date = 01/14/2005 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20050130091  Analysis Date = 01/10/2005 
 Lab Value = 0.005 
 RPT Level = 0.008 
 Lab Sample ID = 20050070016  Analysis Date = 01/03/2005 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20043650002  Analysis Date = 01/03/2005 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20043580037  Analysis Date = 01/03/2005 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20043580035  Analysis Date = 12/20/2004 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20043520023  Analysis Date = 12/20/2004 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20043510018  Analysis Date = 12/13/2004 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20043450069  Analysis Date = 12/13/2004 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20043440147  Analysis Date = 12/06/2004 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20043380005  Analysis Date = 12/06/2004 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20043380002  Analysis Date = 12/01/2004 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20043310059  Analysis Date = 12/02/2004 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20043280048  Analysis Date = 11/22/2004 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20043240012  Analysis Date = 09/02/2004 
 Lab Value = 0.007 
 RPT Level = 0.008 
 Lab Sample ID = 20042450138  Analysis Date = 08/30/2004 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20042400089  Analysis Date = 08/25/2004 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20042370105  Analysis Date = 08/23/2004 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20042330206  Analysis Date = 08/20/2004 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20042320136  Analysis Date = 08/20/2004 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20042320138  Analysis Date = 08/12/2004 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20042240114  Analysis Date = 08/05/2004 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20042170123  Analysis Date = 07/30/2004 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20042110015  Analysis Date = 07/23/2004 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20042040039  Analysis Date = 07/15/2004 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20041960050  Analysis Date = 07/09/2004 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20041900062  Analysis Date = 07/01/2004 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20041820035  Analysis Date = 06/24/2004 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20041750057  Analysis Date = 06/21/2004 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20041700080  Analysis Date = 06/10/2004 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20041610055  Analysis Date = 06/08/2004 
 Lab Value = 0.006 
 RPT Level = 0.008 
 Lab Sample ID = 20041550019  Analysis Date = 06/02/2004 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20041470132  Analysis Date = 05/25/2004 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20041400016  Analysis Date = 05/12/2004 
 Lab Value = -0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20041260099  Analysis Date = 05/07/2004 
 Lab Value = 0.006 
 RPT Level = 0.008 
 Lab Sample ID = 20041200046  Analysis Date = 05/04/2004 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20041130016  Analysis Date = 04/23/2004 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20041050022  Analysis Date = 04/20/2004 
 Lab Value = 0.006 
 RPT Level = 0.008 
 Lab Sample ID = 20040980007  Analysis Date = 04/15/2004 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20040930009  Analysis Date = 04/12/2004 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20040910012  Analysis Date = 04/09/2004 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20040850021  Analysis Date = 04/08/2004 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20040830056  Analysis Date = 04/06/2004 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20040790023  Analysis Date = 03/31/2004 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20040760010  Analysis Date = 03/23/2004 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20040720029  Analysis Date = 03/16/2004 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20040710005  Analysis Date = 03/12/2004 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20040680093  Analysis Date = 03/11/2004 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20040650001  Analysis Date = 03/03/2004 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20040580032  Analysis Date = 03/01/2004 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20040550018  Analysis Date = 02/27/2004 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20040510134  Analysis Date = 02/25/2004 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20040490025  Analysis Date = 02/19/2004 
 Lab Value = 0 
 RPT Level = 0.008 
 Lab Sample ID = 20040440035  Analysis Date = 02/13/2004 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20040420001  Analysis Date = 02/12/2004 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20040370017  Analysis Date = 02/11/2004 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20040340024  Analysis Date = 02/06/2004 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20040300012  Analysis Date = 02/04/2004 
 Lab Value = 0.004 
 RPT Level = 0.008 
 Lab Sample ID = 20040270036  Analysis Date = 01/30/2004 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20040230030  Analysis Date = 01/28/2004 
 Lab Value = 0.001 
 RPT Level = 0.008 
 Lab Sample ID = 20040210154  Analysis Date = 01/27/2004 
 Lab Value = 0.007 
 RPT Level = 0.008 
 Lab Sample ID = 20040200023  Analysis Date = 01/21/2004 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20040150075  Analysis Date = 01/14/2004 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20040090020  Analysis Date = 01/08/2004 
 Lab Value = 0.003 
 RPT Level = 0.008 
 Lab Sample ID = 20040070032  Analysis Date = 01/08/2004 
 Lab Value = 0.002 
 RPT Level = 0.008 
 Lab Sample ID = 20040050016  Analysis Date = 10/10/2003 
 Lab Value = 0.004 
 RPT Level = 0.011 
 Lab Sample ID = 20032660009  Analysis Date = 10/08/2003 
 Lab Value = 0.002 
 RPT Level = 0.011 
 Lab Sample ID = 20032600107  Analysis Date = 09/26/2003 
 Lab Value = 0.004 
 RPT Level = 0.011 
 Lab Sample ID = 20032520179  Analysis Date = 09/24/2003 
 Lab Value = 0.004 
 RPT Level = 0.011 
 Lab Sample ID = 20032450195  Analysis Date = 09/17/2003 
 Lab Value = 0.004 
 RPT Level = 0.011 
 Lab Sample ID = 20032380029  Analysis Date = 09/10/2003 
 Lab Value = 0.003 
 RPT Level = 0.011 
 Lab Sample ID = 20032310028  Analysis Date = 08/29/2003 
 Lab Value = 0.002 
 RPT Level = 0.011 
 Lab Sample ID = 20032250256  Analysis Date = 08/19/2003 
 Lab Value = 0.003 
 RPT Level = 0.011 
 Lab Sample ID = 20032180019  Analysis Date = 08/06/2003 
 Lab Value = 0.005 
 RPT Level = 0.011 
 Lab Sample ID = 20032100004  Analysis Date = 08/01/2003 
 Lab Value = 0.005 
 RPT Level = 0.011 
 Lab Sample ID = 20032040043  Analysis Date = 07/23/2003 
 Lab Value = 0.003 
 RPT Level = 0.011 
 Lab Sample ID = 20031960025  Analysis Date = 07/21/2003 
 Lab Value = 0.003 
 RPT Level = 0.011 
 Lab Sample ID = 20031900098  Analysis Date = 07/17/2003 
 Lab Value = 0.006 
 RPT Level = 0.011 
 Lab Sample ID = 20031820037  Analysis Date = 07/15/2003 
 Lab Value = 0.002 
 RPT Level = 0.011 
 Lab Sample ID = 20031770041  Analysis Date = 07/07/2003 
 Lab Value = 0.003 
 RPT Level = 0.011 
 Lab Sample ID = 20031700013  Analysis Date = 07/02/2003 
 Lab Value = 0.003 
 RPT Level = 0.011 
 Lab Sample ID = 20031630053  Analysis Date = 07/01/2003 
 Lab Value = 0.003 
 RPT Level = 0.011 
 Lab Sample ID = 20031600109  Analysis Date = 06/04/2003 
 Lab Value = 0.005 
 RPT Level = 0.011 
 Lab Sample ID = 20031480059  Analysis Date = 06/03/2003 
 Lab Value = 0.007 
 RPT Level = 0.011 
 Lab Sample ID = 20031430019  Analysis Date = 05/30/2003 
 Lab Value = 0.006 
 RPT Level = 0.011 
 Lab Sample ID = 20031400115  Analysis Date = 05/16/2003 
 Lab Value = 0.003 
 RPT Level = 0.011 
 Lab Sample ID = 20031290084  Analysis Date = 05/13/2003 
 Lab Value = 0.005 
 RPT Level = 0.011 
 Lab Sample ID = 20031220070  Analysis Date = 05/12/2003 
 Lab Value = 0.004 
 RPT Level = 0.011 
 Lab Sample ID = 20031200043  Analysis Date = 04/29/2003 
 Lab Value = 0.004 
 RPT Level = 0.011 
 Lab Sample ID = 20031080208  Analysis Date = 04/16/2003 
 Lab Value = 0.005 
 RPT Level = 0.011 
 Lab Sample ID = 20030970018  Analysis Date = 04/10/2003 
 Lab Value = 0.004 
 RPT Level = 0.011 
 Lab Sample ID = 20030920027  Analysis Date = 04/10/2003 
 Lab Value = 0.005 
 RPT Level = 0.011 
 Lab Sample ID = 20030900015  Analysis Date = 04/08/2003 
 Lab Value = 0.003 
 RPT Level = 0.011 
 Lab Sample ID = 20030860023  Analysis Date = 03/21/2003 
 Lab Value = 0.002 
 RPT Level = 0.011 
 Lab Sample ID = 20030710021  Analysis Date = 03/21/2003 
 Lab Value = 0.004 
 RPT Level = 0.011 
 Lab Sample ID = 20030660148  Analysis Date = 03/12/2003 
 Lab Value = 0.003 
 RPT Level = 0.011 
 Lab Sample ID = 20030590040  Analysis Date = 03/07/2003 
 Lab Value = 0.005 
 RPT Level = 0.011 
 Lab Sample ID = 20030570061  Analysis Date = 02/26/2003 
 Lab Value = 0.002 
 RPT Level = 0.011 
 Lab Sample ID = 20030410034  Analysis Date = 02/05/2003 
 Lab Value = 0.002 
 RPT Level = 0.011 
 Lab Sample ID = 20030350008  Analysis Date = 02/05/2003 
 Lab Value = 0.003 
 RPT Level = 0.011 
 Lab Sample ID = 20030310028  Analysis Date = 02/05/2003 
 Lab Value = 0.004 
 RPT Level = 0.011 
 Lab Sample ID = 20030300004  Analysis Date = 01/17/2003 
 Lab Value = 0.005 
 RPT Level = 0.011 
 Lab Sample ID = 20030150009  Analysis Date = 01/17/2003 
 Lab Value = 0.005 
 RPT Level = 0.011 
 Lab Sample ID = 20030140019  Analysis Date = 01/07/2003 
 Lab Value = 0.006 
 RPT Level = 0.011 
 Lab Sample ID = 20030020002  Analysis Date = 01/07/2003 
 Lab Value = 0.005 
 RPT Level = 0.011 
 Lab Sample ID = 20023650009  Analysis Date = 12/23/2002 
 Lab Value = 0.004 
 RPT Level = 0.011 
 Lab Sample ID = 20023500166  Analysis Date = 12/18/2002 
 Lab Value = 0.004 
 RPT Level = 0.011 
 Lab Sample ID = 20023500092  Analysis Date = 12/10/2002 
 Lab Value = 0.004 
 RPT Level = 0.011 
 Lab Sample ID = 20023370026  Analysis Date = 12/10/2002 
 Lab Value = 0.005 
 RPT Level = 0.011 
 Lab Sample ID = 20023370025  Analysis Date = 12/06/2002 
 Lab Value = 0.003 
 RPT Level = 0.011 
 Lab Sample ID = 20023330096  Analysis Date = 12/06/2002 
 Lab Value = 0.002 
 RPT Level = 0.011 
 Lab Sample ID = 20023360020  Analysis Date = 12/06/2002 
 Lab Value = 0.003 
 RPT Level = 0.011 
 Lab Sample ID = 20023310020  Analysis Date = 11/14/2002 
 Lab Value = 0.004 
 RPT Level = 0.011 
 Lab Sample ID = 20023040033  Analysis Date = 10/30/2002 
 Lab Value = 0.006 
 RPT Level = 0.011 
 Lab Sample ID = 20022970050  Analysis Date = 10/30/2002 
 Lab Value = 0.005 
 RPT Level = 0.011 
 Lab Sample ID = 20022970049  Analysis Date = 10/30/2002 
 Lab Value = 0.006 
 RPT Level = 0.011 
 Lab Sample ID = 20022970048  Analysis Date = 10/30/2002 
 Lab Value = 0.005 
 RPT Level = 0.011 
 Lab Sample ID = 20022960022  Analysis Date = 09/10/2002 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20022470018  Analysis Date = 09/10/2002 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20022460135  Analysis Date = 08/29/2002 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20022340186  Analysis Date = 08/27/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20022280008  Analysis Date = 08/20/2002 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20022210007  Analysis Date = 08/16/2002 
 Lab Value = 0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20022170107  Analysis Date = 08/01/2002 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20022060077  Analysis Date = 07/17/2002 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20021970116  Analysis Date = 07/16/2002 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20021960234  Analysis Date = 07/09/2002 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20021830026  Analysis Date = 07/02/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20021790006  Analysis Date = 06/21/2002 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20021690011  Analysis Date = 06/20/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20021650005  Analysis Date = 06/11/2002 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20021550019  Analysis Date = 06/10/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20021510057  Analysis Date = 05/30/2002 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20021420157  Analysis Date = 05/22/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20021330224  Analysis Date = 05/17/2002 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20021300018  Analysis Date = 05/13/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20021210087  Analysis Date = 04/26/2002 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20021140035  Analysis Date = 04/26/2002 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20021140034  Analysis Date = 04/17/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20021010014  Analysis Date = 04/05/2002 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20020930111  Analysis Date = 04/03/2002 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20020850093  Analysis Date = 04/03/2002 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20020810193  Analysis Date = 04/01/2002 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20020730106  Analysis Date = 03/29/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20020670024  Analysis Date = 03/22/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20020600007  Analysis Date = 03/04/2002 
 Lab Value = 0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20020570017  Analysis Date = 02/20/2002 
 Lab Value = 0.008 
 RPT Level = 0.009 
 Lab Sample ID = 20020460046  Analysis Date = 02/08/2002 
 Lab Value = 0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20020360013  Analysis Date = 02/08/2002 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20020320103  Analysis Date = 01/23/2002 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20020220080  Analysis Date = 01/17/2002 
 Lab Value = 0.008 
 RPT Level = 0.009 
 Lab Sample ID = 20020110004  Analysis Date = 01/09/2002 
 Lab Value = 0.006 
 RPT Level = 0.009 
 Lab Sample ID = 20020020006  Analysis Date = 01/03/2002 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20013600208  Analysis Date = 12/20/2001 
 Lab Value = 0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20013520043  Analysis Date = 12/14/2001 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20013480009  Analysis Date = 12/07/2001 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20013390004  Analysis Date = 11/15/2001 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20013110128  Analysis Date = 10/13/2011 
 RPT Level = 0.008  Analysis Date = 10/05/2011 
 RPT Level = 0.008  Analysis Date = 10/05/2011 
 RPT Level = 0.008  Analysis Date = 09/27/2011 
 RPT Level = 0.008  Analysis Date = 09/27/2011 
 RPT Level = 0.008  Analysis Date = 09/27/2011 
 RPT Level = 0.008  Analysis Date = 09/27/2011 
 RPT Level = 0.008  Analysis Date = 09/15/2011 
 RPT Level = 0.008  Analysis Date = 09/15/2011 
 RPT Level = 0.008  Analysis Date = 09/09/2011 
 RPT Level = 0.008  Analysis Date = 09/09/2011 
 RPT Level = 0.008  Analysis Date = 09/09/2011 
 RPT Level = 0.008  Analysis Date = 09/09/2011 
 RPT Level = 0.008  Analysis Date = 08/30/2011 
 RPT Level = 0.008  Analysis Date = 08/30/2011 
 RPT Level = 0.008  Analysis Date = 08/22/2011 
 RPT Level = 0.008  Analysis Date = 08/22/2011 
 RPT Level = 0.008  Analysis Date = 08/09/2011 
 RPT Level = 0.008  Analysis Date = 08/09/2011 
 RPT Level = 0.008  Analysis Date = 08/03/2011 
 RPT Level = 0.008  Analysis Date = 08/03/2011 
 RPT Level = 0.008  Analysis Date = 08/03/2011 
 RPT Level = 0.008  Analysis Date = 08/03/2011 
 RPT Level = 0.008  Analysis Date = 07/22/2011 
 RPT Level = 0.008  Analysis Date = 07/22/2011 
 RPT Level = 0.008  Analysis Date = 07/12/2011 
 RPT Level = 0.008  Analysis Date = 07/12/2011 
 RPT Level = 0.008  Analysis Date = 07/06/2011 
 RPT Level = 0.008  Analysis Date = 07/06/2011 
 RPT Level = 0.008  Analysis Date = 06/30/2011 
 RPT Level = 0.008  Analysis Date = 06/30/2011 
 RPT Level = 0.008  Analysis Date = 06/23/2011 
 RPT Level = 0.008  Analysis Date = 06/23/2011 
 RPT Level = 0.008  Analysis Date = 06/17/2011 
 RPT Level = 0.008  Analysis Date = 06/17/2011 
 RPT Level = 0.008  Analysis Date = 06/13/2011 
 RPT Level = 0.008  Analysis Date = 06/13/2011 
 RPT Level = 0.008  Analysis Date = 06/09/2011 
 RPT Level = 0.008  Analysis Date = 06/09/2011 
 RPT Level = 0.008  Analysis Date = 06/07/2011 
 RPT Level = 0.008  Analysis Date = 06/07/2011 
 RPT Level = 0.008  Analysis Date = 05/23/2011 
 RPT Level = 0.008  Analysis Date = 05/23/2011 
 RPT Level = 0.008  Analysis Date = 05/23/2011 
 RPT Level = 0.008  Analysis Date = 05/23/2011 
 RPT Level = 0.008  Analysis Date = 05/04/2011 
 RPT Level = 0.008  Analysis Date = 05/04/2011 
 RPT Level = 0.008  Analysis Date = 04/26/2011 
 RPT Level = 0.008  Analysis Date = 04/26/2011 
 RPT Level = 0.008  Analysis Date = 04/19/2011 
 RPT Level = 0.008  Analysis Date = 04/19/2011 
 RPT Level = 0.008  Analysis Date = 04/12/2011 
 RPT Level = 0.008  Analysis Date = 04/12/2011 
 RPT Level = 0.008  Analysis Date = 04/06/2011 
 RPT Level = 0.008  Analysis Date = 04/06/2011 
 RPT Level = 0.008  Analysis Date = 03/29/2011 
 RPT Level = 0.008  Analysis Date = 03/29/2011 
 RPT Level = 0.008  Analysis Date = 03/29/2011 
 RPT Level = 0.008  Analysis Date = 03/29/2011 
 RPT Level = 0.008  Analysis Date = 03/21/2011 
 RPT Level = 0.008  Analysis Date = 03/21/2011 
 RPT Level = 0.008  Analysis Date = 03/21/2011 
 RPT Level = 0.008  Analysis Date = 03/21/2011 
 RPT Level = 0.008  Analysis Date = 03/07/2011 
 RPT Level = 0.008  Analysis Date = 03/07/2011 
 RPT Level = 0.008  Analysis Date = 02/25/2011 
 RPT Level = 0.008  Analysis Date = 02/25/2011 
 RPT Level = 0.008  Analysis Date = 02/28/2011 
 RPT Level = 0.008  Analysis Date = 02/28/2011 
 RPT Level = 0.008  Analysis Date = 02/24/2011 
 RPT Level = 0.008  Analysis Date = 02/24/2011 
 RPT Level = 0.008  Analysis Date = 02/24/2011 
 RPT Level = 0.008  Analysis Date = 02/24/2011 
 RPT Level = 0.008  Analysis Date = 02/17/2011 
 RPT Level = 0.008  Analysis Date = 02/17/2011 
 RPT Level = 0.008  Analysis Date = 02/09/2011 
 RPT Level = 0.008  Analysis Date = 02/09/2011 
 RPT Level = 0.008  Analysis Date = 02/02/2011 
 RPT Level = 0.008  Analysis Date = 02/02/2011 
 RPT Level = 0.008  Analysis Date = 01/20/2011 
 RPT Level = 0.008  Analysis Date = 01/20/2011 
 RPT Level = 0.008  Analysis Date = 01/20/2011 
 RPT Level = 0.008  Analysis Date = 01/20/2011 
 RPT Level = 0.008  Analysis Date = 01/13/2011 
 RPT Level = 0.008  Analysis Date = 01/13/2011 
 RPT Level = 0.008  Analysis Date = 12/28/2010 
 RPT Level = 0.008  Analysis Date = 12/28/2010 
 RPT Level = 0.008  Analysis Date = 12/16/2010 
 RPT Level = 0.008  Analysis Date = 12/16/2010 
 RPT Level = 0.008  Analysis Date = 12/16/2010 
 RPT Level = 0.008  Analysis Date = 12/16/2010 
 RPT Level = 0.008  Analysis Date = 12/13/2010 
 RPT Level = 0.008  Analysis Date = 12/13/2010 
 RPT Level = 0.008  Analysis Date = 12/08/2010 
 RPT Level = 0.008  Analysis Date = 12/08/2010 
 RPT Level = 0.008  Analysis Date = 11/23/2010 
 RPT Level = 0.008  Analysis Date = 11/23/2010 
 RPT Level = 0.008  Analysis Date = 11/23/2010 
 RPT Level = 0.008  Analysis Date = 11/23/2010 
 RPT Level = 0.008  Analysis Date = 11/17/2010 
 RPT Level = 0.008  Analysis Date = 11/17/2010 
 RPT Level = 0.008  Analysis Date = 11/02/2010 
 RPT Level = 0.008  Analysis Date = 11/02/2010 
 RPT Level = 0.008  Analysis Date = 11/02/2010 
 RPT Level = 0.008  Analysis Date = 11/02/2010 
 RPT Level = 0.008  Analysis Date = 10/28/2010 
 RPT Level = 0.008  Analysis Date = 10/28/2010 
 RPT Level = 0.008  Analysis Date = 10/28/2010 
 RPT Level = 0.008  Analysis Date = 10/28/2010 
 RPT Level = 0.008  Analysis Date = 10/07/2010 
 RPT Level = 0.008  Analysis Date = 10/07/2010 
 RPT Level = 0.008  Analysis Date = 10/07/2010 
 RPT Level = 0.008  Analysis Date = 10/07/2010 
 RPT Level = 0.008  Analysis Date = 09/21/2010 
 RPT Level = 0.008  Analysis Date = 09/21/2010 
 RPT Level = 0.008  Analysis Date = 09/21/2010 
 RPT Level = 0.008  Analysis Date = 09/21/2010 
 RPT Level = 0.008  Analysis Date = 09/17/2010 
 RPT Level = 0.008  Analysis Date = 09/17/2010 
 RPT Level = 0.008  Analysis Date = 08/24/2010 
 RPT Level = 0.008  Analysis Date = 08/24/2010 
 RPT Level = 0.008  Analysis Date = 08/19/2010 
 RPT Level = 0.008  Analysis Date = 08/19/2010 
 RPT Level = 0.008  Analysis Date = 08/18/2010 
 RPT Level = 0.008  Analysis Date = 08/18/2010 
 RPT Level = 0.008  Analysis Date = 08/16/2010 
 RPT Level = 0.008  Analysis Date = 08/16/2010 
 RPT Level = 0.008  Analysis Date = 07/29/2010 
 RPT Level = 0.008  Analysis Date = 07/29/2010 
 RPT Level = 0.008  Analysis Date = 07/28/2010 
 RPT Level = 0.008  Analysis Date = 07/28/2010 
 RPT Level = 0.008  Analysis Date = 07/22/2010 
 RPT Level = 0.008  Analysis Date = 07/22/2010 
 RPT Level = 0.008  Analysis Date = 07/21/2010 
 RPT Level = 0.008  Analysis Date = 07/21/2010 
 RPT Level = 0.008  Analysis Date = 07/15/2010 
 RPT Level = 0.008  Analysis Date = 07/15/2010 
 RPT Level = 0.008  Analysis Date = 07/08/2010 
 RPT Level = 0.008  Analysis Date = 07/08/2010 
 RPT Level = 0.008  Analysis Date = 07/07/2010 
 RPT Level = 0.008  Analysis Date = 07/07/2010 
 RPT Level = 0.008  Analysis Date = 07/02/2010 
 RPT Level = 0.008  Analysis Date = 07/02/2010 
 RPT Level = 0.008  Analysis Date = 06/23/2010 
 RPT Level = 0.008  Analysis Date = 06/23/2010 
 RPT Level = 0.008  Analysis Date = 06/01/2010 
 RPT Level = 0.008  Analysis Date = 06/01/2010 
 RPT Level = 0.008  Analysis Date = 05/26/2010 
 RPT Level = 0.008  Analysis Date = 05/26/2010 
 RPT Level = 0.008  Analysis Date = 05/25/2010 
 RPT Level = 0.008  Analysis Date = 05/25/2010 
 RPT Level = 0.008  Analysis Date = 05/20/2010 
 RPT Level = 0.008  Analysis Date = 05/20/2010 
 RPT Level = 0.008  Analysis Date = 05/12/2010 
 RPT Level = 0.008  Analysis Date = 05/12/2010 
 RPT Level = 0.008  Analysis Date = 04/29/2010 
 RPT Level = 0.008  Analysis Date = 04/29/2010 
 RPT Level = 0.008  Analysis Date = 04/20/2010 
 RPT Level = 0.008  Analysis Date = 04/20/2010 
 RPT Level = 0.008  Analysis Date = 04/08/2010 
 RPT Level = 0.008  Analysis Date = 04/08/2010 
 RPT Level = 0.008  Analysis Date = 04/08/2010 
 RPT Level = 0.008  Analysis Date = 04/08/2010 
 RPT Level = 0.008  Analysis Date = 03/29/2010 
 RPT Level = 0.008  Analysis Date = 03/29/2010 
 RPT Level = 0.008  Analysis Date = 03/25/2010 
 RPT Level = 0.008  Analysis Date = 03/25/2010 
 RPT Level = 0.008  Analysis Date = 03/17/2010 
 RPT Level = 0.008  Analysis Date = 03/17/2010 
 RPT Level = 0.008  Analysis Date = 02/25/2010 
 RPT Level = 0.008  Analysis Date = 02/25/2010 
 RPT Level = 0.008  Analysis Date = 02/24/2010 
 RPT Level = 0.008  Analysis Date = 02/24/2010 
 RPT Level = 0.008  Analysis Date = 02/24/2010 
 RPT Level = 0.008  Analysis Date = 02/24/2010 
 RPT Level = 0.008  Analysis Date = 02/17/2010 
 RPT Level = 0.008  Analysis Date = 02/17/2010 
 RPT Level = 0.008  Analysis Date = 02/09/2010 
 RPT Level = 0.008  Analysis Date = 02/09/2010 
 RPT Level = 0.008  Analysis Date = 02/09/2010 
 RPT Level = 0.008  Analysis Date = 02/09/2010 
 RPT Level = 0.008  Analysis Date = 01/13/2010 
 RPT Level = 0.008  Analysis Date = 01/13/2010 
 RPT Level = 0.008  Analysis Date = 01/13/2010 
 RPT Level = 0.008  Analysis Date = 01/13/2010 
 RPT Level = 0.008  Analysis Date = 01/13/2010 
 RPT Level = 0.008  Analysis Date = 01/13/2010 
 RPT Level = 0.008  Analysis Date = 01/13/2010 
 RPT Level = 0.008  Analysis Date = 01/13/2010 
 RPT Level = 0.008  Analysis Date = 12/31/2009 
 RPT Level = 0.008  Analysis Date = 12/31/2009 
 RPT Level = 0.008  Analysis Date = 12/17/2009 
 RPT Level = 0.008  Analysis Date = 12/17/2009 
 RPT Level = 0.008  Analysis Date = 12/16/2009 
 RPT Level = 0.008  Analysis Date = 12/16/2009 
 RPT Level = 0.008  Analysis Date = 12/16/2009 
 RPT Level = 0.008  Analysis Date = 12/16/2009 
 RPT Level = 0.008  Analysis Date = 12/01/2009 
 RPT Level = 0.008  Analysis Date = 12/01/2009 
 RPT Level = 0.008  Analysis Date = 12/01/2009 
 RPT Level = 0.008  Analysis Date = 12/01/2009 
 RPT Level = 0.008  Analysis Date = 11/17/2009 
 RPT Level = 0.008  Analysis Date = 11/17/2009 
 RPT Level = 0.008  Analysis Date = 11/16/2009 
 RPT Level = 0.008  Analysis Date = 11/16/2009 
 RPT Level = 0.008  Analysis Date = 11/03/2009 
 RPT Level = 0.008  Analysis Date = 11/03/2009 
 RPT Level = 0.008  Analysis Date = 11/02/2009 
 RPT Level = 0.008  Analysis Date = 11/02/2009 
 RPT Level = 0.008  Analysis Date = 10/27/2009 
 RPT Level = 0.008  Analysis Date = 10/27/2009 
 RPT Level = 0.008  Analysis Date = 10/20/2009 
 RPT Level = 0.008  Analysis Date = 10/20/2009 
 RPT Level = 0.008  Analysis Date = 10/20/2009 
 RPT Level = 0.008  Analysis Date = 10/20/2009 
 RPT Level = 0.008  Analysis Date = 10/06/2009 
 RPT Level = 0.008  Analysis Date = 10/06/2009 
 RPT Level = 0.008  Analysis Date = 09/16/2009 
 RPT Level = 0.008  Analysis Date = 09/16/2009 
 RPT Level = 0.008  Analysis Date = 09/15/2009 
 RPT Level = 0.008  Analysis Date = 09/15/2009 
 RPT Level = 0.008  Analysis Date = 09/15/2009 
 RPT Level = 0.008  Analysis Date = 09/15/2009 
 RPT Level = 0.008  Analysis Date = 09/01/2009 
 RPT Level = 0.008  Analysis Date = 09/01/2009 
 RPT Level = 0.008  Analysis Date = 08/25/2009 
 RPT Level = 0.008  Analysis Date = 08/25/2009 
 RPT Level = 0.008  Analysis Date = 08/24/2009 
 RPT Level = 0.008  Analysis Date = 08/24/2009 
 RPT Level = 0.008  Analysis Date = 08/11/2009 
 RPT Level = 0.008  Analysis Date = 08/11/2009 
 RPT Level = 0.008  Analysis Date = 07/30/2009 
 RPT Level = 0.008  Analysis Date = 07/30/2009 
 RPT Level = 0.008  Analysis Date = 07/22/2009 
 RPT Level = 0.008  Analysis Date = 07/22/2009 
 RPT Level = 0.008  Analysis Date = 07/07/2009 
 RPT Level = 0.008  Analysis Date = 07/07/2009 
 RPT Level = 0.008  Analysis Date = 07/07/2009 
 RPT Level = 0.008  Analysis Date = 07/07/2009 
 RPT Level = 0.008  Analysis Date = 06/23/2009 
 RPT Level = 0.008  Analysis Date = 06/23/2009 
 RPT Level = 0.008  Analysis Date = 06/22/2009 
 RPT Level = 0.008  Analysis Date = 06/22/2009 
 RPT Level = 0.008  Analysis Date = 06/18/2009 
 RPT Level = 0.008  Analysis Date = 06/18/2009 
 RPT Level = 0.008  Analysis Date = 06/11/2009 
 RPT Level = 0.008  Analysis Date = 06/11/2009 
 RPT Level = 0.008  Analysis Date = 06/01/2009 
 RPT Level = 0.008  Analysis Date = 06/01/2009 
 RPT Level = 0.008  Analysis Date = 05/19/2009 
 RPT Level = 0.008  Analysis Date = 05/19/2009 
 RPT Level = 0.008  Analysis Date = 05/19/2009 
 RPT Level = 0.008  Analysis Date = 05/19/2009 
 RPT Level = 0.008  Analysis Date = 05/12/2009 
 RPT Level = 0.008  Analysis Date = 05/12/2009 
 RPT Level = 0.008  Analysis Date = 05/07/2009 
 RPT Level = 0.008  Analysis Date = 05/07/2009 
 RPT Level = 0.008  Analysis Date = 04/23/2009 
 RPT Level = 0.008  Analysis Date = 04/23/2009 
 RPT Level = 0.008  Analysis Date = 04/16/2009 
 RPT Level = 0.008  Analysis Date = 04/16/2009 
 RPT Level = 0.008  Analysis Date = 04/09/2009 
 RPT Level = 0.008  Analysis Date = 04/09/2009 
 RPT Level = 0.008  Analysis Date = 04/02/2009 
 RPT Level = 0.008  Analysis Date = 04/02/2009 
 RPT Level = 0.008  Analysis Date = 04/02/2009 
 RPT Level = 0.008  Analysis Date = 04/02/2009 
 RPT Level = 0.008  Analysis Date = 04/01/2009 
 RPT Level = 0.008  Analysis Date = 04/01/2009 
 RPT Level = 0.008  Analysis Date = 03/19/2009 
 RPT Level = 0.008  Analysis Date = 03/19/2009 
 RPT Level = 0.008  Analysis Date = 03/09/2009 
 RPT Level = 0.008  Analysis Date = 03/09/2009 
 RPT Level = 0.008  Analysis Date = 03/05/2009 
 RPT Level = 0.008  Analysis Date = 03/05/2009 
 RPT Level = 0.008  Analysis Date = 03/05/2009 
 RPT Level = 0.008  Analysis Date = 03/05/2009 
 RPT Level = 0.008  Analysis Date = 02/26/2009 
 RPT Level = 0.008  Analysis Date = 02/26/2009 
 RPT Level = 0.008  Analysis Date = 02/11/2009 
 RPT Level = 0.008  Analysis Date = 02/11/2009 
 RPT Level = 0.008  Analysis Date = 02/09/2009 
 RPT Level = 0.008  Analysis Date = 02/09/2009 
 RPT Level = 0.008  Analysis Date = 01/29/2009 
 RPT Level = 0.008  Analysis Date = 01/29/2009 
 RPT Level = 0.008  Analysis Date = 01/15/2009 
 RPT Level = 0.008  Analysis Date = 01/15/2009 
 RPT Level = 0.008  Analysis Date = 01/15/2009 
 RPT Level = 0.008  Analysis Date = 01/15/2009 
 RPT Level = 0.008  Analysis Date = 01/15/2009 
 RPT Level = 0.008  Analysis Date = 01/15/2009 
 RPT Level = 0.008  Analysis Date = 12/30/2008 
 RPT Level = 0.008  Analysis Date = 12/30/2008 
 RPT Level = 0.008  Analysis Date = 12/29/2008 
 RPT Level = 0.008  Analysis Date = 12/29/2008 
 RPT Level = 0.008  Analysis Date = 12/29/2008 
 RPT Level = 0.008  Analysis Date = 12/29/2008 
 RPT Level = 0.008  Analysis Date = 12/23/2008 
 RPT Level = 0.008  Analysis Date = 12/23/2008 
 RPT Level = 0.008  Analysis Date = 12/11/2008 
 RPT Level = 0.008  Analysis Date = 12/11/2008 
 RPT Level = 0.008  Analysis Date = 11/20/2008 
 RPT Level = 0.008  Analysis Date = 11/20/2008 
 RPT Level = 0.008  Analysis Date = 11/20/2008 
 RPT Level = 0.008  Analysis Date = 11/20/2008 
 RPT Level = 0.008  Analysis Date = 11/06/2008 
 RPT Level = 0.008  Analysis Date = 11/06/2008 
 RPT Level = 0.008  Analysis Date = 10/31/2008 
 RPT Level = 0.008  Analysis Date = 10/31/2008 
 RPT Level = 0.008  Analysis Date = 10/22/2008 
 RPT Level = 0.008  Analysis Date = 10/22/2008 
 RPT Level = 0.008  Analysis Date = 10/15/2008 
 RPT Level = 0.008  Analysis Date = 10/15/2008 
 RPT Level = 0.008  Analysis Date = 10/07/2008 
 RPT Level = 0.008  Analysis Date = 10/07/2008 
 RPT Level = 0.008  Analysis Date = 10/07/2008 
 RPT Level = 0.008  Analysis Date = 10/07/2008 
 RPT Level = 0.008  Analysis Date = 09/25/2008 
 RPT Level = 0.008  Analysis Date = 09/25/2008 
 RPT Level = 0.008  Analysis Date = 09/24/2008 
 RPT Level = 0.008  Analysis Date = 09/24/2008 
 RPT Level = 0.008  Analysis Date = 09/17/2008 
 RPT Level = 0.008  Analysis Date = 09/17/2008 
 RPT Level = 0.008  Analysis Date = 09/09/2008 
 RPT Level = 0.008  Analysis Date = 09/09/2008 
 RPT Level = 0.008  Analysis Date = 08/27/2008 
 RPT Level = 0.008  Analysis Date = 08/27/2008 
 RPT Level = 0.008  Analysis Date = 08/25/2008 
 RPT Level = 0.008  Analysis Date = 08/25/2008 
 RPT Level = 0.008  Analysis Date = 08/18/2008 
 RPT Level = 0.008  Analysis Date = 08/18/2008 
 RPT Level = 0.008  Analysis Date = 08/14/2008 
 RPT Level = 0.008  Analysis Date = 08/14/2008 
 RPT Level = 0.008  Analysis Date = 07/23/2008 
 RPT Level = 0.008  Analysis Date = 07/23/2008 
 RPT Level = 0.008  Analysis Date = 07/16/2008 
 RPT Level = 0.008  Analysis Date = 07/16/2008 
 RPT Level = 0.008  Analysis Date = 07/09/2008 
 RPT Level = 0.008  Analysis Date = 07/09/2008 
 RPT Level = 0.008  Analysis Date = 07/07/2008 
 RPT Level = 0.008  Analysis Date = 07/07/2008 
 RPT Level = 0.008  Analysis Date = 06/27/2008 
 RPT Level = 0.008  Analysis Date = 06/27/2008 
 RPT Level = 0.008  Analysis Date = 06/17/2008 
 RPT Level = 0.008  Analysis Date = 06/17/2008 
 RPT Level = 0.008  Analysis Date = 06/11/2008 
 RPT Level = 0.008  Analysis Date = 06/11/2008 
 RPT Level = 0.008  Analysis Date = 06/04/2008 
 RPT Level = 0.008  Analysis Date = 06/04/2008 
 RPT Level = 0.008  Analysis Date = 06/04/2008 
 RPT Level = 0.008  Analysis Date = 06/04/2008 
 RPT Level = 0.008  Analysis Date = 05/22/2008 
 RPT Level = 0.008  Analysis Date = 05/22/2008 
 RPT Level = 0.008  Analysis Date = 05/16/2008 
 RPT Level = 0.008  Analysis Date = 05/16/2008 
 RPT Level = 0.008  Analysis Date = 05/08/2008 
 RPT Level = 0.008  Analysis Date = 05/08/2008 
 RPT Level = 0.008  Analysis Date = 05/01/2008 
 RPT Level = 0.008  Analysis Date = 05/01/2008 
 RPT Level = 0.008  Analysis Date = 04/24/2008 
 RPT Level = 0.008  Analysis Date = 04/24/2008 
 RPT Level = 0.008  Analysis Date = 04/15/2008 
 RPT Level = 0.008  Analysis Date = 04/15/2008 
 RPT Level = 0.008  Analysis Date = 04/10/2008 
 RPT Level = 0.008  Analysis Date = 04/10/2008 
 RPT Level = 0.008  Analysis Date = 04/07/2008 
 RPT Level = 0.008  Analysis Date = 04/07/2008 
 RPT Level = 0.008  Analysis Date = 03/27/2008 
 RPT Level = 0.008  Analysis Date = 03/27/2008 
 RPT Level = 0.008  Analysis Date = 03/20/2008 
 RPT Level = 0.008  Analysis Date = 03/20/2008 
 RPT Level = 0.008  Analysis Date = 03/11/2008 
 RPT Level = 0.008  Analysis Date = 03/11/2008 
 RPT Level = 0.008  Analysis Date = 03/05/2008 
 RPT Level = 0.008  Analysis Date = 03/05/2008 
 RPT Level = 0.008  Analysis Date = 03/03/2008 
 RPT Level = 0.008  Analysis Date = 03/03/2008 
 RPT Level = 0.008  Analysis Date = 02/22/2008 
 RPT Level = 0.008  Analysis Date = 02/22/2008 
 RPT Level = 0.008  Analysis Date = 02/13/2008 
 RPT Level = 0.008  Analysis Date = 02/13/2008 
 RPT Level = 0.008  Analysis Date = 02/06/2008 
 RPT Level = 0.008  Analysis Date = 02/06/2008 
 RPT Level = 0.008  Analysis Date = 01/31/2008 
 RPT Level = 0.008  Analysis Date = 01/31/2008 
 RPT Level = 0.008  Analysis Date = 01/24/2008 
 RPT Level = 0.008  Analysis Date = 01/24/2008 
 RPT Level = 0.008  Analysis Date = 01/15/2008 
 RPT Level = 0.008  Analysis Date = 01/15/2008 
 RPT Level = 0.008  Analysis Date = 01/08/2008 
 RPT Level = 0.008  Analysis Date = 01/08/2008 
 RPT Level = 0.008  Analysis Date = 01/07/2008 
 RPT Level = 0.008  Analysis Date = 01/07/2008 
 RPT Level = 0.008  Analysis Date = 12/18/2007 
 RPT Level = 0.008  Analysis Date = 12/18/2007 
 RPT Level = 0.008  Analysis Date = 12/12/2007 
 RPT Level = 0.008  Analysis Date = 12/12/2007 
 RPT Level = 0.008  Analysis Date = 12/06/2007 
 RPT Level = 0.008  Analysis Date = 12/06/2007 
 RPT Level = 0.008  Analysis Date = 11/27/2007 
 RPT Level = 0.008  Analysis Date = 11/27/2007 
 RPT Level = 0.008  Analysis Date = 11/20/2007 
 RPT Level = 0.008  Analysis Date = 11/20/2007 
 RPT Level = 0.008  Analysis Date = 11/16/2007 
 RPT Level = 0.008  Analysis Date = 11/16/2007 
 RPT Level = 0.008  Analysis Date = 11/15/2007 
 RPT Level = 0.008  Analysis Date = 11/15/2007 
 RPT Level = 0.008  Analysis Date = 11/01/2007 
 RPT Level = 0.008  Analysis Date = 11/01/2007 
 RPT Level = 0.008  Analysis Date = 10/31/2007 
 RPT Level = 0.008  Analysis Date = 10/31/2007 
 RPT Level = 0.008  Analysis Date = 10/18/2007 
 RPT Level = 0.008  Analysis Date = 10/18/2007 
 RPT Level = 0.008  Analysis Date = 10/18/2007 
 RPT Level = 0.008  Analysis Date = 10/18/2007 
 RPT Level = 0.008  Analysis Date = 10/09/2007 
 RPT Level = 0.008  Analysis Date = 10/09/2007 
 RPT Level = 0.008  Analysis Date = 09/21/2007 
 RPT Level = 0.008  Analysis Date = 09/21/2007 
 RPT Level = 0.008  Analysis Date = 09/12/2007 
 RPT Level = 0.008  Analysis Date = 09/12/2007 
 RPT Level = 0.008  Analysis Date = 09/12/2007 
 RPT Level = 0.008  Analysis Date = 09/12/2007 
 RPT Level = 0.008  Analysis Date = 09/04/2007 
 RPT Level = 0.008  Analysis Date = 09/04/2007 
 RPT Level = 0.008  Analysis Date = 08/28/2007 
 RPT Level = 0.008  Analysis Date = 08/28/2007 
 RPT Level = 0.008  Analysis Date = 08/15/2007 
 RPT Level = 0.008  Analysis Date = 08/15/2007 
 RPT Level = 0.008  Analysis Date = 08/13/2007 
 RPT Level = 0.008  Analysis Date = 08/13/2007 
 RPT Level = 0.008  Analysis Date = 08/02/2007 
 RPT Level = 0.008  Analysis Date = 08/02/2007 
 RPT Level = 0.008  Analysis Date = 07/31/2007 
 RPT Level = 0.008  Analysis Date = 07/31/2007 
 RPT Level = 0.008  Analysis Date = 07/12/2007 
 RPT Level = 0.008  Analysis Date = 07/12/2007 
 RPT Level = 0.008  Analysis Date = 07/09/2007 
 RPT Level = 0.008  Analysis Date = 07/09/2007 
 RPT Level = 0.008  Analysis Date = 07/05/2007 
 RPT Level = 0.008  Analysis Date = 07/05/2007 
 RPT Level = 0.008  Analysis Date = 06/20/2007 
 RPT Level = 0.008  Analysis Date = 06/20/2007 
 RPT Level = 0.008  Analysis Date = 06/18/2007 
 RPT Level = 0.008  Analysis Date = 06/18/2007 
 RPT Level = 0.008  Analysis Date = 06/07/2007 
 RPT Level = 0.008  Analysis Date = 06/07/2007 
 RPT Level = 0.008  Analysis Date = 06/01/2007 
 RPT Level = 0.008  Analysis Date = 06/01/2007 
 RPT Level = 0.008  Analysis Date = 05/22/2007 
 RPT Level = 0.008  Analysis Date = 05/22/2007 
 RPT Level = 0.008  Analysis Date = 05/21/2007 
 RPT Level = 0.008  Analysis Date = 05/21/2007 
 RPT Level = 0.008  Analysis Date = 05/10/2007 
 RPT Level = 0.008  Analysis Date = 05/10/2007 
 RPT Level = 0.008  Analysis Date = 05/01/2007 
 RPT Level = 0.008  Analysis Date = 05/01/2007 
 RPT Level = 0.008  Analysis Date = 04/24/2007 
 RPT Level = 0.008  Analysis Date = 04/24/2007 
 RPT Level = 0.008  Analysis Date = 04/19/2007 
 RPT Level = 0.008  Analysis Date = 04/19/2007 
 RPT Level = 0.008  Analysis Date = 04/11/2007 
 RPT Level = 0.008  Analysis Date = 04/11/2007 
 RPT Level = 0.008  Analysis Date = 04/04/2007 
 RPT Level = 0.008  Analysis Date = 04/04/2007 
 RPT Level = 0.008  Analysis Date = 03/29/2007 
 RPT Level = 0.008  Analysis Date = 03/29/2007 
 RPT Level = 0.008  Analysis Date = 03/22/2007 
 RPT Level = 0.008  Analysis Date = 03/22/2007 
 RPT Level = 0.008  Analysis Date = 03/14/2007 
 RPT Level = 0.008  Analysis Date = 03/14/2007 
 RPT Level = 0.008  Analysis Date = 03/07/2007 
 RPT Level = 0.008  Analysis Date = 03/07/2007 
 RPT Level = 0.008  Analysis Date = 02/28/2007 
 RPT Level = 0.008  Analysis Date = 02/28/2007 
 RPT Level = 0.008  Analysis Date = 02/28/2007 
 RPT Level = 0.008  Analysis Date = 02/28/2007 
 RPT Level = 0.008  Analysis Date = 02/20/2007 
 RPT Level = 0.008  Analysis Date = 02/20/2007 
 RPT Level = 0.008  Analysis Date = 02/13/2007 
 RPT Level = 0.008  Analysis Date = 02/13/2007 
 RPT Level = 0.008  Analysis Date = 02/02/2007 
 RPT Level = 0.008  Analysis Date = 02/02/2007 
 RPT Level = 0.008  Analysis Date = 01/22/2007 
 RPT Level = 0.008  Analysis Date = 01/22/2007 
 RPT Level = 0.008  Analysis Date = 01/18/2007 
 RPT Level = 0.008  Analysis Date = 01/18/2007 
 RPT Level = 0.008  Analysis Date = 01/08/2007 
 RPT Level = 0.008  Analysis Date = 01/08/2007 
 RPT Level = 0.008  Analysis Date = 01/08/2007 
 RPT Level = 0.008  Analysis Date = 01/08/2007 
 RPT Level = 0.008  Analysis Date = 01/05/2007 
 RPT Level = 0.008  Analysis Date = 01/05/2007 
 RPT Level = 0.008  Analysis Date = 12/12/2006 
 RPT Level = 0.008  Analysis Date = 12/12/2006 
 RPT Level = 0.008  Analysis Date = 12/05/2006 
 RPT Level = 0.008  Analysis Date = 12/05/2006 
 RPT Level = 0.008  Analysis Date = 12/01/2006 
 RPT Level = 0.008  Analysis Date = 12/01/2006 
 RPT Level = 0.008  Analysis Date = 11/21/2006 
 RPT Level = 0.008  Analysis Date = 11/21/2006 
 RPT Level = 0.008  Analysis Date = 11/15/2006 
 RPT Level = 0.008  Analysis Date = 11/15/2006 
 RPT Level = 0.008  Analysis Date = 11/08/2006 
 RPT Level = 0.008  Analysis Date = 11/08/2006 
 RPT Level = 0.008  Analysis Date = 10/31/2006 
 RPT Level = 0.008  Analysis Date = 10/31/2006 
 RPT Level = 0.008  Analysis Date = 10/24/2006 
 RPT Level = 0.008  Analysis Date = 10/24/2006 
 RPT Level = 0.008  Analysis Date = 10/24/2006 
 RPT Level = 0.008  Analysis Date = 10/24/2006 
 RPT Level = 0.008  Analysis Date = 10/13/2006 
 RPT Level = 0.008  Analysis Date = 10/13/2006 
 RPT Level = 0.008  Analysis Date = 10/06/2006 
 RPT Level = 0.008  Analysis Date = 10/06/2006 
 RPT Level = 0.008  Analysis Date = 09/21/2006 
 RPT Level = 0.008  Analysis Date = 09/21/2006 
 RPT Level = 0.008  Analysis Date = 09/14/2006 
 RPT Level = 0.008  Analysis Date = 09/14/2006 
 RPT Level = 0.008  Analysis Date = 09/08/2006 
 RPT Level = 0.008  Analysis Date = 09/08/2006 
 RPT Level = 0.008  Analysis Date = 08/24/2006 
 RPT Level = 0.008  Analysis Date = 08/24/2006 
 RPT Level = 0.008  Analysis Date = 08/22/2006 
 RPT Level = 0.008  Analysis Date = 08/22/2006 
 RPT Level = 0.008  Analysis Date = 08/14/2006 
 RPT Level = 0.008  Analysis Date = 08/14/2006 
 RPT Level = 0.008  Analysis Date = 08/02/2006 
 RPT Level = 0.008  Analysis Date = 08/02/2006 
 RPT Level = 0.008  Analysis Date = 07/17/2006 
 RPT Level = 0.008  Analysis Date = 07/17/2006 
 RPT Level = 0.008  Analysis Date = 07/10/2006 
 RPT Level = 0.008  Analysis Date = 07/10/2006 
 RPT Level = 0.008  Analysis Date = 06/23/2006 
 RPT Level = 0.008  Analysis Date = 06/23/2006 
 RPT Level = 0.008  Analysis Date = 06/19/2006 
 RPT Level = 0.008  Analysis Date = 06/19/2006 
 RPT Level = 0.008  Analysis Date = 06/08/2006 
 RPT Level = 0.008  Analysis Date = 06/08/2006 
 RPT Level = 0.008  Analysis Date = 05/19/2006 
 RPT Level = 0.008  Analysis Date = 05/19/2006 
 RPT Level = 0.008  Analysis Date = 05/10/2006 
 RPT Level = 0.008  Analysis Date = 05/10/2006 
 RPT Level = 0.008  Analysis Date = 05/04/2006 
 RPT Level = 0.008  Analysis Date = 05/04/2006 
 RPT Level = 0.008  Analysis Date = 09/19/2005 
 RPT Level = 0.008  Analysis Date = 09/19/2005 
 RPT Level = 0.008  Analysis Date = 09/12/2005 
 RPT Level = 0.008  Analysis Date = 09/12/2005 
 RPT Level = 0.008  Analysis Date = 09/01/2005 
 RPT Level = 0.008  Analysis Date = 09/01/2005 
 RPT Level = 0.008  Analysis Date = 08/29/2005 
 RPT Level = 0.008  Analysis Date = 08/29/2005 
 RPT Level = 0.008  Analysis Date = 08/23/2005 
 RPT Level = 0.008  Analysis Date = 08/23/2005 
 RPT Level = 0.008  Analysis Date = 08/15/2005 
 RPT Level = 0.008  Analysis Date = 08/15/2005 
 RPT Level = 0.008  Analysis Date = 08/11/2005 
 RPT Level = 0.008  Analysis Date = 08/11/2005 
 RPT Level = 0.008  Analysis Date = 08/11/2005 
 RPT Level = 0.008  Analysis Date = 08/11/2005 
 RPT Level = 0.008  Analysis Date = 07/21/2005 
 RPT Level = 0.008  Analysis Date = 07/21/2005 
 RPT Level = 0.008  Analysis Date = 07/14/2005 
 RPT Level = 0.008  Analysis Date = 07/14/2005 
 RPT Level = 0.008  Analysis Date = 07/08/2005 
 RPT Level = 0.008  Analysis Date = 07/08/2005 
 RPT Level = 0.008  Analysis Date = 06/30/2005 
 RPT Level = 0.008  Analysis Date = 06/30/2005 
 RPT Level = 0.008  Analysis Date = 06/24/2005 
 RPT Level = 0.008  Analysis Date = 06/24/2005 
 RPT Level = 0.008  Analysis Date = 06/16/2005 
 RPT Level = 0.008  Analysis Date = 06/16/2005 
 RPT Level = 0.008  Analysis Date = 06/09/2005 
 RPT Level = 0.008  Analysis Date = 06/09/2005 
 RPT Level = 0.008  Analysis Date = 06/03/2005 
 RPT Level = 0.008  Analysis Date = 06/03/2005 
 RPT Level = 0.008  Analysis Date = 05/25/2005 
 RPT Level = 0.008  Analysis Date = 05/25/2005 
 RPT Level = 0.008  Analysis Date = 05/19/2005 
 RPT Level = 0.008  Analysis Date = 05/19/2005 
 RPT Level = 0.008  Analysis Date = 05/13/2005 
 RPT Level = 0.008  Analysis Date = 05/13/2005 
 RPT Level = 0.008  Analysis Date = 05/06/2005 
 RPT Level = 0.008  Analysis Date = 05/06/2005 
 RPT Level = 0.008  Analysis Date = 04/28/2005 
 RPT Level = 0.008  Analysis Date = 04/28/2005 
 RPT Level = 0.008  Analysis Date = 04/22/2005 
 RPT Level = 0.008  Analysis Date = 04/22/2005 
 RPT Level = 0.008  Analysis Date = 04/13/2005 
 RPT Level = 0.008  Analysis Date = 04/13/2005 
 RPT Level = 0.008  Analysis Date = 04/06/2005 
 RPT Level = 0.008  Analysis Date = 04/06/2005 
 RPT Level = 0.008  Analysis Date = 03/30/2005 
 RPT Level = 0.008  Analysis Date = 03/30/2005 
 RPT Level = 0.008  Analysis Date = 03/28/2005 
 RPT Level = 0.008  Analysis Date = 03/28/2005 
 RPT Level = 0.008  Analysis Date = 03/17/2005 
 RPT Level = 0.008  Analysis Date = 03/17/2005 
 RPT Level = 0.008  Analysis Date = 03/14/2005 
 RPT Level = 0.008  Analysis Date = 03/14/2005 
 RPT Level = 0.008  Analysis Date = 03/14/2005 
 RPT Level = 0.008  Analysis Date = 03/14/2005 
 RPT Level = 0.008  Analysis Date = 03/09/2005 
 RPT Level = 0.008  Analysis Date = 03/09/2005 
 RPT Level = 0.008  Analysis Date = 02/25/2005 
 RPT Level = 0.008  Analysis Date = 02/25/2005 
 RPT Level = 0.008  Analysis Date = 02/22/2005 
 RPT Level = 0.008  Analysis Date = 02/22/2005 
 RPT Level = 0.008  Analysis Date = 02/14/2005 
 RPT Level = 0.008  Analysis Date = 02/14/2005 
 RPT Level = 0.008  Analysis Date = 02/04/2005 
 RPT Level = 0.008  Analysis Date = 02/04/2005 
 RPT Level = 0.008  Analysis Date = 01/28/2005 
 RPT Level = 0.008  Analysis Date = 01/28/2005 
 RPT Level = 0.008  Analysis Date = 01/21/2005 
 RPT Level = 0.008  Analysis Date = 01/21/2005 
 RPT Level = 0.008  Analysis Date = 01/14/2005 
 RPT Level = 0.008  Analysis Date = 01/14/2005 
 RPT Level = 0.008  Analysis Date = 01/10/2005 
 RPT Level = 0.008  Analysis Date = 01/10/2005 
 RPT Level = 0.008  Analysis Date = 01/03/2005 
 RPT Level = 0.008  Analysis Date = 01/03/2005 
 RPT Level = 0.008  Analysis Date = 01/03/2005 
 RPT Level = 0.008  Analysis Date = 01/03/2005 
 RPT Level = 0.008  Analysis Date = 01/03/2005 
 RPT Level = 0.008  Analysis Date = 01/03/2005 
 RPT Level = 0.008  Analysis Date = 12/20/2004 
 RPT Level = 0.008  Analysis Date = 12/20/2004 
 RPT Level = 0.008  Analysis Date = 12/20/2004 
 RPT Level = 0.008  Analysis Date = 12/20/2004 
 RPT Level = 0.008  Analysis Date = 12/13/2004 
 RPT Level = 0.008  Analysis Date = 12/13/2004 
 RPT Level = 0.008  Analysis Date = 12/13/2004 
 RPT Level = 0.008  Analysis Date = 12/13/2004 
 RPT Level = 0.008  Analysis Date = 12/06/2004 
 RPT Level = 0.008  Analysis Date = 12/06/2004 
 RPT Level = 0.008  Analysis Date = 12/06/2004 
 RPT Level = 0.008  Analysis Date = 12/06/2004 
 RPT Level = 0.008  Analysis Date = 12/01/2004 
 RPT Level = 0.008  Analysis Date = 12/01/2004 
 RPT Level = 0.008  Analysis Date = 12/02/2004 
 RPT Level = 0.008  Analysis Date = 12/02/2004 
 RPT Level = 0.008  Analysis Date = 11/22/2004 
 RPT Level = 0.008  Analysis Date = 11/22/2004 
 RPT Level = 0.008  Analysis Date = 09/02/2004 
 RPT Level = 0.008  Analysis Date = 09/02/2004 
 RPT Level = 0.008  Analysis Date = 08/30/2004 
 RPT Level = 0.008  Analysis Date = 08/30/2004 
 RPT Level = 0.008  Analysis Date = 08/25/2004 
 RPT Level = 0.008  Analysis Date = 08/25/2004 
 RPT Level = 0.008  Analysis Date = 08/23/2004 
 RPT Level = 0.008  Analysis Date = 08/23/2004 
 RPT Level = 0.008  Analysis Date = 08/20/2004 
 RPT Level = 0.008  Analysis Date = 08/20/2004 
 RPT Level = 0.008  Analysis Date = 08/20/2004 
 RPT Level = 0.008  Analysis Date = 08/20/2004 
 RPT Level = 0.008  Analysis Date = 08/12/2004 
 RPT Level = 0.008  Analysis Date = 08/12/2004 
 RPT Level = 0.008  Analysis Date = 08/05/2004 
 RPT Level = 0.008  Analysis Date = 08/05/2004 
 RPT Level = 0.008  Analysis Date = 07/30/2004 
 RPT Level = 0.008  Analysis Date = 07/30/2004 
 RPT Level = 0.008  Analysis Date = 07/23/2004 
 RPT Level = 0.008  Analysis Date = 07/23/2004 
 RPT Level = 0.008  Analysis Date = 07/15/2004 
 RPT Level = 0.008  Analysis Date = 07/15/2004 
 RPT Level = 0.008  Analysis Date = 07/09/2004 
 RPT Level = 0.008  Analysis Date = 07/09/2004 
 RPT Level = 0.008  Analysis Date = 07/01/2004 
 RPT Level = 0.008  Analysis Date = 07/01/2004 
 RPT Level = 0.008  Analysis Date = 06/24/2004 
 RPT Level = 0.008  Analysis Date = 06/24/2004 
 RPT Level = 0.008  Analysis Date = 06/21/2004 
 RPT Level = 0.008  Analysis Date = 06/21/2004 
 RPT Level = 0.008  Analysis Date = 06/10/2004 
 RPT Level = 0.008  Analysis Date = 06/10/2004 
 RPT Level = 0.008  Analysis Date = 06/08/2004 
 RPT Level = 0.008  Analysis Date = 06/08/2004 
 RPT Level = 0.008  Analysis Date = 06/02/2004 
 RPT Level = 0.008  Analysis Date = 06/02/2004 
 RPT Level = 0.008  Analysis Date = 05/25/2004 
 RPT Level = 0.008  Analysis Date = 05/25/2004 
 RPT Level = 0.008  Analysis Date = 05/12/2004 
 RPT Level = 0.008  Analysis Date = 05/12/2004 
 RPT Level = 0.008  Analysis Date = 05/07/2004 
 RPT Level = 0.008  Analysis Date = 05/07/2004 
 RPT Level = 0.008  Analysis Date = 05/04/2004 
 RPT Level = 0.008  Analysis Date = 05/04/2004 
 RPT Level = 0.008  Analysis Date = 04/23/2004 
 RPT Level = 0.008  Analysis Date = 04/23/2004 
 RPT Level = 0.008  Analysis Date = 04/20/2004 
 RPT Level = 0.008  Analysis Date = 04/20/2004 
 RPT Level = 0.008  Analysis Date = 04/15/2004 
 RPT Level = 0.008  Analysis Date = 04/15/2004 
 RPT Level = 0.008  Analysis Date = 04/12/2004 
 RPT Level = 0.008  Analysis Date = 04/12/2004 
 RPT Level = 0.008  Analysis Date = 04/09/2004 
 RPT Level = 0.008  Analysis Date = 04/09/2004 
 RPT Level = 0.008  Analysis Date = 04/08/2004 
 RPT Level = 0.008  Analysis Date = 04/08/2004 
 RPT Level = 0.008  Analysis Date = 04/06/2004 
 RPT Level = 0.008  Analysis Date = 04/06/2004 
 RPT Level = 0.008  Analysis Date = 03/31/2004 
 RPT Level = 0.008  Analysis Date = 03/31/2004 
 RPT Level = 0.008  Analysis Date = 03/23/2004 
 RPT Level = 0.008  Analysis Date = 03/23/2004 
 RPT Level = 0.008  Analysis Date = 03/16/2004 
 RPT Level = 0.008  Analysis Date = 03/16/2004 
 RPT Level = 0.008  Analysis Date = 03/12/2004 
 RPT Level = 0.008  Analysis Date = 03/12/2004 
 RPT Level = 0.008  Analysis Date = 03/11/2004 
 RPT Level = 0.008  Analysis Date = 03/11/2004 
 RPT Level = 0.008  Analysis Date = 03/03/2004 
 RPT Level = 0.008  Analysis Date = 03/03/2004 
 RPT Level = 0.008  Analysis Date = 03/01/2004 
 RPT Level = 0.008  Analysis Date = 03/01/2004 
 RPT Level = 0.008  Analysis Date = 02/27/2004 
 RPT Level = 0.008  Analysis Date = 02/27/2004 
 RPT Level = 0.008  Analysis Date = 02/25/2004 
 RPT Level = 0.008  Analysis Date = 02/25/2004 
 RPT Level = 0.008  Analysis Date = 02/19/2004 
 RPT Level = 0.008  Analysis Date = 02/19/2004 
 RPT Level = 0.008  Analysis Date = 02/13/2004 
 RPT Level = 0.008  Analysis Date = 02/13/2004 
 RPT Level = 0.008  Analysis Date = 02/12/2004 
 RPT Level = 0.008  Analysis Date = 02/12/2004 
 RPT Level = 0.008  Analysis Date = 02/11/2004 
 RPT Level = 0.008  Analysis Date = 02/11/2004 
 RPT Level = 0.008  Analysis Date = 02/06/2004 
 RPT Level = 0.008  Analysis Date = 02/06/2004 
 RPT Level = 0.008  Analysis Date = 02/04/2004 
 RPT Level = 0.008  Analysis Date = 02/04/2004 
 RPT Level = 0.008  Analysis Date = 01/30/2004 
 RPT Level = 0.008  Analysis Date = 01/30/2004 
 RPT Level = 0.008  Analysis Date = 01/28/2004 
 RPT Level = 0.008  Analysis Date = 01/28/2004 
 RPT Level = 0.008  Analysis Date = 01/27/2004 
 RPT Level = 0.008  Analysis Date = 01/27/2004 
 RPT Level = 0.008  Analysis Date = 01/21/2004 
 RPT Level = 0.008  Analysis Date = 01/21/2004 
 RPT Level = 0.008  Analysis Date = 01/14/2004 
 RPT Level = 0.008  Analysis Date = 01/14/2004 
 RPT Level = 0.008  Analysis Date = 01/08/2004 
 RPT Level = 0.008  Analysis Date = 01/08/2004 
 RPT Level = 0.008  Analysis Date = 01/08/2004 
 RPT Level = 0.008  Analysis Date = 01/08/2004 
 RPT Level = 0.008  Analysis Date = 10/10/2003 
 RPT Level = 0.011  Analysis Date = 10/10/2003 
 RPT Level = 0.011  Analysis Date = 10/08/2003 
 RPT Level = 0.011  Analysis Date = 10/08/2003 
 RPT Level = 0.011  Analysis Date = 09/26/2003 
 RPT Level = 0.011  Analysis Date = 09/26/2003 
 RPT Level = 0.011  Analysis Date = 09/24/2003 
 RPT Level = 0.011  Analysis Date = 09/24/2003 
 RPT Level = 0.011  Analysis Date = 09/17/2003 
 RPT Level = 0.011  Analysis Date = 09/17/2003 
 RPT Level = 0.011  Analysis Date = 09/10/2003 
 RPT Level = 0.011  Analysis Date = 09/10/2003 
 RPT Level = 0.011  Analysis Date = 08/29/2003 
 RPT Level = 0.011  Analysis Date = 08/29/2003 
 RPT Level = 0.011  Analysis Date = 08/19/2003 
 RPT Level = 0.011  Analysis Date = 08/19/2003 
 RPT Level = 0.011  Analysis Date = 08/06/2003 
 RPT Level = 0.011  Analysis Date = 08/06/2003 
 RPT Level = 0.011  Analysis Date = 08/01/2003 
 RPT Level = 0.011  Analysis Date = 08/01/2003 
 RPT Level = 0.011  Analysis Date = 07/23/2003 
 RPT Level = 0.011  Analysis Date = 07/23/2003 
 RPT Level = 0.011  Analysis Date = 07/21/2003 
 RPT Level = 0.011  Analysis Date = 07/21/2003 
 RPT Level = 0.011  Analysis Date = 07/17/2003 
 RPT Level = 0.011  Analysis Date = 07/17/2003 
 RPT Level = 0.011  Analysis Date = 07/15/2003 
 RPT Level = 0.011  Analysis Date = 07/15/2003 
 RPT Level = 0.011  Analysis Date = 07/07/2003 
 RPT Level = 0.011  Analysis Date = 07/07/2003 
 RPT Level = 0.011  Analysis Date = 07/02/2003 
 RPT Level = 0.011  Analysis Date = 07/02/2003 
 RPT Level = 0.011  Analysis Date = 07/01/2003 
 RPT Level = 0.011  Analysis Date = 07/01/2003 
 RPT Level = 0.011  Analysis Date = 06/04/2003 
 RPT Level = 0.011  Analysis Date = 06/04/2003 
 RPT Level = 0.011  Analysis Date = 06/03/2003 
 RPT Level = 0.011  Analysis Date = 06/03/2003 
 RPT Level = 0.011  Analysis Date = 05/30/2003 
 RPT Level = 0.011  Analysis Date = 05/30/2003 
 RPT Level = 0.011  Analysis Date = 05/16/2003 
 RPT Level = 0.011  Analysis Date = 05/16/2003 
 RPT Level = 0.011  Analysis Date = 05/13/2003 
 RPT Level = 0.011  Analysis Date = 05/13/2003 
 RPT Level = 0.011  Analysis Date = 05/12/2003 
 RPT Level = 0.011  Analysis Date = 05/12/2003 
 RPT Level = 0.011  Analysis Date = 04/29/2003 
 RPT Level = 0.011  Analysis Date = 04/29/2003 
 RPT Level = 0.011  Analysis Date = 04/16/2003 
 RPT Level = 0.011  Analysis Date = 04/16/2003 
 RPT Level = 0.011  Analysis Date = 04/10/2003 
 RPT Level = 0.011  Analysis Date = 04/10/2003 
 RPT Level = 0.011  Analysis Date = 04/10/2003 
 RPT Level = 0.011  Analysis Date = 04/10/2003 
 RPT Level = 0.011  Analysis Date = 04/08/2003 
 RPT Level = 0.011  Analysis Date = 04/08/2003 
 RPT Level = 0.011  Analysis Date = 03/21/2003 
 RPT Level = 0.011  Analysis Date = 03/21/2003 
 RPT Level = 0.011  Analysis Date = 03/21/2003 
 RPT Level = 0.011  Analysis Date = 03/21/2003 
 RPT Level = 0.011  Analysis Date = 03/12/2003 
 RPT Level = 0.011  Analysis Date = 03/12/2003 
 RPT Level = 0.011  Analysis Date = 03/07/2003 
 RPT Level = 0.011  Analysis Date = 03/07/2003 
 RPT Level = 0.011  Analysis Date = 02/26/2003 
 RPT Level = 0.011  Analysis Date = 02/26/2003 
 RPT Level = 0.011  Analysis Date = 02/05/2003 
 RPT Level = 0.011  Analysis Date = 02/05/2003 
 RPT Level = 0.011  Analysis Date = 02/05/2003 
 RPT Level = 0.011  Analysis Date = 02/05/2003 
 RPT Level = 0.011  Analysis Date = 02/05/2003 
 RPT Level = 0.011  Analysis Date = 02/05/2003 
 RPT Level = 0.011  Analysis Date = 01/17/2003 
 RPT Level = 0.011  Analysis Date = 01/17/2003 
 RPT Level = 0.011  Analysis Date = 01/17/2003 
 RPT Level = 0.011  Analysis Date = 01/17/2003 
 RPT Level = 0.011  Analysis Date = 01/07/2003 
 RPT Level = 0.011  Analysis Date = 01/07/2003 
 RPT Level = 0.011  Analysis Date = 01/07/2003 
 RPT Level = 0.011  Analysis Date = 01/07/2003 
 RPT Level = 0.011  Analysis Date = 12/23/2002 
 RPT Level = 0.011  Analysis Date = 12/23/2002 
 RPT Level = 0.011  Analysis Date = 12/18/2002 
 RPT Level = 0.011  Analysis Date = 12/18/2002 
 RPT Level = 0.011  Analysis Date = 12/10/2002 
 RPT Level = 0.011  Analysis Date = 12/10/2002 
 RPT Level = 0.011  Analysis Date = 12/10/2002 
 RPT Level = 0.011  Analysis Date = 12/10/2002 
 RPT Level = 0.011  Analysis Date = 12/06/2002 
 RPT Level = 0.011  Analysis Date = 12/06/2002 
 RPT Level = 0.011  Analysis Date = 12/06/2002 
 RPT Level = 0.011  Analysis Date = 12/06/2002 
 RPT Level = 0.011  Analysis Date = 12/06/2002 
 RPT Level = 0.011  Analysis Date = 12/06/2002 
 RPT Level = 0.011  Analysis Date = 11/14/2002 
 RPT Level = 0.011  Analysis Date = 11/14/2002 
 RPT Level = 0.011  Analysis Date = 10/30/2002 
 RPT Level = 0.011  Analysis Date = 10/30/2002 
 RPT Level = 0.011  Analysis Date = 10/30/2002 
 RPT Level = 0.011  Analysis Date = 10/30/2002 
 RPT Level = 0.011  Analysis Date = 10/30/2002 
 RPT Level = 0.011  Analysis Date = 10/30/2002 
 RPT Level = 0.011  Analysis Date = 10/30/2002 
 RPT Level = 0.011  Analysis Date = 10/30/2002 
 RPT Level = 0.011  Analysis Date = 09/10/2002 
 RPT Level = 0.009  Analysis Date = 09/10/2002 
 RPT Level = 0.009  Analysis Date = 09/10/2002 
 RPT Level = 0.009  Analysis Date = 09/10/2002 
 RPT Level = 0.009  Analysis Date = 08/29/2002 
 RPT Level = 0.009  Analysis Date = 08/29/2002 
 RPT Level = 0.009  Analysis Date = 08/27/2002 
 RPT Level = 0.009  Analysis Date = 08/27/2002 
 RPT Level = 0.009  Analysis Date = 08/20/2002 
 RPT Level = 0.009  Analysis Date = 08/20/2002 
 RPT Level = 0.009  Analysis Date = 08/16/2002 
 RPT Level = 0.009  Analysis Date = 08/16/2002 
 RPT Level = 0.009  Analysis Date = 08/01/2002 
 RPT Level = 0.009  Analysis Date = 08/01/2002 
 RPT Level = 0.009  Analysis Date = 07/17/2002 
 RPT Level = 0.009  Analysis Date = 07/17/2002 
 RPT Level = 0.009  Analysis Date = 07/16/2002 
 RPT Level = 0.009  Analysis Date = 07/16/2002 
 RPT Level = 0.009  Analysis Date = 07/09/2002 
 RPT Level = 0.009  Analysis Date = 07/09/2002 
 RPT Level = 0.009  Analysis Date = 07/02/2002 
 RPT Level = 0.009  Analysis Date = 07/02/2002 
 RPT Level = 0.009  Analysis Date = 06/21/2002 
 RPT Level = 0.009  Analysis Date = 06/21/2002 
 RPT Level = 0.009  Analysis Date = 06/20/2002 
 RPT Level = 0.009  Analysis Date = 06/20/2002 
 RPT Level = 0.009  Analysis Date = 06/11/2002 
 RPT Level = 0.009  Analysis Date = 06/11/2002 
 RPT Level = 0.009  Analysis Date = 06/10/2002 
 RPT Level = 0.009  Analysis Date = 06/10/2002 
 RPT Level = 0.009  Analysis Date = 05/30/2002 
 RPT Level = 0.009  Analysis Date = 05/30/2002 
 RPT Level = 0.009  Analysis Date = 05/22/2002 
 RPT Level = 0.009  Analysis Date = 05/22/2002 
 RPT Level = 0.009  Analysis Date = 05/17/2002 
 RPT Level = 0.009  Analysis Date = 05/17/2002 
 RPT Level = 0.009  Analysis Date = 05/13/2002 
 RPT Level = 0.009  Analysis Date = 05/13/2002 
 RPT Level = 0.009  Analysis Date = 04/26/2002 
 RPT Level = 0.009  Analysis Date = 04/26/2002 
 RPT Level = 0.009  Analysis Date = 04/26/2002 
 RPT Level = 0.009  Analysis Date = 04/26/2002 
 RPT Level = 0.009  Analysis Date = 04/17/2002 
 RPT Level = 0.009  Analysis Date = 04/17/2002 
 RPT Level = 0.009  Analysis Date = 04/05/2002 
 RPT Level = 0.009  Analysis Date = 04/05/2002 
 RPT Level = 0.009  Analysis Date = 04/03/2002 
 RPT Level = 0.009  Analysis Date = 04/03/2002 
 RPT Level = 0.009  Analysis Date = 04/03/2002 
 RPT Level = 0.009  Analysis Date = 04/03/2002 
 RPT Level = 0.009  Analysis Date = 04/01/2002 
 RPT Level = 0.009  Analysis Date = 04/01/2002 
 RPT Level = 0.009  Analysis Date = 03/29/2002 
 RPT Level = 0.009  Analysis Date = 03/29/2002 
 RPT Level = 0.009  Analysis Date = 03/22/2002 
 RPT Level = 0.009  Analysis Date = 03/22/2002 
 RPT Level = 0.009  Analysis Date = 03/04/2002 
 RPT Level = 0.009  Analysis Date = 03/04/2002 
 RPT Level = 0.009  Analysis Date = 02/20/2002 
 RPT Level = 0.009  Analysis Date = 02/20/2002 
 RPT Level = 0.009  Analysis Date = 02/08/2002 
 RPT Level = 0.009  Analysis Date = 02/08/2002 
 RPT Level = 0.009  Analysis Date = 02/08/2002 
 RPT Level = 0.009  Analysis Date = 02/08/2002 
 RPT Level = 0.009  Analysis Date = 01/23/2002 
 RPT Level = 0.009  Analysis Date = 01/23/2002 
 RPT Level = 0.009  Analysis Date = 01/17/2002 
 RPT Level = 0.009  Analysis Date = 01/17/2002 
 RPT Level = 0.009  Analysis Date = 01/09/2002 
 RPT Level = 0.009  Analysis Date = 01/09/2002 
 RPT Level = 0.009  Analysis Date = 01/03/2002 
 RPT Level = 0.009  Analysis Date = 01/03/2002 
 RPT Level = 0.009  Analysis Date = 12/20/2001 
 RPT Level = 0.009  Analysis Date = 12/20/2001 
 RPT Level = 0.009  Analysis Date = 12/14/2001 
 RPT Level = 0.009  Analysis Date = 12/14/2001 
 RPT Level = 0.009  Analysis Date = 12/07/2001 
 RPT Level = 0.009  Analysis Date = 12/07/2001 
 RPT Level = 0.009  Analysis Date = 11/15/2001 
 RPT Level = 0.009  Y = 0
The SGPlot Procedure

False Positive Rate for Nitrate plus Nitrite (NO3+NO2 as N), FIL, COL, LL

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Nitrate plus Nitrite (NO3+NO2 as N), FIL, COL, LL 00631CL050 2002 40 0 0%
    2003 52 0 0%
    2004 51 0 0%
    2005 50 2 4%
    2006 15 0 0%
    2007 50 0 0%
    2008 50 1 2%
    2009 52 1 2%
    2010 52 1 2%
    2011 52 0 0%
    2012 2 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Nitrate plus Nitrite (NO3+NO2 as N), FIL, DA -
Blind Blank Results
Lab: NWQL, PCode: 00631, MCode: RED01
Analysis dates: 10/20/11 through 09/21/16
Open Data Set

 Analysis Date = 01/15/2015 
 Lab Value = 6.0146 
 RPT Level = 0.04 
 Lab Sample ID = 20150050006  Analysis Date = 05/08/2013 
 Lab Value = 0.1122 
 RPT Level = 0.04 
 Lab Sample ID = 20131270022  Analysis Date = 01/15/2015 
 Lab Value = 6.0146 
 RPT Level = 0.04 
 Lab Sample ID = 20150050006  Analysis Date = 05/08/2013 
 Lab Value = 0.1122 
 RPT Level = 0.04 
 Lab Sample ID = 20131270022  Analysis Date = 09/21/2016 
 Lab Value = -0.03 
 RPT Level = 0.04 
 Lab Sample ID = 20162520025  Analysis Date = 09/21/2016 
 Lab Value = 0.0039 
 RPT Level = 0.04 
 Lab Sample ID = 20162440121  Analysis Date = 09/02/2016 
 Lab Value = 0.0145 
 RPT Level = 0.04 
 Lab Sample ID = 20162360195  Analysis Date = 08/25/2016 
 Lab Value = -0.01 
 RPT Level = 0.04 
 Lab Sample ID = 20162290137  Analysis Date = 08/23/2016 
 Lab Value = -0.002 
 RPT Level = 0.04 
 Lab Sample ID = 20162230008  Analysis Date = 08/17/2016 
 Lab Value = -0.006 
 RPT Level = 0.04 
 Lab Sample ID = 20162150204  Analysis Date = 08/09/2016 
 Lab Value = 0.0123 
 RPT Level = 0.04 
 Lab Sample ID = 20162080232  Analysis Date = 07/26/2016 
 Lab Value = 0.0669 
 RPT Level = 0.04 
 Lab Sample ID = 20162010257  Analysis Date = 07/19/2016 
 Lab Value = 0.0022 
 RPT Level = 0.04 
 Lab Sample ID = 20161940107  Analysis Date = 07/13/2016 
 Lab Value = -0.024 
 RPT Level = 0.04 
 Lab Sample ID = 20161870031  Analysis Date = 07/12/2016 
 Lab Value = -0.022 
 RPT Level = 0.04 
 Lab Sample ID = 20161800082  Analysis Date = 06/27/2016 
 Lab Value = .00072 
 RPT Level = 0.04 
 Lab Sample ID = 20161740071  Analysis Date = 06/21/2016 
 Lab Value = -0.012 
 RPT Level = 0.04 
 Lab Sample ID = 20161660156  Analysis Date = 06/13/2016 
 Lab Value = 0.0229 
 RPT Level = 0.04 
 Lab Sample ID = 20161590152  Analysis Date = 06/07/2016 
 Lab Value = -0.018 
 RPT Level = 0.04 
 Lab Sample ID = 20161520025  Analysis Date = 06/07/2016 
 Lab Value = -0.019 
 RPT Level = 0.04 
 Lab Sample ID = 20161480189  Analysis Date = 05/09/2016 
 Lab Value = -0.005 
 RPT Level = 0.04 
 Lab Sample ID = 20161270006  Analysis Date = 05/03/2016 
 Lab Value = 0.0019 
 RPT Level = 0.04 
 Lab Sample ID = 20161230045  Analysis Date = 05/03/2016 
 Lab Value = .00068 
 RPT Level = 0.04 
 Lab Sample ID = 20161160091  Analysis Date = 04/22/2016 
 Lab Value = 0.0053 
 RPT Level = 0.04 
 Lab Sample ID = 20161100126  Analysis Date = 04/19/2016 
 Lab Value = 0.0067 
 RPT Level = 0.04 
 Lab Sample ID = 20161020027  Analysis Date = 04/11/2016 
 Lab Value = 0.0014 
 RPT Level = 0.04 
 Lab Sample ID = 20160950044  Analysis Date = 04/05/2016 
 Lab Value = 0.0157 
 RPT Level = 0.04 
 Lab Sample ID = 20160880040  Analysis Date = 03/30/2016 
 Lab Value = -91E-5 
 RPT Level = 0.04 
 Lab Sample ID = 20160810065  Analysis Date = 03/25/2016 
 Lab Value = 0.014 
 RPT Level = 0.04 
 Lab Sample ID = 20160740013  Analysis Date = 03/10/2016 
 Lab Value = -0.007 
 RPT Level = 0.04 
 Lab Sample ID = 20160670014  Analysis Date = 03/07/2016 
 Lab Value = 0.0085 
 RPT Level = 0.04 
 Lab Sample ID = 20160600013  Analysis Date = 03/01/2016 
 Lab Value = 0.0399 
 RPT Level = 0.04 
 Lab Sample ID = 20160530013  Analysis Date = 02/23/2016 
 Lab Value = 0.0167 
 RPT Level = 0.04 
 Lab Sample ID = 20160470015  Analysis Date = 02/22/2016 
 Lab Value = -0.022 
 RPT Level = 0.04 
 Lab Sample ID = 20160400084  Analysis Date = 02/04/2016 
 Lab Value = -0.031 
 RPT Level = 0.04 
 Lab Sample ID = 20160320011  Analysis Date = 01/28/2016 
 Lab Value = 0.0085 
 RPT Level = 0.04 
 Lab Sample ID = 20160250031  Analysis Date = 01/28/2016 
 Lab Value = 0.0095 
 RPT Level = 0.04 
 Lab Sample ID = 20160190011  Analysis Date = 01/20/2016 
 Lab Value = 0.0086 
 RPT Level = 0.04 
 Lab Sample ID = 20160110011  Analysis Date = 01/07/2016 
 Lab Value = 0.0143 
 RPT Level = 0.04 
 Lab Sample ID = 20160050030  Analysis Date = 01/05/2016 
 Lab Value = 0.0106 
 RPT Level = 0.04 
 Lab Sample ID = 20153630045  Analysis Date = 12/31/2015 
 Lab Value = 0.0068 
 RPT Level = 0.04 
 Lab Sample ID = 20153550011  Analysis Date = 12/23/2015 
 Lab Value = -0.016 
 RPT Level = 0.04 
 Lab Sample ID = 20153500160  Analysis Date = 12/15/2015 
 Lab Value = -0.017 
 RPT Level = 0.04 
 Lab Sample ID = 20153420017  Analysis Date = 12/02/2015 
 Lab Value = 0.0013 
 RPT Level = 0.04 
 Lab Sample ID = 20153340016  Analysis Date = 12/02/2015 
 Lab Value = 0.0086 
 RPT Level = 0.04 
 Lab Sample ID = 20153270012  Analysis Date = 11/23/2015 
 Lab Value = 0.0174 
 RPT Level = 0.04 
 Lab Sample ID = 20153200025  Analysis Date = 11/20/2015 
 Lab Value = 0.0139 
 RPT Level = 0.04 
 Lab Sample ID = 20153140011  Analysis Date = 11/06/2015 
 Lab Value = 0.0192 
 RPT Level = 0.04 
 Lab Sample ID = 20153060033  Analysis Date = 11/03/2015 
 Lab Value = 0.0103 
 RPT Level = 0.04 
 Lab Sample ID = 20152990066  Analysis Date = 10/23/2015 
 Lab Value = 0.0205 
 RPT Level = 0.04 
 Lab Sample ID = 20152920036  Analysis Date = 10/22/2015 
 Lab Value = 0.0161 
 RPT Level = 0.04 
 Lab Sample ID = 20152860152  Analysis Date = 10/09/2015 
 Lab Value = 0.0212 
 RPT Level = 0.04 
 Lab Sample ID = 20152780012  Analysis Date = 09/29/2015 
 Lab Value = 0.001 
 RPT Level = 0.04 
 Lab Sample ID = 20152710066  Analysis Date = 09/28/2015 
 Lab Value = 0.0101 
 RPT Level = 0.04 
 Lab Sample ID = 20152640026  Analysis Date = 09/25/2015 
 Lab Value = -0.015 
 RPT Level = 0.04 
 Lab Sample ID = 20152590157  Analysis Date = 09/21/2015 
 Lab Value = 0.0036 
 RPT Level = 0.04 
 Lab Sample ID = 20152510009  Analysis Date = 09/14/2015 
 Lab Value = 0.0132 
 RPT Level = 0.04 
 Lab Sample ID = 20152430096  Analysis Date = 09/01/2015 
 Lab Value = 0.0056 
 RPT Level = 0.04 
 Lab Sample ID = 20152360157  Analysis Date = 09/01/2015 
 Lab Value = 0.0142 
 RPT Level = 0.04 
 Lab Sample ID = 20152330007  Analysis Date = 08/18/2015 
 Lab Value = 0.0029 
 RPT Level = 0.04 
 Lab Sample ID = 20152230132  Analysis Date = 08/10/2015 
 Lab Value = -0.002 
 RPT Level = 0.04 
 Lab Sample ID = 20152150073  Analysis Date = 07/31/2015 
 Lab Value = -75E-5 
 RPT Level = 0.04 
 Lab Sample ID = 20152080065  Analysis Date = 07/22/2015 
 Lab Value = 0.0079 
 RPT Level = 0.04 
 Lab Sample ID = 20152010051  Analysis Date = 07/16/2015 
 Lab Value = 0.0197 
 RPT Level = 0.04 
 Lab Sample ID = 20151940024  Analysis Date = 07/09/2015 
 Lab Value = 0.0137 
 RPT Level = 0.04 
 Lab Sample ID = 20151870009  Analysis Date = 07/08/2015 
 Lab Value = 0.0042 
 RPT Level = 0.04 
 Lab Sample ID = 20151800049  Analysis Date = 07/07/2015 
 Lab Value = 0.0056 
 RPT Level = 0.04 
 Lab Sample ID = 20151730016  Analysis Date = 06/24/2015 
 Lab Value = 0.0321 
 RPT Level = 0.04 
 Lab Sample ID = 20151660034  Analysis Date = 06/23/2015 
 Lab Value = 0.0226 
 RPT Level = 0.04 
 Lab Sample ID = 20151620213  Analysis Date = 06/05/2015 
 Lab Value = 0.022 
 RPT Level = 0.04 
 Lab Sample ID = 20151530198  Analysis Date = 05/27/2015 
 Lab Value = -0.013 
 RPT Level = 0.04 
 Lab Sample ID = 20151460121  Analysis Date = 05/21/2015 
 Lab Value = -0.01 
 RPT Level = 0.04 
 Lab Sample ID = 20151390198  Analysis Date = 05/14/2015 
 Lab Value = -0.025 
 RPT Level = 0.04 
 Lab Sample ID = 20151310070  Analysis Date = 05/14/2015 
 Lab Value = -0.005 
 RPT Level = 0.04 
 Lab Sample ID = 20151240065  Analysis Date = 05/06/2015 
 Lab Value = 0.014 
 RPT Level = 0.04 
 Lab Sample ID = 20151180073  Analysis Date = 05/01/2015 
 Lab Value = -0.003 
 RPT Level = 0.04 
 Lab Sample ID = 20151140024  Analysis Date = 04/16/2015 
 Lab Value = -0.021 
 RPT Level = 0.04 
 Lab Sample ID = 20151050039  Analysis Date = 04/13/2015 
 Lab Value = -0.012 
 RPT Level = 0.04 
 Lab Sample ID = 20150970052  Analysis Date = 04/08/2015 
 Lab Value = 0.0048 
 RPT Level = 0.04 
 Lab Sample ID = 20150900037  Analysis Date = 04/06/2015 
 Lab Value = -0.011 
 RPT Level = 0.04 
 Lab Sample ID = 20150850041  Analysis Date = 03/27/2015 
 Lab Value = -0.006 
 RPT Level = 0.04 
 Lab Sample ID = 20150770031  Analysis Date = 03/11/2015 
 Lab Value = 0.0585 
 RPT Level = 0.04 
 Lab Sample ID = 20150690109  Analysis Date = 03/05/2015 
 Lab Value = 0.0074 
 RPT Level = 0.04 
 Lab Sample ID = 20150610104  Analysis Date = 02/27/2015 
 Lab Value = 0.0509 
 RPT Level = 0.04 
 Lab Sample ID = 20150540029  Analysis Date = 02/26/2015 
 Lab Value = 0.0199 
 RPT Level = 0.04 
 Lab Sample ID = 20150490025  Analysis Date = 02/17/2015 
 Lab Value = 0.0057 
 RPT Level = 0.04 
 Lab Sample ID = 20150400033  Analysis Date = 02/12/2015 
 Lab Value = -0.012 
 RPT Level = 0.04 
 Lab Sample ID = 20150330024  Analysis Date = 02/03/2015 
 Lab Value = 0.0115 
 RPT Level = 0.04 
 Lab Sample ID = 20150260015  Analysis Date = 01/28/2015 
 Lab Value = 0.0331 
 RPT Level = 0.04 
 Lab Sample ID = 20150200036  Analysis Date = 01/22/2015 
 Lab Value = 0.0228 
 RPT Level = 0.04 
 Lab Sample ID = 20150120017  Analysis Date = 01/13/2015 
 Lab Value = 0.0128 
 RPT Level = 0.04 
 Lab Sample ID = 20143630008  Analysis Date = 01/07/2015 
 Lab Value = 0.0058 
 RPT Level = 0.04 
 Lab Sample ID = 20143560049  Analysis Date = 01/07/2015 
 Lab Value = 0.0076 
 RPT Level = 0.04 
 Lab Sample ID = 20143490026  Analysis Date = 12/16/2014 
 Lab Value = 0.0305 
 RPT Level = 0.04 
 Lab Sample ID = 20143420020  Analysis Date = 12/12/2014 
 Lab Value = 0.0109 
 RPT Level = 0.04 
 Lab Sample ID = 20143360073  Analysis Date = 12/11/2014 
 Lab Value = 0.0177 
 RPT Level = 0.04 
 Lab Sample ID = 20143300036  Analysis Date = 12/08/2014 
 Lab Value = 0.0336 
 RPT Level = 0.04 
 Lab Sample ID = 20143230047  Analysis Date = 11/24/2014 
 Lab Value = 0.0299 
 RPT Level = 0.04 
 Lab Sample ID = 20143160029  Analysis Date = 11/20/2014 
 Lab Value = -0.006 
 RPT Level = 0.04 
 Lab Sample ID = 20143080087  Analysis Date = 11/12/2014 
 Lab Value = -0.002 
 RPT Level = 0.04 
 Lab Sample ID = 20143010065  Analysis Date = 11/07/2014 
 Lab Value = -0.006 
 RPT Level = 0.04 
 Lab Sample ID = 20142950122  Analysis Date = 10/22/2014 
 Lab Value = -0.011 
 RPT Level = 0.04 
 Lab Sample ID = 20142880084  Analysis Date = 10/15/2014 
 Lab Value = -0.015 
 RPT Level = 0.04 
 Lab Sample ID = 20142790031  Analysis Date = 10/02/2014 
 Lab Value = 0.0092 
 RPT Level = 0.04 
 Lab Sample ID = 20142720101  Analysis Date = 09/24/2014 
 Lab Value = 0.0132 
 RPT Level = 0.04 
 Lab Sample ID = 20142650106  Analysis Date = 09/24/2014 
 Lab Value = 0.0017 
 RPT Level = 0.04 
 Lab Sample ID = 20142590046  Analysis Date = 09/15/2014 
 Lab Value = 0.0203 
 RPT Level = 0.04 
 Lab Sample ID = 20142520024  Analysis Date = 09/10/2014 
 Lab Value = 0.0161 
 RPT Level = 0.04 
 Lab Sample ID = 20142470052  Analysis Date = 08/18/2014 
 Lab Value = -0.018 
 RPT Level = 0.04 
 Lab Sample ID = 20142230082  Analysis Date = 08/05/2014 
 Lab Value = -0.001 
 RPT Level = 0.04 
 Lab Sample ID = 20142160063  Analysis Date = 07/30/2014 
 Lab Value = 0.0237 
 RPT Level = 0.04 
 Lab Sample ID = 20142090217  Analysis Date = 07/24/2014 
 Lab Value = .00099 
 RPT Level = 0.04 
 Lab Sample ID = 20142030069  Analysis Date = 07/18/2014 
 Lab Value = 0.0034 
 RPT Level = 0.04 
 Lab Sample ID = 20141960042  Analysis Date = 07/09/2014 
 Lab Value = 0.0213 
 RPT Level = 0.04 
 Lab Sample ID = 20141890083  Analysis Date = 07/07/2014 
 Lab Value = 0.0059 
 RPT Level = 0.04 
 Lab Sample ID = 20141820118  Analysis Date = 06/26/2014 
 Lab Value = 0.0141 
 RPT Level = 0.04 
 Lab Sample ID = 20141750143  Analysis Date = 06/20/2014 
 Lab Value = -0.003 
 RPT Level = 0.04 
 Lab Sample ID = 20141680085  Analysis Date = 06/13/2014 
 Lab Value = 0.0141 
 RPT Level = 0.04 
 Lab Sample ID = 20141620033  Analysis Date = 06/05/2014 
 Lab Value = 0.0164 
 RPT Level = 0.04 
 Lab Sample ID = 20141550058  Analysis Date = 06/04/2014 
 Lab Value = 0.0032 
 RPT Level = 0.04 
 Lab Sample ID = 20141470144  Analysis Date = 05/28/2014 
 Lab Value = -0.005 
 RPT Level = 0.04 
 Lab Sample ID = 20141400011  Analysis Date = 05/16/2014 
 Lab Value = 0.0044 
 RPT Level = 0.04 
 Lab Sample ID = 20141340002  Analysis Date = 05/08/2014 
 Lab Value = 0.0164 
 RPT Level = 0.04 
 Lab Sample ID = 20141250086  Analysis Date = 04/30/2014 
 Lab Value = -0.009 
 RPT Level = 0.04 
 Lab Sample ID = 20141190022  Analysis Date = 04/28/2014 
 Lab Value = 0.0209 
 RPT Level = 0.04 
 Lab Sample ID = 20141130021  Analysis Date = 04/18/2014 
 Lab Value = 0.0019 
 RPT Level = 0.04 
 Lab Sample ID = 20141050008  Analysis Date = 04/10/2014 
 Lab Value = 0.0108 
 RPT Level = 0.04 
 Lab Sample ID = 20140970044  Analysis Date = 04/01/2014 
 Lab Value = -0.018 
 RPT Level = 0.04 
 Lab Sample ID = 20140900020  Analysis Date = 03/26/2014 
 Lab Value = -0.021 
 RPT Level = 0.04 
 Lab Sample ID = 20140840099  Analysis Date = 03/18/2014 
 Lab Value = 0.0071 
 RPT Level = 0.04 
 Lab Sample ID = 20140760039  Analysis Date = 03/13/2014 
 Lab Value = 0.0049 
 RPT Level = 0.04 
 Lab Sample ID = 20140690021  Analysis Date = 03/11/2014 
 Lab Value = -0.003 
 RPT Level = 0.04 
 Lab Sample ID = 20140630120  Analysis Date = 02/26/2014 
 Lab Value = -0.012 
 RPT Level = 0.04 
 Lab Sample ID = 20140550042  Analysis Date = 02/25/2014 
 Lab Value = -0.017 
 RPT Level = 0.04 
 Lab Sample ID = 20140490012  Analysis Date = 02/11/2014 
 Lab Value = 0.0151 
 RPT Level = 0.04 
 Lab Sample ID = 20140410005  Analysis Date = 02/06/2014 
 Lab Value = 0.0184 
 RPT Level = 0.04 
 Lab Sample ID = 20140340022  Analysis Date = 01/30/2014 
 Lab Value = 0.0045 
 RPT Level = 0.04 
 Lab Sample ID = 20140270193  Analysis Date = 01/24/2014 
 Lab Value = 0.0076 
 RPT Level = 0.04 
 Lab Sample ID = 20140210036  Analysis Date = 01/15/2014 
 Lab Value = 0.067 
 RPT Level = 0.04 
 Lab Sample ID = 20140130049  Analysis Date = 01/15/2014 
 Lab Value = 0.0107 
 RPT Level = 0.04 
 Lab Sample ID = 20140070067  Analysis Date = 01/07/2014 
 Lab Value = -0.002 
 RPT Level = 0.04 
 Lab Sample ID = 20133580053  Analysis Date = 12/19/2013 
 Lab Value = -0.024 
 RPT Level = 0.04 
 Lab Sample ID = 20133500067  Analysis Date = 12/17/2013 
 Lab Value = -0.032 
 RPT Level = 0.04 
 Lab Sample ID = 20133430107  Analysis Date = 12/10/2013 
 Lab Value = -0.004 
 RPT Level = 0.04 
 Lab Sample ID = 20133360022  Analysis Date = 11/29/2013 
 Lab Value = -0.029 
 RPT Level = 0.04 
 Lab Sample ID = 20133300012  Analysis Date = 11/21/2013 
 Lab Value = 0.0023 
 RPT Level = 0.04 
 Lab Sample ID = 20133230003  Analysis Date = 11/14/2013 
 Lab Value = 0.012 
 RPT Level = 0.04 
 Lab Sample ID = 20133170105  Analysis Date = 11/07/2013 
 Lab Value = 0.028 
 RPT Level = 0.04 
 Lab Sample ID = 20133090098  Analysis Date = 11/04/2013 
 Lab Value = 0.0211 
 RPT Level = 0.04 
 Lab Sample ID = 20133030027  Analysis Date = 10/30/2013 
 Lab Value = -0.002 
 RPT Level = 0.04 
 Lab Sample ID = 20132970027  Analysis Date = 10/18/2013 
 Lab Value = -0.005 
 RPT Level = 0.04 
 Lab Sample ID = 20132730140  Analysis Date = 09/25/2013 
 Lab Value = 0.025 
 RPT Level = 0.04 
 Lab Sample ID = 20132660104  Analysis Date = 09/19/2013 
 Lab Value = 0.0058 
 RPT Level = 0.04 
 Lab Sample ID = 20132600015  Analysis Date = 09/11/2013 
 Lab Value = 0.0067 
 RPT Level = 0.04 
 Lab Sample ID = 20132530113  Analysis Date = 09/05/2013 
 Lab Value = 0.017 
 RPT Level = 0.04 
 Lab Sample ID = 20132410009  Analysis Date = 09/05/2013 
 Lab Value = 0.0298 
 RPT Level = 0.04 
 Lab Sample ID = 20132390012  Analysis Date = 08/27/2013 
 Lab Value = 0.0068 
 RPT Level = 0.04 
 Lab Sample ID = 20132350027  Analysis Date = 08/16/2013 
 Lab Value = -0.002 
 RPT Level = 0.04 
 Lab Sample ID = 20132270018  Analysis Date = 08/09/2013 
 Lab Value = 0.0056 
 RPT Level = 0.04 
 Lab Sample ID = 20132180181  Analysis Date = 08/01/2013 
 Lab Value = 0.0083 
 RPT Level = 0.04 
 Lab Sample ID = 20132120027  Analysis Date = 07/24/2013 
 Lab Value = 0.0234 
 RPT Level = 0.04 
 Lab Sample ID = 20132040021  Analysis Date = 07/23/2013 
 Lab Value = 0.025 
 RPT Level = 0.04 
 Lab Sample ID = 20131970028  Analysis Date = 07/12/2013 
 Lab Value = -37E-5 
 RPT Level = 0.04 
 Lab Sample ID = 20131900090  Analysis Date = 07/03/2013 
 Lab Value = 0.0068 
 RPT Level = 0.04 
 Lab Sample ID = 20131830073  Analysis Date = 07/01/2013 
 Lab Value = 0.0126 
 RPT Level = 0.04 
 Lab Sample ID = 20131770013  Analysis Date = 06/21/2013 
 Lab Value = 0.0092 
 RPT Level = 0.04 
 Lab Sample ID = 20131700038  Analysis Date = 06/17/2013 
 Lab Value = 0.0195 
 RPT Level = 0.04 
 Lab Sample ID = 20131640004  Analysis Date = 06/06/2013 
 Lab Value = 0.0076 
 RPT Level = 0.04 
 Lab Sample ID = 20131550029  Analysis Date = 06/04/2013 
 Lab Value = -0.028 
 RPT Level = 0.04 
 Lab Sample ID = 20131500013  Analysis Date = 05/24/2013 
 Lab Value = 0.0254 
 RPT Level = 0.04 
 Lab Sample ID = 20131430198  Analysis Date = 05/21/2013 
 Lab Value = 0.0101 
 RPT Level = 0.04 
 Lab Sample ID = 20131350129  Analysis Date = 05/06/2013 
 Lab Value = 0.0068 
 RPT Level = 0.04 
 Lab Sample ID = 20131220014  Analysis Date = 04/29/2013 
 Lab Value = 0.0059 
 RPT Level = 0.04 
 Lab Sample ID = 20131150015  Analysis Date = 04/26/2013 
 Lab Value = -0.017 
 RPT Level = 0.04 
 Lab Sample ID = 20131120125  Analysis Date = 04/25/2013 
 Lab Value = -0.004 
 RPT Level = 0.04 
 Lab Sample ID = 20131090030  Analysis Date = 04/05/2013 
 Lab Value = -0.034 
 RPT Level = 0.04 
 Lab Sample ID = 20130930087  Analysis Date = 03/27/2013 
 Lab Value = 0.0007 
 RPT Level = 0.04 
 Lab Sample ID = 20130840058  Analysis Date = 03/20/2013 
 Lab Value = -0.009 
 RPT Level = 0.04 
 Lab Sample ID = 20130770160  Analysis Date = 03/12/2013 
 Lab Value = 0.0119 
 RPT Level = 0.04 
 Lab Sample ID = 20130700013  Analysis Date = 03/05/2013 
 Lab Value = 0.0222 
 RPT Level = 0.04 
 Lab Sample ID = 20130630124  Analysis Date = 02/28/2013 
 Lab Value = -34E-5 
 RPT Level = 0.04 
 Lab Sample ID = 20130570007  Analysis Date = 02/22/2013 
 Lab Value = -0.014 
 RPT Level = 0.04 
 Lab Sample ID = 20130520006  Analysis Date = 02/12/2013 
 Lab Value = 0.009 
 RPT Level = 0.04 
 Lab Sample ID = 20130420052  Analysis Date = 02/06/2013 
 Lab Value = 0.0115 
 RPT Level = 0.04 
 Lab Sample ID = 20130350029  Analysis Date = 01/30/2013 
 Lab Value = 0.0448 
 RPT Level = 0.04 
 Lab Sample ID = 20130280039  Analysis Date = 01/25/2013 
 Lab Value = -0.025 
 RPT Level = 0.04 
 Lab Sample ID = 20130230099  Analysis Date = 01/15/2013 
 Lab Value = -0.016 
 RPT Level = 0.04 
 Lab Sample ID = 20130140071  Analysis Date = 01/08/2013 
 Lab Value = -0.014 
 RPT Level = 0.04 
 Lab Sample ID = 20130070056  Analysis Date = 01/03/2013 
 Lab Value = 0.0058 
 RPT Level = 0.04 
 Lab Sample ID = 20130020010  Analysis Date = 01/03/2013 
 Lab Value = 0.0051 
 RPT Level = 0.04 
 Lab Sample ID = 20123620011  Analysis Date = 12/20/2012 
 Lab Value = -0.002 
 RPT Level = 0.04 
 Lab Sample ID = 20123530084  Analysis Date = 12/17/2012 
 Lab Value = 0.0197 
 RPT Level = 0.04 
 Lab Sample ID = 20123480061  Analysis Date = 12/06/2012 
 Lab Value = 0.0036 
 RPT Level = 0.04 
 Lab Sample ID = 20123390115  Analysis Date = 11/30/2012 
 Lab Value = -0.003 
 RPT Level = 0.04 
 Lab Sample ID = 20123330010  Analysis Date = 11/21/2012 
 Lab Value = -0.006 
 RPT Level = 0.04 
 Lab Sample ID = 20123250063  Analysis Date = 11/16/2012 
 Lab Value = 0.0097 
 RPT Level = 0.04 
 Lab Sample ID = 20123200054  Analysis Date = 11/08/2012 
 Lab Value = 0.0051 
 RPT Level = 0.04 
 Lab Sample ID = 20123120066  Analysis Date = 11/05/2012 
 Lab Value = 0.023 
 RPT Level = 0.04 
 Lab Sample ID = 20123040119  Analysis Date = 10/25/2012 
 Lab Value = 0.0042 
 RPT Level = 0.04 
 Lab Sample ID = 20122980126  Analysis Date = 10/18/2012 
 Lab Value = 0.0079 
 RPT Level = 0.04 
 Lab Sample ID = 20122900096  Analysis Date = 10/12/2012 
 Lab Value = 0.0013 
 RPT Level = 0.04 
 Lab Sample ID = 20122830034  Analysis Date = 10/02/2012 
 Lab Value = 0.0193 
 RPT Level = 0.04 
 Lab Sample ID = 20122750025  Analysis Date = 10/02/2012 
 Lab Value = 0.0223 
 RPT Level = 0.04 
 Lab Sample ID = 20122700110  Analysis Date = 10/02/2012 
 Lab Value = 0.0285 
 RPT Level = 0.04 
 Lab Sample ID = 20122690153  Analysis Date = 09/12/2012 
 Lab Value = 0.0172 
 RPT Level = 0.04 
 Lab Sample ID = 20122550016  Analysis Date = 09/10/2012 
 Lab Value = 0.0166 
 RPT Level = 0.04 
 Lab Sample ID = 20122490102  Analysis Date = 08/30/2012 
 Lab Value = 0.0063 
 RPT Level = 0.04 
 Lab Sample ID = 20122410013  Analysis Date = 08/27/2012 
 Lab Value = -0.003 
 RPT Level = 0.04 
 Lab Sample ID = 20122350175  Analysis Date = 08/16/2012 
 Lab Value = 0.0022 
 RPT Level = 0.04 
 Lab Sample ID = 20122280090  Analysis Date = 08/09/2012 
 Lab Value = 0.0137 
 RPT Level = 0.04 
 Lab Sample ID = 20122190099  Analysis Date = 08/06/2012 
 Lab Value = 0.0152 
 RPT Level = 0.04 
 Lab Sample ID = 20122140050  Analysis Date = 07/25/2012 
 Lab Value = -0.001 
 RPT Level = 0.04 
 Lab Sample ID = 20122050101  Analysis Date = 07/19/2012 
 Lab Value = -0.001 
 RPT Level = 0.04 
 Lab Sample ID = 20121990080  Analysis Date = 07/12/2012 
 Lab Value = 0.0381 
 RPT Level = 0.04 
 Lab Sample ID = 20121910041  Analysis Date = 07/09/2012 
 Lab Value = -0.012 
 RPT Level = 0.04 
 Lab Sample ID = 20121870014  Analysis Date = 06/27/2012 
 Lab Value = 0.0349 
 RPT Level = 0.04 
 Lab Sample ID = 20121780033  Analysis Date = 06/20/2012 
 Lab Value = 0.0117 
 RPT Level = 0.04 
 Lab Sample ID = 20121710006  Analysis Date = 06/18/2012 
 Lab Value = -0.004 
 RPT Level = 0.04 
 Lab Sample ID = 20121650052  Analysis Date = 06/11/2012 
 Lab Value = 0.0258 
 RPT Level = 0.04 
 Lab Sample ID = 20121560125  Analysis Date = 06/08/2012 
 Lab Value = 0.0161 
 RPT Level = 0.04 
 Lab Sample ID = 20121510037  Analysis Date = 06/06/2012 
 Lab Value = 0.0271 
 RPT Level = 0.04 
 Lab Sample ID = 20121430021  Analysis Date = 05/17/2012 
 Lab Value = 0.055 
 RPT Level = 0.04 
 Lab Sample ID = 20121370053  Analysis Date = 05/10/2012 
 Lab Value = 0.0129 
 RPT Level = 0.04 
 Lab Sample ID = 20121290072  Analysis Date = 05/03/2012 
 Lab Value = 0.0113 
 RPT Level = 0.04 
 Lab Sample ID = 20121210123  Analysis Date = 04/27/2012 
 Lab Value = 0.0184 
 RPT Level = 0.04 
 Lab Sample ID = 20121150089  Analysis Date = 06/06/2012 
 Lab Value = 0.0378 
 RPT Level = 0.04 
 Lab Sample ID = 20121080009  Analysis Date = 04/17/2012 
 Lab Value = 0.0164 
 RPT Level = 0.04 
 Lab Sample ID = 20121010029  Analysis Date = 04/05/2012 
 Lab Value = 0.0127 
 RPT Level = 0.04 
 Lab Sample ID = 20120930058  Analysis Date = 03/29/2012 
 Lab Value = .00032 
 RPT Level = 0.04 
 Lab Sample ID = 20120870035  Analysis Date = 03/21/2012 
 Lab Value = 0.0116 
 RPT Level = 0.04 
 Lab Sample ID = 20120790085  Analysis Date = 03/15/2012 
 Lab Value = 0.0637 
 RPT Level = 0.04 
 Lab Sample ID = 20120730079  Analysis Date = 03/12/2012 
 Lab Value = 0.0253 
 RPT Level = 0.04 
 Lab Sample ID = 20120660073  Analysis Date = 03/05/2012 
 Lab Value = 0.0184 
 RPT Level = 0.04 
 Lab Sample ID = 20120580047  Analysis Date = 02/28/2012 
 Lab Value = -0.007 
 RPT Level = 0.04 
 Lab Sample ID = 20120530099  Analysis Date = 02/21/2012 
 Lab Value = 0.0163 
 RPT Level = 0.04 
 Lab Sample ID = 20120450020  Analysis Date = 02/10/2012 
 Lab Value = -0.037 
 RPT Level = 0.04 
 Lab Sample ID = 20120370064  Analysis Date = 02/02/2012 
 Lab Value = 0.0337 
 RPT Level = 0.04 
 Lab Sample ID = 20120310012  Analysis Date = 01/25/2012 
 Lab Value = 0.0015 
 RPT Level = 0.04 
 Lab Sample ID = 20120230046  Analysis Date = 01/25/2012 
 Lab Value = -0.006 
 RPT Level = 0.04 
 Lab Sample ID = 20120180013  Analysis Date = 01/11/2012 
 Lab Value = 0.0228 
 RPT Level = 0.04 
 Lab Sample ID = 20120090052  Analysis Date = 01/11/2012 
 Lab Value = 0.017 
 RPT Level = 0.04 
 Lab Sample ID = 20120030028  Analysis Date = 01/03/2012 
 Lab Value = 0.0225 
 RPT Level = 0.04 
 Lab Sample ID = 20113610089  Analysis Date = 12/21/2011 
 Lab Value = 0.0135 
 RPT Level = 0.04 
 Lab Sample ID = 20113530139  Analysis Date = 12/19/2011 
 Lab Value = 0.0029 
 RPT Level = 0.04 
 Lab Sample ID = 20113490075  Analysis Date = 12/14/2011 
 Lab Value = 0.0312 
 RPT Level = 0.04 
 Lab Sample ID = 20113460137  Analysis Date = 11/30/2011 
 Lab Value = 0.0234 
 RPT Level = 0.04 
 Lab Sample ID = 20113320115  Analysis Date = 11/28/2011 
 Lab Value = 0.0689 
 RPT Level = 0.04 
 Lab Sample ID = 20113250126  Analysis Date = 11/15/2011 
 Lab Value = 0.0048 
 RPT Level = 0.04 
 Lab Sample ID = 20113180164  Analysis Date = 11/15/2011 
 Lab Value = 0.0161 
 RPT Level = 0.04 
 Lab Sample ID = 20113110062  Analysis Date = 11/15/2011 
 Lab Value = 0.0131 
 RPT Level = 0.04 
 Lab Sample ID = 20113050092  Analysis Date = 10/26/2011 
 Lab Value = 0.0111 
 RPT Level = 0.04 
 Lab Sample ID = 20112970118  Analysis Date = 10/20/2011 
 Lab Value = 0.0097 
 RPT Level = 0.04 
 Lab Sample ID = 20112910137  Analysis Date = 09/21/2016 
 RPT Level = 0.04  Analysis Date = 09/21/2016 
 RPT Level = 0.04  Analysis Date = 09/21/2016 
 RPT Level = 0.04  Analysis Date = 09/02/2016 
 RPT Level = 0.04  Analysis Date = 09/02/2016 
 RPT Level = 0.04  Analysis Date = 08/25/2016 
 RPT Level = 0.04  Analysis Date = 08/25/2016 
 RPT Level = 0.04  Analysis Date = 08/23/2016 
 RPT Level = 0.04  Analysis Date = 08/23/2016 
 RPT Level = 0.04  Analysis Date = 08/17/2016 
 RPT Level = 0.04  Analysis Date = 08/17/2016 
 RPT Level = 0.04  Analysis Date = 08/09/2016 
 RPT Level = 0.04  Analysis Date = 08/09/2016 
 RPT Level = 0.04  Analysis Date = 07/26/2016 
 RPT Level = 0.04  Analysis Date = 07/26/2016 
 RPT Level = 0.04  Analysis Date = 07/19/2016 
 RPT Level = 0.04  Analysis Date = 07/19/2016 
 RPT Level = 0.04  Analysis Date = 07/13/2016 
 RPT Level = 0.04  Analysis Date = 07/13/2016 
 RPT Level = 0.04  Analysis Date = 07/12/2016 
 RPT Level = 0.04  Analysis Date = 07/12/2016 
 RPT Level = 0.04  Analysis Date = 06/27/2016 
 RPT Level = 0.04  Analysis Date = 06/27/2016 
 RPT Level = 0.04  Analysis Date = 06/21/2016 
 RPT Level = 0.04  Analysis Date = 06/21/2016 
 RPT Level = 0.04  Analysis Date = 06/13/2016 
 RPT Level = 0.04  Analysis Date = 06/13/2016 
 RPT Level = 0.04  Analysis Date = 06/07/2016 
 RPT Level = 0.04  Analysis Date = 06/07/2016 
 RPT Level = 0.04  Analysis Date = 06/07/2016 
 RPT Level = 0.04  Analysis Date = 06/07/2016 
 RPT Level = 0.04  Analysis Date = 05/09/2016 
 RPT Level = 0.04  Analysis Date = 05/09/2016 
 RPT Level = 0.04  Analysis Date = 05/03/2016 
 RPT Level = 0.04  Analysis Date = 05/03/2016 
 RPT Level = 0.04  Analysis Date = 05/03/2016 
 RPT Level = 0.04  Analysis Date = 05/03/2016 
 RPT Level = 0.04  Analysis Date = 04/22/2016 
 RPT Level = 0.04  Analysis Date = 04/22/2016 
 RPT Level = 0.04  Analysis Date = 04/19/2016 
 RPT Level = 0.04  Analysis Date = 04/19/2016 
 RPT Level = 0.04  Analysis Date = 04/11/2016 
 RPT Level = 0.04  Analysis Date = 04/11/2016 
 RPT Level = 0.04  Analysis Date = 04/05/2016 
 RPT Level = 0.04  Analysis Date = 04/05/2016 
 RPT Level = 0.04  Analysis Date = 03/30/2016 
 RPT Level = 0.04  Analysis Date = 03/30/2016 
 RPT Level = 0.04  Analysis Date = 03/25/2016 
 RPT Level = 0.04  Analysis Date = 03/25/2016 
 RPT Level = 0.04  Analysis Date = 03/10/2016 
 RPT Level = 0.04  Analysis Date = 03/10/2016 
 RPT Level = 0.04  Analysis Date = 03/07/2016 
 RPT Level = 0.04  Analysis Date = 03/07/2016 
 RPT Level = 0.04  Analysis Date = 03/01/2016 
 RPT Level = 0.04  Analysis Date = 03/01/2016 
 RPT Level = 0.04  Analysis Date = 02/23/2016 
 RPT Level = 0.04  Analysis Date = 02/23/2016 
 RPT Level = 0.04  Analysis Date = 02/22/2016 
 RPT Level = 0.04  Analysis Date = 02/22/2016 
 RPT Level = 0.04  Analysis Date = 02/04/2016 
 RPT Level = 0.04  Analysis Date = 02/04/2016 
 RPT Level = 0.04  Analysis Date = 01/28/2016 
 RPT Level = 0.04  Analysis Date = 01/28/2016 
 RPT Level = 0.04  Analysis Date = 01/28/2016 
 RPT Level = 0.04  Analysis Date = 01/28/2016 
 RPT Level = 0.04  Analysis Date = 01/20/2016 
 RPT Level = 0.04  Analysis Date = 01/20/2016 
 RPT Level = 0.04  Analysis Date = 01/07/2016 
 RPT Level = 0.04  Analysis Date = 01/07/2016 
 RPT Level = 0.04  Analysis Date = 01/05/2016 
 RPT Level = 0.04  Analysis Date = 01/05/2016 
 RPT Level = 0.04  Analysis Date = 12/31/2015 
 RPT Level = 0.04  Analysis Date = 12/31/2015 
 RPT Level = 0.04  Analysis Date = 12/23/2015 
 RPT Level = 0.04  Analysis Date = 12/23/2015 
 RPT Level = 0.04  Analysis Date = 12/15/2015 
 RPT Level = 0.04  Analysis Date = 12/15/2015 
 RPT Level = 0.04  Analysis Date = 12/02/2015 
 RPT Level = 0.04  Analysis Date = 12/02/2015 
 RPT Level = 0.04  Analysis Date = 12/02/2015 
 RPT Level = 0.04  Analysis Date = 12/02/2015 
 RPT Level = 0.04  Analysis Date = 11/23/2015 
 RPT Level = 0.04  Analysis Date = 11/23/2015 
 RPT Level = 0.04  Analysis Date = 11/20/2015 
 RPT Level = 0.04  Analysis Date = 11/20/2015 
 RPT Level = 0.04  Analysis Date = 11/06/2015 
 RPT Level = 0.04  Analysis Date = 11/06/2015 
 RPT Level = 0.04  Analysis Date = 11/03/2015 
 RPT Level = 0.04  Analysis Date = 11/03/2015 
 RPT Level = 0.04  Analysis Date = 10/23/2015 
 RPT Level = 0.04  Analysis Date = 10/23/2015 
 RPT Level = 0.04  Analysis Date = 10/22/2015 
 RPT Level = 0.04  Analysis Date = 10/22/2015 
 RPT Level = 0.04  Analysis Date = 10/09/2015 
 RPT Level = 0.04  Analysis Date = 10/09/2015 
 RPT Level = 0.04  Analysis Date = 09/29/2015 
 RPT Level = 0.04  Analysis Date = 09/29/2015 
 RPT Level = 0.04  Analysis Date = 09/28/2015 
 RPT Level = 0.04  Analysis Date = 09/28/2015 
 RPT Level = 0.04  Analysis Date = 09/25/2015 
 RPT Level = 0.04  Analysis Date = 09/25/2015 
 RPT Level = 0.04  Analysis Date = 09/21/2015 
 RPT Level = 0.04  Analysis Date = 09/21/2015 
 RPT Level = 0.04  Analysis Date = 09/14/2015 
 RPT Level = 0.04  Analysis Date = 09/14/2015 
 RPT Level = 0.04  Analysis Date = 09/01/2015 
 RPT Level = 0.04  Analysis Date = 09/01/2015 
 RPT Level = 0.04  Analysis Date = 09/01/2015 
 RPT Level = 0.04  Analysis Date = 09/01/2015 
 RPT Level = 0.04  Analysis Date = 08/18/2015 
 RPT Level = 0.04  Analysis Date = 08/18/2015 
 RPT Level = 0.04  Analysis Date = 08/10/2015 
 RPT Level = 0.04  Analysis Date = 08/10/2015 
 RPT Level = 0.04  Analysis Date = 07/31/2015 
 RPT Level = 0.04  Analysis Date = 07/31/2015 
 RPT Level = 0.04  Analysis Date = 07/22/2015 
 RPT Level = 0.04  Analysis Date = 07/22/2015 
 RPT Level = 0.04  Analysis Date = 07/16/2015 
 RPT Level = 0.04  Analysis Date = 07/16/2015 
 RPT Level = 0.04  Analysis Date = 07/09/2015 
 RPT Level = 0.04  Analysis Date = 07/09/2015 
 RPT Level = 0.04  Analysis Date = 07/08/2015 
 RPT Level = 0.04  Analysis Date = 07/08/2015 
 RPT Level = 0.04  Analysis Date = 07/07/2015 
 RPT Level = 0.04  Analysis Date = 07/07/2015 
 RPT Level = 0.04  Analysis Date = 06/24/2015 
 RPT Level = 0.04  Analysis Date = 06/24/2015 
 RPT Level = 0.04  Analysis Date = 06/23/2015 
 RPT Level = 0.04  Analysis Date = 06/23/2015 
 RPT Level = 0.04  Analysis Date = 06/05/2015 
 RPT Level = 0.04  Analysis Date = 06/05/2015 
 RPT Level = 0.04  Analysis Date = 05/27/2015 
 RPT Level = 0.04  Analysis Date = 05/27/2015 
 RPT Level = 0.04  Analysis Date = 05/21/2015 
 RPT Level = 0.04  Analysis Date = 05/21/2015 
 RPT Level = 0.04  Analysis Date = 05/14/2015 
 RPT Level = 0.04  Analysis Date = 05/14/2015 
 RPT Level = 0.04  Analysis Date = 05/14/2015 
 RPT Level = 0.04  Analysis Date = 05/14/2015 
 RPT Level = 0.04  Analysis Date = 05/06/2015 
 RPT Level = 0.04  Analysis Date = 05/06/2015 
 RPT Level = 0.04  Analysis Date = 05/01/2015 
 RPT Level = 0.04  Analysis Date = 05/01/2015 
 RPT Level = 0.04  Analysis Date = 04/16/2015 
 RPT Level = 0.04  Analysis Date = 04/16/2015 
 RPT Level = 0.04  Analysis Date = 04/13/2015 
 RPT Level = 0.04  Analysis Date = 04/13/2015 
 RPT Level = 0.04  Analysis Date = 04/08/2015 
 RPT Level = 0.04  Analysis Date = 04/08/2015 
 RPT Level = 0.04  Analysis Date = 04/06/2015 
 RPT Level = 0.04  Analysis Date = 04/06/2015 
 RPT Level = 0.04  Analysis Date = 03/27/2015 
 RPT Level = 0.04  Analysis Date = 03/27/2015 
 RPT Level = 0.04  Analysis Date = 03/11/2015 
 RPT Level = 0.04  Analysis Date = 03/11/2015 
 RPT Level = 0.04  Analysis Date = 03/05/2015 
 RPT Level = 0.04  Analysis Date = 03/05/2015 
 RPT Level = 0.04  Analysis Date = 02/27/2015 
 RPT Level = 0.04  Analysis Date = 02/27/2015 
 RPT Level = 0.04  Analysis Date = 02/26/2015 
 RPT Level = 0.04  Analysis Date = 02/26/2015 
 RPT Level = 0.04  Analysis Date = 02/17/2015 
 RPT Level = 0.04  Analysis Date = 02/17/2015 
 RPT Level = 0.04  Analysis Date = 02/12/2015 
 RPT Level = 0.04  Analysis Date = 02/12/2015 
 RPT Level = 0.04  Analysis Date = 02/03/2015 
 RPT Level = 0.04  Analysis Date = 02/03/2015 
 RPT Level = 0.04  Analysis Date = 01/28/2015 
 RPT Level = 0.04  Analysis Date = 01/28/2015 
 RPT Level = 0.04  Analysis Date = 01/22/2015 
 RPT Level = 0.04  Analysis Date = 01/22/2015 
 RPT Level = 0.04  Analysis Date = 01/15/2015 
 RPT Level = 0.04  Analysis Date = 01/15/2015 
 RPT Level = 0.04  Analysis Date = 01/13/2015 
 RPT Level = 0.04  Analysis Date = 01/13/2015 
 RPT Level = 0.04  Analysis Date = 01/07/2015 
 RPT Level = 0.04  Analysis Date = 01/07/2015 
 RPT Level = 0.04  Analysis Date = 01/07/2015 
 RPT Level = 0.04  Analysis Date = 01/07/2015 
 RPT Level = 0.04  Analysis Date = 12/16/2014 
 RPT Level = 0.04  Analysis Date = 12/16/2014 
 RPT Level = 0.04  Analysis Date = 12/12/2014 
 RPT Level = 0.04  Analysis Date = 12/12/2014 
 RPT Level = 0.04  Analysis Date = 12/11/2014 
 RPT Level = 0.04  Analysis Date = 12/11/2014 
 RPT Level = 0.04  Analysis Date = 12/08/2014 
 RPT Level = 0.04  Analysis Date = 12/08/2014 
 RPT Level = 0.04  Analysis Date = 11/24/2014 
 RPT Level = 0.04  Analysis Date = 11/24/2014 
 RPT Level = 0.04  Analysis Date = 11/20/2014 
 RPT Level = 0.04  Analysis Date = 11/20/2014 
 RPT Level = 0.04  Analysis Date = 11/12/2014 
 RPT Level = 0.04  Analysis Date = 11/12/2014 
 RPT Level = 0.04  Analysis Date = 11/07/2014 
 RPT Level = 0.04  Analysis Date = 11/07/2014 
 RPT Level = 0.04  Analysis Date = 10/22/2014 
 RPT Level = 0.04  Analysis Date = 10/22/2014 
 RPT Level = 0.04  Analysis Date = 10/15/2014 
 RPT Level = 0.04  Analysis Date = 10/15/2014 
 RPT Level = 0.04  Analysis Date = 10/02/2014 
 RPT Level = 0.04  Analysis Date = 10/02/2014 
 RPT Level = 0.04  Analysis Date = 09/24/2014 
 RPT Level = 0.04  Analysis Date = 09/24/2014 
 RPT Level = 0.04  Analysis Date = 09/24/2014 
 RPT Level = 0.04  Analysis Date = 09/24/2014 
 RPT Level = 0.04  Analysis Date = 09/15/2014 
 RPT Level = 0.04  Analysis Date = 09/15/2014 
 RPT Level = 0.04  Analysis Date = 09/10/2014 
 RPT Level = 0.04  Analysis Date = 09/10/2014 
 RPT Level = 0.04  Analysis Date = 08/18/2014 
 RPT Level = 0.04  Analysis Date = 08/18/2014 
 RPT Level = 0.04  Analysis Date = 08/05/2014 
 RPT Level = 0.04  Analysis Date = 08/05/2014 
 RPT Level = 0.04  Analysis Date = 07/30/2014 
 RPT Level = 0.04  Analysis Date = 07/30/2014 
 RPT Level = 0.04  Analysis Date = 07/24/2014 
 RPT Level = 0.04  Analysis Date = 07/24/2014 
 RPT Level = 0.04  Analysis Date = 07/18/2014 
 RPT Level = 0.04  Analysis Date = 07/18/2014 
 RPT Level = 0.04  Analysis Date = 07/09/2014 
 RPT Level = 0.04  Analysis Date = 07/09/2014 
 RPT Level = 0.04  Analysis Date = 07/07/2014 
 RPT Level = 0.04  Analysis Date = 07/07/2014 
 RPT Level = 0.04  Analysis Date = 06/26/2014 
 RPT Level = 0.04  Analysis Date = 06/26/2014 
 RPT Level = 0.04  Analysis Date = 06/20/2014 
 RPT Level = 0.04  Analysis Date = 06/20/2014 
 RPT Level = 0.04  Analysis Date = 06/13/2014 
 RPT Level = 0.04  Analysis Date = 06/13/2014 
 RPT Level = 0.04  Analysis Date = 06/05/2014 
 RPT Level = 0.04  Analysis Date = 06/05/2014 
 RPT Level = 0.04  Analysis Date = 06/04/2014 
 RPT Level = 0.04  Analysis Date = 06/04/2014 
 RPT Level = 0.04  Analysis Date = 05/28/2014 
 RPT Level = 0.04  Analysis Date = 05/28/2014 
 RPT Level = 0.04  Analysis Date = 05/16/2014 
 RPT Level = 0.04  Analysis Date = 05/16/2014 
 RPT Level = 0.04  Analysis Date = 05/08/2014 
 RPT Level = 0.04  Analysis Date = 05/08/2014 
 RPT Level = 0.04  Analysis Date = 04/30/2014 
 RPT Level = 0.04  Analysis Date = 04/30/2014 
 RPT Level = 0.04  Analysis Date = 04/28/2014 
 RPT Level = 0.04  Analysis Date = 04/28/2014 
 RPT Level = 0.04  Analysis Date = 04/18/2014 
 RPT Level = 0.04  Analysis Date = 04/18/2014 
 RPT Level = 0.04  Analysis Date = 04/10/2014 
 RPT Level = 0.04  Analysis Date = 04/10/2014 
 RPT Level = 0.04  Analysis Date = 04/01/2014 
 RPT Level = 0.04  Analysis Date = 04/01/2014 
 RPT Level = 0.04  Analysis Date = 03/26/2014 
 RPT Level = 0.04  Analysis Date = 03/26/2014 
 RPT Level = 0.04  Analysis Date = 03/18/2014 
 RPT Level = 0.04  Analysis Date = 03/18/2014 
 RPT Level = 0.04  Analysis Date = 03/13/2014 
 RPT Level = 0.04  Analysis Date = 03/13/2014 
 RPT Level = 0.04  Analysis Date = 03/11/2014 
 RPT Level = 0.04  Analysis Date = 03/11/2014 
 RPT Level = 0.04  Analysis Date = 02/26/2014 
 RPT Level = 0.04  Analysis Date = 02/26/2014 
 RPT Level = 0.04  Analysis Date = 02/25/2014 
 RPT Level = 0.04  Analysis Date = 02/25/2014 
 RPT Level = 0.04  Analysis Date = 02/11/2014 
 RPT Level = 0.04  Analysis Date = 02/11/2014 
 RPT Level = 0.04  Analysis Date = 02/06/2014 
 RPT Level = 0.04  Analysis Date = 02/06/2014 
 RPT Level = 0.04  Analysis Date = 01/30/2014 
 RPT Level = 0.04  Analysis Date = 01/30/2014 
 RPT Level = 0.04  Analysis Date = 01/24/2014 
 RPT Level = 0.04  Analysis Date = 01/24/2014 
 RPT Level = 0.04  Analysis Date = 01/15/2014 
 RPT Level = 0.04  Analysis Date = 01/15/2014 
 RPT Level = 0.04  Analysis Date = 01/15/2014 
 RPT Level = 0.04  Analysis Date = 01/15/2014 
 RPT Level = 0.04  Analysis Date = 01/07/2014 
 RPT Level = 0.04  Analysis Date = 01/07/2014 
 RPT Level = 0.04  Analysis Date = 12/19/2013 
 RPT Level = 0.04  Analysis Date = 12/19/2013 
 RPT Level = 0.04  Analysis Date = 12/17/2013 
 RPT Level = 0.04  Analysis Date = 12/17/2013 
 RPT Level = 0.04  Analysis Date = 12/10/2013 
 RPT Level = 0.04  Analysis Date = 12/10/2013 
 RPT Level = 0.04  Analysis Date = 11/29/2013 
 RPT Level = 0.04  Analysis Date = 11/29/2013 
 RPT Level = 0.04  Analysis Date = 11/21/2013 
 RPT Level = 0.04  Analysis Date = 11/21/2013 
 RPT Level = 0.04  Analysis Date = 11/14/2013 
 RPT Level = 0.04  Analysis Date = 11/14/2013 
 RPT Level = 0.04  Analysis Date = 11/07/2013 
 RPT Level = 0.04  Analysis Date = 11/07/2013 
 RPT Level = 0.04  Analysis Date = 11/04/2013 
 RPT Level = 0.04  Analysis Date = 11/04/2013 
 RPT Level = 0.04  Analysis Date = 10/30/2013 
 RPT Level = 0.04  Analysis Date = 10/30/2013 
 RPT Level = 0.04  Analysis Date = 10/18/2013 
 RPT Level = 0.04  Analysis Date = 10/18/2013 
 RPT Level = 0.04  Analysis Date = 09/25/2013 
 RPT Level = 0.04  Analysis Date = 09/25/2013 
 RPT Level = 0.04  Analysis Date = 09/19/2013 
 RPT Level = 0.04  Analysis Date = 09/19/2013 
 RPT Level = 0.04  Analysis Date = 09/11/2013 
 RPT Level = 0.04  Analysis Date = 09/11/2013 
 RPT Level = 0.04  Analysis Date = 09/05/2013 
 RPT Level = 0.04  Analysis Date = 09/05/2013 
 RPT Level = 0.04  Analysis Date = 09/05/2013 
 RPT Level = 0.04  Analysis Date = 09/05/2013 
 RPT Level = 0.04  Analysis Date = 08/27/2013 
 RPT Level = 0.04  Analysis Date = 08/27/2013 
 RPT Level = 0.04  Analysis Date = 08/16/2013 
 RPT Level = 0.04  Analysis Date = 08/16/2013 
 RPT Level = 0.04  Analysis Date = 08/09/2013 
 RPT Level = 0.04  Analysis Date = 08/09/2013 
 RPT Level = 0.04  Analysis Date = 08/01/2013 
 RPT Level = 0.04  Analysis Date = 08/01/2013 
 RPT Level = 0.04  Analysis Date = 07/24/2013 
 RPT Level = 0.04  Analysis Date = 07/24/2013 
 RPT Level = 0.04  Analysis Date = 07/23/2013 
 RPT Level = 0.04  Analysis Date = 07/23/2013 
 RPT Level = 0.04  Analysis Date = 07/12/2013 
 RPT Level = 0.04  Analysis Date = 07/12/2013 
 RPT Level = 0.04  Analysis Date = 07/03/2013 
 RPT Level = 0.04  Analysis Date = 07/03/2013 
 RPT Level = 0.04  Analysis Date = 07/01/2013 
 RPT Level = 0.04  Analysis Date = 07/01/2013 
 RPT Level = 0.04  Analysis Date = 06/21/2013 
 RPT Level = 0.04  Analysis Date = 06/21/2013 
 RPT Level = 0.04  Analysis Date = 06/17/2013 
 RPT Level = 0.04  Analysis Date = 06/17/2013 
 RPT Level = 0.04  Analysis Date = 06/06/2013 
 RPT Level = 0.04  Analysis Date = 06/06/2013 
 RPT Level = 0.04  Analysis Date = 06/04/2013 
 RPT Level = 0.04  Analysis Date = 06/04/2013 
 RPT Level = 0.04  Analysis Date = 05/24/2013 
 RPT Level = 0.04  Analysis Date = 05/24/2013 
 RPT Level = 0.04  Analysis Date = 05/21/2013 
 RPT Level = 0.04  Analysis Date = 05/21/2013 
 RPT Level = 0.04  Analysis Date = 05/08/2013 
 RPT Level = 0.04  Analysis Date = 05/08/2013 
 RPT Level = 0.04  Analysis Date = 05/06/2013 
 RPT Level = 0.04  Analysis Date = 05/06/2013 
 RPT Level = 0.04  Analysis Date = 04/29/2013 
 RPT Level = 0.04  Analysis Date = 04/29/2013 
 RPT Level = 0.04  Analysis Date = 04/26/2013 
 RPT Level = 0.04  Analysis Date = 04/26/2013 
 RPT Level = 0.04  Analysis Date = 04/25/2013 
 RPT Level = 0.04  Analysis Date = 04/25/2013 
 RPT Level = 0.04  Analysis Date = 04/05/2013 
 RPT Level = 0.04  Analysis Date = 04/05/2013 
 RPT Level = 0.04  Analysis Date = 03/27/2013 
 RPT Level = 0.04  Analysis Date = 03/27/2013 
 RPT Level = 0.04  Analysis Date = 03/20/2013 
 RPT Level = 0.04  Analysis Date = 03/20/2013 
 RPT Level = 0.04  Analysis Date = 03/12/2013 
 RPT Level = 0.04  Analysis Date = 03/12/2013 
 RPT Level = 0.04  Analysis Date = 03/05/2013 
 RPT Level = 0.04  Analysis Date = 03/05/2013 
 RPT Level = 0.04  Analysis Date = 02/28/2013 
 RPT Level = 0.04  Analysis Date = 02/28/2013 
 RPT Level = 0.04  Analysis Date = 02/22/2013 
 RPT Level = 0.04  Analysis Date = 02/22/2013 
 RPT Level = 0.04  Analysis Date = 02/12/2013 
 RPT Level = 0.04  Analysis Date = 02/12/2013 
 RPT Level = 0.04  Analysis Date = 02/06/2013 
 RPT Level = 0.04  Analysis Date = 02/06/2013 
 RPT Level = 0.04  Analysis Date = 01/30/2013 
 RPT Level = 0.04  Analysis Date = 01/30/2013 
 RPT Level = 0.04  Analysis Date = 01/25/2013 
 RPT Level = 0.04  Analysis Date = 01/25/2013 
 RPT Level = 0.04  Analysis Date = 01/15/2013 
 RPT Level = 0.04  Analysis Date = 01/15/2013 
 RPT Level = 0.04  Analysis Date = 01/08/2013 
 RPT Level = 0.04  Analysis Date = 01/08/2013 
 RPT Level = 0.04  Analysis Date = 01/03/2013 
 RPT Level = 0.04  Analysis Date = 01/03/2013 
 RPT Level = 0.04  Analysis Date = 01/03/2013 
 RPT Level = 0.04  Analysis Date = 01/03/2013 
 RPT Level = 0.04  Analysis Date = 12/20/2012 
 RPT Level = 0.04  Analysis Date = 12/20/2012 
 RPT Level = 0.04  Analysis Date = 12/17/2012 
 RPT Level = 0.04  Analysis Date = 12/17/2012 
 RPT Level = 0.04  Analysis Date = 12/06/2012 
 RPT Level = 0.04  Analysis Date = 12/06/2012 
 RPT Level = 0.04  Analysis Date = 11/30/2012 
 RPT Level = 0.04  Analysis Date = 11/30/2012 
 RPT Level = 0.04  Analysis Date = 11/21/2012 
 RPT Level = 0.04  Analysis Date = 11/21/2012 
 RPT Level = 0.04  Analysis Date = 11/16/2012 
 RPT Level = 0.04  Analysis Date = 11/16/2012 
 RPT Level = 0.04  Analysis Date = 11/08/2012 
 RPT Level = 0.04  Analysis Date = 11/08/2012 
 RPT Level = 0.04  Analysis Date = 11/05/2012 
 RPT Level = 0.04  Analysis Date = 11/05/2012 
 RPT Level = 0.04  Analysis Date = 10/25/2012 
 RPT Level = 0.04  Analysis Date = 10/25/2012 
 RPT Level = 0.04  Analysis Date = 10/18/2012 
 RPT Level = 0.04  Analysis Date = 10/18/2012 
 RPT Level = 0.04  Analysis Date = 10/12/2012 
 RPT Level = 0.04  Analysis Date = 10/12/2012 
 RPT Level = 0.04  Analysis Date = 10/02/2012 
 RPT Level = 0.04  Analysis Date = 10/02/2012 
 RPT Level = 0.04  Analysis Date = 10/02/2012 
 RPT Level = 0.04  Analysis Date = 10/02/2012 
 RPT Level = 0.04  Analysis Date = 10/02/2012 
 RPT Level = 0.04  Analysis Date = 10/02/2012 
 RPT Level = 0.04  Analysis Date = 09/12/2012 
 RPT Level = 0.04  Analysis Date = 09/12/2012 
 RPT Level = 0.04  Analysis Date = 09/10/2012 
 RPT Level = 0.04  Analysis Date = 09/10/2012 
 RPT Level = 0.04  Analysis Date = 08/30/2012 
 RPT Level = 0.04  Analysis Date = 08/30/2012 
 RPT Level = 0.04  Analysis Date = 08/27/2012 
 RPT Level = 0.04  Analysis Date = 08/27/2012 
 RPT Level = 0.04  Analysis Date = 08/16/2012 
 RPT Level = 0.04  Analysis Date = 08/16/2012 
 RPT Level = 0.04  Analysis Date = 08/09/2012 
 RPT Level = 0.04  Analysis Date = 08/09/2012 
 RPT Level = 0.04  Analysis Date = 08/06/2012 
 RPT Level = 0.04  Analysis Date = 08/06/2012 
 RPT Level = 0.04  Analysis Date = 07/25/2012 
 RPT Level = 0.04  Analysis Date = 07/25/2012 
 RPT Level = 0.04  Analysis Date = 07/19/2012 
 RPT Level = 0.04  Analysis Date = 07/19/2012 
 RPT Level = 0.04  Analysis Date = 07/12/2012 
 RPT Level = 0.04  Analysis Date = 07/12/2012 
 RPT Level = 0.04  Analysis Date = 07/09/2012 
 RPT Level = 0.04  Analysis Date = 07/09/2012 
 RPT Level = 0.04  Analysis Date = 06/27/2012 
 RPT Level = 0.04  Analysis Date = 06/27/2012 
 RPT Level = 0.04  Analysis Date = 06/20/2012 
 RPT Level = 0.04  Analysis Date = 06/20/2012 
 RPT Level = 0.04  Analysis Date = 06/18/2012 
 RPT Level = 0.04  Analysis Date = 06/18/2012 
 RPT Level = 0.04  Analysis Date = 06/11/2012 
 RPT Level = 0.04  Analysis Date = 06/11/2012 
 RPT Level = 0.04  Analysis Date = 06/08/2012 
 RPT Level = 0.04  Analysis Date = 06/08/2012 
 RPT Level = 0.04  Analysis Date = 06/06/2012 
 RPT Level = 0.04  Analysis Date = 06/06/2012 
 RPT Level = 0.04  Analysis Date = 05/17/2012 
 RPT Level = 0.04  Analysis Date = 05/17/2012 
 RPT Level = 0.04  Analysis Date = 05/10/2012 
 RPT Level = 0.04  Analysis Date = 05/10/2012 
 RPT Level = 0.04  Analysis Date = 05/03/2012 
 RPT Level = 0.04  Analysis Date = 05/03/2012 
 RPT Level = 0.04  Analysis Date = 04/27/2012 
 RPT Level = 0.04  Analysis Date = 04/27/2012 
 RPT Level = 0.04  Analysis Date = 06/06/2012 
 RPT Level = 0.04  Analysis Date = 06/06/2012 
 RPT Level = 0.04  Analysis Date = 04/17/2012 
 RPT Level = 0.04  Analysis Date = 04/17/2012 
 RPT Level = 0.04  Analysis Date = 04/05/2012 
 RPT Level = 0.04  Analysis Date = 04/05/2012 
 RPT Level = 0.04  Analysis Date = 03/29/2012 
 RPT Level = 0.04  Analysis Date = 03/29/2012 
 RPT Level = 0.04  Analysis Date = 03/21/2012 
 RPT Level = 0.04  Analysis Date = 03/21/2012 
 RPT Level = 0.04  Analysis Date = 03/15/2012 
 RPT Level = 0.04  Analysis Date = 03/15/2012 
 RPT Level = 0.04  Analysis Date = 03/12/2012 
 RPT Level = 0.04  Analysis Date = 03/12/2012 
 RPT Level = 0.04  Analysis Date = 03/05/2012 
 RPT Level = 0.04  Analysis Date = 03/05/2012 
 RPT Level = 0.04  Analysis Date = 02/28/2012 
 RPT Level = 0.04  Analysis Date = 02/28/2012 
 RPT Level = 0.04  Analysis Date = 02/21/2012 
 RPT Level = 0.04  Analysis Date = 02/21/2012 
 RPT Level = 0.04  Analysis Date = 02/10/2012 
 RPT Level = 0.04  Analysis Date = 02/10/2012 
 RPT Level = 0.04  Analysis Date = 02/02/2012 
 RPT Level = 0.04  Analysis Date = 02/02/2012 
 RPT Level = 0.04  Analysis Date = 01/25/2012 
 RPT Level = 0.04  Analysis Date = 01/25/2012 
 RPT Level = 0.04  Analysis Date = 01/25/2012 
 RPT Level = 0.04  Analysis Date = 01/25/2012 
 RPT Level = 0.04  Analysis Date = 01/11/2012 
 RPT Level = 0.04  Analysis Date = 01/11/2012 
 RPT Level = 0.04  Analysis Date = 01/11/2012 
 RPT Level = 0.04  Analysis Date = 01/11/2012 
 RPT Level = 0.04  Analysis Date = 01/03/2012 
 RPT Level = 0.04  Analysis Date = 01/03/2012 
 RPT Level = 0.04  Analysis Date = 12/21/2011 
 RPT Level = 0.04  Analysis Date = 12/21/2011 
 RPT Level = 0.04  Analysis Date = 12/19/2011 
 RPT Level = 0.04  Analysis Date = 12/19/2011 
 RPT Level = 0.04  Analysis Date = 12/14/2011 
 RPT Level = 0.04  Analysis Date = 12/14/2011 
 RPT Level = 0.04  Analysis Date = 11/30/2011 
 RPT Level = 0.04  Analysis Date = 11/30/2011 
 RPT Level = 0.04  Analysis Date = 11/28/2011 
 RPT Level = 0.04  Analysis Date = 11/28/2011 
 RPT Level = 0.04  Analysis Date = 11/15/2011 
 RPT Level = 0.04  Analysis Date = 11/15/2011 
 RPT Level = 0.04  Analysis Date = 11/15/2011 
 RPT Level = 0.04  Analysis Date = 11/15/2011 
 RPT Level = 0.04  Analysis Date = 11/15/2011 
 RPT Level = 0.04  Analysis Date = 11/15/2011 
 RPT Level = 0.04  Analysis Date = 10/26/2011 
 RPT Level = 0.04  Analysis Date = 10/26/2011 
 RPT Level = 0.04  Analysis Date = 10/20/2011 
 RPT Level = 0.04  Y = 0
The SGPlot Procedure

False Positive Rate for Nitrate plus Nitrite (NO3+NO2 as N), FIL, DA

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Nitrate plus Nitrite (NO3+NO2 as N), FIL, DA 00631RED01 2012 50 3 6%
    2013 53 2 4%
    2014 47 1 2%
    2015 52 3 6%
    2016 48 1 2%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Nitrate plus Nitrite (NO3+NO2 as N), FIL, DA, LL -
Blind Blank Results
Lab: NWQL, PCode: 00631, MCode: RED02
Analysis dates: 10/20/11 through 09/27/16
Open Data Set

 Analysis Date = 02/19/2015 
 Lab Value = 0.0525 
 RPT Level = 0.01 
 Lab Sample ID = 20150490025  Analysis Date = 11/10/2014 
 Lab Value = 0.037 
 RPT Level = 0.01 
 Lab Sample ID = 20143010065  Analysis Date = 07/31/2014 
 Lab Value = 0.0183 
 RPT Level = 0.01 
 Lab Sample ID = 20142030069  Analysis Date = 02/19/2015 
 Lab Value = 0.0525 
 RPT Level = 0.01 
 Lab Sample ID = 20150490025  Analysis Date = 11/10/2014 
 Lab Value = 0.037 
 RPT Level = 0.01 
 Lab Sample ID = 20143010065  Analysis Date = 07/31/2014 
 Lab Value = 0.0183 
 RPT Level = 0.01 
 Lab Sample ID = 20142030069  Analysis Date = 09/27/2016 
 Lab Value = 0.0017 
 RPT Level = 0.01 
 Lab Sample ID = 20162640173  Analysis Date = 09/15/2016 
 Lab Value = 0.0055 
 RPT Level = 0.01 
 Lab Sample ID = 20162580012  Analysis Date = 09/15/2016 
 Lab Value = 0.0029 
 RPT Level = 0.01 
 Lab Sample ID = 20162520025  Analysis Date = 09/15/2016 
 Lab Value = 0.0034 
 RPT Level = 0.01 
 Lab Sample ID = 20162440121  Analysis Date = 09/09/2016 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20162360195  Analysis Date = 08/29/2016 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20162290137  Analysis Date = 08/11/2016 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20162230008  Analysis Date = 08/11/2016 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20162150204  Analysis Date = 08/10/2016 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20162080232  Analysis Date = 07/29/2016 
 Lab Value = 0.0037 
 RPT Level = 0.01 
 Lab Sample ID = 20162010257  Analysis Date = 07/19/2016 
 Lab Value = 0.0017 
 RPT Level = 0.01 
 Lab Sample ID = 20161940107  Analysis Date = 07/19/2016 
 Lab Value = 0.0015 
 RPT Level = 0.01 
 Lab Sample ID = 20161870031  Analysis Date = 07/05/2016 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20161800082  Analysis Date = 06/23/2016 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20161740071  Analysis Date = 06/23/2016 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20161660156  Analysis Date = 06/17/2016 
 Lab Value = -19E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20161590152  Analysis Date = 06/08/2016 
 Lab Value = 0.0019 
 RPT Level = 0.01 
 Lab Sample ID = 20161520025  Analysis Date = 06/08/2016 
 Lab Value = .00045 
 RPT Level = 0.01 
 Lab Sample ID = 20161480189  Analysis Date = 05/16/2016 
 Lab Value = -85E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20161270006  Analysis Date = 05/16/2016 
 Lab Value = 0.0105 
 RPT Level = 0.01 
 Lab Sample ID = 20161230045  Analysis Date = 05/02/2016 
 Lab Value = 0.0029 
 RPT Level = 0.01 
 Lab Sample ID = 20161160091  Analysis Date = 05/02/2016 
 Lab Value = 0.0032 
 RPT Level = 0.01 
 Lab Sample ID = 20161100126  Analysis Date = 04/12/2016 
 Lab Value = 0.0022 
 RPT Level = 0.01 
 Lab Sample ID = 20161020027  Analysis Date = 04/07/2016 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20160950044  Analysis Date = 03/29/2016 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20160880040  Analysis Date = 03/25/2016 
 Lab Value = 0.0019 
 RPT Level = 0.01 
 Lab Sample ID = 20160810065  Analysis Date = 03/17/2016 
 Lab Value = -98E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20160740013  Analysis Date = 03/10/2016 
 Lab Value = 0.0055 
 RPT Level = 0.01 
 Lab Sample ID = 20160670014  Analysis Date = 03/07/2016 
 Lab Value = 0.0025 
 RPT Level = 0.01 
 Lab Sample ID = 20160600013  Analysis Date = 02/26/2016 
 Lab Value = 0.0039 
 RPT Level = 0.01 
 Lab Sample ID = 20160530013  Analysis Date = 02/18/2016 
 Lab Value = 0.0019 
 RPT Level = 0.01 
 Lab Sample ID = 20160470015  Analysis Date = 02/18/2016 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20160400084  Analysis Date = 02/16/2016 
 Lab Value = 0.0036 
 RPT Level = 0.01 
 Lab Sample ID = 20160320011  Analysis Date = 01/26/2016 
 Lab Value = 0.0024 
 RPT Level = 0.01 
 Lab Sample ID = 20160250031  Analysis Date = 01/20/2016 
 Lab Value = 0.0025 
 RPT Level = 0.01 
 Lab Sample ID = 20160190011  Analysis Date = 01/20/2016 
 Lab Value = 0.0041 
 RPT Level = 0.01 
 Lab Sample ID = 20160110011  Analysis Date = 01/07/2016 
 Lab Value = 0.0032 
 RPT Level = 0.01 
 Lab Sample ID = 20160050030  Analysis Date = 01/07/2016 
 Lab Value = 0.0035 
 RPT Level = 0.01 
 Lab Sample ID = 20153630045  Analysis Date = 12/24/2015 
 Lab Value = -3E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20153550011  Analysis Date = 12/24/2015 
 Lab Value = .00053 
 RPT Level = 0.01 
 Lab Sample ID = 20153500160  Analysis Date = 12/24/2015 
 Lab Value = 0.0032 
 RPT Level = 0.01 
 Lab Sample ID = 20153420017  Analysis Date = 12/02/2015 
 Lab Value = -22E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20153340016  Analysis Date = 12/01/2015 
 Lab Value = -11E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20153270012  Analysis Date = 11/30/2015 
 Lab Value = 0.0036 
 RPT Level = 0.01 
 Lab Sample ID = 20153200025  Analysis Date = 11/20/2015 
 Lab Value = 0.0046 
 RPT Level = 0.01 
 Lab Sample ID = 20153140011  Analysis Date = 11/06/2015 
 Lab Value = 0.0147 
 RPT Level = 0.01 
 Lab Sample ID = 20153060033  Analysis Date = 11/06/2015 
 Lab Value = 0.0041 
 RPT Level = 0.01 
 Lab Sample ID = 20152990066  Analysis Date = 10/23/2015 
 Lab Value = 0.0027 
 RPT Level = 0.01 
 Lab Sample ID = 20152920036  Analysis Date = 10/23/2015 
 Lab Value = 0.0026 
 RPT Level = 0.01 
 Lab Sample ID = 20152860152  Analysis Date = 10/07/2015 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20152780012  Analysis Date = 09/29/2015 
 Lab Value = .00096 
 RPT Level = 0.01 
 Lab Sample ID = 20152710066  Analysis Date = 09/24/2015 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20152640026  Analysis Date = 09/24/2015 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20152590157  Analysis Date = 09/11/2015 
 Lab Value = 0.0021 
 RPT Level = 0.01 
 Lab Sample ID = 20152510009  Analysis Date = 09/11/2015 
 Lab Value = 0.0027 
 RPT Level = 0.01 
 Lab Sample ID = 20152430096  Analysis Date = 08/27/2015 
 Lab Value = .00016 
 RPT Level = 0.01 
 Lab Sample ID = 20152360157  Analysis Date = 08/27/2015 
 Lab Value = 0.0041 
 RPT Level = 0.01 
 Lab Sample ID = 20152330007  Analysis Date = 08/17/2015 
 Lab Value = 0.0047 
 RPT Level = 0.01 
 Lab Sample ID = 20152230132  Analysis Date = 08/17/2015 
 Lab Value = 0.0091 
 RPT Level = 0.01 
 Lab Sample ID = 20152150073  Analysis Date = 08/03/2015 
 Lab Value = 0.0043 
 RPT Level = 0.01 
 Lab Sample ID = 20152080065  Analysis Date = 07/22/2015 
 Lab Value = 0.0079 
 RPT Level = 0.01 
 Lab Sample ID = 20152010051  Analysis Date = 07/20/2015 
 Lab Value = 0.0021 
 RPT Level = 0.01 
 Lab Sample ID = 20151940024  Analysis Date = 07/13/2015 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20151870009  Analysis Date = 07/13/2015 
 Lab Value = 0.0056 
 RPT Level = 0.01 
 Lab Sample ID = 20151800049  Analysis Date = 07/06/2015 
 Lab Value = 0.0033 
 RPT Level = 0.01 
 Lab Sample ID = 20151730016  Analysis Date = 07/06/2015 
 Lab Value = 0.0043 
 RPT Level = 0.01 
 Lab Sample ID = 20151660034  Analysis Date = 06/15/2015 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20151620213  Analysis Date = 06/04/2015 
 Lab Value = 0.0064 
 RPT Level = 0.01 
 Lab Sample ID = 20151530198  Analysis Date = 05/27/2015 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20151460121  Analysis Date = 05/22/2015 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20151390198  Analysis Date = 05/22/2015 
 Lab Value = 0.0025 
 RPT Level = 0.01 
 Lab Sample ID = 20151310070  Analysis Date = 06/15/2015 
 Lab Value = 0.0067 
 RPT Level = 0.01 
 Lab Sample ID = 20151240065  Analysis Date = 05/04/2015 
 Lab Value = 0.0048 
 RPT Level = 0.01 
 Lab Sample ID = 20151180073  Analysis Date = 06/15/2015 
 Lab Value = 0.0028 
 RPT Level = 0.01 
 Lab Sample ID = 20151140024  Analysis Date = 04/16/2015 
 Lab Value = -11E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20151050039  Analysis Date = 04/14/2015 
 Lab Value = 0.0031 
 RPT Level = 0.01 
 Lab Sample ID = 20150970052  Analysis Date = 04/10/2015 
 Lab Value = 0.0055 
 RPT Level = 0.01 
 Lab Sample ID = 20150900037  Analysis Date = 03/27/2015 
 Lab Value = 0.0038 
 RPT Level = 0.01 
 Lab Sample ID = 20150850041  Analysis Date = 03/19/2015 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20150770031  Analysis Date = 03/19/2015 
 Lab Value = 0.0064 
 RPT Level = 0.01 
 Lab Sample ID = 20150690109  Analysis Date = 03/09/2015 
 Lab Value = 0.0143 
 RPT Level = 0.01 
 Lab Sample ID = 20150610104  Analysis Date = 03/02/2015 
 Lab Value = 0.0051 
 RPT Level = 0.01 
 Lab Sample ID = 20150540029  Analysis Date = 02/18/2015 
 Lab Value = 0.0018 
 RPT Level = 0.01 
 Lab Sample ID = 20150400033  Analysis Date = 02/05/2015 
 Lab Value = .00015 
 RPT Level = 0.01 
 Lab Sample ID = 20150330024  Analysis Date = 01/30/2015 
 Lab Value = .00012 
 RPT Level = 0.01 
 Lab Sample ID = 20150260015  Analysis Date = 01/30/2015 
 Lab Value = .00033 
 RPT Level = 0.01 
 Lab Sample ID = 20150200036  Analysis Date = 01/20/2015 
 Lab Value = .00051 
 RPT Level = 0.01 
 Lab Sample ID = 20150120017  Analysis Date = 01/08/2015 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20150050006  Analysis Date = 01/08/2015 
 Lab Value = -69E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20143630008  Analysis Date = 01/08/2015 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20143560049  Analysis Date = 01/08/2015 
 Lab Value = 0.0028 
 RPT Level = 0.01 
 Lab Sample ID = 20143490026  Analysis Date = 01/08/2015 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20143420020  Analysis Date = 12/18/2014 
 Lab Value = 0.0058 
 RPT Level = 0.01 
 Lab Sample ID = 20143360073  Analysis Date = 12/18/2014 
 Lab Value = 0.0088 
 RPT Level = 0.01 
 Lab Sample ID = 20143300036  Analysis Date = 11/26/2014 
 Lab Value = 0.0036 
 RPT Level = 0.01 
 Lab Sample ID = 20143230047  Analysis Date = 11/26/2014 
 Lab Value = 0.0025 
 RPT Level = 0.01 
 Lab Sample ID = 20143160029  Analysis Date = 11/19/2014 
 Lab Value = 0.0062 
 RPT Level = 0.01 
 Lab Sample ID = 20143080087  Analysis Date = 11/10/2014 
 Lab Value = .00095 
 RPT Level = 0.01 
 Lab Sample ID = 20142950122  Analysis Date = 10/31/2014 
 Lab Value = 0.0137 
 RPT Level = 0.01 
 Lab Sample ID = 20142880084  Analysis Date = 10/15/2014 
 Lab Value = 0.0049 
 RPT Level = 0.01 
 Lab Sample ID = 20142790031  Analysis Date = 10/07/2014 
 Lab Value = -54E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20142720101  Analysis Date = 09/25/2014 
 Lab Value = .00069 
 RPT Level = 0.01 
 Lab Sample ID = 20142650106  Analysis Date = 09/18/2014 
 Lab Value = 0.0047 
 RPT Level = 0.01 
 Lab Sample ID = 20142590046  Analysis Date = 09/11/2014 
 Lab Value = 0.0019 
 RPT Level = 0.01 
 Lab Sample ID = 20142520024  Analysis Date = 09/11/2014 
 Lab Value = 0.0024 
 RPT Level = 0.01 
 Lab Sample ID = 20142470052  Analysis Date = 08/14/2014 
 Lab Value = -63E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20142230082  Analysis Date = 08/07/2014 
 Lab Value = 0.0029 
 RPT Level = 0.01 
 Lab Sample ID = 20142160063  Analysis Date = 07/31/2014 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20142090217  Analysis Date = 07/16/2014 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20141960042  Analysis Date = 07/09/2014 
 Lab Value = 0.0068 
 RPT Level = 0.01 
 Lab Sample ID = 20141890083  Analysis Date = 07/09/2014 
 Lab Value = 0.0051 
 RPT Level = 0.01 
 Lab Sample ID = 20141820118  Analysis Date = 06/26/2014 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20141750143  Analysis Date = 06/18/2014 
 Lab Value = 0.0054 
 RPT Level = 0.01 
 Lab Sample ID = 20141680085  Analysis Date = 06/18/2014 
 Lab Value = 0.0043 
 RPT Level = 0.01 
 Lab Sample ID = 20141620033  Analysis Date = 06/09/2014 
 Lab Value = 0.0015 
 RPT Level = 0.01 
 Lab Sample ID = 20141550058  Analysis Date = 06/09/2014 
 Lab Value = .00008 
 RPT Level = 0.01 
 Lab Sample ID = 20141470144  Analysis Date = 05/29/2014 
 Lab Value = -45E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20141400011  Analysis Date = 05/29/2014 
 Lab Value = 0.0018 
 RPT Level = 0.01 
 Lab Sample ID = 20141340002  Analysis Date = 05/09/2014 
 Lab Value = 0.0015 
 RPT Level = 0.01 
 Lab Sample ID = 20141250086  Analysis Date = 05/09/2014 
 Lab Value = 0.0012 
 RPT Level = 0.01 
 Lab Sample ID = 20141190022  Analysis Date = 04/29/2014 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20141130021  Analysis Date = 04/16/2014 
 Lab Value = 0.0056 
 RPT Level = 0.01 
 Lab Sample ID = 20141050008  Analysis Date = 04/16/2014 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20140970044  Analysis Date = 04/16/2014 
 Lab Value = -85E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20140900020  Analysis Date = 03/31/2014 
 Lab Value = 0.0078 
 RPT Level = 0.01 
 Lab Sample ID = 20140840099  Analysis Date = 03/18/2014 
 Lab Value = 0.0137 
 RPT Level = 0.01 
 Lab Sample ID = 20140760039  Analysis Date = 03/13/2014 
 Lab Value = 0.0038 
 RPT Level = 0.01 
 Lab Sample ID = 20140690021  Analysis Date = 03/05/2014 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20140630120  Analysis Date = 03/03/2014 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20140550042  Analysis Date = 02/19/2014 
 Lab Value = .00047 
 RPT Level = 0.01 
 Lab Sample ID = 20140490012  Analysis Date = 02/11/2014 
 Lab Value = .00039 
 RPT Level = 0.01 
 Lab Sample ID = 20140410005  Analysis Date = 02/11/2014 
 Lab Value = 0.0012 
 RPT Level = 0.01 
 Lab Sample ID = 20140340022  Analysis Date = 01/30/2014 
 Lab Value = 0.0016 
 RPT Level = 0.01 
 Lab Sample ID = 20140270193  Analysis Date = 01/24/2014 
 Lab Value = 0.0059 
 RPT Level = 0.01 
 Lab Sample ID = 20140210036  Analysis Date = 01/16/2014 
 Lab Value = 0.0144 
 RPT Level = 0.01 
 Lab Sample ID = 20140130049  Analysis Date = 01/16/2014 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20140070067  Analysis Date = 01/07/2014 
 Lab Value = 0.0019 
 RPT Level = 0.01 
 Lab Sample ID = 20133580053  Analysis Date = 12/23/2013 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20133500067  Analysis Date = 12/12/2013 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20133430107  Analysis Date = 12/12/2013 
 Lab Value = 0.0017 
 RPT Level = 0.01 
 Lab Sample ID = 20133360022  Analysis Date = 12/12/2013 
 Lab Value = 0.0028 
 RPT Level = 0.01 
 Lab Sample ID = 20133300012  Analysis Date = 11/26/2013 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20133230003  Analysis Date = 11/26/2013 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20133170105  Analysis Date = 11/06/2013 
 Lab Value = 0.0016 
 RPT Level = 0.01 
 Lab Sample ID = 20133090098  Analysis Date = 11/06/2013 
 Lab Value = 0.0027 
 RPT Level = 0.01 
 Lab Sample ID = 20133030027  Analysis Date = 10/29/2013 
 Lab Value = 0.0023 
 RPT Level = 0.01 
 Lab Sample ID = 20132970027  Analysis Date = 10/18/2013 
 Lab Value = 0.0016 
 RPT Level = 0.01 
 Lab Sample ID = 20132730140  Analysis Date = 09/25/2013 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20132660104  Analysis Date = 09/25/2013 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20132600015  Analysis Date = 09/17/2013 
 Lab Value = 0.0027 
 RPT Level = 0.01 
 Lab Sample ID = 20132530113  Analysis Date = 09/12/2013 
 Lab Value = 0.0044 
 RPT Level = 0.01 
 Lab Sample ID = 20132410009  Analysis Date = 08/28/2013 
 Lab Value = .00099 
 RPT Level = 0.01 
 Lab Sample ID = 20132390012  Analysis Date = 08/28/2013 
 Lab Value = 0.0017 
 RPT Level = 0.01 
 Lab Sample ID = 20132350027  Analysis Date = 08/21/2013 
 Lab Value = 0.0013 
 RPT Level = 0.01 
 Lab Sample ID = 20132270018  Analysis Date = 08/12/2013 
 Lab Value = 0.0027 
 RPT Level = 0.01 
 Lab Sample ID = 20132180181  Analysis Date = 08/12/2013 
 Lab Value = 0.0034 
 RPT Level = 0.01 
 Lab Sample ID = 20132120027  Analysis Date = 07/26/2013 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20132040021  Analysis Date = 07/18/2013 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20131970028  Analysis Date = 07/10/2013 
 Lab Value = -64E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20131900090  Analysis Date = 07/10/2013 
 Lab Value = -95E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20131830073  Analysis Date = 06/28/2013 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20131770013  Analysis Date = 06/28/2013 
 Lab Value = .00072 
 RPT Level = 0.01 
 Lab Sample ID = 20131700038  Analysis Date = 06/18/2013 
 Lab Value = 0.0043 
 RPT Level = 0.01 
 Lab Sample ID = 20131640004  Analysis Date = 06/05/2013 
 Lab Value = 0.0014 
 RPT Level = 0.01 
 Lab Sample ID = 20131550029  Analysis Date = 06/05/2013 
 Lab Value = 0.0015 
 RPT Level = 0.01 
 Lab Sample ID = 20131500013  Analysis Date = 05/28/2013 
 Lab Value = 0.0011 
 RPT Level = 0.01 
 Lab Sample ID = 20131430198  Analysis Date = 05/16/2013 
 Lab Value = 0.0011 
 RPT Level = 0.01 
 Lab Sample ID = 20131350129  Analysis Date = 05/16/2013 
 Lab Value = 0.0027 
 RPT Level = 0.01 
 Lab Sample ID = 20131270022  Analysis Date = 05/08/2013 
 Lab Value = 0.0027 
 RPT Level = 0.01 
 Lab Sample ID = 20131220014  Analysis Date = 04/30/2013 
 Lab Value = .00013 
 RPT Level = 0.01 
 Lab Sample ID = 20131150015  Analysis Date = 04/30/2013 
 Lab Value = 0.0163 
 RPT Level = 0.01 
 Lab Sample ID = 20131120125  Analysis Date = 04/30/2013 
 Lab Value = .00028 
 RPT Level = 0.01 
 Lab Sample ID = 20131090030  Analysis Date = 04/10/2013 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20130930087  Analysis Date = 03/28/2013 
 Lab Value = -48E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20130840058  Analysis Date = 03/28/2013 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20130770160  Analysis Date = 03/13/2013 
 Lab Value = -.0003 
 RPT Level = 0.01 
 Lab Sample ID = 20130700013  Analysis Date = 03/06/2013 
 Lab Value = 0.0021 
 RPT Level = 0.01 
 Lab Sample ID = 20130630124  Analysis Date = 03/06/2013 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20130570007  Analysis Date = 02/22/2013 
 Lab Value = -31E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20130520006  Analysis Date = 02/14/2013 
 Lab Value = 0.0022 
 RPT Level = 0.01 
 Lab Sample ID = 20130420052  Analysis Date = 02/06/2013 
 Lab Value = 0.0039 
 RPT Level = 0.01 
 Lab Sample ID = 20130350029  Analysis Date = 01/30/2013 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20130280039  Analysis Date = 01/30/2013 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20130230099  Analysis Date = 01/23/2013 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20130140071  Analysis Date = 01/11/2013 
 Lab Value = -72E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20130070056  Analysis Date = 01/03/2013 
 Lab Value = 0.0026 
 RPT Level = 0.01 
 Lab Sample ID = 20130020010  Analysis Date = 01/03/2013 
 Lab Value = 0.0031 
 RPT Level = 0.01 
 Lab Sample ID = 20123620011  Analysis Date = 12/20/2012 
 Lab Value = -92E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20123530084  Analysis Date = 12/20/2012 
 Lab Value = -55E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20123480061  Analysis Date = 12/13/2012 
 Lab Value = 0.0092 
 RPT Level = 0.01 
 Lab Sample ID = 20123390115  Analysis Date = 11/30/2012 
 Lab Value = 0.0014 
 RPT Level = 0.01 
 Lab Sample ID = 20123330010  Analysis Date = 11/30/2012 
 Lab Value = 0.0062 
 RPT Level = 0.01 
 Lab Sample ID = 20123250063  Analysis Date = 11/19/2012 
 Lab Value = -72E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20123200054  Analysis Date = 11/19/2012 
 Lab Value = -38E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20123120066  Analysis Date = 11/01/2012 
 Lab Value = 0.0014 
 RPT Level = 0.01 
 Lab Sample ID = 20123040119  Analysis Date = 11/01/2012 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20122980126  Analysis Date = 10/18/2012 
 Lab Value = 0.0056 
 RPT Level = 0.01 
 Lab Sample ID = 20122900096  Analysis Date = 10/12/2012 
 Lab Value = -56E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20122830034  Analysis Date = 10/03/2012 
 Lab Value = 0.0034 
 RPT Level = 0.01 
 Lab Sample ID = 20122750025  Analysis Date = 10/03/2012 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20122700110  Analysis Date = 09/26/2012 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20122690153  Analysis Date = 09/12/2012 
 Lab Value = 0.0041 
 RPT Level = 0.01 
 Lab Sample ID = 20122550016  Analysis Date = 09/12/2012 
 Lab Value = 0.0038 
 RPT Level = 0.01 
 Lab Sample ID = 20122490102  Analysis Date = 09/05/2012 
 Lab Value = 0.0029 
 RPT Level = 0.01 
 Lab Sample ID = 20122410013  Analysis Date = 08/23/2012 
 Lab Value = 0.0044 
 RPT Level = 0.01 
 Lab Sample ID = 20122350175  Analysis Date = 08/17/2012 
 Lab Value = 0.0025 
 RPT Level = 0.01 
 Lab Sample ID = 20122280090  Analysis Date = 08/07/2012 
 Lab Value = 0.0052 
 RPT Level = 0.01 
 Lab Sample ID = 20122190099  Analysis Date = 08/07/2012 
 Lab Value = 0.0053 
 RPT Level = 0.01 
 Lab Sample ID = 20122140050  Analysis Date = 07/26/2012 
 Lab Value = 0.0056 
 RPT Level = 0.01 
 Lab Sample ID = 20122050101  Analysis Date = 07/18/2012 
 Lab Value = 0.0036 
 RPT Level = 0.01 
 Lab Sample ID = 20121990080  Analysis Date = 07/10/2012 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20121910041  Analysis Date = 07/10/2012 
 Lab Value = 0.0052 
 RPT Level = 0.01 
 Lab Sample ID = 20121870014  Analysis Date = 06/29/2012 
 Lab Value = 0.0041 
 RPT Level = 0.01 
 Lab Sample ID = 20121780033  Analysis Date = 06/20/2012 
 Lab Value = .00032 
 RPT Level = 0.01 
 Lab Sample ID = 20121710006  Analysis Date = 06/20/2012 
 Lab Value = -45E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20121650052  Analysis Date = 06/12/2012 
 Lab Value = -58E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20121560125  Analysis Date = 06/12/2012 
 Lab Value = 0.0013 
 RPT Level = 0.01 
 Lab Sample ID = 20121510037  Analysis Date = 06/05/2012 
 Lab Value = 0.0111 
 RPT Level = 0.01 
 Lab Sample ID = 20121430021  Analysis Date = 05/17/2012 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20121370053  Analysis Date = 05/14/2012 
 Lab Value = 0.0063 
 RPT Level = 0.01 
 Lab Sample ID = 20121290072  Analysis Date = 05/02/2012 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20121210123  Analysis Date = 05/02/2012 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20121150089  Analysis Date = 04/19/2012 
 Lab Value = 0.0058 
 RPT Level = 0.01 
 Lab Sample ID = 20121080009  Analysis Date = 04/11/2012 
 Lab Value = 0.0015 
 RPT Level = 0.01 
 Lab Sample ID = 20121010029  Analysis Date = 04/11/2012 
 Lab Value = 0.0072 
 RPT Level = 0.01 
 Lab Sample ID = 20120930058  Analysis Date = 03/30/2012 
 Lab Value = 0.0027 
 RPT Level = 0.01 
 Lab Sample ID = 20120870035  Analysis Date = 03/23/2012 
 Lab Value = 0.0111 
 RPT Level = 0.01 
 Lab Sample ID = 20120790085  Analysis Date = 03/20/2012 
 Lab Value = 0.0033 
 RPT Level = 0.01 
 Lab Sample ID = 20120730079  Analysis Date = 03/13/2012 
 Lab Value = 0.0052 
 RPT Level = 0.01 
 Lab Sample ID = 20120660073  Analysis Date = 02/29/2012 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20120580047  Analysis Date = 02/29/2012 
 Lab Value = 0.0042 
 RPT Level = 0.01 
 Lab Sample ID = 20120530099  Analysis Date = 02/22/2012 
 Lab Value = 0.0044 
 RPT Level = 0.01 
 Lab Sample ID = 20120450020  Analysis Date = 02/14/2012 
 Lab Value = 0.0039 
 RPT Level = 0.01 
 Lab Sample ID = 20120370064  Analysis Date = 02/06/2012 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20120310012  Analysis Date = 01/30/2012 
 Lab Value = 0.0056 
 RPT Level = 0.01 
 Lab Sample ID = 20120230046  Analysis Date = 01/20/2012 
 Lab Value = 0.0016 
 RPT Level = 0.01 
 Lab Sample ID = 20120180013  Analysis Date = 01/20/2012 
 Lab Value = -9E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20120090052  Analysis Date = 01/05/2012 
 Lab Value = 0.0068 
 RPT Level = 0.01 
 Lab Sample ID = 20120030028  Analysis Date = 01/05/2012 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20113610089  Analysis Date = 12/21/2011 
 Lab Value = 0.0084 
 RPT Level = 0.01 
 Lab Sample ID = 20113530139  Analysis Date = 12/21/2011 
 Lab Value = 0.0081 
 RPT Level = 0.01 
 Lab Sample ID = 20113490075  Analysis Date = 12/15/2011 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20113460137  Analysis Date = 12/09/2011 
 Lab Value = .00073 
 RPT Level = 0.01 
 Lab Sample ID = 20113320115  Analysis Date = 12/09/2011 
 Lab Value = 0.0017 
 RPT Level = 0.01 
 Lab Sample ID = 20113250126  Analysis Date = 11/29/2011 
 Lab Value = 0.0056 
 RPT Level = 0.01 
 Lab Sample ID = 20113180164  Analysis Date = 11/14/2011 
 Lab Value = -82E-5 
 RPT Level = 0.01 
 Lab Sample ID = 20113110062  Analysis Date = 11/14/2011 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20113050092  Analysis Date = 10/26/2011 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20112970118  Analysis Date = 10/20/2011 
 Lab Value = 0.0165 
 RPT Level = 0.01 
 Lab Sample ID = 20112910137  Analysis Date = 09/27/2016 
 RPT Level = 0.01  Analysis Date = 09/15/2016 
 RPT Level = 0.01  Analysis Date = 09/15/2016 
 RPT Level = 0.01  Analysis Date = 09/15/2016 
 RPT Level = 0.01  Analysis Date = 09/15/2016 
 RPT Level = 0.01  Analysis Date = 09/15/2016 
 RPT Level = 0.01  Analysis Date = 09/15/2016 
 RPT Level = 0.01  Analysis Date = 09/09/2016 
 RPT Level = 0.01  Analysis Date = 09/09/2016 
 RPT Level = 0.01  Analysis Date = 08/29/2016 
 RPT Level = 0.01  Analysis Date = 08/29/2016 
 RPT Level = 0.01  Analysis Date = 08/11/2016 
 RPT Level = 0.01  Analysis Date = 08/11/2016 
 RPT Level = 0.01  Analysis Date = 08/11/2016 
 RPT Level = 0.01  Analysis Date = 08/11/2016 
 RPT Level = 0.01  Analysis Date = 08/10/2016 
 RPT Level = 0.01  Analysis Date = 08/10/2016 
 RPT Level = 0.01  Analysis Date = 07/29/2016 
 RPT Level = 0.01  Analysis Date = 07/29/2016 
 RPT Level = 0.01  Analysis Date = 07/19/2016 
 RPT Level = 0.01  Analysis Date = 07/19/2016 
 RPT Level = 0.01  Analysis Date = 07/19/2016 
 RPT Level = 0.01  Analysis Date = 07/19/2016 
 RPT Level = 0.01  Analysis Date = 07/05/2016 
 RPT Level = 0.01  Analysis Date = 07/05/2016 
 RPT Level = 0.01  Analysis Date = 06/23/2016 
 RPT Level = 0.01  Analysis Date = 06/23/2016 
 RPT Level = 0.01  Analysis Date = 06/23/2016 
 RPT Level = 0.01  Analysis Date = 06/23/2016 
 RPT Level = 0.01  Analysis Date = 06/17/2016 
 RPT Level = 0.01  Analysis Date = 06/17/2016 
 RPT Level = 0.01  Analysis Date = 06/08/2016 
 RPT Level = 0.01  Analysis Date = 06/08/2016 
 RPT Level = 0.01  Analysis Date = 06/08/2016 
 RPT Level = 0.01  Analysis Date = 06/08/2016 
 RPT Level = 0.01  Analysis Date = 05/16/2016 
 RPT Level = 0.01  Analysis Date = 05/16/2016 
 RPT Level = 0.01  Analysis Date = 05/16/2016 
 RPT Level = 0.01  Analysis Date = 05/16/2016 
 RPT Level = 0.01  Analysis Date = 05/02/2016 
 RPT Level = 0.01  Analysis Date = 05/02/2016 
 RPT Level = 0.01  Analysis Date = 05/02/2016 
 RPT Level = 0.01  Analysis Date = 05/02/2016 
 RPT Level = 0.01  Analysis Date = 04/12/2016 
 RPT Level = 0.01  Analysis Date = 04/12/2016 
 RPT Level = 0.01  Analysis Date = 04/07/2016 
 RPT Level = 0.01  Analysis Date = 04/07/2016 
 RPT Level = 0.01  Analysis Date = 03/29/2016 
 RPT Level = 0.01  Analysis Date = 03/29/2016 
 RPT Level = 0.01  Analysis Date = 03/25/2016 
 RPT Level = 0.01  Analysis Date = 03/25/2016 
 RPT Level = 0.01  Analysis Date = 03/17/2016 
 RPT Level = 0.01  Analysis Date = 03/17/2016 
 RPT Level = 0.01  Analysis Date = 03/10/2016 
 RPT Level = 0.01  Analysis Date = 03/10/2016 
 RPT Level = 0.01  Analysis Date = 03/07/2016 
 RPT Level = 0.01  Analysis Date = 03/07/2016 
 RPT Level = 0.01  Analysis Date = 02/26/2016 
 RPT Level = 0.01  Analysis Date = 02/26/2016 
 RPT Level = 0.01  Analysis Date = 02/18/2016 
 RPT Level = 0.01  Analysis Date = 02/18/2016 
 RPT Level = 0.01  Analysis Date = 02/18/2016 
 RPT Level = 0.01  Analysis Date = 02/18/2016 
 RPT Level = 0.01  Analysis Date = 02/16/2016 
 RPT Level = 0.01  Analysis Date = 02/16/2016 
 RPT Level = 0.01  Analysis Date = 01/26/2016 
 RPT Level = 0.01  Analysis Date = 01/26/2016 
 RPT Level = 0.01  Analysis Date = 01/20/2016 
 RPT Level = 0.01  Analysis Date = 01/20/2016 
 RPT Level = 0.01  Analysis Date = 01/20/2016 
 RPT Level = 0.01  Analysis Date = 01/20/2016 
 RPT Level = 0.01  Analysis Date = 01/07/2016 
 RPT Level = 0.01  Analysis Date = 01/07/2016 
 RPT Level = 0.01  Analysis Date = 01/07/2016 
 RPT Level = 0.01  Analysis Date = 01/07/2016 
 RPT Level = 0.01  Analysis Date = 12/24/2015 
 RPT Level = 0.01  Analysis Date = 12/24/2015 
 RPT Level = 0.01  Analysis Date = 12/24/2015 
 RPT Level = 0.01  Analysis Date = 12/24/2015 
 RPT Level = 0.01  Analysis Date = 12/24/2015 
 RPT Level = 0.01  Analysis Date = 12/24/2015 
 RPT Level = 0.01  Analysis Date = 12/02/2015 
 RPT Level = 0.01  Analysis Date = 12/02/2015 
 RPT Level = 0.01  Analysis Date = 12/01/2015 
 RPT Level = 0.01  Analysis Date = 12/01/2015 
 RPT Level = 0.01  Analysis Date = 11/30/2015 
 RPT Level = 0.01  Analysis Date = 11/30/2015 
 RPT Level = 0.01  Analysis Date = 11/20/2015 
 RPT Level = 0.01  Analysis Date = 11/20/2015 
 RPT Level = 0.01  Analysis Date = 11/06/2015 
 RPT Level = 0.01  Analysis Date = 11/06/2015 
 RPT Level = 0.01  Analysis Date = 11/06/2015 
 RPT Level = 0.01  Analysis Date = 11/06/2015 
 RPT Level = 0.01  Analysis Date = 10/23/2015 
 RPT Level = 0.01  Analysis Date = 10/23/2015 
 RPT Level = 0.01  Analysis Date = 10/23/2015 
 RPT Level = 0.01  Analysis Date = 10/23/2015 
 RPT Level = 0.01  Analysis Date = 10/07/2015 
 RPT Level = 0.01  Analysis Date = 10/07/2015 
 RPT Level = 0.01  Analysis Date = 09/29/2015 
 RPT Level = 0.01  Analysis Date = 09/29/2015 
 RPT Level = 0.01  Analysis Date = 09/24/2015 
 RPT Level = 0.01  Analysis Date = 09/24/2015 
 RPT Level = 0.01  Analysis Date = 09/24/2015 
 RPT Level = 0.01  Analysis Date = 09/24/2015 
 RPT Level = 0.01  Analysis Date = 09/11/2015 
 RPT Level = 0.01  Analysis Date = 09/11/2015 
 RPT Level = 0.01  Analysis Date = 09/11/2015 
 RPT Level = 0.01  Analysis Date = 09/11/2015 
 RPT Level = 0.01  Analysis Date = 08/27/2015 
 RPT Level = 0.01  Analysis Date = 08/27/2015 
 RPT Level = 0.01  Analysis Date = 08/27/2015 
 RPT Level = 0.01  Analysis Date = 08/27/2015 
 RPT Level = 0.01  Analysis Date = 08/17/2015 
 RPT Level = 0.01  Analysis Date = 08/17/2015 
 RPT Level = 0.01  Analysis Date = 08/17/2015 
 RPT Level = 0.01  Analysis Date = 08/17/2015 
 RPT Level = 0.01  Analysis Date = 08/03/2015 
 RPT Level = 0.01  Analysis Date = 08/03/2015 
 RPT Level = 0.01  Analysis Date = 07/22/2015 
 RPT Level = 0.01  Analysis Date = 07/22/2015 
 RPT Level = 0.01  Analysis Date = 07/20/2015 
 RPT Level = 0.01  Analysis Date = 07/20/2015 
 RPT Level = 0.01  Analysis Date = 07/13/2015 
 RPT Level = 0.01  Analysis Date = 07/13/2015 
 RPT Level = 0.01  Analysis Date = 07/13/2015 
 RPT Level = 0.01  Analysis Date = 07/13/2015 
 RPT Level = 0.01  Analysis Date = 07/06/2015 
 RPT Level = 0.01  Analysis Date = 07/06/2015 
 RPT Level = 0.01  Analysis Date = 07/06/2015 
 RPT Level = 0.01  Analysis Date = 07/06/2015 
 RPT Level = 0.01  Analysis Date = 06/15/2015 
 RPT Level = 0.01  Analysis Date = 06/15/2015 
 RPT Level = 0.01  Analysis Date = 06/04/2015 
 RPT Level = 0.01  Analysis Date = 06/04/2015 
 RPT Level = 0.01  Analysis Date = 05/27/2015 
 RPT Level = 0.01  Analysis Date = 05/27/2015 
 RPT Level = 0.01  Analysis Date = 05/22/2015 
 RPT Level = 0.01  Analysis Date = 05/22/2015 
 RPT Level = 0.01  Analysis Date = 05/22/2015 
 RPT Level = 0.01  Analysis Date = 05/22/2015 
 RPT Level = 0.01  Analysis Date = 06/15/2015 
 RPT Level = 0.01  Analysis Date = 06/15/2015 
 RPT Level = 0.01  Analysis Date = 05/04/2015 
 RPT Level = 0.01  Analysis Date = 05/04/2015 
 RPT Level = 0.01  Analysis Date = 06/15/2015 
 RPT Level = 0.01  Analysis Date = 06/15/2015 
 RPT Level = 0.01  Analysis Date = 04/16/2015 
 RPT Level = 0.01  Analysis Date = 04/16/2015 
 RPT Level = 0.01  Analysis Date = 04/14/2015 
 RPT Level = 0.01  Analysis Date = 04/14/2015 
 RPT Level = 0.01  Analysis Date = 04/10/2015 
 RPT Level = 0.01  Analysis Date = 04/10/2015 
 RPT Level = 0.01  Analysis Date = 03/27/2015 
 RPT Level = 0.01  Analysis Date = 03/27/2015 
 RPT Level = 0.01  Analysis Date = 03/19/2015 
 RPT Level = 0.01  Analysis Date = 03/19/2015 
 RPT Level = 0.01  Analysis Date = 03/19/2015 
 RPT Level = 0.01  Analysis Date = 03/19/2015 
 RPT Level = 0.01  Analysis Date = 03/09/2015 
 RPT Level = 0.01  Analysis Date = 03/09/2015 
 RPT Level = 0.01  Analysis Date = 03/02/2015 
 RPT Level = 0.01  Analysis Date = 03/02/2015 
 RPT Level = 0.01  Analysis Date = 02/19/2015 
 RPT Level = 0.01  Analysis Date = 02/19/2015 
 RPT Level = 0.01  Analysis Date = 02/18/2015 
 RPT Level = 0.01  Analysis Date = 02/18/2015 
 RPT Level = 0.01  Analysis Date = 02/05/2015 
 RPT Level = 0.01  Analysis Date = 02/05/2015 
 RPT Level = 0.01  Analysis Date = 01/30/2015 
 RPT Level = 0.01  Analysis Date = 01/30/2015 
 RPT Level = 0.01  Analysis Date = 01/30/2015 
 RPT Level = 0.01  Analysis Date = 01/30/2015 
 RPT Level = 0.01  Analysis Date = 01/20/2015 
 RPT Level = 0.01  Analysis Date = 01/20/2015 
 RPT Level = 0.01  Analysis Date = 01/08/2015 
 RPT Level = 0.01  Analysis Date = 01/08/2015 
 RPT Level = 0.01  Analysis Date = 01/08/2015 
 RPT Level = 0.01  Analysis Date = 01/08/2015 
 RPT Level = 0.01  Analysis Date = 01/08/2015 
 RPT Level = 0.01  Analysis Date = 01/08/2015 
 RPT Level = 0.01  Analysis Date = 01/08/2015 
 RPT Level = 0.01  Analysis Date = 01/08/2015 
 RPT Level = 0.01  Analysis Date = 01/08/2015 
 RPT Level = 0.01  Analysis Date = 01/08/2015 
 RPT Level = 0.01  Analysis Date = 12/18/2014 
 RPT Level = 0.01  Analysis Date = 12/18/2014 
 RPT Level = 0.01  Analysis Date = 12/18/2014 
 RPT Level = 0.01  Analysis Date = 12/18/2014 
 RPT Level = 0.01  Analysis Date = 11/26/2014 
 RPT Level = 0.01  Analysis Date = 11/26/2014 
 RPT Level = 0.01  Analysis Date = 11/26/2014 
 RPT Level = 0.01  Analysis Date = 11/26/2014 
 RPT Level = 0.01  Analysis Date = 11/19/2014 
 RPT Level = 0.01  Analysis Date = 11/19/2014 
 RPT Level = 0.01  Analysis Date = 11/10/2014 
 RPT Level = 0.01  Analysis Date = 11/10/2014 
 RPT Level = 0.01  Analysis Date = 11/10/2014 
 RPT Level = 0.01  Analysis Date = 11/10/2014 
 RPT Level = 0.01  Analysis Date = 10/31/2014 
 RPT Level = 0.01  Analysis Date = 10/31/2014 
 RPT Level = 0.01  Analysis Date = 10/15/2014 
 RPT Level = 0.01  Analysis Date = 10/15/2014 
 RPT Level = 0.01  Analysis Date = 10/07/2014 
 RPT Level = 0.01  Analysis Date = 10/07/2014 
 RPT Level = 0.01  Analysis Date = 09/25/2014 
 RPT Level = 0.01  Analysis Date = 09/25/2014 
 RPT Level = 0.01  Analysis Date = 09/18/2014 
 RPT Level = 0.01  Analysis Date = 09/18/2014 
 RPT Level = 0.01  Analysis Date = 09/11/2014 
 RPT Level = 0.01  Analysis Date = 09/11/2014 
 RPT Level = 0.01  Analysis Date = 09/11/2014 
 RPT Level = 0.01  Analysis Date = 09/11/2014 
 RPT Level = 0.01  Analysis Date = 08/14/2014 
 RPT Level = 0.01  Analysis Date = 08/14/2014 
 RPT Level = 0.01  Analysis Date = 08/07/2014 
 RPT Level = 0.01  Analysis Date = 08/07/2014 
 RPT Level = 0.01  Analysis Date = 07/31/2014 
 RPT Level = 0.01  Analysis Date = 07/31/2014 
 RPT Level = 0.01  Analysis Date = 07/31/2014 
 RPT Level = 0.01  Analysis Date = 07/31/2014 
 RPT Level = 0.01  Analysis Date = 07/16/2014 
 RPT Level = 0.01  Analysis Date = 07/16/2014 
 RPT Level = 0.01  Analysis Date = 07/09/2014 
 RPT Level = 0.01  Analysis Date = 07/09/2014 
 RPT Level = 0.01  Analysis Date = 07/09/2014 
 RPT Level = 0.01  Analysis Date = 07/09/2014 
 RPT Level = 0.01  Analysis Date = 06/26/2014 
 RPT Level = 0.01  Analysis Date = 06/26/2014 
 RPT Level = 0.01  Analysis Date = 06/18/2014 
 RPT Level = 0.01  Analysis Date = 06/18/2014 
 RPT Level = 0.01  Analysis Date = 06/18/2014 
 RPT Level = 0.01  Analysis Date = 06/18/2014 
 RPT Level = 0.01  Analysis Date = 06/09/2014 
 RPT Level = 0.01  Analysis Date = 06/09/2014 
 RPT Level = 0.01  Analysis Date = 06/09/2014 
 RPT Level = 0.01  Analysis Date = 06/09/2014 
 RPT Level = 0.01  Analysis Date = 05/29/2014 
 RPT Level = 0.01  Analysis Date = 05/29/2014 
 RPT Level = 0.01  Analysis Date = 05/29/2014 
 RPT Level = 0.01  Analysis Date = 05/29/2014 
 RPT Level = 0.01  Analysis Date = 05/09/2014 
 RPT Level = 0.01  Analysis Date = 05/09/2014 
 RPT Level = 0.01  Analysis Date = 05/09/2014 
 RPT Level = 0.01  Analysis Date = 05/09/2014 
 RPT Level = 0.01  Analysis Date = 04/29/2014 
 RPT Level = 0.01  Analysis Date = 04/29/2014 
 RPT Level = 0.01  Analysis Date = 04/16/2014 
 RPT Level = 0.01  Analysis Date = 04/16/2014 
 RPT Level = 0.01  Analysis Date = 04/16/2014 
 RPT Level = 0.01  Analysis Date = 04/16/2014 
 RPT Level = 0.01  Analysis Date = 04/16/2014 
 RPT Level = 0.01  Analysis Date = 04/16/2014 
 RPT Level = 0.01  Analysis Date = 03/31/2014 
 RPT Level = 0.01  Analysis Date = 03/31/2014 
 RPT Level = 0.01  Analysis Date = 03/18/2014 
 RPT Level = 0.01  Analysis Date = 03/18/2014 
 RPT Level = 0.01  Analysis Date = 03/13/2014 
 RPT Level = 0.01  Analysis Date = 03/13/2014 
 RPT Level = 0.01  Analysis Date = 03/05/2014 
 RPT Level = 0.01  Analysis Date = 03/05/2014 
 RPT Level = 0.01  Analysis Date = 03/03/2014 
 RPT Level = 0.01  Analysis Date = 03/03/2014 
 RPT Level = 0.01  Analysis Date = 02/19/2014 
 RPT Level = 0.01  Analysis Date = 02/19/2014 
 RPT Level = 0.01  Analysis Date = 02/11/2014 
 RPT Level = 0.01  Analysis Date = 02/11/2014 
 RPT Level = 0.01  Analysis Date = 02/11/2014 
 RPT Level = 0.01  Analysis Date = 02/11/2014 
 RPT Level = 0.01  Analysis Date = 01/30/2014 
 RPT Level = 0.01  Analysis Date = 01/30/2014 
 RPT Level = 0.01  Analysis Date = 01/24/2014 
 RPT Level = 0.01  Analysis Date = 01/24/2014 
 RPT Level = 0.01  Analysis Date = 01/16/2014 
 RPT Level = 0.01  Analysis Date = 01/16/2014 
 RPT Level = 0.01  Analysis Date = 01/16/2014 
 RPT Level = 0.01  Analysis Date = 01/16/2014 
 RPT Level = 0.01  Analysis Date = 01/07/2014 
 RPT Level = 0.01  Analysis Date = 01/07/2014 
 RPT Level = 0.01  Analysis Date = 12/23/2013 
 RPT Level = 0.01  Analysis Date = 12/23/2013 
 RPT Level = 0.01  Analysis Date = 12/12/2013 
 RPT Level = 0.01  Analysis Date = 12/12/2013 
 RPT Level = 0.01  Analysis Date = 12/12/2013 
 RPT Level = 0.01  Analysis Date = 12/12/2013 
 RPT Level = 0.01  Analysis Date = 12/12/2013 
 RPT Level = 0.01  Analysis Date = 12/12/2013 
 RPT Level = 0.01  Analysis Date = 11/26/2013 
 RPT Level = 0.01  Analysis Date = 11/26/2013 
 RPT Level = 0.01  Analysis Date = 11/26/2013 
 RPT Level = 0.01  Analysis Date = 11/26/2013 
 RPT Level = 0.01  Analysis Date = 11/06/2013 
 RPT Level = 0.01  Analysis Date = 11/06/2013 
 RPT Level = 0.01  Analysis Date = 11/06/2013 
 RPT Level = 0.01  Analysis Date = 11/06/2013 
 RPT Level = 0.01  Analysis Date = 10/29/2013 
 RPT Level = 0.01  Analysis Date = 10/29/2013 
 RPT Level = 0.01  Analysis Date = 10/18/2013 
 RPT Level = 0.01  Analysis Date = 10/18/2013 
 RPT Level = 0.01  Analysis Date = 09/25/2013 
 RPT Level = 0.01  Analysis Date = 09/25/2013 
 RPT Level = 0.01  Analysis Date = 09/25/2013 
 RPT Level = 0.01  Analysis Date = 09/25/2013 
 RPT Level = 0.01  Analysis Date = 09/17/2013 
 RPT Level = 0.01  Analysis Date = 09/17/2013 
 RPT Level = 0.01  Analysis Date = 09/12/2013 
 RPT Level = 0.01  Analysis Date = 09/12/2013 
 RPT Level = 0.01  Analysis Date = 08/28/2013 
 RPT Level = 0.01  Analysis Date = 08/28/2013 
 RPT Level = 0.01  Analysis Date = 08/28/2013 
 RPT Level = 0.01  Analysis Date = 08/28/2013 
 RPT Level = 0.01  Analysis Date = 08/21/2013 
 RPT Level = 0.01  Analysis Date = 08/21/2013 
 RPT Level = 0.01  Analysis Date = 08/12/2013 
 RPT Level = 0.01  Analysis Date = 08/12/2013 
 RPT Level = 0.01  Analysis Date = 08/12/2013 
 RPT Level = 0.01  Analysis Date = 08/12/2013 
 RPT Level = 0.01  Analysis Date = 07/26/2013 
 RPT Level = 0.01  Analysis Date = 07/26/2013 
 RPT Level = 0.01  Analysis Date = 07/18/2013 
 RPT Level = 0.01  Analysis Date = 07/18/2013 
 RPT Level = 0.01  Analysis Date = 07/10/2013 
 RPT Level = 0.01  Analysis Date = 07/10/2013 
 RPT Level = 0.01  Analysis Date = 07/10/2013 
 RPT Level = 0.01  Analysis Date = 07/10/2013 
 RPT Level = 0.01  Analysis Date = 06/28/2013 
 RPT Level = 0.01  Analysis Date = 06/28/2013 
 RPT Level = 0.01  Analysis Date = 06/28/2013 
 RPT Level = 0.01  Analysis Date = 06/28/2013 
 RPT Level = 0.01  Analysis Date = 06/18/2013 
 RPT Level = 0.01  Analysis Date = 06/18/2013 
 RPT Level = 0.01  Analysis Date = 06/05/2013 
 RPT Level = 0.01  Analysis Date = 06/05/2013 
 RPT Level = 0.01  Analysis Date = 06/05/2013 
 RPT Level = 0.01  Analysis Date = 06/05/2013 
 RPT Level = 0.01  Analysis Date = 05/28/2013 
 RPT Level = 0.01  Analysis Date = 05/28/2013 
 RPT Level = 0.01  Analysis Date = 05/16/2013 
 RPT Level = 0.01  Analysis Date = 05/16/2013 
 RPT Level = 0.01  Analysis Date = 05/16/2013 
 RPT Level = 0.01  Analysis Date = 05/16/2013 
 RPT Level = 0.01  Analysis Date = 05/08/2013 
 RPT Level = 0.01  Analysis Date = 05/08/2013 
 RPT Level = 0.01  Analysis Date = 04/30/2013 
 RPT Level = 0.01  Analysis Date = 04/30/2013 
 RPT Level = 0.01  Analysis Date = 04/30/2013 
 RPT Level = 0.01  Analysis Date = 04/30/2013 
 RPT Level = 0.01  Analysis Date = 04/30/2013 
 RPT Level = 0.01  Analysis Date = 04/30/2013 
 RPT Level = 0.01  Analysis Date = 04/10/2013 
 RPT Level = 0.01  Analysis Date = 04/10/2013 
 RPT Level = 0.01  Analysis Date = 03/28/2013 
 RPT Level = 0.01  Analysis Date = 03/28/2013 
 RPT Level = 0.01  Analysis Date = 03/28/2013 
 RPT Level = 0.01  Analysis Date = 03/28/2013 
 RPT Level = 0.01  Analysis Date = 03/13/2013 
 RPT Level = 0.01  Analysis Date = 03/13/2013 
 RPT Level = 0.01  Analysis Date = 03/06/2013 
 RPT Level = 0.01  Analysis Date = 03/06/2013 
 RPT Level = 0.01  Analysis Date = 03/06/2013 
 RPT Level = 0.01  Analysis Date = 03/06/2013 
 RPT Level = 0.01  Analysis Date = 02/22/2013 
 RPT Level = 0.01  Analysis Date = 02/22/2013 
 RPT Level = 0.01  Analysis Date = 02/14/2013 
 RPT Level = 0.01  Analysis Date = 02/14/2013 
 RPT Level = 0.01  Analysis Date = 02/06/2013 
 RPT Level = 0.01  Analysis Date = 02/06/2013 
 RPT Level = 0.01  Analysis Date = 01/30/2013 
 RPT Level = 0.01  Analysis Date = 01/30/2013 
 RPT Level = 0.01  Analysis Date = 01/30/2013 
 RPT Level = 0.01  Analysis Date = 01/30/2013 
 RPT Level = 0.01  Analysis Date = 01/23/2013 
 RPT Level = 0.01  Analysis Date = 01/23/2013 
 RPT Level = 0.01  Analysis Date = 01/11/2013 
 RPT Level = 0.01  Analysis Date = 01/11/2013 
 RPT Level = 0.01  Analysis Date = 01/03/2013 
 RPT Level = 0.01  Analysis Date = 01/03/2013 
 RPT Level = 0.01  Analysis Date = 01/03/2013 
 RPT Level = 0.01  Analysis Date = 01/03/2013 
 RPT Level = 0.01  Analysis Date = 12/20/2012 
 RPT Level = 0.01  Analysis Date = 12/20/2012 
 RPT Level = 0.01  Analysis Date = 12/20/2012 
 RPT Level = 0.01  Analysis Date = 12/20/2012 
 RPT Level = 0.01  Analysis Date = 12/13/2012 
 RPT Level = 0.01  Analysis Date = 12/13/2012 
 RPT Level = 0.01  Analysis Date = 11/30/2012 
 RPT Level = 0.01  Analysis Date = 11/30/2012 
 RPT Level = 0.01  Analysis Date = 11/30/2012 
 RPT Level = 0.01  Analysis Date = 11/30/2012 
 RPT Level = 0.01  Analysis Date = 11/19/2012 
 RPT Level = 0.01  Analysis Date = 11/19/2012 
 RPT Level = 0.01  Analysis Date = 11/19/2012 
 RPT Level = 0.01  Analysis Date = 11/19/2012 
 RPT Level = 0.01  Analysis Date = 11/01/2012 
 RPT Level = 0.01  Analysis Date = 11/01/2012 
 RPT Level = 0.01  Analysis Date = 11/01/2012 
 RPT Level = 0.01  Analysis Date = 11/01/2012 
 RPT Level = 0.01  Analysis Date = 10/18/2012 
 RPT Level = 0.01  Analysis Date = 10/18/2012 
 RPT Level = 0.01  Analysis Date = 10/12/2012 
 RPT Level = 0.01  Analysis Date = 10/12/2012 
 RPT Level = 0.01  Analysis Date = 10/03/2012 
 RPT Level = 0.01  Analysis Date = 10/03/2012 
 RPT Level = 0.01  Analysis Date = 10/03/2012 
 RPT Level = 0.01  Analysis Date = 10/03/2012 
 RPT Level = 0.01  Analysis Date = 09/26/2012 
 RPT Level = 0.01  Analysis Date = 09/26/2012 
 RPT Level = 0.01  Analysis Date = 09/12/2012 
 RPT Level = 0.01  Analysis Date = 09/12/2012 
 RPT Level = 0.01  Analysis Date = 09/12/2012 
 RPT Level = 0.01  Analysis Date = 09/12/2012 
 RPT Level = 0.01  Analysis Date = 09/05/2012 
 RPT Level = 0.01  Analysis Date = 09/05/2012 
 RPT Level = 0.01  Analysis Date = 08/23/2012 
 RPT Level = 0.01  Analysis Date = 08/23/2012 
 RPT Level = 0.01  Analysis Date = 08/17/2012 
 RPT Level = 0.01  Analysis Date = 08/17/2012 
 RPT Level = 0.01  Analysis Date = 08/07/2012 
 RPT Level = 0.01  Analysis Date = 08/07/2012 
 RPT Level = 0.01  Analysis Date = 08/07/2012 
 RPT Level = 0.01  Analysis Date = 08/07/2012 
 RPT Level = 0.01  Analysis Date = 07/26/2012 
 RPT Level = 0.01  Analysis Date = 07/26/2012 
 RPT Level = 0.01  Analysis Date = 07/18/2012 
 RPT Level = 0.01  Analysis Date = 07/18/2012 
 RPT Level = 0.01  Analysis Date = 07/10/2012 
 RPT Level = 0.01  Analysis Date = 07/10/2012 
 RPT Level = 0.01  Analysis Date = 07/10/2012 
 RPT Level = 0.01  Analysis Date = 07/10/2012 
 RPT Level = 0.01  Analysis Date = 06/29/2012 
 RPT Level = 0.01  Analysis Date = 06/29/2012 
 RPT Level = 0.01  Analysis Date = 06/20/2012 
 RPT Level = 0.01  Analysis Date = 06/20/2012 
 RPT Level = 0.01  Analysis Date = 06/20/2012 
 RPT Level = 0.01  Analysis Date = 06/20/2012 
 RPT Level = 0.01  Analysis Date = 06/12/2012 
 RPT Level = 0.01  Analysis Date = 06/12/2012 
 RPT Level = 0.01  Analysis Date = 06/12/2012 
 RPT Level = 0.01  Analysis Date = 06/12/2012 
 RPT Level = 0.01  Analysis Date = 06/05/2012 
 RPT Level = 0.01  Analysis Date = 06/05/2012 
 RPT Level = 0.01  Analysis Date = 05/17/2012 
 RPT Level = 0.01  Analysis Date = 05/17/2012 
 RPT Level = 0.01  Analysis Date = 05/14/2012 
 RPT Level = 0.01  Analysis Date = 05/14/2012 
 RPT Level = 0.01  Analysis Date = 05/02/2012 
 RPT Level = 0.01  Analysis Date = 05/02/2012 
 RPT Level = 0.01  Analysis Date = 05/02/2012 
 RPT Level = 0.01  Analysis Date = 05/02/2012 
 RPT Level = 0.01  Analysis Date = 04/19/2012 
 RPT Level = 0.01  Analysis Date = 04/19/2012 
 RPT Level = 0.01  Analysis Date = 04/11/2012 
 RPT Level = 0.01  Analysis Date = 04/11/2012 
 RPT Level = 0.01  Analysis Date = 04/11/2012 
 RPT Level = 0.01  Analysis Date = 04/11/2012 
 RPT Level = 0.01  Analysis Date = 03/30/2012 
 RPT Level = 0.01  Analysis Date = 03/30/2012 
 RPT Level = 0.01  Analysis Date = 03/23/2012 
 RPT Level = 0.01  Analysis Date = 03/23/2012 
 RPT Level = 0.01  Analysis Date = 03/20/2012 
 RPT Level = 0.01  Analysis Date = 03/20/2012 
 RPT Level = 0.01  Analysis Date = 03/13/2012 
 RPT Level = 0.01  Analysis Date = 03/13/2012 
 RPT Level = 0.01  Analysis Date = 02/29/2012 
 RPT Level = 0.01  Analysis Date = 02/29/2012 
 RPT Level = 0.01  Analysis Date = 02/29/2012 
 RPT Level = 0.01  Analysis Date = 02/29/2012 
 RPT Level = 0.01  Analysis Date = 02/22/2012 
 RPT Level = 0.01  Analysis Date = 02/22/2012 
 RPT Level = 0.01  Analysis Date = 02/14/2012 
 RPT Level = 0.01  Analysis Date = 02/14/2012 
 RPT Level = 0.01  Analysis Date = 02/06/2012 
 RPT Level = 0.01  Analysis Date = 02/06/2012 
 RPT Level = 0.01  Analysis Date = 01/30/2012 
 RPT Level = 0.01  Analysis Date = 01/30/2012 
 RPT Level = 0.01  Analysis Date = 01/20/2012 
 RPT Level = 0.01  Analysis Date = 01/20/2012 
 RPT Level = 0.01  Analysis Date = 01/20/2012 
 RPT Level = 0.01  Analysis Date = 01/20/2012 
 RPT Level = 0.01  Analysis Date = 01/05/2012 
 RPT Level = 0.01  Analysis Date = 01/05/2012 
 RPT Level = 0.01  Analysis Date = 01/05/2012 
 RPT Level = 0.01  Analysis Date = 01/05/2012 
 RPT Level = 0.01  Analysis Date = 12/21/2011 
 RPT Level = 0.01  Analysis Date = 12/21/2011 
 RPT Level = 0.01  Analysis Date = 12/21/2011 
 RPT Level = 0.01  Analysis Date = 12/21/2011 
 RPT Level = 0.01  Analysis Date = 12/15/2011 
 RPT Level = 0.01  Analysis Date = 12/15/2011 
 RPT Level = 0.01  Analysis Date = 12/09/2011 
 RPT Level = 0.01  Analysis Date = 12/09/2011 
 RPT Level = 0.01  Analysis Date = 12/09/2011 
 RPT Level = 0.01  Analysis Date = 12/09/2011 
 RPT Level = 0.01  Analysis Date = 11/29/2011 
 RPT Level = 0.01  Analysis Date = 11/29/2011 
 RPT Level = 0.01  Analysis Date = 11/14/2011 
 RPT Level = 0.01  Analysis Date = 11/14/2011 
 RPT Level = 0.01  Analysis Date = 11/14/2011 
 RPT Level = 0.01  Analysis Date = 11/14/2011 
 RPT Level = 0.01  Analysis Date = 10/26/2011 
 RPT Level = 0.01  Analysis Date = 10/26/2011 
 RPT Level = 0.01  Analysis Date = 10/20/2011 
 RPT Level = 0.01  Y = 0
The SGPlot Procedure

False Positive Rate for Nitrate plus Nitrite (NO3+NO2 as N), FIL, DA, LL

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Nitrate plus Nitrite (NO3+NO2 as N), FIL, DA, LL 00631RED02 2012 50 3 6%
    2013 53 1 2%
    2014 47 3 6%
    2015 52 4 8%
    2016 50 2 4%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Nitrate plus Nitrite (NO3+NO2 as N), FIL, EPA -
Blind Blank Results
Lab: NWQL, PCode: 00631, MCode: CL047
Analysis dates: 11/14/01 through 02/15/13
Open Data Set

 Analysis Date = 11/03/2011 
 Lab Value = 0.054 
 RPT Level = 0.02 
 Lab Sample ID = 20112910137  Analysis Date = 11/03/2011 
 Lab Value = 0.054 
 RPT Level = 0.02 
 Lab Sample ID = 20112910137  Analysis Date = 02/15/2013 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20130420052  Analysis Date = 02/15/2013 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20130350029  Analysis Date = 02/15/2013 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20130280039  Analysis Date = 01/25/2013 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20130230099  Analysis Date = 01/25/2013 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20130140071  Analysis Date = 01/25/2013 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20130070056  Analysis Date = 01/25/2013 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20130020010  Analysis Date = 01/25/2013 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20123620011  Analysis Date = 12/20/2012 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20123530084  Analysis Date = 12/20/2012 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20123480061  Analysis Date = 12/05/2012 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20123390115  Analysis Date = 12/05/2012 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20123330010  Analysis Date = 11/27/2012 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20123250063  Analysis Date = 11/27/2012 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20123200054  Analysis Date = 11/27/2012 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20123120066  Analysis Date = 11/27/2012 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20123040119  Analysis Date = 10/30/2012 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20122980126  Analysis Date = 10/30/2012 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20122900096  Analysis Date = 10/19/2012 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20122830034  Analysis Date = 10/19/2012 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20122750025  Analysis Date = 09/27/2012 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20122700110  Analysis Date = 09/27/2012 
 Lab Value = 0.037 
 RPT Level = 0.02 
 Lab Sample ID = 20122690153  Analysis Date = 09/27/2012 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20122550016  Analysis Date = 09/27/2012 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20122490102  Analysis Date = 09/27/2012 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20122410013  Analysis Date = 09/27/2012 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20122350175  Analysis Date = 09/27/2012 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20122280090  Analysis Date = 09/06/2012 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20122190099  Analysis Date = 09/06/2012 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20122140050  Analysis Date = 08/28/2012 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20122050101  Analysis Date = 08/28/2012 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20121990080  Analysis Date = 07/10/2012 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20121910041  Analysis Date = 07/10/2012 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20121870014  Analysis Date = 06/28/2012 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20121780033  Analysis Date = 06/28/2012 
 Lab Value = 0.018 
 RPT Level = 0.02 
 Lab Sample ID = 20121710006  Analysis Date = 06/18/2012 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20121650052  Analysis Date = 06/18/2012 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20121560125  Analysis Date = 06/04/2012 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20121510037  Analysis Date = 06/04/2012 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20121430021  Analysis Date = 05/24/2012 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20121370053  Analysis Date = 05/18/2012 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20121290072  Analysis Date = 05/04/2012 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20121210123  Analysis Date = 05/04/2012 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20121150089  Analysis Date = 05/04/2012 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20121080009  Analysis Date = 05/04/2012 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20121010029  Analysis Date = 04/09/2012 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20120930058  Analysis Date = 04/09/2012 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20120870035  Analysis Date = 03/20/2012 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20120790085  Analysis Date = 03/20/2012 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20120730079  Analysis Date = 03/20/2012 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20120660073  Analysis Date = 03/06/2012 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20120580047  Analysis Date = 01/17/2012 
 Lab Value = -0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20113610089  Analysis Date = 01/17/2012 
 Lab Value = -0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20113530139  Analysis Date = 12/16/2011 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20113490075  Analysis Date = 12/16/2011 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20113460137  Analysis Date = 12/09/2011 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20113320115  Analysis Date = 12/09/2011 
 Lab Value = -0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20113250126  Analysis Date = 12/09/2011 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20113180164  Analysis Date = 11/10/2011 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20113110062  Analysis Date = 11/10/2011 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20113050092  Analysis Date = 11/10/2011 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20112970118  Analysis Date = 10/14/2011 
 Lab Value = -0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20112840071  Analysis Date = 10/14/2011 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20112760061  Analysis Date = 10/14/2011 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20112690123  Analysis Date = 10/14/2011 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20112630061  Analysis Date = 10/14/2011 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20112560021  Analysis Date = 09/28/2011 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20112510037  Analysis Date = 09/28/2011 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20112500188  Analysis Date = 09/07/2011 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20112360063  Analysis Date = 09/07/2011 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20112300036  Analysis Date = 08/12/2011 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20112200051  Analysis Date = 08/12/2011 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20112130154  Analysis Date = 07/28/2011 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20112060094  Analysis Date = 07/28/2011 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20112010020  Analysis Date = 07/28/2011 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20111920099  Analysis Date = 07/08/2011 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20111860062  Analysis Date = 07/08/2011 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20111780166  Analysis Date = 07/08/2011 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20111710111  Analysis Date = 07/08/2011 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20111640067  Analysis Date = 06/10/2011 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20111570061  Analysis Date = 06/10/2011 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20111510151  Analysis Date = 06/10/2011 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20111430203  Analysis Date = 05/23/2011 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20111360146  Analysis Date = 05/23/2011 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20111290046  Analysis Date = 05/09/2011 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20111220086  Analysis Date = 05/09/2011 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20111150114  Analysis Date = 04/25/2011 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20111080073  Analysis Date = 04/25/2011 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20111010118  Analysis Date = 04/06/2011 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20110950054  Analysis Date = 04/06/2011 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20110870089  Analysis Date = 03/22/2011 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20110800059  Analysis Date = 03/22/2011 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20110750067  Analysis Date = 03/22/2011 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20110660032  Analysis Date = 03/03/2011 
 Lab Value = 0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20110590070  Analysis Date = 02/23/2011 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20110530105  Analysis Date = 02/23/2011 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20110450036  Analysis Date = 02/23/2011 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20110410098  Analysis Date = 02/23/2011 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20110400069  Analysis Date = 02/09/2011 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20110240065  Analysis Date = 01/24/2011 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20110180057  Analysis Date = 01/24/2011 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20110110016  Analysis Date = 01/05/2011 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20110030021  Analysis Date = 01/05/2011 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20103610054  Analysis Date = 01/05/2011 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20103540047  Analysis Date = 01/05/2011 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20103470078  Analysis Date = 12/07/2010 
 Lab Value = -0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20103400086  Analysis Date = 12/07/2010 
 Lab Value = -0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20103330099  Analysis Date = 11/23/2010 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20103260065  Analysis Date = 11/23/2010 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20103190064  Analysis Date = 11/09/2010 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20103120026  Analysis Date = 11/09/2010 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20103060008  Analysis Date = 10/27/2010 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20102990006  Analysis Date = 10/27/2010 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20102920006  Analysis Date = 10/27/2010 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20102850132  Analysis Date = 10/08/2010 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20102770110  Analysis Date = 10/08/2010 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20102700152  Analysis Date = 10/08/2010 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20102640136  Analysis Date = 09/21/2010 
 Lab Value = -0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20102570015  Analysis Date = 09/09/2010 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20102510062  Analysis Date = 09/09/2010 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20102430249  Analysis Date = 08/27/2010 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20102350196  Analysis Date = 08/27/2010 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20102290049  Analysis Date = 08/16/2010 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20102230041  Analysis Date = 08/16/2010 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20102140090  Analysis Date = 07/28/2010 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20102080005  Analysis Date = 07/20/2010 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20102000188  Analysis Date = 07/20/2010 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20101930104  Analysis Date = 07/07/2010 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20101870059  Analysis Date = 07/07/2010 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20101790124  Analysis Date = 07/07/2010 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20101730068  Analysis Date = 07/07/2010 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20101660061  Analysis Date = 06/10/2010 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20101590005  Analysis Date = 06/10/2010 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20101530090  Analysis Date = 05/25/2010 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20101440165  Analysis Date = 05/25/2010 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20101380021  Analysis Date = 05/25/2010 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20101310098  Analysis Date = 05/05/2010 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20101240080  Analysis Date = 05/05/2010 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20101180043  Analysis Date = 04/23/2010 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20101090063  Analysis Date = 04/13/2010 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20101020075  Analysis Date = 04/13/2010 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20100950036  Analysis Date = 03/30/2010 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20100880044  Analysis Date = 03/30/2010 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20100850066  Analysis Date = 03/19/2010 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20100750002  Analysis Date = 03/12/2010 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20100680014  Analysis Date = 03/03/2010 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20100600067  Analysis Date = 03/03/2010 
 Lab Value = -0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20100530048  Analysis Date = 02/19/2010 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20100470025  Analysis Date = 02/11/2010 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20100390038  Analysis Date = 02/03/2010 
 Lab Value = -0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20100320023  Analysis Date = 02/03/2010 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20100260065  Analysis Date = 02/03/2010 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20100190102  Analysis Date = 01/13/2010 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20100110099  Analysis Date = 01/13/2010 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20100050014  Analysis Date = 01/13/2010 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20093620042  Analysis Date = 01/13/2010 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20093560033  Analysis Date = 12/22/2009 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20093480064  Analysis Date = 12/22/2009 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20093420004  Analysis Date = 12/04/2009 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20093350070  Analysis Date = 12/04/2009 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20093280015  Analysis Date = 11/20/2009 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20093200062  Analysis Date = 11/20/2009 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20093130061  Analysis Date = 11/05/2009 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20093070201  Analysis Date = 11/05/2009 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20093000106  Analysis Date = 11/05/2009 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20092920096  Analysis Date = 10/22/2009 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20092870073  Analysis Date = 10/09/2009 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20092780071  Analysis Date = 10/07/2005 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20052590035  Analysis Date = 09/16/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20052520006  Analysis Date = 09/09/2005 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20052430006  Analysis Date = 09/09/2005 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20052370002  Analysis Date = 08/31/2005 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20052300009  Analysis Date = 08/10/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20052210012  Analysis Date = 08/10/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20052160007  Analysis Date = 08/10/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20052160005  Analysis Date = 07/27/2005 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20052010007  Analysis Date = 07/19/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20051940015  Analysis Date = 07/08/2005 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20051880018  Analysis Date = 06/30/2005 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20051800189  Analysis Date = 06/30/2005 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20051740019  Analysis Date = 06/22/2005 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20051660174  Analysis Date = 06/10/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20051590025  Analysis Date = 06/10/2005 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20051530021  Analysis Date = 06/01/2005 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20051440043  Analysis Date = 05/26/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20051380014  Analysis Date = 05/18/2005 
 Lab Value = 0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20051320029  Analysis Date = 05/06/2005 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20051250003  Analysis Date = 05/06/2005 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20051170012  Analysis Date = 04/26/2005 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20051110007  Analysis Date = 04/15/2005 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20051020018  Analysis Date = 04/07/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20050950044  Analysis Date = 04/07/2005 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20050880116  Analysis Date = 04/07/2005 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20050840096  Analysis Date = 03/18/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20050750004  Analysis Date = 03/18/2005 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20050700007  Analysis Date = 03/18/2005 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20050700004  Analysis Date = 03/11/2005 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20050670011  Analysis Date = 03/02/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20050550024  Analysis Date = 02/18/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20050480005  Analysis Date = 02/15/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20050410004  Analysis Date = 02/08/2005 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20050340020  Analysis Date = 02/02/2005 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20050260024  Analysis Date = 02/02/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20050200048  Analysis Date = 01/14/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20050130091  Analysis Date = 01/14/2005 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20050070016  Analysis Date = 01/04/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20043650002  Analysis Date = 01/04/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20043580037  Analysis Date = 01/04/2005 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20043580035  Analysis Date = 01/04/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20043520023  Analysis Date = 12/17/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20043510018  Analysis Date = 12/17/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20043450069  Analysis Date = 12/17/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20043440147  Analysis Date = 12/17/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20043380005  Analysis Date = 12/17/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20043380002  Analysis Date = 12/03/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20043310059  Analysis Date = 12/03/2004 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20043280048  Analysis Date = 12/03/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20043240012  Analysis Date = 09/09/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20042450138  Analysis Date = 09/09/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20042400089  Analysis Date = 08/27/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20042370105  Analysis Date = 08/27/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20042330206  Analysis Date = 08/20/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20042320136  Analysis Date = 08/20/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20042320138  Analysis Date = 08/20/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20042240114  Analysis Date = 08/12/2004 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20042170123  Analysis Date = 08/12/2004 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20042110015  Analysis Date = 07/29/2004 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20042040039  Analysis Date = 07/15/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20041960050  Analysis Date = 07/15/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20041900062  Analysis Date = 07/15/2004 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20041820035  Analysis Date = 07/02/2004 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20041750057  Analysis Date = 07/02/2004 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20041700080  Analysis Date = 06/18/2004 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20041610055  Analysis Date = 06/09/2004 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20041550019  Analysis Date = 05/27/2004 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20041470132  Analysis Date = 05/27/2004 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20041400016  Analysis Date = 05/11/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20041260099  Analysis Date = 05/03/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20041200046  Analysis Date = 04/26/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20041130016  Analysis Date = 04/21/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20041050022  Analysis Date = 04/08/2004 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20040980007  Analysis Date = 04/14/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20040930009  Analysis Date = 04/01/2004 
 Lab Value = 0.018 
 RPT Level = 0.02 
 Lab Sample ID = 20040910012  Analysis Date = 04/01/2004 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20040850021  Analysis Date = 03/24/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20040830056  Analysis Date = 03/24/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20040790023  Analysis Date = 03/18/2004 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20040760010  Analysis Date = 03/18/2004 
 Lab Value = -0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20040720029  Analysis Date = 03/18/2004 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20040710005  Analysis Date = 03/18/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040680093  Analysis Date = 03/08/2004 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20040650001  Analysis Date = 03/08/2004 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20040580032  Analysis Date = 03/08/2004 
 Lab Value = 0.022 
 RPT Level = 0.02 
 Lab Sample ID = 20040550018  Analysis Date = 02/23/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20040510134  Analysis Date = 02/23/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20040490025  Analysis Date = 02/23/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20040440035  Analysis Date = 02/23/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20040420001  Analysis Date = 02/09/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040370017  Analysis Date = 02/09/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20040340024  Analysis Date = 02/09/2004 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20040300012  Analysis Date = 02/09/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20040270036  Analysis Date = 01/26/2004 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20040230030  Analysis Date = 01/26/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20040210154  Analysis Date = 01/26/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20040200023  Analysis Date = 01/26/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20040150075  Analysis Date = 01/14/2004 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20040090020  Analysis Date = 01/08/2004 
 Lab Value = 0.02 
 RPT Level = 0.02 
 Lab Sample ID = 20040070032  Analysis Date = 01/08/2004 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20040050016  Analysis Date = 10/02/2003 
 Lab Value = 0.014 
 RPT Level = 0.024 
 Lab Sample ID = 20032660009  Analysis Date = 10/02/2003 
 Lab Value = 0.013 
 RPT Level = 0.024 
 Lab Sample ID = 20032600107  Analysis Date = 10/01/2003 
 Lab Value = 0.009 
 RPT Level = 0.024 
 Lab Sample ID = 20032520179  Analysis Date = 09/16/2003 
 Lab Value = -0.001 
 RPT Level = 0.024 
 Lab Sample ID = 20032450195  Analysis Date = 09/03/2003 
 Lab Value = 0 
 RPT Level = 0.024 
 Lab Sample ID = 20032380029  Analysis Date = 08/28/2003 
 Lab Value = 0.005 
 RPT Level = 0.024 
 Lab Sample ID = 20032310028  Analysis Date = 08/25/2003 
 Lab Value = 0.003 
 RPT Level = 0.024 
 Lab Sample ID = 20032250256  Analysis Date = 08/14/2003 
 Lab Value = 0.006 
 RPT Level = 0.024 
 Lab Sample ID = 20032180019  Analysis Date = 08/06/2003 
 Lab Value = 0.009 
 RPT Level = 0.024 
 Lab Sample ID = 20032100004  Analysis Date = 08/06/2003 
 Lab Value = 0.01 
 RPT Level = 0.024 
 Lab Sample ID = 20032040043  Analysis Date = 07/23/2003 
 Lab Value = 0.008 
 RPT Level = 0.024 
 Lab Sample ID = 20031960025  Analysis Date = 07/16/2003 
 Lab Value = -0.002 
 RPT Level = 0.024 
 Lab Sample ID = 20031900098  Analysis Date = 07/16/2003 
 Lab Value = -0.003 
 RPT Level = 0.024 
 Lab Sample ID = 20031820037  Analysis Date = 07/16/2003 
 Lab Value = -0.002 
 RPT Level = 0.024 
 Lab Sample ID = 20031770041  Analysis Date = 06/24/2003 
 Lab Value = 0.003 
 RPT Level = 0.024 
 Lab Sample ID = 20031700013  Analysis Date = 06/18/2003 
 Lab Value = 0.003 
 RPT Level = 0.024 
 Lab Sample ID = 20031630053  Analysis Date = 06/18/2003 
 Lab Value = 0.003 
 RPT Level = 0.024 
 Lab Sample ID = 20031600109  Analysis Date = 06/05/2003 
 Lab Value = -0.005 
 RPT Level = 0.024 
 Lab Sample ID = 20031480059  Analysis Date = 06/05/2003 
 Lab Value = -0.002 
 RPT Level = 0.024 
 Lab Sample ID = 20031430019  Analysis Date = 05/27/2003 
 Lab Value = -0.004 
 RPT Level = 0.024 
 Lab Sample ID = 20031400115  Analysis Date = 05/13/2003 
 Lab Value = 0.013 
 RPT Level = 0.024 
 Lab Sample ID = 20031290084  Analysis Date = 05/06/2003 
 Lab Value = 0 
 RPT Level = 0.024 
 Lab Sample ID = 20031220070  Analysis Date = 05/06/2003 
 Lab Value = 0.003 
 RPT Level = 0.024 
 Lab Sample ID = 20031200043  Analysis Date = 04/23/2003 
 Lab Value = -0.001 
 RPT Level = 0.024 
 Lab Sample ID = 20031080208  Analysis Date = 04/09/2003 
 Lab Value = -0.001 
 RPT Level = 0.024 
 Lab Sample ID = 20030970018  Analysis Date = 04/09/2003 
 Lab Value = -0.001 
 RPT Level = 0.024 
 Lab Sample ID = 20030920027  Analysis Date = 04/09/2003 
 Lab Value = 0 
 RPT Level = 0.024 
 Lab Sample ID = 20030900015  Analysis Date = 04/09/2003 
 Lab Value = 0.001 
 RPT Level = 0.024 
 Lab Sample ID = 20030860023  Analysis Date = 03/13/2003 
 Lab Value = 0.005 
 RPT Level = 0.024 
 Lab Sample ID = 20030710021  Analysis Date = 03/13/2003 
 Lab Value = 0.01 
 RPT Level = 0.024 
 Lab Sample ID = 20030660148  Analysis Date = 03/06/2003 
 Lab Value = 0.015 
 RPT Level = 0.024 
 Lab Sample ID = 20030590040  Analysis Date = 02/27/2003 
 Lab Value = 0.012 
 RPT Level = 0.024 
 Lab Sample ID = 20030570061  Analysis Date = 02/19/2003 
 Lab Value = 0.002 
 RPT Level = 0.024 
 Lab Sample ID = 20030410034  Analysis Date = 02/05/2003 
 Lab Value = 0.011 
 RPT Level = 0.024 
 Lab Sample ID = 20030350008  Analysis Date = 02/05/2003 
 Lab Value = 0.012 
 RPT Level = 0.024 
 Lab Sample ID = 20030310028  Analysis Date = 02/05/2003 
 Lab Value = 0.012 
 RPT Level = 0.024 
 Lab Sample ID = 20030300004  Analysis Date = 01/23/2003 
 Lab Value = -0.003 
 RPT Level = 0.024 
 Lab Sample ID = 20030150009  Analysis Date = 01/15/2003 
 Lab Value = -0.003 
 RPT Level = 0.024 
 Lab Sample ID = 20030140019  Analysis Date = 01/15/2003 
 Lab Value = -0.008 
 RPT Level = 0.024 
 Lab Sample ID = 20030020002  Analysis Date = 01/15/2003 
 Lab Value = -0.003 
 RPT Level = 0.024 
 Lab Sample ID = 20023650009  Analysis Date = 12/31/2002 
 Lab Value = 0.003 
 RPT Level = 0.024 
 Lab Sample ID = 20023500166  Analysis Date = 12/31/2002 
 Lab Value = 0.003 
 RPT Level = 0.024 
 Lab Sample ID = 20023500092  Analysis Date = 12/31/2002 
 Lab Value = 0.007 
 RPT Level = 0.024 
 Lab Sample ID = 20023370026  Analysis Date = 12/31/2002 
 Lab Value = 0.001 
 RPT Level = 0.024 
 Lab Sample ID = 20023370025  Analysis Date = 12/31/2002 
 Lab Value = 0.006 
 RPT Level = 0.024 
 Lab Sample ID = 20023330096  Analysis Date = 12/31/2002 
 Lab Value = 0.004 
 RPT Level = 0.024 
 Lab Sample ID = 20023360020  Analysis Date = 12/31/2002 
 Lab Value = 0.002 
 RPT Level = 0.024 
 Lab Sample ID = 20023310020  Analysis Date = 11/14/2002 
 Lab Value = 0.011 
 RPT Level = 0.024 
 Lab Sample ID = 20023040033  Analysis Date = 11/07/2002 
 Lab Value = 0.005 
 RPT Level = 0.024 
 Lab Sample ID = 20022970050  Analysis Date = 11/07/2002 
 Lab Value = 0.007 
 RPT Level = 0.024 
 Lab Sample ID = 20022970049  Analysis Date = 11/07/2002 
 Lab Value = 0.008 
 RPT Level = 0.024 
 Lab Sample ID = 20022970048  Analysis Date = 11/07/2002 
 Lab Value = 0.007 
 RPT Level = 0.024 
 Lab Sample ID = 20022960022  Analysis Date = 09/11/2002 
 Lab Value = -0.017 
 RPT Level = 0.018 
 Lab Sample ID = 20022470019  Analysis Date = 08/29/2002 
 Lab Value = 0.001 
 RPT Level = 0.018 
 Lab Sample ID = 20022340185  Analysis Date = 08/13/2002 
 Lab Value = 0.012 
 RPT Level = 0.018 
 Lab Sample ID = 20022210006  Analysis Date = 08/07/2002 
 Lab Value = 0.002 
 RPT Level = 0.018 
 Lab Sample ID = 20022170108  Analysis Date = 07/19/2002 
 Lab Value = 0.004 
 RPT Level = 0.018 
 Lab Sample ID = 20021960235  Analysis Date = 07/10/2002 
 Lab Value = 0.004 
 RPT Level = 0.018 
 Lab Sample ID = 20021790007  Analysis Date = 06/17/2002 
 Lab Value = 0.002 
 RPT Level = 0.018 
 Lab Sample ID = 20021650004  Analysis Date = 06/05/2002 
 Lab Value = 0.01 
 RPT Level = 0.018 
 Lab Sample ID = 20021510058  Analysis Date = 05/22/2002 
 Lab Value = 0.001 
 RPT Level = 0.018 
 Lab Sample ID = 20021330224  Analysis Date = 05/22/2002 
 Lab Value = 0.001 
 RPT Level = 0.018 
 Lab Sample ID = 20021300018  Analysis Date = 05/03/2002 
 Lab Value = -0.002 
 RPT Level = 0.018 
 Lab Sample ID = 20021210087  Analysis Date = 05/03/2002 
 Lab Value = -0.002 
 RPT Level = 0.018 
 Lab Sample ID = 20021140035  Analysis Date = 05/03/2002 
 Lab Value = -0.002 
 RPT Level = 0.018 
 Lab Sample ID = 20021140034  Analysis Date = 04/18/2002 
 Lab Value = 0.024 
 RPT Level = 0.018 
 Lab Sample ID = 20021010014  Analysis Date = 04/10/2002 
 Lab Value = -0.013 
 RPT Level = 0.018 
 Lab Sample ID = 20020930111  Analysis Date = 03/27/2002 
 Lab Value = -0.005 
 RPT Level = 0.018 
 Lab Sample ID = 20020850093  Analysis Date = 03/27/2002 
 Lab Value = -0.005 
 RPT Level = 0.018 
 Lab Sample ID = 20020810193  Analysis Date = 03/27/2002 
 Lab Value = 0.001 
 RPT Level = 0.018 
 Lab Sample ID = 20020730106  Analysis Date = 03/14/2002 
 Lab Value = 0.005 
 RPT Level = 0.018 
 Lab Sample ID = 20020670024  Analysis Date = 03/14/2002 
 Lab Value = -0.005 
 RPT Level = 0.018 
 Lab Sample ID = 20020600007  Analysis Date = 03/01/2002 
 Lab Value = 0.001 
 RPT Level = 0.018 
 Lab Sample ID = 20020570017  Analysis Date = 02/21/2002 
 Lab Value = -0.008 
 RPT Level = 0.018 
 Lab Sample ID = 20020460046  Analysis Date = 02/07/2002 
 Lab Value = 0.022 
 RPT Level = 0.018 
 Lab Sample ID = 20020360013  Analysis Date = 02/07/2002 
 Lab Value = 0.019 
 RPT Level = 0.018 
 Lab Sample ID = 20020320103  Analysis Date = 02/07/2002 
 Lab Value = 0.021 
 RPT Level = 0.018 
 Lab Sample ID = 20020220080  Analysis Date = 01/18/2002 
 Lab Value = 0.007 
 RPT Level = 0.018 
 Lab Sample ID = 20020110004  Analysis Date = 01/18/2002 
 Lab Value = 0.005 
 RPT Level = 0.018 
 Lab Sample ID = 20020020006  Analysis Date = 01/18/2002 
 Lab Value = 0.01 
 RPT Level = 0.018 
 Lab Sample ID = 20013600208  Analysis Date = 12/21/2001 
 Lab Value = 0.026 
 RPT Level = 0.018 
 Lab Sample ID = 20013520043  Analysis Date = 12/21/2001 
 Lab Value = 0.026 
 RPT Level = 0.018 
 Lab Sample ID = 20013480009  Analysis Date = 12/07/2001 
 Lab Value = 0.021 
 RPT Level = 0.018 
 Lab Sample ID = 20013390004  Analysis Date = 11/14/2001 
 Lab Value = 0.011 
 RPT Level = 0.018 
 Lab Sample ID = 20013110128  Analysis Date = 02/15/2013 
 RPT Level = 0.02  Analysis Date = 02/15/2013 
 RPT Level = 0.02  Analysis Date = 02/15/2013 
 RPT Level = 0.02  Analysis Date = 02/15/2013 
 RPT Level = 0.02  Analysis Date = 02/15/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 01/25/2013 
 RPT Level = 0.02  Analysis Date = 12/20/2012 
 RPT Level = 0.02  Analysis Date = 12/20/2012 
 RPT Level = 0.02  Analysis Date = 12/20/2012 
 RPT Level = 0.02  Analysis Date = 12/20/2012 
 RPT Level = 0.02  Analysis Date = 12/05/2012 
 RPT Level = 0.02  Analysis Date = 12/05/2012 
 RPT Level = 0.02  Analysis Date = 12/05/2012 
 RPT Level = 0.02  Analysis Date = 12/05/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 10/30/2012 
 RPT Level = 0.02  Analysis Date = 10/30/2012 
 RPT Level = 0.02  Analysis Date = 10/30/2012 
 RPT Level = 0.02  Analysis Date = 10/30/2012 
 RPT Level = 0.02  Analysis Date = 10/19/2012 
 RPT Level = 0.02  Analysis Date = 10/19/2012 
 RPT Level = 0.02  Analysis Date = 10/19/2012 
 RPT Level = 0.02  Analysis Date = 10/19/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/27/2012 
 RPT Level = 0.02  Analysis Date = 09/06/2012 
 RPT Level = 0.02  Analysis Date = 09/06/2012 
 RPT Level = 0.02  Analysis Date = 09/06/2012 
 RPT Level = 0.02  Analysis Date = 09/06/2012 
 RPT Level = 0.02  Analysis Date = 08/28/2012 
 RPT Level = 0.02  Analysis Date = 08/28/2012 
 RPT Level = 0.02  Analysis Date = 08/28/2012 
 RPT Level = 0.02  Analysis Date = 08/28/2012 
 RPT Level = 0.02  Analysis Date = 07/10/2012 
 RPT Level = 0.02  Analysis Date = 07/10/2012 
 RPT Level = 0.02  Analysis Date = 07/10/2012 
 RPT Level = 0.02  Analysis Date = 07/10/2012 
 RPT Level = 0.02  Analysis Date = 06/28/2012 
 RPT Level = 0.02  Analysis Date = 06/28/2012 
 RPT Level = 0.02  Analysis Date = 06/28/2012 
 RPT Level = 0.02  Analysis Date = 06/28/2012 
 RPT Level = 0.02  Analysis Date = 06/18/2012 
 RPT Level = 0.02  Analysis Date = 06/18/2012 
 RPT Level = 0.02  Analysis Date = 06/18/2012 
 RPT Level = 0.02  Analysis Date = 06/18/2012 
 RPT Level = 0.02  Analysis Date = 06/04/2012 
 RPT Level = 0.02  Analysis Date = 06/04/2012 
 RPT Level = 0.02  Analysis Date = 06/04/2012 
 RPT Level = 0.02  Analysis Date = 06/04/2012 
 RPT Level = 0.02  Analysis Date = 05/24/2012 
 RPT Level = 0.02  Analysis Date = 05/24/2012 
 RPT Level = 0.02  Analysis Date = 05/18/2012 
 RPT Level = 0.02  Analysis Date = 05/18/2012 
 RPT Level = 0.02  Analysis Date = 05/04/2012 
 RPT Level = 0.02  Analysis Date = 05/04/2012 
 RPT Level = 0.02  Analysis Date = 05/04/2012 
 RPT Level = 0.02  Analysis Date = 05/04/2012 
 RPT Level = 0.02  Analysis Date = 05/04/2012 
 RPT Level = 0.02  Analysis Date = 05/04/2012 
 RPT Level = 0.02  Analysis Date = 05/04/2012 
 RPT Level = 0.02  Analysis Date = 05/04/2012 
 RPT Level = 0.02  Analysis Date = 04/09/2012 
 RPT Level = 0.02  Analysis Date = 04/09/2012 
 RPT Level = 0.02  Analysis Date = 04/09/2012 
 RPT Level = 0.02  Analysis Date = 04/09/2012 
 RPT Level = 0.02  Analysis Date = 03/20/2012 
 RPT Level = 0.02  Analysis Date = 03/20/2012 
 RPT Level = 0.02  Analysis Date = 03/20/2012 
 RPT Level = 0.02  Analysis Date = 03/20/2012 
 RPT Level = 0.02  Analysis Date = 03/20/2012 
 RPT Level = 0.02  Analysis Date = 03/20/2012 
 RPT Level = 0.02  Analysis Date = 03/06/2012 
 RPT Level = 0.02  Analysis Date = 03/06/2012 
 RPT Level = 0.02  Analysis Date = 01/17/2012 
 RPT Level = 0.02  Analysis Date = 01/17/2012 
 RPT Level = 0.02  Analysis Date = 01/17/2012 
 RPT Level = 0.02  Analysis Date = 01/17/2012 
 RPT Level = 0.02  Analysis Date = 12/16/2011 
 RPT Level = 0.02  Analysis Date = 12/16/2011 
 RPT Level = 0.02  Analysis Date = 12/16/2011 
 RPT Level = 0.02  Analysis Date = 12/16/2011 
 RPT Level = 0.02  Analysis Date = 12/09/2011 
 RPT Level = 0.02  Analysis Date = 12/09/2011 
 RPT Level = 0.02  Analysis Date = 12/09/2011 
 RPT Level = 0.02  Analysis Date = 12/09/2011 
 RPT Level = 0.02  Analysis Date = 12/09/2011 
 RPT Level = 0.02  Analysis Date = 12/09/2011 
 RPT Level = 0.02  Analysis Date = 11/10/2011 
 RPT Level = 0.02  Analysis Date = 11/10/2011 
 RPT Level = 0.02  Analysis Date = 11/10/2011 
 RPT Level = 0.02  Analysis Date = 11/10/2011 
 RPT Level = 0.02  Analysis Date = 11/10/2011 
 RPT Level = 0.02  Analysis Date = 11/10/2011 
 RPT Level = 0.02  Analysis Date = 11/03/2011 
 RPT Level = 0.02  Analysis Date = 11/03/2011 
 RPT Level = 0.02  Analysis Date = 10/14/2011 
 RPT Level = 0.02  Analysis Date = 10/14/2011 
 RPT Level = 0.02  Analysis Date = 10/14/2011 
 RPT Level = 0.02  Analysis Date = 10/14/2011 
 RPT Level = 0.02  Analysis Date = 10/14/2011 
 RPT Level = 0.02  Analysis Date = 10/14/2011 
 RPT Level = 0.02  Analysis Date = 10/14/2011 
 RPT Level = 0.02  Analysis Date = 10/14/2011 
 RPT Level = 0.02  Analysis Date = 10/14/2011 
 RPT Level = 0.02  Analysis Date = 10/14/2011 
 RPT Level = 0.02  Analysis Date = 09/28/2011 
 RPT Level = 0.02  Analysis Date = 09/28/2011 
 RPT Level = 0.02  Analysis Date = 09/28/2011 
 RPT Level = 0.02  Analysis Date = 09/28/2011 
 RPT Level = 0.02  Analysis Date = 09/07/2011 
 RPT Level = 0.02  Analysis Date = 09/07/2011 
 RPT Level = 0.02  Analysis Date = 09/07/2011 
 RPT Level = 0.02  Analysis Date = 09/07/2011 
 RPT Level = 0.02  Analysis Date = 08/12/2011 
 RPT Level = 0.02  Analysis Date = 08/12/2011 
 RPT Level = 0.02  Analysis Date = 08/12/2011 
 RPT Level = 0.02  Analysis Date = 08/12/2011 
 RPT Level = 0.02  Analysis Date = 07/28/2011 
 RPT Level = 0.02  Analysis Date = 07/28/2011 
 RPT Level = 0.02  Analysis Date = 07/28/2011 
 RPT Level = 0.02  Analysis Date = 07/28/2011 
 RPT Level = 0.02  Analysis Date = 07/28/2011 
 RPT Level = 0.02  Analysis Date = 07/28/2011 
 RPT Level = 0.02  Analysis Date = 07/08/2011 
 RPT Level = 0.02  Analysis Date = 07/08/2011 
 RPT Level = 0.02  Analysis Date = 07/08/2011 
 RPT Level = 0.02  Analysis Date = 07/08/2011 
 RPT Level = 0.02  Analysis Date = 07/08/2011 
 RPT Level = 0.02  Analysis Date = 07/08/2011 
 RPT Level = 0.02  Analysis Date = 07/08/2011 
 RPT Level = 0.02  Analysis Date = 07/08/2011 
 RPT Level = 0.02  Analysis Date = 06/10/2011 
 RPT Level = 0.02  Analysis Date = 06/10/2011 
 RPT Level = 0.02  Analysis Date = 06/10/2011 
 RPT Level = 0.02  Analysis Date = 06/10/2011 
 RPT Level = 0.02  Analysis Date = 06/10/2011 
 RPT Level = 0.02  Analysis Date = 06/10/2011 
 RPT Level = 0.02  Analysis Date = 05/23/2011 
 RPT Level = 0.02  Analysis Date = 05/23/2011 
 RPT Level = 0.02  Analysis Date = 05/23/2011 
 RPT Level = 0.02  Analysis Date = 05/23/2011 
 RPT Level = 0.02  Analysis Date = 05/09/2011 
 RPT Level = 0.02  Analysis Date = 05/09/2011 
 RPT Level = 0.02  Analysis Date = 05/09/2011 
 RPT Level = 0.02  Analysis Date = 05/09/2011 
 RPT Level = 0.02  Analysis Date = 04/25/2011 
 RPT Level = 0.02  Analysis Date = 04/25/2011 
 RPT Level = 0.02  Analysis Date = 04/25/2011 
 RPT Level = 0.02  Analysis Date = 04/25/2011 
 RPT Level = 0.02  Analysis Date = 04/06/2011 
 RPT Level = 0.02  Analysis Date = 04/06/2011 
 RPT Level = 0.02  Analysis Date = 04/06/2011 
 RPT Level = 0.02  Analysis Date = 04/06/2011 
 RPT Level = 0.02  Analysis Date = 03/22/2011 
 RPT Level = 0.02  Analysis Date = 03/22/2011 
 RPT Level = 0.02  Analysis Date = 03/22/2011 
 RPT Level = 0.02  Analysis Date = 03/22/2011 
 RPT Level = 0.02  Analysis Date = 03/22/2011 
 RPT Level = 0.02  Analysis Date = 03/22/2011 
 RPT Level = 0.02  Analysis Date = 03/03/2011 
 RPT Level = 0.02  Analysis Date = 03/03/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/23/2011 
 RPT Level = 0.02  Analysis Date = 02/09/2011 
 RPT Level = 0.02  Analysis Date = 02/09/2011 
 RPT Level = 0.02  Analysis Date = 01/24/2011 
 RPT Level = 0.02  Analysis Date = 01/24/2011 
 RPT Level = 0.02  Analysis Date = 01/24/2011 
 RPT Level = 0.02  Analysis Date = 01/24/2011 
 RPT Level = 0.02  Analysis Date = 01/05/2011 
 RPT Level = 0.02  Analysis Date = 01/05/2011 
 RPT Level = 0.02  Analysis Date = 01/05/2011 
 RPT Level = 0.02  Analysis Date = 01/05/2011 
 RPT Level = 0.02  Analysis Date = 01/05/2011 
 RPT Level = 0.02  Analysis Date = 01/05/2011 
 RPT Level = 0.02  Analysis Date = 01/05/2011 
 RPT Level = 0.02  Analysis Date = 01/05/2011 
 RPT Level = 0.02  Analysis Date = 12/07/2010 
 RPT Level = 0.02  Analysis Date = 12/07/2010 
 RPT Level = 0.02  Analysis Date = 12/07/2010 
 RPT Level = 0.02  Analysis Date = 12/07/2010 
 RPT Level = 0.02  Analysis Date = 11/23/2010 
 RPT Level = 0.02  Analysis Date = 11/23/2010 
 RPT Level = 0.02  Analysis Date = 11/23/2010 
 RPT Level = 0.02  Analysis Date = 11/23/2010 
 RPT Level = 0.02  Analysis Date = 11/09/2010 
 RPT Level = 0.02  Analysis Date = 11/09/2010 
 RPT Level = 0.02  Analysis Date = 11/09/2010 
 RPT Level = 0.02  Analysis Date = 11/09/2010 
 RPT Level = 0.02  Analysis Date = 10/27/2010 
 RPT Level = 0.02  Analysis Date = 10/27/2010 
 RPT Level = 0.02  Analysis Date = 10/27/2010 
 RPT Level = 0.02  Analysis Date = 10/27/2010 
 RPT Level = 0.02  Analysis Date = 10/27/2010 
 RPT Level = 0.02  Analysis Date = 10/27/2010 
 RPT Level = 0.02  Analysis Date = 10/08/2010 
 RPT Level = 0.02  Analysis Date = 10/08/2010 
 RPT Level = 0.02  Analysis Date = 10/08/2010 
 RPT Level = 0.02  Analysis Date = 10/08/2010 
 RPT Level = 0.02  Analysis Date = 10/08/2010 
 RPT Level = 0.02  Analysis Date = 10/08/2010 
 RPT Level = 0.02  Analysis Date = 09/21/2010 
 RPT Level = 0.02  Analysis Date = 09/21/2010 
 RPT Level = 0.02  Analysis Date = 09/09/2010 
 RPT Level = 0.02  Analysis Date = 09/09/2010 
 RPT Level = 0.02  Analysis Date = 09/09/2010 
 RPT Level = 0.02  Analysis Date = 09/09/2010 
 RPT Level = 0.02  Analysis Date = 08/27/2010 
 RPT Level = 0.02  Analysis Date = 08/27/2010 
 RPT Level = 0.02  Analysis Date = 08/27/2010 
 RPT Level = 0.02  Analysis Date = 08/27/2010 
 RPT Level = 0.02  Analysis Date = 08/16/2010 
 RPT Level = 0.02  Analysis Date = 08/16/2010 
 RPT Level = 0.02  Analysis Date = 08/16/2010 
 RPT Level = 0.02  Analysis Date = 08/16/2010 
 RPT Level = 0.02  Analysis Date = 07/28/2010 
 RPT Level = 0.02  Analysis Date = 07/28/2010 
 RPT Level = 0.02  Analysis Date = 07/20/2010 
 RPT Level = 0.02  Analysis Date = 07/20/2010 
 RPT Level = 0.02  Analysis Date = 07/20/2010 
 RPT Level = 0.02  Analysis Date = 07/20/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 06/10/2010 
 RPT Level = 0.02  Analysis Date = 06/10/2010 
 RPT Level = 0.02  Analysis Date = 06/10/2010 
 RPT Level = 0.02  Analysis Date = 06/10/2010 
 RPT Level = 0.02  Analysis Date = 05/25/2010 
 RPT Level = 0.02  Analysis Date = 05/25/2010 
 RPT Level = 0.02  Analysis Date = 05/25/2010 
 RPT Level = 0.02  Analysis Date = 05/25/2010 
 RPT Level = 0.02  Analysis Date = 05/25/2010 
 RPT Level = 0.02  Analysis Date = 05/25/2010 
 RPT Level = 0.02  Analysis Date = 05/05/2010 
 RPT Level = 0.02  Analysis Date = 05/05/2010 
 RPT Level = 0.02  Analysis Date = 05/05/2010 
 RPT Level = 0.02  Analysis Date = 05/05/2010 
 RPT Level = 0.02  Analysis Date = 04/23/2010 
 RPT Level = 0.02  Analysis Date = 04/23/2010 
 RPT Level = 0.02  Analysis Date = 04/13/2010 
 RPT Level = 0.02  Analysis Date = 04/13/2010 
 RPT Level = 0.02  Analysis Date = 04/13/2010 
 RPT Level = 0.02  Analysis Date = 04/13/2010 
 RPT Level = 0.02  Analysis Date = 03/30/2010 
 RPT Level = 0.02  Analysis Date = 03/30/2010 
 RPT Level = 0.02  Analysis Date = 03/30/2010 
 RPT Level = 0.02  Analysis Date = 03/30/2010 
 RPT Level = 0.02  Analysis Date = 03/19/2010 
 RPT Level = 0.02  Analysis Date = 03/19/2010 
 RPT Level = 0.02  Analysis Date = 03/12/2010 
 RPT Level = 0.02  Analysis Date = 03/12/2010 
 RPT Level = 0.02  Analysis Date = 03/03/2010 
 RPT Level = 0.02  Analysis Date = 03/03/2010 
 RPT Level = 0.02  Analysis Date = 03/03/2010 
 RPT Level = 0.02  Analysis Date = 03/03/2010 
 RPT Level = 0.02  Analysis Date = 02/19/2010 
 RPT Level = 0.02  Analysis Date = 02/19/2010 
 RPT Level = 0.02  Analysis Date = 02/11/2010 
 RPT Level = 0.02  Analysis Date = 02/11/2010 
 RPT Level = 0.02  Analysis Date = 02/03/2010 
 RPT Level = 0.02  Analysis Date = 02/03/2010 
 RPT Level = 0.02  Analysis Date = 02/03/2010 
 RPT Level = 0.02  Analysis Date = 02/03/2010 
 RPT Level = 0.02  Analysis Date = 02/03/2010 
 RPT Level = 0.02  Analysis Date = 02/03/2010 
 RPT Level = 0.02  Analysis Date = 01/13/2010 
 RPT Level = 0.02  Analysis Date = 01/13/2010 
 RPT Level = 0.02  Analysis Date = 01/13/2010 
 RPT Level = 0.02  Analysis Date = 01/13/2010 
 RPT Level = 0.02  Analysis Date = 01/13/2010 
 RPT Level = 0.02  Analysis Date = 01/13/2010 
 RPT Level = 0.02  Analysis Date = 01/13/2010 
 RPT Level = 0.02  Analysis Date = 01/13/2010 
 RPT Level = 0.02  Analysis Date = 12/22/2009 
 RPT Level = 0.02  Analysis Date = 12/22/2009 
 RPT Level = 0.02  Analysis Date = 12/22/2009 
 RPT Level = 0.02  Analysis Date = 12/22/2009 
 RPT Level = 0.02  Analysis Date = 12/04/2009 
 RPT Level = 0.02  Analysis Date = 12/04/2009 
 RPT Level = 0.02  Analysis Date = 12/04/2009 
 RPT Level = 0.02  Analysis Date = 12/04/2009 
 RPT Level = 0.02  Analysis Date = 11/20/2009 
 RPT Level = 0.02  Analysis Date = 11/20/2009 
 RPT Level = 0.02  Analysis Date = 11/20/2009 
 RPT Level = 0.02  Analysis Date = 11/20/2009 
 RPT Level = 0.02  Analysis Date = 11/05/2009 
 RPT Level = 0.02  Analysis Date = 11/05/2009 
 RPT Level = 0.02  Analysis Date = 11/05/2009 
 RPT Level = 0.02  Analysis Date = 11/05/2009 
 RPT Level = 0.02  Analysis Date = 11/05/2009 
 RPT Level = 0.02  Analysis Date = 11/05/2009 
 RPT Level = 0.02  Analysis Date = 10/22/2009 
 RPT Level = 0.02  Analysis Date = 10/22/2009 
 RPT Level = 0.02  Analysis Date = 10/09/2009 
 RPT Level = 0.02  Analysis Date = 10/09/2009 
 RPT Level = 0.02  Analysis Date = 10/07/2005 
 RPT Level = 0.02  Analysis Date = 10/07/2005 
 RPT Level = 0.02  Analysis Date = 09/16/2005 
 RPT Level = 0.02  Analysis Date = 09/16/2005 
 RPT Level = 0.02  Analysis Date = 09/09/2005 
 RPT Level = 0.02  Analysis Date = 09/09/2005 
 RPT Level = 0.02  Analysis Date = 09/09/2005 
 RPT Level = 0.02  Analysis Date = 09/09/2005 
 RPT Level = 0.02  Analysis Date = 08/31/2005 
 RPT Level = 0.02  Analysis Date = 08/31/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 07/27/2005 
 RPT Level = 0.02  Analysis Date = 07/27/2005 
 RPT Level = 0.02  Analysis Date = 07/19/2005 
 RPT Level = 0.02  Analysis Date = 07/19/2005 
 RPT Level = 0.02  Analysis Date = 07/08/2005 
 RPT Level = 0.02  Analysis Date = 07/08/2005 
 RPT Level = 0.02  Analysis Date = 06/30/2005 
 RPT Level = 0.02  Analysis Date = 06/30/2005 
 RPT Level = 0.02  Analysis Date = 06/30/2005 
 RPT Level = 0.02  Analysis Date = 06/30/2005 
 RPT Level = 0.02  Analysis Date = 06/22/2005 
 RPT Level = 0.02  Analysis Date = 06/22/2005 
 RPT Level = 0.02  Analysis Date = 06/10/2005 
 RPT Level = 0.02  Analysis Date = 06/10/2005 
 RPT Level = 0.02  Analysis Date = 06/10/2005 
 RPT Level = 0.02  Analysis Date = 06/10/2005 
 RPT Level = 0.02  Analysis Date = 06/01/2005 
 RPT Level = 0.02  Analysis Date = 06/01/2005 
 RPT Level = 0.02  Analysis Date = 05/26/2005 
 RPT Level = 0.02  Analysis Date = 05/26/2005 
 RPT Level = 0.02  Analysis Date = 05/18/2005 
 RPT Level = 0.02  Analysis Date = 05/18/2005 
 RPT Level = 0.02  Analysis Date = 05/06/2005 
 RPT Level = 0.02  Analysis Date = 05/06/2005 
 RPT Level = 0.02  Analysis Date = 05/06/2005 
 RPT Level = 0.02  Analysis Date = 05/06/2005 
 RPT Level = 0.02  Analysis Date = 04/26/2005 
 RPT Level = 0.02  Analysis Date = 04/26/2005 
 RPT Level = 0.02  Analysis Date = 04/15/2005 
 RPT Level = 0.02  Analysis Date = 04/15/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 03/18/2005 
 RPT Level = 0.02  Analysis Date = 03/18/2005 
 RPT Level = 0.02  Analysis Date = 03/18/2005 
 RPT Level = 0.02  Analysis Date = 03/18/2005 
 RPT Level = 0.02  Analysis Date = 03/18/2005 
 RPT Level = 0.02  Analysis Date = 03/18/2005 
 RPT Level = 0.02  Analysis Date = 03/11/2005 
 RPT Level = 0.02  Analysis Date = 03/11/2005 
 RPT Level = 0.02  Analysis Date = 03/02/2005 
 RPT Level = 0.02  Analysis Date = 03/02/2005 
 RPT Level = 0.02  Analysis Date = 02/18/2005 
 RPT Level = 0.02  Analysis Date = 02/18/2005 
 RPT Level = 0.02  Analysis Date = 02/15/2005 
 RPT Level = 0.02  Analysis Date = 02/15/2005 
 RPT Level = 0.02  Analysis Date = 02/08/2005 
 RPT Level = 0.02  Analysis Date = 02/08/2005 
 RPT Level = 0.02  Analysis Date = 02/02/2005 
 RPT Level = 0.02  Analysis Date = 02/02/2005 
 RPT Level = 0.02  Analysis Date = 02/02/2005 
 RPT Level = 0.02  Analysis Date = 02/02/2005 
 RPT Level = 0.02  Analysis Date = 01/14/2005 
 RPT Level = 0.02  Analysis Date = 01/14/2005 
 RPT Level = 0.02  Analysis Date = 01/14/2005 
 RPT Level = 0.02  Analysis Date = 01/14/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/17/2004 
 RPT Level = 0.02  Analysis Date = 12/03/2004 
 RPT Level = 0.02  Analysis Date = 12/03/2004 
 RPT Level = 0.02  Analysis Date = 12/03/2004 
 RPT Level = 0.02  Analysis Date = 12/03/2004 
 RPT Level = 0.02  Analysis Date = 12/03/2004 
 RPT Level = 0.02  Analysis Date = 12/03/2004 
 RPT Level = 0.02  Analysis Date = 09/09/2004 
 RPT Level = 0.02  Analysis Date = 09/09/2004 
 RPT Level = 0.02  Analysis Date = 09/09/2004 
 RPT Level = 0.02  Analysis Date = 09/09/2004 
 RPT Level = 0.02  Analysis Date = 08/27/2004 
 RPT Level = 0.02  Analysis Date = 08/27/2004 
 RPT Level = 0.02  Analysis Date = 08/27/2004 
 RPT Level = 0.02  Analysis Date = 08/27/2004 
 RPT Level = 0.02  Analysis Date = 08/20/2004 
 RPT Level = 0.02  Analysis Date = 08/20/2004 
 RPT Level = 0.02  Analysis Date = 08/20/2004 
 RPT Level = 0.02  Analysis Date = 08/20/2004 
 RPT Level = 0.02  Analysis Date = 08/20/2004 
 RPT Level = 0.02  Analysis Date = 08/20/2004 
 RPT Level = 0.02  Analysis Date = 08/12/2004 
 RPT Level = 0.02  Analysis Date = 08/12/2004 
 RPT Level = 0.02  Analysis Date = 08/12/2004 
 RPT Level = 0.02  Analysis Date = 08/12/2004 
 RPT Level = 0.02  Analysis Date = 07/29/2004 
 RPT Level = 0.02  Analysis Date = 07/29/2004 
 RPT Level = 0.02  Analysis Date = 07/15/2004 
 RPT Level = 0.02  Analysis Date = 07/15/2004 
 RPT Level = 0.02  Analysis Date = 07/15/2004 
 RPT Level = 0.02  Analysis Date = 07/15/2004 
 RPT Level = 0.02  Analysis Date = 07/15/2004 
 RPT Level = 0.02  Analysis Date = 07/15/2004 
 RPT Level = 0.02  Analysis Date = 07/02/2004 
 RPT Level = 0.02  Analysis Date = 07/02/2004 
 RPT Level = 0.02  Analysis Date = 07/02/2004 
 RPT Level = 0.02  Analysis Date = 07/02/2004 
 RPT Level = 0.02  Analysis Date = 06/18/2004 
 RPT Level = 0.02  Analysis Date = 06/18/2004 
 RPT Level = 0.02  Analysis Date = 06/09/2004 
 RPT Level = 0.02  Analysis Date = 06/09/2004 
 RPT Level = 0.02  Analysis Date = 05/27/2004 
 RPT Level = 0.02  Analysis Date = 05/27/2004 
 RPT Level = 0.02  Analysis Date = 05/27/2004 
 RPT Level = 0.02  Analysis Date = 05/27/2004 
 RPT Level = 0.02  Analysis Date = 05/11/2004 
 RPT Level = 0.02  Analysis Date = 05/11/2004 
 RPT Level = 0.02  Analysis Date = 05/03/2004 
 RPT Level = 0.02  Analysis Date = 05/03/2004 
 RPT Level = 0.02  Analysis Date = 04/26/2004 
 RPT Level = 0.02  Analysis Date = 04/26/2004 
 RPT Level = 0.02  Analysis Date = 04/21/2004 
 RPT Level = 0.02  Analysis Date = 04/21/2004 
 RPT Level = 0.02  Analysis Date = 04/08/2004 
 RPT Level = 0.02  Analysis Date = 04/08/2004 
 RPT Level = 0.02  Analysis Date = 04/14/2004 
 RPT Level = 0.02  Analysis Date = 04/14/2004 
 RPT Level = 0.02  Analysis Date = 04/01/2004 
 RPT Level = 0.02  Analysis Date = 04/01/2004 
 RPT Level = 0.02  Analysis Date = 04/01/2004 
 RPT Level = 0.02  Analysis Date = 04/01/2004 
 RPT Level = 0.02  Analysis Date = 03/24/2004 
 RPT Level = 0.02  Analysis Date = 03/24/2004 
 RPT Level = 0.02  Analysis Date = 03/24/2004 
 RPT Level = 0.02  Analysis Date = 03/24/2004 
 RPT Level = 0.02  Analysis Date = 03/18/2004 
 RPT Level = 0.02  Analysis Date = 03/18/2004 
 RPT Level = 0.02  Analysis Date = 03/18/2004 
 RPT Level = 0.02  Analysis Date = 03/18/2004 
 RPT Level = 0.02  Analysis Date = 03/18/2004 
 RPT Level = 0.02  Analysis Date = 03/18/2004 
 RPT Level = 0.02  Analysis Date = 03/18/2004 
 RPT Level = 0.02  Analysis Date = 03/18/2004 
 RPT Level = 0.02  Analysis Date = 03/08/2004 
 RPT Level = 0.02  Analysis Date = 03/08/2004 
 RPT Level = 0.02  Analysis Date = 03/08/2004 
 RPT Level = 0.02  Analysis Date = 03/08/2004 
 RPT Level = 0.02  Analysis Date = 03/08/2004 
 RPT Level = 0.02  Analysis Date = 03/08/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/14/2004 
 RPT Level = 0.02  Analysis Date = 01/14/2004 
 RPT Level = 0.02  Analysis Date = 01/08/2004 
 RPT Level = 0.02  Analysis Date = 01/08/2004 
 RPT Level = 0.02  Analysis Date = 01/08/2004 
 RPT Level = 0.02  Analysis Date = 01/08/2004 
 RPT Level = 0.02  Analysis Date = 10/02/2003 
 RPT Level = 0.024  Analysis Date = 10/02/2003 
 RPT Level = 0.024  Analysis Date = 10/02/2003 
 RPT Level = 0.024  Analysis Date = 10/02/2003 
 RPT Level = 0.024  Analysis Date = 10/01/2003 
 RPT Level = 0.024  Analysis Date = 10/01/2003 
 RPT Level = 0.024  Analysis Date = 09/16/2003 
 RPT Level = 0.024  Analysis Date = 09/16/2003 
 RPT Level = 0.024  Analysis Date = 09/03/2003 
 RPT Level = 0.024  Analysis Date = 09/03/2003 
 RPT Level = 0.024  Analysis Date = 08/28/2003 
 RPT Level = 0.024  Analysis Date = 08/28/2003 
 RPT Level = 0.024  Analysis Date = 08/25/2003 
 RPT Level = 0.024  Analysis Date = 08/25/2003 
 RPT Level = 0.024  Analysis Date = 08/14/2003 
 RPT Level = 0.024  Analysis Date = 08/14/2003 
 RPT Level = 0.024  Analysis Date = 08/06/2003 
 RPT Level = 0.024  Analysis Date = 08/06/2003 
 RPT Level = 0.024  Analysis Date = 08/06/2003 
 RPT Level = 0.024  Analysis Date = 08/06/2003 
 RPT Level = 0.024  Analysis Date = 07/23/2003 
 RPT Level = 0.024  Analysis Date = 07/23/2003 
 RPT Level = 0.024  Analysis Date = 07/16/2003 
 RPT Level = 0.024  Analysis Date = 07/16/2003 
 RPT Level = 0.024  Analysis Date = 07/16/2003 
 RPT Level = 0.024  Analysis Date = 07/16/2003 
 RPT Level = 0.024  Analysis Date = 07/16/2003 
 RPT Level = 0.024  Analysis Date = 07/16/2003 
 RPT Level = 0.024  Analysis Date = 06/24/2003 
 RPT Level = 0.024  Analysis Date = 06/24/2003 
 RPT Level = 0.024  Analysis Date = 06/18/2003 
 RPT Level = 0.024  Analysis Date = 06/18/2003 
 RPT Level = 0.024  Analysis Date = 06/18/2003 
 RPT Level = 0.024  Analysis Date = 06/18/2003 
 RPT Level = 0.024  Analysis Date = 06/05/2003 
 RPT Level = 0.024  Analysis Date = 06/05/2003 
 RPT Level = 0.024  Analysis Date = 06/05/2003 
 RPT Level = 0.024  Analysis Date = 06/05/2003 
 RPT Level = 0.024  Analysis Date = 05/27/2003 
 RPT Level = 0.024  Analysis Date = 05/27/2003 
 RPT Level = 0.024  Analysis Date = 05/13/2003 
 RPT Level = 0.024  Analysis Date = 05/13/2003 
 RPT Level = 0.024  Analysis Date = 05/06/2003 
 RPT Level = 0.024  Analysis Date = 05/06/2003 
 RPT Level = 0.024  Analysis Date = 05/06/2003 
 RPT Level = 0.024  Analysis Date = 05/06/2003 
 RPT Level = 0.024  Analysis Date = 04/23/2003 
 RPT Level = 0.024  Analysis Date = 04/23/2003 
 RPT Level = 0.024  Analysis Date = 04/09/2003 
 RPT Level = 0.024  Analysis Date = 04/09/2003 
 RPT Level = 0.024  Analysis Date = 04/09/2003 
 RPT Level = 0.024  Analysis Date = 04/09/2003 
 RPT Level = 0.024  Analysis Date = 04/09/2003 
 RPT Level = 0.024  Analysis Date = 04/09/2003 
 RPT Level = 0.024  Analysis Date = 04/09/2003 
 RPT Level = 0.024  Analysis Date = 04/09/2003 
 RPT Level = 0.024  Analysis Date = 03/13/2003 
 RPT Level = 0.024  Analysis Date = 03/13/2003 
 RPT Level = 0.024  Analysis Date = 03/13/2003 
 RPT Level = 0.024  Analysis Date = 03/13/2003 
 RPT Level = 0.024  Analysis Date = 03/06/2003 
 RPT Level = 0.024  Analysis Date = 03/06/2003 
 RPT Level = 0.024  Analysis Date = 02/27/2003 
 RPT Level = 0.024  Analysis Date = 02/27/2003 
 RPT Level = 0.024  Analysis Date = 02/19/2003 
 RPT Level = 0.024  Analysis Date = 02/19/2003 
 RPT Level = 0.024  Analysis Date = 02/05/2003 
 RPT Level = 0.024  Analysis Date = 02/05/2003 
 RPT Level = 0.024  Analysis Date = 02/05/2003 
 RPT Level = 0.024  Analysis Date = 02/05/2003 
 RPT Level = 0.024  Analysis Date = 02/05/2003 
 RPT Level = 0.024  Analysis Date = 02/05/2003 
 RPT Level = 0.024  Analysis Date = 01/23/2003 
 RPT Level = 0.024  Analysis Date = 01/23/2003 
 RPT Level = 0.024  Analysis Date = 01/15/2003 
 RPT Level = 0.024  Analysis Date = 01/15/2003 
 RPT Level = 0.024  Analysis Date = 01/15/2003 
 RPT Level = 0.024  Analysis Date = 01/15/2003 
 RPT Level = 0.024  Analysis Date = 01/15/2003 
 RPT Level = 0.024  Analysis Date = 01/15/2003 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 12/31/2002 
 RPT Level = 0.024  Analysis Date = 11/14/2002 
 RPT Level = 0.024  Analysis Date = 11/14/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 11/07/2002 
 RPT Level = 0.024  Analysis Date = 09/11/2002 
 RPT Level = 0.018  Analysis Date = 09/11/2002 
 RPT Level = 0.018  Analysis Date = 08/29/2002 
 RPT Level = 0.018  Analysis Date = 08/29/2002 
 RPT Level = 0.018  Analysis Date = 08/13/2002 
 RPT Level = 0.018  Analysis Date = 08/13/2002 
 RPT Level = 0.018  Analysis Date = 08/07/2002 
 RPT Level = 0.018  Analysis Date = 08/07/2002 
 RPT Level = 0.018  Analysis Date = 07/19/2002 
 RPT Level = 0.018  Analysis Date = 07/19/2002 
 RPT Level = 0.018  Analysis Date = 07/10/2002 
 RPT Level = 0.018  Analysis Date = 07/10/2002 
 RPT Level = 0.018  Analysis Date = 06/17/2002 
 RPT Level = 0.018  Analysis Date = 06/17/2002 
 RPT Level = 0.018  Analysis Date = 06/05/2002 
 RPT Level = 0.018  Analysis Date = 06/05/2002 
 RPT Level = 0.018  Analysis Date = 05/22/2002 
 RPT Level = 0.018  Analysis Date = 05/22/2002 
 RPT Level = 0.018  Analysis Date = 05/22/2002 
 RPT Level = 0.018  Analysis Date = 05/22/2002 
 RPT Level = 0.018  Analysis Date = 05/03/2002 
 RPT Level = 0.018  Analysis Date = 05/03/2002 
 RPT Level = 0.018  Analysis Date = 05/03/2002 
 RPT Level = 0.018  Analysis Date = 05/03/2002 
 RPT Level = 0.018  Analysis Date = 05/03/2002 
 RPT Level = 0.018  Analysis Date = 05/03/2002 
 RPT Level = 0.018  Analysis Date = 04/18/2002 
 RPT Level = 0.018  Analysis Date = 04/18/2002 
 RPT Level = 0.018  Analysis Date = 04/10/2002 
 RPT Level = 0.018  Analysis Date = 04/10/2002 
 RPT Level = 0.018  Analysis Date = 03/27/2002 
 RPT Level = 0.018  Analysis Date = 03/27/2002 
 RPT Level = 0.018  Analysis Date = 03/27/2002 
 RPT Level = 0.018  Analysis Date = 03/27/2002 
 RPT Level = 0.018  Analysis Date = 03/27/2002 
 RPT Level = 0.018  Analysis Date = 03/27/2002 
 RPT Level = 0.018  Analysis Date = 03/14/2002 
 RPT Level = 0.018  Analysis Date = 03/14/2002 
 RPT Level = 0.018  Analysis Date = 03/14/2002 
 RPT Level = 0.018  Analysis Date = 03/14/2002 
 RPT Level = 0.018  Analysis Date = 03/01/2002 
 RPT Level = 0.018  Analysis Date = 03/01/2002 
 RPT Level = 0.018  Analysis Date = 02/21/2002 
 RPT Level = 0.018  Analysis Date = 02/21/2002 
 RPT Level = 0.018  Analysis Date = 02/07/2002 
 RPT Level = 0.018  Analysis Date = 02/07/2002 
 RPT Level = 0.018  Analysis Date = 02/07/2002 
 RPT Level = 0.018  Analysis Date = 02/07/2002 
 RPT Level = 0.018  Analysis Date = 02/07/2002 
 RPT Level = 0.018  Analysis Date = 02/07/2002 
 RPT Level = 0.018  Analysis Date = 01/18/2002 
 RPT Level = 0.018  Analysis Date = 01/18/2002 
 RPT Level = 0.018  Analysis Date = 01/18/2002 
 RPT Level = 0.018  Analysis Date = 01/18/2002 
 RPT Level = 0.018  Analysis Date = 01/18/2002 
 RPT Level = 0.018  Analysis Date = 01/18/2002 
 RPT Level = 0.018  Analysis Date = 12/21/2001 
 RPT Level = 0.018  Analysis Date = 12/21/2001 
 RPT Level = 0.018  Analysis Date = 12/21/2001 
 RPT Level = 0.018  Analysis Date = 12/21/2001 
 RPT Level = 0.018  Analysis Date = 12/07/2001 
 RPT Level = 0.018  Analysis Date = 12/07/2001 
 RPT Level = 0.018  Analysis Date = 11/14/2001 
 RPT Level = 0.018  Y = 0
The SGPlot Procedure

False Positive Rate for Nitrate plus Nitrite (NO3+NO2 as N), FIL, EPA

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Nitrate plus Nitrite (NO3+NO2 as N), FIL, EPA 00631CL047 2002 32 7 22%
    2003 52 0 0%
    2004 51 1 2%
    2005 50 0 0%
    2010 52 0 0%
    2011 52 0 0%
    2012 44 2 5%
    2013 20 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Nitrate plus Nitrite (NO3+NO2 as N), UNF, LL -
Blind Blank Results
Lab: NWQL, PCode: 00630, MCode: CDR03
Analysis dates: 04/04/05 through 09/21/05
Open Data Set

 Analysis Date = 09/21/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20052590029  Analysis Date = 09/21/2005 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20052520004  Analysis Date = 09/07/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20052430013  Analysis Date = 08/30/2005 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20052370003  Analysis Date = 08/22/2005 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20052300012  Analysis Date = 08/17/2005 
 Lab Value = -0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20052210014  Analysis Date = 08/10/2005 
 Lab Value = -0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20052160011  Analysis Date = 08/10/2005 
 Lab Value = 0.003 
 RPT Level = 0.005 
 Lab Sample ID = 20052160010  Analysis Date = 07/21/2005 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20052010013  Analysis Date = 07/19/2005 
 Lab Value = 0.003 
 RPT Level = 0.005 
 Lab Sample ID = 20051940011  Analysis Date = 07/13/2005 
 Lab Value = -.0007 
 RPT Level = 0.005 
 Lab Sample ID = 20051880029  Analysis Date = 07/06/2005 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20051800190  Analysis Date = 06/28/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20051740021  Analysis Date = 06/23/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20051660116  Analysis Date = 06/10/2005 
 Lab Value = 0 
 RPT Level = 0.005 
 Lab Sample ID = 20051590039  Analysis Date = 06/10/2005 
 Lab Value = 0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20051530013  Analysis Date = 06/01/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20051440051  Analysis Date = 05/24/2005 
 Lab Value = 0.001 
 RPT Level = 0.005 
 Lab Sample ID = 20051380016  Analysis Date = 06/01/2005 
 Lab Value = -0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20051320039  Analysis Date = 05/10/2005 
 Lab Value = -.0004 
 RPT Level = 0.005 
 Lab Sample ID = 20051250007  Analysis Date = 05/10/2005 
 Lab Value = -0.003 
 RPT Level = 0.005 
 Lab Sample ID = 20051170114  Analysis Date = 04/27/2005 
 Lab Value = -0.003 
 RPT Level = 0.005 
 Lab Sample ID = 20051110016  Analysis Date = 04/27/2005 
 Lab Value = -.0005 
 RPT Level = 0.005 
 Lab Sample ID = 20051020011  Analysis Date = 04/12/2005 
 Lab Value = -0.002 
 RPT Level = 0.005 
 Lab Sample ID = 20050950048  Analysis Date = 04/04/2005 
 Lab Value = 0.0013 
 RPT Level = 0.005 
 Lab Sample ID = 20050880118  Analysis Date = 09/21/2005 
 RPT Level = 0.005  Analysis Date = 09/21/2005 
 RPT Level = 0.005  Analysis Date = 09/21/2005 
 RPT Level = 0.005  Analysis Date = 09/07/2005 
 RPT Level = 0.005  Analysis Date = 09/07/2005 
 RPT Level = 0.005  Analysis Date = 08/30/2005 
 RPT Level = 0.005  Analysis Date = 08/30/2005 
 RPT Level = 0.005  Analysis Date = 08/22/2005 
 RPT Level = 0.005  Analysis Date = 08/22/2005 
 RPT Level = 0.005  Analysis Date = 08/17/2005 
 RPT Level = 0.005  Analysis Date = 08/17/2005 
 RPT Level = 0.005  Analysis Date = 08/10/2005 
 RPT Level = 0.005  Analysis Date = 08/10/2005 
 RPT Level = 0.005  Analysis Date = 08/10/2005 
 RPT Level = 0.005  Analysis Date = 08/10/2005 
 RPT Level = 0.005  Analysis Date = 07/21/2005 
 RPT Level = 0.005  Analysis Date = 07/21/2005 
 RPT Level = 0.005  Analysis Date = 07/19/2005 
 RPT Level = 0.005  Analysis Date = 07/19/2005 
 RPT Level = 0.005  Analysis Date = 07/13/2005 
 RPT Level = 0.005  Analysis Date = 07/13/2005 
 RPT Level = 0.005  Analysis Date = 07/06/2005 
 RPT Level = 0.005  Analysis Date = 07/06/2005 
 RPT Level = 0.005  Analysis Date = 06/28/2005 
 RPT Level = 0.005  Analysis Date = 06/28/2005 
 RPT Level = 0.005  Analysis Date = 06/23/2005 
 RPT Level = 0.005  Analysis Date = 06/23/2005 
 RPT Level = 0.005  Analysis Date = 06/10/2005 
 RPT Level = 0.005  Analysis Date = 06/10/2005 
 RPT Level = 0.005  Analysis Date = 06/10/2005 
 RPT Level = 0.005  Analysis Date = 06/10/2005 
 RPT Level = 0.005  Analysis Date = 06/01/2005 
 RPT Level = 0.005  Analysis Date = 06/01/2005 
 RPT Level = 0.005  Analysis Date = 05/24/2005 
 RPT Level = 0.005  Analysis Date = 05/24/2005 
 RPT Level = 0.005  Analysis Date = 06/01/2005 
 RPT Level = 0.005  Analysis Date = 06/01/2005 
 RPT Level = 0.005  Analysis Date = 05/10/2005 
 RPT Level = 0.005  Analysis Date = 05/10/2005 
 RPT Level = 0.005  Analysis Date = 05/10/2005 
 RPT Level = 0.005  Analysis Date = 05/10/2005 
 RPT Level = 0.005  Analysis Date = 04/27/2005 
 RPT Level = 0.005  Analysis Date = 04/27/2005 
 RPT Level = 0.005  Analysis Date = 04/27/2005 
 RPT Level = 0.005  Analysis Date = 04/27/2005 
 RPT Level = 0.005  Analysis Date = 04/12/2005 
 RPT Level = 0.005  Analysis Date = 04/12/2005 
 RPT Level = 0.005  Analysis Date = 04/04/2005 
 RPT Level = 0.005  Y = 0
The SGPlot Procedure

False Positive Rate for Nitrate plus Nitrite (NO3+NO2 as N), UNF, LL

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Nitrate plus Nitrite (NO3+NO2 as N), UNF, LL 00630CDR03 2005 25 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Nitrite (NO2 as N), FIL -
Blind Blank Results
Lab: NWQL, PCode: 00613, MCode: DZ001
Analysis dates: 06/13/06 through 09/30/16
Open Data Set

 Analysis Date = 03/11/2015 
 Lab Value = 0.002 
 RPT Level = 0.001 
 Lab Sample ID = 20150690109  Analysis Date = 12/22/2008 
 Lab Value = 0.0027 
 RPT Level = 0.001 
 Lab Sample ID = 20083150065  Analysis Date = 08/30/2007 
 Lab Value = 0.002 
 RPT Level = 0.001 
 Lab Sample ID = 20072400035  Analysis Date = 03/11/2015 
 Lab Value = 0.002 
 RPT Level = 0.001 
 Lab Sample ID = 20150690109  Analysis Date = 12/22/2008 
 Lab Value = 0.0027 
 RPT Level = 0.001 
 Lab Sample ID = 20083150065  Analysis Date = 08/30/2007 
 Lab Value = 0.002 
 RPT Level = 0.001 
 Lab Sample ID = 20072400035  Analysis Date = 09/30/2016 
 Lab Value = -34E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20162710098  Analysis Date = 09/23/2016 
 Lab Value = .00037 
 RPT Level = 0.001 
 Lab Sample ID = 20162640173  Analysis Date = 09/16/2016 
 Lab Value = .00027 
 RPT Level = 0.001 
 Lab Sample ID = 20162580012  Analysis Date = 09/13/2016 
 Lab Value = -1E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20162520025  Analysis Date = 09/09/2016 
 Lab Value = .00004 
 RPT Level = 0.001 
 Lab Sample ID = 20162440121  Analysis Date = 08/26/2016 
 Lab Value = .00002 
 RPT Level = 0.001 
 Lab Sample ID = 20162360195  Analysis Date = 08/19/2016 
 Lab Value = 0.0015 
 RPT Level = 0.001 
 Lab Sample ID = 20162290137  Analysis Date = 08/12/2016 
 Lab Value = .00065 
 RPT Level = 0.001 
 Lab Sample ID = 20162230008  Analysis Date = 08/08/2016 
 Lab Value = -25E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20162150204  Analysis Date = 08/02/2016 
 Lab Value = .00002 
 RPT Level = 0.001 
 Lab Sample ID = 20162080232  Analysis Date = 07/26/2016 
 Lab Value = .00042 
 RPT Level = 0.001 
 Lab Sample ID = 20162010257  Analysis Date = 07/14/2016 
 Lab Value = -36E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20161940107  Analysis Date = 07/12/2016 
 Lab Value = -32E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20161870031  Analysis Date = 07/07/2016 
 Lab Value = -39E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20161800082  Analysis Date = 06/29/2016 
 Lab Value = .00011 
 RPT Level = 0.001 
 Lab Sample ID = 20161740071  Analysis Date = 06/20/2016 
 Lab Value = .00047 
 RPT Level = 0.001 
 Lab Sample ID = 20161660156  Analysis Date = 06/09/2016 
 Lab Value = -26E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20161590152  Analysis Date = 06/02/2016 
 Lab Value = .00085 
 RPT Level = 0.001 
 Lab Sample ID = 20161520025  Analysis Date = 06/02/2016 
 Lab Value = .00097 
 RPT Level = 0.001 
 Lab Sample ID = 20161480189  Analysis Date = 05/10/2016 
 Lab Value = -26E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20161270006  Analysis Date = 05/04/2016 
 Lab Value = .00002 
 RPT Level = 0.001 
 Lab Sample ID = 20161230045  Analysis Date = 04/29/2016 
 Lab Value = -22E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20161160091  Analysis Date = 04/22/2016 
 Lab Value = -27E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20161100126  Analysis Date = 04/13/2016 
 Lab Value = 0.0012 
 RPT Level = 0.001 
 Lab Sample ID = 20161020027  Analysis Date = 04/07/2016 
 Lab Value = -42E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20160950044  Analysis Date = 03/31/2016 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20160880040  Analysis Date = 03/25/2016 
 Lab Value = -8E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20160810065  Analysis Date = 03/17/2016 
 Lab Value = .00037 
 RPT Level = 0.001 
 Lab Sample ID = 20160740013  Analysis Date = 03/08/2016 
 Lab Value = -4E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20160670014  Analysis Date = 03/02/2016 
 Lab Value = .00017 
 RPT Level = 0.001 
 Lab Sample ID = 20160600013  Analysis Date = 02/25/2016 
 Lab Value = .00036 
 RPT Level = 0.001 
 Lab Sample ID = 20160530013  Analysis Date = 02/23/2016 
 Lab Value = -34E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20160470015  Analysis Date = 02/19/2016 
 Lab Value = .00033 
 RPT Level = 0.001 
 Lab Sample ID = 20160400084  Analysis Date = 02/03/2016 
 Lab Value = -39E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20160320011  Analysis Date = 01/27/2016 
 Lab Value = .00029 
 RPT Level = 0.001 
 Lab Sample ID = 20160250031  Analysis Date = 01/25/2016 
 Lab Value = -23E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20160190011  Analysis Date = 01/14/2016 
 Lab Value = .00035 
 RPT Level = 0.001 
 Lab Sample ID = 20160110011  Analysis Date = 01/06/2016 
 Lab Value = .00015 
 RPT Level = 0.001 
 Lab Sample ID = 20160050030  Analysis Date = 01/05/2016 
 Lab Value = -29E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20153630045  Analysis Date = 12/28/2015 
 Lab Value = .00023 
 RPT Level = 0.001 
 Lab Sample ID = 20153550011  Analysis Date = 12/22/2015 
 Lab Value = -9E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20153500160  Analysis Date = 12/14/2015 
 Lab Value = -7E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20153420017  Analysis Date = 12/02/2015 
 Lab Value = .00012 
 RPT Level = 0.001 
 Lab Sample ID = 20153340016  Analysis Date = 11/27/2015 
 Lab Value = .00052 
 RPT Level = 0.001 
 Lab Sample ID = 20153270012  Analysis Date = 11/18/2015 
 Lab Value = -24E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20153200025  Analysis Date = 11/16/2015 
 Lab Value = -74E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20153140011  Analysis Date = 11/04/2015 
 Lab Value = -13E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20153060033  Analysis Date = 10/28/2015 
 Lab Value = 0.0007 
 RPT Level = 0.001 
 Lab Sample ID = 20152990066  Analysis Date = 10/20/2015 
 Lab Value = -16E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20152920036  Analysis Date = 10/14/2015 
 Lab Value = -47E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20152860152  Analysis Date = 10/06/2015 
 Lab Value = -46E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20152780012  Analysis Date = 09/29/2015 
 Lab Value = -54E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20152710066  Analysis Date = 09/23/2015 
 Lab Value = .00066 
 RPT Level = 0.001 
 Lab Sample ID = 20152640026  Analysis Date = 09/21/2015 
 Lab Value = -16E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20152590157  Analysis Date = 09/09/2015 
 Lab Value = .00058 
 RPT Level = 0.001 
 Lab Sample ID = 20152510009  Analysis Date = 09/02/2015 
 Lab Value = -32E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20152430096  Analysis Date = 08/26/2015 
 Lab Value = -.0004 
 RPT Level = 0.001 
 Lab Sample ID = 20152360157  Analysis Date = 08/26/2015 
 Lab Value = -2E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20152330007  Analysis Date = 08/13/2015 
 Lab Value = .00023 
 RPT Level = 0.001 
 Lab Sample ID = 20152230132  Analysis Date = 08/04/2015 
 Lab Value = .00002 
 RPT Level = 0.001 
 Lab Sample ID = 20152150073  Analysis Date = 07/28/2015 
 Lab Value = .00021 
 RPT Level = 0.001 
 Lab Sample ID = 20152080065  Analysis Date = 07/22/2015 
 Lab Value = -53E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20152010051  Analysis Date = 07/15/2015 
 Lab Value = .00008 
 RPT Level = 0.001 
 Lab Sample ID = 20151940024  Analysis Date = 07/08/2015 
 Lab Value = -58E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20151870009  Analysis Date = 07/01/2015 
 Lab Value = .00034 
 RPT Level = 0.001 
 Lab Sample ID = 20151800049  Analysis Date = 06/24/2015 
 Lab Value = -59E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20151730016  Analysis Date = 06/17/2015 
 Lab Value = -61E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20151660034  Analysis Date = 06/12/2015 
 Lab Value = .00009 
 RPT Level = 0.001 
 Lab Sample ID = 20151620213  Analysis Date = 06/04/2015 
 Lab Value = .00023 
 RPT Level = 0.001 
 Lab Sample ID = 20151530198  Analysis Date = 05/28/2015 
 Lab Value = .00058 
 RPT Level = 0.001 
 Lab Sample ID = 20151460121  Analysis Date = 05/21/2015 
 Lab Value = -26E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20151390198  Analysis Date = 05/15/2015 
 Lab Value = -48E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20151310070  Analysis Date = 05/08/2015 
 Lab Value = -5E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20151240065  Analysis Date = 05/04/2015 
 Lab Value = -.0004 
 RPT Level = 0.001 
 Lab Sample ID = 20151180073  Analysis Date = 04/27/2015 
 Lab Value = .00006 
 RPT Level = 0.001 
 Lab Sample ID = 20151140024  Analysis Date = 04/17/2015 
 Lab Value = -48E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20151050039  Analysis Date = 04/10/2015 
 Lab Value = -13E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20150970052  Analysis Date = 04/06/2015 
 Lab Value = -18E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20150900037  Analysis Date = 03/30/2015 
 Lab Value = -45E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20150850041  Analysis Date = 03/19/2015 
 Lab Value = 0.0006 
 RPT Level = 0.001 
 Lab Sample ID = 20150770031  Analysis Date = 03/06/2015 
 Lab Value = -18E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20150610104  Analysis Date = 02/24/2015 
 Lab Value = .00025 
 RPT Level = 0.001 
 Lab Sample ID = 20150540029  Analysis Date = 02/19/2015 
 Lab Value = .00075 
 RPT Level = 0.001 
 Lab Sample ID = 20150490025  Analysis Date = 02/17/2015 
 Lab Value = -2E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20150400033  Analysis Date = 02/04/2015 
 Lab Value = .00024 
 RPT Level = 0.001 
 Lab Sample ID = 20150330024  Analysis Date = 02/04/2015 
 Lab Value = .00025 
 RPT Level = 0.001 
 Lab Sample ID = 20150260015  Analysis Date = 02/03/2015 
 Lab Value = .00047 
 RPT Level = 0.001 
 Lab Sample ID = 20150200036  Analysis Date = 01/16/2015 
 Lab Value = .00047 
 RPT Level = 0.001 
 Lab Sample ID = 20150120017  Analysis Date = 01/08/2015 
 Lab Value = -.0003 
 RPT Level = 0.001 
 Lab Sample ID = 20150050006  Analysis Date = 01/08/2015 
 Lab Value = -29E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20143630008  Analysis Date = 01/07/2015 
 Lab Value = 0.0011 
 RPT Level = 0.001 
 Lab Sample ID = 20143560049  Analysis Date = 01/06/2015 
 Lab Value = -38E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20143490026  Analysis Date = 12/17/2014 
 Lab Value = -41E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20143420020  Analysis Date = 12/15/2014 
 Lab Value = -55E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20143360073  Analysis Date = 12/15/2014 
 Lab Value = -17E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20143300036  Analysis Date = 11/25/2014 
 Lab Value = .00006 
 RPT Level = 0.001 
 Lab Sample ID = 20143230047  Analysis Date = 11/21/2014 
 Lab Value = -17E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20143160029  Analysis Date = 11/21/2014 
 Lab Value = -17E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20143160029  Analysis Date = 11/19/2014 
 Lab Value = -54E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20143080087  Analysis Date = 11/19/2014 
 Lab Value = -54E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20143080087  Analysis Date = 11/17/2014 
 Lab Value = -17E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20143010065  Analysis Date = 11/17/2014 
 Lab Value = -17E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20143010065  Analysis Date = 11/06/2014 
 Lab Value = -43E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20142950122  Analysis Date = 11/06/2014 
 Lab Value = -43E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20142950122  Analysis Date = 10/23/2014 
 Lab Value = -54E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20142880084  Analysis Date = 10/23/2014 
 Lab Value = -54E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20142880084  Analysis Date = 10/14/2014 
 Lab Value = -0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20142790031  Analysis Date = 10/14/2014 
 Lab Value = -0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20142790031  Analysis Date = 10/01/2014 
 Lab Value = -85E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20142720101  Analysis Date = 10/01/2014 
 Lab Value = -85E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20142720101  Analysis Date = 09/23/2014 
 Lab Value = .00039 
 RPT Level = 0.001 
 Lab Sample ID = 20142650106  Analysis Date = 09/23/2014 
 Lab Value = .00039 
 RPT Level = 0.001 
 Lab Sample ID = 20142650106  Analysis Date = 09/22/2014 
 Lab Value = .00042 
 RPT Level = 0.001 
 Lab Sample ID = 20142590046  Analysis Date = 09/22/2014 
 Lab Value = .00042 
 RPT Level = 0.001 
 Lab Sample ID = 20142590046  Analysis Date = 09/12/2014 
 Lab Value = -42E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20142520024  Analysis Date = 09/12/2014 
 Lab Value = -42E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20142520024  Analysis Date = 09/08/2014 
 Lab Value = .00006 
 RPT Level = 0.001 
 Lab Sample ID = 20142470052  Analysis Date = 09/08/2014 
 Lab Value = .00006 
 RPT Level = 0.001 
 Lab Sample ID = 20142470052  Analysis Date = 08/13/2014 
 Lab Value = -14E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20142230082  Analysis Date = 08/13/2014 
 Lab Value = -14E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20142230082  Analysis Date = 08/06/2014 
 Lab Value = 0.0002 
 RPT Level = 0.001 
 Lab Sample ID = 20142160063  Analysis Date = 08/06/2014 
 Lab Value = 0.0002 
 RPT Level = 0.001 
 Lab Sample ID = 20142160063  Analysis Date = 07/31/2014 
 Lab Value = .00069 
 RPT Level = 0.001 
 Lab Sample ID = 20142090217  Analysis Date = 07/31/2014 
 Lab Value = .00069 
 RPT Level = 0.001 
 Lab Sample ID = 20142090217  Analysis Date = 07/23/2014 
 Lab Value = .00043 
 RPT Level = 0.001 
 Lab Sample ID = 20142030069  Analysis Date = 07/17/2014 
 Lab Value = .00038 
 RPT Level = 0.001 
 Lab Sample ID = 20141960042  Analysis Date = 07/10/2014 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20141890083  Analysis Date = 07/02/2014 
 Lab Value = -24E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20141820118  Analysis Date = 06/25/2014 
 Lab Value = .00025 
 RPT Level = 0.001 
 Lab Sample ID = 20141750143  Analysis Date = 06/19/2014 
 Lab Value = 0.0007 
 RPT Level = 0.001 
 Lab Sample ID = 20141680085  Analysis Date = 06/16/2014 
 Lab Value = -59E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20141620033  Analysis Date = 06/06/2014 
 Lab Value = .00043 
 RPT Level = 0.001 
 Lab Sample ID = 20141550058  Analysis Date = 06/03/2014 
 Lab Value = -45E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20141470144  Analysis Date = 05/27/2014 
 Lab Value = .00014 
 RPT Level = 0.001 
 Lab Sample ID = 20141400011  Analysis Date = 05/15/2014 
 Lab Value = .00068 
 RPT Level = 0.001 
 Lab Sample ID = 20141340002  Analysis Date = 05/07/2014 
 Lab Value = .00062 
 RPT Level = 0.001 
 Lab Sample ID = 20141250086  Analysis Date = 05/02/2014 
 Lab Value = .00043 
 RPT Level = 0.001 
 Lab Sample ID = 20141190022  Analysis Date = 04/29/2014 
 Lab Value = -81E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20141130021  Analysis Date = 04/17/2014 
 Lab Value = .00029 
 RPT Level = 0.001 
 Lab Sample ID = 20141050008  Analysis Date = 04/10/2014 
 Lab Value = 0.0005 
 RPT Level = 0.001 
 Lab Sample ID = 20140970044  Analysis Date = 04/02/2014 
 Lab Value = -19E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20140900020  Analysis Date = 03/26/2014 
 Lab Value = .00014 
 RPT Level = 0.001 
 Lab Sample ID = 20140840099  Analysis Date = 03/19/2014 
 Lab Value = -9E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20140760039  Analysis Date = 03/12/2014 
 Lab Value = -11E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20140690021  Analysis Date = 03/06/2014 
 Lab Value = -3E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20140630120  Analysis Date = 02/27/2014 
 Lab Value = -.0003 
 RPT Level = 0.001 
 Lab Sample ID = 20140550042  Analysis Date = 02/24/2014 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20140490012  Analysis Date = 02/18/2014 
 Lab Value = .00021 
 RPT Level = 0.001 
 Lab Sample ID = 20140410005  Analysis Date = 02/13/2014 
 Lab Value = -21E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20140340022  Analysis Date = 02/06/2014 
 Lab Value = .00002 
 RPT Level = 0.001 
 Lab Sample ID = 20140270193  Analysis Date = 01/22/2014 
 Lab Value = -9E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20140210036  Analysis Date = 01/15/2014 
 Lab Value = -28E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20140130049  Analysis Date = 01/10/2014 
 Lab Value = .00013 
 RPT Level = 0.001 
 Lab Sample ID = 20140070067  Analysis Date = 01/08/2014 
 Lab Value = .00027 
 RPT Level = 0.001 
 Lab Sample ID = 20133580053  Analysis Date = 12/17/2013 
 Lab Value = .00006 
 RPT Level = 0.001 
 Lab Sample ID = 20133500067  Analysis Date = 12/17/2013 
 Lab Value = .00016 
 RPT Level = 0.001 
 Lab Sample ID = 20133430107  Analysis Date = 12/06/2013 
 Lab Value = 0.0006 
 RPT Level = 0.001 
 Lab Sample ID = 20133360022  Analysis Date = 12/03/2013 
 Lab Value = .00033 
 RPT Level = 0.001 
 Lab Sample ID = 20133300012  Analysis Date = 11/20/2013 
 Lab Value = .00008 
 RPT Level = 0.001 
 Lab Sample ID = 20133230003  Analysis Date = 11/14/2013 
 Lab Value = .00018 
 RPT Level = 0.001 
 Lab Sample ID = 20133170105  Analysis Date = 11/12/2013 
 Lab Value = -16E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20133090098  Analysis Date = 10/31/2013 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20133030027  Analysis Date = 10/28/2013 
 Lab Value = .00021 
 RPT Level = 0.001 
 Lab Sample ID = 20132970027  Analysis Date = 10/17/2013 
 Lab Value = .00035 
 RPT Level = 0.001 
 Lab Sample ID = 20132730140  Analysis Date = 09/24/2013 
 Lab Value = -54E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20132660104  Analysis Date = 09/18/2013 
 Lab Value = .00005 
 RPT Level = 0.001 
 Lab Sample ID = 20132600015  Analysis Date = 10/24/2013 
 Lab Value = -3E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20132530113  Analysis Date = 09/04/2013 
 Lab Value = .00016 
 RPT Level = 0.001 
 Lab Sample ID = 20132410009  Analysis Date = 08/28/2013 
 Lab Value = -37E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20132390012  Analysis Date = 08/26/2013 
 Lab Value = .00037 
 RPT Level = 0.001 
 Lab Sample ID = 20132350027  Analysis Date = 08/19/2013 
 Lab Value = .00011 
 RPT Level = 0.001 
 Lab Sample ID = 20132270018  Analysis Date = 08/09/2013 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20132180181  Analysis Date = 08/02/2013 
 Lab Value = -5E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20132120027  Analysis Date = 07/25/2013 
 Lab Value = .00036 
 RPT Level = 0.001 
 Lab Sample ID = 20132040021  Analysis Date = 07/17/2013 
 Lab Value = -12E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20131970028  Analysis Date = 07/11/2013 
 Lab Value = 0.0005 
 RPT Level = 0.001 
 Lab Sample ID = 20131900090  Analysis Date = 07/08/2013 
 Lab Value = .00001 
 RPT Level = 0.001 
 Lab Sample ID = 20131830073  Analysis Date = 06/28/2013 
 Lab Value = -13E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20131770013  Analysis Date = 06/21/2013 
 Lab Value = .00004 
 RPT Level = 0.001 
 Lab Sample ID = 20131700038  Analysis Date = 06/18/2013 
 Lab Value = -37E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20131640004  Analysis Date = 06/05/2013 
 Lab Value = 0.0004 
 RPT Level = 0.001 
 Lab Sample ID = 20131550029  Analysis Date = 06/03/2013 
 Lab Value = -41E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20131500013  Analysis Date = 05/24/2013 
 Lab Value = -29E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20131430198  Analysis Date = 05/16/2013 
 Lab Value = 0.0005 
 RPT Level = 0.001 
 Lab Sample ID = 20131350129  Analysis Date = 05/10/2013 
 Lab Value = 0.0004 
 RPT Level = 0.001 
 Lab Sample ID = 20131270022  Analysis Date = 05/03/2013 
 Lab Value = -47E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20131220014  Analysis Date = 04/26/2013 
 Lab Value = -15E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20131150015  Analysis Date = 04/24/2013 
 Lab Value = -.0003 
 RPT Level = 0.001 
 Lab Sample ID = 20131120125  Analysis Date = 04/24/2013 
 Lab Value = -11E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20131090030  Analysis Date = 04/04/2013 
 Lab Value = .00017 
 RPT Level = 0.001 
 Lab Sample ID = 20130930087  Analysis Date = 03/27/2013 
 Lab Value = .00042 
 RPT Level = 0.001 
 Lab Sample ID = 20130840058  Analysis Date = 03/21/2013 
 Lab Value = .00038 
 RPT Level = 0.001 
 Lab Sample ID = 20130770160  Analysis Date = 03/14/2013 
 Lab Value = -5E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20130700013  Analysis Date = 03/07/2013 
 Lab Value = .00018 
 RPT Level = 0.001 
 Lab Sample ID = 20130630124  Analysis Date = 02/28/2013 
 Lab Value = -11E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20130570007  Analysis Date = 02/25/2013 
 Lab Value = .00005 
 RPT Level = 0.001 
 Lab Sample ID = 20130520006  Analysis Date = 02/13/2013 
 Lab Value = -12E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20130420052  Analysis Date = 02/05/2013 
 Lab Value = 0.0002 
 RPT Level = 0.001 
 Lab Sample ID = 20130350029  Analysis Date = 02/01/2013 
 Lab Value = .00005 
 RPT Level = 0.001 
 Lab Sample ID = 20130280039  Analysis Date = 01/24/2013 
 Lab Value = .00078 
 RPT Level = 0.001 
 Lab Sample ID = 20130230099  Analysis Date = 01/17/2013 
 Lab Value = 0.0002 
 RPT Level = 0.001 
 Lab Sample ID = 20130140071  Analysis Date = 01/10/2013 
 Lab Value = -1E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20130070056  Analysis Date = 01/04/2013 
 Lab Value = -17E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20130020010  Analysis Date = 01/04/2013 
 Lab Value = -8E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20123620011  Analysis Date = 12/21/2012 
 Lab Value = .00005 
 RPT Level = 0.001 
 Lab Sample ID = 20123530084  Analysis Date = 12/18/2012 
 Lab Value = 0.0005 
 RPT Level = 0.001 
 Lab Sample ID = 20123480061  Analysis Date = 12/07/2012 
 Lab Value = .00069 
 RPT Level = 0.001 
 Lab Sample ID = 20123390115  Analysis Date = 11/29/2012 
 Lab Value = -8E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20123330010  Analysis Date = 11/29/2012 
 Lab Value = .00028 
 RPT Level = 0.001 
 Lab Sample ID = 20123250063  Analysis Date = 11/20/2012 
 Lab Value = .00003 
 RPT Level = 0.001 
 Lab Sample ID = 20123200054  Analysis Date = 11/09/2012 
 Lab Value = 0.0002 
 RPT Level = 0.001 
 Lab Sample ID = 20123120066  Analysis Date = 10/31/2012 
 Lab Value = .00017 
 RPT Level = 0.001 
 Lab Sample ID = 20123040119  Analysis Date = 10/29/2012 
 Lab Value = -2E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20122980126  Analysis Date = 10/18/2012 
 Lab Value = .00013 
 RPT Level = 0.001 
 Lab Sample ID = 20122900096  Analysis Date = 10/15/2012 
 Lab Value = .00062 
 RPT Level = 0.001 
 Lab Sample ID = 20122830034  Analysis Date = 10/10/2012 
 Lab Value = -2E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20122750025  Analysis Date = 10/10/2012 
 Lab Value = .00009 
 RPT Level = 0.001 
 Lab Sample ID = 20122700110  Analysis Date = 10/10/2012 
 Lab Value = .00029 
 RPT Level = 0.001 
 Lab Sample ID = 20122690153  Analysis Date = 09/21/2012 
 Lab Value = .00019 
 RPT Level = 0.001 
 Lab Sample ID = 20122550016  Analysis Date = 09/18/2012 
 Lab Value = -3E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20122490102  Analysis Date = 09/14/2012 
 Lab Value = .00015 
 RPT Level = 0.001 
 Lab Sample ID = 20122410013  Analysis Date = 09/21/2012 
 Lab Value = .00031 
 RPT Level = 0.001 
 Lab Sample ID = 20122350175  Analysis Date = 08/29/2012 
 Lab Value = 0.0013 
 RPT Level = 0.001 
 Lab Sample ID = 20122280090  Analysis Date = 08/23/2012 
 Lab Value = -59E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20122190099  Analysis Date = 08/16/2012 
 Lab Value = -6E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20122140050  Analysis Date = 08/01/2012 
 Lab Value = .00081 
 RPT Level = 0.001 
 Lab Sample ID = 20122050101  Analysis Date = 07/20/2012 
 Lab Value = -.0008 
 RPT Level = 0.001 
 Lab Sample ID = 20121990080  Analysis Date = 07/13/2012 
 Lab Value = -27E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20121910041  Analysis Date = 07/13/2012 
 Lab Value = .00024 
 RPT Level = 0.001 
 Lab Sample ID = 20121870014  Analysis Date = 07/06/2012 
 Lab Value = -7E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20121780033  Analysis Date = 06/22/2012 
 Lab Value = -71E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20121710006  Analysis Date = 06/14/2012 
 Lab Value = -.0003 
 RPT Level = 0.001 
 Lab Sample ID = 20121650052  Analysis Date = 06/13/2012 
 Lab Value = -18E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20121560125  Analysis Date = 06/07/2012 
 Lab Value = .00081 
 RPT Level = 0.001 
 Lab Sample ID = 20121510037  Analysis Date = 06/06/2012 
 Lab Value = -3E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20121430021  Analysis Date = 05/22/2012 
 Lab Value = -15E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20121370053  Analysis Date = 05/11/2012 
 Lab Value = -86E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20121290072  Analysis Date = 05/08/2012 
 Lab Value = -12E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20121210123  Analysis Date = 05/01/2012 
 Lab Value = -59E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20121150089  Analysis Date = 04/18/2012 
 Lab Value = .00068 
 RPT Level = 0.001 
 Lab Sample ID = 20121080009  Analysis Date = 04/11/2012 
 Lab Value = -.0004 
 RPT Level = 0.001 
 Lab Sample ID = 20121010029  Analysis Date = 04/04/2012 
 Lab Value = -26E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20120930058  Analysis Date = 03/29/2012 
 Lab Value = -.0001 
 RPT Level = 0.001 
 Lab Sample ID = 20120870035  Analysis Date = 03/28/2012 
 Lab Value = .00034 
 RPT Level = 0.001 
 Lab Sample ID = 20120790085  Analysis Date = 03/21/2012 
 Lab Value = -67E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20120730079  Analysis Date = 03/13/2012 
 Lab Value = -35E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20120660073  Analysis Date = 03/06/2012 
 Lab Value = -39E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20120580047  Analysis Date = 02/23/2012 
 Lab Value = -16E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20120530099  Analysis Date = 02/23/2012 
 Lab Value = .00049 
 RPT Level = 0.001 
 Lab Sample ID = 20120450020  Analysis Date = 02/08/2012 
 Lab Value = -6E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20120370064  Analysis Date = 02/02/2012 
 Lab Value = -15E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20120310012  Analysis Date = 01/25/2012 
 Lab Value = -31E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20120230046  Analysis Date = 01/19/2012 
 Lab Value = -7E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20120180013  Analysis Date = 01/12/2012 
 Lab Value = -64E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20120090052  Analysis Date = 01/09/2012 
 Lab Value = -69E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20120030028  Analysis Date = 01/09/2012 
 Lab Value = .00058 
 RPT Level = 0.001 
 Lab Sample ID = 20113610089  Analysis Date = 12/21/2011 
 Lab Value = 0.0011 
 RPT Level = 0.001 
 Lab Sample ID = 20113530139  Analysis Date = 12/20/2011 
 Lab Value = .00031 
 RPT Level = 0.001 
 Lab Sample ID = 20113490075  Analysis Date = 12/15/2011 
 Lab Value = -.0001 
 RPT Level = 0.001 
 Lab Sample ID = 20113460137  Analysis Date = 12/02/2011 
 Lab Value = -29E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20113320115  Analysis Date = 12/07/2011 
 Lab Value = -14E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20113250126  Analysis Date = 11/28/2011 
 Lab Value = 0.0011 
 RPT Level = 0.001 
 Lab Sample ID = 20113180164  Analysis Date = 11/09/2011 
 Lab Value = .00038 
 RPT Level = 0.001 
 Lab Sample ID = 20113110062  Analysis Date = 11/08/2011 
 Lab Value = -64E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20113050092  Analysis Date = 10/26/2011 
 Lab Value = -0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20112970118  Analysis Date = 10/25/2011 
 Lab Value = -1E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20112910137  Analysis Date = 10/14/2011 
 Lab Value = -2E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20112840071  Analysis Date = 10/04/2011 
 Lab Value = -68E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20112760061  Analysis Date = 09/29/2011 
 Lab Value = -67E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20112690123  Analysis Date = 09/22/2011 
 Lab Value = -72E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20112630061  Analysis Date = 09/16/2011 
 Lab Value = 0.0016 
 RPT Level = 0.001 
 Lab Sample ID = 20112560021  Analysis Date = 09/12/2011 
 Lab Value = .00036 
 RPT Level = 0.001 
 Lab Sample ID = 20112510037  Analysis Date = 09/08/2011 
 Lab Value = .00027 
 RPT Level = 0.001 
 Lab Sample ID = 20112500188  Analysis Date = 08/25/2011 
 Lab Value = -.0008 
 RPT Level = 0.001 
 Lab Sample ID = 20112360063  Analysis Date = 08/19/2011 
 Lab Value = .00072 
 RPT Level = 0.001 
 Lab Sample ID = 20112300036  Analysis Date = 08/10/2011 
 Lab Value = .00014 
 RPT Level = 0.001 
 Lab Sample ID = 20112200051  Analysis Date = 08/02/2011 
 Lab Value = .00034 
 RPT Level = 0.001 
 Lab Sample ID = 20112130154  Analysis Date = 07/28/2011 
 Lab Value = .00044 
 RPT Level = 0.001 
 Lab Sample ID = 20112060094  Analysis Date = 07/21/2011 
 Lab Value = .00015 
 RPT Level = 0.001 
 Lab Sample ID = 20112010020  Analysis Date = 07/13/2011 
 Lab Value = .00045 
 RPT Level = 0.001 
 Lab Sample ID = 20111920099  Analysis Date = 07/08/2011 
 Lab Value = -18E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20111860062  Analysis Date = 06/29/2011 
 Lab Value = .00082 
 RPT Level = 0.001 
 Lab Sample ID = 20111780166  Analysis Date = 06/22/2011 
 Lab Value = .00049 
 RPT Level = 0.001 
 Lab Sample ID = 20111710111  Analysis Date = 06/15/2011 
 Lab Value = .00047 
 RPT Level = 0.001 
 Lab Sample ID = 20111640067  Analysis Date = 06/07/2011 
 Lab Value = -32E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20111570061  Analysis Date = 06/03/2011 
 Lab Value = -32E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20111510151  Analysis Date = 05/25/2011 
 Lab Value = .00072 
 RPT Level = 0.001 
 Lab Sample ID = 20111430203  Analysis Date = 05/19/2011 
 Lab Value = .00059 
 RPT Level = 0.001 
 Lab Sample ID = 20111360146  Analysis Date = 05/11/2011 
 Lab Value = .00071 
 RPT Level = 0.001 
 Lab Sample ID = 20111290046  Analysis Date = 05/05/2011 
 Lab Value = -65E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20111220086  Analysis Date = 04/27/2011 
 Lab Value = .00077 
 RPT Level = 0.001 
 Lab Sample ID = 20111150114  Analysis Date = 04/20/2011 
 Lab Value = .00096 
 RPT Level = 0.001 
 Lab Sample ID = 20111080073  Analysis Date = 04/13/2011 
 Lab Value = .00005 
 RPT Level = 0.001 
 Lab Sample ID = 20111010118  Analysis Date = 04/07/2011 
 Lab Value = -4E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20110950054  Analysis Date = 03/30/2011 
 Lab Value = .00008 
 RPT Level = 0.001 
 Lab Sample ID = 20110870089  Analysis Date = 03/22/2011 
 Lab Value = -1E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20110800059  Analysis Date = 03/18/2011 
 Lab Value = .00059 
 RPT Level = 0.001 
 Lab Sample ID = 20110750067  Analysis Date = 03/09/2011 
 Lab Value = -22E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20110660032  Analysis Date = 03/01/2011 
 Lab Value = -5E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20110590070  Analysis Date = 02/24/2011 
 Lab Value = -22E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20110530105  Analysis Date = 02/16/2011 
 Lab Value = .00042 
 RPT Level = 0.001 
 Lab Sample ID = 20110450036  Analysis Date = 02/15/2011 
 Lab Value = .00012 
 RPT Level = 0.001 
 Lab Sample ID = 20110410098  Analysis Date = 02/15/2011 
 Lab Value = .00007 
 RPT Level = 0.001 
 Lab Sample ID = 20110400069  Analysis Date = 02/02/2011 
 Lab Value = .00005 
 RPT Level = 0.001 
 Lab Sample ID = 20110240065  Analysis Date = 02/01/2011 
 Lab Value = -.0007 
 RPT Level = 0.001 
 Lab Sample ID = 20110180057  Analysis Date = 01/20/2011 
 Lab Value = -13E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20110110016  Analysis Date = 01/10/2011 
 Lab Value = .00043 
 RPT Level = 0.001 
 Lab Sample ID = 20110030021  Analysis Date = 01/10/2011 
 Lab Value = .00069 
 RPT Level = 0.001 
 Lab Sample ID = 20103610054  Analysis Date = 01/14/2011 
 Lab Value = -3E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20103540047  Analysis Date = 01/06/2011 
 Lab Value = .00025 
 RPT Level = 0.001 
 Lab Sample ID = 20103470078  Analysis Date = 12/15/2010 
 Lab Value = .00062 
 RPT Level = 0.001 
 Lab Sample ID = 20103400086  Analysis Date = 12/09/2010 
 Lab Value = .00013 
 RPT Level = 0.001 
 Lab Sample ID = 20103330099  Analysis Date = 12/09/2010 
 Lab Value = .00013 
 RPT Level = 0.001 
 Lab Sample ID = 20103260065  Analysis Date = 12/02/2010 
 Lab Value = .00041 
 RPT Level = 0.001 
 Lab Sample ID = 20103190064  Analysis Date = 11/18/2010 
 Lab Value = .00074 
 RPT Level = 0.001 
 Lab Sample ID = 20103120026  Analysis Date = 11/09/2010 
 Lab Value = .00022 
 RPT Level = 0.001 
 Lab Sample ID = 20103060008  Analysis Date = 11/09/2010 
 Lab Value = 0.0001 
 RPT Level = 0.001 
 Lab Sample ID = 20102990006  Analysis Date = 11/04/2010 
 Lab Value = .00026 
 RPT Level = 0.001 
 Lab Sample ID = 20102920006  Analysis Date = 10/27/2010 
 Lab Value = .00004 
 RPT Level = 0.001 
 Lab Sample ID = 20102850132  Analysis Date = 11/03/2010 
 Lab Value = .00058 
 RPT Level = 0.001 
 Lab Sample ID = 20102770110  Analysis Date = 10/14/2010 
 Lab Value = .00016 
 RPT Level = 0.001 
 Lab Sample ID = 20102700152  Analysis Date = 10/14/2010 
 Lab Value = .00014 
 RPT Level = 0.001 
 Lab Sample ID = 20102640136  Analysis Date = 09/30/2010 
 Lab Value = .00035 
 RPT Level = 0.001 
 Lab Sample ID = 20102570015  Analysis Date = 09/29/2010 
 Lab Value = .00007 
 RPT Level = 0.001 
 Lab Sample ID = 20102510062  Analysis Date = 09/16/2010 
 Lab Value = -41E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20102430249  Analysis Date = 09/15/2010 
 Lab Value = .00069 
 RPT Level = 0.001 
 Lab Sample ID = 20102350196  Analysis Date = 08/31/2010 
 Lab Value = -4E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20102290049  Analysis Date = 08/26/2010 
 Lab Value = -24E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20102230041  Analysis Date = 08/17/2010 
 Lab Value = .00014 
 RPT Level = 0.001 
 Lab Sample ID = 20102140090  Analysis Date = 08/12/2010 
 Lab Value = 0.0011 
 RPT Level = 0.001 
 Lab Sample ID = 20102080005  Analysis Date = 08/05/2010 
 Lab Value = .00022 
 RPT Level = 0.001 
 Lab Sample ID = 20102000188  Analysis Date = 07/16/2010 
 Lab Value = -16E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20101930104  Analysis Date = 07/16/2010 
 Lab Value = -9E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20101870059  Analysis Date = 07/16/2010 
 Lab Value = -18E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20101790124  Analysis Date = 07/14/2010 
 Lab Value = .00094 
 RPT Level = 0.001 
 Lab Sample ID = 20101730068  Analysis Date = 07/13/2010 
 Lab Value = -.0001 
 RPT Level = 0.001 
 Lab Sample ID = 20101660061  Analysis Date = 06/28/2010 
 Lab Value = .00021 
 RPT Level = 0.001 
 Lab Sample ID = 20101590005  Analysis Date = 06/25/2010 
 Lab Value = -32E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20101530090  Analysis Date = 06/24/2010 
 Lab Value = -15E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20101440165  Analysis Date = 06/17/2010 
 Lab Value = -29E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20101380021  Analysis Date = 05/27/2010 
 Lab Value = -.0001 
 RPT Level = 0.001 
 Lab Sample ID = 20101310098  Analysis Date = 05/11/2010 
 Lab Value = 0.0001 
 RPT Level = 0.001 
 Lab Sample ID = 20101240080  Analysis Date = 05/11/2010 
 Lab Value = -9E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20101180043  Analysis Date = 05/10/2010 
 Lab Value = -24E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20101090063  Analysis Date = 04/26/2010 
 Lab Value = -22E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20101020075  Analysis Date = 04/14/2010 
 Lab Value = .00002 
 RPT Level = 0.001 
 Lab Sample ID = 20100950036  Analysis Date = 04/12/2010 
 Lab Value = -23E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20100880044  Analysis Date = 04/12/2010 
 Lab Value = -21E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20100850066  Analysis Date = 04/06/2010 
 Lab Value = .00007 
 RPT Level = 0.001 
 Lab Sample ID = 20100750002  Analysis Date = 03/31/2010 
 Lab Value = -3E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20100680014  Analysis Date = 03/11/2010 
 Lab Value = .00015 
 RPT Level = 0.001 
 Lab Sample ID = 20100600067  Analysis Date = 02/23/2010 
 Lab Value = -11E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20100530048  Analysis Date = 02/22/2010 
 Lab Value = .00058 
 RPT Level = 0.001 
 Lab Sample ID = 20100470025  Analysis Date = 02/22/2010 
 Lab Value = 0.0002 
 RPT Level = 0.001 
 Lab Sample ID = 20100390038  Analysis Date = 02/18/2010 
 Lab Value = -61E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20100320023  Analysis Date = 02/11/2010 
 Lab Value = -6E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20100260065  Analysis Date = 01/28/2010 
 Lab Value = -27E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20100190102  Analysis Date = 01/14/2010 
 Lab Value = .00007 
 RPT Level = 0.001 
 Lab Sample ID = 20100110099  Analysis Date = 01/12/2010 
 Lab Value = -13E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20100050014  Analysis Date = 01/12/2010 
 Lab Value = -26E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20093620042  Analysis Date = 01/12/2010 
 Lab Value = .00006 
 RPT Level = 0.001 
 Lab Sample ID = 20093560033  Analysis Date = 01/07/2010 
 Lab Value = .00016 
 RPT Level = 0.001 
 Lab Sample ID = 20093480064  Analysis Date = 12/22/2009 
 Lab Value = .00022 
 RPT Level = 0.001 
 Lab Sample ID = 20093420004  Analysis Date = 01/06/2010 
 Lab Value = -21E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20093350070  Analysis Date = 11/27/2009 
 Lab Value = .00003 
 RPT Level = 0.001 
 Lab Sample ID = 20093280015  Analysis Date = 11/27/2009 
 Lab Value = .00019 
 RPT Level = 0.001 
 Lab Sample ID = 20093200062  Analysis Date = 11/25/2009 
 Lab Value = .00007 
 RPT Level = 0.001 
 Lab Sample ID = 20093130061  Analysis Date = 11/24/2009 
 Lab Value = .00018 
 RPT Level = 0.001 
 Lab Sample ID = 20093070201  Analysis Date = 11/19/2009 
 Lab Value = -26E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20093000106  Analysis Date = 11/06/2009 
 Lab Value = .00004 
 RPT Level = 0.001 
 Lab Sample ID = 20092920096  Analysis Date = 11/05/2009 
 Lab Value = .00025 
 RPT Level = 0.001 
 Lab Sample ID = 20092870073  Analysis Date = 10/22/2009 
 Lab Value = -1E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20092780071  Analysis Date = 10/21/2009 
 Lab Value = -8E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20092720011  Analysis Date = 10/15/2009 
 Lab Value = .00017 
 RPT Level = 0.001 
 Lab Sample ID = 20092640026  Analysis Date = 09/30/2009 
 Lab Value = .00016 
 RPT Level = 0.001 
 Lab Sample ID = 20092570049  Analysis Date = 09/30/2009 
 Lab Value = .00015 
 RPT Level = 0.001 
 Lab Sample ID = 20092520132  Analysis Date = 09/23/2009 
 Lab Value = -38E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20092430155  Analysis Date = 09/10/2009 
 Lab Value = -9E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20092360171  Analysis Date = 09/02/2009 
 Lab Value = -36E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20092290211  Analysis Date = 08/26/2009 
 Lab Value = -13E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20092220169  Analysis Date = 08/20/2009 
 Lab Value = .00015 
 RPT Level = 0.001 
 Lab Sample ID = 20092150073  Analysis Date = 08/12/2009 
 Lab Value = -35E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20092090263  Analysis Date = 07/29/2009 
 Lab Value = .00008 
 RPT Level = 0.001 
 Lab Sample ID = 20092010116  Analysis Date = 07/23/2009 
 Lab Value = -18E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20091950026  Analysis Date = 07/16/2009 
 Lab Value = -77E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20091870025  Analysis Date = 07/09/2009 
 Lab Value = -26E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20091800174  Analysis Date = 06/30/2009 
 Lab Value = -52E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20091730218  Analysis Date = 06/25/2009 
 Lab Value = .00026 
 RPT Level = 0.001 
 Lab Sample ID = 20091660206  Analysis Date = 06/17/2009 
 Lab Value = .00059 
 RPT Level = 0.001 
 Lab Sample ID = 20091590088  Analysis Date = 06/10/2009 
 Lab Value = -8E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20091520151  Analysis Date = 06/03/2009 
 Lab Value = -17E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20091460188  Analysis Date = 05/21/2009 
 Lab Value = .00046 
 RPT Level = 0.001 
 Lab Sample ID = 20091380122  Analysis Date = 05/20/2009 
 Lab Value = -11E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20091320020  Analysis Date = 05/14/2009 
 Lab Value = -0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20091240123  Analysis Date = 05/06/2009 
 Lab Value = .00008 
 RPT Level = 0.001 
 Lab Sample ID = 20091170110  Analysis Date = 04/30/2009 
 Lab Value = 0.0002 
 RPT Level = 0.001 
 Lab Sample ID = 20091110135  Analysis Date = 04/15/2009 
 Lab Value = .00005 
 RPT Level = 0.001 
 Lab Sample ID = 20091030081  Analysis Date = 04/08/2009 
 Lab Value = .00064 
 RPT Level = 0.001 
 Lab Sample ID = 20090960054  Analysis Date = 04/08/2009 
 Lab Value = .00055 
 RPT Level = 0.001 
 Lab Sample ID = 20090890069  Analysis Date = 04/06/2009 
 Lab Value = -13E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20090820029  Analysis Date = 03/31/2009 
 Lab Value = -26E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20090750048  Analysis Date = 03/10/2009 
 Lab Value = -3E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20090680045  Analysis Date = 03/04/2009 
 Lab Value = .00022 
 RPT Level = 0.001 
 Lab Sample ID = 20090610057  Analysis Date = 03/04/2009 
 Lab Value = .00053 
 RPT Level = 0.001 
 Lab Sample ID = 20090540030  Analysis Date = 03/03/2009 
 Lab Value = -26E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20090480058  Analysis Date = 02/18/2009 
 Lab Value = -46E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20090400032  Analysis Date = 02/03/2009 
 Lab Value = .00055 
 RPT Level = 0.001 
 Lab Sample ID = 20090330037  Analysis Date = 02/03/2009 
 Lab Value = .00051 
 RPT Level = 0.001 
 Lab Sample ID = 20090260027  Analysis Date = 01/28/2009 
 Lab Value = .00048 
 RPT Level = 0.001 
 Lab Sample ID = 20090200036  Analysis Date = 01/22/2009 
 Lab Value = 0.0001 
 RPT Level = 0.001 
 Lab Sample ID = 20090120049  Analysis Date = 01/08/2009 
 Lab Value = .00007 
 RPT Level = 0.001 
 Lab Sample ID = 20090050019  Analysis Date = 01/08/2009 
 Lab Value = .00012 
 RPT Level = 0.001 
 Lab Sample ID = 20083650083  Analysis Date = 01/07/2009 
 Lab Value = .00016 
 RPT Level = 0.001 
 Lab Sample ID = 20083570034  Analysis Date = 12/22/2008 
 Lab Value = .00049 
 RPT Level = 0.001 
 Lab Sample ID = 20083500071  Analysis Date = 12/18/2008 
 Lab Value = .00023 
 RPT Level = 0.001 
 Lab Sample ID = 20083450064  Analysis Date = 12/09/2008 
 Lab Value = .00012 
 RPT Level = 0.001 
 Lab Sample ID = 20083360040  Analysis Date = 12/04/2008 
 Lab Value = .00022 
 RPT Level = 0.001 
 Lab Sample ID = 20083290062  Analysis Date = 12/03/2008 
 Lab Value = -6E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20083220064  Analysis Date = 11/13/2008 
 Lab Value = .00074 
 RPT Level = 0.001 
 Lab Sample ID = 20083080100  Analysis Date = 11/12/2008 
 Lab Value = .00016 
 RPT Level = 0.001 
 Lab Sample ID = 20083010109  Analysis Date = 11/04/2008 
 Lab Value = -47E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20082940063  Analysis Date = 10/16/2008 
 Lab Value = -15E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20082880040  Analysis Date = 10/15/2008 
 Lab Value = -11E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20082800042  Analysis Date = 10/08/2008 
 Lab Value = -4E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20082730062  Analysis Date = 09/30/2008 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20082660047  Analysis Date = 09/24/2008 
 Lab Value = .00027 
 RPT Level = 0.001 
 Lab Sample ID = 20082590105  Analysis Date = 09/23/2008 
 Lab Value = .00031 
 RPT Level = 0.001 
 Lab Sample ID = 20082520008  Analysis Date = 09/16/2008 
 Lab Value = .00015 
 RPT Level = 0.001 
 Lab Sample ID = 20082460098  Analysis Date = 09/10/2008 
 Lab Value = .00015 
 RPT Level = 0.001 
 Lab Sample ID = 20082380080  Analysis Date = 08/26/2008 
 Lab Value = .00082 
 RPT Level = 0.001 
 Lab Sample ID = 20082310131  Analysis Date = 08/28/2008 
 Lab Value = -47E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20082250010  Analysis Date = 08/28/2008 
 Lab Value = -33E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20082190011  Analysis Date = 07/24/2008 
 Lab Value = .00037 
 RPT Level = 0.001 
 Lab Sample ID = 20082030127  Analysis Date = 07/17/2008 
 Lab Value = 0.0001 
 RPT Level = 0.001 
 Lab Sample ID = 20081970139  Analysis Date = 07/14/2008 
 Lab Value = -18E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20081890044  Analysis Date = 07/07/2008 
 Lab Value = .00021 
 RPT Level = 0.001 
 Lab Sample ID = 20081820059  Analysis Date = 07/02/2008 
 Lab Value = .00082 
 RPT Level = 0.001 
 Lab Sample ID = 20081750128  Analysis Date = 06/24/2008 
 Lab Value = -39E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20081680067  Analysis Date = 06/18/2008 
 Lab Value = .00005 
 RPT Level = 0.001 
 Lab Sample ID = 20081620017  Analysis Date = 06/11/2008 
 Lab Value = -14E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20081540109  Analysis Date = 06/09/2008 
 Lab Value = .00037 
 RPT Level = 0.001 
 Lab Sample ID = 20081480068  Analysis Date = 05/21/2008 
 Lab Value = -12E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20081400061  Analysis Date = 05/20/2008 
 Lab Value = .00059 
 RPT Level = 0.001 
 Lab Sample ID = 20081330112  Analysis Date = 05/13/2008 
 Lab Value = .00016 
 RPT Level = 0.001 
 Lab Sample ID = 20081260070  Analysis Date = 05/06/2008 
 Lab Value = -3E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20081190055  Analysis Date = 04/30/2008 
 Lab Value = .00012 
 RPT Level = 0.001 
 Lab Sample ID = 20081120033  Analysis Date = 04/29/2008 
 Lab Value = .00059 
 RPT Level = 0.001 
 Lab Sample ID = 20081050114  Analysis Date = 04/15/2008 
 Lab Value = -34E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20080980084  Analysis Date = 04/15/2008 
 Lab Value = -29E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20080920083  Analysis Date = 03/31/2008 
 Lab Value = .00035 
 RPT Level = 0.001 
 Lab Sample ID = 20080840064  Analysis Date = 03/26/2008 
 Lab Value = -1E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20080770124  Analysis Date = 03/20/2008 
 Lab Value = .00024 
 RPT Level = 0.001 
 Lab Sample ID = 20080700074  Analysis Date = 03/06/2008 
 Lab Value = .00004 
 RPT Level = 0.001 
 Lab Sample ID = 20080630067  Analysis Date = 03/05/2008 
 Lab Value = .00016 
 RPT Level = 0.001 
 Lab Sample ID = 20080560070  Analysis Date = 02/28/2008 
 Lab Value = .00015 
 RPT Level = 0.001 
 Lab Sample ID = 20080510055  Analysis Date = 02/12/2008 
 Lab Value = .00028 
 RPT Level = 0.001 
 Lab Sample ID = 20080420072  Analysis Date = 02/06/2008 
 Lab Value = .00066 
 RPT Level = 0.001 
 Lab Sample ID = 20080360051  Analysis Date = 01/29/2008 
 Lab Value = .00002 
 RPT Level = 0.001 
 Lab Sample ID = 20080280050  Analysis Date = 01/24/2008 
 Lab Value = 0.0007 
 RPT Level = 0.001 
 Lab Sample ID = 20080230021  Analysis Date = 01/23/2008 
 Lab Value = -9E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20080140027  Analysis Date = 01/17/2008 
 Lab Value = .00004 
 RPT Level = 0.001 
 Lab Sample ID = 20080070023  Analysis Date = 01/08/2008 
 Lab Value = -3E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20073620004  Analysis Date = 01/03/2008 
 Lab Value = .00049 
 RPT Level = 0.001 
 Lab Sample ID = 20073510098  Analysis Date = 12/13/2007 
 Lab Value = .00013 
 RPT Level = 0.001 
 Lab Sample ID = 20073440039  Analysis Date = 12/04/2007 
 Lab Value = .00016 
 RPT Level = 0.001 
 Lab Sample ID = 20073370069  Analysis Date = 11/27/2007 
 Lab Value = -16E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20073300042  Analysis Date = 11/21/2007 
 Lab Value = .00007 
 RPT Level = 0.001 
 Lab Sample ID = 20073230113  Analysis Date = 11/15/2007 
 Lab Value = .00047 
 RPT Level = 0.001 
 Lab Sample ID = 20073170062  Analysis Date = 11/15/2007 
 Lab Value = .00011 
 RPT Level = 0.001 
 Lab Sample ID = 20073100012  Analysis Date = 10/30/2007 
 Lab Value = .00023 
 RPT Level = 0.001 
 Lab Sample ID = 20073020065  Analysis Date = 10/26/2007 
 Lab Value = .00023 
 RPT Level = 0.001 
 Lab Sample ID = 20072960186  Analysis Date = 10/23/2007 
 Lab Value = .00076 
 RPT Level = 0.001 
 Lab Sample ID = 20072890056  Analysis Date = 10/22/2007 
 Lab Value = .00007 
 RPT Level = 0.001 
 Lab Sample ID = 20072850025  Analysis Date = 10/10/2007 
 Lab Value = .00033 
 RPT Level = 0.001 
 Lab Sample ID = 20072670056  Analysis Date = 10/10/2007 
 Lab Value = -2E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20072600129  Analysis Date = 10/05/2007 
 Lab Value = -5E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20072540015  Analysis Date = 09/28/2007 
 Lab Value = .00044 
 RPT Level = 0.001 
 Lab Sample ID = 20072480018  Analysis Date = 08/27/2007 
 Lab Value = .00055 
 RPT Level = 0.001 
 Lab Sample ID = 20072330109  Analysis Date = 08/24/2007 
 Lab Value = .00038 
 RPT Level = 0.001 
 Lab Sample ID = 20072260198  Analysis Date = 08/22/2007 
 Lab Value = .00023 
 RPT Level = 0.001 
 Lab Sample ID = 20072210252  Analysis Date = 08/20/2007 
 Lab Value = -75E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20072110162  Analysis Date = 08/15/2007 
 Lab Value = .00058 
 RPT Level = 0.001 
 Lab Sample ID = 20072040101  Analysis Date = 07/24/2007 
 Lab Value = .00031 
 RPT Level = 0.001 
 Lab Sample ID = 20071900105  Analysis Date = 07/23/2007 
 Lab Value = .00022 
 RPT Level = 0.001 
 Lab Sample ID = 20071830158  Analysis Date = 07/03/2007 
 Lab Value = .00039 
 RPT Level = 0.001 
 Lab Sample ID = 20071770201  Analysis Date = 06/22/2007 
 Lab Value = 0.0006 
 RPT Level = 0.001 
 Lab Sample ID = 20071690119  Analysis Date = 06/22/2007 
 Lab Value = -9E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20071620045  Analysis Date = 06/21/2007 
 Lab Value = .00023 
 RPT Level = 0.001 
 Lab Sample ID = 20071560026  Analysis Date = 06/20/2007 
 Lab Value = .00055 
 RPT Level = 0.001 
 Lab Sample ID = 20071500033  Analysis Date = 05/30/2007 
 Lab Value = .00045 
 RPT Level = 0.001 
 Lab Sample ID = 20071410089  Analysis Date = 05/17/2007 
 Lab Value = .00009 
 RPT Level = 0.001 
 Lab Sample ID = 20071340113  Analysis Date = 05/16/2007 
 Lab Value = .00037 
 RPT Level = 0.001 
 Lab Sample ID = 20071280019  Analysis Date = 05/08/2007 
 Lab Value = -46E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20071200089  Analysis Date = 05/03/2007 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20071130120  Analysis Date = 05/01/2007 
 Lab Value = -3E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20071070021  Analysis Date = 04/26/2007 
 Lab Value = -.0001 
 RPT Level = 0.001 
 Lab Sample ID = 20070990050  Analysis Date = 04/24/2007 
 Lab Value = .00008 
 RPT Level = 0.001 
 Lab Sample ID = 20070930070  Analysis Date = 04/10/2007 
 Lab Value = .00008 
 RPT Level = 0.001 
 Lab Sample ID = 20070860217  Analysis Date = 03/26/2007 
 Lab Value = .00003 
 RPT Level = 0.001 
 Lab Sample ID = 20070780128  Analysis Date = 03/20/2007 
 Lab Value = .00009 
 RPT Level = 0.001 
 Lab Sample ID = 20070710075  Analysis Date = 03/15/2007 
 Lab Value = .00003 
 RPT Level = 0.001 
 Lab Sample ID = 20070650009  Analysis Date = 03/14/2007 
 Lab Value = .00033 
 RPT Level = 0.001 
 Lab Sample ID = 20070580141  Analysis Date = 02/27/2007 
 Lab Value = .00046 
 RPT Level = 0.001 
 Lab Sample ID = 20070540023  Analysis Date = 02/21/2007 
 Lab Value = .00001 
 RPT Level = 0.001 
 Lab Sample ID = 20070460015  Analysis Date = 02/13/2007 
 Lab Value = 0.0008 
 RPT Level = 0.001 
 Lab Sample ID = 20070400103  Analysis Date = 02/01/2007 
 Lab Value = .00014 
 RPT Level = 0.001 
 Lab Sample ID = 20070250023  Analysis Date = 02/01/2007 
 Lab Value = .00035 
 RPT Level = 0.001 
 Lab Sample ID = 20070180071  Analysis Date = 01/18/2007 
 Lab Value = .00036 
 RPT Level = 0.001 
 Lab Sample ID = 20070120012  Analysis Date = 01/09/2007 
 Lab Value = .00049 
 RPT Level = 0.001 
 Lab Sample ID = 20070040013  Analysis Date = 12/28/2006 
 Lab Value = .00045 
 RPT Level = 0.001 
 Lab Sample ID = 20063610084  Analysis Date = 12/27/2006 
 Lab Value = .00018 
 RPT Level = 0.001 
 Lab Sample ID = 20063520072  Analysis Date = 12/26/2006 
 Lab Value = .00009 
 RPT Level = 0.001 
 Lab Sample ID = 20063450081  Analysis Date = 12/05/2006 
 Lab Value = .00021 
 RPT Level = 0.001 
 Lab Sample ID = 20063380055  Analysis Date = 11/29/2006 
 Lab Value = 0.0003 
 RPT Level = 0.001 
 Lab Sample ID = 20063310047  Analysis Date = 11/28/2006 
 Lab Value = -.0004 
 RPT Level = 0.001 
 Lab Sample ID = 20063240079  Analysis Date = 11/27/2006 
 Lab Value = 0.0002 
 RPT Level = 0.001 
 Lab Sample ID = 20063180103  Analysis Date = 11/22/2006 
 Lab Value = -0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20063100080  Analysis Date = 11/22/2006 
 Lab Value = -0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20063030096  Analysis Date = 11/16/2006 
 Lab Value = .00011 
 RPT Level = 0.001 
 Lab Sample ID = 20062960133  Analysis Date = 11/07/2006 
 Lab Value = 0.0005 
 RPT Level = 0.001 
 Lab Sample ID = 20062910013  Analysis Date = 11/07/2006 
 Lab Value = .00041 
 RPT Level = 0.001 
 Lab Sample ID = 20062850014  Analysis Date = 10/26/2006 
 Lab Value = -0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20062780050  Analysis Date = 10/03/2006 
 Lab Value = -9E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20062620013  Analysis Date = 09/25/2006 
 Lab Value = .00003 
 RPT Level = 0.001 
 Lab Sample ID = 20062540016  Analysis Date = 09/20/2006 
 Lab Value = -7E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20062500008  Analysis Date = 09/12/2006 
 Lab Value = .00055 
 RPT Level = 0.001 
 Lab Sample ID = 20062350182  Analysis Date = 08/24/2006 
 Lab Value = .00047 
 RPT Level = 0.001 
 Lab Sample ID = 20062270273  Analysis Date = 08/18/2006 
 Lab Value = -8E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20062220039  Analysis Date = 08/07/2006 
 Lab Value = -23E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20062020314  Analysis Date = 07/19/2006 
 Lab Value = .00079 
 RPT Level = 0.001 
 Lab Sample ID = 20061950007  Analysis Date = 07/14/2006 
 Lab Value = -24E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20061880009  Analysis Date = 06/27/2006 
 Lab Value = 0.0004 
 RPT Level = 0.001 
 Lab Sample ID = 20061730014  Analysis Date = 06/21/2006 
 Lab Value = -22E-5 
 RPT Level = 0.001 
 Lab Sample ID = 20061670021  Analysis Date = 06/13/2006 
 Lab Value = .00019 
 RPT Level = 0.001 
 Lab Sample ID = 20061580018  Analysis Date = 09/30/2016 
 RPT Level = 0.001  Analysis Date = 09/23/2016 
 RPT Level = 0.001  Analysis Date = 09/23/2016 
 RPT Level = 0.001  Analysis Date = 09/16/2016 
 RPT Level = 0.001  Analysis Date = 09/16/2016 
 RPT Level = 0.001  Analysis Date = 09/13/2016 
 RPT Level = 0.001  Analysis Date = 09/13/2016 
 RPT Level = 0.001  Analysis Date = 09/09/2016 
 RPT Level = 0.001  Analysis Date = 09/09/2016 
 RPT Level = 0.001  Analysis Date = 08/26/2016 
 RPT Level = 0.001  Analysis Date = 08/26/2016 
 RPT Level = 0.001  Analysis Date = 08/19/2016 
 RPT Level = 0.001  Analysis Date = 08/19/2016 
 RPT Level = 0.001  Analysis Date = 08/12/2016 
 RPT Level = 0.001  Analysis Date = 08/12/2016 
 RPT Level = 0.001  Analysis Date = 08/08/2016 
 RPT Level = 0.001  Analysis Date = 08/08/2016 
 RPT Level = 0.001  Analysis Date = 08/02/2016 
 RPT Level = 0.001  Analysis Date = 08/02/2016 
 RPT Level = 0.001  Analysis Date = 07/26/2016 
 RPT Level = 0.001  Analysis Date = 07/26/2016 
 RPT Level = 0.001  Analysis Date = 07/14/2016 
 RPT Level = 0.001  Analysis Date = 07/14/2016 
 RPT Level = 0.001  Analysis Date = 07/12/2016 
 RPT Level = 0.001  Analysis Date = 07/12/2016 
 RPT Level = 0.001  Analysis Date = 07/07/2016 
 RPT Level = 0.001  Analysis Date = 07/07/2016 
 RPT Level = 0.001  Analysis Date = 06/29/2016 
 RPT Level = 0.001  Analysis Date = 06/29/2016 
 RPT Level = 0.001  Analysis Date = 06/20/2016 
 RPT Level = 0.001  Analysis Date = 06/20/2016 
 RPT Level = 0.001  Analysis Date = 06/09/2016 
 RPT Level = 0.001  Analysis Date = 06/09/2016 
 RPT Level = 0.001  Analysis Date = 06/02/2016 
 RPT Level = 0.001  Analysis Date = 06/02/2016 
 RPT Level = 0.001  Analysis Date = 06/02/2016 
 RPT Level = 0.001  Analysis Date = 06/02/2016 
 RPT Level = 0.001  Analysis Date = 05/10/2016 
 RPT Level = 0.001  Analysis Date = 05/10/2016 
 RPT Level = 0.001  Analysis Date = 05/04/2016 
 RPT Level = 0.001  Analysis Date = 05/04/2016 
 RPT Level = 0.001  Analysis Date = 04/29/2016 
 RPT Level = 0.001  Analysis Date = 04/29/2016 
 RPT Level = 0.001  Analysis Date = 04/22/2016 
 RPT Level = 0.001  Analysis Date = 04/22/2016 
 RPT Level = 0.001  Analysis Date = 04/13/2016 
 RPT Level = 0.001  Analysis Date = 04/13/2016 
 RPT Level = 0.001  Analysis Date = 04/07/2016 
 RPT Level = 0.001  Analysis Date = 04/07/2016 
 RPT Level = 0.001  Analysis Date = 03/31/2016 
 RPT Level = 0.001  Analysis Date = 03/31/2016 
 RPT Level = 0.001  Analysis Date = 03/25/2016 
 RPT Level = 0.001  Analysis Date = 03/25/2016 
 RPT Level = 0.001  Analysis Date = 03/17/2016 
 RPT Level = 0.001  Analysis Date = 03/17/2016 
 RPT Level = 0.001  Analysis Date = 03/08/2016 
 RPT Level = 0.001  Analysis Date = 03/08/2016 
 RPT Level = 0.001  Analysis Date = 03/02/2016 
 RPT Level = 0.001  Analysis Date = 03/02/2016 
 RPT Level = 0.001  Analysis Date = 02/25/2016 
 RPT Level = 0.001  Analysis Date = 02/25/2016 
 RPT Level = 0.001  Analysis Date = 02/23/2016 
 RPT Level = 0.001  Analysis Date = 02/23/2016 
 RPT Level = 0.001  Analysis Date = 02/19/2016 
 RPT Level = 0.001  Analysis Date = 02/19/2016 
 RPT Level = 0.001  Analysis Date = 02/03/2016 
 RPT Level = 0.001  Analysis Date = 02/03/2016 
 RPT Level = 0.001  Analysis Date = 01/27/2016 
 RPT Level = 0.001  Analysis Date = 01/27/2016 
 RPT Level = 0.001  Analysis Date = 01/25/2016 
 RPT Level = 0.001  Analysis Date = 01/25/2016 
 RPT Level = 0.001  Analysis Date = 01/14/2016 
 RPT Level = 0.001  Analysis Date = 01/14/2016 
 RPT Level = 0.001  Analysis Date = 01/06/2016 
 RPT Level = 0.001  Analysis Date = 01/06/2016 
 RPT Level = 0.001  Analysis Date = 01/05/2016 
 RPT Level = 0.001  Analysis Date = 01/05/2016 
 RPT Level = 0.001  Analysis Date = 12/28/2015 
 RPT Level = 0.001  Analysis Date = 12/28/2015 
 RPT Level = 0.001  Analysis Date = 12/22/2015 
 RPT Level = 0.001  Analysis Date = 12/22/2015 
 RPT Level = 0.001  Analysis Date = 12/14/2015 
 RPT Level = 0.001  Analysis Date = 12/14/2015 
 RPT Level = 0.001  Analysis Date = 12/02/2015 
 RPT Level = 0.001  Analysis Date = 12/02/2015 
 RPT Level = 0.001  Analysis Date = 11/27/2015 
 RPT Level = 0.001  Analysis Date = 11/27/2015 
 RPT Level = 0.001  Analysis Date = 11/18/2015 
 RPT Level = 0.001  Analysis Date = 11/18/2015 
 RPT Level = 0.001  Analysis Date = 11/16/2015 
 RPT Level = 0.001  Analysis Date = 11/16/2015 
 RPT Level = 0.001  Analysis Date = 11/04/2015 
 RPT Level = 0.001  Analysis Date = 11/04/2015 
 RPT Level = 0.001  Analysis Date = 10/28/2015 
 RPT Level = 0.001  Analysis Date = 10/28/2015 
 RPT Level = 0.001  Analysis Date = 10/20/2015 
 RPT Level = 0.001  Analysis Date = 10/20/2015 
 RPT Level = 0.001  Analysis Date = 10/14/2015 
 RPT Level = 0.001  Analysis Date = 10/14/2015 
 RPT Level = 0.001  Analysis Date = 10/06/2015 
 RPT Level = 0.001  Analysis Date = 10/06/2015 
 RPT Level = 0.001  Analysis Date = 09/29/2015 
 RPT Level = 0.001  Analysis Date = 09/29/2015 
 RPT Level = 0.001  Analysis Date = 09/23/2015 
 RPT Level = 0.001  Analysis Date = 09/23/2015 
 RPT Level = 0.001  Analysis Date = 09/21/2015 
 RPT Level = 0.001  Analysis Date = 09/21/2015 
 RPT Level = 0.001  Analysis Date = 09/09/2015 
 RPT Level = 0.001  Analysis Date = 09/09/2015 
 RPT Level = 0.001  Analysis Date = 09/02/2015 
 RPT Level = 0.001  Analysis Date = 09/02/2015 
 RPT Level = 0.001  Analysis Date = 08/26/2015 
 RPT Level = 0.001  Analysis Date = 08/26/2015 
 RPT Level = 0.001  Analysis Date = 08/26/2015 
 RPT Level = 0.001  Analysis Date = 08/26/2015 
 RPT Level = 0.001  Analysis Date = 08/13/2015 
 RPT Level = 0.001  Analysis Date = 08/13/2015 
 RPT Level = 0.001  Analysis Date = 08/04/2015 
 RPT Level = 0.001  Analysis Date = 08/04/2015 
 RPT Level = 0.001  Analysis Date = 07/28/2015 
 RPT Level = 0.001  Analysis Date = 07/28/2015 
 RPT Level = 0.001  Analysis Date = 07/22/2015 
 RPT Level = 0.001  Analysis Date = 07/22/2015 
 RPT Level = 0.001  Analysis Date = 07/15/2015 
 RPT Level = 0.001  Analysis Date = 07/15/2015 
 RPT Level = 0.001  Analysis Date = 07/08/2015 
 RPT Level = 0.001  Analysis Date = 07/08/2015 
 RPT Level = 0.001  Analysis Date = 07/01/2015 
 RPT Level = 0.001  Analysis Date = 07/01/2015 
 RPT Level = 0.001  Analysis Date = 06/24/2015 
 RPT Level = 0.001  Analysis Date = 06/24/2015 
 RPT Level = 0.001  Analysis Date = 06/17/2015 
 RPT Level = 0.001  Analysis Date = 06/17/2015 
 RPT Level = 0.001  Analysis Date = 06/12/2015 
 RPT Level = 0.001  Analysis Date = 06/12/2015 
 RPT Level = 0.001  Analysis Date = 06/04/2015 
 RPT Level = 0.001  Analysis Date = 06/04/2015 
 RPT Level = 0.001  Analysis Date = 05/28/2015 
 RPT Level = 0.001  Analysis Date = 05/28/2015 
 RPT Level = 0.001  Analysis Date = 05/21/2015 
 RPT Level = 0.001  Analysis Date = 05/21/2015 
 RPT Level = 0.001  Analysis Date = 05/15/2015 
 RPT Level = 0.001  Analysis Date = 05/15/2015 
 RPT Level = 0.001  Analysis Date = 05/08/2015 
 RPT Level = 0.001  Analysis Date = 05/08/2015 
 RPT Level = 0.001  Analysis Date = 05/04/2015 
 RPT Level = 0.001  Analysis Date = 05/04/2015 
 RPT Level = 0.001  Analysis Date = 04/27/2015 
 RPT Level = 0.001  Analysis Date = 04/27/2015 
 RPT Level = 0.001  Analysis Date = 04/17/2015 
 RPT Level = 0.001  Analysis Date = 04/17/2015 
 RPT Level = 0.001  Analysis Date = 04/10/2015 
 RPT Level = 0.001  Analysis Date = 04/10/2015 
 RPT Level = 0.001  Analysis Date = 04/06/2015 
 RPT Level = 0.001  Analysis Date = 04/06/2015 
 RPT Level = 0.001  Analysis Date = 03/30/2015 
 RPT Level = 0.001  Analysis Date = 03/30/2015 
 RPT Level = 0.001  Analysis Date = 03/19/2015 
 RPT Level = 0.001  Analysis Date = 03/19/2015 
 RPT Level = 0.001  Analysis Date = 03/11/2015 
 RPT Level = 0.001  Analysis Date = 03/11/2015 
 RPT Level = 0.001  Analysis Date = 03/06/2015 
 RPT Level = 0.001  Analysis Date = 03/06/2015 
 RPT Level = 0.001  Analysis Date = 02/24/2015 
 RPT Level = 0.001  Analysis Date = 02/24/2015 
 RPT Level = 0.001  Analysis Date = 02/19/2015 
 RPT Level = 0.001  Analysis Date = 02/19/2015 
 RPT Level = 0.001  Analysis Date = 02/17/2015 
 RPT Level = 0.001  Analysis Date = 02/17/2015 
 RPT Level = 0.001  Analysis Date = 02/04/2015 
 RPT Level = 0.001  Analysis Date = 02/04/2015 
 RPT Level = 0.001  Analysis Date = 02/04/2015 
 RPT Level = 0.001  Analysis Date = 02/04/2015 
 RPT Level = 0.001  Analysis Date = 02/03/2015 
 RPT Level = 0.001  Analysis Date = 02/03/2015 
 RPT Level = 0.001  Analysis Date = 01/16/2015 
 RPT Level = 0.001  Analysis Date = 01/16/2015 
 RPT Level = 0.001  Analysis Date = 01/08/2015 
 RPT Level = 0.001  Analysis Date = 01/08/2015 
 RPT Level = 0.001  Analysis Date = 01/08/2015 
 RPT Level = 0.001  Analysis Date = 01/08/2015 
 RPT Level = 0.001  Analysis Date = 01/07/2015 
 RPT Level = 0.001  Analysis Date = 01/07/2015 
 RPT Level = 0.001  Analysis Date = 01/06/2015 
 RPT Level = 0.001  Analysis Date = 01/06/2015 
 RPT Level = 0.001  Analysis Date = 12/17/2014 
 RPT Level = 0.001  Analysis Date = 12/17/2014 
 RPT Level = 0.001  Analysis Date = 12/15/2014 
 RPT Level = 0.001  Analysis Date = 12/15/2014 
 RPT Level = 0.001  Analysis Date = 12/15/2014 
 RPT Level = 0.001  Analysis Date = 12/15/2014 
 RPT Level = 0.001  Analysis Date = 11/25/2014 
 RPT Level = 0.001  Analysis Date = 11/25/2014 
 RPT Level = 0.001  Analysis Date = 11/21/2014 
 RPT Level = 0.001  Analysis Date = 11/21/2014 
 RPT Level = 0.001  Analysis Date = 11/21/2014 
 RPT Level = 0.001  Analysis Date = 11/21/2014 
 RPT Level = 0.001  Analysis Date = 11/19/2014 
 RPT Level = 0.001  Analysis Date = 11/19/2014 
 RPT Level = 0.001  Analysis Date = 11/19/2014 
 RPT Level = 0.001  Analysis Date = 11/19/2014 
 RPT Level = 0.001  Analysis Date = 11/17/2014 
 RPT Level = 0.001  Analysis Date = 11/17/2014 
 RPT Level = 0.001  Analysis Date = 11/17/2014 
 RPT Level = 0.001  Analysis Date = 11/17/2014 
 RPT Level = 0.001  Analysis Date = 11/06/2014 
 RPT Level = 0.001  Analysis Date = 11/06/2014 
 RPT Level = 0.001  Analysis Date = 11/06/2014 
 RPT Level = 0.001  Analysis Date = 11/06/2014 
 RPT Level = 0.001  Analysis Date = 10/23/2014 
 RPT Level = 0.001  Analysis Date = 10/23/2014 
 RPT Level = 0.001  Analysis Date = 10/23/2014 
 RPT Level = 0.001  Analysis Date = 10/23/2014 
 RPT Level = 0.001  Analysis Date = 10/14/2014 
 RPT Level = 0.001  Analysis Date = 10/14/2014 
 RPT Level = 0.001  Analysis Date = 10/14/2014 
 RPT Level = 0.001  Analysis Date = 10/14/2014 
 RPT Level = 0.001  Analysis Date = 10/01/2014 
 RPT Level = 0.001  Analysis Date = 10/01/2014 
 RPT Level = 0.001  Analysis Date = 10/01/2014 
 RPT Level = 0.001  Analysis Date = 10/01/2014 
 RPT Level = 0.001  Analysis Date = 09/23/2014 
 RPT Level = 0.001  Analysis Date = 09/23/2014 
 RPT Level = 0.001  Analysis Date = 09/23/2014 
 RPT Level = 0.001  Analysis Date = 09/23/2014 
 RPT Level = 0.001  Analysis Date = 09/22/2014 
 RPT Level = 0.001  Analysis Date = 09/22/2014 
 RPT Level = 0.001  Analysis Date = 09/22/2014 
 RPT Level = 0.001  Analysis Date = 09/22/2014 
 RPT Level = 0.001  Analysis Date = 09/12/2014 
 RPT Level = 0.001  Analysis Date = 09/12/2014 
 RPT Level = 0.001  Analysis Date = 09/12/2014 
 RPT Level = 0.001  Analysis Date = 09/12/2014 
 RPT Level = 0.001  Analysis Date = 09/08/2014 
 RPT Level = 0.001  Analysis Date = 09/08/2014 
 RPT Level = 0.001  Analysis Date = 09/08/2014 
 RPT Level = 0.001  Analysis Date = 09/08/2014 
 RPT Level = 0.001  Analysis Date = 08/13/2014 
 RPT Level = 0.001  Analysis Date = 08/13/2014 
 RPT Level = 0.001  Analysis Date = 08/13/2014 
 RPT Level = 0.001  Analysis Date = 08/13/2014 
 RPT Level = 0.001  Analysis Date = 08/06/2014 
 RPT Level = 0.001  Analysis Date = 08/06/2014 
 RPT Level = 0.001  Analysis Date = 08/06/2014 
 RPT Level = 0.001  Analysis Date = 08/06/2014 
 RPT Level = 0.001  Analysis Date = 07/31/2014 
 RPT Level = 0.001  Analysis Date = 07/31/2014 
 RPT Level = 0.001  Analysis Date = 07/31/2014 
 RPT Level = 0.001  Analysis Date = 07/31/2014 
 RPT Level = 0.001  Analysis Date = 07/23/2014 
 RPT Level = 0.001  Analysis Date = 07/23/2014 
 RPT Level = 0.001  Analysis Date = 07/17/2014 
 RPT Level = 0.001  Analysis Date = 07/17/2014 
 RPT Level = 0.001  Analysis Date = 07/10/2014 
 RPT Level = 0.001  Analysis Date = 07/10/2014 
 RPT Level = 0.001  Analysis Date = 07/02/2014 
 RPT Level = 0.001  Analysis Date = 07/02/2014 
 RPT Level = 0.001  Analysis Date = 06/25/2014 
 RPT Level = 0.001  Analysis Date = 06/25/2014 
 RPT Level = 0.001  Analysis Date = 06/19/2014 
 RPT Level = 0.001  Analysis Date = 06/19/2014 
 RPT Level = 0.001  Analysis Date = 06/16/2014 
 RPT Level = 0.001  Analysis Date = 06/16/2014 
 RPT Level = 0.001  Analysis Date = 06/06/2014 
 RPT Level = 0.001  Analysis Date = 06/06/2014 
 RPT Level = 0.001  Analysis Date = 06/03/2014 
 RPT Level = 0.001  Analysis Date = 06/03/2014 
 RPT Level = 0.001  Analysis Date = 05/27/2014 
 RPT Level = 0.001  Analysis Date = 05/27/2014 
 RPT Level = 0.001  Analysis Date = 05/15/2014 
 RPT Level = 0.001  Analysis Date = 05/15/2014 
 RPT Level = 0.001  Analysis Date = 05/07/2014 
 RPT Level = 0.001  Analysis Date = 05/07/2014 
 RPT Level = 0.001  Analysis Date = 05/02/2014 
 RPT Level = 0.001  Analysis Date = 05/02/2014 
 RPT Level = 0.001  Analysis Date = 04/29/2014 
 RPT Level = 0.001  Analysis Date = 04/29/2014 
 RPT Level = 0.001  Analysis Date = 04/17/2014 
 RPT Level = 0.001  Analysis Date = 04/17/2014 
 RPT Level = 0.001  Analysis Date = 04/10/2014 
 RPT Level = 0.001  Analysis Date = 04/10/2014 
 RPT Level = 0.001  Analysis Date = 04/02/2014 
 RPT Level = 0.001  Analysis Date = 04/02/2014 
 RPT Level = 0.001  Analysis Date = 03/26/2014 
 RPT Level = 0.001  Analysis Date = 03/26/2014 
 RPT Level = 0.001  Analysis Date = 03/19/2014 
 RPT Level = 0.001  Analysis Date = 03/19/2014 
 RPT Level = 0.001  Analysis Date = 03/12/2014 
 RPT Level = 0.001  Analysis Date = 03/12/2014 
 RPT Level = 0.001  Analysis Date = 03/06/2014 
 RPT Level = 0.001  Analysis Date = 03/06/2014 
 RPT Level = 0.001  Analysis Date = 02/27/2014 
 RPT Level = 0.001  Analysis Date = 02/27/2014 
 RPT Level = 0.001  Analysis Date = 02/24/2014 
 RPT Level = 0.001  Analysis Date = 02/24/2014 
 RPT Level = 0.001  Analysis Date = 02/18/2014 
 RPT Level = 0.001  Analysis Date = 02/18/2014 
 RPT Level = 0.001  Analysis Date = 02/13/2014 
 RPT Level = 0.001  Analysis Date = 02/13/2014 
 RPT Level = 0.001  Analysis Date = 02/06/2014 
 RPT Level = 0.001  Analysis Date = 02/06/2014 
 RPT Level = 0.001  Analysis Date = 01/22/2014 
 RPT Level = 0.001  Analysis Date = 01/22/2014 
 RPT Level = 0.001  Analysis Date = 01/15/2014 
 RPT Level = 0.001  Analysis Date = 01/15/2014 
 RPT Level = 0.001  Analysis Date = 01/10/2014 
 RPT Level = 0.001  Analysis Date = 01/10/2014 
 RPT Level = 0.001  Analysis Date = 01/08/2014 
 RPT Level = 0.001  Analysis Date = 01/08/2014 
 RPT Level = 0.001  Analysis Date = 12/17/2013 
 RPT Level = 0.001  Analysis Date = 12/17/2013 
 RPT Level = 0.001  Analysis Date = 12/17/2013 
 RPT Level = 0.001  Analysis Date = 12/17/2013 
 RPT Level = 0.001  Analysis Date = 12/06/2013 
 RPT Level = 0.001  Analysis Date = 12/06/2013 
 RPT Level = 0.001  Analysis Date = 12/03/2013 
 RPT Level = 0.001  Analysis Date = 12/03/2013 
 RPT Level = 0.001  Analysis Date = 11/20/2013 
 RPT Level = 0.001  Analysis Date = 11/20/2013 
 RPT Level = 0.001  Analysis Date = 11/14/2013 
 RPT Level = 0.001  Analysis Date = 11/14/2013 
 RPT Level = 0.001  Analysis Date = 11/12/2013 
 RPT Level = 0.001  Analysis Date = 11/12/2013 
 RPT Level = 0.001  Analysis Date = 10/31/2013 
 RPT Level = 0.001  Analysis Date = 10/31/2013 
 RPT Level = 0.001  Analysis Date = 10/28/2013 
 RPT Level = 0.001  Analysis Date = 10/28/2013 
 RPT Level = 0.001  Analysis Date = 10/17/2013 
 RPT Level = 0.001  Analysis Date = 10/17/2013 
 RPT Level = 0.001  Analysis Date = 09/24/2013 
 RPT Level = 0.001  Analysis Date = 09/24/2013 
 RPT Level = 0.001  Analysis Date = 09/18/2013 
 RPT Level = 0.001  Analysis Date = 09/18/2013 
 RPT Level = 0.001  Analysis Date = 10/24/2013 
 RPT Level = 0.001  Analysis Date = 10/24/2013 
 RPT Level = 0.001  Analysis Date = 09/04/2013 
 RPT Level = 0.001  Analysis Date = 09/04/2013 
 RPT Level = 0.001  Analysis Date = 08/28/2013 
 RPT Level = 0.001  Analysis Date = 08/28/2013 
 RPT Level = 0.001  Analysis Date = 08/26/2013 
 RPT Level = 0.001  Analysis Date = 08/26/2013 
 RPT Level = 0.001  Analysis Date = 08/19/2013 
 RPT Level = 0.001  Analysis Date = 08/19/2013 
 RPT Level = 0.001  Analysis Date = 08/09/2013 
 RPT Level = 0.001  Analysis Date = 08/09/2013 
 RPT Level = 0.001  Analysis Date = 08/02/2013 
 RPT Level = 0.001  Analysis Date = 08/02/2013 
 RPT Level = 0.001  Analysis Date = 07/25/2013 
 RPT Level = 0.001  Analysis Date = 07/25/2013 
 RPT Level = 0.001  Analysis Date = 07/17/2013 
 RPT Level = 0.001  Analysis Date = 07/17/2013 
 RPT Level = 0.001  Analysis Date = 07/11/2013 
 RPT Level = 0.001  Analysis Date = 07/11/2013 
 RPT Level = 0.001  Analysis Date = 07/08/2013 
 RPT Level = 0.001  Analysis Date = 07/08/2013 
 RPT Level = 0.001  Analysis Date = 06/28/2013 
 RPT Level = 0.001  Analysis Date = 06/28/2013 
 RPT Level = 0.001  Analysis Date = 06/21/2013 
 RPT Level = 0.001  Analysis Date = 06/21/2013 
 RPT Level = 0.001  Analysis Date = 06/18/2013 
 RPT Level = 0.001  Analysis Date = 06/18/2013 
 RPT Level = 0.001  Analysis Date = 06/05/2013 
 RPT Level = 0.001  Analysis Date = 06/05/2013 
 RPT Level = 0.001  Analysis Date = 06/03/2013 
 RPT Level = 0.001  Analysis Date = 06/03/2013 
 RPT Level = 0.001  Analysis Date = 05/24/2013 
 RPT Level = 0.001  Analysis Date = 05/24/2013 
 RPT Level = 0.001  Analysis Date = 05/16/2013 
 RPT Level = 0.001  Analysis Date = 05/16/2013 
 RPT Level = 0.001  Analysis Date = 05/10/2013 
 RPT Level = 0.001  Analysis Date = 05/10/2013 
 RPT Level = 0.001  Analysis Date = 05/03/2013 
 RPT Level = 0.001  Analysis Date = 05/03/2013 
 RPT Level = 0.001  Analysis Date = 04/26/2013 
 RPT Level = 0.001  Analysis Date = 04/26/2013 
 RPT Level = 0.001  Analysis Date = 04/24/2013 
 RPT Level = 0.001  Analysis Date = 04/24/2013 
 RPT Level = 0.001  Analysis Date = 04/24/2013 
 RPT Level = 0.001  Analysis Date = 04/24/2013 
 RPT Level = 0.001  Analysis Date = 04/04/2013 
 RPT Level = 0.001  Analysis Date = 04/04/2013 
 RPT Level = 0.001  Analysis Date = 03/27/2013 
 RPT Level = 0.001  Analysis Date = 03/27/2013 
 RPT Level = 0.001  Analysis Date = 03/21/2013 
 RPT Level = 0.001  Analysis Date = 03/21/2013 
 RPT Level = 0.001  Analysis Date = 03/14/2013 
 RPT Level = 0.001  Analysis Date = 03/14/2013 
 RPT Level = 0.001  Analysis Date = 03/07/2013 
 RPT Level = 0.001  Analysis Date = 03/07/2013 
 RPT Level = 0.001  Analysis Date = 02/28/2013 
 RPT Level = 0.001  Analysis Date = 02/28/2013 
 RPT Level = 0.001  Analysis Date = 02/25/2013 
 RPT Level = 0.001  Analysis Date = 02/25/2013 
 RPT Level = 0.001  Analysis Date = 02/13/2013 
 RPT Level = 0.001  Analysis Date = 02/13/2013 
 RPT Level = 0.001  Analysis Date = 02/05/2013 
 RPT Level = 0.001  Analysis Date = 02/05/2013 
 RPT Level = 0.001  Analysis Date = 02/01/2013 
 RPT Level = 0.001  Analysis Date = 02/01/2013 
 RPT Level = 0.001  Analysis Date = 01/24/2013 
 RPT Level = 0.001  Analysis Date = 01/24/2013 
 RPT Level = 0.001  Analysis Date = 01/17/2013 
 RPT Level = 0.001  Analysis Date = 01/17/2013 
 RPT Level = 0.001  Analysis Date = 01/10/2013 
 RPT Level = 0.001  Analysis Date = 01/10/2013 
 RPT Level = 0.001  Analysis Date = 01/04/2013 
 RPT Level = 0.001  Analysis Date = 01/04/2013 
 RPT Level = 0.001  Analysis Date = 01/04/2013 
 RPT Level = 0.001  Analysis Date = 01/04/2013 
 RPT Level = 0.001  Analysis Date = 12/21/2012 
 RPT Level = 0.001  Analysis Date = 12/21/2012 
 RPT Level = 0.001  Analysis Date = 12/18/2012 
 RPT Level = 0.001  Analysis Date = 12/18/2012 
 RPT Level = 0.001  Analysis Date = 12/07/2012 
 RPT Level = 0.001  Analysis Date = 12/07/2012 
 RPT Level = 0.001  Analysis Date = 11/29/2012 
 RPT Level = 0.001  Analysis Date = 11/29/2012 
 RPT Level = 0.001  Analysis Date = 11/29/2012 
 RPT Level = 0.001  Analysis Date = 11/29/2012 
 RPT Level = 0.001  Analysis Date = 11/20/2012 
 RPT Level = 0.001  Analysis Date = 11/20/2012 
 RPT Level = 0.001  Analysis Date = 11/09/2012 
 RPT Level = 0.001  Analysis Date = 11/09/2012 
 RPT Level = 0.001  Analysis Date = 10/31/2012 
 RPT Level = 0.001  Analysis Date = 10/31/2012 
 RPT Level = 0.001  Analysis Date = 10/29/2012 
 RPT Level = 0.001  Analysis Date = 10/29/2012 
 RPT Level = 0.001  Analysis Date = 10/18/2012 
 RPT Level = 0.001  Analysis Date = 10/18/2012 
 RPT Level = 0.001  Analysis Date = 10/15/2012 
 RPT Level = 0.001  Analysis Date = 10/15/2012 
 RPT Level = 0.001  Analysis Date = 10/10/2012 
 RPT Level = 0.001  Analysis Date = 10/10/2012 
 RPT Level = 0.001  Analysis Date = 10/10/2012 
 RPT Level = 0.001  Analysis Date = 10/10/2012 
 RPT Level = 0.001  Analysis Date = 10/10/2012 
 RPT Level = 0.001  Analysis Date = 10/10/2012 
 RPT Level = 0.001  Analysis Date = 09/21/2012 
 RPT Level = 0.001  Analysis Date = 09/21/2012 
 RPT Level = 0.001  Analysis Date = 09/18/2012 
 RPT Level = 0.001  Analysis Date = 09/18/2012 
 RPT Level = 0.001  Analysis Date = 09/14/2012 
 RPT Level = 0.001  Analysis Date = 09/14/2012 
 RPT Level = 0.001  Analysis Date = 09/21/2012 
 RPT Level = 0.001  Analysis Date = 09/21/2012 
 RPT Level = 0.001  Analysis Date = 08/29/2012 
 RPT Level = 0.001  Analysis Date = 08/29/2012 
 RPT Level = 0.001  Analysis Date = 08/23/2012 
 RPT Level = 0.001  Analysis Date = 08/23/2012 
 RPT Level = 0.001  Analysis Date = 08/16/2012 
 RPT Level = 0.001  Analysis Date = 08/16/2012 
 RPT Level = 0.001  Analysis Date = 08/01/2012 
 RPT Level = 0.001  Analysis Date = 08/01/2012 
 RPT Level = 0.001  Analysis Date = 07/20/2012 
 RPT Level = 0.001  Analysis Date = 07/20/2012 
 RPT Level = 0.001  Analysis Date = 07/13/2012 
 RPT Level = 0.001  Analysis Date = 07/13/2012 
 RPT Level = 0.001  Analysis Date = 07/13/2012 
 RPT Level = 0.001  Analysis Date = 07/13/2012 
 RPT Level = 0.001  Analysis Date = 07/06/2012 
 RPT Level = 0.001  Analysis Date = 07/06/2012 
 RPT Level = 0.001  Analysis Date = 06/22/2012 
 RPT Level = 0.001  Analysis Date = 06/22/2012 
 RPT Level = 0.001  Analysis Date = 06/14/2012 
 RPT Level = 0.001  Analysis Date = 06/14/2012 
 RPT Level = 0.001  Analysis Date = 06/13/2012 
 RPT Level = 0.001  Analysis Date = 06/13/2012 
 RPT Level = 0.001  Analysis Date = 06/07/2012 
 RPT Level = 0.001  Analysis Date = 06/07/2012 
 RPT Level = 0.001  Analysis Date = 06/06/2012 
 RPT Level = 0.001  Analysis Date = 06/06/2012 
 RPT Level = 0.001  Analysis Date = 05/22/2012 
 RPT Level = 0.001  Analysis Date = 05/22/2012 
 RPT Level = 0.001  Analysis Date = 05/11/2012 
 RPT Level = 0.001  Analysis Date = 05/11/2012 
 RPT Level = 0.001  Analysis Date = 05/08/2012 
 RPT Level = 0.001  Analysis Date = 05/08/2012 
 RPT Level = 0.001  Analysis Date = 05/01/2012 
 RPT Level = 0.001  Analysis Date = 05/01/2012 
 RPT Level = 0.001  Analysis Date = 04/18/2012 
 RPT Level = 0.001  Analysis Date = 04/18/2012 
 RPT Level = 0.001  Analysis Date = 04/11/2012 
 RPT Level = 0.001  Analysis Date = 04/11/2012 
 RPT Level = 0.001  Analysis Date = 04/04/2012 
 RPT Level = 0.001  Analysis Date = 04/04/2012 
 RPT Level = 0.001  Analysis Date = 03/29/2012 
 RPT Level = 0.001  Analysis Date = 03/29/2012 
 RPT Level = 0.001  Analysis Date = 03/28/2012 
 RPT Level = 0.001  Analysis Date = 03/28/2012 
 RPT Level = 0.001  Analysis Date = 03/21/2012 
 RPT Level = 0.001  Analysis Date = 03/21/2012 
 RPT Level = 0.001  Analysis Date = 03/13/2012 
 RPT Level = 0.001  Analysis Date = 03/13/2012 
 RPT Level = 0.001  Analysis Date = 03/06/2012 
 RPT Level = 0.001  Analysis Date = 03/06/2012 
 RPT Level = 0.001  Analysis Date = 02/23/2012 
 RPT Level = 0.001  Analysis Date = 02/23/2012 
 RPT Level = 0.001  Analysis Date = 02/23/2012 
 RPT Level = 0.001  Analysis Date = 02/23/2012 
 RPT Level = 0.001  Analysis Date = 02/08/2012 
 RPT Level = 0.001  Analysis Date = 02/08/2012 
 RPT Level = 0.001  Analysis Date = 02/02/2012 
 RPT Level = 0.001  Analysis Date = 02/02/2012 
 RPT Level = 0.001  Analysis Date = 01/25/2012 
 RPT Level = 0.001  Analysis Date = 01/25/2012 
 RPT Level = 0.001  Analysis Date = 01/19/2012 
 RPT Level = 0.001  Analysis Date = 01/19/2012 
 RPT Level = 0.001  Analysis Date = 01/12/2012 
 RPT Level = 0.001  Analysis Date = 01/12/2012 
 RPT Level = 0.001  Analysis Date = 01/09/2012 
 RPT Level = 0.001  Analysis Date = 01/09/2012 
 RPT Level = 0.001  Analysis Date = 01/09/2012 
 RPT Level = 0.001  Analysis Date = 01/09/2012 
 RPT Level = 0.001  Analysis Date = 12/21/2011 
 RPT Level = 0.001  Analysis Date = 12/21/2011 
 RPT Level = 0.001  Analysis Date = 12/20/2011 
 RPT Level = 0.001  Analysis Date = 12/20/2011 
 RPT Level = 0.001  Analysis Date = 12/15/2011 
 RPT Level = 0.001  Analysis Date = 12/15/2011 
 RPT Level = 0.001  Analysis Date = 12/02/2011 
 RPT Level = 0.001  Analysis Date = 12/02/2011 
 RPT Level = 0.001  Analysis Date = 12/07/2011 
 RPT Level = 0.001  Analysis Date = 12/07/2011 
 RPT Level = 0.001  Analysis Date = 11/28/2011 
 RPT Level = 0.001  Analysis Date = 11/28/2011 
 RPT Level = 0.001  Analysis Date = 11/09/2011 
 RPT Level = 0.001  Analysis Date = 11/09/2011 
 RPT Level = 0.001  Analysis Date = 11/08/2011 
 RPT Level = 0.001  Analysis Date = 11/08/2011 
 RPT Level = 0.001  Analysis Date = 10/26/2011 
 RPT Level = 0.001  Analysis Date = 10/26/2011 
 RPT Level = 0.001  Analysis Date = 10/25/2011 
 RPT Level = 0.001  Analysis Date = 10/25/2011 
 RPT Level = 0.001  Analysis Date = 10/14/2011 
 RPT Level = 0.001  Analysis Date = 10/14/2011 
 RPT Level = 0.001  Analysis Date = 10/04/2011 
 RPT Level = 0.001  Analysis Date = 10/04/2011 
 RPT Level = 0.001  Analysis Date = 09/29/2011 
 RPT Level = 0.001  Analysis Date = 09/29/2011 
 RPT Level = 0.001  Analysis Date = 09/22/2011 
 RPT Level = 0.001  Analysis Date = 09/22/2011 
 RPT Level = 0.001  Analysis Date = 09/16/2011 
 RPT Level = 0.001  Analysis Date = 09/16/2011 
 RPT Level = 0.001  Analysis Date = 09/12/2011 
 RPT Level = 0.001  Analysis Date = 09/12/2011 
 RPT Level = 0.001  Analysis Date = 09/08/2011 
 RPT Level = 0.001  Analysis Date = 09/08/2011 
 RPT Level = 0.001  Analysis Date = 08/25/2011 
 RPT Level = 0.001  Analysis Date = 08/25/2011 
 RPT Level = 0.001  Analysis Date = 08/19/2011 
 RPT Level = 0.001  Analysis Date = 08/19/2011 
 RPT Level = 0.001  Analysis Date = 08/10/2011 
 RPT Level = 0.001  Analysis Date = 08/10/2011 
 RPT Level = 0.001  Analysis Date = 08/02/2011 
 RPT Level = 0.001  Analysis Date = 08/02/2011 
 RPT Level = 0.001  Analysis Date = 07/28/2011 
 RPT Level = 0.001  Analysis Date = 07/28/2011 
 RPT Level = 0.001  Analysis Date = 07/21/2011 
 RPT Level = 0.001  Analysis Date = 07/21/2011 
 RPT Level = 0.001  Analysis Date = 07/13/2011 
 RPT Level = 0.001  Analysis Date = 07/13/2011 
 RPT Level = 0.001  Analysis Date = 07/08/2011 
 RPT Level = 0.001  Analysis Date = 07/08/2011 
 RPT Level = 0.001  Analysis Date = 06/29/2011 
 RPT Level = 0.001  Analysis Date = 06/29/2011 
 RPT Level = 0.001  Analysis Date = 06/22/2011 
 RPT Level = 0.001  Analysis Date = 06/22/2011 
 RPT Level = 0.001  Analysis Date = 06/15/2011 
 RPT Level = 0.001  Analysis Date = 06/15/2011 
 RPT Level = 0.001  Analysis Date = 06/07/2011 
 RPT Level = 0.001  Analysis Date = 06/07/2011 
 RPT Level = 0.001  Analysis Date = 06/03/2011 
 RPT Level = 0.001  Analysis Date = 06/03/2011 
 RPT Level = 0.001  Analysis Date = 05/25/2011 
 RPT Level = 0.001  Analysis Date = 05/25/2011 
 RPT Level = 0.001  Analysis Date = 05/19/2011 
 RPT Level = 0.001  Analysis Date = 05/19/2011 
 RPT Level = 0.001  Analysis Date = 05/11/2011 
 RPT Level = 0.001  Analysis Date = 05/11/2011 
 RPT Level = 0.001  Analysis Date = 05/05/2011 
 RPT Level = 0.001  Analysis Date = 05/05/2011 
 RPT Level = 0.001  Analysis Date = 04/27/2011 
 RPT Level = 0.001  Analysis Date = 04/27/2011 
 RPT Level = 0.001  Analysis Date = 04/20/2011 
 RPT Level = 0.001  Analysis Date = 04/20/2011 
 RPT Level = 0.001  Analysis Date = 04/13/2011 
 RPT Level = 0.001  Analysis Date = 04/13/2011 
 RPT Level = 0.001  Analysis Date = 04/07/2011 
 RPT Level = 0.001  Analysis Date = 04/07/2011 
 RPT Level = 0.001  Analysis Date = 03/30/2011 
 RPT Level = 0.001  Analysis Date = 03/30/2011 
 RPT Level = 0.001  Analysis Date = 03/22/2011 
 RPT Level = 0.001  Analysis Date = 03/22/2011 
 RPT Level = 0.001  Analysis Date = 03/18/2011 
 RPT Level = 0.001  Analysis Date = 03/18/2011 
 RPT Level = 0.001  Analysis Date = 03/09/2011 
 RPT Level = 0.001  Analysis Date = 03/09/2011 
 RPT Level = 0.001  Analysis Date = 03/01/2011 
 RPT Level = 0.001  Analysis Date = 03/01/2011 
 RPT Level = 0.001  Analysis Date = 02/24/2011 
 RPT Level = 0.001  Analysis Date = 02/24/2011 
 RPT Level = 0.001  Analysis Date = 02/16/2011 
 RPT Level = 0.001  Analysis Date = 02/16/2011 
 RPT Level = 0.001  Analysis Date = 02/15/2011 
 RPT Level = 0.001  Analysis Date = 02/15/2011 
 RPT Level = 0.001  Analysis Date = 02/15/2011 
 RPT Level = 0.001  Analysis Date = 02/15/2011 
 RPT Level = 0.001  Analysis Date = 02/02/2011 
 RPT Level = 0.001  Analysis Date = 02/02/2011 
 RPT Level = 0.001  Analysis Date = 02/01/2011 
 RPT Level = 0.001  Analysis Date = 02/01/2011 
 RPT Level = 0.001  Analysis Date = 01/20/2011 
 RPT Level = 0.001  Analysis Date = 01/20/2011 
 RPT Level = 0.001  Analysis Date = 01/10/2011 
 RPT Level = 0.001  Analysis Date = 01/10/2011 
 RPT Level = 0.001  Analysis Date = 01/10/2011 
 RPT Level = 0.001  Analysis Date = 01/10/2011 
 RPT Level = 0.001  Analysis Date = 01/14/2011 
 RPT Level = 0.001  Analysis Date = 01/14/2011 
 RPT Level = 0.001  Analysis Date = 01/06/2011 
 RPT Level = 0.001  Analysis Date = 01/06/2011 
 RPT Level = 0.001  Analysis Date = 12/15/2010 
 RPT Level = 0.001  Analysis Date = 12/15/2010 
 RPT Level = 0.001  Analysis Date = 12/09/2010 
 RPT Level = 0.001  Analysis Date = 12/09/2010 
 RPT Level = 0.001  Analysis Date = 12/09/2010 
 RPT Level = 0.001  Analysis Date = 12/09/2010 
 RPT Level = 0.001  Analysis Date = 12/02/2010 
 RPT Level = 0.001  Analysis Date = 12/02/2010 
 RPT Level = 0.001  Analysis Date = 11/18/2010 
 RPT Level = 0.001  Analysis Date = 11/18/2010 
 RPT Level = 0.001  Analysis Date = 11/09/2010 
 RPT Level = 0.001  Analysis Date = 11/09/2010 
 RPT Level = 0.001  Analysis Date = 11/09/2010 
 RPT Level = 0.001  Analysis Date = 11/09/2010 
 RPT Level = 0.001  Analysis Date = 11/04/2010 
 RPT Level = 0.001  Analysis Date = 11/04/2010 
 RPT Level = 0.001  Analysis Date = 10/27/2010 
 RPT Level = 0.001  Analysis Date = 10/27/2010 
 RPT Level = 0.001  Analysis Date = 11/03/2010 
 RPT Level = 0.001  Analysis Date = 11/03/2010 
 RPT Level = 0.001  Analysis Date = 10/14/2010 
 RPT Level = 0.001  Analysis Date = 10/14/2010 
 RPT Level = 0.001  Analysis Date = 10/14/2010 
 RPT Level = 0.001  Analysis Date = 10/14/2010 
 RPT Level = 0.001  Analysis Date = 09/30/2010 
 RPT Level = 0.001  Analysis Date = 09/30/2010 
 RPT Level = 0.001  Analysis Date = 09/29/2010 
 RPT Level = 0.001  Analysis Date = 09/29/2010 
 RPT Level = 0.001  Analysis Date = 09/16/2010 
 RPT Level = 0.001  Analysis Date = 09/16/2010 
 RPT Level = 0.001  Analysis Date = 09/15/2010 
 RPT Level = 0.001  Analysis Date = 09/15/2010 
 RPT Level = 0.001  Analysis Date = 08/31/2010 
 RPT Level = 0.001  Analysis Date = 08/31/2010 
 RPT Level = 0.001  Analysis Date = 08/26/2010 
 RPT Level = 0.001  Analysis Date = 08/26/2010 
 RPT Level = 0.001  Analysis Date = 08/17/2010 
 RPT Level = 0.001  Analysis Date = 08/17/2010 
 RPT Level = 0.001  Analysis Date = 08/12/2010 
 RPT Level = 0.001  Analysis Date = 08/12/2010 
 RPT Level = 0.001  Analysis Date = 08/05/2010 
 RPT Level = 0.001  Analysis Date = 08/05/2010 
 RPT Level = 0.001  Analysis Date = 07/16/2010 
 RPT Level = 0.001  Analysis Date = 07/16/2010 
 RPT Level = 0.001  Analysis Date = 07/16/2010 
 RPT Level = 0.001  Analysis Date = 07/16/2010 
 RPT Level = 0.001  Analysis Date = 07/16/2010 
 RPT Level = 0.001  Analysis Date = 07/16/2010 
 RPT Level = 0.001  Analysis Date = 07/14/2010 
 RPT Level = 0.001  Analysis Date = 07/14/2010 
 RPT Level = 0.001  Analysis Date = 07/13/2010 
 RPT Level = 0.001  Analysis Date = 07/13/2010 
 RPT Level = 0.001  Analysis Date = 06/28/2010 
 RPT Level = 0.001  Analysis Date = 06/28/2010 
 RPT Level = 0.001  Analysis Date = 06/25/2010 
 RPT Level = 0.001  Analysis Date = 06/25/2010 
 RPT Level = 0.001  Analysis Date = 06/24/2010 
 RPT Level = 0.001  Analysis Date = 06/24/2010 
 RPT Level = 0.001  Analysis Date = 06/17/2010 
 RPT Level = 0.001  Analysis Date = 06/17/2010 
 RPT Level = 0.001  Analysis Date = 05/27/2010 
 RPT Level = 0.001  Analysis Date = 05/27/2010 
 RPT Level = 0.001  Analysis Date = 05/11/2010 
 RPT Level = 0.001  Analysis Date = 05/11/2010 
 RPT Level = 0.001  Analysis Date = 05/11/2010 
 RPT Level = 0.001  Analysis Date = 05/11/2010 
 RPT Level = 0.001  Analysis Date = 05/10/2010 
 RPT Level = 0.001  Analysis Date = 05/10/2010 
 RPT Level = 0.001  Analysis Date = 04/26/2010 
 RPT Level = 0.001  Analysis Date = 04/26/2010 
 RPT Level = 0.001  Analysis Date = 04/14/2010 
 RPT Level = 0.001  Analysis Date = 04/14/2010 
 RPT Level = 0.001  Analysis Date = 04/12/2010 
 RPT Level = 0.001  Analysis Date = 04/12/2010 
 RPT Level = 0.001  Analysis Date = 04/12/2010 
 RPT Level = 0.001  Analysis Date = 04/12/2010 
 RPT Level = 0.001  Analysis Date = 04/06/2010 
 RPT Level = 0.001  Analysis Date = 04/06/2010 
 RPT Level = 0.001  Analysis Date = 03/31/2010 
 RPT Level = 0.001  Analysis Date = 03/31/2010 
 RPT Level = 0.001  Analysis Date = 03/11/2010 
 RPT Level = 0.001  Analysis Date = 03/11/2010 
 RPT Level = 0.001  Analysis Date = 02/23/2010 
 RPT Level = 0.001  Analysis Date = 02/23/2010 
 RPT Level = 0.001  Analysis Date = 02/22/2010 
 RPT Level = 0.001  Analysis Date = 02/22/2010 
 RPT Level = 0.001  Analysis Date = 02/22/2010 
 RPT Level = 0.001  Analysis Date = 02/22/2010 
 RPT Level = 0.001  Analysis Date = 02/18/2010 
 RPT Level = 0.001  Analysis Date = 02/18/2010 
 RPT Level = 0.001  Analysis Date = 02/11/2010 
 RPT Level = 0.001  Analysis Date = 02/11/2010 
 RPT Level = 0.001  Analysis Date = 01/28/2010 
 RPT Level = 0.001  Analysis Date = 01/28/2010 
 RPT Level = 0.001  Analysis Date = 01/14/2010 
 RPT Level = 0.001  Analysis Date = 01/14/2010 
 RPT Level = 0.001  Analysis Date = 01/12/2010 
 RPT Level = 0.001  Analysis Date = 01/12/2010 
 RPT Level = 0.001  Analysis Date = 01/12/2010 
 RPT Level = 0.001  Analysis Date = 01/12/2010 
 RPT Level = 0.001  Analysis Date = 01/12/2010 
 RPT Level = 0.001  Analysis Date = 01/12/2010 
 RPT Level = 0.001  Analysis Date = 01/07/2010 
 RPT Level = 0.001  Analysis Date = 01/07/2010 
 RPT Level = 0.001  Analysis Date = 12/22/2009 
 RPT Level = 0.001  Analysis Date = 12/22/2009 
 RPT Level = 0.001  Analysis Date = 01/06/2010 
 RPT Level = 0.001  Analysis Date = 01/06/2010 
 RPT Level = 0.001  Analysis Date = 11/27/2009 
 RPT Level = 0.001  Analysis Date = 11/27/2009 
 RPT Level = 0.001  Analysis Date = 11/27/2009 
 RPT Level = 0.001  Analysis Date = 11/27/2009 
 RPT Level = 0.001  Analysis Date = 11/25/2009 
 RPT Level = 0.001  Analysis Date = 11/25/2009 
 RPT Level = 0.001  Analysis Date = 11/24/2009 
 RPT Level = 0.001  Analysis Date = 11/24/2009 
 RPT Level = 0.001  Analysis Date = 11/19/2009 
 RPT Level = 0.001  Analysis Date = 11/19/2009 
 RPT Level = 0.001  Analysis Date = 11/06/2009 
 RPT Level = 0.001  Analysis Date = 11/06/2009 
 RPT Level = 0.001  Analysis Date = 11/05/2009 
 RPT Level = 0.001  Analysis Date = 11/05/2009 
 RPT Level = 0.001  Analysis Date = 10/22/2009 
 RPT Level = 0.001  Analysis Date = 10/22/2009 
 RPT Level = 0.001  Analysis Date = 10/21/2009 
 RPT Level = 0.001  Analysis Date = 10/21/2009 
 RPT Level = 0.001  Analysis Date = 10/15/2009 
 RPT Level = 0.001  Analysis Date = 10/15/2009 
 RPT Level = 0.001  Analysis Date = 09/30/2009 
 RPT Level = 0.001  Analysis Date = 09/30/2009 
 RPT Level = 0.001  Analysis Date = 09/30/2009 
 RPT Level = 0.001  Analysis Date = 09/30/2009 
 RPT Level = 0.001  Analysis Date = 09/23/2009 
 RPT Level = 0.001  Analysis Date = 09/23/2009 
 RPT Level = 0.001  Analysis Date = 09/10/2009 
 RPT Level = 0.001  Analysis Date = 09/10/2009 
 RPT Level = 0.001  Analysis Date = 09/02/2009 
 RPT Level = 0.001  Analysis Date = 09/02/2009 
 RPT Level = 0.001  Analysis Date = 08/26/2009 
 RPT Level = 0.001  Analysis Date = 08/26/2009 
 RPT Level = 0.001  Analysis Date = 08/20/2009 
 RPT Level = 0.001  Analysis Date = 08/20/2009 
 RPT Level = 0.001  Analysis Date = 08/12/2009 
 RPT Level = 0.001  Analysis Date = 08/12/2009 
 RPT Level = 0.001  Analysis Date = 07/29/2009 
 RPT Level = 0.001  Analysis Date = 07/29/2009 
 RPT Level = 0.001  Analysis Date = 07/23/2009 
 RPT Level = 0.001  Analysis Date = 07/23/2009 
 RPT Level = 0.001  Analysis Date = 07/16/2009 
 RPT Level = 0.001  Analysis Date = 07/16/2009 
 RPT Level = 0.001  Analysis Date = 07/09/2009 
 RPT Level = 0.001  Analysis Date = 07/09/2009 
 RPT Level = 0.001  Analysis Date = 06/30/2009 
 RPT Level = 0.001  Analysis Date = 06/30/2009 
 RPT Level = 0.001  Analysis Date = 06/25/2009 
 RPT Level = 0.001  Analysis Date = 06/25/2009 
 RPT Level = 0.001  Analysis Date = 06/17/2009 
 RPT Level = 0.001  Analysis Date = 06/17/2009 
 RPT Level = 0.001  Analysis Date = 06/10/2009 
 RPT Level = 0.001  Analysis Date = 06/10/2009 
 RPT Level = 0.001  Analysis Date = 06/03/2009 
 RPT Level = 0.001  Analysis Date = 06/03/2009 
 RPT Level = 0.001  Analysis Date = 05/21/2009 
 RPT Level = 0.001  Analysis Date = 05/21/2009 
 RPT Level = 0.001  Analysis Date = 05/20/2009 
 RPT Level = 0.001  Analysis Date = 05/20/2009 
 RPT Level = 0.001  Analysis Date = 05/14/2009 
 RPT Level = 0.001  Analysis Date = 05/14/2009 
 RPT Level = 0.001  Analysis Date = 05/06/2009 
 RPT Level = 0.001  Analysis Date = 05/06/2009 
 RPT Level = 0.001  Analysis Date = 04/30/2009 
 RPT Level = 0.001  Analysis Date = 04/30/2009 
 RPT Level = 0.001  Analysis Date = 04/15/2009 
 RPT Level = 0.001  Analysis Date = 04/15/2009 
 RPT Level = 0.001  Analysis Date = 04/08/2009 
 RPT Level = 0.001  Analysis Date = 04/08/2009 
 RPT Level = 0.001  Analysis Date = 04/08/2009 
 RPT Level = 0.001  Analysis Date = 04/08/2009 
 RPT Level = 0.001  Analysis Date = 04/06/2009 
 RPT Level = 0.001  Analysis Date = 04/06/2009 
 RPT Level = 0.001  Analysis Date = 03/31/2009 
 RPT Level = 0.001  Analysis Date = 03/31/2009 
 RPT Level = 0.001  Analysis Date = 03/10/2009 
 RPT Level = 0.001  Analysis Date = 03/10/2009 
 RPT Level = 0.001  Analysis Date = 03/04/2009 
 RPT Level = 0.001  Analysis Date = 03/04/2009 
 RPT Level = 0.001  Analysis Date = 03/04/2009 
 RPT Level = 0.001  Analysis Date = 03/04/2009 
 RPT Level = 0.001  Analysis Date = 03/03/2009 
 RPT Level = 0.001  Analysis Date = 03/03/2009 
 RPT Level = 0.001  Analysis Date = 02/18/2009 
 RPT Level = 0.001  Analysis Date = 02/18/2009 
 RPT Level = 0.001  Analysis Date = 02/03/2009 
 RPT Level = 0.001  Analysis Date = 02/03/2009 
 RPT Level = 0.001  Analysis Date = 02/03/2009 
 RPT Level = 0.001  Analysis Date = 02/03/2009 
 RPT Level = 0.001  Analysis Date = 01/28/2009 
 RPT Level = 0.001  Analysis Date = 01/28/2009 
 RPT Level = 0.001  Analysis Date = 01/22/2009 
 RPT Level = 0.001  Analysis Date = 01/22/2009 
 RPT Level = 0.001  Analysis Date = 01/08/2009 
 RPT Level = 0.001  Analysis Date = 01/08/2009 
 RPT Level = 0.001  Analysis Date = 01/08/2009 
 RPT Level = 0.001  Analysis Date = 01/08/2009 
 RPT Level = 0.001  Analysis Date = 01/07/2009 
 RPT Level = 0.001  Analysis Date = 01/07/2009 
 RPT Level = 0.001  Analysis Date = 12/22/2008 
 RPT Level = 0.001  Analysis Date = 12/22/2008 
 RPT Level = 0.001  Analysis Date = 12/18/2008 
 RPT Level = 0.001  Analysis Date = 12/18/2008 
 RPT Level = 0.001  Analysis Date = 12/09/2008 
 RPT Level = 0.001  Analysis Date = 12/09/2008 
 RPT Level = 0.001  Analysis Date = 12/04/2008 
 RPT Level = 0.001  Analysis Date = 12/04/2008 
 RPT Level = 0.001  Analysis Date = 12/03/2008 
 RPT Level = 0.001  Analysis Date = 12/03/2008 
 RPT Level = 0.001  Analysis Date = 12/22/2008 
 RPT Level = 0.001  Analysis Date = 12/22/2008 
 RPT Level = 0.001  Analysis Date = 11/13/2008 
 RPT Level = 0.001  Analysis Date = 11/13/2008 
 RPT Level = 0.001  Analysis Date = 11/12/2008 
 RPT Level = 0.001  Analysis Date = 11/12/2008 
 RPT Level = 0.001  Analysis Date = 11/04/2008 
 RPT Level = 0.001  Analysis Date = 11/04/2008 
 RPT Level = 0.001  Analysis Date = 10/16/2008 
 RPT Level = 0.001  Analysis Date = 10/16/2008 
 RPT Level = 0.001  Analysis Date = 10/15/2008 
 RPT Level = 0.001  Analysis Date = 10/15/2008 
 RPT Level = 0.001  Analysis Date = 10/08/2008 
 RPT Level = 0.001  Analysis Date = 10/08/2008 
 RPT Level = 0.001  Analysis Date = 09/30/2008 
 RPT Level = 0.001  Analysis Date = 09/30/2008 
 RPT Level = 0.001  Analysis Date = 09/24/2008 
 RPT Level = 0.001  Analysis Date = 09/24/2008 
 RPT Level = 0.001  Analysis Date = 09/23/2008 
 RPT Level = 0.001  Analysis Date = 09/23/2008 
 RPT Level = 0.001  Analysis Date = 09/16/2008 
 RPT Level = 0.001  Analysis Date = 09/16/2008 
 RPT Level = 0.001  Analysis Date = 09/10/2008 
 RPT Level = 0.001  Analysis Date = 09/10/2008 
 RPT Level = 0.001  Analysis Date = 08/26/2008 
 RPT Level = 0.001  Analysis Date = 08/26/2008 
 RPT Level = 0.001  Analysis Date = 08/28/2008 
 RPT Level = 0.001  Analysis Date = 08/28/2008 
 RPT Level = 0.001  Analysis Date = 08/28/2008 
 RPT Level = 0.001  Analysis Date = 08/28/2008 
 RPT Level = 0.001  Analysis Date = 07/24/2008 
 RPT Level = 0.001  Analysis Date = 07/24/2008 
 RPT Level = 0.001  Analysis Date = 07/17/2008 
 RPT Level = 0.001  Analysis Date = 07/17/2008 
 RPT Level = 0.001  Analysis Date = 07/14/2008 
 RPT Level = 0.001  Analysis Date = 07/14/2008 
 RPT Level = 0.001  Analysis Date = 07/07/2008 
 RPT Level = 0.001  Analysis Date = 07/07/2008 
 RPT Level = 0.001  Analysis Date = 07/02/2008 
 RPT Level = 0.001  Analysis Date = 07/02/2008 
 RPT Level = 0.001  Analysis Date = 06/24/2008 
 RPT Level = 0.001  Analysis Date = 06/24/2008 
 RPT Level = 0.001  Analysis Date = 06/18/2008 
 RPT Level = 0.001  Analysis Date = 06/18/2008 
 RPT Level = 0.001  Analysis Date = 06/11/2008 
 RPT Level = 0.001  Analysis Date = 06/11/2008 
 RPT Level = 0.001  Analysis Date = 06/09/2008 
 RPT Level = 0.001  Analysis Date = 06/09/2008 
 RPT Level = 0.001  Analysis Date = 05/21/2008 
 RPT Level = 0.001  Analysis Date = 05/21/2008 
 RPT Level = 0.001  Analysis Date = 05/20/2008 
 RPT Level = 0.001  Analysis Date = 05/20/2008 
 RPT Level = 0.001  Analysis Date = 05/13/2008 
 RPT Level = 0.001  Analysis Date = 05/13/2008 
 RPT Level = 0.001  Analysis Date = 05/06/2008 
 RPT Level = 0.001  Analysis Date = 05/06/2008 
 RPT Level = 0.001  Analysis Date = 04/30/2008 
 RPT Level = 0.001  Analysis Date = 04/30/2008 
 RPT Level = 0.001  Analysis Date = 04/29/2008 
 RPT Level = 0.001  Analysis Date = 04/29/2008 
 RPT Level = 0.001  Analysis Date = 04/15/2008 
 RPT Level = 0.001  Analysis Date = 04/15/2008 
 RPT Level = 0.001  Analysis Date = 04/15/2008 
 RPT Level = 0.001  Analysis Date = 04/15/2008 
 RPT Level = 0.001  Analysis Date = 03/31/2008 
 RPT Level = 0.001  Analysis Date = 03/31/2008 
 RPT Level = 0.001  Analysis Date = 03/26/2008 
 RPT Level = 0.001  Analysis Date = 03/26/2008 
 RPT Level = 0.001  Analysis Date = 03/20/2008 
 RPT Level = 0.001  Analysis Date = 03/20/2008 
 RPT Level = 0.001  Analysis Date = 03/06/2008 
 RPT Level = 0.001  Analysis Date = 03/06/2008 
 RPT Level = 0.001  Analysis Date = 03/05/2008 
 RPT Level = 0.001  Analysis Date = 03/05/2008 
 RPT Level = 0.001  Analysis Date = 02/28/2008 
 RPT Level = 0.001  Analysis Date = 02/28/2008 
 RPT Level = 0.001  Analysis Date = 02/12/2008 
 RPT Level = 0.001  Analysis Date = 02/12/2008 
 RPT Level = 0.001  Analysis Date = 02/06/2008 
 RPT Level = 0.001  Analysis Date = 02/06/2008 
 RPT Level = 0.001  Analysis Date = 01/29/2008 
 RPT Level = 0.001  Analysis Date = 01/29/2008 
 RPT Level = 0.001  Analysis Date = 01/24/2008 
 RPT Level = 0.001  Analysis Date = 01/24/2008 
 RPT Level = 0.001  Analysis Date = 01/23/2008 
 RPT Level = 0.001  Analysis Date = 01/23/2008 
 RPT Level = 0.001  Analysis Date = 01/17/2008 
 RPT Level = 0.001  Analysis Date = 01/17/2008 
 RPT Level = 0.001  Analysis Date = 01/08/2008 
 RPT Level = 0.001  Analysis Date = 01/08/2008 
 RPT Level = 0.001  Analysis Date = 01/03/2008 
 RPT Level = 0.001  Analysis Date = 01/03/2008 
 RPT Level = 0.001  Analysis Date = 12/13/2007 
 RPT Level = 0.001  Analysis Date = 12/13/2007 
 RPT Level = 0.001  Analysis Date = 12/04/2007 
 RPT Level = 0.001  Analysis Date = 12/04/2007 
 RPT Level = 0.001  Analysis Date = 11/27/2007 
 RPT Level = 0.001  Analysis Date = 11/27/2007 
 RPT Level = 0.001  Analysis Date = 11/21/2007 
 RPT Level = 0.001  Analysis Date = 11/21/2007 
 RPT Level = 0.001  Analysis Date = 11/15/2007 
 RPT Level = 0.001  Analysis Date = 11/15/2007 
 RPT Level = 0.001  Analysis Date = 11/15/2007 
 RPT Level = 0.001  Analysis Date = 11/15/2007 
 RPT Level = 0.001  Analysis Date = 10/30/2007 
 RPT Level = 0.001  Analysis Date = 10/30/2007 
 RPT Level = 0.001  Analysis Date = 10/26/2007 
 RPT Level = 0.001  Analysis Date = 10/26/2007 
 RPT Level = 0.001  Analysis Date = 10/23/2007 
 RPT Level = 0.001  Analysis Date = 10/23/2007 
 RPT Level = 0.001  Analysis Date = 10/22/2007 
 RPT Level = 0.001  Analysis Date = 10/22/2007 
 RPT Level = 0.001  Analysis Date = 10/10/2007 
 RPT Level = 0.001  Analysis Date = 10/10/2007 
 RPT Level = 0.001  Analysis Date = 10/10/2007 
 RPT Level = 0.001  Analysis Date = 10/10/2007 
 RPT Level = 0.001  Analysis Date = 10/05/2007 
 RPT Level = 0.001  Analysis Date = 10/05/2007 
 RPT Level = 0.001  Analysis Date = 09/28/2007 
 RPT Level = 0.001  Analysis Date = 09/28/2007 
 RPT Level = 0.001  Analysis Date = 08/30/2007 
 RPT Level = 0.001  Analysis Date = 08/30/2007 
 RPT Level = 0.001  Analysis Date = 08/27/2007 
 RPT Level = 0.001  Analysis Date = 08/27/2007 
 RPT Level = 0.001  Analysis Date = 08/24/2007 
 RPT Level = 0.001  Analysis Date = 08/24/2007 
 RPT Level = 0.001  Analysis Date = 08/22/2007 
 RPT Level = 0.001  Analysis Date = 08/22/2007 
 RPT Level = 0.001  Analysis Date = 08/20/2007 
 RPT Level = 0.001  Analysis Date = 08/20/2007 
 RPT Level = 0.001  Analysis Date = 08/15/2007 
 RPT Level = 0.001  Analysis Date = 08/15/2007 
 RPT Level = 0.001  Analysis Date = 07/24/2007 
 RPT Level = 0.001  Analysis Date = 07/24/2007 
 RPT Level = 0.001  Analysis Date = 07/23/2007 
 RPT Level = 0.001  Analysis Date = 07/23/2007 
 RPT Level = 0.001  Analysis Date = 07/03/2007 
 RPT Level = 0.001  Analysis Date = 07/03/2007 
 RPT Level = 0.001  Analysis Date = 06/22/2007 
 RPT Level = 0.001  Analysis Date = 06/22/2007 
 RPT Level = 0.001  Analysis Date = 06/22/2007 
 RPT Level = 0.001  Analysis Date = 06/22/2007 
 RPT Level = 0.001  Analysis Date = 06/21/2007 
 RPT Level = 0.001  Analysis Date = 06/21/2007 
 RPT Level = 0.001  Analysis Date = 06/20/2007 
 RPT Level = 0.001  Analysis Date = 06/20/2007 
 RPT Level = 0.001  Analysis Date = 05/30/2007 
 RPT Level = 0.001  Analysis Date = 05/30/2007 
 RPT Level = 0.001  Analysis Date = 05/17/2007 
 RPT Level = 0.001  Analysis Date = 05/17/2007 
 RPT Level = 0.001  Analysis Date = 05/16/2007 
 RPT Level = 0.001  Analysis Date = 05/16/2007 
 RPT Level = 0.001  Analysis Date = 05/08/2007 
 RPT Level = 0.001  Analysis Date = 05/08/2007 
 RPT Level = 0.001  Analysis Date = 05/03/2007 
 RPT Level = 0.001  Analysis Date = 05/03/2007 
 RPT Level = 0.001  Analysis Date = 05/01/2007 
 RPT Level = 0.001  Analysis Date = 05/01/2007 
 RPT Level = 0.001  Analysis Date = 04/26/2007 
 RPT Level = 0.001  Analysis Date = 04/26/2007 
 RPT Level = 0.001  Analysis Date = 04/24/2007 
 RPT Level = 0.001  Analysis Date = 04/24/2007 
 RPT Level = 0.001  Analysis Date = 04/10/2007 
 RPT Level = 0.001  Analysis Date = 04/10/2007 
 RPT Level = 0.001  Analysis Date = 03/26/2007 
 RPT Level = 0.001  Analysis Date = 03/26/2007 
 RPT Level = 0.001  Analysis Date = 03/20/2007 
 RPT Level = 0.001  Analysis Date = 03/20/2007 
 RPT Level = 0.001  Analysis Date = 03/15/2007 
 RPT Level = 0.001  Analysis Date = 03/15/2007 
 RPT Level = 0.001  Analysis Date = 03/14/2007 
 RPT Level = 0.001  Analysis Date = 03/14/2007 
 RPT Level = 0.001  Analysis Date = 02/27/2007 
 RPT Level = 0.001  Analysis Date = 02/27/2007 
 RPT Level = 0.001  Analysis Date = 02/21/2007 
 RPT Level = 0.001  Analysis Date = 02/21/2007 
 RPT Level = 0.001  Analysis Date = 02/13/2007 
 RPT Level = 0.001  Analysis Date = 02/13/2007 
 RPT Level = 0.001  Analysis Date = 02/01/2007 
 RPT Level = 0.001  Analysis Date = 02/01/2007 
 RPT Level = 0.001  Analysis Date = 02/01/2007 
 RPT Level = 0.001  Analysis Date = 02/01/2007 
 RPT Level = 0.001  Analysis Date = 01/18/2007 
 RPT Level = 0.001  Analysis Date = 01/18/2007 
 RPT Level = 0.001  Analysis Date = 01/09/2007 
 RPT Level = 0.001  Analysis Date = 01/09/2007 
 RPT Level = 0.001  Analysis Date = 12/28/2006 
 RPT Level = 0.001  Analysis Date = 12/28/2006 
 RPT Level = 0.001  Analysis Date = 12/27/2006 
 RPT Level = 0.001  Analysis Date = 12/27/2006 
 RPT Level = 0.001  Analysis Date = 12/26/2006 
 RPT Level = 0.001  Analysis Date = 12/26/2006 
 RPT Level = 0.001  Analysis Date = 12/05/2006 
 RPT Level = 0.001  Analysis Date = 12/05/2006 
 RPT Level = 0.001  Analysis Date = 11/29/2006 
 RPT Level = 0.001  Analysis Date = 11/29/2006 
 RPT Level = 0.001  Analysis Date = 11/28/2006 
 RPT Level = 0.001  Analysis Date = 11/28/2006 
 RPT Level = 0.001  Analysis Date = 11/27/2006 
 RPT Level = 0.001  Analysis Date = 11/27/2006 
 RPT Level = 0.001  Analysis Date = 11/22/2006 
 RPT Level = 0.001  Analysis Date = 11/22/2006 
 RPT Level = 0.001  Analysis Date = 11/22/2006 
 RPT Level = 0.001  Analysis Date = 11/22/2006 
 RPT Level = 0.001  Analysis Date = 11/16/2006 
 RPT Level = 0.001  Analysis Date = 11/16/2006 
 RPT Level = 0.001  Analysis Date = 11/07/2006 
 RPT Level = 0.001  Analysis Date = 11/07/2006 
 RPT Level = 0.001  Analysis Date = 11/07/2006 
 RPT Level = 0.001  Analysis Date = 11/07/2006 
 RPT Level = 0.001  Analysis Date = 10/26/2006 
 RPT Level = 0.001  Analysis Date = 10/26/2006 
 RPT Level = 0.001  Analysis Date = 10/03/2006 
 RPT Level = 0.001  Analysis Date = 10/03/2006 
 RPT Level = 0.001  Analysis Date = 09/25/2006 
 RPT Level = 0.001  Analysis Date = 09/25/2006 
 RPT Level = 0.001  Analysis Date = 09/20/2006 
 RPT Level = 0.001  Analysis Date = 09/20/2006 
 RPT Level = 0.001  Analysis Date = 09/12/2006 
 RPT Level = 0.001  Analysis Date = 09/12/2006 
 RPT Level = 0.001  Analysis Date = 08/24/2006 
 RPT Level = 0.001  Analysis Date = 08/24/2006 
 RPT Level = 0.001  Analysis Date = 08/18/2006 
 RPT Level = 0.001  Analysis Date = 08/18/2006 
 RPT Level = 0.001  Analysis Date = 08/07/2006 
 RPT Level = 0.001  Analysis Date = 08/07/2006 
 RPT Level = 0.001  Analysis Date = 07/19/2006 
 RPT Level = 0.001  Analysis Date = 07/19/2006 
 RPT Level = 0.001  Analysis Date = 07/14/2006 
 RPT Level = 0.001  Analysis Date = 07/14/2006 
 RPT Level = 0.001  Analysis Date = 06/27/2006 
 RPT Level = 0.001  Analysis Date = 06/27/2006 
 RPT Level = 0.001  Analysis Date = 06/21/2006 
 RPT Level = 0.001  Analysis Date = 06/21/2006 
 RPT Level = 0.001  Analysis Date = 06/13/2006 
 RPT Level = 0.001  Y = 0
The SGPlot Procedure

False Positive Rate for Nitrite (NO2 as N), FIL

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Nitrite (NO2 as N), FIL 00613DZ001 2006 12 0 0%
    2007 50 1 2%
    2008 50 0 0%
    2009 52 0 0%
    2010 52 1 2%
    2011 52 1 2%
    2012 52 3 6%
    2013 53 0 0%
    2014 55 0 0%
    2015 58 2 3%
    2016 51 2 4%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Nitrite (NO2 as N), FIL, COL -
Blind Blank Results
Lab: NWQL, PCode: 00613, MCode: CL041
Analysis dates: 11/13/01 through 05/25/06
Open Data Set

 Analysis Date = 09/12/2005 
 Lab Value = -0.008 
 RPT Level = 0.004 
 Lab Sample ID = 20052430006  Analysis Date = 02/17/2004 
 Lab Value = -0.013 
 RPT Level = 0.004 
 Lab Sample ID = 20040370017  Analysis Date = 03/23/2004 
 Lab Value = 0.01 
 RPT Level = 0.004 
 Lab Sample ID = 20040680093  Analysis Date = 05/25/2006 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20061370016  Analysis Date = 05/22/2006 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20061280111  Analysis Date = 05/11/2006 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20061220099  Analysis Date = 09/27/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20052590035  Analysis Date = 09/20/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20052520006  Analysis Date = 09/07/2005 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20052370002  Analysis Date = 08/31/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20052300009  Analysis Date = 08/16/2005 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20052210012  Analysis Date = 08/10/2005 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20052160007  Analysis Date = 08/10/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20052160005  Analysis Date = 07/26/2005 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20052010007  Analysis Date = 07/15/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20051940015  Analysis Date = 07/12/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20051880018  Analysis Date = 07/01/2005 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20051800189  Analysis Date = 06/27/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20051740019  Analysis Date = 06/20/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20051660174  Analysis Date = 06/14/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20051590025  Analysis Date = 06/06/2005 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20051530021  Analysis Date = 05/26/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20051440043  Analysis Date = 05/24/2005 
 Lab Value = -0.003 
 RPT Level = 0.004 
 Lab Sample ID = 20051380014  Analysis Date = 05/16/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20051320029  Analysis Date = 05/10/2005 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20051250003  Analysis Date = 04/28/2005 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20051170012  Analysis Date = 04/26/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20051110007  Analysis Date = 04/14/2005 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20051020018  Analysis Date = 04/07/2005 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20050950044  Analysis Date = 03/31/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20050880116  Analysis Date = 03/30/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20050840096  Analysis Date = 03/21/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20050750004  Analysis Date = 03/15/2005 
 Lab Value = -0.003 
 RPT Level = 0.004 
 Lab Sample ID = 20050700007  Analysis Date = 03/15/2005 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20050700004  Analysis Date = 03/09/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20050670011  Analysis Date = 03/01/2005 
 Lab Value = -0.003 
 RPT Level = 0.004 
 Lab Sample ID = 20050550024  Analysis Date = 02/24/2005 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20050480005  Analysis Date = 02/15/2005 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20050410004  Analysis Date = 02/09/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20050340020  Analysis Date = 01/31/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20050260024  Analysis Date = 01/26/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20050200048  Analysis Date = 01/25/2005 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20050130091  Analysis Date = 01/18/2005 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20050070016  Analysis Date = 01/18/2005 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20043650002  Analysis Date = 12/27/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20043580037  Analysis Date = 12/27/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20043580035  Analysis Date = 12/21/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20043520023  Analysis Date = 12/21/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20043510018  Analysis Date = 12/21/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20043450069  Analysis Date = 12/21/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20043440147  Analysis Date = 12/15/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20043380005  Analysis Date = 12/15/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20043380002  Analysis Date = 12/14/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20043310059  Analysis Date = 12/09/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20043280048  Analysis Date = 12/08/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20043240012  Analysis Date = 09/15/2004 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20042450138  Analysis Date = 09/09/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20042400089  Analysis Date = 09/08/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20042370105  Analysis Date = 09/02/2004 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20042330206  Analysis Date = 09/01/2004 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20042320136  Analysis Date = 09/01/2004 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20042320138  Analysis Date = 08/19/2004 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20042240114  Analysis Date = 08/11/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20042170123  Analysis Date = 08/05/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20042110015  Analysis Date = 07/27/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20042040039  Analysis Date = 07/19/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20041960050  Analysis Date = 07/14/2004 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20041900062  Analysis Date = 07/13/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20041820035  Analysis Date = 07/08/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20041750057  Analysis Date = 07/06/2004 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20041700080  Analysis Date = 06/24/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20041610055  Analysis Date = 06/23/2004 
 Lab Value = 0.005 
 RPT Level = 0.004 
 Lab Sample ID = 20041550019  Analysis Date = 06/16/2004 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20041470132  Analysis Date = 06/08/2004 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20041400016  Analysis Date = 05/17/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20041260099  Analysis Date = 05/11/2004 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20041200046  Analysis Date = 05/06/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20041130016  Analysis Date = 04/22/2004 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20041050022  Analysis Date = 04/13/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20040980007  Analysis Date = 04/13/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20040930009  Analysis Date = 04/14/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20040910012  Analysis Date = 04/08/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20040850021  Analysis Date = 04/08/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20040830056  Analysis Date = 04/05/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20040790023  Analysis Date = 04/02/2004 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20040760010  Analysis Date = 04/01/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20040720029  Analysis Date = 03/23/2004 
 Lab Value = 0.004 
 RPT Level = 0.004 
 Lab Sample ID = 20040710005  Analysis Date = 03/23/2004 
 Lab Value = 0.005 
 RPT Level = 0.004 
 Lab Sample ID = 20040650001  Analysis Date = 03/16/2004 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20040580032  Analysis Date = 03/16/2004 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20040550018  Analysis Date = 03/15/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20040510134  Analysis Date = 03/15/2004 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20040490025  Analysis Date = 03/09/2004 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20040440035  Analysis Date = 02/26/2004 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20040420001  Analysis Date = 02/10/2004 
 Lab Value = -0.003 
 RPT Level = 0.004 
 Lab Sample ID = 20040340024  Analysis Date = 02/10/2004 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20040300012  Analysis Date = 02/03/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20040270036  Analysis Date = 02/02/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20040230030  Analysis Date = 01/29/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20040210154  Analysis Date = 01/29/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20040200023  Analysis Date = 01/28/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20040150075  Analysis Date = 01/27/2004 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20040090020  Analysis Date = 01/20/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20040070032  Analysis Date = 01/06/2004 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20040050016  Analysis Date = 10/03/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20032660009  Analysis Date = 10/16/2003 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20032600107  Analysis Date = 09/23/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20032520179  Analysis Date = 09/22/2003 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20032450195  Analysis Date = 09/16/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20032380029  Analysis Date = 09/11/2003 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20032310028  Analysis Date = 09/10/2003 
 Lab Value = -0.003 
 RPT Level = 0.004 
 Lab Sample ID = 20032250256  Analysis Date = 08/26/2003 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20032180019  Analysis Date = 08/21/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20032100004  Analysis Date = 08/13/2003 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20032040043  Analysis Date = 08/08/2003 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20031960025  Analysis Date = 08/04/2003 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20031900098  Analysis Date = 07/25/2003 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20031820037  Analysis Date = 07/22/2003 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20031770041  Analysis Date = 07/15/2003 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20031700013  Analysis Date = 07/09/2003 
 Lab Value = -0.003 
 RPT Level = 0.004 
 Lab Sample ID = 20031630053  Analysis Date = 06/24/2003 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20031600109  Analysis Date = 06/16/2003 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20031480059  Analysis Date = 06/17/2003 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20031430019  Analysis Date = 06/12/2003 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20031400115  Analysis Date = 05/21/2003 
 Lab Value = -0.004 
 RPT Level = 0.004 
 Lab Sample ID = 20031290084  Analysis Date = 05/13/2003 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20031220070  Analysis Date = 05/12/2003 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20031200043  Analysis Date = 04/24/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20031080208  Analysis Date = 04/09/2003 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20030970018  Analysis Date = 04/03/2003 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20030920027  Analysis Date = 04/01/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20030900015  Analysis Date = 03/31/2003 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20030860023  Analysis Date = 03/27/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20030710021  Analysis Date = 03/27/2003 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20030660148  Analysis Date = 03/06/2003 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20030590040  Analysis Date = 03/06/2003 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20030570061  Analysis Date = 02/12/2003 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20030410034  Analysis Date = 02/11/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20030350008  Analysis Date = 02/06/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20030310028  Analysis Date = 02/06/2003 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20030300004  Analysis Date = 01/16/2003 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20030150009  Analysis Date = 01/16/2003 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20030140019  Analysis Date = 01/09/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20030020002  Analysis Date = 01/09/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20023650009  Analysis Date = 12/24/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20023500166  Analysis Date = 12/24/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20023500092  Analysis Date = 12/04/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20023370026  Analysis Date = 12/04/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20023370025  Analysis Date = 12/04/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20023330096  Analysis Date = 12/04/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20023360020  Analysis Date = 12/04/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20023310020  Analysis Date = 11/05/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20023040033  Analysis Date = 11/07/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20022970050  Analysis Date = 11/07/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20022970049  Analysis Date = 11/07/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20022970048  Analysis Date = 11/07/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20022960022  Analysis Date = 09/25/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20022470018  Analysis Date = 09/24/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20022460135  Analysis Date = 09/04/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20022340186  Analysis Date = 08/27/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20022280008  Analysis Date = 08/21/2002 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20022210007  Analysis Date = 08/19/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20022170107  Analysis Date = 08/07/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20022060077  Analysis Date = 07/29/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021970116  Analysis Date = 07/29/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20021960234  Analysis Date = 07/16/2002 
 Lab Value = -0.004 
 RPT Level = 0.004 
 Lab Sample ID = 20021830026  Analysis Date = 07/11/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021790006  Analysis Date = 06/25/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021690011  Analysis Date = 06/24/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021650005  Analysis Date = 06/12/2002 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20021550019  Analysis Date = 06/12/2002 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20021510057  Analysis Date = 06/11/2002 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20021420157  Analysis Date = 05/28/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021330223  Analysis Date = 05/23/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20021300001  Analysis Date = 05/02/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021210086  Analysis Date = 04/26/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021140037  Analysis Date = 04/26/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021140036  Analysis Date = 04/17/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021010016  Analysis Date = 04/09/2002 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20020930112  Analysis Date = 03/27/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20020850091  Analysis Date = 04/01/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20020810192  Analysis Date = 03/21/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20020730104  Analysis Date = 03/13/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20020670021  Analysis Date = 03/07/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20020600005  Analysis Date = 03/07/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20020570018  Analysis Date = 03/04/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20020460048  Analysis Date = 02/06/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20020360005  Analysis Date = 02/05/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20020320102  Analysis Date = 01/30/2002 
 Lab Value = 0.003 
 RPT Level = 0.004 
 Lab Sample ID = 20020220079  Analysis Date = 01/16/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20020110003  Analysis Date = 01/08/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20020020005  Analysis Date = 01/03/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20013600207  Analysis Date = 12/20/2001 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20013520042  Analysis Date = 12/17/2001 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20013480008  Analysis Date = 12/13/2001 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20013390010  Analysis Date = 11/13/2001 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20013110130  Analysis Date = 05/25/2006 
 RPT Level = 0.004  Analysis Date = 05/22/2006 
 RPT Level = 0.004  Analysis Date = 05/22/2006 
 RPT Level = 0.004  Analysis Date = 05/11/2006 
 RPT Level = 0.004  Analysis Date = 05/11/2006 
 RPT Level = 0.004  Analysis Date = 09/27/2005 
 RPT Level = 0.004  Analysis Date = 09/27/2005 
 RPT Level = 0.004  Analysis Date = 09/20/2005 
 RPT Level = 0.004  Analysis Date = 09/20/2005 
 RPT Level = 0.004  Analysis Date = 09/12/2005 
 RPT Level = 0.004  Analysis Date = 09/12/2005 
 RPT Level = 0.004  Analysis Date = 09/07/2005 
 RPT Level = 0.004  Analysis Date = 09/07/2005 
 RPT Level = 0.004  Analysis Date = 08/31/2005 
 RPT Level = 0.004  Analysis Date = 08/31/2005 
 RPT Level = 0.004  Analysis Date = 08/16/2005 
 RPT Level = 0.004  Analysis Date = 08/16/2005 
 RPT Level = 0.004  Analysis Date = 08/10/2005 
 RPT Level = 0.004  Analysis Date = 08/10/2005 
 RPT Level = 0.004  Analysis Date = 08/10/2005 
 RPT Level = 0.004  Analysis Date = 08/10/2005 
 RPT Level = 0.004  Analysis Date = 07/26/2005 
 RPT Level = 0.004  Analysis Date = 07/26/2005 
 RPT Level = 0.004  Analysis Date = 07/15/2005 
 RPT Level = 0.004  Analysis Date = 07/15/2005 
 RPT Level = 0.004  Analysis Date = 07/12/2005 
 RPT Level = 0.004  Analysis Date = 07/12/2005 
 RPT Level = 0.004  Analysis Date = 07/01/2005 
 RPT Level = 0.004  Analysis Date = 07/01/2005 
 RPT Level = 0.004  Analysis Date = 06/27/2005 
 RPT Level = 0.004  Analysis Date = 06/27/2005 
 RPT Level = 0.004  Analysis Date = 06/20/2005 
 RPT Level = 0.004  Analysis Date = 06/20/2005 
 RPT Level = 0.004  Analysis Date = 06/14/2005 
 RPT Level = 0.004  Analysis Date = 06/14/2005 
 RPT Level = 0.004  Analysis Date = 06/06/2005 
 RPT Level = 0.004  Analysis Date = 06/06/2005 
 RPT Level = 0.004  Analysis Date = 05/26/2005 
 RPT Level = 0.004  Analysis Date = 05/26/2005 
 RPT Level = 0.004  Analysis Date = 05/24/2005 
 RPT Level = 0.004  Analysis Date = 05/24/2005 
 RPT Level = 0.004  Analysis Date = 05/16/2005 
 RPT Level = 0.004  Analysis Date = 05/16/2005 
 RPT Level = 0.004  Analysis Date = 05/10/2005 
 RPT Level = 0.004  Analysis Date = 05/10/2005 
 RPT Level = 0.004  Analysis Date = 04/28/2005 
 RPT Level = 0.004  Analysis Date = 04/28/2005 
 RPT Level = 0.004  Analysis Date = 04/26/2005 
 RPT Level = 0.004  Analysis Date = 04/26/2005 
 RPT Level = 0.004  Analysis Date = 04/14/2005 
 RPT Level = 0.004  Analysis Date = 04/14/2005 
 RPT Level = 0.004  Analysis Date = 04/07/2005 
 RPT Level = 0.004  Analysis Date = 04/07/2005 
 RPT Level = 0.004  Analysis Date = 03/31/2005 
 RPT Level = 0.004  Analysis Date = 03/31/2005 
 RPT Level = 0.004  Analysis Date = 03/30/2005 
 RPT Level = 0.004  Analysis Date = 03/30/2005 
 RPT Level = 0.004  Analysis Date = 03/21/2005 
 RPT Level = 0.004  Analysis Date = 03/21/2005 
 RPT Level = 0.004  Analysis Date = 03/15/2005 
 RPT Level = 0.004  Analysis Date = 03/15/2005 
 RPT Level = 0.004  Analysis Date = 03/15/2005 
 RPT Level = 0.004  Analysis Date = 03/15/2005 
 RPT Level = 0.004  Analysis Date = 03/09/2005 
 RPT Level = 0.004  Analysis Date = 03/09/2005 
 RPT Level = 0.004  Analysis Date = 03/01/2005 
 RPT Level = 0.004  Analysis Date = 03/01/2005 
 RPT Level = 0.004  Analysis Date = 02/24/2005 
 RPT Level = 0.004  Analysis Date = 02/24/2005 
 RPT Level = 0.004  Analysis Date = 02/15/2005 
 RPT Level = 0.004  Analysis Date = 02/15/2005 
 RPT Level = 0.004  Analysis Date = 02/09/2005 
 RPT Level = 0.004  Analysis Date = 02/09/2005 
 RPT Level = 0.004  Analysis Date = 01/31/2005 
 RPT Level = 0.004  Analysis Date = 01/31/2005 
 RPT Level = 0.004  Analysis Date = 01/26/2005 
 RPT Level = 0.004  Analysis Date = 01/26/2005 
 RPT Level = 0.004  Analysis Date = 01/25/2005 
 RPT Level = 0.004  Analysis Date = 01/25/2005 
 RPT Level = 0.004  Analysis Date = 01/18/2005 
 RPT Level = 0.004  Analysis Date = 01/18/2005 
 RPT Level = 0.004  Analysis Date = 01/18/2005 
 RPT Level = 0.004  Analysis Date = 01/18/2005 
 RPT Level = 0.004  Analysis Date = 12/27/2004 
 RPT Level = 0.004  Analysis Date = 12/27/2004 
 RPT Level = 0.004  Analysis Date = 12/27/2004 
 RPT Level = 0.004  Analysis Date = 12/27/2004 
 RPT Level = 0.004  Analysis Date = 12/21/2004 
 RPT Level = 0.004  Analysis Date = 12/21/2004 
 RPT Level = 0.004  Analysis Date = 12/21/2004 
 RPT Level = 0.004  Analysis Date = 12/21/2004 
 RPT Level = 0.004  Analysis Date = 12/21/2004 
 RPT Level = 0.004  Analysis Date = 12/21/2004 
 RPT Level = 0.004  Analysis Date = 12/21/2004 
 RPT Level = 0.004  Analysis Date = 12/21/2004 
 RPT Level = 0.004  Analysis Date = 12/15/2004 
 RPT Level = 0.004  Analysis Date = 12/15/2004 
 RPT Level = 0.004  Analysis Date = 12/15/2004 
 RPT Level = 0.004  Analysis Date = 12/15/2004 
 RPT Level = 0.004  Analysis Date = 12/14/2004 
 RPT Level = 0.004  Analysis Date = 12/14/2004 
 RPT Level = 0.004  Analysis Date = 12/09/2004 
 RPT Level = 0.004  Analysis Date = 12/09/2004 
 RPT Level = 0.004  Analysis Date = 12/08/2004 
 RPT Level = 0.004  Analysis Date = 12/08/2004 
 RPT Level = 0.004  Analysis Date = 09/15/2004 
 RPT Level = 0.004  Analysis Date = 09/15/2004 
 RPT Level = 0.004  Analysis Date = 09/09/2004 
 RPT Level = 0.004  Analysis Date = 09/09/2004 
 RPT Level = 0.004  Analysis Date = 09/08/2004 
 RPT Level = 0.004  Analysis Date = 09/08/2004 
 RPT Level = 0.004  Analysis Date = 09/02/2004 
 RPT Level = 0.004  Analysis Date = 09/02/2004 
 RPT Level = 0.004  Analysis Date = 09/01/2004 
 RPT Level = 0.004  Analysis Date = 09/01/2004 
 RPT Level = 0.004  Analysis Date = 09/01/2004 
 RPT Level = 0.004  Analysis Date = 09/01/2004 
 RPT Level = 0.004  Analysis Date = 08/19/2004 
 RPT Level = 0.004  Analysis Date = 08/19/2004 
 RPT Level = 0.004  Analysis Date = 08/11/2004 
 RPT Level = 0.004  Analysis Date = 08/11/2004 
 RPT Level = 0.004  Analysis Date = 08/05/2004 
 RPT Level = 0.004  Analysis Date = 08/05/2004 
 RPT Level = 0.004  Analysis Date = 07/27/2004 
 RPT Level = 0.004  Analysis Date = 07/27/2004 
 RPT Level = 0.004  Analysis Date = 07/19/2004 
 RPT Level = 0.004  Analysis Date = 07/19/2004 
 RPT Level = 0.004  Analysis Date = 07/14/2004 
 RPT Level = 0.004  Analysis Date = 07/14/2004 
 RPT Level = 0.004  Analysis Date = 07/13/2004 
 RPT Level = 0.004  Analysis Date = 07/13/2004 
 RPT Level = 0.004  Analysis Date = 07/08/2004 
 RPT Level = 0.004  Analysis Date = 07/08/2004 
 RPT Level = 0.004  Analysis Date = 07/06/2004 
 RPT Level = 0.004  Analysis Date = 07/06/2004 
 RPT Level = 0.004  Analysis Date = 06/24/2004 
 RPT Level = 0.004  Analysis Date = 06/24/2004 
 RPT Level = 0.004  Analysis Date = 06/23/2004 
 RPT Level = 0.004  Analysis Date = 06/23/2004 
 RPT Level = 0.004  Analysis Date = 06/16/2004 
 RPT Level = 0.004  Analysis Date = 06/16/2004 
 RPT Level = 0.004  Analysis Date = 06/08/2004 
 RPT Level = 0.004  Analysis Date = 06/08/2004 
 RPT Level = 0.004  Analysis Date = 05/17/2004 
 RPT Level = 0.004  Analysis Date = 05/17/2004 
 RPT Level = 0.004  Analysis Date = 05/11/2004 
 RPT Level = 0.004  Analysis Date = 05/11/2004 
 RPT Level = 0.004  Analysis Date = 05/06/2004 
 RPT Level = 0.004  Analysis Date = 05/06/2004 
 RPT Level = 0.004  Analysis Date = 04/22/2004 
 RPT Level = 0.004  Analysis Date = 04/22/2004 
 RPT Level = 0.004  Analysis Date = 04/13/2004 
 RPT Level = 0.004  Analysis Date = 04/13/2004 
 RPT Level = 0.004  Analysis Date = 04/13/2004 
 RPT Level = 0.004  Analysis Date = 04/13/2004 
 RPT Level = 0.004  Analysis Date = 04/14/2004 
 RPT Level = 0.004  Analysis Date = 04/14/2004 
 RPT Level = 0.004  Analysis Date = 04/08/2004 
 RPT Level = 0.004  Analysis Date = 04/08/2004 
 RPT Level = 0.004  Analysis Date = 04/08/2004 
 RPT Level = 0.004  Analysis Date = 04/08/2004 
 RPT Level = 0.004  Analysis Date = 04/05/2004 
 RPT Level = 0.004  Analysis Date = 04/05/2004 
 RPT Level = 0.004  Analysis Date = 04/02/2004 
 RPT Level = 0.004  Analysis Date = 04/02/2004 
 RPT Level = 0.004  Analysis Date = 04/01/2004 
 RPT Level = 0.004  Analysis Date = 04/01/2004 
 RPT Level = 0.004  Analysis Date = 03/23/2004 
 RPT Level = 0.004  Analysis Date = 03/23/2004 
 RPT Level = 0.004  Analysis Date = 03/23/2004 
 RPT Level = 0.004  Analysis Date = 03/23/2004 
 RPT Level = 0.004  Analysis Date = 03/23/2004 
 RPT Level = 0.004  Analysis Date = 03/23/2004 
 RPT Level = 0.004  Analysis Date = 03/16/2004 
 RPT Level = 0.004  Analysis Date = 03/16/2004 
 RPT Level = 0.004  Analysis Date = 03/16/2004 
 RPT Level = 0.004  Analysis Date = 03/16/2004 
 RPT Level = 0.004  Analysis Date = 03/15/2004 
 RPT Level = 0.004  Analysis Date = 03/15/2004 
 RPT Level = 0.004  Analysis Date = 03/15/2004 
 RPT Level = 0.004  Analysis Date = 03/15/2004 
 RPT Level = 0.004  Analysis Date = 03/09/2004 
 RPT Level = 0.004  Analysis Date = 03/09/2004 
 RPT Level = 0.004  Analysis Date = 02/26/2004 
 RPT Level = 0.004  Analysis Date = 02/26/2004 
 RPT Level = 0.004  Analysis Date = 02/17/2004 
 RPT Level = 0.004  Analysis Date = 02/17/2004 
 RPT Level = 0.004  Analysis Date = 02/10/2004 
 RPT Level = 0.004  Analysis Date = 02/10/2004 
 RPT Level = 0.004  Analysis Date = 02/10/2004 
 RPT Level = 0.004  Analysis Date = 02/10/2004 
 RPT Level = 0.004  Analysis Date = 02/03/2004 
 RPT Level = 0.004  Analysis Date = 02/03/2004 
 RPT Level = 0.004  Analysis Date = 02/02/2004 
 RPT Level = 0.004  Analysis Date = 02/02/2004 
 RPT Level = 0.004  Analysis Date = 01/29/2004 
 RPT Level = 0.004  Analysis Date = 01/29/2004 
 RPT Level = 0.004  Analysis Date = 01/29/2004 
 RPT Level = 0.004  Analysis Date = 01/29/2004 
 RPT Level = 0.004  Analysis Date = 01/28/2004 
 RPT Level = 0.004  Analysis Date = 01/28/2004 
 RPT Level = 0.004  Analysis Date = 01/27/2004 
 RPT Level = 0.004  Analysis Date = 01/27/2004 
 RPT Level = 0.004  Analysis Date = 01/20/2004 
 RPT Level = 0.004  Analysis Date = 01/20/2004 
 RPT Level = 0.004  Analysis Date = 01/06/2004 
 RPT Level = 0.004  Analysis Date = 01/06/2004 
 RPT Level = 0.004  Analysis Date = 10/03/2003 
 RPT Level = 0.004  Analysis Date = 10/03/2003 
 RPT Level = 0.004  Analysis Date = 10/16/2003 
 RPT Level = 0.004  Analysis Date = 10/16/2003 
 RPT Level = 0.004  Analysis Date = 09/23/2003 
 RPT Level = 0.004  Analysis Date = 09/23/2003 
 RPT Level = 0.004  Analysis Date = 09/22/2003 
 RPT Level = 0.004  Analysis Date = 09/22/2003 
 RPT Level = 0.004  Analysis Date = 09/16/2003 
 RPT Level = 0.004  Analysis Date = 09/16/2003 
 RPT Level = 0.004  Analysis Date = 09/11/2003 
 RPT Level = 0.004  Analysis Date = 09/11/2003 
 RPT Level = 0.004  Analysis Date = 09/10/2003 
 RPT Level = 0.004  Analysis Date = 09/10/2003 
 RPT Level = 0.004  Analysis Date = 08/26/2003 
 RPT Level = 0.004  Analysis Date = 08/26/2003 
 RPT Level = 0.004  Analysis Date = 08/21/2003 
 RPT Level = 0.004  Analysis Date = 08/21/2003 
 RPT Level = 0.004  Analysis Date = 08/13/2003 
 RPT Level = 0.004  Analysis Date = 08/13/2003 
 RPT Level = 0.004  Analysis Date = 08/08/2003 
 RPT Level = 0.004  Analysis Date = 08/08/2003 
 RPT Level = 0.004  Analysis Date = 08/04/2003 
 RPT Level = 0.004  Analysis Date = 08/04/2003 
 RPT Level = 0.004  Analysis Date = 07/25/2003 
 RPT Level = 0.004  Analysis Date = 07/25/2003 
 RPT Level = 0.004  Analysis Date = 07/22/2003 
 RPT Level = 0.004  Analysis Date = 07/22/2003 
 RPT Level = 0.004  Analysis Date = 07/15/2003 
 RPT Level = 0.004  Analysis Date = 07/15/2003 
 RPT Level = 0.004  Analysis Date = 07/09/2003 
 RPT Level = 0.004  Analysis Date = 07/09/2003 
 RPT Level = 0.004  Analysis Date = 06/24/2003 
 RPT Level = 0.004  Analysis Date = 06/24/2003 
 RPT Level = 0.004  Analysis Date = 06/16/2003 
 RPT Level = 0.004  Analysis Date = 06/16/2003 
 RPT Level = 0.004  Analysis Date = 06/17/2003 
 RPT Level = 0.004  Analysis Date = 06/17/2003 
 RPT Level = 0.004  Analysis Date = 06/12/2003 
 RPT Level = 0.004  Analysis Date = 06/12/2003 
 RPT Level = 0.004  Analysis Date = 05/21/2003 
 RPT Level = 0.004  Analysis Date = 05/21/2003 
 RPT Level = 0.004  Analysis Date = 05/13/2003 
 RPT Level = 0.004  Analysis Date = 05/13/2003 
 RPT Level = 0.004  Analysis Date = 05/12/2003 
 RPT Level = 0.004  Analysis Date = 05/12/2003 
 RPT Level = 0.004  Analysis Date = 04/24/2003 
 RPT Level = 0.004  Analysis Date = 04/24/2003 
 RPT Level = 0.004  Analysis Date = 04/09/2003 
 RPT Level = 0.004  Analysis Date = 04/09/2003 
 RPT Level = 0.004  Analysis Date = 04/03/2003 
 RPT Level = 0.004  Analysis Date = 04/03/2003 
 RPT Level = 0.004  Analysis Date = 04/01/2003 
 RPT Level = 0.004  Analysis Date = 04/01/2003 
 RPT Level = 0.004  Analysis Date = 03/31/2003 
 RPT Level = 0.004  Analysis Date = 03/31/2003 
 RPT Level = 0.004  Analysis Date = 03/27/2003 
 RPT Level = 0.004  Analysis Date = 03/27/2003 
 RPT Level = 0.004  Analysis Date = 03/27/2003 
 RPT Level = 0.004  Analysis Date = 03/27/2003 
 RPT Level = 0.004  Analysis Date = 03/06/2003 
 RPT Level = 0.004  Analysis Date = 03/06/2003 
 RPT Level = 0.004  Analysis Date = 03/06/2003 
 RPT Level = 0.004  Analysis Date = 03/06/2003 
 RPT Level = 0.004  Analysis Date = 02/12/2003 
 RPT Level = 0.004  Analysis Date = 02/12/2003 
 RPT Level = 0.004  Analysis Date = 02/11/2003 
 RPT Level = 0.004  Analysis Date = 02/11/2003 
 RPT Level = 0.004  Analysis Date = 02/06/2003 
 RPT Level = 0.004  Analysis Date = 02/06/2003 
 RPT Level = 0.004  Analysis Date = 02/06/2003 
 RPT Level = 0.004  Analysis Date = 02/06/2003 
 RPT Level = 0.004  Analysis Date = 01/16/2003 
 RPT Level = 0.004  Analysis Date = 01/16/2003 
 RPT Level = 0.004  Analysis Date = 01/16/2003 
 RPT Level = 0.004  Analysis Date = 01/16/2003 
 RPT Level = 0.004  Analysis Date = 01/09/2003 
 RPT Level = 0.004  Analysis Date = 01/09/2003 
 RPT Level = 0.004  Analysis Date = 01/09/2003 
 RPT Level = 0.004  Analysis Date = 01/09/2003 
 RPT Level = 0.004  Analysis Date = 12/24/2002 
 RPT Level = 0.004  Analysis Date = 12/24/2002 
 RPT Level = 0.004  Analysis Date = 12/24/2002 
 RPT Level = 0.004  Analysis Date = 12/24/2002 
 RPT Level = 0.004  Analysis Date = 12/04/2002 
 RPT Level = 0.004  Analysis Date = 12/04/2002 
 RPT Level = 0.004  Analysis Date = 12/04/2002 
 RPT Level = 0.004  Analysis Date = 12/04/2002 
 RPT Level = 0.004  Analysis Date = 12/04/2002 
 RPT Level = 0.004  Analysis Date = 12/04/2002 
 RPT Level = 0.004  Analysis Date = 12/04/2002 
 RPT Level = 0.004  Analysis Date = 12/04/2002 
 RPT Level = 0.004  Analysis Date = 12/04/2002 
 RPT Level = 0.004  Analysis Date = 12/04/2002 
 RPT Level = 0.004  Analysis Date = 11/05/2002 
 RPT Level = 0.004  Analysis Date = 11/05/2002 
 RPT Level = 0.004  Analysis Date = 11/07/2002 
 RPT Level = 0.004  Analysis Date = 11/07/2002 
 RPT Level = 0.004  Analysis Date = 11/07/2002 
 RPT Level = 0.004  Analysis Date = 11/07/2002 
 RPT Level = 0.004  Analysis Date = 11/07/2002 
 RPT Level = 0.004  Analysis Date = 11/07/2002 
 RPT Level = 0.004  Analysis Date = 11/07/2002 
 RPT Level = 0.004  Analysis Date = 11/07/2002 
 RPT Level = 0.004  Analysis Date = 09/25/2002 
 RPT Level = 0.004  Analysis Date = 09/25/2002 
 RPT Level = 0.004  Analysis Date = 09/24/2002 
 RPT Level = 0.004  Analysis Date = 09/24/2002 
 RPT Level = 0.004  Analysis Date = 09/04/2002 
 RPT Level = 0.004  Analysis Date = 09/04/2002 
 RPT Level = 0.004  Analysis Date = 08/27/2002 
 RPT Level = 0.004  Analysis Date = 08/27/2002 
 RPT Level = 0.004  Analysis Date = 08/21/2002 
 RPT Level = 0.004  Analysis Date = 08/21/2002 
 RPT Level = 0.004  Analysis Date = 08/19/2002 
 RPT Level = 0.004  Analysis Date = 08/19/2002 
 RPT Level = 0.004  Analysis Date = 08/07/2002 
 RPT Level = 0.004  Analysis Date = 08/07/2002 
 RPT Level = 0.004  Analysis Date = 07/29/2002 
 RPT Level = 0.004  Analysis Date = 07/29/2002 
 RPT Level = 0.004  Analysis Date = 07/29/2002 
 RPT Level = 0.004  Analysis Date = 07/29/2002 
 RPT Level = 0.004  Analysis Date = 07/16/2002 
 RPT Level = 0.004  Analysis Date = 07/16/2002 
 RPT Level = 0.004  Analysis Date = 07/11/2002 
 RPT Level = 0.004  Analysis Date = 07/11/2002 
 RPT Level = 0.004  Analysis Date = 06/25/2002 
 RPT Level = 0.004  Analysis Date = 06/25/2002 
 RPT Level = 0.004  Analysis Date = 06/24/2002 
 RPT Level = 0.004  Analysis Date = 06/24/2002 
 RPT Level = 0.004  Analysis Date = 06/12/2002 
 RPT Level = 0.004  Analysis Date = 06/12/2002 
 RPT Level = 0.004  Analysis Date = 06/12/2002 
 RPT Level = 0.004  Analysis Date = 06/12/2002 
 RPT Level = 0.004  Analysis Date = 06/11/2002 
 RPT Level = 0.004  Analysis Date = 06/11/2002 
 RPT Level = 0.004  Analysis Date = 05/28/2002 
 RPT Level = 0.004  Analysis Date = 05/28/2002 
 RPT Level = 0.004  Analysis Date = 05/23/2002 
 RPT Level = 0.004  Analysis Date = 05/23/2002 
 RPT Level = 0.004  Analysis Date = 05/02/2002 
 RPT Level = 0.004  Analysis Date = 05/02/2002 
 RPT Level = 0.004  Analysis Date = 04/26/2002 
 RPT Level = 0.004  Analysis Date = 04/26/2002 
 RPT Level = 0.004  Analysis Date = 04/26/2002 
 RPT Level = 0.004  Analysis Date = 04/26/2002 
 RPT Level = 0.004  Analysis Date = 04/17/2002 
 RPT Level = 0.004  Analysis Date = 04/17/2002 
 RPT Level = 0.004  Analysis Date = 04/09/2002 
 RPT Level = 0.004  Analysis Date = 04/09/2002 
 RPT Level = 0.004  Analysis Date = 03/27/2002 
 RPT Level = 0.004  Analysis Date = 03/27/2002 
 RPT Level = 0.004  Analysis Date = 04/01/2002 
 RPT Level = 0.004  Analysis Date = 04/01/2002 
 RPT Level = 0.004  Analysis Date = 03/21/2002 
 RPT Level = 0.004  Analysis Date = 03/21/2002 
 RPT Level = 0.004  Analysis Date = 03/13/2002 
 RPT Level = 0.004  Analysis Date = 03/13/2002 
 RPT Level = 0.004  Analysis Date = 03/07/2002 
 RPT Level = 0.004  Analysis Date = 03/07/2002 
 RPT Level = 0.004  Analysis Date = 03/07/2002 
 RPT Level = 0.004  Analysis Date = 03/07/2002 
 RPT Level = 0.004  Analysis Date = 03/04/2002 
 RPT Level = 0.004  Analysis Date = 03/04/2002 
 RPT Level = 0.004  Analysis Date = 02/06/2002 
 RPT Level = 0.004  Analysis Date = 02/06/2002 
 RPT Level = 0.004  Analysis Date = 02/05/2002 
 RPT Level = 0.004  Analysis Date = 02/05/2002 
 RPT Level = 0.004  Analysis Date = 01/30/2002 
 RPT Level = 0.004  Analysis Date = 01/30/2002 
 RPT Level = 0.004  Analysis Date = 01/16/2002 
 RPT Level = 0.004  Analysis Date = 01/16/2002 
 RPT Level = 0.004  Analysis Date = 01/08/2002 
 RPT Level = 0.004  Analysis Date = 01/08/2002 
 RPT Level = 0.004  Analysis Date = 01/03/2002 
 RPT Level = 0.004  Analysis Date = 01/03/2002 
 RPT Level = 0.004  Analysis Date = 12/20/2001 
 RPT Level = 0.004  Analysis Date = 12/20/2001 
 RPT Level = 0.004  Analysis Date = 12/17/2001 
 RPT Level = 0.004  Analysis Date = 12/17/2001 
 RPT Level = 0.004  Analysis Date = 12/13/2001 
 RPT Level = 0.004  Analysis Date = 12/13/2001 
 RPT Level = 0.004  Analysis Date = 11/13/2001 
 RPT Level = 0.004  Y = 0
The SGPlot Procedure

False Positive Rate for Nitrite (NO2 as N), FIL, COL

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Nitrite (NO2 as N), FIL, COL 00613CL041 2002 40 0 0%
    2003 52 0 0%
    2004 51 3 6%
    2005 50 0 0%
    2006 3 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Nitrite (NO2 as N), FIL, COL, LL -
Blind Blank Results
Lab: NWQL, PCode: 00613, MCode: CL043
Analysis dates: 11/15/01 through 05/19/06
Open Data Set

 Analysis Date = 03/09/2005 
 Lab Value = 0.003 
 RPT Level = 0.001 
 Lab Sample ID = 20050670011  Analysis Date = 05/19/2006 
 Lab Value = 0 
 RPT Level = 0.002 
 Lab Sample ID = 20061370016  Analysis Date = 05/10/2006 
 Lab Value = 0 
 RPT Level = 0.002 
 Lab Sample ID = 20061280111  Analysis Date = 05/04/2006 
 Lab Value = 0 
 RPT Level = 0.002 
 Lab Sample ID = 20061220099  Analysis Date = 09/19/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20052590035  Analysis Date = 09/12/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20052520006  Analysis Date = 09/01/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20052430006  Analysis Date = 08/29/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20052370002  Analysis Date = 08/23/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20052300009  Analysis Date = 08/15/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20052210012  Analysis Date = 08/11/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20052160007  Analysis Date = 08/11/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20052160005  Analysis Date = 07/21/2005 
 Lab Value = 0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20052010007  Analysis Date = 07/14/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20051940015  Analysis Date = 07/08/2005 
 Lab Value = 0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20051880018  Analysis Date = 06/30/2005 
 Lab Value = -0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20051800189  Analysis Date = 06/24/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20051740019  Analysis Date = 06/16/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20051660174  Analysis Date = 06/09/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20051590025  Analysis Date = 06/03/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20051530021  Analysis Date = 05/25/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20051440043  Analysis Date = 05/19/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20051380014  Analysis Date = 05/13/2005 
 Lab Value = 0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20051320029  Analysis Date = 05/06/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20051250003  Analysis Date = 04/28/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20051170012  Analysis Date = 04/22/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20051110007  Analysis Date = 04/13/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20051020018  Analysis Date = 04/06/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20050950044  Analysis Date = 03/30/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20050880116  Analysis Date = 03/28/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20050840096  Analysis Date = 03/17/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20050750004  Analysis Date = 03/14/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20050700007  Analysis Date = 03/14/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20050700004  Analysis Date = 02/25/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20050550024  Analysis Date = 02/22/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20050480005  Analysis Date = 02/14/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20050410004  Analysis Date = 02/04/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20050340020  Analysis Date = 01/28/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20050260024  Analysis Date = 01/21/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20050200048  Analysis Date = 01/14/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20050130091  Analysis Date = 01/10/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20050070016  Analysis Date = 01/03/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20043650002  Analysis Date = 01/03/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20043580037  Analysis Date = 01/03/2005 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20043580035  Analysis Date = 12/20/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20043520023  Analysis Date = 12/20/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20043510018  Analysis Date = 12/13/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20043450069  Analysis Date = 12/13/2004 
 Lab Value = 0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20043440147  Analysis Date = 12/06/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20043380005  Analysis Date = 12/06/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20043380002  Analysis Date = 12/01/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20043310059  Analysis Date = 12/02/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20043280048  Analysis Date = 11/22/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20043240012  Analysis Date = 09/02/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20042450138  Analysis Date = 08/30/2004 
 Lab Value = 0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20042400089  Analysis Date = 08/25/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20042370105  Analysis Date = 08/23/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20042330206  Analysis Date = 08/20/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20042320136  Analysis Date = 08/20/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20042320138  Analysis Date = 08/12/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20042240114  Analysis Date = 08/05/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20042170123  Analysis Date = 07/30/2004 
 Lab Value = -0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20042110015  Analysis Date = 07/23/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20042040039  Analysis Date = 07/15/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20041960050  Analysis Date = 07/09/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20041900062  Analysis Date = 07/01/2004 
 Lab Value = -0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20041820035  Analysis Date = 06/24/2004 
 Lab Value = -0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20041750057  Analysis Date = 06/21/2004 
 Lab Value = -0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20041700080  Analysis Date = 06/10/2004 
 Lab Value = 0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20041610055  Analysis Date = 06/08/2004 
 Lab Value = 0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20041550019  Analysis Date = 06/02/2004 
 Lab Value = 0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20041470132  Analysis Date = 05/25/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20041400016  Analysis Date = 05/12/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20041260099  Analysis Date = 05/07/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20041200046  Analysis Date = 05/04/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20041130016  Analysis Date = 04/23/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20041050022  Analysis Date = 04/20/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040980007  Analysis Date = 04/15/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040930009  Analysis Date = 04/12/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040910012  Analysis Date = 04/09/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040850021  Analysis Date = 04/08/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040830056  Analysis Date = 04/06/2004 
 Lab Value = -0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20040790023  Analysis Date = 03/31/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040760010  Analysis Date = 03/23/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040720029  Analysis Date = 03/16/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040710005  Analysis Date = 03/12/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040680093  Analysis Date = 03/11/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040650001  Analysis Date = 03/03/2004 
 Lab Value = 0.001 
 RPT Level = 0.001 
 Lab Sample ID = 20040580032  Analysis Date = 03/01/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040550018  Analysis Date = 02/27/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040510134  Analysis Date = 02/25/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040490025  Analysis Date = 02/19/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040440035  Analysis Date = 02/13/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040420001  Analysis Date = 02/12/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040370017  Analysis Date = 02/11/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040340024  Analysis Date = 02/06/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040300012  Analysis Date = 02/04/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040270036  Analysis Date = 01/30/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040230030  Analysis Date = 01/28/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040210154  Analysis Date = 01/27/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040200023  Analysis Date = 01/21/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040150075  Analysis Date = 01/14/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040090020  Analysis Date = 01/08/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040070032  Analysis Date = 01/08/2004 
 Lab Value = 0 
 RPT Level = 0.001 
 Lab Sample ID = 20040050016  Analysis Date = 10/10/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20032660009  Analysis Date = 10/08/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20032600107  Analysis Date = 09/26/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20032520179  Analysis Date = 09/24/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20032450195  Analysis Date = 09/17/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20032380029  Analysis Date = 09/10/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20032310028  Analysis Date = 08/29/2003 
 Lab Value = 0.001 
 RPT Level = 0.0011 
 Lab Sample ID = 20032250256  Analysis Date = 08/19/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20032180019  Analysis Date = 08/06/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20032100004  Analysis Date = 08/01/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20032040043  Analysis Date = 07/23/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20031960025  Analysis Date = 07/21/2003 
 Lab Value = 0.001 
 RPT Level = 0.0011 
 Lab Sample ID = 20031900098  Analysis Date = 07/17/2003 
 Lab Value = 0.001 
 RPT Level = 0.0011 
 Lab Sample ID = 20031820037  Analysis Date = 07/15/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20031770041  Analysis Date = 07/07/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20031700013  Analysis Date = 07/02/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20031630053  Analysis Date = 07/01/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20031600109  Analysis Date = 06/04/2003 
 Lab Value = 0.001 
 RPT Level = 0.0011 
 Lab Sample ID = 20031480059  Analysis Date = 06/03/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20031430019  Analysis Date = 05/30/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20031400115  Analysis Date = 05/16/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20031290084  Analysis Date = 05/13/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20031220070  Analysis Date = 05/12/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20031200043  Analysis Date = 04/29/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20031080208  Analysis Date = 04/16/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20030970018  Analysis Date = 04/10/2003 
 Lab Value = -0.001 
 RPT Level = 0.0011 
 Lab Sample ID = 20030920027  Analysis Date = 04/10/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20030900015  Analysis Date = 04/08/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20030860023  Analysis Date = 03/21/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20030710021  Analysis Date = 03/21/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20030660148  Analysis Date = 03/12/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20030590040  Analysis Date = 03/07/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20030570061  Analysis Date = 02/26/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20030410034  Analysis Date = 02/05/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20030350008  Analysis Date = 02/05/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20030310028  Analysis Date = 02/05/2003 
 Lab Value = 0.001 
 RPT Level = 0.0011 
 Lab Sample ID = 20030300004  Analysis Date = 01/17/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20030150009  Analysis Date = 01/17/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20030140019  Analysis Date = 01/07/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20030020002  Analysis Date = 01/07/2003 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20023650009  Analysis Date = 12/23/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20023500166  Analysis Date = 12/18/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20023500092  Analysis Date = 12/10/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20023370026  Analysis Date = 12/10/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20023370025  Analysis Date = 12/06/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20023330096  Analysis Date = 12/06/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20023360020  Analysis Date = 12/06/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20023310020  Analysis Date = 11/14/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20023040033  Analysis Date = 10/30/2002 
 Lab Value = 0.001 
 RPT Level = 0.0011 
 Lab Sample ID = 20022970050  Analysis Date = 10/30/2002 
 Lab Value = 0.001 
 RPT Level = 0.0011 
 Lab Sample ID = 20022970049  Analysis Date = 10/30/2002 
 Lab Value = 0.001 
 RPT Level = 0.0011 
 Lab Sample ID = 20022970048  Analysis Date = 10/30/2002 
 Lab Value = 0.001 
 RPT Level = 0.0011 
 Lab Sample ID = 20022960022  Analysis Date = 09/10/2002 
 Lab Value = 0.001 
 RPT Level = 0.0011 
 Lab Sample ID = 20022470018  Analysis Date = 09/10/2002 
 Lab Value = 0.001 
 RPT Level = 0.0011 
 Lab Sample ID = 20022460135  Analysis Date = 08/29/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20022340186  Analysis Date = 08/27/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20022280008  Analysis Date = 08/20/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20022210007  Analysis Date = 08/16/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20022170107  Analysis Date = 08/01/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20022060077  Analysis Date = 07/17/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20021970116  Analysis Date = 07/16/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20021960234  Analysis Date = 07/09/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20021830026  Analysis Date = 07/02/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20021790006  Analysis Date = 06/21/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20021690011  Analysis Date = 06/20/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20021650005  Analysis Date = 06/11/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20021550019  Analysis Date = 06/10/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20021510057  Analysis Date = 05/30/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20021420157  Analysis Date = 05/17/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20021300002  Analysis Date = 04/26/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20021140038  Analysis Date = 04/17/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20021010015  Analysis Date = 04/03/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20020850092  Analysis Date = 04/01/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20020730105  Analysis Date = 03/22/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20020600006  Analysis Date = 02/20/2002 
 Lab Value = -0.001 
 RPT Level = 0.0011 
 Lab Sample ID = 20020460047  Analysis Date = 02/08/2002 
 Lab Value = -0.001 
 RPT Level = 0.0011 
 Lab Sample ID = 20020320104  Analysis Date = 01/17/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20020110002  Analysis Date = 01/03/2002 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20013600206  Analysis Date = 12/14/2001 
 Lab Value = 0.001 
 RPT Level = 0.0011 
 Lab Sample ID = 20013480007  Analysis Date = 11/15/2001 
 Lab Value = 0 
 RPT Level = 0.0011 
 Lab Sample ID = 20013110129  Analysis Date = 05/19/2006 
 RPT Level = 0.002  Analysis Date = 05/10/2006 
 RPT Level = 0.002  Analysis Date = 05/10/2006 
 RPT Level = 0.002  Analysis Date = 05/04/2006 
 RPT Level = 0.002  Analysis Date = 05/04/2006 
 RPT Level = 0.002  Analysis Date = 09/19/2005 
 RPT Level = 0.001  Analysis Date = 09/19/2005 
 RPT Level = 0.001  Analysis Date = 09/12/2005 
 RPT Level = 0.001  Analysis Date = 09/12/2005 
 RPT Level = 0.001  Analysis Date = 09/01/2005 
 RPT Level = 0.001  Analysis Date = 09/01/2005 
 RPT Level = 0.001  Analysis Date = 08/29/2005 
 RPT Level = 0.001  Analysis Date = 08/29/2005 
 RPT Level = 0.001  Analysis Date = 08/23/2005 
 RPT Level = 0.001  Analysis Date = 08/23/2005 
 RPT Level = 0.001  Analysis Date = 08/15/2005 
 RPT Level = 0.001  Analysis Date = 08/15/2005 
 RPT Level = 0.001  Analysis Date = 08/11/2005 
 RPT Level = 0.001  Analysis Date = 08/11/2005 
 RPT Level = 0.001  Analysis Date = 08/11/2005 
 RPT Level = 0.001  Analysis Date = 08/11/2005 
 RPT Level = 0.001  Analysis Date = 07/21/2005 
 RPT Level = 0.001  Analysis Date = 07/21/2005 
 RPT Level = 0.001  Analysis Date = 07/14/2005 
 RPT Level = 0.001  Analysis Date = 07/14/2005 
 RPT Level = 0.001  Analysis Date = 07/08/2005 
 RPT Level = 0.001  Analysis Date = 07/08/2005 
 RPT Level = 0.001  Analysis Date = 06/30/2005 
 RPT Level = 0.001  Analysis Date = 06/30/2005 
 RPT Level = 0.001  Analysis Date = 06/24/2005 
 RPT Level = 0.001  Analysis Date = 06/24/2005 
 RPT Level = 0.001  Analysis Date = 06/16/2005 
 RPT Level = 0.001  Analysis Date = 06/16/2005 
 RPT Level = 0.001  Analysis Date = 06/09/2005 
 RPT Level = 0.001  Analysis Date = 06/09/2005 
 RPT Level = 0.001  Analysis Date = 06/03/2005 
 RPT Level = 0.001  Analysis Date = 06/03/2005 
 RPT Level = 0.001  Analysis Date = 05/25/2005 
 RPT Level = 0.001  Analysis Date = 05/25/2005 
 RPT Level = 0.001  Analysis Date = 05/19/2005 
 RPT Level = 0.001  Analysis Date = 05/19/2005 
 RPT Level = 0.001  Analysis Date = 05/13/2005 
 RPT Level = 0.001  Analysis Date = 05/13/2005 
 RPT Level = 0.001  Analysis Date = 05/06/2005 
 RPT Level = 0.001  Analysis Date = 05/06/2005 
 RPT Level = 0.001  Analysis Date = 04/28/2005 
 RPT Level = 0.001  Analysis Date = 04/28/2005 
 RPT Level = 0.001  Analysis Date = 04/22/2005 
 RPT Level = 0.001  Analysis Date = 04/22/2005 
 RPT Level = 0.001  Analysis Date = 04/13/2005 
 RPT Level = 0.001  Analysis Date = 04/13/2005 
 RPT Level = 0.001  Analysis Date = 04/06/2005 
 RPT Level = 0.001  Analysis Date = 04/06/2005 
 RPT Level = 0.001  Analysis Date = 03/30/2005 
 RPT Level = 0.001  Analysis Date = 03/30/2005 
 RPT Level = 0.001  Analysis Date = 03/28/2005 
 RPT Level = 0.001  Analysis Date = 03/28/2005 
 RPT Level = 0.001  Analysis Date = 03/17/2005 
 RPT Level = 0.001  Analysis Date = 03/17/2005 
 RPT Level = 0.001  Analysis Date = 03/14/2005 
 RPT Level = 0.001  Analysis Date = 03/14/2005 
 RPT Level = 0.001  Analysis Date = 03/14/2005 
 RPT Level = 0.001  Analysis Date = 03/14/2005 
 RPT Level = 0.001  Analysis Date = 03/09/2005 
 RPT Level = 0.001  Analysis Date = 03/09/2005 
 RPT Level = 0.001  Analysis Date = 02/25/2005 
 RPT Level = 0.001  Analysis Date = 02/25/2005 
 RPT Level = 0.001  Analysis Date = 02/22/2005 
 RPT Level = 0.001  Analysis Date = 02/22/2005 
 RPT Level = 0.001  Analysis Date = 02/14/2005 
 RPT Level = 0.001  Analysis Date = 02/14/2005 
 RPT Level = 0.001  Analysis Date = 02/04/2005 
 RPT Level = 0.001  Analysis Date = 02/04/2005 
 RPT Level = 0.001  Analysis Date = 01/28/2005 
 RPT Level = 0.001  Analysis Date = 01/28/2005 
 RPT Level = 0.001  Analysis Date = 01/21/2005 
 RPT Level = 0.001  Analysis Date = 01/21/2005 
 RPT Level = 0.001  Analysis Date = 01/14/2005 
 RPT Level = 0.001  Analysis Date = 01/14/2005 
 RPT Level = 0.001  Analysis Date = 01/10/2005 
 RPT Level = 0.001  Analysis Date = 01/10/2005 
 RPT Level = 0.001  Analysis Date = 01/03/2005 
 RPT Level = 0.001  Analysis Date = 01/03/2005 
 RPT Level = 0.001  Analysis Date = 01/03/2005 
 RPT Level = 0.001  Analysis Date = 01/03/2005 
 RPT Level = 0.001  Analysis Date = 01/03/2005 
 RPT Level = 0.001  Analysis Date = 01/03/2005 
 RPT Level = 0.001  Analysis Date = 12/20/2004 
 RPT Level = 0.001  Analysis Date = 12/20/2004 
 RPT Level = 0.001  Analysis Date = 12/20/2004 
 RPT Level = 0.001  Analysis Date = 12/20/2004 
 RPT Level = 0.001  Analysis Date = 12/13/2004 
 RPT Level = 0.001  Analysis Date = 12/13/2004 
 RPT Level = 0.001  Analysis Date = 12/13/2004 
 RPT Level = 0.001  Analysis Date = 12/13/2004 
 RPT Level = 0.001  Analysis Date = 12/06/2004 
 RPT Level = 0.001  Analysis Date = 12/06/2004 
 RPT Level = 0.001  Analysis Date = 12/06/2004 
 RPT Level = 0.001  Analysis Date = 12/06/2004 
 RPT Level = 0.001  Analysis Date = 12/01/2004 
 RPT Level = 0.001  Analysis Date = 12/01/2004 
 RPT Level = 0.001  Analysis Date = 12/02/2004 
 RPT Level = 0.001  Analysis Date = 12/02/2004 
 RPT Level = 0.001  Analysis Date = 11/22/2004 
 RPT Level = 0.001  Analysis Date = 11/22/2004 
 RPT Level = 0.001  Analysis Date = 09/02/2004 
 RPT Level = 0.001  Analysis Date = 09/02/2004 
 RPT Level = 0.001  Analysis Date = 08/30/2004 
 RPT Level = 0.001  Analysis Date = 08/30/2004 
 RPT Level = 0.001  Analysis Date = 08/25/2004 
 RPT Level = 0.001  Analysis Date = 08/25/2004 
 RPT Level = 0.001  Analysis Date = 08/23/2004 
 RPT Level = 0.001  Analysis Date = 08/23/2004 
 RPT Level = 0.001  Analysis Date = 08/20/2004 
 RPT Level = 0.001  Analysis Date = 08/20/2004 
 RPT Level = 0.001  Analysis Date = 08/20/2004 
 RPT Level = 0.001  Analysis Date = 08/20/2004 
 RPT Level = 0.001  Analysis Date = 08/12/2004 
 RPT Level = 0.001  Analysis Date = 08/12/2004 
 RPT Level = 0.001  Analysis Date = 08/05/2004 
 RPT Level = 0.001  Analysis Date = 08/05/2004 
 RPT Level = 0.001  Analysis Date = 07/30/2004 
 RPT Level = 0.001  Analysis Date = 07/30/2004 
 RPT Level = 0.001  Analysis Date = 07/23/2004 
 RPT Level = 0.001  Analysis Date = 07/23/2004 
 RPT Level = 0.001  Analysis Date = 07/15/2004 
 RPT Level = 0.001  Analysis Date = 07/15/2004 
 RPT Level = 0.001  Analysis Date = 07/09/2004 
 RPT Level = 0.001  Analysis Date = 07/09/2004 
 RPT Level = 0.001  Analysis Date = 07/01/2004 
 RPT Level = 0.001  Analysis Date = 07/01/2004 
 RPT Level = 0.001  Analysis Date = 06/24/2004 
 RPT Level = 0.001  Analysis Date = 06/24/2004 
 RPT Level = 0.001  Analysis Date = 06/21/2004 
 RPT Level = 0.001  Analysis Date = 06/21/2004 
 RPT Level = 0.001  Analysis Date = 06/10/2004 
 RPT Level = 0.001  Analysis Date = 06/10/2004 
 RPT Level = 0.001  Analysis Date = 06/08/2004 
 RPT Level = 0.001  Analysis Date = 06/08/2004 
 RPT Level = 0.001  Analysis Date = 06/02/2004 
 RPT Level = 0.001  Analysis Date = 06/02/2004 
 RPT Level = 0.001  Analysis Date = 05/25/2004 
 RPT Level = 0.001  Analysis Date = 05/25/2004 
 RPT Level = 0.001  Analysis Date = 05/12/2004 
 RPT Level = 0.001  Analysis Date = 05/12/2004 
 RPT Level = 0.001  Analysis Date = 05/07/2004 
 RPT Level = 0.001  Analysis Date = 05/07/2004 
 RPT Level = 0.001  Analysis Date = 05/04/2004 
 RPT Level = 0.001  Analysis Date = 05/04/2004 
 RPT Level = 0.001  Analysis Date = 04/23/2004 
 RPT Level = 0.001  Analysis Date = 04/23/2004 
 RPT Level = 0.001  Analysis Date = 04/20/2004 
 RPT Level = 0.001  Analysis Date = 04/20/2004 
 RPT Level = 0.001  Analysis Date = 04/15/2004 
 RPT Level = 0.001  Analysis Date = 04/15/2004 
 RPT Level = 0.001  Analysis Date = 04/12/2004 
 RPT Level = 0.001  Analysis Date = 04/12/2004 
 RPT Level = 0.001  Analysis Date = 04/09/2004 
 RPT Level = 0.001  Analysis Date = 04/09/2004 
 RPT Level = 0.001  Analysis Date = 04/08/2004 
 RPT Level = 0.001  Analysis Date = 04/08/2004 
 RPT Level = 0.001  Analysis Date = 04/06/2004 
 RPT Level = 0.001  Analysis Date = 04/06/2004 
 RPT Level = 0.001  Analysis Date = 03/31/2004 
 RPT Level = 0.001  Analysis Date = 03/31/2004 
 RPT Level = 0.001  Analysis Date = 03/23/2004 
 RPT Level = 0.001  Analysis Date = 03/23/2004 
 RPT Level = 0.001  Analysis Date = 03/16/2004 
 RPT Level = 0.001  Analysis Date = 03/16/2004 
 RPT Level = 0.001  Analysis Date = 03/12/2004 
 RPT Level = 0.001  Analysis Date = 03/12/2004 
 RPT Level = 0.001  Analysis Date = 03/11/2004 
 RPT Level = 0.001  Analysis Date = 03/11/2004 
 RPT Level = 0.001  Analysis Date = 03/03/2004 
 RPT Level = 0.001  Analysis Date = 03/03/2004 
 RPT Level = 0.001  Analysis Date = 03/01/2004 
 RPT Level = 0.001  Analysis Date = 03/01/2004 
 RPT Level = 0.001  Analysis Date = 02/27/2004 
 RPT Level = 0.001  Analysis Date = 02/27/2004 
 RPT Level = 0.001  Analysis Date = 02/25/2004 
 RPT Level = 0.001  Analysis Date = 02/25/2004 
 RPT Level = 0.001  Analysis Date = 02/19/2004 
 RPT Level = 0.001  Analysis Date = 02/19/2004 
 RPT Level = 0.001  Analysis Date = 02/13/2004 
 RPT Level = 0.001  Analysis Date = 02/13/2004 
 RPT Level = 0.001  Analysis Date = 02/12/2004 
 RPT Level = 0.001  Analysis Date = 02/12/2004 
 RPT Level = 0.001  Analysis Date = 02/11/2004 
 RPT Level = 0.001  Analysis Date = 02/11/2004 
 RPT Level = 0.001  Analysis Date = 02/06/2004 
 RPT Level = 0.001  Analysis Date = 02/06/2004 
 RPT Level = 0.001  Analysis Date = 02/04/2004 
 RPT Level = 0.001  Analysis Date = 02/04/2004 
 RPT Level = 0.001  Analysis Date = 01/30/2004 
 RPT Level = 0.001  Analysis Date = 01/30/2004 
 RPT Level = 0.001  Analysis Date = 01/28/2004 
 RPT Level = 0.001  Analysis Date = 01/28/2004 
 RPT Level = 0.001  Analysis Date = 01/27/2004 
 RPT Level = 0.001  Analysis Date = 01/27/2004 
 RPT Level = 0.001  Analysis Date = 01/21/2004 
 RPT Level = 0.001  Analysis Date = 01/21/2004 
 RPT Level = 0.001  Analysis Date = 01/14/2004 
 RPT Level = 0.001  Analysis Date = 01/14/2004 
 RPT Level = 0.001  Analysis Date = 01/08/2004 
 RPT Level = 0.001  Analysis Date = 01/08/2004 
 RPT Level = 0.001  Analysis Date = 01/08/2004 
 RPT Level = 0.001  Analysis Date = 01/08/2004 
 RPT Level = 0.001  Analysis Date = 10/10/2003 
 RPT Level = 0.0011  Analysis Date = 10/10/2003 
 RPT Level = 0.0011  Analysis Date = 10/08/2003 
 RPT Level = 0.0011  Analysis Date = 10/08/2003 
 RPT Level = 0.0011  Analysis Date = 09/26/2003 
 RPT Level = 0.0011  Analysis Date = 09/26/2003 
 RPT Level = 0.0011  Analysis Date = 09/24/2003 
 RPT Level = 0.0011  Analysis Date = 09/24/2003 
 RPT Level = 0.0011  Analysis Date = 09/17/2003 
 RPT Level = 0.0011  Analysis Date = 09/17/2003 
 RPT Level = 0.0011  Analysis Date = 09/10/2003 
 RPT Level = 0.0011  Analysis Date = 09/10/2003 
 RPT Level = 0.0011  Analysis Date = 08/29/2003 
 RPT Level = 0.0011  Analysis Date = 08/29/2003 
 RPT Level = 0.0011  Analysis Date = 08/19/2003 
 RPT Level = 0.0011  Analysis Date = 08/19/2003 
 RPT Level = 0.0011  Analysis Date = 08/06/2003 
 RPT Level = 0.0011  Analysis Date = 08/06/2003 
 RPT Level = 0.0011  Analysis Date = 08/01/2003 
 RPT Level = 0.0011  Analysis Date = 08/01/2003 
 RPT Level = 0.0011  Analysis Date = 07/23/2003 
 RPT Level = 0.0011  Analysis Date = 07/23/2003 
 RPT Level = 0.0011  Analysis Date = 07/21/2003 
 RPT Level = 0.0011  Analysis Date = 07/21/2003 
 RPT Level = 0.0011  Analysis Date = 07/17/2003 
 RPT Level = 0.0011  Analysis Date = 07/17/2003 
 RPT Level = 0.0011  Analysis Date = 07/15/2003 
 RPT Level = 0.0011  Analysis Date = 07/15/2003 
 RPT Level = 0.0011  Analysis Date = 07/07/2003 
 RPT Level = 0.0011  Analysis Date = 07/07/2003 
 RPT Level = 0.0011  Analysis Date = 07/02/2003 
 RPT Level = 0.0011  Analysis Date = 07/02/2003 
 RPT Level = 0.0011  Analysis Date = 07/01/2003 
 RPT Level = 0.0011  Analysis Date = 07/01/2003 
 RPT Level = 0.0011  Analysis Date = 06/04/2003 
 RPT Level = 0.0011  Analysis Date = 06/04/2003 
 RPT Level = 0.0011  Analysis Date = 06/03/2003 
 RPT Level = 0.0011  Analysis Date = 06/03/2003 
 RPT Level = 0.0011  Analysis Date = 05/30/2003 
 RPT Level = 0.0011  Analysis Date = 05/30/2003 
 RPT Level = 0.0011  Analysis Date = 05/16/2003 
 RPT Level = 0.0011  Analysis Date = 05/16/2003 
 RPT Level = 0.0011  Analysis Date = 05/13/2003 
 RPT Level = 0.0011  Analysis Date = 05/13/2003 
 RPT Level = 0.0011  Analysis Date = 05/12/2003 
 RPT Level = 0.0011  Analysis Date = 05/12/2003 
 RPT Level = 0.0011  Analysis Date = 04/29/2003 
 RPT Level = 0.0011  Analysis Date = 04/29/2003 
 RPT Level = 0.0011  Analysis Date = 04/16/2003 
 RPT Level = 0.0011  Analysis Date = 04/16/2003 
 RPT Level = 0.0011  Analysis Date = 04/10/2003 
 RPT Level = 0.0011  Analysis Date = 04/10/2003 
 RPT Level = 0.0011  Analysis Date = 04/10/2003 
 RPT Level = 0.0011  Analysis Date = 04/10/2003 
 RPT Level = 0.0011  Analysis Date = 04/08/2003 
 RPT Level = 0.0011  Analysis Date = 04/08/2003 
 RPT Level = 0.0011  Analysis Date = 03/21/2003 
 RPT Level = 0.0011  Analysis Date = 03/21/2003 
 RPT Level = 0.0011  Analysis Date = 03/21/2003 
 RPT Level = 0.0011  Analysis Date = 03/21/2003 
 RPT Level = 0.0011  Analysis Date = 03/12/2003 
 RPT Level = 0.0011  Analysis Date = 03/12/2003 
 RPT Level = 0.0011  Analysis Date = 03/07/2003 
 RPT Level = 0.0011  Analysis Date = 03/07/2003 
 RPT Level = 0.0011  Analysis Date = 02/26/2003 
 RPT Level = 0.0011  Analysis Date = 02/26/2003 
 RPT Level = 0.0011  Analysis Date = 02/05/2003 
 RPT Level = 0.0011  Analysis Date = 02/05/2003 
 RPT Level = 0.0011  Analysis Date = 02/05/2003 
 RPT Level = 0.0011  Analysis Date = 02/05/2003 
 RPT Level = 0.0011  Analysis Date = 02/05/2003 
 RPT Level = 0.0011  Analysis Date = 02/05/2003 
 RPT Level = 0.0011  Analysis Date = 01/17/2003 
 RPT Level = 0.0011  Analysis Date = 01/17/2003 
 RPT Level = 0.0011  Analysis Date = 01/17/2003 
 RPT Level = 0.0011  Analysis Date = 01/17/2003 
 RPT Level = 0.0011  Analysis Date = 01/07/2003 
 RPT Level = 0.0011  Analysis Date = 01/07/2003 
 RPT Level = 0.0011  Analysis Date = 01/07/2003 
 RPT Level = 0.0011  Analysis Date = 01/07/2003 
 RPT Level = 0.0011  Analysis Date = 12/23/2002 
 RPT Level = 0.0011  Analysis Date = 12/23/2002 
 RPT Level = 0.0011  Analysis Date = 12/18/2002 
 RPT Level = 0.0011  Analysis Date = 12/18/2002 
 RPT Level = 0.0011  Analysis Date = 12/10/2002 
 RPT Level = 0.0011  Analysis Date = 12/10/2002 
 RPT Level = 0.0011  Analysis Date = 12/10/2002 
 RPT Level = 0.0011  Analysis Date = 12/10/2002 
 RPT Level = 0.0011  Analysis Date = 12/06/2002 
 RPT Level = 0.0011  Analysis Date = 12/06/2002 
 RPT Level = 0.0011  Analysis Date = 12/06/2002 
 RPT Level = 0.0011  Analysis Date = 12/06/2002 
 RPT Level = 0.0011  Analysis Date = 12/06/2002 
 RPT Level = 0.0011  Analysis Date = 12/06/2002 
 RPT Level = 0.0011  Analysis Date = 11/14/2002 
 RPT Level = 0.0011  Analysis Date = 11/14/2002 
 RPT Level = 0.0011  Analysis Date = 10/30/2002 
 RPT Level = 0.0011  Analysis Date = 10/30/2002 
 RPT Level = 0.0011  Analysis Date = 10/30/2002 
 RPT Level = 0.0011  Analysis Date = 10/30/2002 
 RPT Level = 0.0011  Analysis Date = 10/30/2002 
 RPT Level = 0.0011  Analysis Date = 10/30/2002 
 RPT Level = 0.0011  Analysis Date = 10/30/2002 
 RPT Level = 0.0011  Analysis Date = 10/30/2002 
 RPT Level = 0.0011  Analysis Date = 09/10/2002 
 RPT Level = 0.0011  Analysis Date = 09/10/2002 
 RPT Level = 0.0011  Analysis Date = 09/10/2002 
 RPT Level = 0.0011  Analysis Date = 09/10/2002 
 RPT Level = 0.0011  Analysis Date = 08/29/2002 
 RPT Level = 0.0011  Analysis Date = 08/29/2002 
 RPT Level = 0.0011  Analysis Date = 08/27/2002 
 RPT Level = 0.0011  Analysis Date = 08/27/2002 
 RPT Level = 0.0011  Analysis Date = 08/20/2002 
 RPT Level = 0.0011  Analysis Date = 08/20/2002 
 RPT Level = 0.0011  Analysis Date = 08/16/2002 
 RPT Level = 0.0011  Analysis Date = 08/16/2002 
 RPT Level = 0.0011  Analysis Date = 08/01/2002 
 RPT Level = 0.0011  Analysis Date = 08/01/2002 
 RPT Level = 0.0011  Analysis Date = 07/17/2002 
 RPT Level = 0.0011  Analysis Date = 07/17/2002 
 RPT Level = 0.0011  Analysis Date = 07/16/2002 
 RPT Level = 0.0011  Analysis Date = 07/16/2002 
 RPT Level = 0.0011  Analysis Date = 07/09/2002 
 RPT Level = 0.0011  Analysis Date = 07/09/2002 
 RPT Level = 0.0011  Analysis Date = 07/02/2002 
 RPT Level = 0.0011  Analysis Date = 07/02/2002 
 RPT Level = 0.0011  Analysis Date = 06/21/2002 
 RPT Level = 0.0011  Analysis Date = 06/21/2002 
 RPT Level = 0.0011  Analysis Date = 06/20/2002 
 RPT Level = 0.0011  Analysis Date = 06/20/2002 
 RPT Level = 0.0011  Analysis Date = 06/11/2002 
 RPT Level = 0.0011  Analysis Date = 06/11/2002 
 RPT Level = 0.0011  Analysis Date = 06/10/2002 
 RPT Level = 0.0011  Analysis Date = 06/10/2002 
 RPT Level = 0.0011  Analysis Date = 05/30/2002 
 RPT Level = 0.0011  Analysis Date = 05/30/2002 
 RPT Level = 0.0011  Analysis Date = 05/17/2002 
 RPT Level = 0.0011  Analysis Date = 05/17/2002 
 RPT Level = 0.0011  Analysis Date = 04/26/2002 
 RPT Level = 0.0011  Analysis Date = 04/26/2002 
 RPT Level = 0.0011  Analysis Date = 04/17/2002 
 RPT Level = 0.0011  Analysis Date = 04/17/2002 
 RPT Level = 0.0011  Analysis Date = 04/03/2002 
 RPT Level = 0.0011  Analysis Date = 04/03/2002 
 RPT Level = 0.0011  Analysis Date = 04/01/2002 
 RPT Level = 0.0011  Analysis Date = 04/01/2002 
 RPT Level = 0.0011  Analysis Date = 03/22/2002 
 RPT Level = 0.0011  Analysis Date = 03/22/2002 
 RPT Level = 0.0011  Analysis Date = 02/20/2002 
 RPT Level = 0.0011  Analysis Date = 02/20/2002 
 RPT Level = 0.0011  Analysis Date = 02/08/2002 
 RPT Level = 0.0011  Analysis Date = 02/08/2002 
 RPT Level = 0.0011  Analysis Date = 01/17/2002 
 RPT Level = 0.0011  Analysis Date = 01/17/2002 
 RPT Level = 0.0011  Analysis Date = 01/03/2002 
 RPT Level = 0.0011  Analysis Date = 01/03/2002 
 RPT Level = 0.0011  Analysis Date = 12/14/2001 
 RPT Level = 0.0011  Analysis Date = 12/14/2001 
 RPT Level = 0.0011  Analysis Date = 11/15/2001 
 RPT Level = 0.0011  Y = 0
The SGPlot Procedure

False Positive Rate for Nitrite (NO2 as N), FIL, COL, LL

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Nitrite (NO2 as N), FIL, COL, LL 00613CL043 2002 28 0 0%
    2003 52 0 0%
    2004 51 0 0%
    2005 50 1 2%
    2006 3 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Orthophosphate (PO4 as P), FIL, COL -
Blind Blank Results
Lab: NWQL, PCode: 00671, MCode: CL053
Analysis dates: 11/13/01 through 06/05/06
Open Data Set

 Analysis Date = 05/12/2003 
 Lab Value = 0.037 
 RPT Level = 0.009 
 Lab Sample ID = 20031200043  Analysis Date = 06/05/2006 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20061370016  Analysis Date = 05/22/2006 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20061280111  Analysis Date = 05/11/2006 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20061220099  Analysis Date = 09/27/2005 
 Lab Value = -0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20052590035  Analysis Date = 09/20/2005 
 Lab Value = -0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20052520006  Analysis Date = 09/12/2005 
 Lab Value = -0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20052430006  Analysis Date = 09/07/2005 
 Lab Value = -0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20052370002  Analysis Date = 08/31/2005 
 Lab Value = -0.006 
 RPT Level = 0.009 
 Lab Sample ID = 20052300009  Analysis Date = 08/16/2005 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20052210012  Analysis Date = 08/10/2005 
 Lab Value = -0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20052160007  Analysis Date = 08/10/2005 
 Lab Value = -0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20052160005  Analysis Date = 07/26/2005 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20052010007  Analysis Date = 07/15/2005 
 Lab Value = -0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20051940015  Analysis Date = 07/12/2005 
 Lab Value = -0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20051880018  Analysis Date = 07/01/2005 
 Lab Value = -0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20051800189  Analysis Date = 06/27/2005 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20051740019  Analysis Date = 06/20/2005 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20051660174  Analysis Date = 06/14/2005 
 Lab Value = -0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20051590025  Analysis Date = 06/06/2005 
 Lab Value = -0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20051530021  Analysis Date = 05/26/2005 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20051440043  Analysis Date = 05/24/2005 
 Lab Value = -0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20051380014  Analysis Date = 05/16/2005 
 Lab Value = -0.006 
 RPT Level = 0.009 
 Lab Sample ID = 20051320029  Analysis Date = 05/10/2005 
 Lab Value = -0.007 
 RPT Level = 0.009 
 Lab Sample ID = 20051250003  Analysis Date = 04/28/2005 
 Lab Value = -0.006 
 RPT Level = 0.009 
 Lab Sample ID = 20051170012  Analysis Date = 04/26/2005 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20051110007  Analysis Date = 04/14/2005 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20051020018  Analysis Date = 04/07/2005 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20050950044  Analysis Date = 03/31/2005 
 Lab Value = -0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20050880116  Analysis Date = 03/30/2005 
 Lab Value = -0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20050840096  Analysis Date = 03/21/2005 
 Lab Value = -0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20050750004  Analysis Date = 03/15/2005 
 Lab Value = -0.006 
 RPT Level = 0.009 
 Lab Sample ID = 20050700007  Analysis Date = 03/15/2005 
 Lab Value = -0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20050700004  Analysis Date = 03/09/2005 
 Lab Value = -0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20050670011  Analysis Date = 03/01/2005 
 Lab Value = -0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20050550024  Analysis Date = 02/24/2005 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20050480005  Analysis Date = 02/15/2005 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20050410004  Analysis Date = 02/09/2005 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20050340020  Analysis Date = 01/31/2005 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20050260024  Analysis Date = 01/26/2005 
 Lab Value = -0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20050200048  Analysis Date = 01/25/2005 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20050130091  Analysis Date = 01/18/2005 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20050070016  Analysis Date = 01/18/2005 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20043650002  Analysis Date = 12/27/2004 
 Lab Value = -0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20043580037  Analysis Date = 12/27/2004 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20043580035  Analysis Date = 12/21/2004 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20043520023  Analysis Date = 12/21/2004 
 Lab Value = -0.006 
 RPT Level = 0.009 
 Lab Sample ID = 20043510018  Analysis Date = 12/23/2004 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20043450069  Analysis Date = 12/23/2004 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20043440147  Analysis Date = 12/15/2004 
 Lab Value = 0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20043380005  Analysis Date = 12/15/2004 
 Lab Value = 0.007 
 RPT Level = 0.009 
 Lab Sample ID = 20043380002  Analysis Date = 12/14/2004 
 Lab Value = -0.006 
 RPT Level = 0.009 
 Lab Sample ID = 20043310059  Analysis Date = 12/13/2004 
 Lab Value = -0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20043280048  Analysis Date = 12/08/2004 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20043240012  Analysis Date = 09/15/2004 
 Lab Value = -0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20042450138  Analysis Date = 09/09/2004 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20042400089  Analysis Date = 09/08/2004 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20042370105  Analysis Date = 09/02/2004 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20042330206  Analysis Date = 09/01/2004 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20042320136  Analysis Date = 09/01/2004 
 Lab Value = -0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20042320138  Analysis Date = 08/19/2004 
 Lab Value = -0.007 
 RPT Level = 0.009 
 Lab Sample ID = 20042240114  Analysis Date = 08/11/2004 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20042170123  Analysis Date = 08/05/2004 
 Lab Value = -0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20042110015  Analysis Date = 07/27/2004 
 Lab Value = -0.006 
 RPT Level = 0.009 
 Lab Sample ID = 20042040039  Analysis Date = 07/19/2004 
 Lab Value = -0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20041960050  Analysis Date = 07/14/2004 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20041900062  Analysis Date = 07/13/2004 
 Lab Value = -0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20041820035  Analysis Date = 07/08/2004 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20041750057  Analysis Date = 07/06/2004 
 Lab Value = -0.008 
 RPT Level = 0.009 
 Lab Sample ID = 20041700080  Analysis Date = 06/24/2004 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20041610055  Analysis Date = 06/23/2004 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20041550019  Analysis Date = 06/16/2004 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20041470132  Analysis Date = 06/08/2004 
 Lab Value = 0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20041400016  Analysis Date = 05/17/2004 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20041260099  Analysis Date = 05/11/2004 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20041200046  Analysis Date = 05/06/2004 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20041130016  Analysis Date = 04/22/2004 
 Lab Value = 0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20041050022  Analysis Date = 04/13/2004 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20040980007  Analysis Date = 04/15/2004 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20040930009  Analysis Date = 04/14/2004 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20040910012  Analysis Date = 04/07/2004 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20040850021  Analysis Date = 04/07/2004 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20040830056  Analysis Date = 04/07/2004 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20040790023  Analysis Date = 04/02/2004 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20040760010  Analysis Date = 03/30/2004 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20040720029  Analysis Date = 03/23/2004 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20040710005  Analysis Date = 03/23/2004 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20040680093  Analysis Date = 03/23/2004 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20040650001  Analysis Date = 03/16/2004 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20040580032  Analysis Date = 03/16/2004 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20040550018  Analysis Date = 03/15/2004 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20040510134  Analysis Date = 03/15/2004 
 Lab Value = 0.015 
 RPT Level = 0.009 
 Lab Sample ID = 20040490025  Analysis Date = 03/09/2004 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20040440035  Analysis Date = 03/04/2004 
 Lab Value = -0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20040420001  Analysis Date = 02/17/2004 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20040370017  Analysis Date = 02/10/2004 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20040340024  Analysis Date = 02/10/2004 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20040300012  Analysis Date = 02/03/2004 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20040270036  Analysis Date = 02/02/2004 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20040230030  Analysis Date = 01/29/2004 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20040210154  Analysis Date = 01/29/2004 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20040200023  Analysis Date = 01/28/2004 
 Lab Value = -0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20040150075  Analysis Date = 01/27/2004 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20040090020  Analysis Date = 01/20/2004 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20040070032  Analysis Date = 01/20/2004 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20040050016  Analysis Date = 10/03/2003 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20032660009  Analysis Date = 10/16/2003 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20032600107  Analysis Date = 09/30/2003 
 Lab Value = 0.014 
 RPT Level = 0.009 
 Lab Sample ID = 20032520179  Analysis Date = 09/22/2003 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20032450195  Analysis Date = 09/16/2003 
 Lab Value = 0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20032380029  Analysis Date = 09/11/2003 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20032310028  Analysis Date = 09/10/2003 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20032250256  Analysis Date = 08/26/2003 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20032180019  Analysis Date = 08/22/2003 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20032100004  Analysis Date = 08/13/2003 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20032040043  Analysis Date = 08/08/2003 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20031960025  Analysis Date = 08/04/2003 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20031900098  Analysis Date = 07/25/2003 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20031820037  Analysis Date = 07/22/2003 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20031770041  Analysis Date = 07/15/2003 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20031700013  Analysis Date = 07/09/2003 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20031630053  Analysis Date = 06/24/2003 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20031600109  Analysis Date = 06/16/2003 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20031480059  Analysis Date = 06/17/2003 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20031430019  Analysis Date = 06/12/2003 
 Lab Value = 0.019 
 RPT Level = 0.009 
 Lab Sample ID = 20031400115  Analysis Date = 05/21/2003 
 Lab Value = -0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20031290084  Analysis Date = 05/13/2003 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20031220070  Analysis Date = 04/24/2003 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20031080208  Analysis Date = 04/16/2003 
 Lab Value = 0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20030970018  Analysis Date = 04/03/2003 
 Lab Value = 0.016 
 RPT Level = 0.009 
 Lab Sample ID = 20030920027  Analysis Date = 04/01/2003 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20030900015  Analysis Date = 03/31/2003 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20030860023  Analysis Date = 03/27/2003 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20030710021  Analysis Date = 03/27/2003 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20030660148  Analysis Date = 03/06/2003 
 Lab Value = 0.013 
 RPT Level = 0.009 
 Lab Sample ID = 20030590040  Analysis Date = 03/06/2003 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20030570061  Analysis Date = 02/12/2003 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20030410034  Analysis Date = 02/11/2003 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20030350008  Analysis Date = 02/06/2003 
 Lab Value = -0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20030310028  Analysis Date = 02/06/2003 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20030300004  Analysis Date = 01/16/2003 
 Lab Value = 0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20030150009  Analysis Date = 01/16/2003 
 Lab Value = 0.008 
 RPT Level = 0.009 
 Lab Sample ID = 20030140019  Analysis Date = 01/09/2003 
 Lab Value = -0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20030020002  Analysis Date = 01/09/2003 
 Lab Value = -0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20023650009  Analysis Date = 12/24/2002 
 Lab Value = 0.023 
 RPT Level = 0.009 
 Lab Sample ID = 20023500166  Analysis Date = 12/24/2002 
 Lab Value = 0.021 
 RPT Level = 0.009 
 Lab Sample ID = 20023500092  Analysis Date = 12/04/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20023370026  Analysis Date = 12/04/2002 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20023370025  Analysis Date = 12/10/2002 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20023330096  Analysis Date = 12/04/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20023360020  Analysis Date = 12/11/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20023310020  Analysis Date = 11/05/2002 
 Lab Value = 0.008 
 RPT Level = 0.009 
 Lab Sample ID = 20023040033  Analysis Date = 11/07/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20022970050  Analysis Date = 11/07/2002 
 Lab Value = 0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20022970049  Analysis Date = 11/07/2002 
 Lab Value = 0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20022970048  Analysis Date = 11/07/2002 
 Lab Value = 0.011 
 RPT Level = 0.009 
 Lab Sample ID = 20022960022  Analysis Date = 09/25/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20022470018  Analysis Date = 09/24/2002 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20022460135  Analysis Date = 09/04/2002 
 Lab Value = 0.005 
 RPT Level = 0.009 
 Lab Sample ID = 20022340186  Analysis Date = 08/27/2002 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20022280008  Analysis Date = 08/21/2002 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20022210007  Analysis Date = 08/19/2002 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20022170107  Analysis Date = 08/07/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20022060077  Analysis Date = 07/29/2002 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20021970116  Analysis Date = 07/29/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20021960234  Analysis Date = 07/16/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20021830026  Analysis Date = 07/11/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20021790006  Analysis Date = 06/27/2002 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20021690011  Analysis Date = 06/24/2002 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20021650005  Analysis Date = 06/12/2002 
 Lab Value = 0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20021550019  Analysis Date = 06/12/2002 
 Lab Value = -0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20021510057  Analysis Date = 06/11/2002 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20021420157  Analysis Date = 05/28/2002 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20021330223  Analysis Date = 05/30/2002 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20021300001  Analysis Date = 05/02/2002 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20021210086  Analysis Date = 04/26/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20021140037  Analysis Date = 04/26/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20021140036  Analysis Date = 04/17/2002 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20021010016  Analysis Date = 04/11/2002 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20020930112  Analysis Date = 03/27/2002 
 Lab Value = -0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20020850091  Analysis Date = 04/01/2002 
 Lab Value = -0.008 
 RPT Level = 0.009 
 Lab Sample ID = 20020810192  Analysis Date = 03/21/2002 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20020730104  Analysis Date = 03/13/2002 
 Lab Value = -0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20020670021  Analysis Date = 03/07/2002 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20020600005  Analysis Date = 03/07/2002 
 Lab Value = 0 
 RPT Level = 0.009 
 Lab Sample ID = 20020570018  Analysis Date = 03/04/2002 
 Lab Value = -0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20020460048  Analysis Date = 02/06/2002 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20020360005  Analysis Date = 02/19/2002 
 Lab Value = -0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20020320102  Analysis Date = 01/30/2002 
 Lab Value = 0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20020220079  Analysis Date = 01/16/2002 
 Lab Value = -0.002 
 RPT Level = 0.009 
 Lab Sample ID = 20020110003  Analysis Date = 01/08/2002 
 Lab Value = -0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20020020005  Analysis Date = 01/03/2002 
 Lab Value = 0.014 
 RPT Level = 0.009 
 Lab Sample ID = 20013600207  Analysis Date = 12/20/2001 
 Lab Value = -0.003 
 RPT Level = 0.009 
 Lab Sample ID = 20013520042  Analysis Date = 12/17/2001 
 Lab Value = 0.001 
 RPT Level = 0.009 
 Lab Sample ID = 20013480008  Analysis Date = 12/13/2001 
 Lab Value = -0.006 
 RPT Level = 0.009 
 Lab Sample ID = 20013390010  Analysis Date = 11/13/2001 
 Lab Value = -0.004 
 RPT Level = 0.009 
 Lab Sample ID = 20013110130  Analysis Date = 06/05/2006 
 RPT Level = 0.009  Analysis Date = 05/22/2006 
 RPT Level = 0.009  Analysis Date = 05/22/2006 
 RPT Level = 0.009  Analysis Date = 05/11/2006 
 RPT Level = 0.009  Analysis Date = 05/11/2006 
 RPT Level = 0.009  Analysis Date = 09/27/2005 
 RPT Level = 0.009  Analysis Date = 09/27/2005 
 RPT Level = 0.009  Analysis Date = 09/20/2005 
 RPT Level = 0.009  Analysis Date = 09/20/2005 
 RPT Level = 0.009  Analysis Date = 09/12/2005 
 RPT Level = 0.009  Analysis Date = 09/12/2005 
 RPT Level = 0.009  Analysis Date = 09/07/2005 
 RPT Level = 0.009  Analysis Date = 09/07/2005 
 RPT Level = 0.009  Analysis Date = 08/31/2005 
 RPT Level = 0.009  Analysis Date = 08/31/2005 
 RPT Level = 0.009  Analysis Date = 08/16/2005 
 RPT Level = 0.009  Analysis Date = 08/16/2005 
 RPT Level = 0.009  Analysis Date = 08/10/2005 
 RPT Level = 0.009  Analysis Date = 08/10/2005 
 RPT Level = 0.009  Analysis Date = 08/10/2005 
 RPT Level = 0.009  Analysis Date = 08/10/2005 
 RPT Level = 0.009  Analysis Date = 07/26/2005 
 RPT Level = 0.009  Analysis Date = 07/26/2005 
 RPT Level = 0.009  Analysis Date = 07/15/2005 
 RPT Level = 0.009  Analysis Date = 07/15/2005 
 RPT Level = 0.009  Analysis Date = 07/12/2005 
 RPT Level = 0.009  Analysis Date = 07/12/2005 
 RPT Level = 0.009  Analysis Date = 07/01/2005 
 RPT Level = 0.009  Analysis Date = 07/01/2005 
 RPT Level = 0.009  Analysis Date = 06/27/2005 
 RPT Level = 0.009  Analysis Date = 06/27/2005 
 RPT Level = 0.009  Analysis Date = 06/20/2005 
 RPT Level = 0.009  Analysis Date = 06/20/2005 
 RPT Level = 0.009  Analysis Date = 06/14/2005 
 RPT Level = 0.009  Analysis Date = 06/14/2005 
 RPT Level = 0.009  Analysis Date = 06/06/2005 
 RPT Level = 0.009  Analysis Date = 06/06/2005 
 RPT Level = 0.009  Analysis Date = 05/26/2005 
 RPT Level = 0.009  Analysis Date = 05/26/2005 
 RPT Level = 0.009  Analysis Date = 05/24/2005 
 RPT Level = 0.009  Analysis Date = 05/24/2005 
 RPT Level = 0.009  Analysis Date = 05/16/2005 
 RPT Level = 0.009  Analysis Date = 05/16/2005 
 RPT Level = 0.009  Analysis Date = 05/10/2005 
 RPT Level = 0.009  Analysis Date = 05/10/2005 
 RPT Level = 0.009  Analysis Date = 04/28/2005 
 RPT Level = 0.009  Analysis Date = 04/28/2005 
 RPT Level = 0.009  Analysis Date = 04/26/2005 
 RPT Level = 0.009  Analysis Date = 04/26/2005 
 RPT Level = 0.009  Analysis Date = 04/14/2005 
 RPT Level = 0.009  Analysis Date = 04/14/2005 
 RPT Level = 0.009  Analysis Date = 04/07/2005 
 RPT Level = 0.009  Analysis Date = 04/07/2005 
 RPT Level = 0.009  Analysis Date = 03/31/2005 
 RPT Level = 0.009  Analysis Date = 03/31/2005 
 RPT Level = 0.009  Analysis Date = 03/30/2005 
 RPT Level = 0.009  Analysis Date = 03/30/2005 
 RPT Level = 0.009  Analysis Date = 03/21/2005 
 RPT Level = 0.009  Analysis Date = 03/21/2005 
 RPT Level = 0.009  Analysis Date = 03/15/2005 
 RPT Level = 0.009  Analysis Date = 03/15/2005 
 RPT Level = 0.009  Analysis Date = 03/15/2005 
 RPT Level = 0.009  Analysis Date = 03/15/2005 
 RPT Level = 0.009  Analysis Date = 03/09/2005 
 RPT Level = 0.009  Analysis Date = 03/09/2005 
 RPT Level = 0.009  Analysis Date = 03/01/2005 
 RPT Level = 0.009  Analysis Date = 03/01/2005 
 RPT Level = 0.009  Analysis Date = 02/24/2005 
 RPT Level = 0.009  Analysis Date = 02/24/2005 
 RPT Level = 0.009  Analysis Date = 02/15/2005 
 RPT Level = 0.009  Analysis Date = 02/15/2005 
 RPT Level = 0.009  Analysis Date = 02/09/2005 
 RPT Level = 0.009  Analysis Date = 02/09/2005 
 RPT Level = 0.009  Analysis Date = 01/31/2005 
 RPT Level = 0.009  Analysis Date = 01/31/2005 
 RPT Level = 0.009  Analysis Date = 01/26/2005 
 RPT Level = 0.009  Analysis Date = 01/26/2005 
 RPT Level = 0.009  Analysis Date = 01/25/2005 
 RPT Level = 0.009  Analysis Date = 01/25/2005 
 RPT Level = 0.009  Analysis Date = 01/18/2005 
 RPT Level = 0.009  Analysis Date = 01/18/2005 
 RPT Level = 0.009  Analysis Date = 01/18/2005 
 RPT Level = 0.009  Analysis Date = 01/18/2005 
 RPT Level = 0.009  Analysis Date = 12/27/2004 
 RPT Level = 0.009  Analysis Date = 12/27/2004 
 RPT Level = 0.009  Analysis Date = 12/27/2004 
 RPT Level = 0.009  Analysis Date = 12/27/2004 
 RPT Level = 0.009  Analysis Date = 12/21/2004 
 RPT Level = 0.009  Analysis Date = 12/21/2004 
 RPT Level = 0.009  Analysis Date = 12/21/2004 
 RPT Level = 0.009  Analysis Date = 12/21/2004 
 RPT Level = 0.009  Analysis Date = 12/23/2004 
 RPT Level = 0.009  Analysis Date = 12/23/2004 
 RPT Level = 0.009  Analysis Date = 12/23/2004 
 RPT Level = 0.009  Analysis Date = 12/23/2004 
 RPT Level = 0.009  Analysis Date = 12/15/2004 
 RPT Level = 0.009  Analysis Date = 12/15/2004 
 RPT Level = 0.009  Analysis Date = 12/15/2004 
 RPT Level = 0.009  Analysis Date = 12/15/2004 
 RPT Level = 0.009  Analysis Date = 12/14/2004 
 RPT Level = 0.009  Analysis Date = 12/14/2004 
 RPT Level = 0.009  Analysis Date = 12/13/2004 
 RPT Level = 0.009  Analysis Date = 12/13/2004 
 RPT Level = 0.009  Analysis Date = 12/08/2004 
 RPT Level = 0.009  Analysis Date = 12/08/2004 
 RPT Level = 0.009  Analysis Date = 09/15/2004 
 RPT Level = 0.009  Analysis Date = 09/15/2004 
 RPT Level = 0.009  Analysis Date = 09/09/2004 
 RPT Level = 0.009  Analysis Date = 09/09/2004 
 RPT Level = 0.009  Analysis Date = 09/08/2004 
 RPT Level = 0.009  Analysis Date = 09/08/2004 
 RPT Level = 0.009  Analysis Date = 09/02/2004 
 RPT Level = 0.009  Analysis Date = 09/02/2004 
 RPT Level = 0.009  Analysis Date = 09/01/2004 
 RPT Level = 0.009  Analysis Date = 09/01/2004 
 RPT Level = 0.009  Analysis Date = 09/01/2004 
 RPT Level = 0.009  Analysis Date = 09/01/2004 
 RPT Level = 0.009  Analysis Date = 08/19/2004 
 RPT Level = 0.009  Analysis Date = 08/19/2004 
 RPT Level = 0.009  Analysis Date = 08/11/2004 
 RPT Level = 0.009  Analysis Date = 08/11/2004 
 RPT Level = 0.009  Analysis Date = 08/05/2004 
 RPT Level = 0.009  Analysis Date = 08/05/2004 
 RPT Level = 0.009  Analysis Date = 07/27/2004 
 RPT Level = 0.009  Analysis Date = 07/27/2004 
 RPT Level = 0.009  Analysis Date = 07/19/2004 
 RPT Level = 0.009  Analysis Date = 07/19/2004 
 RPT Level = 0.009  Analysis Date = 07/14/2004 
 RPT Level = 0.009  Analysis Date = 07/14/2004 
 RPT Level = 0.009  Analysis Date = 07/13/2004 
 RPT Level = 0.009  Analysis Date = 07/13/2004 
 RPT Level = 0.009  Analysis Date = 07/08/2004 
 RPT Level = 0.009  Analysis Date = 07/08/2004 
 RPT Level = 0.009  Analysis Date = 07/06/2004 
 RPT Level = 0.009  Analysis Date = 07/06/2004 
 RPT Level = 0.009  Analysis Date = 06/24/2004 
 RPT Level = 0.009  Analysis Date = 06/24/2004 
 RPT Level = 0.009  Analysis Date = 06/23/2004 
 RPT Level = 0.009  Analysis Date = 06/23/2004 
 RPT Level = 0.009  Analysis Date = 06/16/2004 
 RPT Level = 0.009  Analysis Date = 06/16/2004 
 RPT Level = 0.009  Analysis Date = 06/08/2004 
 RPT Level = 0.009  Analysis Date = 06/08/2004 
 RPT Level = 0.009  Analysis Date = 05/17/2004 
 RPT Level = 0.009  Analysis Date = 05/17/2004 
 RPT Level = 0.009  Analysis Date = 05/11/2004 
 RPT Level = 0.009  Analysis Date = 05/11/2004 
 RPT Level = 0.009  Analysis Date = 05/06/2004 
 RPT Level = 0.009  Analysis Date = 05/06/2004 
 RPT Level = 0.009  Analysis Date = 04/22/2004 
 RPT Level = 0.009  Analysis Date = 04/22/2004 
 RPT Level = 0.009  Analysis Date = 04/13/2004 
 RPT Level = 0.009  Analysis Date = 04/13/2004 
 RPT Level = 0.009  Analysis Date = 04/15/2004 
 RPT Level = 0.009  Analysis Date = 04/15/2004 
 RPT Level = 0.009  Analysis Date = 04/14/2004 
 RPT Level = 0.009  Analysis Date = 04/14/2004 
 RPT Level = 0.009  Analysis Date = 04/07/2004 
 RPT Level = 0.009  Analysis Date = 04/07/2004 
 RPT Level = 0.009  Analysis Date = 04/07/2004 
 RPT Level = 0.009  Analysis Date = 04/07/2004 
 RPT Level = 0.009  Analysis Date = 04/07/2004 
 RPT Level = 0.009  Analysis Date = 04/07/2004 
 RPT Level = 0.009  Analysis Date = 04/02/2004 
 RPT Level = 0.009  Analysis Date = 04/02/2004 
 RPT Level = 0.009  Analysis Date = 03/30/2004 
 RPT Level = 0.009  Analysis Date = 03/30/2004 
 RPT Level = 0.009  Analysis Date = 03/23/2004 
 RPT Level = 0.009  Analysis Date = 03/23/2004 
 RPT Level = 0.009  Analysis Date = 03/23/2004 
 RPT Level = 0.009  Analysis Date = 03/23/2004 
 RPT Level = 0.009  Analysis Date = 03/23/2004 
 RPT Level = 0.009  Analysis Date = 03/23/2004 
 RPT Level = 0.009  Analysis Date = 03/16/2004 
 RPT Level = 0.009  Analysis Date = 03/16/2004 
 RPT Level = 0.009  Analysis Date = 03/16/2004 
 RPT Level = 0.009  Analysis Date = 03/16/2004 
 RPT Level = 0.009  Analysis Date = 03/15/2004 
 RPT Level = 0.009  Analysis Date = 03/15/2004 
 RPT Level = 0.009  Analysis Date = 03/15/2004 
 RPT Level = 0.009  Analysis Date = 03/15/2004 
 RPT Level = 0.009  Analysis Date = 03/09/2004 
 RPT Level = 0.009  Analysis Date = 03/09/2004 
 RPT Level = 0.009  Analysis Date = 03/04/2004 
 RPT Level = 0.009  Analysis Date = 03/04/2004 
 RPT Level = 0.009  Analysis Date = 02/17/2004 
 RPT Level = 0.009  Analysis Date = 02/17/2004 
 RPT Level = 0.009  Analysis Date = 02/10/2004 
 RPT Level = 0.009  Analysis Date = 02/10/2004 
 RPT Level = 0.009  Analysis Date = 02/10/2004 
 RPT Level = 0.009  Analysis Date = 02/10/2004 
 RPT Level = 0.009  Analysis Date = 02/03/2004 
 RPT Level = 0.009  Analysis Date = 02/03/2004 
 RPT Level = 0.009  Analysis Date = 02/02/2004 
 RPT Level = 0.009  Analysis Date = 02/02/2004 
 RPT Level = 0.009  Analysis Date = 01/29/2004 
 RPT Level = 0.009  Analysis Date = 01/29/2004 
 RPT Level = 0.009  Analysis Date = 01/29/2004 
 RPT Level = 0.009  Analysis Date = 01/29/2004 
 RPT Level = 0.009  Analysis Date = 01/28/2004 
 RPT Level = 0.009  Analysis Date = 01/28/2004 
 RPT Level = 0.009  Analysis Date = 01/27/2004 
 RPT Level = 0.009  Analysis Date = 01/27/2004 
 RPT Level = 0.009  Analysis Date = 01/20/2004 
 RPT Level = 0.009  Analysis Date = 01/20/2004 
 RPT Level = 0.009  Analysis Date = 01/20/2004 
 RPT Level = 0.009  Analysis Date = 01/20/2004 
 RPT Level = 0.009  Analysis Date = 10/03/2003 
 RPT Level = 0.009  Analysis Date = 10/03/2003 
 RPT Level = 0.009  Analysis Date = 10/16/2003 
 RPT Level = 0.009  Analysis Date = 10/16/2003 
 RPT Level = 0.009  Analysis Date = 09/30/2003 
 RPT Level = 0.009  Analysis Date = 09/30/2003 
 RPT Level = 0.009  Analysis Date = 09/22/2003 
 RPT Level = 0.009  Analysis Date = 09/22/2003 
 RPT Level = 0.009  Analysis Date = 09/16/2003 
 RPT Level = 0.009  Analysis Date = 09/16/2003 
 RPT Level = 0.009  Analysis Date = 09/11/2003 
 RPT Level = 0.009  Analysis Date = 09/11/2003 
 RPT Level = 0.009  Analysis Date = 09/10/2003 
 RPT Level = 0.009  Analysis Date = 09/10/2003 
 RPT Level = 0.009  Analysis Date = 08/26/2003 
 RPT Level = 0.009  Analysis Date = 08/26/2003 
 RPT Level = 0.009  Analysis Date = 08/22/2003 
 RPT Level = 0.009  Analysis Date = 08/22/2003 
 RPT Level = 0.009  Analysis Date = 08/13/2003 
 RPT Level = 0.009  Analysis Date = 08/13/2003 
 RPT Level = 0.009  Analysis Date = 08/08/2003 
 RPT Level = 0.009  Analysis Date = 08/08/2003 
 RPT Level = 0.009  Analysis Date = 08/04/2003 
 RPT Level = 0.009  Analysis Date = 08/04/2003 
 RPT Level = 0.009  Analysis Date = 07/25/2003 
 RPT Level = 0.009  Analysis Date = 07/25/2003 
 RPT Level = 0.009  Analysis Date = 07/22/2003 
 RPT Level = 0.009  Analysis Date = 07/22/2003 
 RPT Level = 0.009  Analysis Date = 07/15/2003 
 RPT Level = 0.009  Analysis Date = 07/15/2003 
 RPT Level = 0.009  Analysis Date = 07/09/2003 
 RPT Level = 0.009  Analysis Date = 07/09/2003 
 RPT Level = 0.009  Analysis Date = 06/24/2003 
 RPT Level = 0.009  Analysis Date = 06/24/2003 
 RPT Level = 0.009  Analysis Date = 06/16/2003 
 RPT Level = 0.009  Analysis Date = 06/16/2003 
 RPT Level = 0.009  Analysis Date = 06/17/2003 
 RPT Level = 0.009  Analysis Date = 06/17/2003 
 RPT Level = 0.009  Analysis Date = 06/12/2003 
 RPT Level = 0.009  Analysis Date = 06/12/2003 
 RPT Level = 0.009  Analysis Date = 05/21/2003 
 RPT Level = 0.009  Analysis Date = 05/21/2003 
 RPT Level = 0.009  Analysis Date = 05/13/2003 
 RPT Level = 0.009  Analysis Date = 05/13/2003 
 RPT Level = 0.009  Analysis Date = 05/12/2003 
 RPT Level = 0.009  Analysis Date = 05/12/2003 
 RPT Level = 0.009  Analysis Date = 04/24/2003 
 RPT Level = 0.009  Analysis Date = 04/24/2003 
 RPT Level = 0.009  Analysis Date = 04/16/2003 
 RPT Level = 0.009  Analysis Date = 04/16/2003 
 RPT Level = 0.009  Analysis Date = 04/03/2003 
 RPT Level = 0.009  Analysis Date = 04/03/2003 
 RPT Level = 0.009  Analysis Date = 04/01/2003 
 RPT Level = 0.009  Analysis Date = 04/01/2003 
 RPT Level = 0.009  Analysis Date = 03/31/2003 
 RPT Level = 0.009  Analysis Date = 03/31/2003 
 RPT Level = 0.009  Analysis Date = 03/27/2003 
 RPT Level = 0.009  Analysis Date = 03/27/2003 
 RPT Level = 0.009  Analysis Date = 03/27/2003 
 RPT Level = 0.009  Analysis Date = 03/27/2003 
 RPT Level = 0.009  Analysis Date = 03/06/2003 
 RPT Level = 0.009  Analysis Date = 03/06/2003 
 RPT Level = 0.009  Analysis Date = 03/06/2003 
 RPT Level = 0.009  Analysis Date = 03/06/2003 
 RPT Level = 0.009  Analysis Date = 02/12/2003 
 RPT Level = 0.009  Analysis Date = 02/12/2003 
 RPT Level = 0.009  Analysis Date = 02/11/2003 
 RPT Level = 0.009  Analysis Date = 02/11/2003 
 RPT Level = 0.009  Analysis Date = 02/06/2003 
 RPT Level = 0.009  Analysis Date = 02/06/2003 
 RPT Level = 0.009  Analysis Date = 02/06/2003 
 RPT Level = 0.009  Analysis Date = 02/06/2003 
 RPT Level = 0.009  Analysis Date = 01/16/2003 
 RPT Level = 0.009  Analysis Date = 01/16/2003 
 RPT Level = 0.009  Analysis Date = 01/16/2003 
 RPT Level = 0.009  Analysis Date = 01/16/2003 
 RPT Level = 0.009  Analysis Date = 01/09/2003 
 RPT Level = 0.009  Analysis Date = 01/09/2003 
 RPT Level = 0.009  Analysis Date = 01/09/2003 
 RPT Level = 0.009  Analysis Date = 01/09/2003 
 RPT Level = 0.009  Analysis Date = 12/24/2002 
 RPT Level = 0.009  Analysis Date = 12/24/2002 
 RPT Level = 0.009  Analysis Date = 12/24/2002 
 RPT Level = 0.009  Analysis Date = 12/24/2002 
 RPT Level = 0.009  Analysis Date = 12/04/2002 
 RPT Level = 0.009  Analysis Date = 12/04/2002 
 RPT Level = 0.009  Analysis Date = 12/04/2002 
 RPT Level = 0.009  Analysis Date = 12/04/2002 
 RPT Level = 0.009  Analysis Date = 12/10/2002 
 RPT Level = 0.009  Analysis Date = 12/10/2002 
 RPT Level = 0.009  Analysis Date = 12/04/2002 
 RPT Level = 0.009  Analysis Date = 12/04/2002 
 RPT Level = 0.009  Analysis Date = 12/11/2002 
 RPT Level = 0.009  Analysis Date = 12/11/2002 
 RPT Level = 0.009  Analysis Date = 11/05/2002 
 RPT Level = 0.009  Analysis Date = 11/05/2002 
 RPT Level = 0.009  Analysis Date = 11/07/2002 
 RPT Level = 0.009  Analysis Date = 11/07/2002 
 RPT Level = 0.009  Analysis Date = 11/07/2002 
 RPT Level = 0.009  Analysis Date = 11/07/2002 
 RPT Level = 0.009  Analysis Date = 11/07/2002 
 RPT Level = 0.009  Analysis Date = 11/07/2002 
 RPT Level = 0.009  Analysis Date = 11/07/2002 
 RPT Level = 0.009  Analysis Date = 11/07/2002 
 RPT Level = 0.009  Analysis Date = 09/25/2002 
 RPT Level = 0.009  Analysis Date = 09/25/2002 
 RPT Level = 0.009  Analysis Date = 09/24/2002 
 RPT Level = 0.009  Analysis Date = 09/24/2002 
 RPT Level = 0.009  Analysis Date = 09/04/2002 
 RPT Level = 0.009  Analysis Date = 09/04/2002 
 RPT Level = 0.009  Analysis Date = 08/27/2002 
 RPT Level = 0.009  Analysis Date = 08/27/2002 
 RPT Level = 0.009  Analysis Date = 08/21/2002 
 RPT Level = 0.009  Analysis Date = 08/21/2002 
 RPT Level = 0.009  Analysis Date = 08/19/2002 
 RPT Level = 0.009  Analysis Date = 08/19/2002 
 RPT Level = 0.009  Analysis Date = 08/07/2002 
 RPT Level = 0.009  Analysis Date = 08/07/2002 
 RPT Level = 0.009  Analysis Date = 07/29/2002 
 RPT Level = 0.009  Analysis Date = 07/29/2002 
 RPT Level = 0.009  Analysis Date = 07/29/2002 
 RPT Level = 0.009  Analysis Date = 07/29/2002 
 RPT Level = 0.009  Analysis Date = 07/16/2002 
 RPT Level = 0.009  Analysis Date = 07/16/2002 
 RPT Level = 0.009  Analysis Date = 07/11/2002 
 RPT Level = 0.009  Analysis Date = 07/11/2002 
 RPT Level = 0.009  Analysis Date = 06/27/2002 
 RPT Level = 0.009  Analysis Date = 06/27/2002 
 RPT Level = 0.009  Analysis Date = 06/24/2002 
 RPT Level = 0.009  Analysis Date = 06/24/2002 
 RPT Level = 0.009  Analysis Date = 06/12/2002 
 RPT Level = 0.009  Analysis Date = 06/12/2002 
 RPT Level = 0.009  Analysis Date = 06/12/2002 
 RPT Level = 0.009  Analysis Date = 06/12/2002 
 RPT Level = 0.009  Analysis Date = 06/11/2002 
 RPT Level = 0.009  Analysis Date = 06/11/2002 
 RPT Level = 0.009  Analysis Date = 05/28/2002 
 RPT Level = 0.009  Analysis Date = 05/28/2002 
 RPT Level = 0.009  Analysis Date = 05/30/2002 
 RPT Level = 0.009  Analysis Date = 05/30/2002 
 RPT Level = 0.009  Analysis Date = 05/02/2002 
 RPT Level = 0.009  Analysis Date = 05/02/2002 
 RPT Level = 0.009  Analysis Date = 04/26/2002 
 RPT Level = 0.009  Analysis Date = 04/26/2002 
 RPT Level = 0.009  Analysis Date = 04/26/2002 
 RPT Level = 0.009  Analysis Date = 04/26/2002 
 RPT Level = 0.009  Analysis Date = 04/17/2002 
 RPT Level = 0.009  Analysis Date = 04/17/2002 
 RPT Level = 0.009  Analysis Date = 04/11/2002 
 RPT Level = 0.009  Analysis Date = 04/11/2002 
 RPT Level = 0.009  Analysis Date = 03/27/2002 
 RPT Level = 0.009  Analysis Date = 03/27/2002 
 RPT Level = 0.009  Analysis Date = 04/01/2002 
 RPT Level = 0.009  Analysis Date = 04/01/2002 
 RPT Level = 0.009  Analysis Date = 03/21/2002 
 RPT Level = 0.009  Analysis Date = 03/21/2002 
 RPT Level = 0.009  Analysis Date = 03/13/2002 
 RPT Level = 0.009  Analysis Date = 03/13/2002 
 RPT Level = 0.009  Analysis Date = 03/07/2002 
 RPT Level = 0.009  Analysis Date = 03/07/2002 
 RPT Level = 0.009  Analysis Date = 03/07/2002 
 RPT Level = 0.009  Analysis Date = 03/07/2002 
 RPT Level = 0.009  Analysis Date = 03/04/2002 
 RPT Level = 0.009  Analysis Date = 03/04/2002 
 RPT Level = 0.009  Analysis Date = 02/06/2002 
 RPT Level = 0.009  Analysis Date = 02/06/2002 
 RPT Level = 0.009  Analysis Date = 02/19/2002 
 RPT Level = 0.009  Analysis Date = 02/19/2002 
 RPT Level = 0.009  Analysis Date = 01/30/2002 
 RPT Level = 0.009  Analysis Date = 01/30/2002 
 RPT Level = 0.009  Analysis Date = 01/16/2002 
 RPT Level = 0.009  Analysis Date = 01/16/2002 
 RPT Level = 0.009  Analysis Date = 01/08/2002 
 RPT Level = 0.009  Analysis Date = 01/08/2002 
 RPT Level = 0.009  Analysis Date = 01/03/2002 
 RPT Level = 0.009  Analysis Date = 01/03/2002 
 RPT Level = 0.009  Analysis Date = 12/20/2001 
 RPT Level = 0.009  Analysis Date = 12/20/2001 
 RPT Level = 0.009  Analysis Date = 12/17/2001 
 RPT Level = 0.009  Analysis Date = 12/17/2001 
 RPT Level = 0.009  Analysis Date = 12/13/2001 
 RPT Level = 0.009  Analysis Date = 12/13/2001 
 RPT Level = 0.009  Analysis Date = 11/13/2001 
 RPT Level = 0.009  Y = 0
The SGPlot Procedure

False Positive Rate for Orthophosphate (PO4 as P), FIL, COL

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Orthophosphate (PO4 as P), FIL, COL 00671CL053 2002 40 1 3%
    2003 52 7 13%
    2004 51 1 2%
    2005 50 0 0%
    2006 3 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Orthophosphate (PO4 as P), FIL, COL, LL -
Blind Blank Results
Lab: NWQL, PCode: 00671, MCode: CL057
Analysis dates: 11/15/01 through 05/19/06
Open Data Set

 Analysis Date = 05/19/2006 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20061370016  Analysis Date = 05/10/2006 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20061280111  Analysis Date = 05/04/2006 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20061220099  Analysis Date = 09/19/2005 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20052590035  Analysis Date = 09/12/2005 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20052520006  Analysis Date = 09/01/2005 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20052430006  Analysis Date = 08/29/2005 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20052370002  Analysis Date = 08/23/2005 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20052300009  Analysis Date = 08/15/2005 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20052210012  Analysis Date = 08/11/2005 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20052160007  Analysis Date = 08/11/2005 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20052160005  Analysis Date = 07/21/2005 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20052010007  Analysis Date = 07/14/2005 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20051940015  Analysis Date = 07/08/2005 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20051880018  Analysis Date = 06/30/2005 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20051800189  Analysis Date = 06/24/2005 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20051740019  Analysis Date = 06/16/2005 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20051660174  Analysis Date = 06/09/2005 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20051590025  Analysis Date = 06/03/2005 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20051530021  Analysis Date = 05/25/2005 
 Lab Value = -0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20051440043  Analysis Date = 05/19/2005 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20051380014  Analysis Date = 05/13/2005 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20051320029  Analysis Date = 05/06/2005 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20051250003  Analysis Date = 04/28/2005 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20051170012  Analysis Date = 04/22/2005 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20051110007  Analysis Date = 04/13/2005 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20051020018  Analysis Date = 04/06/2005 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20050950044  Analysis Date = 03/30/2005 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20050880116  Analysis Date = 03/28/2005 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20050840096  Analysis Date = 03/17/2005 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20050750004  Analysis Date = 03/14/2005 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20050700007  Analysis Date = 03/14/2005 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20050700004  Analysis Date = 03/09/2005 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20050670011  Analysis Date = 02/28/2005 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20050550024  Analysis Date = 02/22/2005 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20050480005  Analysis Date = 02/14/2005 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20050410004  Analysis Date = 02/04/2005 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20050340020  Analysis Date = 01/28/2005 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20050260024  Analysis Date = 01/21/2005 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20050200048  Analysis Date = 01/14/2005 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20050130091  Analysis Date = 01/10/2005 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20050070016  Analysis Date = 01/03/2005 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20043650002  Analysis Date = 01/03/2005 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20043580037  Analysis Date = 01/03/2005 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20043580035  Analysis Date = 12/20/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20043520023  Analysis Date = 12/20/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20043510018  Analysis Date = 12/13/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20043450069  Analysis Date = 12/13/2004 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20043440147  Analysis Date = 12/06/2004 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20043380005  Analysis Date = 12/06/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20043380002  Analysis Date = 12/01/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20043310059  Analysis Date = 12/02/2004 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20043280048  Analysis Date = 11/22/2004 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20043240012  Analysis Date = 09/02/2004 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20042450138  Analysis Date = 08/30/2004 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20042400089  Analysis Date = 08/25/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20042370105  Analysis Date = 08/23/2004 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20042330206  Analysis Date = 08/20/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20042320136  Analysis Date = 08/20/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20042320138  Analysis Date = 08/12/2004 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20042240114  Analysis Date = 08/05/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20042170123  Analysis Date = 07/30/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20042110015  Analysis Date = 07/23/2004 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20042040039  Analysis Date = 07/15/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20041960050  Analysis Date = 07/09/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20041900062  Analysis Date = 07/01/2004 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20041820035  Analysis Date = 06/24/2004 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20041750057  Analysis Date = 06/21/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20041700080  Analysis Date = 06/10/2004 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20041610055  Analysis Date = 06/08/2004 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20041550019  Analysis Date = 06/02/2004 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20041470132  Analysis Date = 05/25/2004 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20041400016  Analysis Date = 05/12/2004 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20041260099  Analysis Date = 05/07/2004 
 Lab Value = 0.003 
 RPT Level = 0.003 
 Lab Sample ID = 20041200046  Analysis Date = 05/04/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20041130016  Analysis Date = 04/23/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20041050022  Analysis Date = 04/20/2004 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20040980007  Analysis Date = 04/15/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20040930009  Analysis Date = 04/12/2004 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20040910012  Analysis Date = 04/09/2004 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20040850021  Analysis Date = 04/08/2004 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20040830056  Analysis Date = 04/06/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20040790023  Analysis Date = 03/31/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20040760010  Analysis Date = 03/23/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20040720029  Analysis Date = 03/16/2004 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20040710005  Analysis Date = 03/12/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20040680093  Analysis Date = 03/11/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20040650001  Analysis Date = 03/03/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20040580032  Analysis Date = 03/01/2004 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20040550018  Analysis Date = 02/27/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20040510134  Analysis Date = 02/25/2004 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20040490025  Analysis Date = 02/19/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20040440035  Analysis Date = 02/13/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20040420001  Analysis Date = 02/12/2004 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20040370017  Analysis Date = 02/11/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20040340024  Analysis Date = 02/06/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20040300012  Analysis Date = 02/04/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20040270036  Analysis Date = 01/30/2004 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20040230030  Analysis Date = 01/28/2004 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20040210154  Analysis Date = 01/27/2004 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20040200023  Analysis Date = 01/21/2004 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20040150075  Analysis Date = 01/14/2004 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20040090020  Analysis Date = 01/08/2004 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20040070032  Analysis Date = 01/08/2004 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20040050016  Analysis Date = 10/10/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20032660009  Analysis Date = 10/08/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20032600107  Analysis Date = 09/26/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20032520179  Analysis Date = 09/24/2003 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20032450195  Analysis Date = 09/17/2003 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20032380029  Analysis Date = 09/10/2003 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20032310028  Analysis Date = 08/29/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20032250256  Analysis Date = 08/19/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20032180019  Analysis Date = 08/06/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20032100004  Analysis Date = 08/01/2003 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20032040043  Analysis Date = 07/23/2003 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20031960025  Analysis Date = 07/21/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20031900098  Analysis Date = 07/17/2003 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20031820037  Analysis Date = 07/15/2003 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20031770041  Analysis Date = 07/07/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20031700013  Analysis Date = 07/02/2003 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20031630053  Analysis Date = 07/01/2003 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20031600109  Analysis Date = 06/04/2003 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20031480059  Analysis Date = 06/03/2003 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20031430019  Analysis Date = 05/30/2003 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20031400115  Analysis Date = 05/16/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20031290084  Analysis Date = 05/13/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20031220070  Analysis Date = 05/12/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20031200043  Analysis Date = 04/29/2003 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20031080208  Analysis Date = 04/16/2003 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20030970018  Analysis Date = 04/10/2003 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20030920027  Analysis Date = 04/10/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20030900015  Analysis Date = 04/08/2003 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20030860023  Analysis Date = 03/21/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20030710021  Analysis Date = 03/21/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20030660148  Analysis Date = 03/12/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20030590040  Analysis Date = 03/07/2003 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20030570061  Analysis Date = 02/26/2003 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20030410034  Analysis Date = 02/05/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20030350008  Analysis Date = 02/05/2003 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20030310028  Analysis Date = 02/05/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20030300004  Analysis Date = 01/17/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20030150009  Analysis Date = 01/17/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20030140019  Analysis Date = 01/07/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20030020002  Analysis Date = 01/07/2003 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20023650009  Analysis Date = 12/23/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20023500166  Analysis Date = 12/18/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20023500092  Analysis Date = 12/10/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20023370026  Analysis Date = 12/10/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20023370025  Analysis Date = 12/06/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20023330096  Analysis Date = 12/06/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20023360020  Analysis Date = 12/06/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20023310020  Analysis Date = 11/14/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20023040033  Analysis Date = 10/30/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20022970050  Analysis Date = 10/30/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20022970049  Analysis Date = 10/30/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20022970048  Analysis Date = 10/30/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20022960022  Analysis Date = 09/10/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20022470018  Analysis Date = 09/10/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20022460135  Analysis Date = 08/29/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20022340186  Analysis Date = 08/27/2002 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20022280008  Analysis Date = 08/20/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20022210007  Analysis Date = 08/16/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20022170107  Analysis Date = 08/01/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20022060077  Analysis Date = 07/17/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021970116  Analysis Date = 07/16/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021960234  Analysis Date = 07/09/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021830026  Analysis Date = 07/02/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021790006  Analysis Date = 06/21/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20021690011  Analysis Date = 06/20/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021650005  Analysis Date = 06/11/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021550019  Analysis Date = 06/10/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021510057  Analysis Date = 05/30/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20021420157  Analysis Date = 05/22/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021330224  Analysis Date = 05/17/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20021300018  Analysis Date = 05/13/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20021210087  Analysis Date = 04/26/2002 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20021140035  Analysis Date = 04/26/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20021140034  Analysis Date = 04/17/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20021010014  Analysis Date = 04/05/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20020930111  Analysis Date = 04/03/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20020850093  Analysis Date = 04/03/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20020810193  Analysis Date = 04/01/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20020730106  Analysis Date = 03/29/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20020670024  Analysis Date = 03/22/2002 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20020600007  Analysis Date = 03/04/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20020570017  Analysis Date = 02/20/2002 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20020460046  Analysis Date = 02/08/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20020360013  Analysis Date = 02/08/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20020320103  Analysis Date = 01/23/2002 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20020220080  Analysis Date = 01/17/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20020110004  Analysis Date = 01/09/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20020020006  Analysis Date = 01/03/2002 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20013600208  Analysis Date = 12/20/2001 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20013520043  Analysis Date = 12/14/2001 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20013480009  Analysis Date = 12/07/2001 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20013390004  Analysis Date = 11/15/2001 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20013110128  Analysis Date = 05/19/2006 
 RPT Level = 0.003  Analysis Date = 05/10/2006 
 RPT Level = 0.003  Analysis Date = 05/10/2006 
 RPT Level = 0.003  Analysis Date = 05/04/2006 
 RPT Level = 0.003  Analysis Date = 05/04/2006 
 RPT Level = 0.003  Analysis Date = 09/19/2005 
 RPT Level = 0.003  Analysis Date = 09/19/2005 
 RPT Level = 0.003  Analysis Date = 09/12/2005 
 RPT Level = 0.003  Analysis Date = 09/12/2005 
 RPT Level = 0.003  Analysis Date = 09/01/2005 
 RPT Level = 0.003  Analysis Date = 09/01/2005 
 RPT Level = 0.003  Analysis Date = 08/29/2005 
 RPT Level = 0.003  Analysis Date = 08/29/2005 
 RPT Level = 0.003  Analysis Date = 08/23/2005 
 RPT Level = 0.003  Analysis Date = 08/23/2005 
 RPT Level = 0.003  Analysis Date = 08/15/2005 
 RPT Level = 0.003  Analysis Date = 08/15/2005 
 RPT Level = 0.003  Analysis Date = 08/11/2005 
 RPT Level = 0.003  Analysis Date = 08/11/2005 
 RPT Level = 0.003  Analysis Date = 08/11/2005 
 RPT Level = 0.003  Analysis Date = 08/11/2005 
 RPT Level = 0.003  Analysis Date = 07/21/2005 
 RPT Level = 0.003  Analysis Date = 07/21/2005 
 RPT Level = 0.003  Analysis Date = 07/14/2005 
 RPT Level = 0.003  Analysis Date = 07/14/2005 
 RPT Level = 0.003  Analysis Date = 07/08/2005 
 RPT Level = 0.003  Analysis Date = 07/08/2005 
 RPT Level = 0.003  Analysis Date = 06/30/2005 
 RPT Level = 0.003  Analysis Date = 06/30/2005 
 RPT Level = 0.003  Analysis Date = 06/24/2005 
 RPT Level = 0.003  Analysis Date = 06/24/2005 
 RPT Level = 0.003  Analysis Date = 06/16/2005 
 RPT Level = 0.003  Analysis Date = 06/16/2005 
 RPT Level = 0.003  Analysis Date = 06/09/2005 
 RPT Level = 0.003  Analysis Date = 06/09/2005 
 RPT Level = 0.003  Analysis Date = 06/03/2005 
 RPT Level = 0.003  Analysis Date = 06/03/2005 
 RPT Level = 0.003  Analysis Date = 05/25/2005 
 RPT Level = 0.003  Analysis Date = 05/25/2005 
 RPT Level = 0.003  Analysis Date = 05/19/2005 
 RPT Level = 0.003  Analysis Date = 05/19/2005 
 RPT Level = 0.003  Analysis Date = 05/13/2005 
 RPT Level = 0.003  Analysis Date = 05/13/2005 
 RPT Level = 0.003  Analysis Date = 05/06/2005 
 RPT Level = 0.003  Analysis Date = 05/06/2005 
 RPT Level = 0.003  Analysis Date = 04/28/2005 
 RPT Level = 0.003  Analysis Date = 04/28/2005 
 RPT Level = 0.003  Analysis Date = 04/22/2005 
 RPT Level = 0.003  Analysis Date = 04/22/2005 
 RPT Level = 0.003  Analysis Date = 04/13/2005 
 RPT Level = 0.003  Analysis Date = 04/13/2005 
 RPT Level = 0.003  Analysis Date = 04/06/2005 
 RPT Level = 0.003  Analysis Date = 04/06/2005 
 RPT Level = 0.003  Analysis Date = 03/30/2005 
 RPT Level = 0.003  Analysis Date = 03/30/2005 
 RPT Level = 0.003  Analysis Date = 03/28/2005 
 RPT Level = 0.003  Analysis Date = 03/28/2005 
 RPT Level = 0.003  Analysis Date = 03/17/2005 
 RPT Level = 0.003  Analysis Date = 03/17/2005 
 RPT Level = 0.003  Analysis Date = 03/14/2005 
 RPT Level = 0.003  Analysis Date = 03/14/2005 
 RPT Level = 0.003  Analysis Date = 03/14/2005 
 RPT Level = 0.003  Analysis Date = 03/14/2005 
 RPT Level = 0.003  Analysis Date = 03/09/2005 
 RPT Level = 0.003  Analysis Date = 03/09/2005 
 RPT Level = 0.003  Analysis Date = 02/28/2005 
 RPT Level = 0.003  Analysis Date = 02/28/2005 
 RPT Level = 0.003  Analysis Date = 02/22/2005 
 RPT Level = 0.003  Analysis Date = 02/22/2005 
 RPT Level = 0.003  Analysis Date = 02/14/2005 
 RPT Level = 0.003  Analysis Date = 02/14/2005 
 RPT Level = 0.003  Analysis Date = 02/04/2005 
 RPT Level = 0.003  Analysis Date = 02/04/2005 
 RPT Level = 0.003  Analysis Date = 01/28/2005 
 RPT Level = 0.003  Analysis Date = 01/28/2005 
 RPT Level = 0.003  Analysis Date = 01/21/2005 
 RPT Level = 0.003  Analysis Date = 01/21/2005 
 RPT Level = 0.003  Analysis Date = 01/14/2005 
 RPT Level = 0.003  Analysis Date = 01/14/2005 
 RPT Level = 0.003  Analysis Date = 01/10/2005 
 RPT Level = 0.003  Analysis Date = 01/10/2005 
 RPT Level = 0.003  Analysis Date = 01/03/2005 
 RPT Level = 0.003  Analysis Date = 01/03/2005 
 RPT Level = 0.003  Analysis Date = 01/03/2005 
 RPT Level = 0.003  Analysis Date = 01/03/2005 
 RPT Level = 0.003  Analysis Date = 01/03/2005 
 RPT Level = 0.003  Analysis Date = 01/03/2005 
 RPT Level = 0.003  Analysis Date = 12/20/2004 
 RPT Level = 0.003  Analysis Date = 12/20/2004 
 RPT Level = 0.003  Analysis Date = 12/20/2004 
 RPT Level = 0.003  Analysis Date = 12/20/2004 
 RPT Level = 0.003  Analysis Date = 12/13/2004 
 RPT Level = 0.003  Analysis Date = 12/13/2004 
 RPT Level = 0.003  Analysis Date = 12/13/2004 
 RPT Level = 0.003  Analysis Date = 12/13/2004 
 RPT Level = 0.003  Analysis Date = 12/06/2004 
 RPT Level = 0.003  Analysis Date = 12/06/2004 
 RPT Level = 0.003  Analysis Date = 12/06/2004 
 RPT Level = 0.003  Analysis Date = 12/06/2004 
 RPT Level = 0.003  Analysis Date = 12/01/2004 
 RPT Level = 0.003  Analysis Date = 12/01/2004 
 RPT Level = 0.003  Analysis Date = 12/02/2004 
 RPT Level = 0.003  Analysis Date = 12/02/2004 
 RPT Level = 0.003  Analysis Date = 11/22/2004 
 RPT Level = 0.003  Analysis Date = 11/22/2004 
 RPT Level = 0.003  Analysis Date = 09/02/2004 
 RPT Level = 0.003  Analysis Date = 09/02/2004 
 RPT Level = 0.003  Analysis Date = 08/30/2004 
 RPT Level = 0.003  Analysis Date = 08/30/2004 
 RPT Level = 0.003  Analysis Date = 08/25/2004 
 RPT Level = 0.003  Analysis Date = 08/25/2004 
 RPT Level = 0.003  Analysis Date = 08/23/2004 
 RPT Level = 0.003  Analysis Date = 08/23/2004 
 RPT Level = 0.003  Analysis Date = 08/20/2004 
 RPT Level = 0.003  Analysis Date = 08/20/2004 
 RPT Level = 0.003  Analysis Date = 08/20/2004 
 RPT Level = 0.003  Analysis Date = 08/20/2004 
 RPT Level = 0.003  Analysis Date = 08/12/2004 
 RPT Level = 0.003  Analysis Date = 08/12/2004 
 RPT Level = 0.003  Analysis Date = 08/05/2004 
 RPT Level = 0.003  Analysis Date = 08/05/2004 
 RPT Level = 0.003  Analysis Date = 07/30/2004 
 RPT Level = 0.003  Analysis Date = 07/30/2004 
 RPT Level = 0.003  Analysis Date = 07/23/2004 
 RPT Level = 0.003  Analysis Date = 07/23/2004 
 RPT Level = 0.003  Analysis Date = 07/15/2004 
 RPT Level = 0.003  Analysis Date = 07/15/2004 
 RPT Level = 0.003  Analysis Date = 07/09/2004 
 RPT Level = 0.003  Analysis Date = 07/09/2004 
 RPT Level = 0.003  Analysis Date = 07/01/2004 
 RPT Level = 0.003  Analysis Date = 07/01/2004 
 RPT Level = 0.003  Analysis Date = 06/24/2004 
 RPT Level = 0.003  Analysis Date = 06/24/2004 
 RPT Level = 0.003  Analysis Date = 06/21/2004 
 RPT Level = 0.003  Analysis Date = 06/21/2004 
 RPT Level = 0.003  Analysis Date = 06/10/2004 
 RPT Level = 0.003  Analysis Date = 06/10/2004 
 RPT Level = 0.003  Analysis Date = 06/08/2004 
 RPT Level = 0.003  Analysis Date = 06/08/2004 
 RPT Level = 0.003  Analysis Date = 06/02/2004 
 RPT Level = 0.003  Analysis Date = 06/02/2004 
 RPT Level = 0.003  Analysis Date = 05/25/2004 
 RPT Level = 0.003  Analysis Date = 05/25/2004 
 RPT Level = 0.003  Analysis Date = 05/12/2004 
 RPT Level = 0.003  Analysis Date = 05/12/2004 
 RPT Level = 0.003  Analysis Date = 05/07/2004 
 RPT Level = 0.003  Analysis Date = 05/07/2004 
 RPT Level = 0.003  Analysis Date = 05/04/2004 
 RPT Level = 0.003  Analysis Date = 05/04/2004 
 RPT Level = 0.003  Analysis Date = 04/23/2004 
 RPT Level = 0.003  Analysis Date = 04/23/2004 
 RPT Level = 0.003  Analysis Date = 04/20/2004 
 RPT Level = 0.003  Analysis Date = 04/20/2004 
 RPT Level = 0.003  Analysis Date = 04/15/2004 
 RPT Level = 0.003  Analysis Date = 04/15/2004 
 RPT Level = 0.003  Analysis Date = 04/12/2004 
 RPT Level = 0.003  Analysis Date = 04/12/2004 
 RPT Level = 0.003  Analysis Date = 04/09/2004 
 RPT Level = 0.003  Analysis Date = 04/09/2004 
 RPT Level = 0.003  Analysis Date = 04/08/2004 
 RPT Level = 0.003  Analysis Date = 04/08/2004 
 RPT Level = 0.003  Analysis Date = 04/06/2004 
 RPT Level = 0.003  Analysis Date = 04/06/2004 
 RPT Level = 0.003  Analysis Date = 03/31/2004 
 RPT Level = 0.003  Analysis Date = 03/31/2004 
 RPT Level = 0.003  Analysis Date = 03/23/2004 
 RPT Level = 0.003  Analysis Date = 03/23/2004 
 RPT Level = 0.003  Analysis Date = 03/16/2004 
 RPT Level = 0.003  Analysis Date = 03/16/2004 
 RPT Level = 0.003  Analysis Date = 03/12/2004 
 RPT Level = 0.003  Analysis Date = 03/12/2004 
 RPT Level = 0.003  Analysis Date = 03/11/2004 
 RPT Level = 0.003  Analysis Date = 03/11/2004 
 RPT Level = 0.003  Analysis Date = 03/03/2004 
 RPT Level = 0.003  Analysis Date = 03/03/2004 
 RPT Level = 0.003  Analysis Date = 03/01/2004 
 RPT Level = 0.003  Analysis Date = 03/01/2004 
 RPT Level = 0.003  Analysis Date = 02/27/2004 
 RPT Level = 0.003  Analysis Date = 02/27/2004 
 RPT Level = 0.003  Analysis Date = 02/25/2004 
 RPT Level = 0.003  Analysis Date = 02/25/2004 
 RPT Level = 0.003  Analysis Date = 02/19/2004 
 RPT Level = 0.003  Analysis Date = 02/19/2004 
 RPT Level = 0.003  Analysis Date = 02/13/2004 
 RPT Level = 0.003  Analysis Date = 02/13/2004 
 RPT Level = 0.003  Analysis Date = 02/12/2004 
 RPT Level = 0.003  Analysis Date = 02/12/2004 
 RPT Level = 0.003  Analysis Date = 02/11/2004 
 RPT Level = 0.003  Analysis Date = 02/11/2004 
 RPT Level = 0.003  Analysis Date = 02/06/2004 
 RPT Level = 0.003  Analysis Date = 02/06/2004 
 RPT Level = 0.003  Analysis Date = 02/04/2004 
 RPT Level = 0.003  Analysis Date = 02/04/2004 
 RPT Level = 0.003  Analysis Date = 01/30/2004 
 RPT Level = 0.003  Analysis Date = 01/30/2004 
 RPT Level = 0.003  Analysis Date = 01/28/2004 
 RPT Level = 0.003  Analysis Date = 01/28/2004 
 RPT Level = 0.003  Analysis Date = 01/27/2004 
 RPT Level = 0.003  Analysis Date = 01/27/2004 
 RPT Level = 0.003  Analysis Date = 01/21/2004 
 RPT Level = 0.003  Analysis Date = 01/21/2004 
 RPT Level = 0.003  Analysis Date = 01/14/2004 
 RPT Level = 0.003  Analysis Date = 01/14/2004 
 RPT Level = 0.003  Analysis Date = 01/08/2004 
 RPT Level = 0.003  Analysis Date = 01/08/2004 
 RPT Level = 0.003  Analysis Date = 01/08/2004 
 RPT Level = 0.003  Analysis Date = 01/08/2004 
 RPT Level = 0.003  Analysis Date = 10/10/2003 
 RPT Level = 0.004  Analysis Date = 10/10/2003 
 RPT Level = 0.004  Analysis Date = 10/08/2003 
 RPT Level = 0.004  Analysis Date = 10/08/2003 
 RPT Level = 0.004  Analysis Date = 09/26/2003 
 RPT Level = 0.004  Analysis Date = 09/26/2003 
 RPT Level = 0.004  Analysis Date = 09/24/2003 
 RPT Level = 0.004  Analysis Date = 09/24/2003 
 RPT Level = 0.004  Analysis Date = 09/17/2003 
 RPT Level = 0.004  Analysis Date = 09/17/2003 
 RPT Level = 0.004  Analysis Date = 09/10/2003 
 RPT Level = 0.004  Analysis Date = 09/10/2003 
 RPT Level = 0.004  Analysis Date = 08/29/2003 
 RPT Level = 0.004  Analysis Date = 08/29/2003 
 RPT Level = 0.004  Analysis Date = 08/19/2003 
 RPT Level = 0.004  Analysis Date = 08/19/2003 
 RPT Level = 0.004  Analysis Date = 08/06/2003 
 RPT Level = 0.004  Analysis Date = 08/06/2003 
 RPT Level = 0.004  Analysis Date = 08/01/2003 
 RPT Level = 0.004  Analysis Date = 08/01/2003 
 RPT Level = 0.004  Analysis Date = 07/23/2003 
 RPT Level = 0.004  Analysis Date = 07/23/2003 
 RPT Level = 0.004  Analysis Date = 07/21/2003 
 RPT Level = 0.004  Analysis Date = 07/21/2003 
 RPT Level = 0.004  Analysis Date = 07/17/2003 
 RPT Level = 0.004  Analysis Date = 07/17/2003 
 RPT Level = 0.004  Analysis Date = 07/15/2003 
 RPT Level = 0.004  Analysis Date = 07/15/2003 
 RPT Level = 0.004  Analysis Date = 07/07/2003 
 RPT Level = 0.004  Analysis Date = 07/07/2003 
 RPT Level = 0.004  Analysis Date = 07/02/2003 
 RPT Level = 0.004  Analysis Date = 07/02/2003 
 RPT Level = 0.004  Analysis Date = 07/01/2003 
 RPT Level = 0.004  Analysis Date = 07/01/2003 
 RPT Level = 0.004  Analysis Date = 06/04/2003 
 RPT Level = 0.004  Analysis Date = 06/04/2003 
 RPT Level = 0.004  Analysis Date = 06/03/2003 
 RPT Level = 0.004  Analysis Date = 06/03/2003 
 RPT Level = 0.004  Analysis Date = 05/30/2003 
 RPT Level = 0.004  Analysis Date = 05/30/2003 
 RPT Level = 0.004  Analysis Date = 05/16/2003 
 RPT Level = 0.004  Analysis Date = 05/16/2003 
 RPT Level = 0.004  Analysis Date = 05/13/2003 
 RPT Level = 0.004  Analysis Date = 05/13/2003 
 RPT Level = 0.004  Analysis Date = 05/12/2003 
 RPT Level = 0.004  Analysis Date = 05/12/2003 
 RPT Level = 0.004  Analysis Date = 04/29/2003 
 RPT Level = 0.004  Analysis Date = 04/29/2003 
 RPT Level = 0.004  Analysis Date = 04/16/2003 
 RPT Level = 0.004  Analysis Date = 04/16/2003 
 RPT Level = 0.004  Analysis Date = 04/10/2003 
 RPT Level = 0.004  Analysis Date = 04/10/2003 
 RPT Level = 0.004  Analysis Date = 04/10/2003 
 RPT Level = 0.004  Analysis Date = 04/10/2003 
 RPT Level = 0.004  Analysis Date = 04/08/2003 
 RPT Level = 0.004  Analysis Date = 04/08/2003 
 RPT Level = 0.004  Analysis Date = 03/21/2003 
 RPT Level = 0.004  Analysis Date = 03/21/2003 
 RPT Level = 0.004  Analysis Date = 03/21/2003 
 RPT Level = 0.004  Analysis Date = 03/21/2003 
 RPT Level = 0.004  Analysis Date = 03/12/2003 
 RPT Level = 0.004  Analysis Date = 03/12/2003 
 RPT Level = 0.004  Analysis Date = 03/07/2003 
 RPT Level = 0.004  Analysis Date = 03/07/2003 
 RPT Level = 0.004  Analysis Date = 02/26/2003 
 RPT Level = 0.004  Analysis Date = 02/26/2003 
 RPT Level = 0.004  Analysis Date = 02/05/2003 
 RPT Level = 0.004  Analysis Date = 02/05/2003 
 RPT Level = 0.004  Analysis Date = 02/05/2003 
 RPT Level = 0.004  Analysis Date = 02/05/2003 
 RPT Level = 0.004  Analysis Date = 02/05/2003 
 RPT Level = 0.004  Analysis Date = 02/05/2003 
 RPT Level = 0.004  Analysis Date = 01/17/2003 
 RPT Level = 0.004  Analysis Date = 01/17/2003 
 RPT Level = 0.004  Analysis Date = 01/17/2003 
 RPT Level = 0.004  Analysis Date = 01/17/2003 
 RPT Level = 0.004  Analysis Date = 01/07/2003 
 RPT Level = 0.004  Analysis Date = 01/07/2003 
 RPT Level = 0.004  Analysis Date = 01/07/2003 
 RPT Level = 0.004  Analysis Date = 01/07/2003 
 RPT Level = 0.004  Analysis Date = 12/23/2002 
 RPT Level = 0.004  Analysis Date = 12/23/2002 
 RPT Level = 0.004  Analysis Date = 12/18/2002 
 RPT Level = 0.004  Analysis Date = 12/18/2002 
 RPT Level = 0.004  Analysis Date = 12/10/2002 
 RPT Level = 0.004  Analysis Date = 12/10/2002 
 RPT Level = 0.004  Analysis Date = 12/10/2002 
 RPT Level = 0.004  Analysis Date = 12/10/2002 
 RPT Level = 0.004  Analysis Date = 12/06/2002 
 RPT Level = 0.004  Analysis Date = 12/06/2002 
 RPT Level = 0.004  Analysis Date = 12/06/2002 
 RPT Level = 0.004  Analysis Date = 12/06/2002 
 RPT Level = 0.004  Analysis Date = 12/06/2002 
 RPT Level = 0.004  Analysis Date = 12/06/2002 
 RPT Level = 0.004  Analysis Date = 11/14/2002 
 RPT Level = 0.004  Analysis Date = 11/14/2002 
 RPT Level = 0.004  Analysis Date = 10/30/2002 
 RPT Level = 0.004  Analysis Date = 10/30/2002 
 RPT Level = 0.004  Analysis Date = 10/30/2002 
 RPT Level = 0.004  Analysis Date = 10/30/2002 
 RPT Level = 0.004  Analysis Date = 10/30/2002 
 RPT Level = 0.004  Analysis Date = 10/30/2002 
 RPT Level = 0.004  Analysis Date = 10/30/2002 
 RPT Level = 0.004  Analysis Date = 10/30/2002 
 RPT Level = 0.004  Analysis Date = 09/10/2002 
 RPT Level = 0.004  Analysis Date = 09/10/2002 
 RPT Level = 0.004  Analysis Date = 09/10/2002 
 RPT Level = 0.004  Analysis Date = 09/10/2002 
 RPT Level = 0.004  Analysis Date = 08/29/2002 
 RPT Level = 0.004  Analysis Date = 08/29/2002 
 RPT Level = 0.004  Analysis Date = 08/27/2002 
 RPT Level = 0.004  Analysis Date = 08/27/2002 
 RPT Level = 0.004  Analysis Date = 08/20/2002 
 RPT Level = 0.004  Analysis Date = 08/20/2002 
 RPT Level = 0.004  Analysis Date = 08/16/2002 
 RPT Level = 0.004  Analysis Date = 08/16/2002 
 RPT Level = 0.004  Analysis Date = 08/01/2002 
 RPT Level = 0.004  Analysis Date = 08/01/2002 
 RPT Level = 0.004  Analysis Date = 07/17/2002 
 RPT Level = 0.004  Analysis Date = 07/17/2002 
 RPT Level = 0.004  Analysis Date = 07/16/2002 
 RPT Level = 0.004  Analysis Date = 07/16/2002 
 RPT Level = 0.004  Analysis Date = 07/09/2002 
 RPT Level = 0.004  Analysis Date = 07/09/2002 
 RPT Level = 0.004  Analysis Date = 07/02/2002 
 RPT Level = 0.004  Analysis Date = 07/02/2002 
 RPT Level = 0.004  Analysis Date = 06/21/2002 
 RPT Level = 0.004  Analysis Date = 06/21/2002 
 RPT Level = 0.004  Analysis Date = 06/20/2002 
 RPT Level = 0.004  Analysis Date = 06/20/2002 
 RPT Level = 0.004  Analysis Date = 06/11/2002 
 RPT Level = 0.004  Analysis Date = 06/11/2002 
 RPT Level = 0.004  Analysis Date = 06/10/2002 
 RPT Level = 0.004  Analysis Date = 06/10/2002 
 RPT Level = 0.004  Analysis Date = 05/30/2002 
 RPT Level = 0.004  Analysis Date = 05/30/2002 
 RPT Level = 0.004  Analysis Date = 05/22/2002 
 RPT Level = 0.004  Analysis Date = 05/22/2002 
 RPT Level = 0.004  Analysis Date = 05/17/2002 
 RPT Level = 0.004  Analysis Date = 05/17/2002 
 RPT Level = 0.004  Analysis Date = 05/13/2002 
 RPT Level = 0.004  Analysis Date = 05/13/2002 
 RPT Level = 0.004  Analysis Date = 04/26/2002 
 RPT Level = 0.004  Analysis Date = 04/26/2002 
 RPT Level = 0.004  Analysis Date = 04/26/2002 
 RPT Level = 0.004  Analysis Date = 04/26/2002 
 RPT Level = 0.004  Analysis Date = 04/17/2002 
 RPT Level = 0.004  Analysis Date = 04/17/2002 
 RPT Level = 0.004  Analysis Date = 04/05/2002 
 RPT Level = 0.004  Analysis Date = 04/05/2002 
 RPT Level = 0.004  Analysis Date = 04/03/2002 
 RPT Level = 0.004  Analysis Date = 04/03/2002 
 RPT Level = 0.004  Analysis Date = 04/03/2002 
 RPT Level = 0.004  Analysis Date = 04/03/2002 
 RPT Level = 0.004  Analysis Date = 04/01/2002 
 RPT Level = 0.004  Analysis Date = 04/01/2002 
 RPT Level = 0.004  Analysis Date = 03/29/2002 
 RPT Level = 0.004  Analysis Date = 03/29/2002 
 RPT Level = 0.004  Analysis Date = 03/22/2002 
 RPT Level = 0.004  Analysis Date = 03/22/2002 
 RPT Level = 0.004  Analysis Date = 03/04/2002 
 RPT Level = 0.004  Analysis Date = 03/04/2002 
 RPT Level = 0.004  Analysis Date = 02/20/2002 
 RPT Level = 0.004  Analysis Date = 02/20/2002 
 RPT Level = 0.004  Analysis Date = 02/08/2002 
 RPT Level = 0.004  Analysis Date = 02/08/2002 
 RPT Level = 0.004  Analysis Date = 02/08/2002 
 RPT Level = 0.004  Analysis Date = 02/08/2002 
 RPT Level = 0.004  Analysis Date = 01/23/2002 
 RPT Level = 0.004  Analysis Date = 01/23/2002 
 RPT Level = 0.004  Analysis Date = 01/17/2002 
 RPT Level = 0.004  Analysis Date = 01/17/2002 
 RPT Level = 0.004  Analysis Date = 01/09/2002 
 RPT Level = 0.004  Analysis Date = 01/09/2002 
 RPT Level = 0.004  Analysis Date = 01/03/2002 
 RPT Level = 0.004  Analysis Date = 01/03/2002 
 RPT Level = 0.004  Analysis Date = 12/20/2001 
 RPT Level = 0.004  Analysis Date = 12/20/2001 
 RPT Level = 0.004  Analysis Date = 12/14/2001 
 RPT Level = 0.004  Analysis Date = 12/14/2001 
 RPT Level = 0.004  Analysis Date = 12/07/2001 
 RPT Level = 0.004  Analysis Date = 12/07/2001 
 RPT Level = 0.004  Analysis Date = 11/15/2001 
 RPT Level = 0.004  Y = 0
The SGPlot Procedure

False Positive Rate for Orthophosphate (PO4 as P), FIL, COL, LL

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Orthophosphate (PO4 as P), FIL, COL, LL 00671CL057 2002 40 0 0%
    2003 52 0 0%
    2004 51 0 0%
    2005 50 0 0%
    2006 3 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Orthophosphate (PO4 as P), FIL, DA -
Blind Blank Results
Lab: NWQL, PCode: 00671, MCode: PHM01
Analysis dates: 06/15/06 through 09/30/16
Open Data Set

 Analysis Date = 06/02/2016 
 Lab Value = -0.005 
 RPT Level = 0.004 
 Lab Sample ID = 20161480189  Analysis Date = 04/24/2013 
 Lab Value = -0.004 
 RPT Level = 0.004 
 Lab Sample ID = 20131120125  Analysis Date = 07/10/2008 
 Lab Value = -0.003 
 RPT Level = 0.003 
 Lab Sample ID = 20081820059  Analysis Date = 06/02/2016 
 Lab Value = -0.005 
 RPT Level = 0.004 
 Lab Sample ID = 20161480189  Analysis Date = 04/24/2013 
 Lab Value = -0.004 
 RPT Level = 0.004 
 Lab Sample ID = 20131120125  Analysis Date = 07/10/2008 
 Lab Value = -0.003 
 RPT Level = 0.003 
 Lab Sample ID = 20081820059  Analysis Date = 07/17/2014 
 Lab Value = 0.0086 
 RPT Level = 0.004 
 Lab Sample ID = 20141960042  Analysis Date = 01/07/2009 
 Lab Value = 0.0094 
 RPT Level = 0.004 
 Lab Sample ID = 20083570034  Analysis Date = 07/24/2007 
 Lab Value = 0.0069 
 RPT Level = 0.003 
 Lab Sample ID = 20071900105  Analysis Date = 07/17/2014 
 Lab Value = 0.0086 
 RPT Level = 0.004 
 Lab Sample ID = 20141960042  Analysis Date = 01/07/2009 
 Lab Value = 0.0094 
 RPT Level = 0.004 
 Lab Sample ID = 20083570034  Analysis Date = 07/24/2007 
 Lab Value = 0.0069 
 RPT Level = 0.003 
 Lab Sample ID = 20071900105  Analysis Date = 09/30/2016 
 Lab Value = -22E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20162710098  Analysis Date = 09/23/2016 
 Lab Value = -78E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20162640173  Analysis Date = 09/16/2016 
 Lab Value = .00031 
 RPT Level = 0.004 
 Lab Sample ID = 20162580012  Analysis Date = 09/13/2016 
 Lab Value = .00055 
 RPT Level = 0.004 
 Lab Sample ID = 20162520025  Analysis Date = 09/09/2016 
 Lab Value = -45E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20162440121  Analysis Date = 08/26/2016 
 Lab Value = .00053 
 RPT Level = 0.004 
 Lab Sample ID = 20162360195  Analysis Date = 08/19/2016 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20162290137  Analysis Date = 08/12/2016 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20162230008  Analysis Date = 08/08/2016 
 Lab Value = .00003 
 RPT Level = 0.004 
 Lab Sample ID = 20162150204  Analysis Date = 08/02/2016 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20162080232  Analysis Date = 07/26/2016 
 Lab Value = -52E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20162010257  Analysis Date = 07/14/2016 
 Lab Value = -72E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20161940107  Analysis Date = 07/12/2016 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20161870031  Analysis Date = 07/07/2016 
 Lab Value = -11E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20161800082  Analysis Date = 06/29/2016 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20161740071  Analysis Date = 06/20/2016 
 Lab Value = -.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20161660156  Analysis Date = 06/09/2016 
 Lab Value = -.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20161590152  Analysis Date = 06/02/2016 
 Lab Value = -.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20161520025  Analysis Date = 05/10/2016 
 Lab Value = -74E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20161270006  Analysis Date = 05/04/2016 
 Lab Value = -61E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20161230045  Analysis Date = 04/28/2016 
 Lab Value = -18E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20161160091  Analysis Date = 04/22/2016 
 Lab Value = -59E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20161100126  Analysis Date = 04/13/2016 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20161020027  Analysis Date = 04/07/2016 
 Lab Value = -41E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20160950044  Analysis Date = 03/31/2016 
 Lab Value = -13E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20160880040  Analysis Date = 03/25/2016 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20160810065  Analysis Date = 03/17/2016 
 Lab Value = -76E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20160740013  Analysis Date = 03/08/2016 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20160670014  Analysis Date = 03/02/2016 
 Lab Value = .00086 
 RPT Level = 0.004 
 Lab Sample ID = 20160600013  Analysis Date = 02/25/2016 
 Lab Value = -89E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20160530013  Analysis Date = 02/23/2016 
 Lab Value = -19E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20160470015  Analysis Date = 02/19/2016 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20160400084  Analysis Date = 02/03/2016 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20160320011  Analysis Date = 01/27/2016 
 Lab Value = .00034 
 RPT Level = 0.004 
 Lab Sample ID = 20160250031  Analysis Date = 01/25/2016 
 Lab Value = .00085 
 RPT Level = 0.004 
 Lab Sample ID = 20160190011  Analysis Date = 01/14/2016 
 Lab Value = .00019 
 RPT Level = 0.004 
 Lab Sample ID = 20160110011  Analysis Date = 01/06/2016 
 Lab Value = .00001 
 RPT Level = 0.004 
 Lab Sample ID = 20160050030  Analysis Date = 01/05/2016 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20153630045  Analysis Date = 12/28/2015 
 Lab Value = -96E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20153550011  Analysis Date = 12/22/2015 
 Lab Value = .00065 
 RPT Level = 0.004 
 Lab Sample ID = 20153500160  Analysis Date = 12/14/2015 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20153420017  Analysis Date = 12/02/2015 
 Lab Value = .00077 
 RPT Level = 0.004 
 Lab Sample ID = 20153340016  Analysis Date = 11/27/2015 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20153270012  Analysis Date = 11/24/2015 
 Lab Value = 0.0042 
 RPT Level = 0.004 
 Lab Sample ID = 20153200025  Analysis Date = 11/16/2015 
 Lab Value = .00001 
 RPT Level = 0.004 
 Lab Sample ID = 20153140011  Analysis Date = 11/04/2015 
 Lab Value = -18E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20153060033  Analysis Date = 10/28/2015 
 Lab Value = -52E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20152990066  Analysis Date = 10/20/2015 
 Lab Value = -14E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20152920036  Analysis Date = 10/14/2015 
 Lab Value = .00085 
 RPT Level = 0.004 
 Lab Sample ID = 20152860152  Analysis Date = 10/06/2015 
 Lab Value = -16E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20152780012  Analysis Date = 09/29/2015 
 Lab Value = -36E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20152710066  Analysis Date = 09/23/2015 
 Lab Value = .00095 
 RPT Level = 0.004 
 Lab Sample ID = 20152640026  Analysis Date = 09/21/2015 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20152590157  Analysis Date = 09/09/2015 
 Lab Value = .00031 
 RPT Level = 0.004 
 Lab Sample ID = 20152510009  Analysis Date = 09/02/2015 
 Lab Value = -98E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20152430096  Analysis Date = 08/26/2015 
 Lab Value = .00075 
 RPT Level = 0.004 
 Lab Sample ID = 20152360157  Analysis Date = 08/26/2015 
 Lab Value = .00044 
 RPT Level = 0.004 
 Lab Sample ID = 20152330007  Analysis Date = 08/13/2015 
 Lab Value = -5E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20152230132  Analysis Date = 08/04/2015 
 Lab Value = -79E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20152150073  Analysis Date = 07/28/2015 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20152080065  Analysis Date = 07/22/2015 
 Lab Value = -25E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20152010051  Analysis Date = 07/15/2015 
 Lab Value = .00028 
 RPT Level = 0.004 
 Lab Sample ID = 20151940024  Analysis Date = 07/08/2015 
 Lab Value = -6E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20151870009  Analysis Date = 07/01/2015 
 Lab Value = .00035 
 RPT Level = 0.004 
 Lab Sample ID = 20151800049  Analysis Date = 06/24/2015 
 Lab Value = -58E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20151730016  Analysis Date = 06/17/2015 
 Lab Value = 0.0035 
 RPT Level = 0.004 
 Lab Sample ID = 20151660034  Analysis Date = 06/12/2015 
 Lab Value = .00053 
 RPT Level = 0.004 
 Lab Sample ID = 20151620213  Analysis Date = 06/04/2015 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20151530198  Analysis Date = 05/28/2015 
 Lab Value = 0.0027 
 RPT Level = 0.004 
 Lab Sample ID = 20151460121  Analysis Date = 05/21/2015 
 Lab Value = 0.0023 
 RPT Level = 0.004 
 Lab Sample ID = 20151390198  Analysis Date = 05/15/2015 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20151310070  Analysis Date = 05/08/2015 
 Lab Value = .00024 
 RPT Level = 0.004 
 Lab Sample ID = 20151240065  Analysis Date = 05/04/2015 
 Lab Value = .00031 
 RPT Level = 0.004 
 Lab Sample ID = 20151180073  Analysis Date = 04/27/2015 
 Lab Value = -8E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20151140024  Analysis Date = 04/17/2015 
 Lab Value = -2E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20151050039  Analysis Date = 04/10/2015 
 Lab Value = -11E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20150970052  Analysis Date = 04/06/2015 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20150900037  Analysis Date = 03/30/2015 
 Lab Value = .00057 
 RPT Level = 0.004 
 Lab Sample ID = 20150850041  Analysis Date = 03/19/2015 
 Lab Value = -31E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20150770031  Analysis Date = 03/11/2015 
 Lab Value = -53E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20150690109  Analysis Date = 03/06/2015 
 Lab Value = -53E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20150610104  Analysis Date = 02/24/2015 
 Lab Value = .00004 
 RPT Level = 0.004 
 Lab Sample ID = 20150540029  Analysis Date = 02/19/2015 
 Lab Value = -37E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20150490025  Analysis Date = 02/17/2015 
 Lab Value = -67E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20150400033  Analysis Date = 02/04/2015 
 Lab Value = .00043 
 RPT Level = 0.004 
 Lab Sample ID = 20150330024  Analysis Date = 02/04/2015 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20150260015  Analysis Date = 01/26/2015 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20150200036  Analysis Date = 01/16/2015 
 Lab Value = .00004 
 RPT Level = 0.004 
 Lab Sample ID = 20150120017  Analysis Date = 01/08/2015 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20150050006  Analysis Date = 01/08/2015 
 Lab Value = .00042 
 RPT Level = 0.004 
 Lab Sample ID = 20143630008  Analysis Date = 01/07/2015 
 Lab Value = -.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20143560049  Analysis Date = 01/06/2015 
 Lab Value = -58E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20143490026  Analysis Date = 12/17/2014 
 Lab Value = -57E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20143420020  Analysis Date = 12/15/2014 
 Lab Value = .00027 
 RPT Level = 0.004 
 Lab Sample ID = 20143360073  Analysis Date = 12/15/2014 
 Lab Value = .00007 
 RPT Level = 0.004 
 Lab Sample ID = 20143300036  Analysis Date = 11/25/2014 
 Lab Value = .00063 
 RPT Level = 0.004 
 Lab Sample ID = 20143230047  Analysis Date = 11/19/2014 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20143160029  Analysis Date = 11/19/2014 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20143160029  Analysis Date = 11/19/2014 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20143080087  Analysis Date = 11/19/2014 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20143080087  Analysis Date = 11/17/2014 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20143010065  Analysis Date = 11/17/2014 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20143010065  Analysis Date = 11/06/2014 
 Lab Value = .00042 
 RPT Level = 0.004 
 Lab Sample ID = 20142950122  Analysis Date = 11/06/2014 
 Lab Value = .00042 
 RPT Level = 0.004 
 Lab Sample ID = 20142950122  Analysis Date = 10/23/2014 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20142880084  Analysis Date = 10/23/2014 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20142880084  Analysis Date = 10/14/2014 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20142790031  Analysis Date = 10/14/2014 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20142790031  Analysis Date = 10/08/2014 
 Lab Value = -37E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20142720101  Analysis Date = 10/08/2014 
 Lab Value = -37E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20142720101  Analysis Date = 09/23/2014 
 Lab Value = -.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20142650106  Analysis Date = 09/23/2014 
 Lab Value = -.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20142650106  Analysis Date = 09/22/2014 
 Lab Value = -72E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20142590046  Analysis Date = 09/22/2014 
 Lab Value = -72E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20142590046  Analysis Date = 09/12/2014 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20142520024  Analysis Date = 09/12/2014 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20142520024  Analysis Date = 09/08/2014 
 Lab Value = .00041 
 RPT Level = 0.004 
 Lab Sample ID = 20142470052  Analysis Date = 09/08/2014 
 Lab Value = .00041 
 RPT Level = 0.004 
 Lab Sample ID = 20142470052  Analysis Date = 08/13/2014 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20142230082  Analysis Date = 08/13/2014 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20142230082  Analysis Date = 08/06/2014 
 Lab Value = .00003 
 RPT Level = 0.004 
 Lab Sample ID = 20142160063  Analysis Date = 08/06/2014 
 Lab Value = .00003 
 RPT Level = 0.004 
 Lab Sample ID = 20142160063  Analysis Date = 07/31/2014 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20142090217  Analysis Date = 07/31/2014 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20142090217  Analysis Date = 07/23/2014 
 Lab Value = -79E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20142030069  Analysis Date = 07/10/2014 
 Lab Value = .00052 
 RPT Level = 0.004 
 Lab Sample ID = 20141890083  Analysis Date = 07/02/2014 
 Lab Value = -96E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20141820118  Analysis Date = 06/25/2014 
 Lab Value = -62E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20141750143  Analysis Date = 06/19/2014 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20141680085  Analysis Date = 06/16/2014 
 Lab Value = -56E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20141620033  Analysis Date = 06/06/2014 
 Lab Value = -38E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20141550058  Analysis Date = 06/03/2014 
 Lab Value = -63E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20141470144  Analysis Date = 05/27/2014 
 Lab Value = .00087 
 RPT Level = 0.004 
 Lab Sample ID = 20141400011  Analysis Date = 05/15/2014 
 Lab Value = .00048 
 RPT Level = 0.004 
 Lab Sample ID = 20141340002  Analysis Date = 05/07/2014 
 Lab Value = -53E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20141250086  Analysis Date = 05/02/2014 
 Lab Value = -86E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20141190022  Analysis Date = 04/29/2014 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20141130021  Analysis Date = 04/17/2014 
 Lab Value = .00082 
 RPT Level = 0.004 
 Lab Sample ID = 20141050008  Analysis Date = 04/10/2014 
 Lab Value = .00052 
 RPT Level = 0.004 
 Lab Sample ID = 20140970044  Analysis Date = 04/02/2014 
 Lab Value = .00068 
 RPT Level = 0.004 
 Lab Sample ID = 20140900020  Analysis Date = 03/26/2014 
 Lab Value = -12E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20140840099  Analysis Date = 03/19/2014 
 Lab Value = -65E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20140760039  Analysis Date = 03/12/2014 
 Lab Value = -38E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20140690021  Analysis Date = 03/06/2014 
 Lab Value = .00023 
 RPT Level = 0.004 
 Lab Sample ID = 20140630120  Analysis Date = 02/27/2014 
 Lab Value = .00046 
 RPT Level = 0.004 
 Lab Sample ID = 20140550042  Analysis Date = 02/24/2014 
 Lab Value = .00019 
 RPT Level = 0.004 
 Lab Sample ID = 20140490012  Analysis Date = 02/18/2014 
 Lab Value = .00083 
 RPT Level = 0.004 
 Lab Sample ID = 20140410005  Analysis Date = 02/13/2014 
 Lab Value = -8E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20140340022  Analysis Date = 02/06/2014 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20140270193  Analysis Date = 01/22/2014 
 Lab Value = .00034 
 RPT Level = 0.004 
 Lab Sample ID = 20140210036  Analysis Date = 01/31/2014 
 Lab Value = -.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20140130049  Analysis Date = 01/10/2014 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20140070067  Analysis Date = 01/08/2014 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20133580053  Analysis Date = 12/17/2013 
 Lab Value = -86E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20133500067  Analysis Date = 12/17/2013 
 Lab Value = -71E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20133430107  Analysis Date = 12/06/2013 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20133360022  Analysis Date = 12/03/2013 
 Lab Value = .00085 
 RPT Level = 0.004 
 Lab Sample ID = 20133300012  Analysis Date = 11/20/2013 
 Lab Value = .00062 
 RPT Level = 0.004 
 Lab Sample ID = 20133230003  Analysis Date = 11/14/2013 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20133170105  Analysis Date = 11/12/2013 
 Lab Value = .00005 
 RPT Level = 0.004 
 Lab Sample ID = 20133090098  Analysis Date = 10/31/2013 
 Lab Value = .00053 
 RPT Level = 0.004 
 Lab Sample ID = 20133030027  Analysis Date = 10/28/2013 
 Lab Value = .00024 
 RPT Level = 0.004 
 Lab Sample ID = 20132970027  Analysis Date = 10/17/2013 
 Lab Value = -.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20132730140  Analysis Date = 09/24/2013 
 Lab Value = .00027 
 RPT Level = 0.004 
 Lab Sample ID = 20132660104  Analysis Date = 09/18/2013 
 Lab Value = .00025 
 RPT Level = 0.004 
 Lab Sample ID = 20132600015  Analysis Date = 10/24/2013 
 Lab Value = .00047 
 RPT Level = 0.004 
 Lab Sample ID = 20132530113  Analysis Date = 09/04/2013 
 Lab Value = .00038 
 RPT Level = 0.004 
 Lab Sample ID = 20132410009  Analysis Date = 08/28/2013 
 Lab Value = .00058 
 RPT Level = 0.004 
 Lab Sample ID = 20132390012  Analysis Date = 08/26/2013 
 Lab Value = .00019 
 RPT Level = 0.004 
 Lab Sample ID = 20132350027  Analysis Date = 08/19/2013 
 Lab Value = .00024 
 RPT Level = 0.004 
 Lab Sample ID = 20132270018  Analysis Date = 08/09/2013 
 Lab Value = .00065 
 RPT Level = 0.004 
 Lab Sample ID = 20132180181  Analysis Date = 08/02/2013 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20132120027  Analysis Date = 07/25/2013 
 Lab Value = .00056 
 RPT Level = 0.004 
 Lab Sample ID = 20132040021  Analysis Date = 07/17/2013 
 Lab Value = .00054 
 RPT Level = 0.004 
 Lab Sample ID = 20131970028  Analysis Date = 07/11/2013 
 Lab Value = -75E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20131900090  Analysis Date = 07/08/2013 
 Lab Value = .00017 
 RPT Level = 0.004 
 Lab Sample ID = 20131830073  Analysis Date = 06/28/2013 
 Lab Value = .00034 
 RPT Level = 0.004 
 Lab Sample ID = 20131770013  Analysis Date = 06/21/2013 
 Lab Value = .00007 
 RPT Level = 0.004 
 Lab Sample ID = 20131700038  Analysis Date = 06/18/2013 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20131640004  Analysis Date = 06/05/2013 
 Lab Value = .00038 
 RPT Level = 0.004 
 Lab Sample ID = 20131550029  Analysis Date = 06/03/2013 
 Lab Value = .00023 
 RPT Level = 0.004 
 Lab Sample ID = 20131500013  Analysis Date = 05/24/2013 
 Lab Value = .00028 
 RPT Level = 0.004 
 Lab Sample ID = 20131430198  Analysis Date = 05/16/2013 
 Lab Value = 0.0027 
 RPT Level = 0.004 
 Lab Sample ID = 20131350129  Analysis Date = 05/10/2013 
 Lab Value = .00012 
 RPT Level = 0.004 
 Lab Sample ID = 20131270022  Analysis Date = 05/03/2013 
 Lab Value = .00083 
 RPT Level = 0.004 
 Lab Sample ID = 20131220014  Analysis Date = 04/26/2013 
 Lab Value = -.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20131150015  Analysis Date = 04/24/2013 
 Lab Value = .00075 
 RPT Level = 0.004 
 Lab Sample ID = 20131090030  Analysis Date = 04/04/2013 
 Lab Value = -6E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20130930087  Analysis Date = 03/27/2013 
 Lab Value = .00005 
 RPT Level = 0.004 
 Lab Sample ID = 20130840058  Analysis Date = 03/21/2013 
 Lab Value = -19E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20130770160  Analysis Date = 03/14/2013 
 Lab Value = -.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20130700013  Analysis Date = 03/07/2013 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20130630124  Analysis Date = 02/28/2013 
 Lab Value = .00011 
 RPT Level = 0.004 
 Lab Sample ID = 20130570007  Analysis Date = 02/25/2013 
 Lab Value = -43E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20130520006  Analysis Date = 02/13/2013 
 Lab Value = -14E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20130420052  Analysis Date = 02/05/2013 
 Lab Value = .00042 
 RPT Level = 0.004 
 Lab Sample ID = 20130350029  Analysis Date = 02/01/2013 
 Lab Value = .00043 
 RPT Level = 0.004 
 Lab Sample ID = 20130280039  Analysis Date = 01/24/2013 
 Lab Value = -22E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20130230099  Analysis Date = 01/17/2013 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20130140071  Analysis Date = 01/10/2013 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20130070056  Analysis Date = 01/04/2013 
 Lab Value = .00077 
 RPT Level = 0.004 
 Lab Sample ID = 20130020010  Analysis Date = 01/04/2013 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20123620011  Analysis Date = 12/21/2012 
 Lab Value = .00093 
 RPT Level = 0.004 
 Lab Sample ID = 20123530084  Analysis Date = 12/18/2012 
 Lab Value = 0.0022 
 RPT Level = 0.004 
 Lab Sample ID = 20123480061  Analysis Date = 12/07/2012 
 Lab Value = -69E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20123390115  Analysis Date = 11/29/2012 
 Lab Value = .00021 
 RPT Level = 0.004 
 Lab Sample ID = 20123330010  Analysis Date = 11/29/2012 
 Lab Value = .00044 
 RPT Level = 0.004 
 Lab Sample ID = 20123250063  Analysis Date = 11/20/2012 
 Lab Value = .00027 
 RPT Level = 0.004 
 Lab Sample ID = 20123200054  Analysis Date = 11/09/2012 
 Lab Value = .00004 
 RPT Level = 0.004 
 Lab Sample ID = 20123120066  Analysis Date = 10/31/2012 
 Lab Value = -4E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20123040119  Analysis Date = 10/29/2012 
 Lab Value = -42E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20122980126  Analysis Date = 10/18/2012 
 Lab Value = .00028 
 RPT Level = 0.004 
 Lab Sample ID = 20122900096  Analysis Date = 10/15/2012 
 Lab Value = .00024 
 RPT Level = 0.004 
 Lab Sample ID = 20122830034  Analysis Date = 10/10/2012 
 Lab Value = .00005 
 RPT Level = 0.004 
 Lab Sample ID = 20122750025  Analysis Date = 10/10/2012 
 Lab Value = -29E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20122700110  Analysis Date = 10/10/2012 
 Lab Value = -25E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20122690153  Analysis Date = 09/21/2012 
 Lab Value = .00002 
 RPT Level = 0.004 
 Lab Sample ID = 20122550016  Analysis Date = 09/18/2012 
 Lab Value = -12E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20122490102  Analysis Date = 09/14/2012 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20122410013  Analysis Date = 09/21/2012 
 Lab Value = .00007 
 RPT Level = 0.004 
 Lab Sample ID = 20122350175  Analysis Date = 08/29/2012 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20122280090  Analysis Date = 08/23/2012 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20122190099  Analysis Date = 08/16/2012 
 Lab Value = -.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20122140050  Analysis Date = 08/01/2012 
 Lab Value = .00044 
 RPT Level = 0.004 
 Lab Sample ID = 20122050101  Analysis Date = 07/20/2012 
 Lab Value = .00046 
 RPT Level = 0.004 
 Lab Sample ID = 20121990080  Analysis Date = 07/13/2012 
 Lab Value = -31E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20121910041  Analysis Date = 08/01/2012 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20121870014  Analysis Date = 07/06/2012 
 Lab Value = .00032 
 RPT Level = 0.004 
 Lab Sample ID = 20121780033  Analysis Date = 06/22/2012 
 Lab Value = .00032 
 RPT Level = 0.004 
 Lab Sample ID = 20121710006  Analysis Date = 06/14/2012 
 Lab Value = .00058 
 RPT Level = 0.004 
 Lab Sample ID = 20121650052  Analysis Date = 06/13/2012 
 Lab Value = .00017 
 RPT Level = 0.004 
 Lab Sample ID = 20121560125  Analysis Date = 06/07/2012 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20121510037  Analysis Date = 06/06/2012 
 Lab Value = 0.0035 
 RPT Level = 0.004 
 Lab Sample ID = 20121430021  Analysis Date = 05/22/2012 
 Lab Value = .00056 
 RPT Level = 0.004 
 Lab Sample ID = 20121370053  Analysis Date = 05/11/2012 
 Lab Value = .00043 
 RPT Level = 0.004 
 Lab Sample ID = 20121290072  Analysis Date = 05/08/2012 
 Lab Value = -47E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20121210123  Analysis Date = 05/01/2012 
 Lab Value = .00035 
 RPT Level = 0.004 
 Lab Sample ID = 20121150089  Analysis Date = 04/18/2012 
 Lab Value = .00056 
 RPT Level = 0.004 
 Lab Sample ID = 20121080009  Analysis Date = 04/11/2012 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20121010029  Analysis Date = 04/04/2012 
 Lab Value = .00026 
 RPT Level = 0.004 
 Lab Sample ID = 20120930058  Analysis Date = 03/29/2012 
 Lab Value = .00064 
 RPT Level = 0.004 
 Lab Sample ID = 20120870035  Analysis Date = 03/28/2012 
 Lab Value = .00046 
 RPT Level = 0.004 
 Lab Sample ID = 20120790085  Analysis Date = 03/21/2012 
 Lab Value = .00034 
 RPT Level = 0.004 
 Lab Sample ID = 20120730079  Analysis Date = 03/13/2012 
 Lab Value = .00021 
 RPT Level = 0.004 
 Lab Sample ID = 20120660073  Analysis Date = 03/06/2012 
 Lab Value = .00071 
 RPT Level = 0.004 
 Lab Sample ID = 20120580047  Analysis Date = 02/23/2012 
 Lab Value = .00052 
 RPT Level = 0.004 
 Lab Sample ID = 20120530099  Analysis Date = 02/23/2012 
 Lab Value = .00074 
 RPT Level = 0.004 
 Lab Sample ID = 20120450020  Analysis Date = 02/08/2012 
 Lab Value = -64E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20120370064  Analysis Date = 02/02/2012 
 Lab Value = .00051 
 RPT Level = 0.004 
 Lab Sample ID = 20120310012  Analysis Date = 01/25/2012 
 Lab Value = .00004 
 RPT Level = 0.004 
 Lab Sample ID = 20120230046  Analysis Date = 01/19/2012 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20120180013  Analysis Date = 01/12/2012 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20120090052  Analysis Date = 01/09/2012 
 Lab Value = .00051 
 RPT Level = 0.004 
 Lab Sample ID = 20120030028  Analysis Date = 01/09/2012 
 Lab Value = .00045 
 RPT Level = 0.004 
 Lab Sample ID = 20113610089  Analysis Date = 12/21/2011 
 Lab Value = -1E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20113530139  Analysis Date = 12/20/2011 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20113490075  Analysis Date = 12/15/2011 
 Lab Value = -11E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20113460137  Analysis Date = 12/02/2011 
 Lab Value = .00032 
 RPT Level = 0.004 
 Lab Sample ID = 20113320115  Analysis Date = 12/01/2011 
 Lab Value = .00081 
 RPT Level = 0.004 
 Lab Sample ID = 20113250126  Analysis Date = 11/28/2011 
 Lab Value = .00004 
 RPT Level = 0.004 
 Lab Sample ID = 20113180164  Analysis Date = 11/09/2011 
 Lab Value = .00085 
 RPT Level = 0.004 
 Lab Sample ID = 20113110062  Analysis Date = 11/08/2011 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20113050092  Analysis Date = 10/26/2011 
 Lab Value = .00007 
 RPT Level = 0.004 
 Lab Sample ID = 20112970118  Analysis Date = 10/25/2011 
 Lab Value = .00061 
 RPT Level = 0.004 
 Lab Sample ID = 20112910137  Analysis Date = 10/14/2011 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20112840071  Analysis Date = 10/04/2011 
 Lab Value = .00061 
 RPT Level = 0.004 
 Lab Sample ID = 20112760061  Analysis Date = 09/29/2011 
 Lab Value = .00014 
 RPT Level = 0.004 
 Lab Sample ID = 20112690123  Analysis Date = 09/22/2011 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20112630061  Analysis Date = 09/16/2011 
 Lab Value = .00072 
 RPT Level = 0.004 
 Lab Sample ID = 20112560021  Analysis Date = 09/12/2011 
 Lab Value = .00032 
 RPT Level = 0.004 
 Lab Sample ID = 20112510037  Analysis Date = 09/08/2011 
 Lab Value = .00026 
 RPT Level = 0.004 
 Lab Sample ID = 20112500188  Analysis Date = 08/25/2011 
 Lab Value = .00059 
 RPT Level = 0.004 
 Lab Sample ID = 20112360063  Analysis Date = 08/19/2011 
 Lab Value = .00091 
 RPT Level = 0.004 
 Lab Sample ID = 20112300036  Analysis Date = 08/10/2011 
 Lab Value = .00012 
 RPT Level = 0.004 
 Lab Sample ID = 20112200051  Analysis Date = 08/02/2011 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20112130154  Analysis Date = 07/28/2011 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20112060094  Analysis Date = 07/21/2011 
 Lab Value = 0.0033 
 RPT Level = 0.004 
 Lab Sample ID = 20112010020  Analysis Date = 07/13/2011 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20111920099  Analysis Date = 07/08/2011 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20111860062  Analysis Date = 06/29/2011 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20111780166  Analysis Date = 06/22/2011 
 Lab Value = 0.0027 
 RPT Level = 0.004 
 Lab Sample ID = 20111710111  Analysis Date = 06/15/2011 
 Lab Value = 0.0023 
 RPT Level = 0.004 
 Lab Sample ID = 20111640067  Analysis Date = 06/07/2011 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20111570061  Analysis Date = 06/03/2011 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20111510151  Analysis Date = 05/25/2011 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20111430203  Analysis Date = 05/19/2011 
 Lab Value = 0.0026 
 RPT Level = 0.004 
 Lab Sample ID = 20111360146  Analysis Date = 05/11/2011 
 Lab Value = 0.0028 
 RPT Level = 0.004 
 Lab Sample ID = 20111290046  Analysis Date = 05/05/2011 
 Lab Value = 0.0021 
 RPT Level = 0.004 
 Lab Sample ID = 20111220086  Analysis Date = 04/27/2011 
 Lab Value = 0.0024 
 RPT Level = 0.004 
 Lab Sample ID = 20111150114  Analysis Date = 04/20/2011 
 Lab Value = 0.0024 
 RPT Level = 0.004 
 Lab Sample ID = 20111080073  Analysis Date = 04/13/2011 
 Lab Value = 0.0027 
 RPT Level = 0.004 
 Lab Sample ID = 20111010118  Analysis Date = 04/07/2011 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20110950054  Analysis Date = 03/30/2011 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20110870089  Analysis Date = 03/22/2011 
 Lab Value = 0.0022 
 RPT Level = 0.004 
 Lab Sample ID = 20110800059  Analysis Date = 03/18/2011 
 Lab Value = 0.0022 
 RPT Level = 0.004 
 Lab Sample ID = 20110750067  Analysis Date = 03/09/2011 
 Lab Value = 0.0026 
 RPT Level = 0.004 
 Lab Sample ID = 20110660032  Analysis Date = 03/01/2011 
 Lab Value = 0.0021 
 RPT Level = 0.004 
 Lab Sample ID = 20110590070  Analysis Date = 02/24/2011 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20110530105  Analysis Date = 02/16/2011 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20110450036  Analysis Date = 02/15/2011 
 Lab Value = 0.0028 
 RPT Level = 0.004 
 Lab Sample ID = 20110410098  Analysis Date = 02/15/2011 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20110400069  Analysis Date = 02/02/2011 
 Lab Value = 0.0022 
 RPT Level = 0.004 
 Lab Sample ID = 20110240065  Analysis Date = 02/01/2011 
 Lab Value = 0.003 
 RPT Level = 0.004 
 Lab Sample ID = 20110180057  Analysis Date = 01/20/2011 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20110110016  Analysis Date = 01/10/2011 
 Lab Value = 0.0028 
 RPT Level = 0.004 
 Lab Sample ID = 20110030021  Analysis Date = 01/10/2011 
 Lab Value = 0.0029 
 RPT Level = 0.004 
 Lab Sample ID = 20103610054  Analysis Date = 01/14/2011 
 Lab Value = 0.0024 
 RPT Level = 0.004 
 Lab Sample ID = 20103540047  Analysis Date = 01/06/2011 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20103470078  Analysis Date = 12/15/2010 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20103400086  Analysis Date = 12/09/2010 
 Lab Value = 0.003 
 RPT Level = 0.004 
 Lab Sample ID = 20103330099  Analysis Date = 12/09/2010 
 Lab Value = 0.0027 
 RPT Level = 0.004 
 Lab Sample ID = 20103260065  Analysis Date = 12/02/2010 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20103190064  Analysis Date = 11/18/2010 
 Lab Value = 0.0026 
 RPT Level = 0.004 
 Lab Sample ID = 20103120026  Analysis Date = 11/09/2010 
 Lab Value = 0.0021 
 RPT Level = 0.004 
 Lab Sample ID = 20103060008  Analysis Date = 11/09/2010 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20102990006  Analysis Date = 11/04/2010 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20102920006  Analysis Date = 10/27/2010 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20102850132  Analysis Date = 10/26/2010 
 Lab Value = 0.0043 
 RPT Level = 0.004 
 Lab Sample ID = 20102770110  Analysis Date = 10/14/2010 
 Lab Value = 0.0022 
 RPT Level = 0.004 
 Lab Sample ID = 20102700152  Analysis Date = 10/14/2010 
 Lab Value = 0.0029 
 RPT Level = 0.004 
 Lab Sample ID = 20102640136  Analysis Date = 09/30/2010 
 Lab Value = 0.0042 
 RPT Level = 0.004 
 Lab Sample ID = 20102570015  Analysis Date = 09/29/2010 
 Lab Value = 0.0032 
 RPT Level = 0.004 
 Lab Sample ID = 20102510062  Analysis Date = 09/16/2010 
 Lab Value = 0.0026 
 RPT Level = 0.004 
 Lab Sample ID = 20102430249  Analysis Date = 09/16/2010 
 Lab Value = 0.0022 
 RPT Level = 0.004 
 Lab Sample ID = 20102350196  Analysis Date = 08/31/2010 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20102290049  Analysis Date = 08/26/2010 
 Lab Value = 0.0029 
 RPT Level = 0.004 
 Lab Sample ID = 20102230041  Analysis Date = 08/17/2010 
 Lab Value = 0.0029 
 RPT Level = 0.004 
 Lab Sample ID = 20102140090  Analysis Date = 08/12/2010 
 Lab Value = 0.0031 
 RPT Level = 0.004 
 Lab Sample ID = 20102080005  Analysis Date = 08/05/2010 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20102000188  Analysis Date = 07/16/2010 
 Lab Value = 0.0023 
 RPT Level = 0.004 
 Lab Sample ID = 20101930104  Analysis Date = 07/16/2010 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20101870059  Analysis Date = 07/16/2010 
 Lab Value = 0.0021 
 RPT Level = 0.004 
 Lab Sample ID = 20101790124  Analysis Date = 07/14/2010 
 Lab Value = 0.0027 
 RPT Level = 0.004 
 Lab Sample ID = 20101730068  Analysis Date = 07/13/2010 
 Lab Value = 0.0021 
 RPT Level = 0.004 
 Lab Sample ID = 20101660061  Analysis Date = 06/28/2010 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20101590005  Analysis Date = 06/25/2010 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20101530090  Analysis Date = 06/24/2010 
 Lab Value = .00037 
 RPT Level = 0.004 
 Lab Sample ID = 20101440165  Analysis Date = 06/17/2010 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20101380021  Analysis Date = 05/27/2010 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20101310098  Analysis Date = 05/11/2010 
 Lab Value = 0.0022 
 RPT Level = 0.004 
 Lab Sample ID = 20101240080  Analysis Date = 05/11/2010 
 Lab Value = 0.0022 
 RPT Level = 0.004 
 Lab Sample ID = 20101180043  Analysis Date = 05/10/2010 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20101090063  Analysis Date = 04/26/2010 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20101020075  Analysis Date = 04/14/2010 
 Lab Value = 0.0017 
 RPT Level = 0.004 
 Lab Sample ID = 20100950036  Analysis Date = 04/12/2010 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20100880044  Analysis Date = 04/12/2010 
 Lab Value = 0.0017 
 RPT Level = 0.004 
 Lab Sample ID = 20100850066  Analysis Date = 04/06/2010 
 Lab Value = 0.0021 
 RPT Level = 0.004 
 Lab Sample ID = 20100750002  Analysis Date = 03/31/2010 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20100680014  Analysis Date = 03/11/2010 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20100600067  Analysis Date = 02/23/2010 
 Lab Value = 0.0024 
 RPT Level = 0.004 
 Lab Sample ID = 20100530048  Analysis Date = 02/22/2010 
 Lab Value = 0.0029 
 RPT Level = 0.004 
 Lab Sample ID = 20100470025  Analysis Date = 02/22/2010 
 Lab Value = 0.0029 
 RPT Level = 0.004 
 Lab Sample ID = 20100390038  Analysis Date = 02/18/2010 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20100320023  Analysis Date = 02/11/2010 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20100260065  Analysis Date = 01/28/2010 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20100190102  Analysis Date = 01/14/2010 
 Lab Value = 0.0023 
 RPT Level = 0.004 
 Lab Sample ID = 20100110099  Analysis Date = 01/12/2010 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20100050014  Analysis Date = 01/12/2010 
 Lab Value = 0.0023 
 RPT Level = 0.004 
 Lab Sample ID = 20093620042  Analysis Date = 01/12/2010 
 Lab Value = 0.0022 
 RPT Level = 0.004 
 Lab Sample ID = 20093560033  Analysis Date = 01/07/2010 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20093480064  Analysis Date = 12/22/2009 
 Lab Value = .00061 
 RPT Level = 0.004 
 Lab Sample ID = 20093420004  Analysis Date = 01/06/2010 
 Lab Value = 0.0021 
 RPT Level = 0.004 
 Lab Sample ID = 20093350070  Analysis Date = 11/27/2009 
 Lab Value = 0.0028 
 RPT Level = 0.004 
 Lab Sample ID = 20093280015  Analysis Date = 11/27/2009 
 Lab Value = 0.0026 
 RPT Level = 0.004 
 Lab Sample ID = 20093200062  Analysis Date = 11/25/2009 
 Lab Value = 0.0017 
 RPT Level = 0.004 
 Lab Sample ID = 20093130061  Analysis Date = 11/24/2009 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20093070201  Analysis Date = 11/19/2009 
 Lab Value = 0.0026 
 RPT Level = 0.004 
 Lab Sample ID = 20093000106  Analysis Date = 11/06/2009 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20092920096  Analysis Date = 11/05/2009 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20092870073  Analysis Date = 10/22/2009 
 Lab Value = 0.0033 
 RPT Level = 0.004 
 Lab Sample ID = 20092780071  Analysis Date = 10/22/2009 
 Lab Value = 0.0029 
 RPT Level = 0.004 
 Lab Sample ID = 20092720011  Analysis Date = 10/15/2009 
 Lab Value = 0.0023 
 RPT Level = 0.004 
 Lab Sample ID = 20092640026  Analysis Date = 09/30/2009 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20092570049  Analysis Date = 09/30/2009 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20092520132  Analysis Date = 09/23/2009 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20092430155  Analysis Date = 09/10/2009 
 Lab Value = 0.0033 
 RPT Level = 0.004 
 Lab Sample ID = 20092360171  Analysis Date = 09/02/2009 
 Lab Value = 0.0023 
 RPT Level = 0.004 
 Lab Sample ID = 20092290211  Analysis Date = 08/26/2009 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20092220169  Analysis Date = 08/20/2009 
 Lab Value = 0.0037 
 RPT Level = 0.004 
 Lab Sample ID = 20092150073  Analysis Date = 08/12/2009 
 Lab Value = 0.003 
 RPT Level = 0.004 
 Lab Sample ID = 20092090263  Analysis Date = 07/29/2009 
 Lab Value = 0.0029 
 RPT Level = 0.004 
 Lab Sample ID = 20092010116  Analysis Date = 07/23/2009 
 Lab Value = 0.0032 
 RPT Level = 0.004 
 Lab Sample ID = 20091950026  Analysis Date = 07/16/2009 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20091870025  Analysis Date = 07/09/2009 
 Lab Value = 0.0029 
 RPT Level = 0.004 
 Lab Sample ID = 20091800174  Analysis Date = 06/30/2009 
 Lab Value = 0.0028 
 RPT Level = 0.004 
 Lab Sample ID = 20091730218  Analysis Date = 06/25/2009 
 Lab Value = 0.0026 
 RPT Level = 0.004 
 Lab Sample ID = 20091660206  Analysis Date = 06/17/2009 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20091590088  Analysis Date = 06/10/2009 
 Lab Value = 0.0029 
 RPT Level = 0.004 
 Lab Sample ID = 20091520151  Analysis Date = 06/04/2009 
 Lab Value = 0.0022 
 RPT Level = 0.004 
 Lab Sample ID = 20091460188  Analysis Date = 05/21/2009 
 Lab Value = 0.0024 
 RPT Level = 0.004 
 Lab Sample ID = 20091380122  Analysis Date = 05/20/2009 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20091320020  Analysis Date = 05/14/2009 
 Lab Value = 0.0026 
 RPT Level = 0.004 
 Lab Sample ID = 20091240123  Analysis Date = 05/06/2009 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20091170110  Analysis Date = 04/30/2009 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20091110135  Analysis Date = 04/15/2009 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20091030081  Analysis Date = 04/08/2009 
 Lab Value = 0.0024 
 RPT Level = 0.004 
 Lab Sample ID = 20090960054  Analysis Date = 04/08/2009 
 Lab Value = 0.0022 
 RPT Level = 0.004 
 Lab Sample ID = 20090890069  Analysis Date = 04/06/2009 
 Lab Value = 0.0017 
 RPT Level = 0.004 
 Lab Sample ID = 20090820029  Analysis Date = 03/31/2009 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20090750048  Analysis Date = 03/10/2009 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20090680045  Analysis Date = 03/04/2009 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20090610057  Analysis Date = 03/04/2009 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20090540030  Analysis Date = 03/03/2009 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20090480058  Analysis Date = 02/18/2009 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20090400032  Analysis Date = 02/03/2009 
 Lab Value = .00095 
 RPT Level = 0.004 
 Lab Sample ID = 20090330037  Analysis Date = 02/03/2009 
 Lab Value = .00098 
 RPT Level = 0.004 
 Lab Sample ID = 20090260027  Analysis Date = 01/28/2009 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20090200036  Analysis Date = 01/22/2009 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20090120049  Analysis Date = 01/08/2009 
 Lab Value = 0.0021 
 RPT Level = 0.004 
 Lab Sample ID = 20090050019  Analysis Date = 01/08/2009 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20083650083  Analysis Date = 12/22/2008 
 Lab Value = .00092 
 RPT Level = 0.004 
 Lab Sample ID = 20083500071  Analysis Date = 12/18/2008 
 Lab Value = 0.0027 
 RPT Level = 0.004 
 Lab Sample ID = 20083450064  Analysis Date = 12/09/2008 
 Lab Value = 0.0021 
 RPT Level = 0.004 
 Lab Sample ID = 20083360040  Analysis Date = 12/04/2008 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20083290062  Analysis Date = 12/03/2008 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20083220064  Analysis Date = 12/22/2008 
 Lab Value = 0.0021 
 RPT Level = 0.004 
 Lab Sample ID = 20083150065  Analysis Date = 11/13/2008 
 Lab Value = 0.0028 
 RPT Level = 0.004 
 Lab Sample ID = 20083080100  Analysis Date = 11/12/2008 
 Lab Value = 0.0026 
 RPT Level = 0.004 
 Lab Sample ID = 20083010109  Analysis Date = 11/04/2008 
 Lab Value = 0.0021 
 RPT Level = 0.004 
 Lab Sample ID = 20082940063  Analysis Date = 10/16/2008 
 Lab Value = -7E-5 
 RPT Level = 0.004 
 Lab Sample ID = 20082880040  Analysis Date = 10/15/2008 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20082800042  Analysis Date = 10/08/2008 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20082730062  Analysis Date = 09/30/2008 
 Lab Value = .00098 
 RPT Level = 0.003 
 Lab Sample ID = 20082660047  Analysis Date = 09/24/2008 
 Lab Value = 0.0018 
 RPT Level = 0.003 
 Lab Sample ID = 20082590105  Analysis Date = 09/23/2008 
 Lab Value = 0.0018 
 RPT Level = 0.003 
 Lab Sample ID = 20082520008  Analysis Date = 09/16/2008 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20082460098  Analysis Date = 09/10/2008 
 Lab Value = 0.0024 
 RPT Level = 0.003 
 Lab Sample ID = 20082380080  Analysis Date = 08/26/2008 
 Lab Value = 0.0013 
 RPT Level = 0.003 
 Lab Sample ID = 20082310131  Analysis Date = 08/28/2008 
 Lab Value = 0.0023 
 RPT Level = 0.003 
 Lab Sample ID = 20082250010  Analysis Date = 08/20/2008 
 Lab Value = 0.0027 
 RPT Level = 0.003 
 Lab Sample ID = 20082190011  Analysis Date = 07/24/2008 
 Lab Value = 0.0019 
 RPT Level = 0.003 
 Lab Sample ID = 20082030127  Analysis Date = 07/17/2008 
 Lab Value = 0.0022 
 RPT Level = 0.003 
 Lab Sample ID = 20081970139  Analysis Date = 07/14/2008 
 Lab Value = 0.0025 
 RPT Level = 0.003 
 Lab Sample ID = 20081890044  Analysis Date = 07/02/2008 
 Lab Value = 0.0023 
 RPT Level = 0.003 
 Lab Sample ID = 20081750128  Analysis Date = 06/24/2008 
 Lab Value = .00057 
 RPT Level = 0.003 
 Lab Sample ID = 20081680067  Analysis Date = 06/18/2008 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20081620017  Analysis Date = 06/11/2008 
 Lab Value = 0.0019 
 RPT Level = 0.003 
 Lab Sample ID = 20081540109  Analysis Date = 06/09/2008 
 Lab Value = 0.0016 
 RPT Level = 0.003 
 Lab Sample ID = 20081480068  Analysis Date = 05/21/2008 
 Lab Value = 0.0022 
 RPT Level = 0.003 
 Lab Sample ID = 20081400061  Analysis Date = 05/20/2008 
 Lab Value = 0.0031 
 RPT Level = 0.003 
 Lab Sample ID = 20081330112  Analysis Date = 05/13/2008 
 Lab Value = 0.0018 
 RPT Level = 0.003 
 Lab Sample ID = 20081260070  Analysis Date = 05/06/2008 
 Lab Value = 0.0039 
 RPT Level = 0.003 
 Lab Sample ID = 20081190055  Analysis Date = 04/30/2008 
 Lab Value = 0.0017 
 RPT Level = 0.003 
 Lab Sample ID = 20081120033  Analysis Date = 04/29/2008 
 Lab Value = 0.0016 
 RPT Level = 0.003 
 Lab Sample ID = 20081050114  Analysis Date = 04/15/2008 
 Lab Value = 0.0026 
 RPT Level = 0.003 
 Lab Sample ID = 20080980084  Analysis Date = 04/15/2008 
 Lab Value = 0.0027 
 RPT Level = 0.003 
 Lab Sample ID = 20080920083  Analysis Date = 03/31/2008 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20080840064  Analysis Date = 03/26/2008 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20080770124  Analysis Date = 03/20/2008 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20080700074  Analysis Date = 03/06/2008 
 Lab Value = 0.0028 
 RPT Level = 0.003 
 Lab Sample ID = 20080630067  Analysis Date = 03/05/2008 
 Lab Value = 0.0023 
 RPT Level = 0.003 
 Lab Sample ID = 20080560070  Analysis Date = 02/28/2008 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20080510055  Analysis Date = 02/12/2008 
 Lab Value = 0.0025 
 RPT Level = 0.003 
 Lab Sample ID = 20080420072  Analysis Date = 02/06/2008 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20080360051  Analysis Date = 01/29/2008 
 Lab Value = 0.0022 
 RPT Level = 0.003 
 Lab Sample ID = 20080280050  Analysis Date = 01/24/2008 
 Lab Value = 0.0027 
 RPT Level = 0.003 
 Lab Sample ID = 20080230021  Analysis Date = 01/23/2008 
 Lab Value = 0.0022 
 RPT Level = 0.003 
 Lab Sample ID = 20080140027  Analysis Date = 01/17/2008 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20080070023  Analysis Date = 01/08/2008 
 Lab Value = 0.0017 
 RPT Level = 0.003 
 Lab Sample ID = 20073620004  Analysis Date = 01/03/2008 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20073510098  Analysis Date = 12/13/2007 
 Lab Value = 0.0027 
 RPT Level = 0.003 
 Lab Sample ID = 20073440039  Analysis Date = 12/04/2007 
 Lab Value = 0.0017 
 RPT Level = 0.003 
 Lab Sample ID = 20073370069  Analysis Date = 11/27/2007 
 Lab Value = 0.0017 
 RPT Level = 0.003 
 Lab Sample ID = 20073300042  Analysis Date = 11/21/2007 
 Lab Value = 0.0019 
 RPT Level = 0.003 
 Lab Sample ID = 20073230113  Analysis Date = 11/15/2007 
 Lab Value = 0.0014 
 RPT Level = 0.003 
 Lab Sample ID = 20073170062  Analysis Date = 11/15/2007 
 Lab Value = 0.0014 
 RPT Level = 0.003 
 Lab Sample ID = 20073100012  Analysis Date = 10/30/2007 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20073020065  Analysis Date = 10/26/2007 
 Lab Value = 0.0019 
 RPT Level = 0.003 
 Lab Sample ID = 20072960186  Analysis Date = 10/23/2007 
 Lab Value = 0.0023 
 RPT Level = 0.003 
 Lab Sample ID = 20072890056  Analysis Date = 10/22/2007 
 Lab Value = 0.0023 
 RPT Level = 0.003 
 Lab Sample ID = 20072850025  Analysis Date = 10/10/2007 
 Lab Value = 0.0028 
 RPT Level = 0.003 
 Lab Sample ID = 20072670056  Analysis Date = 10/10/2007 
 Lab Value = 0.0026 
 RPT Level = 0.003 
 Lab Sample ID = 20072600129  Analysis Date = 10/05/2007 
 Lab Value = 0.0022 
 RPT Level = 0.003 
 Lab Sample ID = 20072540015  Analysis Date = 09/28/2007 
 Lab Value = 0.0013 
 RPT Level = 0.003 
 Lab Sample ID = 20072480018  Analysis Date = 08/30/2007 
 Lab Value = 0.0019 
 RPT Level = 0.003 
 Lab Sample ID = 20072400035  Analysis Date = 08/27/2007 
 Lab Value = 0.0025 
 RPT Level = 0.003 
 Lab Sample ID = 20072330109  Analysis Date = 08/24/2007 
 Lab Value = 0.0025 
 RPT Level = 0.003 
 Lab Sample ID = 20072260198  Analysis Date = 08/22/2007 
 Lab Value = 0.0042 
 RPT Level = 0.003 
 Lab Sample ID = 20072210252  Analysis Date = 08/20/2007 
 Lab Value = 0.0028 
 RPT Level = 0.003 
 Lab Sample ID = 20072110162  Analysis Date = 08/15/2007 
 Lab Value = 0.0028 
 RPT Level = 0.003 
 Lab Sample ID = 20072040101  Analysis Date = 07/23/2007 
 Lab Value = 0.0019 
 RPT Level = 0.003 
 Lab Sample ID = 20071830158  Analysis Date = 07/03/2007 
 Lab Value = 0.0025 
 RPT Level = 0.003 
 Lab Sample ID = 20071770201  Analysis Date = 06/22/2007 
 Lab Value = 0.0025 
 RPT Level = 0.003 
 Lab Sample ID = 20071690119  Analysis Date = 06/22/2007 
 Lab Value = 0.0023 
 RPT Level = 0.003 
 Lab Sample ID = 20071620045  Analysis Date = 06/21/2007 
 Lab Value = 0.0025 
 RPT Level = 0.003 
 Lab Sample ID = 20071560026  Analysis Date = 06/20/2007 
 Lab Value = 0.0017 
 RPT Level = 0.003 
 Lab Sample ID = 20071500033  Analysis Date = 05/30/2007 
 Lab Value = 0.0034 
 RPT Level = 0.003 
 Lab Sample ID = 20071410089  Analysis Date = 05/17/2007 
 Lab Value = 0.0017 
 RPT Level = 0.003 
 Lab Sample ID = 20071340113  Analysis Date = 05/16/2007 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20071280019  Analysis Date = 05/08/2007 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20071200089  Analysis Date = 05/03/2007 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20071130120  Analysis Date = 05/01/2007 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20071070021  Analysis Date = 04/26/2007 
 Lab Value = 0.0027 
 RPT Level = 0.003 
 Lab Sample ID = 20070990050  Analysis Date = 04/24/2007 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20070930070  Analysis Date = 04/10/2007 
 Lab Value = 0.003 
 RPT Level = 0.003 
 Lab Sample ID = 20070860217  Analysis Date = 03/26/2007 
 Lab Value = 0.0014 
 RPT Level = 0.003 
 Lab Sample ID = 20070780128  Analysis Date = 03/20/2007 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20070710075  Analysis Date = 03/15/2007 
 Lab Value = 0.0024 
 RPT Level = 0.003 
 Lab Sample ID = 20070650009  Analysis Date = 03/14/2007 
 Lab Value = 0.0023 
 RPT Level = 0.003 
 Lab Sample ID = 20070580141  Analysis Date = 02/27/2007 
 Lab Value = 0.0019 
 RPT Level = 0.003 
 Lab Sample ID = 20070540023  Analysis Date = 02/21/2007 
 Lab Value = 0.0024 
 RPT Level = 0.003 
 Lab Sample ID = 20070460015  Analysis Date = 02/13/2007 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20070400103  Analysis Date = 02/01/2007 
 Lab Value = 0.0022 
 RPT Level = 0.003 
 Lab Sample ID = 20070250023  Analysis Date = 02/01/2007 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20070180071  Analysis Date = 01/18/2007 
 Lab Value = 0.0024 
 RPT Level = 0.003 
 Lab Sample ID = 20070120012  Analysis Date = 01/09/2007 
 Lab Value = 0.0022 
 RPT Level = 0.003 
 Lab Sample ID = 20070040013  Analysis Date = 12/28/2006 
 Lab Value = 0.0025 
 RPT Level = 0.003 
 Lab Sample ID = 20063610084  Analysis Date = 12/27/2006 
 Lab Value = -28E-5 
 RPT Level = 0.003 
 Lab Sample ID = 20063520072  Analysis Date = 12/26/2006 
 Lab Value = 0.0017 
 RPT Level = 0.003 
 Lab Sample ID = 20063450081  Analysis Date = 12/05/2006 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20063380055  Analysis Date = 11/29/2006 
 Lab Value = 0.0019 
 RPT Level = 0.003 
 Lab Sample ID = 20063310047  Analysis Date = 11/28/2006 
 Lab Value = 0.0018 
 RPT Level = 0.003 
 Lab Sample ID = 20063240079  Analysis Date = 11/27/2006 
 Lab Value = 0.0018 
 RPT Level = 0.003 
 Lab Sample ID = 20063180103  Analysis Date = 11/22/2006 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20063100080  Analysis Date = 11/22/2006 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20063030096  Analysis Date = 11/16/2006 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20062960133  Analysis Date = 11/07/2006 
 Lab Value = 0.0018 
 RPT Level = 0.003 
 Lab Sample ID = 20062910013  Analysis Date = 11/07/2006 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20062850014  Analysis Date = 10/26/2006 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20062780050  Analysis Date = 10/03/2006 
 Lab Value = 0.0026 
 RPT Level = 0.003 
 Lab Sample ID = 20062620013  Analysis Date = 09/25/2006 
 Lab Value = 0.0027 
 RPT Level = 0.003 
 Lab Sample ID = 20062540016  Analysis Date = 09/20/2006 
 Lab Value = 0.0026 
 RPT Level = 0.003 
 Lab Sample ID = 20062500008  Analysis Date = 09/12/2006 
 Lab Value = 0.0029 
 RPT Level = 0.003 
 Lab Sample ID = 20062350182  Analysis Date = 08/24/2006 
 Lab Value = 0.0026 
 RPT Level = 0.003 
 Lab Sample ID = 20062270273  Analysis Date = 08/18/2006 
 Lab Value = 0.0029 
 RPT Level = 0.003 
 Lab Sample ID = 20062220039  Analysis Date = 08/07/2006 
 Lab Value = 0.0031 
 RPT Level = 0.003 
 Lab Sample ID = 20062020314  Analysis Date = 07/19/2006 
 Lab Value = 0.0026 
 RPT Level = 0.003 
 Lab Sample ID = 20061950007  Analysis Date = 07/14/2006 
 Lab Value = 0.0018 
 RPT Level = 0.003 
 Lab Sample ID = 20061880009  Analysis Date = 06/27/2006 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20061730014  Analysis Date = 06/21/2006 
 Lab Value = 0.0027 
 RPT Level = 0.003 
 Lab Sample ID = 20061670021  Analysis Date = 06/15/2006 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20061580018  Analysis Date = 09/30/2016 
 RPT Level = 0.004  Analysis Date = 09/23/2016 
 RPT Level = 0.004  Analysis Date = 09/23/2016 
 RPT Level = 0.004  Analysis Date = 09/16/2016 
 RPT Level = 0.004  Analysis Date = 09/16/2016 
 RPT Level = 0.004  Analysis Date = 09/13/2016 
 RPT Level = 0.004  Analysis Date = 09/13/2016 
 RPT Level = 0.004  Analysis Date = 09/09/2016 
 RPT Level = 0.004  Analysis Date = 09/09/2016 
 RPT Level = 0.004  Analysis Date = 08/26/2016 
 RPT Level = 0.004  Analysis Date = 08/26/2016 
 RPT Level = 0.004  Analysis Date = 08/19/2016 
 RPT Level = 0.004  Analysis Date = 08/19/2016 
 RPT Level = 0.004  Analysis Date = 08/12/2016 
 RPT Level = 0.004  Analysis Date = 08/12/2016 
 RPT Level = 0.004  Analysis Date = 08/08/2016 
 RPT Level = 0.004  Analysis Date = 08/08/2016 
 RPT Level = 0.004  Analysis Date = 08/02/2016 
 RPT Level = 0.004  Analysis Date = 08/02/2016 
 RPT Level = 0.004  Analysis Date = 07/26/2016 
 RPT Level = 0.004  Analysis Date = 07/26/2016 
 RPT Level = 0.004  Analysis Date = 07/14/2016 
 RPT Level = 0.004  Analysis Date = 07/14/2016 
 RPT Level = 0.004  Analysis Date = 07/12/2016 
 RPT Level = 0.004  Analysis Date = 07/12/2016 
 RPT Level = 0.004  Analysis Date = 07/07/2016 
 RPT Level = 0.004  Analysis Date = 07/07/2016 
 RPT Level = 0.004  Analysis Date = 06/29/2016 
 RPT Level = 0.004  Analysis Date = 06/29/2016 
 RPT Level = 0.004  Analysis Date = 06/20/2016 
 RPT Level = 0.004  Analysis Date = 06/20/2016 
 RPT Level = 0.004  Analysis Date = 06/09/2016 
 RPT Level = 0.004  Analysis Date = 06/09/2016 
 RPT Level = 0.004  Analysis Date = 06/02/2016 
 RPT Level = 0.004  Analysis Date = 06/02/2016 
 RPT Level = 0.004  Analysis Date = 06/02/2016 
 RPT Level = 0.004  Analysis Date = 06/02/2016 
 RPT Level = 0.004  Analysis Date = 05/10/2016 
 RPT Level = 0.004  Analysis Date = 05/10/2016 
 RPT Level = 0.004  Analysis Date = 05/04/2016 
 RPT Level = 0.004  Analysis Date = 05/04/2016 
 RPT Level = 0.004  Analysis Date = 04/28/2016 
 RPT Level = 0.004  Analysis Date = 04/28/2016 
 RPT Level = 0.004  Analysis Date = 04/22/2016 
 RPT Level = 0.004  Analysis Date = 04/22/2016 
 RPT Level = 0.004  Analysis Date = 04/13/2016 
 RPT Level = 0.004  Analysis Date = 04/13/2016 
 RPT Level = 0.004  Analysis Date = 04/07/2016 
 RPT Level = 0.004  Analysis Date = 04/07/2016 
 RPT Level = 0.004  Analysis Date = 03/31/2016 
 RPT Level = 0.004  Analysis Date = 03/31/2016 
 RPT Level = 0.004  Analysis Date = 03/25/2016 
 RPT Level = 0.004  Analysis Date = 03/25/2016 
 RPT Level = 0.004  Analysis Date = 03/17/2016 
 RPT Level = 0.004  Analysis Date = 03/17/2016 
 RPT Level = 0.004  Analysis Date = 03/08/2016 
 RPT Level = 0.004  Analysis Date = 03/08/2016 
 RPT Level = 0.004  Analysis Date = 03/02/2016 
 RPT Level = 0.004  Analysis Date = 03/02/2016 
 RPT Level = 0.004  Analysis Date = 02/25/2016 
 RPT Level = 0.004  Analysis Date = 02/25/2016 
 RPT Level = 0.004  Analysis Date = 02/23/2016 
 RPT Level = 0.004  Analysis Date = 02/23/2016 
 RPT Level = 0.004  Analysis Date = 02/19/2016 
 RPT Level = 0.004  Analysis Date = 02/19/2016 
 RPT Level = 0.004  Analysis Date = 02/03/2016 
 RPT Level = 0.004  Analysis Date = 02/03/2016 
 RPT Level = 0.004  Analysis Date = 01/27/2016 
 RPT Level = 0.004  Analysis Date = 01/27/2016 
 RPT Level = 0.004  Analysis Date = 01/25/2016 
 RPT Level = 0.004  Analysis Date = 01/25/2016 
 RPT Level = 0.004  Analysis Date = 01/14/2016 
 RPT Level = 0.004  Analysis Date = 01/14/2016 
 RPT Level = 0.004  Analysis Date = 01/06/2016 
 RPT Level = 0.004  Analysis Date = 01/06/2016 
 RPT Level = 0.004  Analysis Date = 01/05/2016 
 RPT Level = 0.004  Analysis Date = 01/05/2016 
 RPT Level = 0.004  Analysis Date = 12/28/2015 
 RPT Level = 0.004  Analysis Date = 12/28/2015 
 RPT Level = 0.004  Analysis Date = 12/22/2015 
 RPT Level = 0.004  Analysis Date = 12/22/2015 
 RPT Level = 0.004  Analysis Date = 12/14/2015 
 RPT Level = 0.004  Analysis Date = 12/14/2015 
 RPT Level = 0.004  Analysis Date = 12/02/2015 
 RPT Level = 0.004  Analysis Date = 12/02/2015 
 RPT Level = 0.004  Analysis Date = 11/27/2015 
 RPT Level = 0.004  Analysis Date = 11/27/2015 
 RPT Level = 0.004  Analysis Date = 11/24/2015 
 RPT Level = 0.004  Analysis Date = 11/24/2015 
 RPT Level = 0.004  Analysis Date = 11/16/2015 
 RPT Level = 0.004  Analysis Date = 11/16/2015 
 RPT Level = 0.004  Analysis Date = 11/04/2015 
 RPT Level = 0.004  Analysis Date = 11/04/2015 
 RPT Level = 0.004  Analysis Date = 10/28/2015 
 RPT Level = 0.004  Analysis Date = 10/28/2015 
 RPT Level = 0.004  Analysis Date = 10/20/2015 
 RPT Level = 0.004  Analysis Date = 10/20/2015 
 RPT Level = 0.004  Analysis Date = 10/14/2015 
 RPT Level = 0.004  Analysis Date = 10/14/2015 
 RPT Level = 0.004  Analysis Date = 10/06/2015 
 RPT Level = 0.004  Analysis Date = 10/06/2015 
 RPT Level = 0.004  Analysis Date = 09/29/2015 
 RPT Level = 0.004  Analysis Date = 09/29/2015 
 RPT Level = 0.004  Analysis Date = 09/23/2015 
 RPT Level = 0.004  Analysis Date = 09/23/2015 
 RPT Level = 0.004  Analysis Date = 09/21/2015 
 RPT Level = 0.004  Analysis Date = 09/21/2015 
 RPT Level = 0.004  Analysis Date = 09/09/2015 
 RPT Level = 0.004  Analysis Date = 09/09/2015 
 RPT Level = 0.004  Analysis Date = 09/02/2015 
 RPT Level = 0.004  Analysis Date = 09/02/2015 
 RPT Level = 0.004  Analysis Date = 08/26/2015 
 RPT Level = 0.004  Analysis Date = 08/26/2015 
 RPT Level = 0.004  Analysis Date = 08/26/2015 
 RPT Level = 0.004  Analysis Date = 08/26/2015 
 RPT Level = 0.004  Analysis Date = 08/13/2015 
 RPT Level = 0.004  Analysis Date = 08/13/2015 
 RPT Level = 0.004  Analysis Date = 08/04/2015 
 RPT Level = 0.004  Analysis Date = 08/04/2015 
 RPT Level = 0.004  Analysis Date = 07/28/2015 
 RPT Level = 0.004  Analysis Date = 07/28/2015 
 RPT Level = 0.004  Analysis Date = 07/22/2015 
 RPT Level = 0.004  Analysis Date = 07/22/2015 
 RPT Level = 0.004  Analysis Date = 07/15/2015 
 RPT Level = 0.004  Analysis Date = 07/15/2015 
 RPT Level = 0.004  Analysis Date = 07/08/2015 
 RPT Level = 0.004  Analysis Date = 07/08/2015 
 RPT Level = 0.004  Analysis Date = 07/01/2015 
 RPT Level = 0.004  Analysis Date = 07/01/2015 
 RPT Level = 0.004  Analysis Date = 06/24/2015 
 RPT Level = 0.004  Analysis Date = 06/24/2015 
 RPT Level = 0.004  Analysis Date = 06/17/2015 
 RPT Level = 0.004  Analysis Date = 06/17/2015 
 RPT Level = 0.004  Analysis Date = 06/12/2015 
 RPT Level = 0.004  Analysis Date = 06/12/2015 
 RPT Level = 0.004  Analysis Date = 06/04/2015 
 RPT Level = 0.004  Analysis Date = 06/04/2015 
 RPT Level = 0.004  Analysis Date = 05/28/2015 
 RPT Level = 0.004  Analysis Date = 05/28/2015 
 RPT Level = 0.004  Analysis Date = 05/21/2015 
 RPT Level = 0.004  Analysis Date = 05/21/2015 
 RPT Level = 0.004  Analysis Date = 05/15/2015 
 RPT Level = 0.004  Analysis Date = 05/15/2015 
 RPT Level = 0.004  Analysis Date = 05/08/2015 
 RPT Level = 0.004  Analysis Date = 05/08/2015 
 RPT Level = 0.004  Analysis Date = 05/04/2015 
 RPT Level = 0.004  Analysis Date = 05/04/2015 
 RPT Level = 0.004  Analysis Date = 04/27/2015 
 RPT Level = 0.004  Analysis Date = 04/27/2015 
 RPT Level = 0.004  Analysis Date = 04/17/2015 
 RPT Level = 0.004  Analysis Date = 04/17/2015 
 RPT Level = 0.004  Analysis Date = 04/10/2015 
 RPT Level = 0.004  Analysis Date = 04/10/2015 
 RPT Level = 0.004  Analysis Date = 04/06/2015 
 RPT Level = 0.004  Analysis Date = 04/06/2015 
 RPT Level = 0.004  Analysis Date = 03/30/2015 
 RPT Level = 0.004  Analysis Date = 03/30/2015 
 RPT Level = 0.004  Analysis Date = 03/19/2015 
 RPT Level = 0.004  Analysis Date = 03/19/2015 
 RPT Level = 0.004  Analysis Date = 03/11/2015 
 RPT Level = 0.004  Analysis Date = 03/11/2015 
 RPT Level = 0.004  Analysis Date = 03/06/2015 
 RPT Level = 0.004  Analysis Date = 03/06/2015 
 RPT Level = 0.004  Analysis Date = 02/24/2015 
 RPT Level = 0.004  Analysis Date = 02/24/2015 
 RPT Level = 0.004  Analysis Date = 02/19/2015 
 RPT Level = 0.004  Analysis Date = 02/19/2015 
 RPT Level = 0.004  Analysis Date = 02/17/2015 
 RPT Level = 0.004  Analysis Date = 02/17/2015 
 RPT Level = 0.004  Analysis Date = 02/04/2015 
 RPT Level = 0.004  Analysis Date = 02/04/2015 
 RPT Level = 0.004  Analysis Date = 02/04/2015 
 RPT Level = 0.004  Analysis Date = 02/04/2015 
 RPT Level = 0.004  Analysis Date = 01/26/2015 
 RPT Level = 0.004  Analysis Date = 01/26/2015 
 RPT Level = 0.004  Analysis Date = 01/16/2015 
 RPT Level = 0.004  Analysis Date = 01/16/2015 
 RPT Level = 0.004  Analysis Date = 01/08/2015 
 RPT Level = 0.004  Analysis Date = 01/08/2015 
 RPT Level = 0.004  Analysis Date = 01/08/2015 
 RPT Level = 0.004  Analysis Date = 01/08/2015 
 RPT Level = 0.004  Analysis Date = 01/07/2015 
 RPT Level = 0.004  Analysis Date = 01/07/2015 
 RPT Level = 0.004  Analysis Date = 01/06/2015 
 RPT Level = 0.004  Analysis Date = 01/06/2015 
 RPT Level = 0.004  Analysis Date = 12/17/2014 
 RPT Level = 0.004  Analysis Date = 12/17/2014 
 RPT Level = 0.004  Analysis Date = 12/15/2014 
 RPT Level = 0.004  Analysis Date = 12/15/2014 
 RPT Level = 0.004  Analysis Date = 12/15/2014 
 RPT Level = 0.004  Analysis Date = 12/15/2014 
 RPT Level = 0.004  Analysis Date = 11/25/2014 
 RPT Level = 0.004  Analysis Date = 11/25/2014 
 RPT Level = 0.004  Analysis Date = 11/19/2014 
 RPT Level = 0.004  Analysis Date = 11/19/2014 
 RPT Level = 0.004  Analysis Date = 11/19/2014 
 RPT Level = 0.004  Analysis Date = 11/19/2014 
 RPT Level = 0.004  Analysis Date = 11/19/2014 
 RPT Level = 0.004  Analysis Date = 11/19/2014 
 RPT Level = 0.004  Analysis Date = 11/19/2014 
 RPT Level = 0.004  Analysis Date = 11/19/2014 
 RPT Level = 0.004  Analysis Date = 11/17/2014 
 RPT Level = 0.004  Analysis Date = 11/17/2014 
 RPT Level = 0.004  Analysis Date = 11/17/2014 
 RPT Level = 0.004  Analysis Date = 11/17/2014 
 RPT Level = 0.004  Analysis Date = 11/06/2014 
 RPT Level = 0.004  Analysis Date = 11/06/2014 
 RPT Level = 0.004  Analysis Date = 11/06/2014 
 RPT Level = 0.004  Analysis Date = 11/06/2014 
 RPT Level = 0.004  Analysis Date = 10/23/2014 
 RPT Level = 0.004  Analysis Date = 10/23/2014 
 RPT Level = 0.004  Analysis Date = 10/23/2014 
 RPT Level = 0.004  Analysis Date = 10/23/2014 
 RPT Level = 0.004  Analysis Date = 10/14/2014 
 RPT Level = 0.004  Analysis Date = 10/14/2014 
 RPT Level = 0.004  Analysis Date = 10/14/2014 
 RPT Level = 0.004  Analysis Date = 10/14/2014 
 RPT Level = 0.004  Analysis Date = 10/08/2014 
 RPT Level = 0.004  Analysis Date = 10/08/2014 
 RPT Level = 0.004  Analysis Date = 10/08/2014 
 RPT Level = 0.004  Analysis Date = 10/08/2014 
 RPT Level = 0.004  Analysis Date = 09/23/2014 
 RPT Level = 0.004  Analysis Date = 09/23/2014 
 RPT Level = 0.004  Analysis Date = 09/23/2014 
 RPT Level = 0.004  Analysis Date = 09/23/2014 
 RPT Level = 0.004  Analysis Date = 09/22/2014 
 RPT Level = 0.004  Analysis Date = 09/22/2014 
 RPT Level = 0.004  Analysis Date = 09/22/2014 
 RPT Level = 0.004  Analysis Date = 09/22/2014 
 RPT Level = 0.004  Analysis Date = 09/12/2014 
 RPT Level = 0.004  Analysis Date = 09/12/2014 
 RPT Level = 0.004  Analysis Date = 09/12/2014 
 RPT Level = 0.004  Analysis Date = 09/12/2014 
 RPT Level = 0.004  Analysis Date = 09/08/2014 
 RPT Level = 0.004  Analysis Date = 09/08/2014 
 RPT Level = 0.004  Analysis Date = 09/08/2014 
 RPT Level = 0.004  Analysis Date = 09/08/2014 
 RPT Level = 0.004  Analysis Date = 08/13/2014 
 RPT Level = 0.004  Analysis Date = 08/13/2014 
 RPT Level = 0.004  Analysis Date = 08/13/2014 
 RPT Level = 0.004  Analysis Date = 08/13/2014 
 RPT Level = 0.004  Analysis Date = 08/06/2014 
 RPT Level = 0.004  Analysis Date = 08/06/2014 
 RPT Level = 0.004  Analysis Date = 08/06/2014 
 RPT Level = 0.004  Analysis Date = 08/06/2014 
 RPT Level = 0.004  Analysis Date = 07/31/2014 
 RPT Level = 0.004  Analysis Date = 07/31/2014 
 RPT Level = 0.004  Analysis Date = 07/31/2014 
 RPT Level = 0.004  Analysis Date = 07/31/2014 
 RPT Level = 0.004  Analysis Date = 07/23/2014 
 RPT Level = 0.004  Analysis Date = 07/23/2014 
 RPT Level = 0.004  Analysis Date = 07/17/2014 
 RPT Level = 0.004  Analysis Date = 07/17/2014 
 RPT Level = 0.004  Analysis Date = 07/10/2014 
 RPT Level = 0.004  Analysis Date = 07/10/2014 
 RPT Level = 0.004  Analysis Date = 07/02/2014 
 RPT Level = 0.004  Analysis Date = 07/02/2014 
 RPT Level = 0.004  Analysis Date = 06/25/2014 
 RPT Level = 0.004  Analysis Date = 06/25/2014 
 RPT Level = 0.004  Analysis Date = 06/19/2014 
 RPT Level = 0.004  Analysis Date = 06/19/2014 
 RPT Level = 0.004  Analysis Date = 06/16/2014 
 RPT Level = 0.004  Analysis Date = 06/16/2014 
 RPT Level = 0.004  Analysis Date = 06/06/2014 
 RPT Level = 0.004  Analysis Date = 06/06/2014 
 RPT Level = 0.004  Analysis Date = 06/03/2014 
 RPT Level = 0.004  Analysis Date = 06/03/2014 
 RPT Level = 0.004  Analysis Date = 05/27/2014 
 RPT Level = 0.004  Analysis Date = 05/27/2014 
 RPT Level = 0.004  Analysis Date = 05/15/2014 
 RPT Level = 0.004  Analysis Date = 05/15/2014 
 RPT Level = 0.004  Analysis Date = 05/07/2014 
 RPT Level = 0.004  Analysis Date = 05/07/2014 
 RPT Level = 0.004  Analysis Date = 05/02/2014 
 RPT Level = 0.004  Analysis Date = 05/02/2014 
 RPT Level = 0.004  Analysis Date = 04/29/2014 
 RPT Level = 0.004  Analysis Date = 04/29/2014 
 RPT Level = 0.004  Analysis Date = 04/17/2014 
 RPT Level = 0.004  Analysis Date = 04/17/2014 
 RPT Level = 0.004  Analysis Date = 04/10/2014 
 RPT Level = 0.004  Analysis Date = 04/10/2014 
 RPT Level = 0.004  Analysis Date = 04/02/2014 
 RPT Level = 0.004  Analysis Date = 04/02/2014 
 RPT Level = 0.004  Analysis Date = 03/26/2014 
 RPT Level = 0.004  Analysis Date = 03/26/2014 
 RPT Level = 0.004  Analysis Date = 03/19/2014 
 RPT Level = 0.004  Analysis Date = 03/19/2014 
 RPT Level = 0.004  Analysis Date = 03/12/2014 
 RPT Level = 0.004  Analysis Date = 03/12/2014 
 RPT Level = 0.004  Analysis Date = 03/06/2014 
 RPT Level = 0.004  Analysis Date = 03/06/2014 
 RPT Level = 0.004  Analysis Date = 02/27/2014 
 RPT Level = 0.004  Analysis Date = 02/27/2014 
 RPT Level = 0.004  Analysis Date = 02/24/2014 
 RPT Level = 0.004  Analysis Date = 02/24/2014 
 RPT Level = 0.004  Analysis Date = 02/18/2014 
 RPT Level = 0.004  Analysis Date = 02/18/2014 
 RPT Level = 0.004  Analysis Date = 02/13/2014 
 RPT Level = 0.004  Analysis Date = 02/13/2014 
 RPT Level = 0.004  Analysis Date = 02/06/2014 
 RPT Level = 0.004  Analysis Date = 02/06/2014 
 RPT Level = 0.004  Analysis Date = 01/22/2014 
 RPT Level = 0.004  Analysis Date = 01/22/2014 
 RPT Level = 0.004  Analysis Date = 01/31/2014 
 RPT Level = 0.004  Analysis Date = 01/31/2014 
 RPT Level = 0.004  Analysis Date = 01/10/2014 
 RPT Level = 0.004  Analysis Date = 01/10/2014 
 RPT Level = 0.004  Analysis Date = 01/08/2014 
 RPT Level = 0.004  Analysis Date = 01/08/2014 
 RPT Level = 0.004  Analysis Date = 12/17/2013 
 RPT Level = 0.004  Analysis Date = 12/17/2013 
 RPT Level = 0.004  Analysis Date = 12/17/2013 
 RPT Level = 0.004  Analysis Date = 12/17/2013 
 RPT Level = 0.004  Analysis Date = 12/06/2013 
 RPT Level = 0.004  Analysis Date = 12/06/2013 
 RPT Level = 0.004  Analysis Date = 12/03/2013 
 RPT Level = 0.004  Analysis Date = 12/03/2013 
 RPT Level = 0.004  Analysis Date = 11/20/2013 
 RPT Level = 0.004  Analysis Date = 11/20/2013 
 RPT Level = 0.004  Analysis Date = 11/14/2013 
 RPT Level = 0.004  Analysis Date = 11/14/2013 
 RPT Level = 0.004  Analysis Date = 11/12/2013 
 RPT Level = 0.004  Analysis Date = 11/12/2013 
 RPT Level = 0.004  Analysis Date = 10/31/2013 
 RPT Level = 0.004  Analysis Date = 10/31/2013 
 RPT Level = 0.004  Analysis Date = 10/28/2013 
 RPT Level = 0.004  Analysis Date = 10/28/2013 
 RPT Level = 0.004  Analysis Date = 10/17/2013 
 RPT Level = 0.004  Analysis Date = 10/17/2013 
 RPT Level = 0.004  Analysis Date = 09/24/2013 
 RPT Level = 0.004  Analysis Date = 09/24/2013 
 RPT Level = 0.004  Analysis Date = 09/18/2013 
 RPT Level = 0.004  Analysis Date = 09/18/2013 
 RPT Level = 0.004  Analysis Date = 10/24/2013 
 RPT Level = 0.004  Analysis Date = 10/24/2013 
 RPT Level = 0.004  Analysis Date = 09/04/2013 
 RPT Level = 0.004  Analysis Date = 09/04/2013 
 RPT Level = 0.004  Analysis Date = 08/28/2013 
 RPT Level = 0.004  Analysis Date = 08/28/2013 
 RPT Level = 0.004  Analysis Date = 08/26/2013 
 RPT Level = 0.004  Analysis Date = 08/26/2013 
 RPT Level = 0.004  Analysis Date = 08/19/2013 
 RPT Level = 0.004  Analysis Date = 08/19/2013 
 RPT Level = 0.004  Analysis Date = 08/09/2013 
 RPT Level = 0.004  Analysis Date = 08/09/2013 
 RPT Level = 0.004  Analysis Date = 08/02/2013 
 RPT Level = 0.004  Analysis Date = 08/02/2013 
 RPT Level = 0.004  Analysis Date = 07/25/2013 
 RPT Level = 0.004  Analysis Date = 07/25/2013 
 RPT Level = 0.004  Analysis Date = 07/17/2013 
 RPT Level = 0.004  Analysis Date = 07/17/2013 
 RPT Level = 0.004  Analysis Date = 07/11/2013 
 RPT Level = 0.004  Analysis Date = 07/11/2013 
 RPT Level = 0.004  Analysis Date = 07/08/2013 
 RPT Level = 0.004  Analysis Date = 07/08/2013 
 RPT Level = 0.004  Analysis Date = 06/28/2013 
 RPT Level = 0.004  Analysis Date = 06/28/2013 
 RPT Level = 0.004  Analysis Date = 06/21/2013 
 RPT Level = 0.004  Analysis Date = 06/21/2013 
 RPT Level = 0.004  Analysis Date = 06/18/2013 
 RPT Level = 0.004  Analysis Date = 06/18/2013 
 RPT Level = 0.004  Analysis Date = 06/05/2013 
 RPT Level = 0.004  Analysis Date = 06/05/2013 
 RPT Level = 0.004  Analysis Date = 06/03/2013 
 RPT Level = 0.004  Analysis Date = 06/03/2013 
 RPT Level = 0.004  Analysis Date = 05/24/2013 
 RPT Level = 0.004  Analysis Date = 05/24/2013 
 RPT Level = 0.004  Analysis Date = 05/16/2013 
 RPT Level = 0.004  Analysis Date = 05/16/2013 
 RPT Level = 0.004  Analysis Date = 05/10/2013 
 RPT Level = 0.004  Analysis Date = 05/10/2013 
 RPT Level = 0.004  Analysis Date = 05/03/2013 
 RPT Level = 0.004  Analysis Date = 05/03/2013 
 RPT Level = 0.004  Analysis Date = 04/26/2013 
 RPT Level = 0.004  Analysis Date = 04/26/2013 
 RPT Level = 0.004  Analysis Date = 04/24/2013 
 RPT Level = 0.004  Analysis Date = 04/24/2013 
 RPT Level = 0.004  Analysis Date = 04/24/2013 
 RPT Level = 0.004  Analysis Date = 04/24/2013 
 RPT Level = 0.004  Analysis Date = 04/04/2013 
 RPT Level = 0.004  Analysis Date = 04/04/2013 
 RPT Level = 0.004  Analysis Date = 03/27/2013 
 RPT Level = 0.004  Analysis Date = 03/27/2013 
 RPT Level = 0.004  Analysis Date = 03/21/2013 
 RPT Level = 0.004  Analysis Date = 03/21/2013 
 RPT Level = 0.004  Analysis Date = 03/14/2013 
 RPT Level = 0.004  Analysis Date = 03/14/2013 
 RPT Level = 0.004  Analysis Date = 03/07/2013 
 RPT Level = 0.004  Analysis Date = 03/07/2013 
 RPT Level = 0.004  Analysis Date = 02/28/2013 
 RPT Level = 0.004  Analysis Date = 02/28/2013 
 RPT Level = 0.004  Analysis Date = 02/25/2013 
 RPT Level = 0.004  Analysis Date = 02/25/2013 
 RPT Level = 0.004  Analysis Date = 02/13/2013 
 RPT Level = 0.004  Analysis Date = 02/13/2013 
 RPT Level = 0.004  Analysis Date = 02/05/2013 
 RPT Level = 0.004  Analysis Date = 02/05/2013 
 RPT Level = 0.004  Analysis Date = 02/01/2013 
 RPT Level = 0.004  Analysis Date = 02/01/2013 
 RPT Level = 0.004  Analysis Date = 01/24/2013 
 RPT Level = 0.004  Analysis Date = 01/24/2013 
 RPT Level = 0.004  Analysis Date = 01/17/2013 
 RPT Level = 0.004  Analysis Date = 01/17/2013 
 RPT Level = 0.004  Analysis Date = 01/10/2013 
 RPT Level = 0.004  Analysis Date = 01/10/2013 
 RPT Level = 0.004  Analysis Date = 01/04/2013 
 RPT Level = 0.004  Analysis Date = 01/04/2013 
 RPT Level = 0.004  Analysis Date = 01/04/2013 
 RPT Level = 0.004  Analysis Date = 01/04/2013 
 RPT Level = 0.004  Analysis Date = 12/21/2012 
 RPT Level = 0.004  Analysis Date = 12/21/2012 
 RPT Level = 0.004  Analysis Date = 12/18/2012 
 RPT Level = 0.004  Analysis Date = 12/18/2012 
 RPT Level = 0.004  Analysis Date = 12/07/2012 
 RPT Level = 0.004  Analysis Date = 12/07/2012 
 RPT Level = 0.004  Analysis Date = 11/29/2012 
 RPT Level = 0.004  Analysis Date = 11/29/2012 
 RPT Level = 0.004  Analysis Date = 11/29/2012 
 RPT Level = 0.004  Analysis Date = 11/29/2012 
 RPT Level = 0.004  Analysis Date = 11/20/2012 
 RPT Level = 0.004  Analysis Date = 11/20/2012 
 RPT Level = 0.004  Analysis Date = 11/09/2012 
 RPT Level = 0.004  Analysis Date = 11/09/2012 
 RPT Level = 0.004  Analysis Date = 10/31/2012 
 RPT Level = 0.004  Analysis Date = 10/31/2012 
 RPT Level = 0.004  Analysis Date = 10/29/2012 
 RPT Level = 0.004  Analysis Date = 10/29/2012 
 RPT Level = 0.004  Analysis Date = 10/18/2012 
 RPT Level = 0.004  Analysis Date = 10/18/2012 
 RPT Level = 0.004  Analysis Date = 10/15/2012 
 RPT Level = 0.004  Analysis Date = 10/15/2012 
 RPT Level = 0.004  Analysis Date = 10/10/2012 
 RPT Level = 0.004  Analysis Date = 10/10/2012 
 RPT Level = 0.004  Analysis Date = 10/10/2012 
 RPT Level = 0.004  Analysis Date = 10/10/2012 
 RPT Level = 0.004  Analysis Date = 10/10/2012 
 RPT Level = 0.004  Analysis Date = 10/10/2012 
 RPT Level = 0.004  Analysis Date = 09/21/2012 
 RPT Level = 0.004  Analysis Date = 09/21/2012 
 RPT Level = 0.004  Analysis Date = 09/18/2012 
 RPT Level = 0.004  Analysis Date = 09/18/2012 
 RPT Level = 0.004  Analysis Date = 09/14/2012 
 RPT Level = 0.004  Analysis Date = 09/14/2012 
 RPT Level = 0.004  Analysis Date = 09/21/2012 
 RPT Level = 0.004  Analysis Date = 09/21/2012 
 RPT Level = 0.004  Analysis Date = 08/29/2012 
 RPT Level = 0.004  Analysis Date = 08/29/2012 
 RPT Level = 0.004  Analysis Date = 08/23/2012 
 RPT Level = 0.004  Analysis Date = 08/23/2012 
 RPT Level = 0.004  Analysis Date = 08/16/2012 
 RPT Level = 0.004  Analysis Date = 08/16/2012 
 RPT Level = 0.004  Analysis Date = 08/01/2012 
 RPT Level = 0.004  Analysis Date = 08/01/2012 
 RPT Level = 0.004  Analysis Date = 07/20/2012 
 RPT Level = 0.004  Analysis Date = 07/20/2012 
 RPT Level = 0.004  Analysis Date = 07/13/2012 
 RPT Level = 0.004  Analysis Date = 07/13/2012 
 RPT Level = 0.004  Analysis Date = 08/01/2012 
 RPT Level = 0.004  Analysis Date = 08/01/2012 
 RPT Level = 0.004  Analysis Date = 07/06/2012 
 RPT Level = 0.004  Analysis Date = 07/06/2012 
 RPT Level = 0.004  Analysis Date = 06/22/2012 
 RPT Level = 0.004  Analysis Date = 06/22/2012 
 RPT Level = 0.004  Analysis Date = 06/14/2012 
 RPT Level = 0.004  Analysis Date = 06/14/2012 
 RPT Level = 0.004  Analysis Date = 06/13/2012 
 RPT Level = 0.004  Analysis Date = 06/13/2012 
 RPT Level = 0.004  Analysis Date = 06/07/2012 
 RPT Level = 0.004  Analysis Date = 06/07/2012 
 RPT Level = 0.004  Analysis Date = 06/06/2012 
 RPT Level = 0.004  Analysis Date = 06/06/2012 
 RPT Level = 0.004  Analysis Date = 05/22/2012 
 RPT Level = 0.004  Analysis Date = 05/22/2012 
 RPT Level = 0.004  Analysis Date = 05/11/2012 
 RPT Level = 0.004  Analysis Date = 05/11/2012 
 RPT Level = 0.004  Analysis Date = 05/08/2012 
 RPT Level = 0.004  Analysis Date = 05/08/2012 
 RPT Level = 0.004  Analysis Date = 05/01/2012 
 RPT Level = 0.004  Analysis Date = 05/01/2012 
 RPT Level = 0.004  Analysis Date = 04/18/2012 
 RPT Level = 0.004  Analysis Date = 04/18/2012 
 RPT Level = 0.004  Analysis Date = 04/11/2012 
 RPT Level = 0.004  Analysis Date = 04/11/2012 
 RPT Level = 0.004  Analysis Date = 04/04/2012 
 RPT Level = 0.004  Analysis Date = 04/04/2012 
 RPT Level = 0.004  Analysis Date = 03/29/2012 
 RPT Level = 0.004  Analysis Date = 03/29/2012 
 RPT Level = 0.004  Analysis Date = 03/28/2012 
 RPT Level = 0.004  Analysis Date = 03/28/2012 
 RPT Level = 0.004  Analysis Date = 03/21/2012 
 RPT Level = 0.004  Analysis Date = 03/21/2012 
 RPT Level = 0.004  Analysis Date = 03/13/2012 
 RPT Level = 0.004  Analysis Date = 03/13/2012 
 RPT Level = 0.004  Analysis Date = 03/06/2012 
 RPT Level = 0.004  Analysis Date = 03/06/2012 
 RPT Level = 0.004  Analysis Date = 02/23/2012 
 RPT Level = 0.004  Analysis Date = 02/23/2012 
 RPT Level = 0.004  Analysis Date = 02/23/2012 
 RPT Level = 0.004  Analysis Date = 02/23/2012 
 RPT Level = 0.004  Analysis Date = 02/08/2012 
 RPT Level = 0.004  Analysis Date = 02/08/2012 
 RPT Level = 0.004  Analysis Date = 02/02/2012 
 RPT Level = 0.004  Analysis Date = 02/02/2012 
 RPT Level = 0.004  Analysis Date = 01/25/2012 
 RPT Level = 0.004  Analysis Date = 01/25/2012 
 RPT Level = 0.004  Analysis Date = 01/19/2012 
 RPT Level = 0.004  Analysis Date = 01/19/2012 
 RPT Level = 0.004  Analysis Date = 01/12/2012 
 RPT Level = 0.004  Analysis Date = 01/12/2012 
 RPT Level = 0.004  Analysis Date = 01/09/2012 
 RPT Level = 0.004  Analysis Date = 01/09/2012 
 RPT Level = 0.004  Analysis Date = 01/09/2012 
 RPT Level = 0.004  Analysis Date = 01/09/2012 
 RPT Level = 0.004  Analysis Date = 12/21/2011 
 RPT Level = 0.004  Analysis Date = 12/21/2011 
 RPT Level = 0.004  Analysis Date = 12/20/2011 
 RPT Level = 0.004  Analysis Date = 12/20/2011 
 RPT Level = 0.004  Analysis Date = 12/15/2011 
 RPT Level = 0.004  Analysis Date = 12/15/2011 
 RPT Level = 0.004  Analysis Date = 12/02/2011 
 RPT Level = 0.004  Analysis Date = 12/02/2011 
 RPT Level = 0.004  Analysis Date = 12/01/2011 
 RPT Level = 0.004  Analysis Date = 12/01/2011 
 RPT Level = 0.004  Analysis Date = 11/28/2011 
 RPT Level = 0.004  Analysis Date = 11/28/2011 
 RPT Level = 0.004  Analysis Date = 11/09/2011 
 RPT Level = 0.004  Analysis Date = 11/09/2011 
 RPT Level = 0.004  Analysis Date = 11/08/2011 
 RPT Level = 0.004  Analysis Date = 11/08/2011 
 RPT Level = 0.004  Analysis Date = 10/26/2011 
 RPT Level = 0.004  Analysis Date = 10/26/2011 
 RPT Level = 0.004  Analysis Date = 10/25/2011 
 RPT Level = 0.004  Analysis Date = 10/25/2011 
 RPT Level = 0.004  Analysis Date = 10/14/2011 
 RPT Level = 0.004  Analysis Date = 10/14/2011 
 RPT Level = 0.004  Analysis Date = 10/04/2011 
 RPT Level = 0.004  Analysis Date = 10/04/2011 
 RPT Level = 0.004  Analysis Date = 09/29/2011 
 RPT Level = 0.004  Analysis Date = 09/29/2011 
 RPT Level = 0.004  Analysis Date = 09/22/2011 
 RPT Level = 0.004  Analysis Date = 09/22/2011 
 RPT Level = 0.004  Analysis Date = 09/16/2011 
 RPT Level = 0.004  Analysis Date = 09/16/2011 
 RPT Level = 0.004  Analysis Date = 09/12/2011 
 RPT Level = 0.004  Analysis Date = 09/12/2011 
 RPT Level = 0.004  Analysis Date = 09/08/2011 
 RPT Level = 0.004  Analysis Date = 09/08/2011 
 RPT Level = 0.004  Analysis Date = 08/25/2011 
 RPT Level = 0.004  Analysis Date = 08/25/2011 
 RPT Level = 0.004  Analysis Date = 08/19/2011 
 RPT Level = 0.004  Analysis Date = 08/19/2011 
 RPT Level = 0.004  Analysis Date = 08/10/2011 
 RPT Level = 0.004  Analysis Date = 08/10/2011 
 RPT Level = 0.004  Analysis Date = 08/02/2011 
 RPT Level = 0.004  Analysis Date = 08/02/2011 
 RPT Level = 0.004  Analysis Date = 07/28/2011 
 RPT Level = 0.004  Analysis Date = 07/28/2011 
 RPT Level = 0.004  Analysis Date = 07/21/2011 
 RPT Level = 0.004  Analysis Date = 07/21/2011 
 RPT Level = 0.004  Analysis Date = 07/13/2011 
 RPT Level = 0.004  Analysis Date = 07/13/2011 
 RPT Level = 0.004  Analysis Date = 07/08/2011 
 RPT Level = 0.004  Analysis Date = 07/08/2011 
 RPT Level = 0.004  Analysis Date = 06/29/2011 
 RPT Level = 0.004  Analysis Date = 06/29/2011 
 RPT Level = 0.004  Analysis Date = 06/22/2011 
 RPT Level = 0.004  Analysis Date = 06/22/2011 
 RPT Level = 0.004  Analysis Date = 06/15/2011 
 RPT Level = 0.004  Analysis Date = 06/15/2011 
 RPT Level = 0.004  Analysis Date = 06/07/2011 
 RPT Level = 0.004  Analysis Date = 06/07/2011 
 RPT Level = 0.004  Analysis Date = 06/03/2011 
 RPT Level = 0.004  Analysis Date = 06/03/2011 
 RPT Level = 0.004  Analysis Date = 05/25/2011 
 RPT Level = 0.004  Analysis Date = 05/25/2011 
 RPT Level = 0.004  Analysis Date = 05/19/2011 
 RPT Level = 0.004  Analysis Date = 05/19/2011 
 RPT Level = 0.004  Analysis Date = 05/11/2011 
 RPT Level = 0.004  Analysis Date = 05/11/2011 
 RPT Level = 0.004  Analysis Date = 05/05/2011 
 RPT Level = 0.004  Analysis Date = 05/05/2011 
 RPT Level = 0.004  Analysis Date = 04/27/2011 
 RPT Level = 0.004  Analysis Date = 04/27/2011 
 RPT Level = 0.004  Analysis Date = 04/20/2011 
 RPT Level = 0.004  Analysis Date = 04/20/2011 
 RPT Level = 0.004  Analysis Date = 04/13/2011 
 RPT Level = 0.004  Analysis Date = 04/13/2011 
 RPT Level = 0.004  Analysis Date = 04/07/2011 
 RPT Level = 0.004  Analysis Date = 04/07/2011 
 RPT Level = 0.004  Analysis Date = 03/30/2011 
 RPT Level = 0.004  Analysis Date = 03/30/2011 
 RPT Level = 0.004  Analysis Date = 03/22/2011 
 RPT Level = 0.004  Analysis Date = 03/22/2011 
 RPT Level = 0.004  Analysis Date = 03/18/2011 
 RPT Level = 0.004  Analysis Date = 03/18/2011 
 RPT Level = 0.004  Analysis Date = 03/09/2011 
 RPT Level = 0.004  Analysis Date = 03/09/2011 
 RPT Level = 0.004  Analysis Date = 03/01/2011 
 RPT Level = 0.004  Analysis Date = 03/01/2011 
 RPT Level = 0.004  Analysis Date = 02/24/2011 
 RPT Level = 0.004  Analysis Date = 02/24/2011 
 RPT Level = 0.004  Analysis Date = 02/16/2011 
 RPT Level = 0.004  Analysis Date = 02/16/2011 
 RPT Level = 0.004  Analysis Date = 02/15/2011 
 RPT Level = 0.004  Analysis Date = 02/15/2011 
 RPT Level = 0.004  Analysis Date = 02/15/2011 
 RPT Level = 0.004  Analysis Date = 02/15/2011 
 RPT Level = 0.004  Analysis Date = 02/02/2011 
 RPT Level = 0.004  Analysis Date = 02/02/2011 
 RPT Level = 0.004  Analysis Date = 02/01/2011 
 RPT Level = 0.004  Analysis Date = 02/01/2011 
 RPT Level = 0.004  Analysis Date = 01/20/2011 
 RPT Level = 0.004  Analysis Date = 01/20/2011 
 RPT Level = 0.004  Analysis Date = 01/10/2011 
 RPT Level = 0.004  Analysis Date = 01/10/2011 
 RPT Level = 0.004  Analysis Date = 01/10/2011 
 RPT Level = 0.004  Analysis Date = 01/10/2011 
 RPT Level = 0.004  Analysis Date = 01/14/2011 
 RPT Level = 0.004  Analysis Date = 01/14/2011 
 RPT Level = 0.004  Analysis Date = 01/06/2011 
 RPT Level = 0.004  Analysis Date = 01/06/2011 
 RPT Level = 0.004  Analysis Date = 12/15/2010 
 RPT Level = 0.004  Analysis Date = 12/15/2010 
 RPT Level = 0.004  Analysis Date = 12/09/2010 
 RPT Level = 0.004  Analysis Date = 12/09/2010 
 RPT Level = 0.004  Analysis Date = 12/09/2010 
 RPT Level = 0.004  Analysis Date = 12/09/2010 
 RPT Level = 0.004  Analysis Date = 12/02/2010 
 RPT Level = 0.004  Analysis Date = 12/02/2010 
 RPT Level = 0.004  Analysis Date = 11/18/2010 
 RPT Level = 0.004  Analysis Date = 11/18/2010 
 RPT Level = 0.004  Analysis Date = 11/09/2010 
 RPT Level = 0.004  Analysis Date = 11/09/2010 
 RPT Level = 0.004  Analysis Date = 11/09/2010 
 RPT Level = 0.004  Analysis Date = 11/09/2010 
 RPT Level = 0.004  Analysis Date = 11/04/2010 
 RPT Level = 0.004  Analysis Date = 11/04/2010 
 RPT Level = 0.004  Analysis Date = 10/27/2010 
 RPT Level = 0.004  Analysis Date = 10/27/2010 
 RPT Level = 0.004  Analysis Date = 10/26/2010 
 RPT Level = 0.004  Analysis Date = 10/26/2010 
 RPT Level = 0.004  Analysis Date = 10/14/2010 
 RPT Level = 0.004  Analysis Date = 10/14/2010 
 RPT Level = 0.004  Analysis Date = 10/14/2010 
 RPT Level = 0.004  Analysis Date = 10/14/2010 
 RPT Level = 0.004  Analysis Date = 09/30/2010 
 RPT Level = 0.004  Analysis Date = 09/30/2010 
 RPT Level = 0.004  Analysis Date = 09/29/2010 
 RPT Level = 0.004  Analysis Date = 09/29/2010 
 RPT Level = 0.004  Analysis Date = 09/16/2010 
 RPT Level = 0.004  Analysis Date = 09/16/2010 
 RPT Level = 0.004  Analysis Date = 09/16/2010 
 RPT Level = 0.004  Analysis Date = 09/16/2010 
 RPT Level = 0.004  Analysis Date = 08/31/2010 
 RPT Level = 0.004  Analysis Date = 08/31/2010 
 RPT Level = 0.004  Analysis Date = 08/26/2010 
 RPT Level = 0.004  Analysis Date = 08/26/2010 
 RPT Level = 0.004  Analysis Date = 08/17/2010 
 RPT Level = 0.004  Analysis Date = 08/17/2010 
 RPT Level = 0.004  Analysis Date = 08/12/2010 
 RPT Level = 0.004  Analysis Date = 08/12/2010 
 RPT Level = 0.004  Analysis Date = 08/05/2010 
 RPT Level = 0.004  Analysis Date = 08/05/2010 
 RPT Level = 0.004  Analysis Date = 07/16/2010 
 RPT Level = 0.004  Analysis Date = 07/16/2010 
 RPT Level = 0.004  Analysis Date = 07/16/2010 
 RPT Level = 0.004  Analysis Date = 07/16/2010 
 RPT Level = 0.004  Analysis Date = 07/16/2010 
 RPT Level = 0.004  Analysis Date = 07/16/2010 
 RPT Level = 0.004  Analysis Date = 07/14/2010 
 RPT Level = 0.004  Analysis Date = 07/14/2010 
 RPT Level = 0.004  Analysis Date = 07/13/2010 
 RPT Level = 0.004  Analysis Date = 07/13/2010 
 RPT Level = 0.004  Analysis Date = 06/28/2010 
 RPT Level = 0.004  Analysis Date = 06/28/2010 
 RPT Level = 0.004  Analysis Date = 06/25/2010 
 RPT Level = 0.004  Analysis Date = 06/25/2010 
 RPT Level = 0.004  Analysis Date = 06/24/2010 
 RPT Level = 0.004  Analysis Date = 06/24/2010 
 RPT Level = 0.004  Analysis Date = 06/17/2010 
 RPT Level = 0.004  Analysis Date = 06/17/2010 
 RPT Level = 0.004  Analysis Date = 05/27/2010 
 RPT Level = 0.004  Analysis Date = 05/27/2010 
 RPT Level = 0.004  Analysis Date = 05/11/2010 
 RPT Level = 0.004  Analysis Date = 05/11/2010 
 RPT Level = 0.004  Analysis Date = 05/11/2010 
 RPT Level = 0.004  Analysis Date = 05/11/2010 
 RPT Level = 0.004  Analysis Date = 05/10/2010 
 RPT Level = 0.004  Analysis Date = 05/10/2010 
 RPT Level = 0.004  Analysis Date = 04/26/2010 
 RPT Level = 0.004  Analysis Date = 04/26/2010 
 RPT Level = 0.004  Analysis Date = 04/14/2010 
 RPT Level = 0.004  Analysis Date = 04/14/2010 
 RPT Level = 0.004  Analysis Date = 04/12/2010 
 RPT Level = 0.004  Analysis Date = 04/12/2010 
 RPT Level = 0.004  Analysis Date = 04/12/2010 
 RPT Level = 0.004  Analysis Date = 04/12/2010 
 RPT Level = 0.004  Analysis Date = 04/06/2010 
 RPT Level = 0.004  Analysis Date = 04/06/2010 
 RPT Level = 0.004  Analysis Date = 03/31/2010 
 RPT Level = 0.004  Analysis Date = 03/31/2010 
 RPT Level = 0.004  Analysis Date = 03/11/2010 
 RPT Level = 0.004  Analysis Date = 03/11/2010 
 RPT Level = 0.004  Analysis Date = 02/23/2010 
 RPT Level = 0.004  Analysis Date = 02/23/2010 
 RPT Level = 0.004  Analysis Date = 02/22/2010 
 RPT Level = 0.004  Analysis Date = 02/22/2010 
 RPT Level = 0.004  Analysis Date = 02/22/2010 
 RPT Level = 0.004  Analysis Date = 02/22/2010 
 RPT Level = 0.004  Analysis Date = 02/18/2010 
 RPT Level = 0.004  Analysis Date = 02/18/2010 
 RPT Level = 0.004  Analysis Date = 02/11/2010 
 RPT Level = 0.004  Analysis Date = 02/11/2010 
 RPT Level = 0.004  Analysis Date = 01/28/2010 
 RPT Level = 0.004  Analysis Date = 01/28/2010 
 RPT Level = 0.004  Analysis Date = 01/14/2010 
 RPT Level = 0.004  Analysis Date = 01/14/2010 
 RPT Level = 0.004  Analysis Date = 01/12/2010 
 RPT Level = 0.004  Analysis Date = 01/12/2010 
 RPT Level = 0.004  Analysis Date = 01/12/2010 
 RPT Level = 0.004  Analysis Date = 01/12/2010 
 RPT Level = 0.004  Analysis Date = 01/12/2010 
 RPT Level = 0.004  Analysis Date = 01/12/2010 
 RPT Level = 0.004  Analysis Date = 01/07/2010 
 RPT Level = 0.004  Analysis Date = 01/07/2010 
 RPT Level = 0.004  Analysis Date = 12/22/2009 
 RPT Level = 0.004  Analysis Date = 12/22/2009 
 RPT Level = 0.004  Analysis Date = 01/06/2010 
 RPT Level = 0.004  Analysis Date = 01/06/2010 
 RPT Level = 0.004  Analysis Date = 11/27/2009 
 RPT Level = 0.004  Analysis Date = 11/27/2009 
 RPT Level = 0.004  Analysis Date = 11/27/2009 
 RPT Level = 0.004  Analysis Date = 11/27/2009 
 RPT Level = 0.004  Analysis Date = 11/25/2009 
 RPT Level = 0.004  Analysis Date = 11/25/2009 
 RPT Level = 0.004  Analysis Date = 11/24/2009 
 RPT Level = 0.004  Analysis Date = 11/24/2009 
 RPT Level = 0.004  Analysis Date = 11/19/2009 
 RPT Level = 0.004  Analysis Date = 11/19/2009 
 RPT Level = 0.004  Analysis Date = 11/06/2009 
 RPT Level = 0.004  Analysis Date = 11/06/2009 
 RPT Level = 0.004  Analysis Date = 11/05/2009 
 RPT Level = 0.004  Analysis Date = 11/05/2009 
 RPT Level = 0.004  Analysis Date = 10/22/2009 
 RPT Level = 0.004  Analysis Date = 10/22/2009 
 RPT Level = 0.004  Analysis Date = 10/22/2009 
 RPT Level = 0.004  Analysis Date = 10/22/2009 
 RPT Level = 0.004  Analysis Date = 10/15/2009 
 RPT Level = 0.004  Analysis Date = 10/15/2009 
 RPT Level = 0.004  Analysis Date = 09/30/2009 
 RPT Level = 0.004  Analysis Date = 09/30/2009 
 RPT Level = 0.004  Analysis Date = 09/30/2009 
 RPT Level = 0.004  Analysis Date = 09/30/2009 
 RPT Level = 0.004  Analysis Date = 09/23/2009 
 RPT Level = 0.004  Analysis Date = 09/23/2009 
 RPT Level = 0.004  Analysis Date = 09/10/2009 
 RPT Level = 0.004  Analysis Date = 09/10/2009 
 RPT Level = 0.004  Analysis Date = 09/02/2009 
 RPT Level = 0.004  Analysis Date = 09/02/2009 
 RPT Level = 0.004  Analysis Date = 08/26/2009 
 RPT Level = 0.004  Analysis Date = 08/26/2009 
 RPT Level = 0.004  Analysis Date = 08/20/2009 
 RPT Level = 0.004  Analysis Date = 08/20/2009 
 RPT Level = 0.004  Analysis Date = 08/12/2009 
 RPT Level = 0.004  Analysis Date = 08/12/2009 
 RPT Level = 0.004  Analysis Date = 07/29/2009 
 RPT Level = 0.004  Analysis Date = 07/29/2009 
 RPT Level = 0.004  Analysis Date = 07/23/2009 
 RPT Level = 0.004  Analysis Date = 07/23/2009 
 RPT Level = 0.004  Analysis Date = 07/16/2009 
 RPT Level = 0.004  Analysis Date = 07/16/2009 
 RPT Level = 0.004  Analysis Date = 07/09/2009 
 RPT Level = 0.004  Analysis Date = 07/09/2009 
 RPT Level = 0.004  Analysis Date = 06/30/2009 
 RPT Level = 0.004  Analysis Date = 06/30/2009 
 RPT Level = 0.004  Analysis Date = 06/25/2009 
 RPT Level = 0.004  Analysis Date = 06/25/2009 
 RPT Level = 0.004  Analysis Date = 06/17/2009 
 RPT Level = 0.004  Analysis Date = 06/17/2009 
 RPT Level = 0.004  Analysis Date = 06/10/2009 
 RPT Level = 0.004  Analysis Date = 06/10/2009 
 RPT Level = 0.004  Analysis Date = 06/04/2009 
 RPT Level = 0.004  Analysis Date = 06/04/2009 
 RPT Level = 0.004  Analysis Date = 05/21/2009 
 RPT Level = 0.004  Analysis Date = 05/21/2009 
 RPT Level = 0.004  Analysis Date = 05/20/2009 
 RPT Level = 0.004  Analysis Date = 05/20/2009 
 RPT Level = 0.004  Analysis Date = 05/14/2009 
 RPT Level = 0.004  Analysis Date = 05/14/2009 
 RPT Level = 0.004  Analysis Date = 05/06/2009 
 RPT Level = 0.004  Analysis Date = 05/06/2009 
 RPT Level = 0.004  Analysis Date = 04/30/2009 
 RPT Level = 0.004  Analysis Date = 04/30/2009 
 RPT Level = 0.004  Analysis Date = 04/15/2009 
 RPT Level = 0.004  Analysis Date = 04/15/2009 
 RPT Level = 0.004  Analysis Date = 04/08/2009 
 RPT Level = 0.004  Analysis Date = 04/08/2009 
 RPT Level = 0.004  Analysis Date = 04/08/2009 
 RPT Level = 0.004  Analysis Date = 04/08/2009 
 RPT Level = 0.004  Analysis Date = 04/06/2009 
 RPT Level = 0.004  Analysis Date = 04/06/2009 
 RPT Level = 0.004  Analysis Date = 03/31/2009 
 RPT Level = 0.004  Analysis Date = 03/31/2009 
 RPT Level = 0.004  Analysis Date = 03/10/2009 
 RPT Level = 0.004  Analysis Date = 03/10/2009 
 RPT Level = 0.004  Analysis Date = 03/04/2009 
 RPT Level = 0.004  Analysis Date = 03/04/2009 
 RPT Level = 0.004  Analysis Date = 03/04/2009 
 RPT Level = 0.004  Analysis Date = 03/04/2009 
 RPT Level = 0.004  Analysis Date = 03/03/2009 
 RPT Level = 0.004  Analysis Date = 03/03/2009 
 RPT Level = 0.004  Analysis Date = 02/18/2009 
 RPT Level = 0.004  Analysis Date = 02/18/2009 
 RPT Level = 0.004  Analysis Date = 02/03/2009 
 RPT Level = 0.004  Analysis Date = 02/03/2009 
 RPT Level = 0.004  Analysis Date = 02/03/2009 
 RPT Level = 0.004  Analysis Date = 02/03/2009 
 RPT Level = 0.004  Analysis Date = 01/28/2009 
 RPT Level = 0.004  Analysis Date = 01/28/2009 
 RPT Level = 0.004  Analysis Date = 01/22/2009 
 RPT Level = 0.004  Analysis Date = 01/22/2009 
 RPT Level = 0.004  Analysis Date = 01/08/2009 
 RPT Level = 0.004  Analysis Date = 01/08/2009 
 RPT Level = 0.004  Analysis Date = 01/08/2009 
 RPT Level = 0.004  Analysis Date = 01/08/2009 
 RPT Level = 0.004  Analysis Date = 01/07/2009 
 RPT Level = 0.004  Analysis Date = 01/07/2009 
 RPT Level = 0.004  Analysis Date = 12/22/2008 
 RPT Level = 0.004  Analysis Date = 12/22/2008 
 RPT Level = 0.004  Analysis Date = 12/18/2008 
 RPT Level = 0.004  Analysis Date = 12/18/2008 
 RPT Level = 0.004  Analysis Date = 12/09/2008 
 RPT Level = 0.004  Analysis Date = 12/09/2008 
 RPT Level = 0.004  Analysis Date = 12/04/2008 
 RPT Level = 0.004  Analysis Date = 12/04/2008 
 RPT Level = 0.004  Analysis Date = 12/03/2008 
 RPT Level = 0.004  Analysis Date = 12/03/2008 
 RPT Level = 0.004  Analysis Date = 12/22/2008 
 RPT Level = 0.004  Analysis Date = 12/22/2008 
 RPT Level = 0.004  Analysis Date = 11/13/2008 
 RPT Level = 0.004  Analysis Date = 11/13/2008 
 RPT Level = 0.004  Analysis Date = 11/12/2008 
 RPT Level = 0.004  Analysis Date = 11/12/2008 
 RPT Level = 0.004  Analysis Date = 11/04/2008 
 RPT Level = 0.004  Analysis Date = 11/04/2008 
 RPT Level = 0.004  Analysis Date = 10/16/2008 
 RPT Level = 0.004  Analysis Date = 10/16/2008 
 RPT Level = 0.004  Analysis Date = 10/15/2008 
 RPT Level = 0.004  Analysis Date = 10/15/2008 
 RPT Level = 0.004  Analysis Date = 10/08/2008 
 RPT Level = 0.003  Analysis Date = 10/08/2008 
 RPT Level = 0.003  Analysis Date = 09/30/2008 
 RPT Level = 0.003  Analysis Date = 09/30/2008 
 RPT Level = 0.003  Analysis Date = 09/24/2008 
 RPT Level = 0.003  Analysis Date = 09/24/2008 
 RPT Level = 0.003  Analysis Date = 09/23/2008 
 RPT Level = 0.003  Analysis Date = 09/23/2008 
 RPT Level = 0.003  Analysis Date = 09/16/2008 
 RPT Level = 0.003  Analysis Date = 09/16/2008 
 RPT Level = 0.003  Analysis Date = 09/10/2008 
 RPT Level = 0.003  Analysis Date = 09/10/2008 
 RPT Level = 0.003  Analysis Date = 08/26/2008 
 RPT Level = 0.003  Analysis Date = 08/26/2008 
 RPT Level = 0.003  Analysis Date = 08/28/2008 
 RPT Level = 0.003  Analysis Date = 08/28/2008 
 RPT Level = 0.003  Analysis Date = 08/20/2008 
 RPT Level = 0.003  Analysis Date = 08/20/2008 
 RPT Level = 0.003  Analysis Date = 07/24/2008 
 RPT Level = 0.003  Analysis Date = 07/24/2008 
 RPT Level = 0.003  Analysis Date = 07/17/2008 
 RPT Level = 0.003  Analysis Date = 07/17/2008 
 RPT Level = 0.003  Analysis Date = 07/14/2008 
 RPT Level = 0.003  Analysis Date = 07/14/2008 
 RPT Level = 0.003  Analysis Date = 07/10/2008 
 RPT Level = 0.003  Analysis Date = 07/10/2008 
 RPT Level = 0.003  Analysis Date = 07/02/2008 
 RPT Level = 0.003  Analysis Date = 07/02/2008 
 RPT Level = 0.003  Analysis Date = 06/24/2008 
 RPT Level = 0.003  Analysis Date = 06/24/2008 
 RPT Level = 0.003  Analysis Date = 06/18/2008 
 RPT Level = 0.003  Analysis Date = 06/18/2008 
 RPT Level = 0.003  Analysis Date = 06/11/2008 
 RPT Level = 0.003  Analysis Date = 06/11/2008 
 RPT Level = 0.003  Analysis Date = 06/09/2008 
 RPT Level = 0.003  Analysis Date = 06/09/2008 
 RPT Level = 0.003  Analysis Date = 05/21/2008 
 RPT Level = 0.003  Analysis Date = 05/21/2008 
 RPT Level = 0.003  Analysis Date = 05/20/2008 
 RPT Level = 0.003  Analysis Date = 05/20/2008 
 RPT Level = 0.003  Analysis Date = 05/13/2008 
 RPT Level = 0.003  Analysis Date = 05/13/2008 
 RPT Level = 0.003  Analysis Date = 05/06/2008 
 RPT Level = 0.003  Analysis Date = 05/06/2008 
 RPT Level = 0.003  Analysis Date = 04/30/2008 
 RPT Level = 0.003  Analysis Date = 04/30/2008 
 RPT Level = 0.003  Analysis Date = 04/29/2008 
 RPT Level = 0.003  Analysis Date = 04/29/2008 
 RPT Level = 0.003  Analysis Date = 04/15/2008 
 RPT Level = 0.003  Analysis Date = 04/15/2008 
 RPT Level = 0.003  Analysis Date = 04/15/2008 
 RPT Level = 0.003  Analysis Date = 04/15/2008 
 RPT Level = 0.003  Analysis Date = 03/31/2008 
 RPT Level = 0.003  Analysis Date = 03/31/2008 
 RPT Level = 0.003  Analysis Date = 03/26/2008 
 RPT Level = 0.003  Analysis Date = 03/26/2008 
 RPT Level = 0.003  Analysis Date = 03/20/2008 
 RPT Level = 0.003  Analysis Date = 03/20/2008 
 RPT Level = 0.003  Analysis Date = 03/06/2008 
 RPT Level = 0.003  Analysis Date = 03/06/2008 
 RPT Level = 0.003  Analysis Date = 03/05/2008 
 RPT Level = 0.003  Analysis Date = 03/05/2008 
 RPT Level = 0.003  Analysis Date = 02/28/2008 
 RPT Level = 0.003  Analysis Date = 02/28/2008 
 RPT Level = 0.003  Analysis Date = 02/12/2008 
 RPT Level = 0.003  Analysis Date = 02/12/2008 
 RPT Level = 0.003  Analysis Date = 02/06/2008 
 RPT Level = 0.003  Analysis Date = 02/06/2008 
 RPT Level = 0.003  Analysis Date = 01/29/2008 
 RPT Level = 0.003  Analysis Date = 01/29/2008 
 RPT Level = 0.003  Analysis Date = 01/24/2008 
 RPT Level = 0.003  Analysis Date = 01/24/2008 
 RPT Level = 0.003  Analysis Date = 01/23/2008 
 RPT Level = 0.003  Analysis Date = 01/23/2008 
 RPT Level = 0.003  Analysis Date = 01/17/2008 
 RPT Level = 0.003  Analysis Date = 01/17/2008 
 RPT Level = 0.003  Analysis Date = 01/08/2008 
 RPT Level = 0.003  Analysis Date = 01/08/2008 
 RPT Level = 0.003  Analysis Date = 01/03/2008 
 RPT Level = 0.003  Analysis Date = 01/03/2008 
 RPT Level = 0.003  Analysis Date = 12/13/2007 
 RPT Level = 0.003  Analysis Date = 12/13/2007 
 RPT Level = 0.003  Analysis Date = 12/04/2007 
 RPT Level = 0.003  Analysis Date = 12/04/2007 
 RPT Level = 0.003  Analysis Date = 11/27/2007 
 RPT Level = 0.003  Analysis Date = 11/27/2007 
 RPT Level = 0.003  Analysis Date = 11/21/2007 
 RPT Level = 0.003  Analysis Date = 11/21/2007 
 RPT Level = 0.003  Analysis Date = 11/15/2007 
 RPT Level = 0.003  Analysis Date = 11/15/2007 
 RPT Level = 0.003  Analysis Date = 11/15/2007 
 RPT Level = 0.003  Analysis Date = 11/15/2007 
 RPT Level = 0.003  Analysis Date = 10/30/2007 
 RPT Level = 0.003  Analysis Date = 10/30/2007 
 RPT Level = 0.003  Analysis Date = 10/26/2007 
 RPT Level = 0.003  Analysis Date = 10/26/2007 
 RPT Level = 0.003  Analysis Date = 10/23/2007 
 RPT Level = 0.003  Analysis Date = 10/23/2007 
 RPT Level = 0.003  Analysis Date = 10/22/2007 
 RPT Level = 0.003  Analysis Date = 10/22/2007 
 RPT Level = 0.003  Analysis Date = 10/10/2007 
 RPT Level = 0.003  Analysis Date = 10/10/2007 
 RPT Level = 0.003  Analysis Date = 10/10/2007 
 RPT Level = 0.003  Analysis Date = 10/10/2007 
 RPT Level = 0.003  Analysis Date = 10/05/2007 
 RPT Level = 0.003  Analysis Date = 10/05/2007 
 RPT Level = 0.003  Analysis Date = 09/28/2007 
 RPT Level = 0.003  Analysis Date = 09/28/2007 
 RPT Level = 0.003  Analysis Date = 08/30/2007 
 RPT Level = 0.003  Analysis Date = 08/30/2007 
 RPT Level = 0.003  Analysis Date = 08/27/2007 
 RPT Level = 0.003  Analysis Date = 08/27/2007 
 RPT Level = 0.003  Analysis Date = 08/24/2007 
 RPT Level = 0.003  Analysis Date = 08/24/2007 
 RPT Level = 0.003  Analysis Date = 08/22/2007 
 RPT Level = 0.003  Analysis Date = 08/22/2007 
 RPT Level = 0.003  Analysis Date = 08/20/2007 
 RPT Level = 0.003  Analysis Date = 08/20/2007 
 RPT Level = 0.003  Analysis Date = 08/15/2007 
 RPT Level = 0.003  Analysis Date = 08/15/2007 
 RPT Level = 0.003  Analysis Date = 07/24/2007 
 RPT Level = 0.003  Analysis Date = 07/24/2007 
 RPT Level = 0.003  Analysis Date = 07/23/2007 
 RPT Level = 0.003  Analysis Date = 07/23/2007 
 RPT Level = 0.003  Analysis Date = 07/03/2007 
 RPT Level = 0.003  Analysis Date = 07/03/2007 
 RPT Level = 0.003  Analysis Date = 06/22/2007 
 RPT Level = 0.003  Analysis Date = 06/22/2007 
 RPT Level = 0.003  Analysis Date = 06/22/2007 
 RPT Level = 0.003  Analysis Date = 06/22/2007 
 RPT Level = 0.003  Analysis Date = 06/21/2007 
 RPT Level = 0.003  Analysis Date = 06/21/2007 
 RPT Level = 0.003  Analysis Date = 06/20/2007 
 RPT Level = 0.003  Analysis Date = 06/20/2007 
 RPT Level = 0.003  Analysis Date = 05/30/2007 
 RPT Level = 0.003  Analysis Date = 05/30/2007 
 RPT Level = 0.003  Analysis Date = 05/17/2007 
 RPT Level = 0.003  Analysis Date = 05/17/2007 
 RPT Level = 0.003  Analysis Date = 05/16/2007 
 RPT Level = 0.003  Analysis Date = 05/16/2007 
 RPT Level = 0.003  Analysis Date = 05/08/2007 
 RPT Level = 0.003  Analysis Date = 05/08/2007 
 RPT Level = 0.003  Analysis Date = 05/03/2007 
 RPT Level = 0.003  Analysis Date = 05/03/2007 
 RPT Level = 0.003  Analysis Date = 05/01/2007 
 RPT Level = 0.003  Analysis Date = 05/01/2007 
 RPT Level = 0.003  Analysis Date = 04/26/2007 
 RPT Level = 0.003  Analysis Date = 04/26/2007 
 RPT Level = 0.003  Analysis Date = 04/24/2007 
 RPT Level = 0.003  Analysis Date = 04/24/2007 
 RPT Level = 0.003  Analysis Date = 04/10/2007 
 RPT Level = 0.003  Analysis Date = 04/10/2007 
 RPT Level = 0.003  Analysis Date = 03/26/2007 
 RPT Level = 0.003  Analysis Date = 03/26/2007 
 RPT Level = 0.003  Analysis Date = 03/20/2007 
 RPT Level = 0.003  Analysis Date = 03/20/2007 
 RPT Level = 0.003  Analysis Date = 03/15/2007 
 RPT Level = 0.003  Analysis Date = 03/15/2007 
 RPT Level = 0.003  Analysis Date = 03/14/2007 
 RPT Level = 0.003  Analysis Date = 03/14/2007 
 RPT Level = 0.003  Analysis Date = 02/27/2007 
 RPT Level = 0.003  Analysis Date = 02/27/2007 
 RPT Level = 0.003  Analysis Date = 02/21/2007 
 RPT Level = 0.003  Analysis Date = 02/21/2007 
 RPT Level = 0.003  Analysis Date = 02/13/2007 
 RPT Level = 0.003  Analysis Date = 02/13/2007 
 RPT Level = 0.003  Analysis Date = 02/01/2007 
 RPT Level = 0.003  Analysis Date = 02/01/2007 
 RPT Level = 0.003  Analysis Date = 02/01/2007 
 RPT Level = 0.003  Analysis Date = 02/01/2007 
 RPT Level = 0.003  Analysis Date = 01/18/2007 
 RPT Level = 0.003  Analysis Date = 01/18/2007 
 RPT Level = 0.003  Analysis Date = 01/09/2007 
 RPT Level = 0.003  Analysis Date = 01/09/2007 
 RPT Level = 0.003  Analysis Date = 12/28/2006 
 RPT Level = 0.003  Analysis Date = 12/28/2006 
 RPT Level = 0.003  Analysis Date = 12/27/2006 
 RPT Level = 0.003  Analysis Date = 12/27/2006 
 RPT Level = 0.003  Analysis Date = 12/26/2006 
 RPT Level = 0.003  Analysis Date = 12/26/2006 
 RPT Level = 0.003  Analysis Date = 12/05/2006 
 RPT Level = 0.003  Analysis Date = 12/05/2006 
 RPT Level = 0.003  Analysis Date = 11/29/2006 
 RPT Level = 0.003  Analysis Date = 11/29/2006 
 RPT Level = 0.003  Analysis Date = 11/28/2006 
 RPT Level = 0.003  Analysis Date = 11/28/2006 
 RPT Level = 0.003  Analysis Date = 11/27/2006 
 RPT Level = 0.003  Analysis Date = 11/27/2006 
 RPT Level = 0.003  Analysis Date = 11/22/2006 
 RPT Level = 0.003  Analysis Date = 11/22/2006 
 RPT Level = 0.003  Analysis Date = 11/22/2006 
 RPT Level = 0.003  Analysis Date = 11/22/2006 
 RPT Level = 0.003  Analysis Date = 11/16/2006 
 RPT Level = 0.003  Analysis Date = 11/16/2006 
 RPT Level = 0.003  Analysis Date = 11/07/2006 
 RPT Level = 0.003  Analysis Date = 11/07/2006 
 RPT Level = 0.003  Analysis Date = 11/07/2006 
 RPT Level = 0.003  Analysis Date = 11/07/2006 
 RPT Level = 0.003  Analysis Date = 10/26/2006 
 RPT Level = 0.003  Analysis Date = 10/26/2006 
 RPT Level = 0.003  Analysis Date = 10/03/2006 
 RPT Level = 0.003  Analysis Date = 10/03/2006 
 RPT Level = 0.003  Analysis Date = 09/25/2006 
 RPT Level = 0.003  Analysis Date = 09/25/2006 
 RPT Level = 0.003  Analysis Date = 09/20/2006 
 RPT Level = 0.003  Analysis Date = 09/20/2006 
 RPT Level = 0.003  Analysis Date = 09/12/2006 
 RPT Level = 0.003  Analysis Date = 09/12/2006 
 RPT Level = 0.003  Analysis Date = 08/24/2006 
 RPT Level = 0.003  Analysis Date = 08/24/2006 
 RPT Level = 0.003  Analysis Date = 08/18/2006 
 RPT Level = 0.003  Analysis Date = 08/18/2006 
 RPT Level = 0.003  Analysis Date = 08/07/2006 
 RPT Level = 0.003  Analysis Date = 08/07/2006 
 RPT Level = 0.003  Analysis Date = 07/19/2006 
 RPT Level = 0.003  Analysis Date = 07/19/2006 
 RPT Level = 0.003  Analysis Date = 07/14/2006 
 RPT Level = 0.003  Analysis Date = 07/14/2006 
 RPT Level = 0.003  Analysis Date = 06/27/2006 
 RPT Level = 0.003  Analysis Date = 06/27/2006 
 RPT Level = 0.003  Analysis Date = 06/21/2006 
 RPT Level = 0.003  Analysis Date = 06/21/2006 
 RPT Level = 0.003  Analysis Date = 06/15/2006 
 RPT Level = 0.003  Y = 0
The SGPlot Procedure

False Positive Rate for Orthophosphate (PO4 as P), FIL, DA

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Orthophosphate (PO4 as P), FIL, DA 00671PHM01 2006 12 1 8%
    2007 50 4 8%
    2008 50 2 4%
    2009 52 1 2%
    2010 52 1 2%
    2011 52 1 2%
    2012 52 0 0%
    2013 53 0 0%
    2014 55 1 2%
    2015 58 0 0%
    2016 51 1 2%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Phosphorus (as P), FIL, CFA, ACD, LL -
Blind Blank Results
Lab: NWQL, PCode: 00666, MCode: CL019
Analysis dates: 06/03/02 through 12/10/13
Open Data Set

 Analysis Date = 10/25/2013 
 Lab Value = 0.0041 
 RPT Level = 0.004 
 Lab Sample ID = 20132530113  Analysis Date = 05/11/2011 
 Lab Value = 0.016 
 RPT Level = 0.004 
 Lab Sample ID = 20111150114  Analysis Date = 10/25/2013 
 Lab Value = 0.0041 
 RPT Level = 0.004 
 Lab Sample ID = 20132530113  Analysis Date = 05/11/2011 
 Lab Value = 0.016 
 RPT Level = 0.004 
 Lab Sample ID = 20111150114  Analysis Date = 12/10/2013 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20133230003  Analysis Date = 11/19/2013 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20133170105  Analysis Date = 11/19/2013 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20133090098  Analysis Date = 11/19/2013 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20133030027  Analysis Date = 10/31/2013 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20132970027  Analysis Date = 10/25/2013 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20132730140  Analysis Date = 10/25/2013 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20132660104  Analysis Date = 10/25/2013 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20132600015  Analysis Date = 09/06/2013 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20132410009  Analysis Date = 09/06/2013 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20132390012  Analysis Date = 09/06/2013 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20132350027  Analysis Date = 08/27/2013 
 Lab Value = 0.0021 
 RPT Level = 0.004 
 Lab Sample ID = 20132270018  Analysis Date = 08/12/2013 
 Lab Value = -.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20132180181  Analysis Date = 08/12/2013 
 Lab Value = -.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20132120027  Analysis Date = 08/12/2013 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20132040021  Analysis Date = 08/12/2013 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20131970028  Analysis Date = 07/16/2013 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20131900090  Analysis Date = 07/16/2013 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20131830073  Analysis Date = 07/16/2013 
 Lab Value = 0.0028 
 RPT Level = 0.004 
 Lab Sample ID = 20131770013  Analysis Date = 07/16/2013 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20131700038  Analysis Date = 06/19/2013 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20131640004  Analysis Date = 06/19/2013 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20131550029  Analysis Date = 06/05/2013 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20131500013  Analysis Date = 06/05/2013 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20131430198  Analysis Date = 06/05/2013 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20131350129  Analysis Date = 05/16/2013 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20131270022  Analysis Date = 05/16/2013 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20131220014  Analysis Date = 05/16/2013 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20131150015  Analysis Date = 05/16/2013 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20131120125  Analysis Date = 04/23/2013 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20131090030  Analysis Date = 04/11/2013 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20130930087  Analysis Date = 04/11/2013 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20130840058  Analysis Date = 03/20/2013 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20130770160  Analysis Date = 03/20/2013 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20130700013  Analysis Date = 03/20/2013 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20130630124  Analysis Date = 03/06/2013 
 Lab Value = -.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20130570007  Analysis Date = 03/06/2013 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20130520006  Analysis Date = 02/14/2013 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20130420052  Analysis Date = 02/14/2013 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20130350029  Analysis Date = 02/14/2013 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20130280039  Analysis Date = 02/14/2013 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20130230099  Analysis Date = 02/14/2013 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20130140071  Analysis Date = 01/15/2013 
 Lab Value = -.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20130070056  Analysis Date = 01/09/2013 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20130020010  Analysis Date = 01/09/2013 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20123620011  Analysis Date = 01/09/2013 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20123530084  Analysis Date = 01/09/2013 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20123480061  Analysis Date = 12/26/2012 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20123390115  Analysis Date = 12/10/2012 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20123330010  Analysis Date = 12/04/2012 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20123250063  Analysis Date = 12/04/2012 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20123200054  Analysis Date = 12/04/2012 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20123120066  Analysis Date = 12/04/2012 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20123040119  Analysis Date = 10/30/2012 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20122980126  Analysis Date = 10/30/2012 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20122900096  Analysis Date = 10/30/2012 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20122830034  Analysis Date = 10/09/2012 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20122750025  Analysis Date = 10/09/2012 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20122700110  Analysis Date = 10/09/2012 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20122690153  Analysis Date = 10/09/2012 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20122550016  Analysis Date = 09/12/2012 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20122490102  Analysis Date = 09/12/2012 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20122410013  Analysis Date = 09/12/2012 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20122350175  Analysis Date = 08/20/2012 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20122280090  Analysis Date = 08/20/2012 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20122190099  Analysis Date = 08/20/2012 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20122140050  Analysis Date = 08/02/2012 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20122050101  Analysis Date = 08/02/2012 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20121990080  Analysis Date = 07/19/2012 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20121910041  Analysis Date = 07/19/2012 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20121870014  Analysis Date = 06/28/2012 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20121780033  Analysis Date = 06/28/2012 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20121710006  Analysis Date = 06/28/2012 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20121650052  Analysis Date = 06/12/2012 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20121560125  Analysis Date = 06/05/2012 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20121510037  Analysis Date = 06/05/2012 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20121430021  Analysis Date = 05/22/2012 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20121370053  Analysis Date = 05/22/2012 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20121290072  Analysis Date = 05/09/2012 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20121210123  Analysis Date = 05/01/2012 
 Lab Value = -.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20121150089  Analysis Date = 05/01/2012 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20121080009  Analysis Date = 04/18/2012 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20121010029  Analysis Date = 04/18/2012 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20120930058  Analysis Date = 04/18/2012 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20120870035  Analysis Date = 03/29/2012 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20120790085  Analysis Date = 03/29/2012 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20120730079  Analysis Date = 03/29/2012 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20120660073  Analysis Date = 03/20/2012 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20120580047  Analysis Date = 03/20/2012 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20120530099  Analysis Date = 03/06/2012 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20120450020  Analysis Date = 03/06/2012 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20120370064  Analysis Date = 02/02/2012 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20120310012  Analysis Date = 02/02/2012 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20120230046  Analysis Date = 01/25/2012 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20120180013  Analysis Date = 01/25/2012 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20120090052  Analysis Date = 01/05/2012 
 Lab Value = -.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20120030028  Analysis Date = 01/05/2012 
 Lab Value = -.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20113610089  Analysis Date = 12/29/2011 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20113530139  Analysis Date = 12/29/2011 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20113490075  Analysis Date = 12/29/2011 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20113460137  Analysis Date = 12/14/2011 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20113320115  Analysis Date = 12/14/2011 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20113250126  Analysis Date = 11/29/2011 
 Lab Value = -.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20113180164  Analysis Date = 11/29/2011 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20113110062  Analysis Date = 11/29/2011 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20113050092  Analysis Date = 11/08/2011 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20112970118  Analysis Date = 11/08/2011 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20112910137  Analysis Date = 11/08/2011 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20112840071  Analysis Date = 11/08/2011 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20112760061  Analysis Date = 10/07/2011 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20112690123  Analysis Date = 09/29/2011 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20112630061  Analysis Date = 09/29/2011 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20112560021  Analysis Date = 09/29/2011 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20112510037  Analysis Date = 09/13/2011 
 Lab Value = 0.0031 
 RPT Level = 0.004 
 Lab Sample ID = 20112500188  Analysis Date = 09/01/2011 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20112360063  Analysis Date = 08/23/2011 
 Lab Value = 0.004 
 RPT Level = 0.004 
 Lab Sample ID = 20112300036  Analysis Date = 08/23/2011 
 Lab Value = -.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20112200051  Analysis Date = 08/09/2011 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20112130154  Analysis Date = 08/03/2011 
 Lab Value = -.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20112060094  Analysis Date = 08/03/2011 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20112010020  Analysis Date = 07/19/2011 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20111920099  Analysis Date = 07/19/2011 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20111860062  Analysis Date = 07/14/2011 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20111780166  Analysis Date = 07/21/2011 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20111710111  Analysis Date = 06/28/2011 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20111640067  Analysis Date = 06/28/2011 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20111570061  Analysis Date = 06/28/2011 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20111510151  Analysis Date = 06/08/2011 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20111430203  Analysis Date = 06/08/2011 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20111360146  Analysis Date = 06/08/2011 
 Lab Value = 0.0017 
 RPT Level = 0.004 
 Lab Sample ID = 20111290046  Analysis Date = 05/11/2011 
 Lab Value = -.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20111220086  Analysis Date = 04/26/2011 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20111080073  Analysis Date = 04/26/2011 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20111010118  Analysis Date = 04/20/2011 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20110950054  Analysis Date = 04/20/2011 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20110870089  Analysis Date = 03/30/2011 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20110800059  Analysis Date = 03/30/2011 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20110750067  Analysis Date = 03/10/2011 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20110660032  Analysis Date = 03/10/2011 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20110590070  Analysis Date = 03/01/2011 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20110530105  Analysis Date = 03/01/2011 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20110450036  Analysis Date = 03/01/2011 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20110410098  Analysis Date = 02/17/2011 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20110400069  Analysis Date = 02/02/2011 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20110240065  Analysis Date = 01/26/2011 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20110180057  Analysis Date = 01/26/2011 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20110110016  Analysis Date = 01/13/2011 
 Lab Value = -.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20110030021  Analysis Date = 01/06/2011 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20103610054  Analysis Date = 01/06/2011 
 Lab Value = -.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20103540047  Analysis Date = 12/28/2010 
 Lab Value = 0.0039 
 RPT Level = 0.004 
 Lab Sample ID = 20103470078  Analysis Date = 12/15/2010 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20103400086  Analysis Date = 12/06/2010 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20103330099  Analysis Date = 12/01/2010 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20103260065  Analysis Date = 12/01/2010 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20103190064  Analysis Date = 12/01/2010 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20103120026  Analysis Date = 11/10/2010 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20103060008  Analysis Date = 11/10/2010 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20102990006  Analysis Date = 11/10/2010 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20102920006  Analysis Date = 10/20/2010 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20102850132  Analysis Date = 10/20/2010 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20102770110  Analysis Date = 10/20/2010 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20102700152  Analysis Date = 09/29/2010 
 Lab Value = -.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20102640136  Analysis Date = 09/21/2010 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20102570015  Analysis Date = 09/21/2010 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20102510062  Analysis Date = 09/08/2010 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20102430249  Analysis Date = 09/01/2010 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20102350196  Analysis Date = 09/01/2010 
 Lab Value = -.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20102290049  Analysis Date = 08/17/2010 
 Lab Value = -.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20102230041  Analysis Date = 08/12/2010 
 Lab Value = -.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20102140090  Analysis Date = 08/10/2010 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20102080005  Analysis Date = 08/10/2010 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20102000188  Analysis Date = 07/15/2010 
 Lab Value = -.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20101930104  Analysis Date = 07/15/2010 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20101870059  Analysis Date = 07/15/2010 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20101790124  Analysis Date = 07/15/2010 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20101730068  Analysis Date = 06/24/2010 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20101660061  Analysis Date = 06/16/2010 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20101590005  Analysis Date = 06/16/2010 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20101530090  Analysis Date = 06/02/2010 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20101440165  Analysis Date = 06/02/2010 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20101380021  Analysis Date = 05/19/2010 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20101310098  Analysis Date = 05/19/2010 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20101240080  Analysis Date = 05/06/2010 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20101180043  Analysis Date = 05/03/2010 
 Lab Value = -.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20101090063  Analysis Date = 05/03/2010 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20101020075  Analysis Date = 04/13/2010 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20100950036  Analysis Date = 04/06/2010 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20100880044  Analysis Date = 04/06/2010 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20100850066  Analysis Date = 04/06/2010 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20100750002  Analysis Date = 03/16/2010 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20100680014  Analysis Date = 03/10/2010 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20100600067  Analysis Date = 03/02/2010 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20100530048  Analysis Date = 02/24/2010 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20100470025  Analysis Date = 02/22/2010 
 Lab Value = 0.0023 
 RPT Level = 0.004 
 Lab Sample ID = 20100390038  Analysis Date = 02/09/2010 
 Lab Value = -.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20100320023  Analysis Date = 01/28/2010 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20100260065  Analysis Date = 01/28/2010 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20100190102  Analysis Date = 01/13/2010 
 Lab Value = -.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20100110099  Analysis Date = 01/13/2010 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20100050014  Analysis Date = 01/05/2010 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20093620042  Analysis Date = 01/05/2010 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20093560033  Analysis Date = 12/21/2009 
 Lab Value = 0.0027 
 RPT Level = 0.004 
 Lab Sample ID = 20093480064  Analysis Date = 12/16/2009 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20093420004  Analysis Date = 12/16/2009 
 Lab Value = -.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20093350070  Analysis Date = 12/03/2009 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20093280015  Analysis Date = 11/27/2009 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20093200062  Analysis Date = 11/12/2009 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20093130061  Analysis Date = 11/12/2009 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20093070201  Analysis Date = 11/12/2009 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20093000106  Analysis Date = 11/03/2009 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20092920096  Analysis Date = 11/03/2009 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20092870073  Analysis Date = 11/03/2009 
 Lab Value = -.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20092780071  Analysis Date = 09/22/2005 
 Lab Value = 0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20052590035  Analysis Date = 09/22/2005 
 Lab Value = 0.0001 
 RPT Level = 0.002 
 Lab Sample ID = 20052520006  Analysis Date = 09/22/2005 
 Lab Value = 0.002 
 RPT Level = 0.002 
 Lab Sample ID = 20052430006  Analysis Date = 09/09/2005 
 Lab Value = 0.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20052370002  Analysis Date = 09/09/2005 
 Lab Value = 0.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20052300009  Analysis Date = 08/25/2005 
 Lab Value = -.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20052210012  Analysis Date = 08/18/2005 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20052160007  Analysis Date = 08/18/2005 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20052160005  Analysis Date = 07/21/2005 
 Lab Value = 0.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20052010007  Analysis Date = 07/21/2005 
 Lab Value = 0.0014 
 RPT Level = 0.002 
 Lab Sample ID = 20051940015  Analysis Date = 07/21/2005 
 Lab Value = -.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20051880018  Analysis Date = 07/21/2005 
 Lab Value = -0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20051800189  Analysis Date = 07/21/2005 
 Lab Value = 0.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20051740019  Analysis Date = 06/30/2005 
 Lab Value = -.0001 
 RPT Level = 0.002 
 Lab Sample ID = 20051660174  Analysis Date = 06/29/2005 
 Lab Value = -.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20051590025  Analysis Date = 06/29/2005 
 Lab Value = 0.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20051530021  Analysis Date = 06/09/2005 
 Lab Value = -.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20051440043  Analysis Date = 06/09/2005 
 Lab Value = -.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20051380014  Analysis Date = 05/24/2005 
 Lab Value = -.0001 
 RPT Level = 0.002 
 Lab Sample ID = 20051320029  Analysis Date = 05/24/2005 
 Lab Value = 0 
 RPT Level = 0.002 
 Lab Sample ID = 20051250003  Analysis Date = 05/12/2005 
 Lab Value = -.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20051170012  Analysis Date = 05/12/2005 
 Lab Value = -.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20051110007  Analysis Date = 05/05/2005 
 Lab Value = -.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20051020018  Analysis Date = 05/05/2005 
 Lab Value = -.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20050950044  Analysis Date = 05/05/2005 
 Lab Value = -0.002 
 RPT Level = 0.002 
 Lab Sample ID = 20050880116  Analysis Date = 05/05/2005 
 Lab Value = -0.002 
 RPT Level = 0.002 
 Lab Sample ID = 20050840096  Analysis Date = 03/31/2005 
 Lab Value = -.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20050750004  Analysis Date = 03/31/2005 
 Lab Value = -.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20050700007  Analysis Date = 03/31/2005 
 Lab Value = -.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20050700004  Analysis Date = 03/10/2005 
 Lab Value = -0.003 
 RPT Level = 0.002 
 Lab Sample ID = 20050670011  Analysis Date = 03/01/2005 
 Lab Value = 0.0001 
 RPT Level = 0.002 
 Lab Sample ID = 20050550024  Analysis Date = 03/01/2005 
 Lab Value = -.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20050480005  Analysis Date = 02/24/2005 
 Lab Value = -.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20050410004  Analysis Date = 02/24/2005 
 Lab Value = -.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20050340020  Analysis Date = 02/24/2005 
 Lab Value = -0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20050260024  Analysis Date = 02/24/2005 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20050200048  Analysis Date = 02/24/2005 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20050130091  Analysis Date = 01/18/2005 
 Lab Value = 0.0014 
 RPT Level = 0.002 
 Lab Sample ID = 20050070016  Analysis Date = 01/18/2005 
 Lab Value = 0.0022 
 RPT Level = 0.002 
 Lab Sample ID = 20043650002  Analysis Date = 01/06/2005 
 Lab Value = -.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20043580037  Analysis Date = 01/06/2005 
 Lab Value = 0.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20043580035  Analysis Date = 01/06/2005 
 Lab Value = 0.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20043520023  Analysis Date = 01/06/2005 
 Lab Value = 0.0013 
 RPT Level = 0.002 
 Lab Sample ID = 20043510018  Analysis Date = 01/06/2005 
 Lab Value = 0.0013 
 RPT Level = 0.002 
 Lab Sample ID = 20043450069  Analysis Date = 01/06/2005 
 Lab Value = 0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20043440147  Analysis Date = 01/05/2005 
 Lab Value = -0.002 
 RPT Level = 0.002 
 Lab Sample ID = 20043380005  Analysis Date = 01/05/2005 
 Lab Value = 0 
 RPT Level = 0.002 
 Lab Sample ID = 20043380002  Analysis Date = 12/02/2004 
 Lab Value = 0.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20043310059  Analysis Date = 12/02/2004 
 Lab Value = -0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20043280048  Analysis Date = 12/01/2004 
 Lab Value = -.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20043240012  Analysis Date = 09/15/2004 
 Lab Value = 0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20042450138  Analysis Date = 09/15/2004 
 Lab Value = 0.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20042400089  Analysis Date = 09/15/2004 
 Lab Value = 0.0015 
 RPT Level = 0.002 
 Lab Sample ID = 20042370105  Analysis Date = 09/15/2004 
 Lab Value = 0.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20042330206  Analysis Date = 09/15/2004 
 Lab Value = 0.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20042320136  Analysis Date = 09/15/2004 
 Lab Value = 0.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20042320138  Analysis Date = 08/30/2004 
 Lab Value = 0.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20042240114  Analysis Date = 08/17/2004 
 Lab Value = 0.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20042170123  Analysis Date = 08/05/2004 
 Lab Value = 0.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20042110015  Analysis Date = 07/29/2004 
 Lab Value = -.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20042040039  Analysis Date = 07/22/2004 
 Lab Value = 0.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20041960050  Analysis Date = 07/13/2004 
 Lab Value = -.0001 
 RPT Level = 0.002 
 Lab Sample ID = 20041900062  Analysis Date = 07/13/2004 
 Lab Value = 0 
 RPT Level = 0.002 
 Lab Sample ID = 20041820035  Analysis Date = 07/13/2004 
 Lab Value = 0.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20041750057  Analysis Date = 06/24/2004 
 Lab Value = -.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20041700080  Analysis Date = 06/24/2004 
 Lab Value = -.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20041610055  Analysis Date = 06/09/2004 
 Lab Value = -.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20041550019  Analysis Date = 06/09/2004 
 Lab Value = -.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20041470132  Analysis Date = 05/20/2004 
 Lab Value = -0.002 
 RPT Level = 0.002 
 Lab Sample ID = 20041400016  Analysis Date = 05/20/2004 
 Lab Value = -0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20041260099  Analysis Date = 05/20/2004 
 Lab Value = -.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20041200046  Analysis Date = 04/29/2004 
 Lab Value = 0 
 RPT Level = 0.002 
 Lab Sample ID = 20041130016  Analysis Date = 04/21/2004 
 Lab Value = 0.0015 
 RPT Level = 0.002 
 Lab Sample ID = 20041050022  Analysis Date = 04/13/2004 
 Lab Value = -.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20040980007  Analysis Date = 04/13/2004 
 Lab Value = 0.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20040930009  Analysis Date = 04/13/2004 
 Lab Value = 0.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20040910012  Analysis Date = 03/26/2004 
 Lab Value = 0.0018 
 RPT Level = 0.002 
 Lab Sample ID = 20040850021  Analysis Date = 03/26/2004 
 Lab Value = 0.0013 
 RPT Level = 0.002 
 Lab Sample ID = 20040830056  Analysis Date = 03/26/2004 
 Lab Value = 0.0021 
 RPT Level = 0.002 
 Lab Sample ID = 20040790023  Analysis Date = 03/19/2004 
 Lab Value = 0.0017 
 RPT Level = 0.002 
 Lab Sample ID = 20040760010  Analysis Date = 03/19/2004 
 Lab Value = 0.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20040720029  Analysis Date = 03/19/2004 
 Lab Value = 0.003 
 RPT Level = 0.002 
 Lab Sample ID = 20040710005  Analysis Date = 03/19/2004 
 Lab Value = 0.0016 
 RPT Level = 0.002 
 Lab Sample ID = 20040680093  Analysis Date = 03/19/2004 
 Lab Value = 0.0016 
 RPT Level = 0.002 
 Lab Sample ID = 20040650001  Analysis Date = 03/02/2004 
 Lab Value = 0.0011 
 RPT Level = 0.002 
 Lab Sample ID = 20040580032  Analysis Date = 03/02/2004 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20040550018  Analysis Date = 03/02/2004 
 Lab Value = 0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20040510134  Analysis Date = 02/20/2004 
 Lab Value = 0.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20040490025  Analysis Date = 02/20/2004 
 Lab Value = 0.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20040440035  Analysis Date = 02/12/2004 
 Lab Value = 0.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20040420001  Analysis Date = 02/12/2004 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20040370017  Analysis Date = 02/12/2004 
 Lab Value = 0.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20040340024  Analysis Date = 02/12/2004 
 Lab Value = 0.0015 
 RPT Level = 0.002 
 Lab Sample ID = 20040300012  Analysis Date = 01/30/2004 
 Lab Value = 0.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20040270036  Analysis Date = 01/30/2004 
 Lab Value = 0.0018 
 RPT Level = 0.002 
 Lab Sample ID = 20040230030  Analysis Date = 01/30/2004 
 Lab Value = 0.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20040210154  Analysis Date = 01/30/2004 
 Lab Value = 0.0011 
 RPT Level = 0.002 
 Lab Sample ID = 20040200023  Analysis Date = 01/16/2004 
 Lab Value = 0.0018 
 RPT Level = 0.002 
 Lab Sample ID = 20040150075  Analysis Date = 01/16/2004 
 Lab Value = 0.0021 
 RPT Level = 0.002 
 Lab Sample ID = 20040090020  Analysis Date = 01/08/2004 
 Lab Value = 0.0013 
 RPT Level = 0.002 
 Lab Sample ID = 20040070032  Analysis Date = 01/08/2004 
 Lab Value = 0.0012 
 RPT Level = 0.002 
 Lab Sample ID = 20040050016  Analysis Date = 09/25/2003 
 Lab Value = 0.0011 
 RPT Level = 0.0018 
 Lab Sample ID = 20032660009  Analysis Date = 09/25/2003 
 Lab Value = 0.0003 
 RPT Level = 0.0018 
 Lab Sample ID = 20032600107  Analysis Date = 09/10/2003 
 Lab Value = 0.0003 
 RPT Level = 0.0018 
 Lab Sample ID = 20032520179  Analysis Date = 09/08/2003 
 Lab Value = -.0007 
 RPT Level = 0.0018 
 Lab Sample ID = 20032450195  Analysis Date = 08/28/2003 
 Lab Value = 0.001 
 RPT Level = 0.0018 
 Lab Sample ID = 20032380029  Analysis Date = 08/21/2003 
 Lab Value = 0.0017 
 RPT Level = 0.0018 
 Lab Sample ID = 20032310028  Analysis Date = 08/21/2003 
 Lab Value = -.0002 
 RPT Level = 0.0018 
 Lab Sample ID = 20032250256  Analysis Date = 08/07/2003 
 Lab Value = 0.0007 
 RPT Level = 0.0018 
 Lab Sample ID = 20032180019  Analysis Date = 08/07/2003 
 Lab Value = 0.0003 
 RPT Level = 0.0018 
 Lab Sample ID = 20032100004  Analysis Date = 07/25/2003 
 Lab Value = 0.0014 
 RPT Level = 0.0018 
 Lab Sample ID = 20032040043  Analysis Date = 07/16/2003 
 Lab Value = 0.0005 
 RPT Level = 0.0018 
 Lab Sample ID = 20031960025  Analysis Date = 07/16/2003 
 Lab Value = 0.0016 
 RPT Level = 0.0018 
 Lab Sample ID = 20031900098  Analysis Date = 07/08/2003 
 Lab Value = 0.0009 
 RPT Level = 0.0018 
 Lab Sample ID = 20031820037  Analysis Date = 06/27/2003 
 Lab Value = 0.0008 
 RPT Level = 0.0018 
 Lab Sample ID = 20031770041  Analysis Date = 06/20/2003 
 Lab Value = -.0005 
 RPT Level = 0.0018 
 Lab Sample ID = 20031700013  Analysis Date = 06/18/2003 
 Lab Value = 0 
 RPT Level = 0.0018 
 Lab Sample ID = 20031630053  Analysis Date = 06/12/2003 
 Lab Value = 0 
 RPT Level = 0.0018 
 Lab Sample ID = 20031600109  Analysis Date = 06/05/2003 
 Lab Value = 0.0019 
 RPT Level = 0.0018 
 Lab Sample ID = 20031480059  Analysis Date = 05/28/2003 
 Lab Value = 0.0015 
 RPT Level = 0.0018 
 Lab Sample ID = 20031430019  Analysis Date = 05/22/2003 
 Lab Value = 0.001 
 RPT Level = 0.0018 
 Lab Sample ID = 20031400115  Analysis Date = 05/16/2003 
 Lab Value = 0.0013 
 RPT Level = 0.0018 
 Lab Sample ID = 20031290084  Analysis Date = 05/09/2003 
 Lab Value = 0.001 
 RPT Level = 0.0018 
 Lab Sample ID = 20031220070  Analysis Date = 05/01/2003 
 Lab Value = -.0004 
 RPT Level = 0.0018 
 Lab Sample ID = 20031200043  Analysis Date = 04/23/2003 
 Lab Value = 0.0015 
 RPT Level = 0.0018 
 Lab Sample ID = 20031080208  Analysis Date = 04/09/2003 
 Lab Value = -.0008 
 RPT Level = 0.0018 
 Lab Sample ID = 20030970018  Analysis Date = 04/09/2003 
 Lab Value = -0.001 
 RPT Level = 0.0018 
 Lab Sample ID = 20030920027  Analysis Date = 04/09/2003 
 Lab Value = 0.0007 
 RPT Level = 0.0018 
 Lab Sample ID = 20030900015  Analysis Date = 03/28/2003 
 Lab Value = -0.002 
 RPT Level = 0.0018 
 Lab Sample ID = 20030860023  Analysis Date = 03/21/2003 
 Lab Value = 0.0013 
 RPT Level = 0.0018 
 Lab Sample ID = 20030710021  Analysis Date = 03/10/2003 
 Lab Value = 0.0004 
 RPT Level = 0.0018 
 Lab Sample ID = 20030660148  Analysis Date = 03/03/2003 
 Lab Value = 0.0016 
 RPT Level = 0.0018 
 Lab Sample ID = 20030590040  Analysis Date = 02/27/2003 
 Lab Value = 0.0002 
 RPT Level = 0.0018 
 Lab Sample ID = 20030570061  Analysis Date = 02/11/2003 
 Lab Value = 0.0014 
 RPT Level = 0.0018 
 Lab Sample ID = 20030410034  Analysis Date = 02/07/2003 
 Lab Value = 0.0007 
 RPT Level = 0.0018 
 Lab Sample ID = 20030350008  Analysis Date = 02/07/2003 
 Lab Value = 0.0009 
 RPT Level = 0.0018 
 Lab Sample ID = 20030310028  Analysis Date = 02/07/2003 
 Lab Value = 0.0019 
 RPT Level = 0.0018 
 Lab Sample ID = 20030300004  Analysis Date = 01/16/2003 
 Lab Value = 0.0009 
 RPT Level = 0.0018 
 Lab Sample ID = 20030150009  Analysis Date = 01/16/2003 
 Lab Value = 0.0021 
 RPT Level = 0.0018 
 Lab Sample ID = 20030140019  Analysis Date = 01/16/2003 
 Lab Value = 0.0011 
 RPT Level = 0.0018 
 Lab Sample ID = 20030020002  Analysis Date = 01/16/2003 
 Lab Value = 0.0022 
 RPT Level = 0.0018 
 Lab Sample ID = 20023650009  Analysis Date = 12/19/2002 
 Lab Value = -.0008 
 RPT Level = 0.0018 
 Lab Sample ID = 20023500166  Analysis Date = 12/19/2002 
 Lab Value = -0.002 
 RPT Level = 0.0018 
 Lab Sample ID = 20023500092  Analysis Date = 12/04/2002 
 Lab Value = 0.0017 
 RPT Level = 0.0018 
 Lab Sample ID = 20023370026  Analysis Date = 12/04/2002 
 Lab Value = 0.0012 
 RPT Level = 0.0018 
 Lab Sample ID = 20023370025  Analysis Date = 12/04/2002 
 Lab Value = 0.0018 
 RPT Level = 0.0018 
 Lab Sample ID = 20023330096  Analysis Date = 12/04/2002 
 Lab Value = 0.0018 
 RPT Level = 0.0018 
 Lab Sample ID = 20023360020  Analysis Date = 12/04/2002 
 Lab Value = 0.0021 
 RPT Level = 0.0018 
 Lab Sample ID = 20023310020  Analysis Date = 11/08/2002 
 Lab Value = 0.0001 
 RPT Level = 0.0018 
 Lab Sample ID = 20023040033  Analysis Date = 11/08/2002 
 Lab Value = 0.0012 
 RPT Level = 0.0018 
 Lab Sample ID = 20022970050  Analysis Date = 11/08/2002 
 Lab Value = 0.0018 
 RPT Level = 0.0018 
 Lab Sample ID = 20022970049  Analysis Date = 11/08/2002 
 Lab Value = 0.001 
 RPT Level = 0.0018 
 Lab Sample ID = 20022970048  Analysis Date = 11/08/2002 
 Lab Value = 0.0004 
 RPT Level = 0.0018 
 Lab Sample ID = 20022960022  Analysis Date = 09/06/2002 
 Lab Value = 0.001 
 RPT Level = 0.0018 
 Lab Sample ID = 20022470019  Analysis Date = 08/23/2002 
 Lab Value = -.0005 
 RPT Level = 0.0018 
 Lab Sample ID = 20022340185  Analysis Date = 08/15/2002 
 Lab Value = 0.0018 
 RPT Level = 0.0018 
 Lab Sample ID = 20022210006  Analysis Date = 08/09/2002 
 Lab Value = 0.001 
 RPT Level = 0.0018 
 Lab Sample ID = 20022170108  Analysis Date = 07/16/2002 
 Lab Value = 0.0009 
 RPT Level = 0.0018 
 Lab Sample ID = 20021960235  Analysis Date = 07/03/2002 
 Lab Value = 0.0017 
 RPT Level = 0.0018 
 Lab Sample ID = 20021790007  Analysis Date = 06/20/2002 
 Lab Value = 0.001 
 RPT Level = 0.0018 
 Lab Sample ID = 20021650004  Analysis Date = 06/03/2002 
 Lab Value = 0.0013 
 RPT Level = 0.0018 
 Lab Sample ID = 20021510058  Analysis Date = 12/10/2013 
 RPT Level = 0.004  Analysis Date = 11/19/2013 
 RPT Level = 0.004  Analysis Date = 11/19/2013 
 RPT Level = 0.004  Analysis Date = 11/19/2013 
 RPT Level = 0.004  Analysis Date = 11/19/2013 
 RPT Level = 0.004  Analysis Date = 11/19/2013 
 RPT Level = 0.004  Analysis Date = 11/19/2013 
 RPT Level = 0.004  Analysis Date = 10/31/2013 
 RPT Level = 0.004  Analysis Date = 10/31/2013 
 RPT Level = 0.004  Analysis Date = 10/25/2013 
 RPT Level = 0.004  Analysis Date = 10/25/2013 
 RPT Level = 0.004  Analysis Date = 10/25/2013 
 RPT Level = 0.004  Analysis Date = 10/25/2013 
 RPT Level = 0.004  Analysis Date = 10/25/2013 
 RPT Level = 0.004  Analysis Date = 10/25/2013 
 RPT Level = 0.004  Analysis Date = 10/25/2013 
 RPT Level = 0.004  Analysis Date = 10/25/2013 
 RPT Level = 0.004  Analysis Date = 09/06/2013 
 RPT Level = 0.004  Analysis Date = 09/06/2013 
 RPT Level = 0.004  Analysis Date = 09/06/2013 
 RPT Level = 0.004  Analysis Date = 09/06/2013 
 RPT Level = 0.004  Analysis Date = 09/06/2013 
 RPT Level = 0.004  Analysis Date = 09/06/2013 
 RPT Level = 0.004  Analysis Date = 08/27/2013 
 RPT Level = 0.004  Analysis Date = 08/27/2013 
 RPT Level = 0.004  Analysis Date = 08/12/2013 
 RPT Level = 0.004  Analysis Date = 08/12/2013 
 RPT Level = 0.004  Analysis Date = 08/12/2013 
 RPT Level = 0.004  Analysis Date = 08/12/2013 
 RPT Level = 0.004  Analysis Date = 08/12/2013 
 RPT Level = 0.004  Analysis Date = 08/12/2013 
 RPT Level = 0.004  Analysis Date = 08/12/2013 
 RPT Level = 0.004  Analysis Date = 08/12/2013 
 RPT Level = 0.004  Analysis Date = 07/16/2013 
 RPT Level = 0.004  Analysis Date = 07/16/2013 
 RPT Level = 0.004  Analysis Date = 07/16/2013 
 RPT Level = 0.004  Analysis Date = 07/16/2013 
 RPT Level = 0.004  Analysis Date = 07/16/2013 
 RPT Level = 0.004  Analysis Date = 07/16/2013 
 RPT Level = 0.004  Analysis Date = 07/16/2013 
 RPT Level = 0.004  Analysis Date = 07/16/2013 
 RPT Level = 0.004  Analysis Date = 06/19/2013 
 RPT Level = 0.004  Analysis Date = 06/19/2013 
 RPT Level = 0.004  Analysis Date = 06/19/2013 
 RPT Level = 0.004  Analysis Date = 06/19/2013 
 RPT Level = 0.004  Analysis Date = 06/05/2013 
 RPT Level = 0.004  Analysis Date = 06/05/2013 
 RPT Level = 0.004  Analysis Date = 06/05/2013 
 RPT Level = 0.004  Analysis Date = 06/05/2013 
 RPT Level = 0.004  Analysis Date = 06/05/2013 
 RPT Level = 0.004  Analysis Date = 06/05/2013 
 RPT Level = 0.004  Analysis Date = 05/16/2013 
 RPT Level = 0.004  Analysis Date = 05/16/2013 
 RPT Level = 0.004  Analysis Date = 05/16/2013 
 RPT Level = 0.004  Analysis Date = 05/16/2013 
 RPT Level = 0.004  Analysis Date = 05/16/2013 
 RPT Level = 0.004  Analysis Date = 05/16/2013 
 RPT Level = 0.004  Analysis Date = 05/16/2013 
 RPT Level = 0.004  Analysis Date = 05/16/2013 
 RPT Level = 0.004  Analysis Date = 04/23/2013 
 RPT Level = 0.004  Analysis Date = 04/23/2013 
 RPT Level = 0.004  Analysis Date = 04/11/2013 
 RPT Level = 0.004  Analysis Date = 04/11/2013 
 RPT Level = 0.004  Analysis Date = 04/11/2013 
 RPT Level = 0.004  Analysis Date = 04/11/2013 
 RPT Level = 0.004  Analysis Date = 03/20/2013 
 RPT Level = 0.004  Analysis Date = 03/20/2013 
 RPT Level = 0.004  Analysis Date = 03/20/2013 
 RPT Level = 0.004  Analysis Date = 03/20/2013 
 RPT Level = 0.004  Analysis Date = 03/20/2013 
 RPT Level = 0.004  Analysis Date = 03/20/2013 
 RPT Level = 0.004  Analysis Date = 03/06/2013 
 RPT Level = 0.004  Analysis Date = 03/06/2013 
 RPT Level = 0.004  Analysis Date = 03/06/2013 
 RPT Level = 0.004  Analysis Date = 03/06/2013 
 RPT Level = 0.004  Analysis Date = 02/14/2013 
 RPT Level = 0.004  Analysis Date = 02/14/2013 
 RPT Level = 0.004  Analysis Date = 02/14/2013 
 RPT Level = 0.004  Analysis Date = 02/14/2013 
 RPT Level = 0.004  Analysis Date = 02/14/2013 
 RPT Level = 0.004  Analysis Date = 02/14/2013 
 RPT Level = 0.004  Analysis Date = 02/14/2013 
 RPT Level = 0.004  Analysis Date = 02/14/2013 
 RPT Level = 0.004  Analysis Date = 02/14/2013 
 RPT Level = 0.004  Analysis Date = 02/14/2013 
 RPT Level = 0.004  Analysis Date = 01/15/2013 
 RPT Level = 0.004  Analysis Date = 01/15/2013 
 RPT Level = 0.004  Analysis Date = 01/09/2013 
 RPT Level = 0.004  Analysis Date = 01/09/2013 
 RPT Level = 0.004  Analysis Date = 01/09/2013 
 RPT Level = 0.004  Analysis Date = 01/09/2013 
 RPT Level = 0.004  Analysis Date = 01/09/2013 
 RPT Level = 0.004  Analysis Date = 01/09/2013 
 RPT Level = 0.004  Analysis Date = 01/09/2013 
 RPT Level = 0.004  Analysis Date = 01/09/2013 
 RPT Level = 0.004  Analysis Date = 12/26/2012 
 RPT Level = 0.004  Analysis Date = 12/26/2012 
 RPT Level = 0.004  Analysis Date = 12/10/2012 
 RPT Level = 0.004  Analysis Date = 12/10/2012 
 RPT Level = 0.004  Analysis Date = 12/04/2012 
 RPT Level = 0.004  Analysis Date = 12/04/2012 
 RPT Level = 0.004  Analysis Date = 12/04/2012 
 RPT Level = 0.004  Analysis Date = 12/04/2012 
 RPT Level = 0.004  Analysis Date = 12/04/2012 
 RPT Level = 0.004  Analysis Date = 12/04/2012 
 RPT Level = 0.004  Analysis Date = 12/04/2012 
 RPT Level = 0.004  Analysis Date = 12/04/2012 
 RPT Level = 0.004  Analysis Date = 10/30/2012 
 RPT Level = 0.004  Analysis Date = 10/30/2012 
 RPT Level = 0.004  Analysis Date = 10/30/2012 
 RPT Level = 0.004  Analysis Date = 10/30/2012 
 RPT Level = 0.004  Analysis Date = 10/30/2012 
 RPT Level = 0.004  Analysis Date = 10/30/2012 
 RPT Level = 0.004  Analysis Date = 10/09/2012 
 RPT Level = 0.004  Analysis Date = 10/09/2012 
 RPT Level = 0.004  Analysis Date = 10/09/2012 
 RPT Level = 0.004  Analysis Date = 10/09/2012 
 RPT Level = 0.004  Analysis Date = 10/09/2012 
 RPT Level = 0.004  Analysis Date = 10/09/2012 
 RPT Level = 0.004  Analysis Date = 10/09/2012 
 RPT Level = 0.004  Analysis Date = 10/09/2012 
 RPT Level = 0.004  Analysis Date = 09/12/2012 
 RPT Level = 0.004  Analysis Date = 09/12/2012 
 RPT Level = 0.004  Analysis Date = 09/12/2012 
 RPT Level = 0.004  Analysis Date = 09/12/2012 
 RPT Level = 0.004  Analysis Date = 09/12/2012 
 RPT Level = 0.004  Analysis Date = 09/12/2012 
 RPT Level = 0.004  Analysis Date = 08/20/2012 
 RPT Level = 0.004  Analysis Date = 08/20/2012 
 RPT Level = 0.004  Analysis Date = 08/20/2012 
 RPT Level = 0.004  Analysis Date = 08/20/2012 
 RPT Level = 0.004  Analysis Date = 08/20/2012 
 RPT Level = 0.004  Analysis Date = 08/20/2012 
 RPT Level = 0.004  Analysis Date = 08/02/2012 
 RPT Level = 0.004  Analysis Date = 08/02/2012 
 RPT Level = 0.004  Analysis Date = 08/02/2012 
 RPT Level = 0.004  Analysis Date = 08/02/2012 
 RPT Level = 0.004  Analysis Date = 07/19/2012 
 RPT Level = 0.004  Analysis Date = 07/19/2012 
 RPT Level = 0.004  Analysis Date = 07/19/2012 
 RPT Level = 0.004  Analysis Date = 07/19/2012 
 RPT Level = 0.004  Analysis Date = 06/28/2012 
 RPT Level = 0.004  Analysis Date = 06/28/2012 
 RPT Level = 0.004  Analysis Date = 06/28/2012 
 RPT Level = 0.004  Analysis Date = 06/28/2012 
 RPT Level = 0.004  Analysis Date = 06/28/2012 
 RPT Level = 0.004  Analysis Date = 06/28/2012 
 RPT Level = 0.004  Analysis Date = 06/12/2012 
 RPT Level = 0.004  Analysis Date = 06/12/2012 
 RPT Level = 0.004  Analysis Date = 06/05/2012 
 RPT Level = 0.004  Analysis Date = 06/05/2012 
 RPT Level = 0.004  Analysis Date = 06/05/2012 
 RPT Level = 0.004  Analysis Date = 06/05/2012 
 RPT Level = 0.004  Analysis Date = 05/22/2012 
 RPT Level = 0.004  Analysis Date = 05/22/2012 
 RPT Level = 0.004  Analysis Date = 05/22/2012 
 RPT Level = 0.004  Analysis Date = 05/22/2012 
 RPT Level = 0.004  Analysis Date = 05/09/2012 
 RPT Level = 0.004  Analysis Date = 05/09/2012 
 RPT Level = 0.004  Analysis Date = 05/01/2012 
 RPT Level = 0.004  Analysis Date = 05/01/2012 
 RPT Level = 0.004  Analysis Date = 05/01/2012 
 RPT Level = 0.004  Analysis Date = 05/01/2012 
 RPT Level = 0.004  Analysis Date = 04/18/2012 
 RPT Level = 0.004  Analysis Date = 04/18/2012 
 RPT Level = 0.004  Analysis Date = 04/18/2012 
 RPT Level = 0.004  Analysis Date = 04/18/2012 
 RPT Level = 0.004  Analysis Date = 04/18/2012 
 RPT Level = 0.004  Analysis Date = 04/18/2012 
 RPT Level = 0.004  Analysis Date = 03/29/2012 
 RPT Level = 0.004  Analysis Date = 03/29/2012 
 RPT Level = 0.004  Analysis Date = 03/29/2012 
 RPT Level = 0.004  Analysis Date = 03/29/2012 
 RPT Level = 0.004  Analysis Date = 03/29/2012 
 RPT Level = 0.004  Analysis Date = 03/29/2012 
 RPT Level = 0.004  Analysis Date = 03/20/2012 
 RPT Level = 0.004  Analysis Date = 03/20/2012 
 RPT Level = 0.004  Analysis Date = 03/20/2012 
 RPT Level = 0.004  Analysis Date = 03/20/2012 
 RPT Level = 0.004  Analysis Date = 03/06/2012 
 RPT Level = 0.004  Analysis Date = 03/06/2012 
 RPT Level = 0.004  Analysis Date = 03/06/2012 
 RPT Level = 0.004  Analysis Date = 03/06/2012 
 RPT Level = 0.004  Analysis Date = 02/02/2012 
 RPT Level = 0.004  Analysis Date = 02/02/2012 
 RPT Level = 0.004  Analysis Date = 02/02/2012 
 RPT Level = 0.004  Analysis Date = 02/02/2012 
 RPT Level = 0.004  Analysis Date = 01/25/2012 
 RPT Level = 0.004  Analysis Date = 01/25/2012 
 RPT Level = 0.004  Analysis Date = 01/25/2012 
 RPT Level = 0.004  Analysis Date = 01/25/2012 
 RPT Level = 0.004  Analysis Date = 01/05/2012 
 RPT Level = 0.004  Analysis Date = 01/05/2012 
 RPT Level = 0.004  Analysis Date = 01/05/2012 
 RPT Level = 0.004  Analysis Date = 01/05/2012 
 RPT Level = 0.004  Analysis Date = 12/29/2011 
 RPT Level = 0.004  Analysis Date = 12/29/2011 
 RPT Level = 0.004  Analysis Date = 12/29/2011 
 RPT Level = 0.004  Analysis Date = 12/29/2011 
 RPT Level = 0.004  Analysis Date = 12/29/2011 
 RPT Level = 0.004  Analysis Date = 12/29/2011 
 RPT Level = 0.004  Analysis Date = 12/14/2011 
 RPT Level = 0.004  Analysis Date = 12/14/2011 
 RPT Level = 0.004  Analysis Date = 12/14/2011 
 RPT Level = 0.004  Analysis Date = 12/14/2011 
 RPT Level = 0.004  Analysis Date = 11/29/2011 
 RPT Level = 0.004  Analysis Date = 11/29/2011 
 RPT Level = 0.004  Analysis Date = 11/29/2011 
 RPT Level = 0.004  Analysis Date = 11/29/2011 
 RPT Level = 0.004  Analysis Date = 11/29/2011 
 RPT Level = 0.004  Analysis Date = 11/29/2011 
 RPT Level = 0.004  Analysis Date = 11/08/2011 
 RPT Level = 0.004  Analysis Date = 11/08/2011 
 RPT Level = 0.004  Analysis Date = 11/08/2011 
 RPT Level = 0.004  Analysis Date = 11/08/2011 
 RPT Level = 0.004  Analysis Date = 11/08/2011 
 RPT Level = 0.004  Analysis Date = 11/08/2011 
 RPT Level = 0.004  Analysis Date = 11/08/2011 
 RPT Level = 0.004  Analysis Date = 11/08/2011 
 RPT Level = 0.004  Analysis Date = 10/07/2011 
 RPT Level = 0.004  Analysis Date = 10/07/2011 
 RPT Level = 0.004  Analysis Date = 09/29/2011 
 RPT Level = 0.004  Analysis Date = 09/29/2011 
 RPT Level = 0.004  Analysis Date = 09/29/2011 
 RPT Level = 0.004  Analysis Date = 09/29/2011 
 RPT Level = 0.004  Analysis Date = 09/29/2011 
 RPT Level = 0.004  Analysis Date = 09/29/2011 
 RPT Level = 0.004  Analysis Date = 09/13/2011 
 RPT Level = 0.004  Analysis Date = 09/13/2011 
 RPT Level = 0.004  Analysis Date = 09/01/2011 
 RPT Level = 0.004  Analysis Date = 09/01/2011 
 RPT Level = 0.004  Analysis Date = 08/23/2011 
 RPT Level = 0.004  Analysis Date = 08/23/2011 
 RPT Level = 0.004  Analysis Date = 08/23/2011 
 RPT Level = 0.004  Analysis Date = 08/23/2011 
 RPT Level = 0.004  Analysis Date = 08/09/2011 
 RPT Level = 0.004  Analysis Date = 08/09/2011 
 RPT Level = 0.004  Analysis Date = 08/03/2011 
 RPT Level = 0.004  Analysis Date = 08/03/2011 
 RPT Level = 0.004  Analysis Date = 08/03/2011 
 RPT Level = 0.004  Analysis Date = 08/03/2011 
 RPT Level = 0.004  Analysis Date = 07/19/2011 
 RPT Level = 0.004  Analysis Date = 07/19/2011 
 RPT Level = 0.004  Analysis Date = 07/19/2011 
 RPT Level = 0.004  Analysis Date = 07/19/2011 
 RPT Level = 0.004  Analysis Date = 07/14/2011 
 RPT Level = 0.004  Analysis Date = 07/14/2011 
 RPT Level = 0.004  Analysis Date = 07/21/2011 
 RPT Level = 0.004  Analysis Date = 07/21/2011 
 RPT Level = 0.004  Analysis Date = 06/28/2011 
 RPT Level = 0.004  Analysis Date = 06/28/2011 
 RPT Level = 0.004  Analysis Date = 06/28/2011 
 RPT Level = 0.004  Analysis Date = 06/28/2011 
 RPT Level = 0.004  Analysis Date = 06/28/2011 
 RPT Level = 0.004  Analysis Date = 06/28/2011 
 RPT Level = 0.004  Analysis Date = 06/08/2011 
 RPT Level = 0.004  Analysis Date = 06/08/2011 
 RPT Level = 0.004  Analysis Date = 06/08/2011 
 RPT Level = 0.004  Analysis Date = 06/08/2011 
 RPT Level = 0.004  Analysis Date = 06/08/2011 
 RPT Level = 0.004  Analysis Date = 06/08/2011 
 RPT Level = 0.004  Analysis Date = 05/11/2011 
 RPT Level = 0.004  Analysis Date = 05/11/2011 
 RPT Level = 0.004  Analysis Date = 05/11/2011 
 RPT Level = 0.004  Analysis Date = 05/11/2011 
 RPT Level = 0.004  Analysis Date = 04/26/2011 
 RPT Level = 0.004  Analysis Date = 04/26/2011 
 RPT Level = 0.004  Analysis Date = 04/26/2011 
 RPT Level = 0.004  Analysis Date = 04/26/2011 
 RPT Level = 0.004  Analysis Date = 04/20/2011 
 RPT Level = 0.004  Analysis Date = 04/20/2011 
 RPT Level = 0.004  Analysis Date = 04/20/2011 
 RPT Level = 0.004  Analysis Date = 04/20/2011 
 RPT Level = 0.004  Analysis Date = 03/30/2011 
 RPT Level = 0.004  Analysis Date = 03/30/2011 
 RPT Level = 0.004  Analysis Date = 03/30/2011 
 RPT Level = 0.004  Analysis Date = 03/30/2011 
 RPT Level = 0.004  Analysis Date = 03/10/2011 
 RPT Level = 0.004  Analysis Date = 03/10/2011 
 RPT Level = 0.004  Analysis Date = 03/10/2011 
 RPT Level = 0.004  Analysis Date = 03/10/2011 
 RPT Level = 0.004  Analysis Date = 03/01/2011 
 RPT Level = 0.004  Analysis Date = 03/01/2011 
 RPT Level = 0.004  Analysis Date = 03/01/2011 
 RPT Level = 0.004  Analysis Date = 03/01/2011 
 RPT Level = 0.004  Analysis Date = 03/01/2011 
 RPT Level = 0.004  Analysis Date = 03/01/2011 
 RPT Level = 0.004  Analysis Date = 02/17/2011 
 RPT Level = 0.004  Analysis Date = 02/17/2011 
 RPT Level = 0.004  Analysis Date = 02/02/2011 
 RPT Level = 0.004  Analysis Date = 02/02/2011 
 RPT Level = 0.004  Analysis Date = 01/26/2011 
 RPT Level = 0.004  Analysis Date = 01/26/2011 
 RPT Level = 0.004  Analysis Date = 01/26/2011 
 RPT Level = 0.004  Analysis Date = 01/26/2011 
 RPT Level = 0.004  Analysis Date = 01/13/2011 
 RPT Level = 0.004  Analysis Date = 01/13/2011 
 RPT Level = 0.004  Analysis Date = 01/06/2011 
 RPT Level = 0.004  Analysis Date = 01/06/2011 
 RPT Level = 0.004  Analysis Date = 01/06/2011 
 RPT Level = 0.004  Analysis Date = 01/06/2011 
 RPT Level = 0.004  Analysis Date = 12/28/2010 
 RPT Level = 0.004  Analysis Date = 12/28/2010 
 RPT Level = 0.004  Analysis Date = 12/15/2010 
 RPT Level = 0.004  Analysis Date = 12/15/2010 
 RPT Level = 0.004  Analysis Date = 12/06/2010 
 RPT Level = 0.004  Analysis Date = 12/06/2010 
 RPT Level = 0.004  Analysis Date = 12/01/2010 
 RPT Level = 0.004  Analysis Date = 12/01/2010 
 RPT Level = 0.004  Analysis Date = 12/01/2010 
 RPT Level = 0.004  Analysis Date = 12/01/2010 
 RPT Level = 0.004  Analysis Date = 12/01/2010 
 RPT Level = 0.004  Analysis Date = 12/01/2010 
 RPT Level = 0.004  Analysis Date = 11/10/2010 
 RPT Level = 0.004  Analysis Date = 11/10/2010 
 RPT Level = 0.004  Analysis Date = 11/10/2010 
 RPT Level = 0.004  Analysis Date = 11/10/2010 
 RPT Level = 0.004  Analysis Date = 11/10/2010 
 RPT Level = 0.004  Analysis Date = 11/10/2010 
 RPT Level = 0.004  Analysis Date = 10/20/2010 
 RPT Level = 0.004  Analysis Date = 10/20/2010 
 RPT Level = 0.004  Analysis Date = 10/20/2010 
 RPT Level = 0.004  Analysis Date = 10/20/2010 
 RPT Level = 0.004  Analysis Date = 10/20/2010 
 RPT Level = 0.004  Analysis Date = 10/20/2010 
 RPT Level = 0.004  Analysis Date = 09/29/2010 
 RPT Level = 0.004  Analysis Date = 09/29/2010 
 RPT Level = 0.004  Analysis Date = 09/21/2010 
 RPT Level = 0.004  Analysis Date = 09/21/2010 
 RPT Level = 0.004  Analysis Date = 09/21/2010 
 RPT Level = 0.004  Analysis Date = 09/21/2010 
 RPT Level = 0.004  Analysis Date = 09/08/2010 
 RPT Level = 0.004  Analysis Date = 09/08/2010 
 RPT Level = 0.004  Analysis Date = 09/01/2010 
 RPT Level = 0.004  Analysis Date = 09/01/2010 
 RPT Level = 0.004  Analysis Date = 09/01/2010 
 RPT Level = 0.004  Analysis Date = 09/01/2010 
 RPT Level = 0.004  Analysis Date = 08/17/2010 
 RPT Level = 0.004  Analysis Date = 08/17/2010 
 RPT Level = 0.004  Analysis Date = 08/12/2010 
 RPT Level = 0.004  Analysis Date = 08/12/2010 
 RPT Level = 0.004  Analysis Date = 08/10/2010 
 RPT Level = 0.004  Analysis Date = 08/10/2010 
 RPT Level = 0.004  Analysis Date = 08/10/2010 
 RPT Level = 0.004  Analysis Date = 08/10/2010 
 RPT Level = 0.004  Analysis Date = 07/15/2010 
 RPT Level = 0.004  Analysis Date = 07/15/2010 
 RPT Level = 0.004  Analysis Date = 07/15/2010 
 RPT Level = 0.004  Analysis Date = 07/15/2010 
 RPT Level = 0.004  Analysis Date = 07/15/2010 
 RPT Level = 0.004  Analysis Date = 07/15/2010 
 RPT Level = 0.004  Analysis Date = 07/15/2010 
 RPT Level = 0.004  Analysis Date = 07/15/2010 
 RPT Level = 0.004  Analysis Date = 06/24/2010 
 RPT Level = 0.004  Analysis Date = 06/24/2010 
 RPT Level = 0.004  Analysis Date = 06/16/2010 
 RPT Level = 0.004  Analysis Date = 06/16/2010 
 RPT Level = 0.004  Analysis Date = 06/16/2010 
 RPT Level = 0.004  Analysis Date = 06/16/2010 
 RPT Level = 0.004  Analysis Date = 06/02/2010 
 RPT Level = 0.004  Analysis Date = 06/02/2010 
 RPT Level = 0.004  Analysis Date = 06/02/2010 
 RPT Level = 0.004  Analysis Date = 06/02/2010 
 RPT Level = 0.004  Analysis Date = 05/19/2010 
 RPT Level = 0.004  Analysis Date = 05/19/2010 
 RPT Level = 0.004  Analysis Date = 05/19/2010 
 RPT Level = 0.004  Analysis Date = 05/19/2010 
 RPT Level = 0.004  Analysis Date = 05/06/2010 
 RPT Level = 0.004  Analysis Date = 05/06/2010 
 RPT Level = 0.004  Analysis Date = 05/03/2010 
 RPT Level = 0.004  Analysis Date = 05/03/2010 
 RPT Level = 0.004  Analysis Date = 05/03/2010 
 RPT Level = 0.004  Analysis Date = 05/03/2010 
 RPT Level = 0.004  Analysis Date = 04/13/2010 
 RPT Level = 0.004  Analysis Date = 04/13/2010 
 RPT Level = 0.004  Analysis Date = 04/06/2010 
 RPT Level = 0.004  Analysis Date = 04/06/2010 
 RPT Level = 0.004  Analysis Date = 04/06/2010 
 RPT Level = 0.004  Analysis Date = 04/06/2010 
 RPT Level = 0.004  Analysis Date = 04/06/2010 
 RPT Level = 0.004  Analysis Date = 04/06/2010 
 RPT Level = 0.004  Analysis Date = 03/16/2010 
 RPT Level = 0.004  Analysis Date = 03/16/2010 
 RPT Level = 0.004  Analysis Date = 03/10/2010 
 RPT Level = 0.004  Analysis Date = 03/10/2010 
 RPT Level = 0.004  Analysis Date = 03/02/2010 
 RPT Level = 0.004  Analysis Date = 03/02/2010 
 RPT Level = 0.004  Analysis Date = 02/24/2010 
 RPT Level = 0.004  Analysis Date = 02/24/2010 
 RPT Level = 0.004  Analysis Date = 02/22/2010 
 RPT Level = 0.004  Analysis Date = 02/22/2010 
 RPT Level = 0.004  Analysis Date = 02/09/2010 
 RPT Level = 0.004  Analysis Date = 02/09/2010 
 RPT Level = 0.004  Analysis Date = 01/28/2010 
 RPT Level = 0.004  Analysis Date = 01/28/2010 
 RPT Level = 0.004  Analysis Date = 01/28/2010 
 RPT Level = 0.004  Analysis Date = 01/28/2010 
 RPT Level = 0.004  Analysis Date = 01/13/2010 
 RPT Level = 0.004  Analysis Date = 01/13/2010 
 RPT Level = 0.004  Analysis Date = 01/13/2010 
 RPT Level = 0.004  Analysis Date = 01/13/2010 
 RPT Level = 0.004  Analysis Date = 01/05/2010 
 RPT Level = 0.004  Analysis Date = 01/05/2010 
 RPT Level = 0.004  Analysis Date = 01/05/2010 
 RPT Level = 0.004  Analysis Date = 01/05/2010 
 RPT Level = 0.004  Analysis Date = 12/21/2009 
 RPT Level = 0.004  Analysis Date = 12/21/2009 
 RPT Level = 0.004  Analysis Date = 12/16/2009 
 RPT Level = 0.004  Analysis Date = 12/16/2009 
 RPT Level = 0.004  Analysis Date = 12/16/2009 
 RPT Level = 0.004  Analysis Date = 12/16/2009 
 RPT Level = 0.004  Analysis Date = 12/03/2009 
 RPT Level = 0.004  Analysis Date = 12/03/2009 
 RPT Level = 0.004  Analysis Date = 11/27/2009 
 RPT Level = 0.004  Analysis Date = 11/27/2009 
 RPT Level = 0.004  Analysis Date = 11/12/2009 
 RPT Level = 0.004  Analysis Date = 11/12/2009 
 RPT Level = 0.004  Analysis Date = 11/12/2009 
 RPT Level = 0.004  Analysis Date = 11/12/2009 
 RPT Level = 0.004  Analysis Date = 11/12/2009 
 RPT Level = 0.004  Analysis Date = 11/12/2009 
 RPT Level = 0.004  Analysis Date = 11/03/2009 
 RPT Level = 0.004  Analysis Date = 11/03/2009 
 RPT Level = 0.004  Analysis Date = 11/03/2009 
 RPT Level = 0.004  Analysis Date = 11/03/2009 
 RPT Level = 0.004  Analysis Date = 11/03/2009 
 RPT Level = 0.004  Analysis Date = 11/03/2009 
 RPT Level = 0.004  Analysis Date = 09/22/2005 
 RPT Level = 0.002  Analysis Date = 09/22/2005 
 RPT Level = 0.002  Analysis Date = 09/22/2005 
 RPT Level = 0.002  Analysis Date = 09/22/2005 
 RPT Level = 0.002  Analysis Date = 09/22/2005 
 RPT Level = 0.002  Analysis Date = 09/22/2005 
 RPT Level = 0.002  Analysis Date = 09/09/2005 
 RPT Level = 0.002  Analysis Date = 09/09/2005 
 RPT Level = 0.002  Analysis Date = 09/09/2005 
 RPT Level = 0.002  Analysis Date = 09/09/2005 
 RPT Level = 0.002  Analysis Date = 08/25/2005 
 RPT Level = 0.002  Analysis Date = 08/25/2005 
 RPT Level = 0.002  Analysis Date = 08/18/2005 
 RPT Level = 0.002  Analysis Date = 08/18/2005 
 RPT Level = 0.002  Analysis Date = 08/18/2005 
 RPT Level = 0.002  Analysis Date = 08/18/2005 
 RPT Level = 0.002  Analysis Date = 07/21/2005 
 RPT Level = 0.002  Analysis Date = 07/21/2005 
 RPT Level = 0.002  Analysis Date = 07/21/2005 
 RPT Level = 0.002  Analysis Date = 07/21/2005 
 RPT Level = 0.002  Analysis Date = 07/21/2005 
 RPT Level = 0.002  Analysis Date = 07/21/2005 
 RPT Level = 0.002  Analysis Date = 07/21/2005 
 RPT Level = 0.002  Analysis Date = 07/21/2005 
 RPT Level = 0.002  Analysis Date = 07/21/2005 
 RPT Level = 0.002  Analysis Date = 07/21/2005 
 RPT Level = 0.002  Analysis Date = 06/30/2005 
 RPT Level = 0.002  Analysis Date = 06/30/2005 
 RPT Level = 0.002  Analysis Date = 06/29/2005 
 RPT Level = 0.002  Analysis Date = 06/29/2005 
 RPT Level = 0.002  Analysis Date = 06/29/2005 
 RPT Level = 0.002  Analysis Date = 06/29/2005 
 RPT Level = 0.002  Analysis Date = 06/09/2005 
 RPT Level = 0.002  Analysis Date = 06/09/2005 
 RPT Level = 0.002  Analysis Date = 06/09/2005 
 RPT Level = 0.002  Analysis Date = 06/09/2005 
 RPT Level = 0.002  Analysis Date = 05/24/2005 
 RPT Level = 0.002  Analysis Date = 05/24/2005 
 RPT Level = 0.002  Analysis Date = 05/24/2005 
 RPT Level = 0.002  Analysis Date = 05/24/2005 
 RPT Level = 0.002  Analysis Date = 05/12/2005 
 RPT Level = 0.002  Analysis Date = 05/12/2005 
 RPT Level = 0.002  Analysis Date = 05/12/2005 
 RPT Level = 0.002  Analysis Date = 05/12/2005 
 RPT Level = 0.002  Analysis Date = 05/05/2005 
 RPT Level = 0.002  Analysis Date = 05/05/2005 
 RPT Level = 0.002  Analysis Date = 05/05/2005 
 RPT Level = 0.002  Analysis Date = 05/05/2005 
 RPT Level = 0.002  Analysis Date = 05/05/2005 
 RPT Level = 0.002  Analysis Date = 05/05/2005 
 RPT Level = 0.002  Analysis Date = 05/05/2005 
 RPT Level = 0.002  Analysis Date = 05/05/2005 
 RPT Level = 0.002  Analysis Date = 03/31/2005 
 RPT Level = 0.002  Analysis Date = 03/31/2005 
 RPT Level = 0.002  Analysis Date = 03/31/2005 
 RPT Level = 0.002  Analysis Date = 03/31/2005 
 RPT Level = 0.002  Analysis Date = 03/31/2005 
 RPT Level = 0.002  Analysis Date = 03/31/2005 
 RPT Level = 0.002  Analysis Date = 03/10/2005 
 RPT Level = 0.002  Analysis Date = 03/10/2005 
 RPT Level = 0.002  Analysis Date = 03/01/2005 
 RPT Level = 0.002  Analysis Date = 03/01/2005 
 RPT Level = 0.002  Analysis Date = 03/01/2005 
 RPT Level = 0.002  Analysis Date = 03/01/2005 
 RPT Level = 0.002  Analysis Date = 02/24/2005 
 RPT Level = 0.002  Analysis Date = 02/24/2005 
 RPT Level = 0.002  Analysis Date = 02/24/2005 
 RPT Level = 0.002  Analysis Date = 02/24/2005 
 RPT Level = 0.002  Analysis Date = 02/24/2005 
 RPT Level = 0.002  Analysis Date = 02/24/2005 
 RPT Level = 0.002  Analysis Date = 02/24/2005 
 RPT Level = 0.002  Analysis Date = 02/24/2005 
 RPT Level = 0.002  Analysis Date = 02/24/2005 
 RPT Level = 0.002  Analysis Date = 02/24/2005 
 RPT Level = 0.002  Analysis Date = 01/18/2005 
 RPT Level = 0.002  Analysis Date = 01/18/2005 
 RPT Level = 0.002  Analysis Date = 01/18/2005 
 RPT Level = 0.002  Analysis Date = 01/18/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/05/2005 
 RPT Level = 0.002  Analysis Date = 01/05/2005 
 RPT Level = 0.002  Analysis Date = 01/05/2005 
 RPT Level = 0.002  Analysis Date = 01/05/2005 
 RPT Level = 0.002  Analysis Date = 12/02/2004 
 RPT Level = 0.002  Analysis Date = 12/02/2004 
 RPT Level = 0.002  Analysis Date = 12/02/2004 
 RPT Level = 0.002  Analysis Date = 12/02/2004 
 RPT Level = 0.002  Analysis Date = 12/01/2004 
 RPT Level = 0.002  Analysis Date = 12/01/2004 
 RPT Level = 0.002  Analysis Date = 09/15/2004 
 RPT Level = 0.002  Analysis Date = 09/15/2004 
 RPT Level = 0.002  Analysis Date = 09/15/2004 
 RPT Level = 0.002  Analysis Date = 09/15/2004 
 RPT Level = 0.002  Analysis Date = 09/15/2004 
 RPT Level = 0.002  Analysis Date = 09/15/2004 
 RPT Level = 0.002  Analysis Date = 09/15/2004 
 RPT Level = 0.002  Analysis Date = 09/15/2004 
 RPT Level = 0.002  Analysis Date = 09/15/2004 
 RPT Level = 0.002  Analysis Date = 09/15/2004 
 RPT Level = 0.002  Analysis Date = 09/15/2004 
 RPT Level = 0.002  Analysis Date = 09/15/2004 
 RPT Level = 0.002  Analysis Date = 08/30/2004 
 RPT Level = 0.002  Analysis Date = 08/30/2004 
 RPT Level = 0.002  Analysis Date = 08/17/2004 
 RPT Level = 0.002  Analysis Date = 08/17/2004 
 RPT Level = 0.002  Analysis Date = 08/05/2004 
 RPT Level = 0.002  Analysis Date = 08/05/2004 
 RPT Level = 0.002  Analysis Date = 07/29/2004 
 RPT Level = 0.002  Analysis Date = 07/29/2004 
 RPT Level = 0.002  Analysis Date = 07/22/2004 
 RPT Level = 0.002  Analysis Date = 07/22/2004 
 RPT Level = 0.002  Analysis Date = 07/13/2004 
 RPT Level = 0.002  Analysis Date = 07/13/2004 
 RPT Level = 0.002  Analysis Date = 07/13/2004 
 RPT Level = 0.002  Analysis Date = 07/13/2004 
 RPT Level = 0.002  Analysis Date = 07/13/2004 
 RPT Level = 0.002  Analysis Date = 07/13/2004 
 RPT Level = 0.002  Analysis Date = 06/24/2004 
 RPT Level = 0.002  Analysis Date = 06/24/2004 
 RPT Level = 0.002  Analysis Date = 06/24/2004 
 RPT Level = 0.002  Analysis Date = 06/24/2004 
 RPT Level = 0.002  Analysis Date = 06/09/2004 
 RPT Level = 0.002  Analysis Date = 06/09/2004 
 RPT Level = 0.002  Analysis Date = 06/09/2004 
 RPT Level = 0.002  Analysis Date = 06/09/2004 
 RPT Level = 0.002  Analysis Date = 05/20/2004 
 RPT Level = 0.002  Analysis Date = 05/20/2004 
 RPT Level = 0.002  Analysis Date = 05/20/2004 
 RPT Level = 0.002  Analysis Date = 05/20/2004 
 RPT Level = 0.002  Analysis Date = 05/20/2004 
 RPT Level = 0.002  Analysis Date = 05/20/2004 
 RPT Level = 0.002  Analysis Date = 04/29/2004 
 RPT Level = 0.002  Analysis Date = 04/29/2004 
 RPT Level = 0.002  Analysis Date = 04/21/2004 
 RPT Level = 0.002  Analysis Date = 04/21/2004 
 RPT Level = 0.002  Analysis Date = 04/13/2004 
 RPT Level = 0.002  Analysis Date = 04/13/2004 
 RPT Level = 0.002  Analysis Date = 04/13/2004 
 RPT Level = 0.002  Analysis Date = 04/13/2004 
 RPT Level = 0.002  Analysis Date = 04/13/2004 
 RPT Level = 0.002  Analysis Date = 04/13/2004 
 RPT Level = 0.002  Analysis Date = 03/26/2004 
 RPT Level = 0.002  Analysis Date = 03/26/2004 
 RPT Level = 0.002  Analysis Date = 03/26/2004 
 RPT Level = 0.002  Analysis Date = 03/26/2004 
 RPT Level = 0.002  Analysis Date = 03/26/2004 
 RPT Level = 0.002  Analysis Date = 03/26/2004 
 RPT Level = 0.002  Analysis Date = 03/19/2004 
 RPT Level = 0.002  Analysis Date = 03/19/2004 
 RPT Level = 0.002  Analysis Date = 03/19/2004 
 RPT Level = 0.002  Analysis Date = 03/19/2004 
 RPT Level = 0.002  Analysis Date = 03/19/2004 
 RPT Level = 0.002  Analysis Date = 03/19/2004 
 RPT Level = 0.002  Analysis Date = 03/19/2004 
 RPT Level = 0.002  Analysis Date = 03/19/2004 
 RPT Level = 0.002  Analysis Date = 03/19/2004 
 RPT Level = 0.002  Analysis Date = 03/19/2004 
 RPT Level = 0.002  Analysis Date = 03/02/2004 
 RPT Level = 0.002  Analysis Date = 03/02/2004 
 RPT Level = 0.002  Analysis Date = 03/02/2004 
 RPT Level = 0.002  Analysis Date = 03/02/2004 
 RPT Level = 0.002  Analysis Date = 03/02/2004 
 RPT Level = 0.002  Analysis Date = 03/02/2004 
 RPT Level = 0.002  Analysis Date = 02/20/2004 
 RPT Level = 0.002  Analysis Date = 02/20/2004 
 RPT Level = 0.002  Analysis Date = 02/20/2004 
 RPT Level = 0.002  Analysis Date = 02/20/2004 
 RPT Level = 0.002  Analysis Date = 02/12/2004 
 RPT Level = 0.002  Analysis Date = 02/12/2004 
 RPT Level = 0.002  Analysis Date = 02/12/2004 
 RPT Level = 0.002  Analysis Date = 02/12/2004 
 RPT Level = 0.002  Analysis Date = 02/12/2004 
 RPT Level = 0.002  Analysis Date = 02/12/2004 
 RPT Level = 0.002  Analysis Date = 02/12/2004 
 RPT Level = 0.002  Analysis Date = 02/12/2004 
 RPT Level = 0.002  Analysis Date = 01/30/2004 
 RPT Level = 0.002  Analysis Date = 01/30/2004 
 RPT Level = 0.002  Analysis Date = 01/30/2004 
 RPT Level = 0.002  Analysis Date = 01/30/2004 
 RPT Level = 0.002  Analysis Date = 01/30/2004 
 RPT Level = 0.002  Analysis Date = 01/30/2004 
 RPT Level = 0.002  Analysis Date = 01/30/2004 
 RPT Level = 0.002  Analysis Date = 01/30/2004 
 RPT Level = 0.002  Analysis Date = 01/16/2004 
 RPT Level = 0.002  Analysis Date = 01/16/2004 
 RPT Level = 0.002  Analysis Date = 01/16/2004 
 RPT Level = 0.002  Analysis Date = 01/16/2004 
 RPT Level = 0.002  Analysis Date = 01/08/2004 
 RPT Level = 0.002  Analysis Date = 01/08/2004 
 RPT Level = 0.002  Analysis Date = 01/08/2004 
 RPT Level = 0.002  Analysis Date = 01/08/2004 
 RPT Level = 0.002  Analysis Date = 09/25/2003 
 RPT Level = 0.0018  Analysis Date = 09/25/2003 
 RPT Level = 0.0018  Analysis Date = 09/25/2003 
 RPT Level = 0.0018  Analysis Date = 09/25/2003 
 RPT Level = 0.0018  Analysis Date = 09/10/2003 
 RPT Level = 0.0018  Analysis Date = 09/10/2003 
 RPT Level = 0.0018  Analysis Date = 09/08/2003 
 RPT Level = 0.0018  Analysis Date = 09/08/2003 
 RPT Level = 0.0018  Analysis Date = 08/28/2003 
 RPT Level = 0.0018  Analysis Date = 08/28/2003 
 RPT Level = 0.0018  Analysis Date = 08/21/2003 
 RPT Level = 0.0018  Analysis Date = 08/21/2003 
 RPT Level = 0.0018  Analysis Date = 08/21/2003 
 RPT Level = 0.0018  Analysis Date = 08/21/2003 
 RPT Level = 0.0018  Analysis Date = 08/07/2003 
 RPT Level = 0.0018  Analysis Date = 08/07/2003 
 RPT Level = 0.0018  Analysis Date = 08/07/2003 
 RPT Level = 0.0018  Analysis Date = 08/07/2003 
 RPT Level = 0.0018  Analysis Date = 07/25/2003 
 RPT Level = 0.0018  Analysis Date = 07/25/2003 
 RPT Level = 0.0018  Analysis Date = 07/16/2003 
 RPT Level = 0.0018  Analysis Date = 07/16/2003 
 RPT Level = 0.0018  Analysis Date = 07/16/2003 
 RPT Level = 0.0018  Analysis Date = 07/16/2003 
 RPT Level = 0.0018  Analysis Date = 07/08/2003 
 RPT Level = 0.0018  Analysis Date = 07/08/2003 
 RPT Level = 0.0018  Analysis Date = 06/27/2003 
 RPT Level = 0.0018  Analysis Date = 06/27/2003 
 RPT Level = 0.0018  Analysis Date = 06/20/2003 
 RPT Level = 0.0018  Analysis Date = 06/20/2003 
 RPT Level = 0.0018  Analysis Date = 06/18/2003 
 RPT Level = 0.0018  Analysis Date = 06/18/2003 
 RPT Level = 0.0018  Analysis Date = 06/12/2003 
 RPT Level = 0.0018  Analysis Date = 06/12/2003 
 RPT Level = 0.0018  Analysis Date = 06/05/2003 
 RPT Level = 0.0018  Analysis Date = 06/05/2003 
 RPT Level = 0.0018  Analysis Date = 05/28/2003 
 RPT Level = 0.0018  Analysis Date = 05/28/2003 
 RPT Level = 0.0018  Analysis Date = 05/22/2003 
 RPT Level = 0.0018  Analysis Date = 05/22/2003 
 RPT Level = 0.0018  Analysis Date = 05/16/2003 
 RPT Level = 0.0018  Analysis Date = 05/16/2003 
 RPT Level = 0.0018  Analysis Date = 05/09/2003 
 RPT Level = 0.0018  Analysis Date = 05/09/2003 
 RPT Level = 0.0018  Analysis Date = 05/01/2003 
 RPT Level = 0.0018  Analysis Date = 05/01/2003 
 RPT Level = 0.0018  Analysis Date = 04/23/2003 
 RPT Level = 0.0018  Analysis Date = 04/23/2003 
 RPT Level = 0.0018  Analysis Date = 04/09/2003 
 RPT Level = 0.0018  Analysis Date = 04/09/2003 
 RPT Level = 0.0018  Analysis Date = 04/09/2003 
 RPT Level = 0.0018  Analysis Date = 04/09/2003 
 RPT Level = 0.0018  Analysis Date = 04/09/2003 
 RPT Level = 0.0018  Analysis Date = 04/09/2003 
 RPT Level = 0.0018  Analysis Date = 03/28/2003 
 RPT Level = 0.0018  Analysis Date = 03/28/2003 
 RPT Level = 0.0018  Analysis Date = 03/21/2003 
 RPT Level = 0.0018  Analysis Date = 03/21/2003 
 RPT Level = 0.0018  Analysis Date = 03/10/2003 
 RPT Level = 0.0018  Analysis Date = 03/10/2003 
 RPT Level = 0.0018  Analysis Date = 03/03/2003 
 RPT Level = 0.0018  Analysis Date = 03/03/2003 
 RPT Level = 0.0018  Analysis Date = 02/27/2003 
 RPT Level = 0.0018  Analysis Date = 02/27/2003 
 RPT Level = 0.0018  Analysis Date = 02/11/2003 
 RPT Level = 0.0018  Analysis Date = 02/11/2003 
 RPT Level = 0.0018  Analysis Date = 02/07/2003 
 RPT Level = 0.0018  Analysis Date = 02/07/2003 
 RPT Level = 0.0018  Analysis Date = 02/07/2003 
 RPT Level = 0.0018  Analysis Date = 02/07/2003 
 RPT Level = 0.0018  Analysis Date = 02/07/2003 
 RPT Level = 0.0018  Analysis Date = 02/07/2003 
 RPT Level = 0.0018  Analysis Date = 01/16/2003 
 RPT Level = 0.0018  Analysis Date = 01/16/2003 
 RPT Level = 0.0018  Analysis Date = 01/16/2003 
 RPT Level = 0.0018  Analysis Date = 01/16/2003 
 RPT Level = 0.0018  Analysis Date = 01/16/2003 
 RPT Level = 0.0018  Analysis Date = 01/16/2003 
 RPT Level = 0.0018  Analysis Date = 01/16/2003 
 RPT Level = 0.0018  Analysis Date = 01/16/2003 
 RPT Level = 0.0018  Analysis Date = 12/19/2002 
 RPT Level = 0.0018  Analysis Date = 12/19/2002 
 RPT Level = 0.0018  Analysis Date = 12/19/2002 
 RPT Level = 0.0018  Analysis Date = 12/19/2002 
 RPT Level = 0.0018  Analysis Date = 12/04/2002 
 RPT Level = 0.0018  Analysis Date = 12/04/2002 
 RPT Level = 0.0018  Analysis Date = 12/04/2002 
 RPT Level = 0.0018  Analysis Date = 12/04/2002 
 RPT Level = 0.0018  Analysis Date = 12/04/2002 
 RPT Level = 0.0018  Analysis Date = 12/04/2002 
 RPT Level = 0.0018  Analysis Date = 12/04/2002 
 RPT Level = 0.0018  Analysis Date = 12/04/2002 
 RPT Level = 0.0018  Analysis Date = 12/04/2002 
 RPT Level = 0.0018  Analysis Date = 12/04/2002 
 RPT Level = 0.0018  Analysis Date = 11/08/2002 
 RPT Level = 0.0018  Analysis Date = 11/08/2002 
 RPT Level = 0.0018  Analysis Date = 11/08/2002 
 RPT Level = 0.0018  Analysis Date = 11/08/2002 
 RPT Level = 0.0018  Analysis Date = 11/08/2002 
 RPT Level = 0.0018  Analysis Date = 11/08/2002 
 RPT Level = 0.0018  Analysis Date = 11/08/2002 
 RPT Level = 0.0018  Analysis Date = 11/08/2002 
 RPT Level = 0.0018  Analysis Date = 11/08/2002 
 RPT Level = 0.0018  Analysis Date = 11/08/2002 
 RPT Level = 0.0018  Analysis Date = 09/06/2002 
 RPT Level = 0.0018  Analysis Date = 09/06/2002 
 RPT Level = 0.0018  Analysis Date = 08/23/2002 
 RPT Level = 0.0018  Analysis Date = 08/23/2002 
 RPT Level = 0.0018  Analysis Date = 08/15/2002 
 RPT Level = 0.0018  Analysis Date = 08/15/2002 
 RPT Level = 0.0018  Analysis Date = 08/09/2002 
 RPT Level = 0.0018  Analysis Date = 08/09/2002 
 RPT Level = 0.0018  Analysis Date = 07/16/2002 
 RPT Level = 0.0018  Analysis Date = 07/16/2002 
 RPT Level = 0.0018  Analysis Date = 07/03/2002 
 RPT Level = 0.0018  Analysis Date = 07/03/2002 
 RPT Level = 0.0018  Analysis Date = 06/20/2002 
 RPT Level = 0.0018  Analysis Date = 06/20/2002 
 RPT Level = 0.0018  Analysis Date = 06/03/2002 
 RPT Level = 0.0018  Y = 0
The SGPlot Procedure

False Positive Rate for Phosphorus (as P), FIL, CFA, ACD, LL

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Phosphorus (as P), FIL, CFA, ACD, LL 00666CL019 2002 8 0 0%
    2003 52 5 10%
    2004 51 3 6%
    2005 50 1 2%
    2010 52 0 0%
    2011 52 1 2%
    2012 52 0 0%
    2013 53 1 2%
    2014 5 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Phosphorus (as P), FIL, CFA, ACD-P, LL -
Blind Blank Results
Lab: NWQL, PCode: 00666, MCode: CL020
Analysis dates: 11/08/01 through 09/27/16
Open Data Set

 Analysis Date = 01/13/2014 
 Lab Value = 0.0588 
 RPT Level = 0.003 
 Lab Sample ID = 20133500067  Analysis Date = 08/04/2011 
 Lab Value = 0.0228 
 RPT Level = 0.003 
 Lab Sample ID = 20112130154  Analysis Date = 01/13/2014 
 Lab Value = 0.0588 
 RPT Level = 0.003 
 Lab Sample ID = 20133500067  Analysis Date = 08/04/2011 
 Lab Value = 0.0228 
 RPT Level = 0.003 
 Lab Sample ID = 20112130154  Analysis Date = 09/27/2016 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20162640173  Analysis Date = 09/22/2016 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20162580012  Analysis Date = 09/15/2016 
 Lab Value = -.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20162520025  Analysis Date = 09/08/2016 
 Lab Value = 0.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20162440121  Analysis Date = 09/02/2016 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20162360195  Analysis Date = 08/25/2016 
 Lab Value = 0.0026 
 RPT Level = 0.003 
 Lab Sample ID = 20162290137  Analysis Date = 08/23/2016 
 Lab Value = 0.0019 
 RPT Level = 0.003 
 Lab Sample ID = 20162230008  Analysis Date = 08/22/2016 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20162150204  Analysis Date = 08/10/2016 
 Lab Value = 0.0019 
 RPT Level = 0.003 
 Lab Sample ID = 20162080232  Analysis Date = 08/02/2016 
 Lab Value = 0.0023 
 RPT Level = 0.003 
 Lab Sample ID = 20162010257  Analysis Date = 07/19/2016 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20161940107  Analysis Date = 07/19/2016 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20161870031  Analysis Date = 07/13/2016 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20161800082  Analysis Date = 06/27/2016 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20161740071  Analysis Date = 06/23/2016 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20161660156  Analysis Date = 06/14/2016 
 Lab Value = 0.0016 
 RPT Level = 0.003 
 Lab Sample ID = 20161590152  Analysis Date = 06/09/2016 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20161520025  Analysis Date = 06/09/2016 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20161480189  Analysis Date = 05/17/2016 
 Lab Value = -.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20161270006  Analysis Date = 05/11/2016 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20161230045  Analysis Date = 05/03/2016 
 Lab Value = -.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20161160091  Analysis Date = 04/27/2016 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20161100126  Analysis Date = 04/27/2016 
 Lab Value = -.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20161020027  Analysis Date = 04/19/2016 
 Lab Value = -.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20160950044  Analysis Date = 04/07/2016 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20160880040  Analysis Date = 03/24/2016 
 Lab Value = -.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20160810065  Analysis Date = 03/22/2016 
 Lab Value = -.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20160740013  Analysis Date = 03/17/2016 
 Lab Value = -.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20160670014  Analysis Date = 03/10/2016 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20160600013  Analysis Date = 03/08/2016 
 Lab Value = -.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20160530013  Analysis Date = 03/02/2016 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20160470015  Analysis Date = 02/18/2016 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20160400084  Analysis Date = 02/11/2016 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20160320011  Analysis Date = 02/11/2016 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20160250031  Analysis Date = 02/04/2016 
 Lab Value = 0.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20160190011  Analysis Date = 01/20/2016 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20160110011  Analysis Date = 01/13/2016 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20160050030  Analysis Date = 01/13/2016 
 Lab Value = 0.0013 
 RPT Level = 0.003 
 Lab Sample ID = 20153630045  Analysis Date = 01/06/2016 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20153550011  Analysis Date = 12/30/2015 
 Lab Value = 0.0023 
 RPT Level = 0.003 
 Lab Sample ID = 20153500160  Analysis Date = 12/16/2015 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20153420017  Analysis Date = 12/08/2015 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20153340016  Analysis Date = 12/02/2015 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20153270012  Analysis Date = 11/25/2015 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20153200025  Analysis Date = 11/24/2015 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20153140011  Analysis Date = 11/18/2015 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20153060033  Analysis Date = 11/04/2015 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20152990066  Analysis Date = 10/28/2015 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20152920036  Analysis Date = 10/27/2015 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20152860152  Analysis Date = 10/14/2015 
 Lab Value = 0.0013 
 RPT Level = 0.003 
 Lab Sample ID = 20152780012  Analysis Date = 10/08/2015 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20152710066  Analysis Date = 10/01/2015 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20152640026  Analysis Date = 10/01/2015 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20152590157  Analysis Date = 09/22/2015 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20152510009  Analysis Date = 09/17/2015 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20152430096  Analysis Date = 09/01/2015 
 Lab Value = 0.0018 
 RPT Level = 0.003 
 Lab Sample ID = 20152360157  Analysis Date = 09/09/2015 
 Lab Value = 0.0026 
 RPT Level = 0.003 
 Lab Sample ID = 20152330007  Analysis Date = 08/19/2015 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20152230132  Analysis Date = 08/07/2015 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20152150073  Analysis Date = 08/05/2015 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20152080065  Analysis Date = 08/03/2015 
 Lab Value = 0.0023 
 RPT Level = 0.003 
 Lab Sample ID = 20152010051  Analysis Date = 08/03/2015 
 Lab Value = 0.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20151940024  Analysis Date = 07/22/2015 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20151870009  Analysis Date = 07/21/2015 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20151800049  Analysis Date = 07/15/2015 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20151730016  Analysis Date = 07/09/2015 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20151660034  Analysis Date = 06/16/2015 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20151620213  Analysis Date = 06/09/2015 
 Lab Value = 0.0014 
 RPT Level = 0.003 
 Lab Sample ID = 20151530198  Analysis Date = 06/02/2015 
 Lab Value = 0.0019 
 RPT Level = 0.003 
 Lab Sample ID = 20151460121  Analysis Date = 06/02/2015 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20151390198  Analysis Date = 05/19/2015 
 Lab Value = 0.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20151310070  Analysis Date = 05/14/2015 
 Lab Value = -.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20151240065  Analysis Date = 05/12/2015 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20151180073  Analysis Date = 05/05/2015 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20151140024  Analysis Date = 04/23/2015 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20151050039  Analysis Date = 04/23/2015 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20150970052  Analysis Date = 05/07/2015 
 Lab Value = 0.0014 
 RPT Level = 0.003 
 Lab Sample ID = 20150900037  Analysis Date = 04/08/2015 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20150850041  Analysis Date = 03/31/2015 
 Lab Value = 0.0014 
 RPT Level = 0.003 
 Lab Sample ID = 20150770031  Analysis Date = 03/19/2015 
 Lab Value = 0.0039 
 RPT Level = 0.003 
 Lab Sample ID = 20150690109  Analysis Date = 03/10/2015 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20150610104  Analysis Date = 03/10/2015 
 Lab Value = 0.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20150540029  Analysis Date = 03/05/2015 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20150490025  Analysis Date = 02/26/2015 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20150400033  Analysis Date = 02/18/2015 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20150330024  Analysis Date = 02/18/2015 
 Lab Value = -.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20150260015  Analysis Date = 02/04/2015 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20150200036  Analysis Date = 01/22/2015 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20150120017  Analysis Date = 01/14/2015 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20150050006  Analysis Date = 01/14/2015 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20143630008  Analysis Date = 01/14/2015 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20143560049  Analysis Date = 01/06/2015 
 Lab Value = -.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20143490026  Analysis Date = 12/16/2014 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20143420020  Analysis Date = 12/09/2014 
 Lab Value = 0.0022 
 RPT Level = 0.003 
 Lab Sample ID = 20143360073  Analysis Date = 12/09/2014 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20143300036  Analysis Date = 12/04/2014 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20143230047  Analysis Date = 12/03/2014 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20143160029  Analysis Date = 12/03/2014 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20143080087  Analysis Date = 11/17/2014 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20143010065  Analysis Date = 11/06/2014 
 Lab Value = -.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20142950122  Analysis Date = 10/27/2014 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20142880084  Analysis Date = 10/21/2014 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20142790031  Analysis Date = 10/16/2014 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20142720101  Analysis Date = 10/07/2014 
 Lab Value = 0.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20142650106  Analysis Date = 10/01/2014 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20142590046  Analysis Date = 09/25/2014 
 Lab Value = 0.0026 
 RPT Level = 0.003 
 Lab Sample ID = 20142520024  Analysis Date = 09/18/2014 
 Lab Value = 0.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20142470052  Analysis Date = 08/14/2014 
 Lab Value = 0.0013 
 RPT Level = 0.003 
 Lab Sample ID = 20142230082  Analysis Date = 08/12/2014 
 Lab Value = -.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20142160063  Analysis Date = 08/07/2014 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20142090217  Analysis Date = 08/05/2014 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20142030069  Analysis Date = 07/31/2014 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20141960042  Analysis Date = 07/22/2014 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20141890083  Analysis Date = 07/17/2014 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20141820118  Analysis Date = 07/09/2014 
 Lab Value = -.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20141750143  Analysis Date = 06/20/2014 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20141680085  Analysis Date = 06/20/2014 
 Lab Value = 0.0019 
 RPT Level = 0.003 
 Lab Sample ID = 20141620033  Analysis Date = 06/09/2014 
 Lab Value = 0.0016 
 RPT Level = 0.003 
 Lab Sample ID = 20141550058  Analysis Date = 06/04/2014 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20141470144  Analysis Date = 05/29/2014 
 Lab Value = 0.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20141400011  Analysis Date = 05/20/2014 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20141340002  Analysis Date = 05/13/2014 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20141250086  Analysis Date = 05/07/2014 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20141190022  Analysis Date = 04/29/2014 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20141130021  Analysis Date = 04/22/2014 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20141050008  Analysis Date = 04/10/2014 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20140970044  Analysis Date = 04/03/2014 
 Lab Value = -.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20140900020  Analysis Date = 04/02/2014 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20140840099  Analysis Date = 04/01/2014 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20140760039  Analysis Date = 03/19/2014 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20140690021  Analysis Date = 03/11/2014 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20140630120  Analysis Date = 03/04/2014 
 Lab Value = 0.0159 
 RPT Level = 0.003 
 Lab Sample ID = 20140550042  Analysis Date = 02/26/2014 
 Lab Value = 0.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20140490012  Analysis Date = 02/11/2014 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20140410005  Analysis Date = 02/11/2014 
 Lab Value = 0.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20140340022  Analysis Date = 02/05/2014 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20140270193  Analysis Date = 01/29/2014 
 Lab Value = 0.0018 
 RPT Level = 0.003 
 Lab Sample ID = 20140210036  Analysis Date = 01/23/2014 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20140130049  Analysis Date = 01/21/2014 
 Lab Value = -.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20140070067  Analysis Date = 01/16/2014 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20133580053  Analysis Date = 01/09/2014 
 Lab Value = -.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20133430107  Analysis Date = 01/16/2014 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20133360022  Analysis Date = 12/11/2013 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20133300012  Analysis Date = 12/11/2013 
 Lab Value = 0.0013 
 RPT Level = 0.003 
 Lab Sample ID = 20133230003  Analysis Date = 11/21/2013 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20133170105  Analysis Date = 11/18/2013 
 Lab Value = 0.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20133090098  Analysis Date = 11/01/2013 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20133030027  Analysis Date = 10/28/2013 
 Lab Value = -.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20132970027  Analysis Date = 10/28/2013 
 Lab Value = -0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20132730140  Analysis Date = 10/18/2013 
 Lab Value = -.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20132660104  Analysis Date = 10/24/2013 
 Lab Value = -.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20132600015  Analysis Date = 10/23/2013 
 Lab Value = -0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20132530113  Analysis Date = 09/30/2013 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20132410009  Analysis Date = 09/30/2013 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20132390012  Analysis Date = 10/01/2013 
 Lab Value = -0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20132350027  Analysis Date = 09/12/2013 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20132270018  Analysis Date = 08/28/2013 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20132180181  Analysis Date = 08/28/2013 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20132120027  Analysis Date = 08/14/2013 
 Lab Value = -.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20132040021  Analysis Date = 08/05/2013 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20131970028  Analysis Date = 07/29/2013 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20131900090  Analysis Date = 07/29/2013 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20131830073  Analysis Date = 07/16/2013 
 Lab Value = -.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20131770013  Analysis Date = 07/11/2013 
 Lab Value = -.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20131700038  Analysis Date = 06/24/2013 
 Lab Value = -.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20131640004  Analysis Date = 06/20/2013 
 Lab Value = -.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20131550029  Analysis Date = 06/18/2013 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20131500013  Analysis Date = 06/13/2013 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20131430198  Analysis Date = 06/06/2013 
 Lab Value = -.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20131350129  Analysis Date = 05/21/2013 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20131270022  Analysis Date = 05/14/2013 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20131220014  Analysis Date = 05/01/2013 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20131150015  Analysis Date = 05/02/2013 
 Lab Value = -.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20131120125  Analysis Date = 05/01/2013 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20131090030  Analysis Date = 04/10/2013 
 Lab Value = -.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20130930087  Analysis Date = 04/03/2013 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20130840058  Analysis Date = 03/26/2013 
 Lab Value = 0.0014 
 RPT Level = 0.003 
 Lab Sample ID = 20130770160  Analysis Date = 03/20/2013 
 Lab Value = -.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20130700013  Analysis Date = 03/11/2013 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20130630124  Analysis Date = 03/13/2013 
 Lab Value = 0.0122 
 RPT Level = 0.003 
 Lab Sample ID = 20130570007  Analysis Date = 03/13/2013 
 Lab Value = 0.0076 
 RPT Level = 0.003 
 Lab Sample ID = 20130520006  Analysis Date = 02/21/2013 
 Lab Value = 0.0019 
 RPT Level = 0.003 
 Lab Sample ID = 20130420052  Analysis Date = 02/07/2013 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20130350029  Analysis Date = 02/07/2013 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20130280039  Analysis Date = 01/31/2013 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20130230099  Analysis Date = 01/23/2013 
 Lab Value = -0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20130140071  Analysis Date = 01/17/2013 
 Lab Value = -.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20130070056  Analysis Date = 01/14/2013 
 Lab Value = 0.0014 
 RPT Level = 0.003 
 Lab Sample ID = 20130020010  Analysis Date = 01/14/2013 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20123620011  Analysis Date = 01/08/2013 
 Lab Value = 0.0018 
 RPT Level = 0.003 
 Lab Sample ID = 20123530084  Analysis Date = 12/26/2012 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20123480061  Analysis Date = 12/17/2012 
 Lab Value = 0.0014 
 RPT Level = 0.003 
 Lab Sample ID = 20123390115  Analysis Date = 12/10/2012 
 Lab Value = -.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20123330010  Analysis Date = 12/04/2012 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20123250063  Analysis Date = 11/29/2012 
 Lab Value = 0.0013 
 RPT Level = 0.003 
 Lab Sample ID = 20123200054  Analysis Date = 11/29/2012 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20123120066  Analysis Date = 11/20/2012 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20123040119  Analysis Date = 11/08/2012 
 Lab Value = -.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20122980126  Analysis Date = 10/24/2012 
 Lab Value = 0.0029 
 RPT Level = 0.003 
 Lab Sample ID = 20122900096  Analysis Date = 10/18/2012 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20122830034  Analysis Date = 10/09/2012 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20122750025  Analysis Date = 10/09/2012 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20122700110  Analysis Date = 10/09/2012 
 Lab Value = 0.0018 
 RPT Level = 0.003 
 Lab Sample ID = 20122690153  Analysis Date = 10/01/2012 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20122550016  Analysis Date = 09/18/2012 
 Lab Value = -.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20122490102  Analysis Date = 09/12/2012 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20122410013  Analysis Date = 09/04/2012 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20122350175  Analysis Date = 08/27/2012 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20122280090  Analysis Date = 08/15/2012 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20122190099  Analysis Date = 08/14/2012 
 Lab Value = -.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20122140050  Analysis Date = 08/08/2012 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20122050101  Analysis Date = 07/25/2012 
 Lab Value = 0.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20121990080  Analysis Date = 07/24/2012 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20121910041  Analysis Date = 07/24/2012 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20121870014  Analysis Date = 07/17/2012 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20121780033  Analysis Date = 06/28/2012 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20121710006  Analysis Date = 06/22/2012 
 Lab Value = 0.0017 
 RPT Level = 0.003 
 Lab Sample ID = 20121650052  Analysis Date = 06/12/2012 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20121560125  Analysis Date = 06/12/2012 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20121510037  Analysis Date = 05/30/2012 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20121430021  Analysis Date = 05/22/2012 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20121370053  Analysis Date = 05/14/2012 
 Lab Value = 0.0013 
 RPT Level = 0.003 
 Lab Sample ID = 20121290072  Analysis Date = 05/09/2012 
 Lab Value = -.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20121210123  Analysis Date = 05/08/2012 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20121150089  Analysis Date = 05/03/2012 
 Lab Value = -.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20121080009  Analysis Date = 04/18/2012 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20121010029  Analysis Date = 04/12/2012 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20120930058  Analysis Date = 04/10/2012 
 Lab Value = 0.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20120870035  Analysis Date = 04/05/2012 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20120790085  Analysis Date = 04/03/2012 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20120730079  Analysis Date = 03/20/2012 
 Lab Value = 0.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20120660073  Analysis Date = 03/13/2012 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20120580047  Analysis Date = 03/13/2012 
 Lab Value = 0.0013 
 RPT Level = 0.003 
 Lab Sample ID = 20120530099  Analysis Date = 02/22/2012 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20120450020  Analysis Date = 02/16/2012 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20120370064  Analysis Date = 02/16/2012 
 Lab Value = -.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20120310012  Analysis Date = 01/31/2012 
 Lab Value = 0.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20120230046  Analysis Date = 01/31/2012 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20120180013  Analysis Date = 01/25/2012 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20120090052  Analysis Date = 01/19/2012 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20120030028  Analysis Date = 01/12/2012 
 Lab Value = 0.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20113610089  Analysis Date = 01/11/2012 
 Lab Value = -.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20113530139  Analysis Date = 01/05/2012 
 Lab Value = 0.0024 
 RPT Level = 0.003 
 Lab Sample ID = 20113490075  Analysis Date = 12/28/2011 
 Lab Value = -.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20113460137  Analysis Date = 12/14/2011 
 Lab Value = -.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20113320115  Analysis Date = 12/02/2011 
 Lab Value = -.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20113250126  Analysis Date = 11/29/2011 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20113180164  Analysis Date = 11/18/2011 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20113110062  Analysis Date = 11/18/2011 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20113050092  Analysis Date = 11/16/2011 
 Lab Value = 0.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20112970118  Analysis Date = 11/08/2011 
 Lab Value = -.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20112910137  Analysis Date = 10/18/2011 
 Lab Value = -.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20112840071  Analysis Date = 10/19/2011 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20112760061  Analysis Date = 10/12/2011 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20112690123  Analysis Date = 10/04/2011 
 Lab Value = -.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20112630061  Analysis Date = 09/29/2011 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20112560021  Analysis Date = 10/12/2011 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20112510037  Analysis Date = 09/29/2011 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20112500188  Analysis Date = 08/30/2011 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20112360063  Analysis Date = 08/25/2011 
 Lab Value = -0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20112300036  Analysis Date = 08/17/2011 
 Lab Value = -.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20112200051  Analysis Date = 08/02/2011 
 Lab Value = 0.0013 
 RPT Level = 0.003 
 Lab Sample ID = 20112060094  Analysis Date = 08/02/2011 
 Lab Value = -.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20112010020  Analysis Date = 07/27/2011 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20111920099  Analysis Date = 07/21/2011 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20111860062  Analysis Date = 07/20/2011 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20111780166  Analysis Date = 07/13/2011 
 Lab Value = -.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20111710111  Analysis Date = 06/28/2011 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20111640067  Analysis Date = 06/28/2011 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20111570061  Analysis Date = 06/23/2011 
 Lab Value = 0.0033 
 RPT Level = 0.003 
 Lab Sample ID = 20111510151  Analysis Date = 06/08/2011 
 Lab Value = 0.0023 
 RPT Level = 0.003 
 Lab Sample ID = 20111430203  Analysis Date = 05/25/2011 
 Lab Value = -0.003 
 RPT Level = 0.003 
 Lab Sample ID = 20111360146  Analysis Date = 05/17/2011 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20111290046  Analysis Date = 05/10/2011 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20111220086  Analysis Date = 05/04/2011 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20111150114  Analysis Date = 04/26/2011 
 Lab Value = -.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20111080073  Analysis Date = 04/20/2011 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20111010118  Analysis Date = 04/08/2011 
 Lab Value = -.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20110950054  Analysis Date = 04/06/2011 
 Lab Value = 0.0037 
 RPT Level = 0.003 
 Lab Sample ID = 20110870089  Analysis Date = 04/05/2011 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20110800059  Analysis Date = 03/30/2011 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20110750067  Analysis Date = 03/10/2011 
 Lab Value = -.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20110660032  Analysis Date = 03/08/2011 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20110590070  Analysis Date = 03/02/2011 
 Lab Value = 0.0014 
 RPT Level = 0.003 
 Lab Sample ID = 20110530105  Analysis Date = 02/24/2011 
 Lab Value = -.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20110450036  Analysis Date = 02/15/2011 
 Lab Value = 0.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20110410098  Analysis Date = 02/15/2011 
 Lab Value = -.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20110400069  Analysis Date = 01/26/2011 
 Lab Value = -.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20110240065  Analysis Date = 01/26/2011 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20110180057  Analysis Date = 01/19/2011 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20110110016  Analysis Date = 01/06/2011 
 Lab Value = -.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20110030021  Analysis Date = 01/05/2011 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20103610054  Analysis Date = 01/04/2011 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20103540047  Analysis Date = 01/04/2011 
 Lab Value = -.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20103470078  Analysis Date = 12/21/2010 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20103400086  Analysis Date = 12/22/2010 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20103330099  Analysis Date = 12/14/2010 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20103260065  Analysis Date = 12/01/2010 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20103190064  Analysis Date = 11/30/2010 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20103120026  Analysis Date = 11/17/2010 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20103060008  Analysis Date = 11/09/2010 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20102990006  Analysis Date = 10/27/2010 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20102920006  Analysis Date = 11/02/2010 
 Lab Value = 0.0018 
 RPT Level = 0.003 
 Lab Sample ID = 20102850132  Analysis Date = 10/20/2010 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20102770110  Analysis Date = 10/13/2010 
 Lab Value = -.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20102700152  Analysis Date = 09/29/2010 
 Lab Value = -.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20102640136  Analysis Date = 09/22/2010 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20102570015  Analysis Date = 09/16/2010 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20102510062  Analysis Date = 09/15/2010 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20102430249  Analysis Date = 09/01/2010 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20102350196  Analysis Date = 08/25/2010 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20102290049  Analysis Date = 08/24/2010 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20102230041  Analysis Date = 08/10/2010 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20102140090  Analysis Date = 08/03/2010 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20102080005  Analysis Date = 08/03/2010 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20102000188  Analysis Date = 07/27/2010 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20101930104  Analysis Date = 07/22/2010 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20101870059  Analysis Date = 07/20/2010 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20101790124  Analysis Date = 06/30/2010 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20101730068  Analysis Date = 06/24/2010 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20101660061  Analysis Date = 06/16/2010 
 Lab Value = -.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20101590005  Analysis Date = 06/16/2010 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20101530090  Analysis Date = 06/09/2010 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20101440165  Analysis Date = 06/03/2010 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20101380021  Analysis Date = 05/20/2010 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20101310098  Analysis Date = 05/12/2010 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20101240080  Analysis Date = 05/05/2010 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20101180043  Analysis Date = 04/28/2010 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20101090063  Analysis Date = 04/21/2010 
 Lab Value = -.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20101020075  Analysis Date = 04/08/2010 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20100950036  Analysis Date = 04/06/2010 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20100880044  Analysis Date = 03/30/2010 
 Lab Value = 0.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20100850066  Analysis Date = 03/25/2010 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20100750002  Analysis Date = 03/16/2010 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20100680014  Analysis Date = 03/10/2010 
 Lab Value = 0.0025 
 RPT Level = 0.003 
 Lab Sample ID = 20100600067  Analysis Date = 03/02/2010 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20100530048  Analysis Date = 02/24/2010 
 Lab Value = -.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20100470025  Analysis Date = 02/12/2010 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20100390038  Analysis Date = 02/10/2010 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20100320023  Analysis Date = 01/28/2010 
 Lab Value = -.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20100260065  Analysis Date = 01/26/2010 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20100190102  Analysis Date = 01/13/2010 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20100110099  Analysis Date = 01/13/2010 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20100050014  Analysis Date = 01/06/2010 
 Lab Value = -.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20093620042  Analysis Date = 01/06/2010 
 Lab Value = -.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20093560033  Analysis Date = 12/29/2009 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20093480064  Analysis Date = 12/21/2009 
 Lab Value = 0.0017 
 RPT Level = 0.003 
 Lab Sample ID = 20093420004  Analysis Date = 12/29/2009 
 Lab Value = -.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20093350070  Analysis Date = 12/01/2009 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20093280015  Analysis Date = 11/27/2009 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20093200062  Analysis Date = 11/25/2009 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20093130061  Analysis Date = 11/24/2009 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20093070201  Analysis Date = 11/18/2009 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20093000106  Analysis Date = 11/18/2009 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20092920096  Analysis Date = 11/10/2009 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20092870073  Analysis Date = 10/28/2009 
 Lab Value = -.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20092780071  Analysis Date = 10/22/2009 
 Lab Value = -.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20092720011  Analysis Date = 10/21/2009 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20092640026  Analysis Date = 09/24/2009 
 Lab Value = -.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20092570049  Analysis Date = 09/24/2009 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20092520132  Analysis Date = 09/23/2009 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20092430155  Analysis Date = 09/15/2009 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20092360171  Analysis Date = 09/10/2009 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20092290211  Analysis Date = 08/20/2009 
 Lab Value = -.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20092220169  Analysis Date = 08/12/2009 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20092150073  Analysis Date = 08/13/2009 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20092090263  Analysis Date = 07/30/2009 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20092010116  Analysis Date = 07/23/2009 
 Lab Value = -.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20091950026  Analysis Date = 07/21/2009 
 Lab Value = -.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20091870025  Analysis Date = 07/16/2009 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20091800174  Analysis Date = 07/01/2009 
 Lab Value = -0.003 
 RPT Level = 0.003 
 Lab Sample ID = 20091730218  Analysis Date = 06/30/2009 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20091660206  Analysis Date = 06/18/2009 
 Lab Value = -.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20091590088  Analysis Date = 06/11/2009 
 Lab Value = -.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20091520151  Analysis Date = 06/09/2009 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20091460188  Analysis Date = 06/03/2009 
 Lab Value = 0.0013 
 RPT Level = 0.003 
 Lab Sample ID = 20091380122  Analysis Date = 05/27/2009 
 Lab Value = 0.0014 
 RPT Level = 0.003 
 Lab Sample ID = 20091320020  Analysis Date = 05/14/2009 
 Lab Value = -.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20091240123  Analysis Date = 05/05/2009 
 Lab Value = 0.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20091170110  Analysis Date = 04/29/2009 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20091110135  Analysis Date = 04/23/2009 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20091030081  Analysis Date = 04/15/2009 
 Lab Value = -0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20090960054  Analysis Date = 04/15/2009 
 Lab Value = -.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20090890069  Analysis Date = 04/09/2009 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20090820029  Analysis Date = 04/08/2009 
 Lab Value = 0.0017 
 RPT Level = 0.003 
 Lab Sample ID = 20090750048  Analysis Date = 03/12/2009 
 Lab Value = -0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20090680045  Analysis Date = 03/10/2009 
 Lab Value = -.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20090610057  Analysis Date = 03/05/2009 
 Lab Value = -.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20090540030  Analysis Date = 03/03/2009 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20090480058  Analysis Date = 02/11/2009 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20090400032  Analysis Date = 02/10/2009 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20090330037  Analysis Date = 02/05/2009 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20090260027  Analysis Date = 01/22/2009 
 Lab Value = -.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20090200036  Analysis Date = 01/20/2009 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20090120049  Analysis Date = 01/09/2009 
 Lab Value = 0.0016 
 RPT Level = 0.003 
 Lab Sample ID = 20090050019  Analysis Date = 01/09/2009 
 Lab Value = 0.0019 
 RPT Level = 0.003 
 Lab Sample ID = 20083650083  Analysis Date = 01/09/2009 
 Lab Value = 0.0023 
 RPT Level = 0.003 
 Lab Sample ID = 20083570034  Analysis Date = 01/13/2009 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20083500071  Analysis Date = 01/08/2009 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20083450064  Analysis Date = 12/09/2008 
 Lab Value = 0.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20083360040  Analysis Date = 12/09/2008 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20083290062  Analysis Date = 11/20/2008 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20083220064  Analysis Date = 11/17/2008 
 Lab Value = -.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20083150065  Analysis Date = 11/13/2008 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20083080100  Analysis Date = 11/06/2008 
 Lab Value = 0.0016 
 RPT Level = 0.003 
 Lab Sample ID = 20083010109  Analysis Date = 11/04/2008 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20082940063  Analysis Date = 10/21/2008 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20082880040  Analysis Date = 10/09/2008 
 Lab Value = 0.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20082800042  Analysis Date = 10/08/2008 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20082730062  Analysis Date = 09/30/2008 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20082660047  Analysis Date = 09/30/2008 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20082590105  Analysis Date = 09/24/2008 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20082520008  Analysis Date = 09/11/2008 
 Lab Value = -.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20082460098  Analysis Date = 09/16/2008 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20082380080  Analysis Date = 08/26/2008 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20082310131  Analysis Date = 08/14/2008 
 Lab Value = -.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20082250010  Analysis Date = 08/12/2008 
 Lab Value = 0.0021 
 RPT Level = 0.003 
 Lab Sample ID = 20082190011  Analysis Date = 07/30/2008 
 Lab Value = 0.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20082030127  Analysis Date = 07/23/2008 
 Lab Value = 0.0029 
 RPT Level = 0.003 
 Lab Sample ID = 20081970139  Analysis Date = 07/17/2008 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20081890044  Analysis Date = 07/15/2008 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20081820059  Analysis Date = 07/08/2008 
 Lab Value = 0.0014 
 RPT Level = 0.003 
 Lab Sample ID = 20081750128  Analysis Date = 07/01/2008 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20081680067  Analysis Date = 06/17/2008 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20081620017  Analysis Date = 06/17/2008 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20081540109  Analysis Date = 06/04/2008 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20081480068  Analysis Date = 06/03/2008 
 Lab Value = 0.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20081400061  Analysis Date = 05/21/2008 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20081330112  Analysis Date = 05/14/2008 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20081260070  Analysis Date = 05/08/2008 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20081190055  Analysis Date = 04/30/2008 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20081120033  Analysis Date = 04/29/2008 
 Lab Value = -.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20081050114  Analysis Date = 04/15/2008 
 Lab Value = 0.0014 
 RPT Level = 0.003 
 Lab Sample ID = 20080980084  Analysis Date = 04/08/2008 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20080920083  Analysis Date = 04/01/2008 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20080840064  Analysis Date = 03/25/2008 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20080770124  Analysis Date = 03/12/2008 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20080700074  Analysis Date = 03/06/2008 
 Lab Value = 0.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20080630067  Analysis Date = 03/04/2008 
 Lab Value = 0.0024 
 RPT Level = 0.003 
 Lab Sample ID = 20080560070  Analysis Date = 02/28/2008 
 Lab Value = 0.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20080510055  Analysis Date = 02/26/2008 
 Lab Value = 0.0018 
 RPT Level = 0.003 
 Lab Sample ID = 20080420072  Analysis Date = 02/13/2008 
 Lab Value = 0.0027 
 RPT Level = 0.003 
 Lab Sample ID = 20080360051  Analysis Date = 01/31/2008 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20080280050  Analysis Date = 01/29/2008 
 Lab Value = 0.0025 
 RPT Level = 0.003 
 Lab Sample ID = 20080230021  Analysis Date = 01/17/2008 
 Lab Value = 0.0009 
 RPT Level = 0.003 
 Lab Sample ID = 20080140027  Analysis Date = 01/11/2008 
 Lab Value = -.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20080070023  Analysis Date = 01/10/2008 
 Lab Value = -.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20073620004  Analysis Date = 01/03/2008 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20073510098  Analysis Date = 12/12/2007 
 Lab Value = 0.0003 
 RPT Level = 0.003 
 Lab Sample ID = 20073440039  Analysis Date = 12/05/2007 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20073370069  Analysis Date = 12/04/2007 
 Lab Value = 0.0013 
 RPT Level = 0.003 
 Lab Sample ID = 20073300042  Analysis Date = 12/03/2007 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20073230113  Analysis Date = 11/30/2007 
 Lab Value = 0.0018 
 RPT Level = 0.003 
 Lab Sample ID = 20073170062  Analysis Date = 11/28/2007 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20073100012  Analysis Date = 11/19/2007 
 Lab Value = 0.0017 
 RPT Level = 0.003 
 Lab Sample ID = 20073020065  Analysis Date = 11/13/2007 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20072960186  Analysis Date = 11/05/2007 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20072890056  Analysis Date = 10/22/2007 
 Lab Value = 0.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20072850025  Analysis Date = 10/15/2007 
 Lab Value = 0.0023 
 RPT Level = 0.003 
 Lab Sample ID = 20072670056  Analysis Date = 10/05/2007 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20072600129  Analysis Date = 10/03/2007 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20072540015  Analysis Date = 09/26/2007 
 Lab Value = 0.0015 
 RPT Level = 0.003 
 Lab Sample ID = 20072480018  Analysis Date = 09/20/2007 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20072400035  Analysis Date = 09/06/2007 
 Lab Value = 0.0012 
 RPT Level = 0.003 
 Lab Sample ID = 20072330109  Analysis Date = 08/30/2007 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20072260198  Analysis Date = 08/28/2007 
 Lab Value = 0.0016 
 RPT Level = 0.003 
 Lab Sample ID = 20072210252  Analysis Date = 08/20/2007 
 Lab Value = 0.0024 
 RPT Level = 0.003 
 Lab Sample ID = 20072110162  Analysis Date = 08/16/2007 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20072040101  Analysis Date = 07/19/2007 
 Lab Value = 0.0014 
 RPT Level = 0.003 
 Lab Sample ID = 20071900105  Analysis Date = 07/19/2007 
 Lab Value = -.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20071830158  Analysis Date = 07/17/2007 
 Lab Value = 0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20071770201  Analysis Date = 07/03/2007 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20071690119  Analysis Date = 06/21/2007 
 Lab Value = 0.0013 
 RPT Level = 0.003 
 Lab Sample ID = 20071620045  Analysis Date = 06/20/2007 
 Lab Value = 0.0006 
 RPT Level = 0.003 
 Lab Sample ID = 20071560026  Analysis Date = 06/19/2007 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20071500033  Analysis Date = 06/13/2007 
 Lab Value = 0.0005 
 RPT Level = 0.003 
 Lab Sample ID = 20071410089  Analysis Date = 06/05/2007 
 Lab Value = -0.002 
 RPT Level = 0.003 
 Lab Sample ID = 20071340113  Analysis Date = 05/17/2007 
 Lab Value = 0.0017 
 RPT Level = 0.003 
 Lab Sample ID = 20071280019  Analysis Date = 05/15/2007 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20071200089  Analysis Date = 05/10/2007 
 Lab Value = -0.003 
 RPT Level = 0.003 
 Lab Sample ID = 20071130120  Analysis Date = 05/01/2007 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20071070021  Analysis Date = 04/19/2007 
 Lab Value = 0.0004 
 RPT Level = 0.003 
 Lab Sample ID = 20070990050  Analysis Date = 04/24/2007 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20070930070  Analysis Date = 04/18/2007 
 Lab Value = 0.0135 
 RPT Level = 0.003 
 Lab Sample ID = 20070860217  Analysis Date = 04/18/2007 
 Lab Value = 0.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20070780128  Analysis Date = 03/22/2007 
 Lab Value = 0.0023 
 RPT Level = 0.003 
 Lab Sample ID = 20070710075  Analysis Date = 03/15/2007 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20070650009  Analysis Date = 03/15/2007 
 Lab Value = 0.0011 
 RPT Level = 0.003 
 Lab Sample ID = 20070580141  Analysis Date = 03/14/2007 
 Lab Value = -.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20070540023  Analysis Date = 02/28/2007 
 Lab Value = 0.0029 
 RPT Level = 0.003 
 Lab Sample ID = 20070460015  Analysis Date = 02/28/2007 
 Lab Value = 0.0014 
 RPT Level = 0.003 
 Lab Sample ID = 20070400103  Analysis Date = 02/13/2007 
 Lab Value = 0.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20070250023  Analysis Date = 02/13/2007 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20070180071  Analysis Date = 01/18/2007 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20070120012  Analysis Date = 01/10/2007 
 Lab Value = 0.0007 
 RPT Level = 0.003 
 Lab Sample ID = 20070040013  Analysis Date = 01/10/2007 
 Lab Value = 0.0013 
 RPT Level = 0.003 
 Lab Sample ID = 20063610084  Analysis Date = 01/04/2007 
 Lab Value = 0.0028 
 RPT Level = 0.003 
 Lab Sample ID = 20063520072  Analysis Date = 12/15/2006 
 Lab Value = -.0001 
 RPT Level = 0.003 
 Lab Sample ID = 20063450081  Analysis Date = 12/06/2006 
 Lab Value = -0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20063380055  Analysis Date = 12/08/2006 
 Lab Value = 0.0025 
 RPT Level = 0.003 
 Lab Sample ID = 20063310047  Analysis Date = 11/30/2006 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20063240079  Analysis Date = 11/20/2006 
 Lab Value = 0 
 RPT Level = 0.003 
 Lab Sample ID = 20063180103  Analysis Date = 11/08/2006 
 Lab Value = 0.0024 
 RPT Level = 0.003 
 Lab Sample ID = 20063100080  Analysis Date = 11/07/2006 
 Lab Value = -.0002 
 RPT Level = 0.003 
 Lab Sample ID = 20063030096  Analysis Date = 10/27/2006 
 Lab Value = 0.0014 
 RPT Level = 0.003 
 Lab Sample ID = 20062960133  Analysis Date = 10/25/2006 
 Lab Value = 0.0008 
 RPT Level = 0.003 
 Lab Sample ID = 20062910013  Analysis Date = 10/18/2006 
 Lab Value = -0.003 
 RPT Level = 0.003 
 Lab Sample ID = 20062850014  Analysis Date = 10/16/2006 
 Lab Value = 0.001 
 RPT Level = 0.003 
 Lab Sample ID = 20062780050  Analysis Date = 10/05/2006 
 Lab Value = 0.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20062620013  Analysis Date = 09/29/2006 
 Lab Value = 0.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20062540016  Analysis Date = 09/27/2006 
 Lab Value = -.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20062500008  Analysis Date = 09/15/2006 
 Lab Value = -.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20062350182  Analysis Date = 08/22/2006 
 Lab Value = -.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20062270273  Analysis Date = 08/16/2006 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20062220039  Analysis Date = 07/28/2006 
 Lab Value = 0.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20062020314  Analysis Date = 07/20/2006 
 Lab Value = 0.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20061950007  Analysis Date = 07/14/2006 
 Lab Value = 0.0012 
 RPT Level = 0.002 
 Lab Sample ID = 20061880009  Analysis Date = 06/30/2006 
 Lab Value = 0.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20061730014  Analysis Date = 06/20/2006 
 Lab Value = 0.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20061670021  Analysis Date = 06/09/2006 
 Lab Value = -0.002 
 RPT Level = 0.002 
 Lab Sample ID = 20061580018  Analysis Date = 06/01/2006 
 Lab Value = 0.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20061370016  Analysis Date = 05/19/2006 
 Lab Value = -.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20061280111  Analysis Date = 05/11/2006 
 Lab Value = 0.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20061220099  Analysis Date = 09/29/2005 
 Lab Value = 0.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20052590035  Analysis Date = 09/22/2005 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20052520006  Analysis Date = 09/09/2005 
 Lab Value = 0.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20052430006  Analysis Date = 09/09/2005 
 Lab Value = 0.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20052370002  Analysis Date = 09/01/2005 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20052300009  Analysis Date = 08/17/2005 
 Lab Value = 0.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20052210012  Analysis Date = 08/17/2005 
 Lab Value = 0 
 RPT Level = 0.002 
 Lab Sample ID = 20052160007  Analysis Date = 08/17/2005 
 Lab Value = 0.0001 
 RPT Level = 0.002 
 Lab Sample ID = 20052160005  Analysis Date = 08/04/2005 
 Lab Value = 0.0022 
 RPT Level = 0.002 
 Lab Sample ID = 20052010007  Analysis Date = 08/02/2005 
 Lab Value = 0.0013 
 RPT Level = 0.002 
 Lab Sample ID = 20051940015  Analysis Date = 07/21/2005 
 Lab Value = 0.0015 
 RPT Level = 0.002 
 Lab Sample ID = 20051880018  Analysis Date = 07/21/2005 
 Lab Value = 0.0017 
 RPT Level = 0.002 
 Lab Sample ID = 20051800189  Analysis Date = 07/11/2005 
 Lab Value = 0.0021 
 RPT Level = 0.002 
 Lab Sample ID = 20051740019  Analysis Date = 07/07/2005 
 Lab Value = -0.002 
 RPT Level = 0.002 
 Lab Sample ID = 20051660174  Analysis Date = 06/23/2005 
 Lab Value = -0.002 
 RPT Level = 0.002 
 Lab Sample ID = 20051590025  Analysis Date = 06/23/2005 
 Lab Value = 0.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20051530021  Analysis Date = 06/08/2005 
 Lab Value = 0.002 
 RPT Level = 0.002 
 Lab Sample ID = 20051440043  Analysis Date = 06/07/2005 
 Lab Value = 0.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20051380014  Analysis Date = 06/02/2005 
 Lab Value = 0.0001 
 RPT Level = 0.002 
 Lab Sample ID = 20051320029  Analysis Date = 06/02/2005 
 Lab Value = 0.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20051250003  Analysis Date = 05/24/2005 
 Lab Value = 0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20051170012  Analysis Date = 05/19/2005 
 Lab Value = -0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20051110007  Analysis Date = 04/21/2005 
 Lab Value = 0.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20051020018  Analysis Date = 04/20/2005 
 Lab Value = -.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20050950044  Analysis Date = 04/20/2005 
 Lab Value = 0.0014 
 RPT Level = 0.002 
 Lab Sample ID = 20050880116  Analysis Date = 04/05/2005 
 Lab Value = 0.0025 
 RPT Level = 0.002 
 Lab Sample ID = 20050840096  Analysis Date = 03/31/2005 
 Lab Value = 0.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20050750004  Analysis Date = 03/17/2005 
 Lab Value = 0.0019 
 RPT Level = 0.002 
 Lab Sample ID = 20050700007  Analysis Date = 03/17/2005 
 Lab Value = 0.0012 
 RPT Level = 0.002 
 Lab Sample ID = 20050700004  Analysis Date = 03/15/2005 
 Lab Value = 0.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20050670011  Analysis Date = 03/02/2005 
 Lab Value = 0.0011 
 RPT Level = 0.002 
 Lab Sample ID = 20050550024  Analysis Date = 02/28/2005 
 Lab Value = -0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20050480005  Analysis Date = 02/25/2005 
 Lab Value = -0.002 
 RPT Level = 0.002 
 Lab Sample ID = 20050410004  Analysis Date = 02/25/2005 
 Lab Value = -0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20050340020  Analysis Date = 02/08/2005 
 Lab Value = -.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20050260024  Analysis Date = 02/07/2005 
 Lab Value = -0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20050200048  Analysis Date = 01/27/2005 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20050130091  Analysis Date = 01/27/2005 
 Lab Value = 0.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20050070016  Analysis Date = 01/14/2005 
 Lab Value = 0.0014 
 RPT Level = 0.002 
 Lab Sample ID = 20043650002  Analysis Date = 01/14/2005 
 Lab Value = 0.0019 
 RPT Level = 0.002 
 Lab Sample ID = 20043580037  Analysis Date = 01/14/2005 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20043580035  Analysis Date = 01/14/2005 
 Lab Value = 0.0012 
 RPT Level = 0.002 
 Lab Sample ID = 20043520023  Analysis Date = 01/14/2005 
 Lab Value = 0.0014 
 RPT Level = 0.002 
 Lab Sample ID = 20043510018  Analysis Date = 01/06/2005 
 Lab Value = 0.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20043450069  Analysis Date = 01/06/2005 
 Lab Value = 0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20043440147  Analysis Date = 12/14/2004 
 Lab Value = 0.0019 
 RPT Level = 0.002 
 Lab Sample ID = 20043380005  Analysis Date = 12/14/2004 
 Lab Value = -.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20043380002  Analysis Date = 12/02/2004 
 Lab Value = -.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20043310059  Analysis Date = 12/02/2004 
 Lab Value = -.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20043280048  Analysis Date = 11/30/2004 
 Lab Value = -.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20043240012  Analysis Date = 09/14/2004 
 Lab Value = -.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20042450138  Analysis Date = 09/14/2004 
 Lab Value = 0.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20042400089  Analysis Date = 09/14/2004 
 Lab Value = 0.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20042370105  Analysis Date = 09/08/2004 
 Lab Value = -.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20042330206  Analysis Date = 09/02/2004 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20042320136  Analysis Date = 09/02/2004 
 Lab Value = 0.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20042320138  Analysis Date = 08/20/2004 
 Lab Value = -.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20042240114  Analysis Date = 09/09/2004 
 Lab Value = 0.0023 
 RPT Level = 0.002 
 Lab Sample ID = 20042170123  Analysis Date = 08/13/2004 
 Lab Value = 0.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20042110015  Analysis Date = 08/12/2004 
 Lab Value = 0.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20042040039  Analysis Date = 07/22/2004 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20041960050  Analysis Date = 07/15/2004 
 Lab Value = 0.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20041900062  Analysis Date = 07/12/2004 
 Lab Value = -.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20041820035  Analysis Date = 07/12/2004 
 Lab Value = 0.0028 
 RPT Level = 0.002 
 Lab Sample ID = 20041750057  Analysis Date = 07/01/2004 
 Lab Value = -.0001 
 RPT Level = 0.002 
 Lab Sample ID = 20041700080  Analysis Date = 06/22/2004 
 Lab Value = 0.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20041610055  Analysis Date = 06/22/2004 
 Lab Value = 0.0014 
 RPT Level = 0.002 
 Lab Sample ID = 20041550019  Analysis Date = 06/17/2004 
 Lab Value = 0.0014 
 RPT Level = 0.002 
 Lab Sample ID = 20041470132  Analysis Date = 06/03/2004 
 Lab Value = 0.0012 
 RPT Level = 0.002 
 Lab Sample ID = 20041400016  Analysis Date = 05/20/2004 
 Lab Value = 0.0014 
 RPT Level = 0.002 
 Lab Sample ID = 20041260099  Analysis Date = 05/06/2004 
 Lab Value = 0.0023 
 RPT Level = 0.002 
 Lab Sample ID = 20041200046  Analysis Date = 04/23/2004 
 Lab Value = 0.0016 
 RPT Level = 0.002 
 Lab Sample ID = 20041130016  Analysis Date = 04/15/2004 
 Lab Value = 0.002 
 RPT Level = 0.002 
 Lab Sample ID = 20041050022  Analysis Date = 04/12/2004 
 Lab Value = 0.0014 
 RPT Level = 0.002 
 Lab Sample ID = 20040980007  Analysis Date = 04/06/2004 
 Lab Value = 0.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20040930009  Analysis Date = 04/06/2004 
 Lab Value = 0.0012 
 RPT Level = 0.002 
 Lab Sample ID = 20040910012  Analysis Date = 03/26/2004 
 Lab Value = 0.0016 
 RPT Level = 0.002 
 Lab Sample ID = 20040850021  Analysis Date = 03/26/2004 
 Lab Value = 0.0019 
 RPT Level = 0.002 
 Lab Sample ID = 20040830056  Analysis Date = 03/23/2004 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20040790023  Analysis Date = 03/23/2004 
 Lab Value = 0.0016 
 RPT Level = 0.002 
 Lab Sample ID = 20040760010  Analysis Date = 03/16/2004 
 Lab Value = 0.0016 
 RPT Level = 0.002 
 Lab Sample ID = 20040720029  Analysis Date = 03/16/2004 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20040710005  Analysis Date = 03/09/2004 
 Lab Value = -.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20040680093  Analysis Date = 03/09/2004 
 Lab Value = 0.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20040650001  Analysis Date = 03/02/2004 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20040580032  Analysis Date = 02/25/2004 
 Lab Value = 0.0013 
 RPT Level = 0.002 
 Lab Sample ID = 20040550018  Analysis Date = 02/24/2004 
 Lab Value = -.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20040510134  Analysis Date = 02/19/2004 
 Lab Value = -.0001 
 RPT Level = 0.002 
 Lab Sample ID = 20040490025  Analysis Date = 02/17/2004 
 Lab Value = 0.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20040440035  Analysis Date = 02/12/2004 
 Lab Value = 0.0001 
 RPT Level = 0.002 
 Lab Sample ID = 20040420001  Analysis Date = 02/10/2004 
 Lab Value = 0.0011 
 RPT Level = 0.002 
 Lab Sample ID = 20040370017  Analysis Date = 02/10/2004 
 Lab Value = -.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20040340024  Analysis Date = 02/10/2004 
 Lab Value = 0.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20040300012  Analysis Date = 01/30/2004 
 Lab Value = 0.0001 
 RPT Level = 0.002 
 Lab Sample ID = 20040270036  Analysis Date = 01/27/2004 
 Lab Value = 0.0017 
 RPT Level = 0.002 
 Lab Sample ID = 20040230030  Analysis Date = 01/22/2004 
 Lab Value = 0.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20040210154  Analysis Date = 01/21/2004 
 Lab Value = -.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20040200023  Analysis Date = 01/16/2004 
 Lab Value = 0.0015 
 RPT Level = 0.002 
 Lab Sample ID = 20040150075  Analysis Date = 01/12/2004 
 Lab Value = 0.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20040090020  Analysis Date = 01/08/2004 
 Lab Value = 0.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20040070032  Analysis Date = 01/08/2004 
 Lab Value = 0.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20040050016  Analysis Date = 09/25/2003 
 Lab Value = 0.0003 
 RPT Level = 0.0022 
 Lab Sample ID = 20032660009  Analysis Date = 09/22/2003 
 Lab Value = 0.0004 
 RPT Level = 0.0022 
 Lab Sample ID = 20032600107  Analysis Date = 09/10/2003 
 Lab Value = 0.0016 
 RPT Level = 0.0022 
 Lab Sample ID = 20032520179  Analysis Date = 09/04/2003 
 Lab Value = -.0003 
 RPT Level = 0.0022 
 Lab Sample ID = 20032450195  Analysis Date = 08/27/2003 
 Lab Value = -.0003 
 RPT Level = 0.0022 
 Lab Sample ID = 20032380029  Analysis Date = 08/20/2003 
 Lab Value = 0.0001 
 RPT Level = 0.0022 
 Lab Sample ID = 20032310028  Analysis Date = 08/15/2003 
 Lab Value = 0.0007 
 RPT Level = 0.0022 
 Lab Sample ID = 20032250256  Analysis Date = 08/07/2003 
 Lab Value = 0.0017 
 RPT Level = 0.0022 
 Lab Sample ID = 20032180019  Analysis Date = 08/04/2003 
 Lab Value = 0.0019 
 RPT Level = 0.0022 
 Lab Sample ID = 20032100004  Analysis Date = 07/24/2003 
 Lab Value = 0 
 RPT Level = 0.0022 
 Lab Sample ID = 20032040043  Analysis Date = 07/16/2003 
 Lab Value = 0.0009 
 RPT Level = 0.0022 
 Lab Sample ID = 20031960025  Analysis Date = 07/11/2003 
 Lab Value = -.0004 
 RPT Level = 0.0022 
 Lab Sample ID = 20031900098  Analysis Date = 07/08/2003 
 Lab Value = 0.0008 
 RPT Level = 0.0022 
 Lab Sample ID = 20031820037  Analysis Date = 07/02/2003 
 Lab Value = 0.0007 
 RPT Level = 0.0022 
 Lab Sample ID = 20031770041  Analysis Date = 06/23/2003 
 Lab Value = 0.0015 
 RPT Level = 0.0022 
 Lab Sample ID = 20031700013  Analysis Date = 06/13/2003 
 Lab Value = 0.0017 
 RPT Level = 0.0022 
 Lab Sample ID = 20031630053  Analysis Date = 06/10/2003 
 Lab Value = 0.0019 
 RPT Level = 0.0022 
 Lab Sample ID = 20031600109  Analysis Date = 05/29/2003 
 Lab Value = 0.0003 
 RPT Level = 0.0022 
 Lab Sample ID = 20031480059  Analysis Date = 05/27/2003 
 Lab Value = 0.0015 
 RPT Level = 0.0022 
 Lab Sample ID = 20031430019  Analysis Date = 05/21/2003 
 Lab Value = 0.0017 
 RPT Level = 0.0022 
 Lab Sample ID = 20031400115  Analysis Date = 05/13/2003 
 Lab Value = 0.0013 
 RPT Level = 0.0022 
 Lab Sample ID = 20031290084  Analysis Date = 05/05/2003 
 Lab Value = 0.001 
 RPT Level = 0.0022 
 Lab Sample ID = 20031220070  Analysis Date = 05/01/2003 
 Lab Value = 0.0011 
 RPT Level = 0.0022 
 Lab Sample ID = 20031200043  Analysis Date = 04/22/2003 
 Lab Value = 0.0004 
 RPT Level = 0.0022 
 Lab Sample ID = 20031080208  Analysis Date = 04/09/2003 
 Lab Value = 0.0016 
 RPT Level = 0.0022 
 Lab Sample ID = 20030970018  Analysis Date = 04/04/2003 
 Lab Value = 0.0002 
 RPT Level = 0.0022 
 Lab Sample ID = 20030920027  Analysis Date = 04/02/2003 
 Lab Value = 0.0008 
 RPT Level = 0.0022 
 Lab Sample ID = 20030900015  Analysis Date = 04/02/2003 
 Lab Value = 0 
 RPT Level = 0.0022 
 Lab Sample ID = 20030860023  Analysis Date = 03/13/2003 
 Lab Value = -.0006 
 RPT Level = 0.0022 
 Lab Sample ID = 20030710021  Analysis Date = 03/10/2003 
 Lab Value = -.0004 
 RPT Level = 0.0022 
 Lab Sample ID = 20030660148  Analysis Date = 03/03/2003 
 Lab Value = 0.0012 
 RPT Level = 0.0022 
 Lab Sample ID = 20030590040  Analysis Date = 02/27/2003 
 Lab Value = 0.0005 
 RPT Level = 0.0022 
 Lab Sample ID = 20030570061  Analysis Date = 02/11/2003 
 Lab Value = 0.0014 
 RPT Level = 0.0022 
 Lab Sample ID = 20030410034  Analysis Date = 02/05/2003 
 Lab Value = 0.0012 
 RPT Level = 0.0022 
 Lab Sample ID = 20030350008  Analysis Date = 02/05/2003 
 Lab Value = 0.0006 
 RPT Level = 0.0022 
 Lab Sample ID = 20030310028  Analysis Date = 01/31/2003 
 Lab Value = 0.0029 
 RPT Level = 0.0022 
 Lab Sample ID = 20030300004  Analysis Date = 01/16/2003 
 Lab Value = 0.0008 
 RPT Level = 0.0022 
 Lab Sample ID = 20030150009  Analysis Date = 01/16/2003 
 Lab Value = -.0001 
 RPT Level = 0.0022 
 Lab Sample ID = 20030140019  Analysis Date = 01/08/2003 
 Lab Value = 0.0002 
 RPT Level = 0.0022 
 Lab Sample ID = 20030020002  Analysis Date = 01/08/2003 
 Lab Value = 0.0004 
 RPT Level = 0.0022 
 Lab Sample ID = 20023650009  Analysis Date = 12/17/2002 
 Lab Value = -.0006 
 RPT Level = 0.0022 
 Lab Sample ID = 20023500166  Analysis Date = 12/17/2002 
 Lab Value = 0.0016 
 RPT Level = 0.0022 
 Lab Sample ID = 20023500092  Analysis Date = 12/09/2002 
 Lab Value = 0.0024 
 RPT Level = 0.0022 
 Lab Sample ID = 20023370026  Analysis Date = 12/09/2002 
 Lab Value = 0.0015 
 RPT Level = 0.0022 
 Lab Sample ID = 20023370025  Analysis Date = 12/03/2002 
 Lab Value = 0.0013 
 RPT Level = 0.0022 
 Lab Sample ID = 20023330096  Analysis Date = 12/09/2002 
 Lab Value = 0.0006 
 RPT Level = 0.0022 
 Lab Sample ID = 20023360020  Analysis Date = 12/03/2002 
 Lab Value = 0.0025 
 RPT Level = 0.0022 
 Lab Sample ID = 20023310020  Analysis Date = 11/08/2002 
 Lab Value = -.0006 
 RPT Level = 0.0022 
 Lab Sample ID = 20023040033  Analysis Date = 10/28/2002 
 Lab Value = 0.0008 
 RPT Level = 0.0022 
 Lab Sample ID = 20022970050  Analysis Date = 10/28/2002 
 Lab Value = 0.0005 
 RPT Level = 0.0022 
 Lab Sample ID = 20022970049  Analysis Date = 10/28/2002 
 Lab Value = 0.0011 
 RPT Level = 0.0022 
 Lab Sample ID = 20022970048  Analysis Date = 10/24/2002 
 Lab Value = 0.0019 
 RPT Level = 0.0022 
 Lab Sample ID = 20022960022  Analysis Date = 09/05/2002 
 Lab Value = 0.0008 
 RPT Level = 0.0022 
 Lab Sample ID = 20022470018  Analysis Date = 09/04/2002 
 Lab Value = 0.0005 
 RPT Level = 0.0022 
 Lab Sample ID = 20022460135  Analysis Date = 08/26/2002 
 Lab Value = 0.0015 
 RPT Level = 0.0022 
 Lab Sample ID = 20022340186  Analysis Date = 08/19/2002 
 Lab Value = 0.0011 
 RPT Level = 0.0022 
 Lab Sample ID = 20022280008  Analysis Date = 08/12/2002 
 Lab Value = 0.0004 
 RPT Level = 0.0022 
 Lab Sample ID = 20022210007  Analysis Date = 08/07/2002 
 Lab Value = -.0005 
 RPT Level = 0.0022 
 Lab Sample ID = 20022170107  Analysis Date = 07/29/2002 
 Lab Value = 0.001 
 RPT Level = 0.0022 
 Lab Sample ID = 20022060077  Analysis Date = 07/19/2002 
 Lab Value = 0.0007 
 RPT Level = 0.0022 
 Lab Sample ID = 20021970116  Analysis Date = 07/16/2002 
 Lab Value = 0.0002 
 RPT Level = 0.0022 
 Lab Sample ID = 20021960234  Analysis Date = 07/08/2002 
 Lab Value = 0.001 
 RPT Level = 0.0022 
 Lab Sample ID = 20021830026  Analysis Date = 07/01/2002 
 Lab Value = 0 
 RPT Level = 0.0022 
 Lab Sample ID = 20021790006  Analysis Date = 06/21/2002 
 Lab Value = 0.0001 
 RPT Level = 0.0022 
 Lab Sample ID = 20021690011  Analysis Date = 06/18/2002 
 Lab Value = 0.0009 
 RPT Level = 0.0022 
 Lab Sample ID = 20021650005  Analysis Date = 06/05/2002 
 Lab Value = 0.0014 
 RPT Level = 0.0022 
 Lab Sample ID = 20021550019  Analysis Date = 06/03/2002 
 Lab Value = -.0004 
 RPT Level = 0.0022 
 Lab Sample ID = 20021510057  Analysis Date = 05/28/2002 
 Lab Value = 0.0009 
 RPT Level = 0.0022 
 Lab Sample ID = 20021420157  Analysis Date = 05/16/2002 
 Lab Value = 0.0015 
 RPT Level = 0.0022 
 Lab Sample ID = 20021330224  Analysis Date = 05/13/2002 
 Lab Value = 0.0016 
 RPT Level = 0.0022 
 Lab Sample ID = 20021300018  Analysis Date = 05/07/2002 
 Lab Value = 0.0005 
 RPT Level = 0.0022 
 Lab Sample ID = 20021210087  Analysis Date = 04/30/2002 
 Lab Value = 0.0027 
 RPT Level = 0.0022 
 Lab Sample ID = 20021140035  Analysis Date = 04/30/2002 
 Lab Value = 0.0018 
 RPT Level = 0.0022 
 Lab Sample ID = 20021140034  Analysis Date = 04/12/2002 
 Lab Value = 0.001 
 RPT Level = 0.0022 
 Lab Sample ID = 20021010014  Analysis Date = 04/10/2002 
 Lab Value = 0.0015 
 RPT Level = 0.0022 
 Lab Sample ID = 20020930111  Analysis Date = 04/09/2002 
 Lab Value = -.0005 
 RPT Level = 0.0022 
 Lab Sample ID = 20020850093  Analysis Date = 03/26/2002 
 Lab Value = 0.0011 
 RPT Level = 0.0022 
 Lab Sample ID = 20020810193  Analysis Date = 03/19/2002 
 Lab Value = 0.0008 
 RPT Level = 0.0022 
 Lab Sample ID = 20020730106  Analysis Date = 03/11/2002 
 Lab Value = 0.0004 
 RPT Level = 0.0022 
 Lab Sample ID = 20020670024  Analysis Date = 03/05/2002 
 Lab Value = 0.0008 
 RPT Level = 0.0022 
 Lab Sample ID = 20020600007  Analysis Date = 02/27/2002 
 Lab Value = 0.001 
 RPT Level = 0.0022 
 Lab Sample ID = 20020570017  Analysis Date = 02/20/2002 
 Lab Value = 0.001 
 RPT Level = 0.0022 
 Lab Sample ID = 20020460046  Analysis Date = 02/06/2002 
 Lab Value = 0 
 RPT Level = 0.0022 
 Lab Sample ID = 20020360013  Analysis Date = 02/06/2002 
 Lab Value = 0.0001 
 RPT Level = 0.0022 
 Lab Sample ID = 20020320103  Analysis Date = 01/23/2002 
 Lab Value = 0 
 RPT Level = 0.0022 
 Lab Sample ID = 20020220080  Analysis Date = 01/16/2002 
 Lab Value = 0.0009 
 RPT Level = 0.0022 
 Lab Sample ID = 20020110004  Analysis Date = 01/04/2002 
 Lab Value = 0.0006 
 RPT Level = 0.0022 
 Lab Sample ID = 20020020006  Analysis Date = 01/04/2002 
 Lab Value = -.0007 
 RPT Level = 0.0022 
 Lab Sample ID = 20013600208  Analysis Date = 12/19/2001 
 Lab Value = -.0002 
 RPT Level = 0.0022 
 Lab Sample ID = 20013520043  Analysis Date = 12/17/2001 
 Lab Value = -.0004 
 RPT Level = 0.0022 
 Lab Sample ID = 20013480009  Analysis Date = 12/06/2001 
 Lab Value = -.0002 
 RPT Level = 0.0022 
 Lab Sample ID = 20013390004  Analysis Date = 11/08/2001 
 Lab Value = -.0001 
 RPT Level = 0.0022 
 Lab Sample ID = 20013110128  Analysis Date = 09/27/2016 
 RPT Level = 0.003  Analysis Date = 09/22/2016 
 RPT Level = 0.003  Analysis Date = 09/22/2016 
 RPT Level = 0.003  Analysis Date = 09/15/2016 
 RPT Level = 0.003  Analysis Date = 09/15/2016 
 RPT Level = 0.003  Analysis Date = 09/08/2016 
 RPT Level = 0.003  Analysis Date = 09/08/2016 
 RPT Level = 0.003  Analysis Date = 09/02/2016 
 RPT Level = 0.003  Analysis Date = 09/02/2016 
 RPT Level = 0.003  Analysis Date = 08/25/2016 
 RPT Level = 0.003  Analysis Date = 08/25/2016 
 RPT Level = 0.003  Analysis Date = 08/23/2016 
 RPT Level = 0.003  Analysis Date = 08/23/2016 
 RPT Level = 0.003  Analysis Date = 08/22/2016 
 RPT Level = 0.003  Analysis Date = 08/22/2016 
 RPT Level = 0.003  Analysis Date = 08/10/2016 
 RPT Level = 0.003  Analysis Date = 08/10/2016 
 RPT Level = 0.003  Analysis Date = 08/02/2016 
 RPT Level = 0.003  Analysis Date = 08/02/2016 
 RPT Level = 0.003  Analysis Date = 07/19/2016 
 RPT Level = 0.003  Analysis Date = 07/19/2016 
 RPT Level = 0.003  Analysis Date = 07/19/2016 
 RPT Level = 0.003  Analysis Date = 07/19/2016 
 RPT Level = 0.003  Analysis Date = 07/13/2016 
 RPT Level = 0.003  Analysis Date = 07/13/2016 
 RPT Level = 0.003  Analysis Date = 06/27/2016 
 RPT Level = 0.003  Analysis Date = 06/27/2016 
 RPT Level = 0.003  Analysis Date = 06/23/2016 
 RPT Level = 0.003  Analysis Date = 06/23/2016 
 RPT Level = 0.003  Analysis Date = 06/14/2016 
 RPT Level = 0.003  Analysis Date = 06/14/2016 
 RPT Level = 0.003  Analysis Date = 06/09/2016 
 RPT Level = 0.003  Analysis Date = 06/09/2016 
 RPT Level = 0.003  Analysis Date = 06/09/2016 
 RPT Level = 0.003  Analysis Date = 06/09/2016 
 RPT Level = 0.003  Analysis Date = 05/17/2016 
 RPT Level = 0.003  Analysis Date = 05/17/2016 
 RPT Level = 0.003  Analysis Date = 05/11/2016 
 RPT Level = 0.003  Analysis Date = 05/11/2016 
 RPT Level = 0.003  Analysis Date = 05/03/2016 
 RPT Level = 0.003  Analysis Date = 05/03/2016 
 RPT Level = 0.003  Analysis Date = 04/27/2016 
 RPT Level = 0.003  Analysis Date = 04/27/2016 
 RPT Level = 0.003  Analysis Date = 04/27/2016 
 RPT Level = 0.003  Analysis Date = 04/27/2016 
 RPT Level = 0.003  Analysis Date = 04/19/2016 
 RPT Level = 0.003  Analysis Date = 04/19/2016 
 RPT Level = 0.003  Analysis Date = 04/07/2016 
 RPT Level = 0.003  Analysis Date = 04/07/2016 
 RPT Level = 0.003  Analysis Date = 03/24/2016 
 RPT Level = 0.003  Analysis Date = 03/24/2016 
 RPT Level = 0.003  Analysis Date = 03/22/2016 
 RPT Level = 0.003  Analysis Date = 03/22/2016 
 RPT Level = 0.003  Analysis Date = 03/17/2016 
 RPT Level = 0.003  Analysis Date = 03/17/2016 
 RPT Level = 0.003  Analysis Date = 03/10/2016 
 RPT Level = 0.003  Analysis Date = 03/10/2016 
 RPT Level = 0.003  Analysis Date = 03/08/2016 
 RPT Level = 0.003  Analysis Date = 03/08/2016 
 RPT Level = 0.003  Analysis Date = 03/02/2016 
 RPT Level = 0.003  Analysis Date = 03/02/2016 
 RPT Level = 0.003  Analysis Date = 02/18/2016 
 RPT Level = 0.003  Analysis Date = 02/18/2016 
 RPT Level = 0.003  Analysis Date = 02/11/2016 
 RPT Level = 0.003  Analysis Date = 02/11/2016 
 RPT Level = 0.003  Analysis Date = 02/11/2016 
 RPT Level = 0.003  Analysis Date = 02/11/2016 
 RPT Level = 0.003  Analysis Date = 02/04/2016 
 RPT Level = 0.003  Analysis Date = 02/04/2016 
 RPT Level = 0.003  Analysis Date = 01/20/2016 
 RPT Level = 0.003  Analysis Date = 01/20/2016 
 RPT Level = 0.003  Analysis Date = 01/13/2016 
 RPT Level = 0.003  Analysis Date = 01/13/2016 
 RPT Level = 0.003  Analysis Date = 01/13/2016 
 RPT Level = 0.003  Analysis Date = 01/13/2016 
 RPT Level = 0.003  Analysis Date = 01/06/2016 
 RPT Level = 0.003  Analysis Date = 01/06/2016 
 RPT Level = 0.003  Analysis Date = 12/30/2015 
 RPT Level = 0.003  Analysis Date = 12/30/2015 
 RPT Level = 0.003  Analysis Date = 12/16/2015 
 RPT Level = 0.003  Analysis Date = 12/16/2015 
 RPT Level = 0.003  Analysis Date = 12/08/2015 
 RPT Level = 0.003  Analysis Date = 12/08/2015 
 RPT Level = 0.003  Analysis Date = 12/02/2015 
 RPT Level = 0.003  Analysis Date = 12/02/2015 
 RPT Level = 0.003  Analysis Date = 11/25/2015 
 RPT Level = 0.003  Analysis Date = 11/25/2015 
 RPT Level = 0.003  Analysis Date = 11/24/2015 
 RPT Level = 0.003  Analysis Date = 11/24/2015 
 RPT Level = 0.003  Analysis Date = 11/18/2015 
 RPT Level = 0.003  Analysis Date = 11/18/2015 
 RPT Level = 0.003  Analysis Date = 11/04/2015 
 RPT Level = 0.003  Analysis Date = 11/04/2015 
 RPT Level = 0.003  Analysis Date = 10/28/2015 
 RPT Level = 0.003  Analysis Date = 10/28/2015 
 RPT Level = 0.003  Analysis Date = 10/27/2015 
 RPT Level = 0.003  Analysis Date = 10/27/2015 
 RPT Level = 0.003  Analysis Date = 10/14/2015 
 RPT Level = 0.003  Analysis Date = 10/14/2015 
 RPT Level = 0.003  Analysis Date = 10/08/2015 
 RPT Level = 0.003  Analysis Date = 10/08/2015 
 RPT Level = 0.003  Analysis Date = 10/01/2015 
 RPT Level = 0.003  Analysis Date = 10/01/2015 
 RPT Level = 0.003  Analysis Date = 10/01/2015 
 RPT Level = 0.003  Analysis Date = 10/01/2015 
 RPT Level = 0.003  Analysis Date = 09/22/2015 
 RPT Level = 0.003  Analysis Date = 09/22/2015 
 RPT Level = 0.003  Analysis Date = 09/17/2015 
 RPT Level = 0.003  Analysis Date = 09/17/2015 
 RPT Level = 0.003  Analysis Date = 09/01/2015 
 RPT Level = 0.003  Analysis Date = 09/01/2015 
 RPT Level = 0.003  Analysis Date = 09/09/2015 
 RPT Level = 0.003  Analysis Date = 09/09/2015 
 RPT Level = 0.003  Analysis Date = 08/19/2015 
 RPT Level = 0.003  Analysis Date = 08/19/2015 
 RPT Level = 0.003  Analysis Date = 08/07/2015 
 RPT Level = 0.003  Analysis Date = 08/07/2015 
 RPT Level = 0.003  Analysis Date = 08/05/2015 
 RPT Level = 0.003  Analysis Date = 08/05/2015 
 RPT Level = 0.003  Analysis Date = 08/03/2015 
 RPT Level = 0.003  Analysis Date = 08/03/2015 
 RPT Level = 0.003  Analysis Date = 08/03/2015 
 RPT Level = 0.003  Analysis Date = 08/03/2015 
 RPT Level = 0.003  Analysis Date = 07/22/2015 
 RPT Level = 0.003  Analysis Date = 07/22/2015 
 RPT Level = 0.003  Analysis Date = 07/21/2015 
 RPT Level = 0.003  Analysis Date = 07/21/2015 
 RPT Level = 0.003  Analysis Date = 07/15/2015 
 RPT Level = 0.003  Analysis Date = 07/15/2015 
 RPT Level = 0.003  Analysis Date = 07/09/2015 
 RPT Level = 0.003  Analysis Date = 07/09/2015 
 RPT Level = 0.003  Analysis Date = 06/16/2015 
 RPT Level = 0.003  Analysis Date = 06/16/2015 
 RPT Level = 0.003  Analysis Date = 06/09/2015 
 RPT Level = 0.003  Analysis Date = 06/09/2015 
 RPT Level = 0.003  Analysis Date = 06/02/2015 
 RPT Level = 0.003  Analysis Date = 06/02/2015 
 RPT Level = 0.003  Analysis Date = 06/02/2015 
 RPT Level = 0.003  Analysis Date = 06/02/2015 
 RPT Level = 0.003  Analysis Date = 05/19/2015 
 RPT Level = 0.003  Analysis Date = 05/19/2015 
 RPT Level = 0.003  Analysis Date = 05/14/2015 
 RPT Level = 0.003  Analysis Date = 05/14/2015 
 RPT Level = 0.003  Analysis Date = 05/12/2015 
 RPT Level = 0.003  Analysis Date = 05/12/2015 
 RPT Level = 0.003  Analysis Date = 05/05/2015 
 RPT Level = 0.003  Analysis Date = 05/05/2015 
 RPT Level = 0.003  Analysis Date = 04/23/2015 
 RPT Level = 0.003  Analysis Date = 04/23/2015 
 RPT Level = 0.003  Analysis Date = 04/23/2015 
 RPT Level = 0.003  Analysis Date = 04/23/2015 
 RPT Level = 0.003  Analysis Date = 05/07/2015 
 RPT Level = 0.003  Analysis Date = 05/07/2015 
 RPT Level = 0.003  Analysis Date = 04/08/2015 
 RPT Level = 0.003  Analysis Date = 04/08/2015 
 RPT Level = 0.003  Analysis Date = 03/31/2015 
 RPT Level = 0.003  Analysis Date = 03/31/2015 
 RPT Level = 0.003  Analysis Date = 03/19/2015 
 RPT Level = 0.003  Analysis Date = 03/19/2015 
 RPT Level = 0.003  Analysis Date = 03/10/2015 
 RPT Level = 0.003  Analysis Date = 03/10/2015 
 RPT Level = 0.003  Analysis Date = 03/10/2015 
 RPT Level = 0.003  Analysis Date = 03/10/2015 
 RPT Level = 0.003  Analysis Date = 03/05/2015 
 RPT Level = 0.003  Analysis Date = 03/05/2015 
 RPT Level = 0.003  Analysis Date = 02/26/2015 
 RPT Level = 0.003  Analysis Date = 02/26/2015 
 RPT Level = 0.003  Analysis Date = 02/18/2015 
 RPT Level = 0.003  Analysis Date = 02/18/2015 
 RPT Level = 0.003  Analysis Date = 02/18/2015 
 RPT Level = 0.003  Analysis Date = 02/18/2015 
 RPT Level = 0.003  Analysis Date = 02/04/2015 
 RPT Level = 0.003  Analysis Date = 02/04/2015 
 RPT Level = 0.003  Analysis Date = 01/22/2015 
 RPT Level = 0.003  Analysis Date = 01/22/2015 
 RPT Level = 0.003  Analysis Date = 01/14/2015 
 RPT Level = 0.003  Analysis Date = 01/14/2015 
 RPT Level = 0.003  Analysis Date = 01/14/2015 
 RPT Level = 0.003  Analysis Date = 01/14/2015 
 RPT Level = 0.003  Analysis Date = 01/14/2015 
 RPT Level = 0.003  Analysis Date = 01/14/2015 
 RPT Level = 0.003  Analysis Date = 01/06/2015 
 RPT Level = 0.003  Analysis Date = 01/06/2015 
 RPT Level = 0.003  Analysis Date = 12/16/2014 
 RPT Level = 0.003  Analysis Date = 12/16/2014 
 RPT Level = 0.003  Analysis Date = 12/09/2014 
 RPT Level = 0.003  Analysis Date = 12/09/2014 
 RPT Level = 0.003  Analysis Date = 12/09/2014 
 RPT Level = 0.003  Analysis Date = 12/09/2014 
 RPT Level = 0.003  Analysis Date = 12/04/2014 
 RPT Level = 0.003  Analysis Date = 12/04/2014 
 RPT Level = 0.003  Analysis Date = 12/03/2014 
 RPT Level = 0.003  Analysis Date = 12/03/2014 
 RPT Level = 0.003  Analysis Date = 12/03/2014 
 RPT Level = 0.003  Analysis Date = 12/03/2014 
 RPT Level = 0.003  Analysis Date = 11/17/2014 
 RPT Level = 0.003  Analysis Date = 11/17/2014 
 RPT Level = 0.003  Analysis Date = 11/06/2014 
 RPT Level = 0.003  Analysis Date = 11/06/2014 
 RPT Level = 0.003  Analysis Date = 10/27/2014 
 RPT Level = 0.003  Analysis Date = 10/27/2014 
 RPT Level = 0.003  Analysis Date = 10/21/2014 
 RPT Level = 0.003  Analysis Date = 10/21/2014 
 RPT Level = 0.003  Analysis Date = 10/16/2014 
 RPT Level = 0.003  Analysis Date = 10/16/2014 
 RPT Level = 0.003  Analysis Date = 10/07/2014 
 RPT Level = 0.003  Analysis Date = 10/07/2014 
 RPT Level = 0.003  Analysis Date = 10/01/2014 
 RPT Level = 0.003  Analysis Date = 10/01/2014 
 RPT Level = 0.003  Analysis Date = 09/25/2014 
 RPT Level = 0.003  Analysis Date = 09/25/2014 
 RPT Level = 0.003  Analysis Date = 09/18/2014 
 RPT Level = 0.003  Analysis Date = 09/18/2014 
 RPT Level = 0.003  Analysis Date = 08/14/2014 
 RPT Level = 0.003  Analysis Date = 08/14/2014 
 RPT Level = 0.003  Analysis Date = 08/12/2014 
 RPT Level = 0.003  Analysis Date = 08/12/2014 
 RPT Level = 0.003  Analysis Date = 08/07/2014 
 RPT Level = 0.003  Analysis Date = 08/07/2014 
 RPT Level = 0.003  Analysis Date = 08/05/2014 
 RPT Level = 0.003  Analysis Date = 08/05/2014 
 RPT Level = 0.003  Analysis Date = 07/31/2014 
 RPT Level = 0.003  Analysis Date = 07/31/2014 
 RPT Level = 0.003  Analysis Date = 07/22/2014 
 RPT Level = 0.003  Analysis Date = 07/22/2014 
 RPT Level = 0.003  Analysis Date = 07/17/2014 
 RPT Level = 0.003  Analysis Date = 07/17/2014 
 RPT Level = 0.003  Analysis Date = 07/09/2014 
 RPT Level = 0.003  Analysis Date = 07/09/2014 
 RPT Level = 0.003  Analysis Date = 06/20/2014 
 RPT Level = 0.003  Analysis Date = 06/20/2014 
 RPT Level = 0.003  Analysis Date = 06/20/2014 
 RPT Level = 0.003  Analysis Date = 06/20/2014 
 RPT Level = 0.003  Analysis Date = 06/09/2014 
 RPT Level = 0.003  Analysis Date = 06/09/2014 
 RPT Level = 0.003  Analysis Date = 06/04/2014 
 RPT Level = 0.003  Analysis Date = 06/04/2014 
 RPT Level = 0.003  Analysis Date = 05/29/2014 
 RPT Level = 0.003  Analysis Date = 05/29/2014 
 RPT Level = 0.003  Analysis Date = 05/20/2014 
 RPT Level = 0.003  Analysis Date = 05/20/2014 
 RPT Level = 0.003  Analysis Date = 05/13/2014 
 RPT Level = 0.003  Analysis Date = 05/13/2014 
 RPT Level = 0.003  Analysis Date = 05/07/2014 
 RPT Level = 0.003  Analysis Date = 05/07/2014 
 RPT Level = 0.003  Analysis Date = 04/29/2014 
 RPT Level = 0.003  Analysis Date = 04/29/2014 
 RPT Level = 0.003  Analysis Date = 04/22/2014 
 RPT Level = 0.003  Analysis Date = 04/22/2014 
 RPT Level = 0.003  Analysis Date = 04/10/2014 
 RPT Level = 0.003  Analysis Date = 04/10/2014 
 RPT Level = 0.003  Analysis Date = 04/03/2014 
 RPT Level = 0.003  Analysis Date = 04/03/2014 
 RPT Level = 0.003  Analysis Date = 04/02/2014 
 RPT Level = 0.003  Analysis Date = 04/02/2014 
 RPT Level = 0.003  Analysis Date = 04/01/2014 
 RPT Level = 0.003  Analysis Date = 04/01/2014 
 RPT Level = 0.003  Analysis Date = 03/19/2014 
 RPT Level = 0.003  Analysis Date = 03/19/2014 
 RPT Level = 0.003  Analysis Date = 03/11/2014 
 RPT Level = 0.003  Analysis Date = 03/11/2014 
 RPT Level = 0.003  Analysis Date = 03/04/2014 
 RPT Level = 0.003  Analysis Date = 03/04/2014 
 RPT Level = 0.003  Analysis Date = 02/26/2014 
 RPT Level = 0.003  Analysis Date = 02/26/2014 
 RPT Level = 0.003  Analysis Date = 02/11/2014 
 RPT Level = 0.003  Analysis Date = 02/11/2014 
 RPT Level = 0.003  Analysis Date = 02/11/2014 
 RPT Level = 0.003  Analysis Date = 02/11/2014 
 RPT Level = 0.003  Analysis Date = 02/05/2014 
 RPT Level = 0.003  Analysis Date = 02/05/2014 
 RPT Level = 0.003  Analysis Date = 01/29/2014 
 RPT Level = 0.003  Analysis Date = 01/29/2014 
 RPT Level = 0.003  Analysis Date = 01/23/2014 
 RPT Level = 0.003  Analysis Date = 01/23/2014 
 RPT Level = 0.003  Analysis Date = 01/21/2014 
 RPT Level = 0.003  Analysis Date = 01/21/2014 
 RPT Level = 0.003  Analysis Date = 01/16/2014 
 RPT Level = 0.003  Analysis Date = 01/16/2014 
 RPT Level = 0.003  Analysis Date = 01/13/2014 
 RPT Level = 0.003  Analysis Date = 01/13/2014 
 RPT Level = 0.003  Analysis Date = 01/09/2014 
 RPT Level = 0.003  Analysis Date = 01/09/2014 
 RPT Level = 0.003  Analysis Date = 01/16/2014 
 RPT Level = 0.003  Analysis Date = 01/16/2014 
 RPT Level = 0.003  Analysis Date = 12/11/2013 
 RPT Level = 0.003  Analysis Date = 12/11/2013 
 RPT Level = 0.003  Analysis Date = 12/11/2013 
 RPT Level = 0.003  Analysis Date = 12/11/2013 
 RPT Level = 0.003  Analysis Date = 11/21/2013 
 RPT Level = 0.003  Analysis Date = 11/21/2013 
 RPT Level = 0.003  Analysis Date = 11/18/2013 
 RPT Level = 0.003  Analysis Date = 11/18/2013 
 RPT Level = 0.003  Analysis Date = 11/01/2013 
 RPT Level = 0.003  Analysis Date = 11/01/2013 
 RPT Level = 0.003  Analysis Date = 10/28/2013 
 RPT Level = 0.003  Analysis Date = 10/28/2013 
 RPT Level = 0.003  Analysis Date = 10/28/2013 
 RPT Level = 0.003  Analysis Date = 10/28/2013 
 RPT Level = 0.003  Analysis Date = 10/18/2013 
 RPT Level = 0.003  Analysis Date = 10/18/2013 
 RPT Level = 0.003  Analysis Date = 10/24/2013 
 RPT Level = 0.003  Analysis Date = 10/24/2013 
 RPT Level = 0.003  Analysis Date = 10/23/2013 
 RPT Level = 0.003  Analysis Date = 10/23/2013 
 RPT Level = 0.003  Analysis Date = 09/30/2013 
 RPT Level = 0.003  Analysis Date = 09/30/2013 
 RPT Level = 0.003  Analysis Date = 09/30/2013 
 RPT Level = 0.003  Analysis Date = 09/30/2013 
 RPT Level = 0.003  Analysis Date = 10/01/2013 
 RPT Level = 0.003  Analysis Date = 10/01/2013 
 RPT Level = 0.003  Analysis Date = 09/12/2013 
 RPT Level = 0.003  Analysis Date = 09/12/2013 
 RPT Level = 0.003  Analysis Date = 08/28/2013 
 RPT Level = 0.003  Analysis Date = 08/28/2013 
 RPT Level = 0.003  Analysis Date = 08/28/2013 
 RPT Level = 0.003  Analysis Date = 08/28/2013 
 RPT Level = 0.003  Analysis Date = 08/14/2013 
 RPT Level = 0.003  Analysis Date = 08/14/2013 
 RPT Level = 0.003  Analysis Date = 08/05/2013 
 RPT Level = 0.003  Analysis Date = 08/05/2013 
 RPT Level = 0.003  Analysis Date = 07/29/2013 
 RPT Level = 0.003  Analysis Date = 07/29/2013 
 RPT Level = 0.003  Analysis Date = 07/29/2013 
 RPT Level = 0.003  Analysis Date = 07/29/2013 
 RPT Level = 0.003  Analysis Date = 07/16/2013 
 RPT Level = 0.003  Analysis Date = 07/16/2013 
 RPT Level = 0.003  Analysis Date = 07/11/2013 
 RPT Level = 0.003  Analysis Date = 07/11/2013 
 RPT Level = 0.003  Analysis Date = 06/24/2013 
 RPT Level = 0.003  Analysis Date = 06/24/2013 
 RPT Level = 0.003  Analysis Date = 06/20/2013 
 RPT Level = 0.003  Analysis Date = 06/20/2013 
 RPT Level = 0.003  Analysis Date = 06/18/2013 
 RPT Level = 0.003  Analysis Date = 06/18/2013 
 RPT Level = 0.003  Analysis Date = 06/13/2013 
 RPT Level = 0.003  Analysis Date = 06/13/2013 
 RPT Level = 0.003  Analysis Date = 06/06/2013 
 RPT Level = 0.003  Analysis Date = 06/06/2013 
 RPT Level = 0.003  Analysis Date = 05/21/2013 
 RPT Level = 0.003  Analysis Date = 05/21/2013 
 RPT Level = 0.003  Analysis Date = 05/14/2013 
 RPT Level = 0.003  Analysis Date = 05/14/2013 
 RPT Level = 0.003  Analysis Date = 05/01/2013 
 RPT Level = 0.003  Analysis Date = 05/01/2013 
 RPT Level = 0.003  Analysis Date = 05/02/2013 
 RPT Level = 0.003  Analysis Date = 05/02/2013 
 RPT Level = 0.003  Analysis Date = 05/01/2013 
 RPT Level = 0.003  Analysis Date = 05/01/2013 
 RPT Level = 0.003  Analysis Date = 04/10/2013 
 RPT Level = 0.003  Analysis Date = 04/10/2013 
 RPT Level = 0.003  Analysis Date = 04/03/2013 
 RPT Level = 0.003  Analysis Date = 04/03/2013 
 RPT Level = 0.003  Analysis Date = 03/26/2013 
 RPT Level = 0.003  Analysis Date = 03/26/2013 
 RPT Level = 0.003  Analysis Date = 03/20/2013 
 RPT Level = 0.003  Analysis Date = 03/20/2013 
 RPT Level = 0.003  Analysis Date = 03/11/2013 
 RPT Level = 0.003  Analysis Date = 03/11/2013 
 RPT Level = 0.003  Analysis Date = 03/13/2013 
 RPT Level = 0.003  Analysis Date = 03/13/2013 
 RPT Level = 0.003  Analysis Date = 03/13/2013 
 RPT Level = 0.003  Analysis Date = 03/13/2013 
 RPT Level = 0.003  Analysis Date = 02/21/2013 
 RPT Level = 0.003  Analysis Date = 02/21/2013 
 RPT Level = 0.003  Analysis Date = 02/07/2013 
 RPT Level = 0.003  Analysis Date = 02/07/2013 
 RPT Level = 0.003  Analysis Date = 02/07/2013 
 RPT Level = 0.003  Analysis Date = 02/07/2013 
 RPT Level = 0.003  Analysis Date = 01/31/2013 
 RPT Level = 0.003  Analysis Date = 01/31/2013 
 RPT Level = 0.003  Analysis Date = 01/23/2013 
 RPT Level = 0.003  Analysis Date = 01/23/2013 
 RPT Level = 0.003  Analysis Date = 01/17/2013 
 RPT Level = 0.003  Analysis Date = 01/17/2013 
 RPT Level = 0.003  Analysis Date = 01/14/2013 
 RPT Level = 0.003  Analysis Date = 01/14/2013 
 RPT Level = 0.003  Analysis Date = 01/14/2013 
 RPT Level = 0.003  Analysis Date = 01/14/2013 
 RPT Level = 0.003  Analysis Date = 01/08/2013 
 RPT Level = 0.003  Analysis Date = 01/08/2013 
 RPT Level = 0.003  Analysis Date = 12/26/2012 
 RPT Level = 0.003  Analysis Date = 12/26/2012 
 RPT Level = 0.003  Analysis Date = 12/17/2012 
 RPT Level = 0.003  Analysis Date = 12/17/2012 
 RPT Level = 0.003  Analysis Date = 12/10/2012 
 RPT Level = 0.003  Analysis Date = 12/10/2012 
 RPT Level = 0.003  Analysis Date = 12/04/2012 
 RPT Level = 0.003  Analysis Date = 12/04/2012 
 RPT Level = 0.003  Analysis Date = 11/29/2012 
 RPT Level = 0.003  Analysis Date = 11/29/2012 
 RPT Level = 0.003  Analysis Date = 11/29/2012 
 RPT Level = 0.003  Analysis Date = 11/29/2012 
 RPT Level = 0.003  Analysis Date = 11/20/2012 
 RPT Level = 0.003  Analysis Date = 11/20/2012 
 RPT Level = 0.003  Analysis Date = 11/08/2012 
 RPT Level = 0.003  Analysis Date = 11/08/2012 
 RPT Level = 0.003  Analysis Date = 10/24/2012 
 RPT Level = 0.003  Analysis Date = 10/24/2012 
 RPT Level = 0.003  Analysis Date = 10/18/2012 
 RPT Level = 0.003  Analysis Date = 10/18/2012 
 RPT Level = 0.003  Analysis Date = 10/09/2012 
 RPT Level = 0.003  Analysis Date = 10/09/2012 
 RPT Level = 0.003  Analysis Date = 10/09/2012 
 RPT Level = 0.003  Analysis Date = 10/09/2012 
 RPT Level = 0.003  Analysis Date = 10/09/2012 
 RPT Level = 0.003  Analysis Date = 10/09/2012 
 RPT Level = 0.003  Analysis Date = 10/01/2012 
 RPT Level = 0.003  Analysis Date = 10/01/2012 
 RPT Level = 0.003  Analysis Date = 09/18/2012 
 RPT Level = 0.003  Analysis Date = 09/18/2012 
 RPT Level = 0.003  Analysis Date = 09/12/2012 
 RPT Level = 0.003  Analysis Date = 09/12/2012 
 RPT Level = 0.003  Analysis Date = 09/04/2012 
 RPT Level = 0.003  Analysis Date = 09/04/2012 
 RPT Level = 0.003  Analysis Date = 08/27/2012 
 RPT Level = 0.003  Analysis Date = 08/27/2012 
 RPT Level = 0.003  Analysis Date = 08/15/2012 
 RPT Level = 0.003  Analysis Date = 08/15/2012 
 RPT Level = 0.003  Analysis Date = 08/14/2012 
 RPT Level = 0.003  Analysis Date = 08/14/2012 
 RPT Level = 0.003  Analysis Date = 08/08/2012 
 RPT Level = 0.003  Analysis Date = 08/08/2012 
 RPT Level = 0.003  Analysis Date = 07/25/2012 
 RPT Level = 0.003  Analysis Date = 07/25/2012 
 RPT Level = 0.003  Analysis Date = 07/24/2012 
 RPT Level = 0.003  Analysis Date = 07/24/2012 
 RPT Level = 0.003  Analysis Date = 07/24/2012 
 RPT Level = 0.003  Analysis Date = 07/24/2012 
 RPT Level = 0.003  Analysis Date = 07/17/2012 
 RPT Level = 0.003  Analysis Date = 07/17/2012 
 RPT Level = 0.003  Analysis Date = 06/28/2012 
 RPT Level = 0.003  Analysis Date = 06/28/2012 
 RPT Level = 0.003  Analysis Date = 06/22/2012 
 RPT Level = 0.003  Analysis Date = 06/22/2012 
 RPT Level = 0.003  Analysis Date = 06/12/2012 
 RPT Level = 0.003  Analysis Date = 06/12/2012 
 RPT Level = 0.003  Analysis Date = 06/12/2012 
 RPT Level = 0.003  Analysis Date = 06/12/2012 
 RPT Level = 0.003  Analysis Date = 05/30/2012 
 RPT Level = 0.003  Analysis Date = 05/30/2012 
 RPT Level = 0.003  Analysis Date = 05/22/2012 
 RPT Level = 0.003  Analysis Date = 05/22/2012 
 RPT Level = 0.003  Analysis Date = 05/14/2012 
 RPT Level = 0.003  Analysis Date = 05/14/2012 
 RPT Level = 0.003  Analysis Date = 05/09/2012 
 RPT Level = 0.003  Analysis Date = 05/09/2012 
 RPT Level = 0.003  Analysis Date = 05/08/2012 
 RPT Level = 0.003  Analysis Date = 05/08/2012 
 RPT Level = 0.003  Analysis Date = 05/03/2012 
 RPT Level = 0.003  Analysis Date = 05/03/2012 
 RPT Level = 0.003  Analysis Date = 04/18/2012 
 RPT Level = 0.003  Analysis Date = 04/18/2012 
 RPT Level = 0.003  Analysis Date = 04/12/2012 
 RPT Level = 0.003  Analysis Date = 04/12/2012 
 RPT Level = 0.003  Analysis Date = 04/10/2012 
 RPT Level = 0.003  Analysis Date = 04/10/2012 
 RPT Level = 0.003  Analysis Date = 04/05/2012 
 RPT Level = 0.003  Analysis Date = 04/05/2012 
 RPT Level = 0.003  Analysis Date = 04/03/2012 
 RPT Level = 0.003  Analysis Date = 04/03/2012 
 RPT Level = 0.003  Analysis Date = 03/20/2012 
 RPT Level = 0.003  Analysis Date = 03/20/2012 
 RPT Level = 0.003  Analysis Date = 03/13/2012 
 RPT Level = 0.003  Analysis Date = 03/13/2012 
 RPT Level = 0.003  Analysis Date = 03/13/2012 
 RPT Level = 0.003  Analysis Date = 03/13/2012 
 RPT Level = 0.003  Analysis Date = 02/22/2012 
 RPT Level = 0.003  Analysis Date = 02/22/2012 
 RPT Level = 0.003  Analysis Date = 02/16/2012 
 RPT Level = 0.003  Analysis Date = 02/16/2012 
 RPT Level = 0.003  Analysis Date = 02/16/2012 
 RPT Level = 0.003  Analysis Date = 02/16/2012 
 RPT Level = 0.003  Analysis Date = 01/31/2012 
 RPT Level = 0.003  Analysis Date = 01/31/2012 
 RPT Level = 0.003  Analysis Date = 01/31/2012 
 RPT Level = 0.003  Analysis Date = 01/31/2012 
 RPT Level = 0.003  Analysis Date = 01/25/2012 
 RPT Level = 0.003  Analysis Date = 01/25/2012 
 RPT Level = 0.003  Analysis Date = 01/19/2012 
 RPT Level = 0.003  Analysis Date = 01/19/2012 
 RPT Level = 0.003  Analysis Date = 01/12/2012 
 RPT Level = 0.003  Analysis Date = 01/12/2012 
 RPT Level = 0.003  Analysis Date = 01/11/2012 
 RPT Level = 0.003  Analysis Date = 01/11/2012 
 RPT Level = 0.003  Analysis Date = 01/05/2012 
 RPT Level = 0.003  Analysis Date = 01/05/2012 
 RPT Level = 0.003  Analysis Date = 12/28/2011 
 RPT Level = 0.003  Analysis Date = 12/28/2011 
 RPT Level = 0.003  Analysis Date = 12/14/2011 
 RPT Level = 0.003  Analysis Date = 12/14/2011 
 RPT Level = 0.003  Analysis Date = 12/02/2011 
 RPT Level = 0.003  Analysis Date = 12/02/2011 
 RPT Level = 0.003  Analysis Date = 11/29/2011 
 RPT Level = 0.003  Analysis Date = 11/29/2011 
 RPT Level = 0.003  Analysis Date = 11/18/2011 
 RPT Level = 0.003  Analysis Date = 11/18/2011 
 RPT Level = 0.003  Analysis Date = 11/18/2011 
 RPT Level = 0.003  Analysis Date = 11/18/2011 
 RPT Level = 0.003  Analysis Date = 11/16/2011 
 RPT Level = 0.003  Analysis Date = 11/16/2011 
 RPT Level = 0.003  Analysis Date = 11/08/2011 
 RPT Level = 0.003  Analysis Date = 11/08/2011 
 RPT Level = 0.003  Analysis Date = 10/18/2011 
 RPT Level = 0.003  Analysis Date = 10/18/2011 
 RPT Level = 0.003  Analysis Date = 10/19/2011 
 RPT Level = 0.003  Analysis Date = 10/19/2011 
 RPT Level = 0.003  Analysis Date = 10/12/2011 
 RPT Level = 0.003  Analysis Date = 10/12/2011 
 RPT Level = 0.003  Analysis Date = 10/04/2011 
 RPT Level = 0.003  Analysis Date = 10/04/2011 
 RPT Level = 0.003  Analysis Date = 09/29/2011 
 RPT Level = 0.003  Analysis Date = 09/29/2011 
 RPT Level = 0.003  Analysis Date = 10/12/2011 
 RPT Level = 0.003  Analysis Date = 10/12/2011 
 RPT Level = 0.003  Analysis Date = 09/29/2011 
 RPT Level = 0.003  Analysis Date = 09/29/2011 
 RPT Level = 0.003  Analysis Date = 08/30/2011 
 RPT Level = 0.003  Analysis Date = 08/30/2011 
 RPT Level = 0.003  Analysis Date = 08/25/2011 
 RPT Level = 0.003  Analysis Date = 08/25/2011 
 RPT Level = 0.003  Analysis Date = 08/17/2011 
 RPT Level = 0.003  Analysis Date = 08/17/2011 
 RPT Level = 0.003  Analysis Date = 08/04/2011 
 RPT Level = 0.003  Analysis Date = 08/04/2011 
 RPT Level = 0.003  Analysis Date = 08/02/2011 
 RPT Level = 0.003  Analysis Date = 08/02/2011 
 RPT Level = 0.003  Analysis Date = 08/02/2011 
 RPT Level = 0.003  Analysis Date = 08/02/2011 
 RPT Level = 0.003  Analysis Date = 07/27/2011 
 RPT Level = 0.003  Analysis Date = 07/27/2011 
 RPT Level = 0.003  Analysis Date = 07/21/2011 
 RPT Level = 0.003  Analysis Date = 07/21/2011 
 RPT Level = 0.003  Analysis Date = 07/20/2011 
 RPT Level = 0.003  Analysis Date = 07/20/2011 
 RPT Level = 0.003  Analysis Date = 07/13/2011 
 RPT Level = 0.003  Analysis Date = 07/13/2011 
 RPT Level = 0.003  Analysis Date = 06/28/2011 
 RPT Level = 0.003  Analysis Date = 06/28/2011 
 RPT Level = 0.003  Analysis Date = 06/28/2011 
 RPT Level = 0.003  Analysis Date = 06/28/2011 
 RPT Level = 0.003  Analysis Date = 06/23/2011 
 RPT Level = 0.003  Analysis Date = 06/23/2011 
 RPT Level = 0.003  Analysis Date = 06/08/2011 
 RPT Level = 0.003  Analysis Date = 06/08/2011 
 RPT Level = 0.003  Analysis Date = 05/25/2011 
 RPT Level = 0.003  Analysis Date = 05/25/2011 
 RPT Level = 0.003  Analysis Date = 05/17/2011 
 RPT Level = 0.003  Analysis Date = 05/17/2011 
 RPT Level = 0.003  Analysis Date = 05/10/2011 
 RPT Level = 0.003  Analysis Date = 05/10/2011 
 RPT Level = 0.003  Analysis Date = 05/04/2011 
 RPT Level = 0.003  Analysis Date = 05/04/2011 
 RPT Level = 0.003  Analysis Date = 04/26/2011 
 RPT Level = 0.003  Analysis Date = 04/26/2011 
 RPT Level = 0.003  Analysis Date = 04/20/2011 
 RPT Level = 0.003  Analysis Date = 04/20/2011 
 RPT Level = 0.003  Analysis Date = 04/08/2011 
 RPT Level = 0.003  Analysis Date = 04/08/2011 
 RPT Level = 0.003  Analysis Date = 04/06/2011 
 RPT Level = 0.003  Analysis Date = 04/06/2011 
 RPT Level = 0.003  Analysis Date = 04/05/2011 
 RPT Level = 0.003  Analysis Date = 04/05/2011 
 RPT Level = 0.003  Analysis Date = 03/30/2011 
 RPT Level = 0.003  Analysis Date = 03/30/2011 
 RPT Level = 0.003  Analysis Date = 03/10/2011 
 RPT Level = 0.003  Analysis Date = 03/10/2011 
 RPT Level = 0.003  Analysis Date = 03/08/2011 
 RPT Level = 0.003  Analysis Date = 03/08/2011 
 RPT Level = 0.003  Analysis Date = 03/02/2011 
 RPT Level = 0.003  Analysis Date = 03/02/2011 
 RPT Level = 0.003  Analysis Date = 02/24/2011 
 RPT Level = 0.003  Analysis Date = 02/24/2011 
 RPT Level = 0.003  Analysis Date = 02/15/2011 
 RPT Level = 0.003  Analysis Date = 02/15/2011 
 RPT Level = 0.003  Analysis Date = 02/15/2011 
 RPT Level = 0.003  Analysis Date = 02/15/2011 
 RPT Level = 0.003  Analysis Date = 01/26/2011 
 RPT Level = 0.003  Analysis Date = 01/26/2011 
 RPT Level = 0.003  Analysis Date = 01/26/2011 
 RPT Level = 0.003  Analysis Date = 01/26/2011 
 RPT Level = 0.003  Analysis Date = 01/19/2011 
 RPT Level = 0.003  Analysis Date = 01/19/2011 
 RPT Level = 0.003  Analysis Date = 01/06/2011 
 RPT Level = 0.003  Analysis Date = 01/06/2011 
 RPT Level = 0.003  Analysis Date = 01/05/2011 
 RPT Level = 0.003  Analysis Date = 01/05/2011 
 RPT Level = 0.003  Analysis Date = 01/04/2011 
 RPT Level = 0.003  Analysis Date = 01/04/2011 
 RPT Level = 0.003  Analysis Date = 01/04/2011 
 RPT Level = 0.003  Analysis Date = 01/04/2011 
 RPT Level = 0.003  Analysis Date = 12/21/2010 
 RPT Level = 0.003  Analysis Date = 12/21/2010 
 RPT Level = 0.003  Analysis Date = 12/22/2010 
 RPT Level = 0.003  Analysis Date = 12/22/2010 
 RPT Level = 0.003  Analysis Date = 12/14/2010 
 RPT Level = 0.003  Analysis Date = 12/14/2010 
 RPT Level = 0.003  Analysis Date = 12/01/2010 
 RPT Level = 0.003  Analysis Date = 12/01/2010 
 RPT Level = 0.003  Analysis Date = 11/30/2010 
 RPT Level = 0.003  Analysis Date = 11/30/2010 
 RPT Level = 0.003  Analysis Date = 11/17/2010 
 RPT Level = 0.003  Analysis Date = 11/17/2010 
 RPT Level = 0.003  Analysis Date = 11/09/2010 
 RPT Level = 0.003  Analysis Date = 11/09/2010 
 RPT Level = 0.003  Analysis Date = 10/27/2010 
 RPT Level = 0.003  Analysis Date = 10/27/2010 
 RPT Level = 0.003  Analysis Date = 11/02/2010 
 RPT Level = 0.003  Analysis Date = 11/02/2010 
 RPT Level = 0.003  Analysis Date = 10/20/2010 
 RPT Level = 0.003  Analysis Date = 10/20/2010 
 RPT Level = 0.003  Analysis Date = 10/13/2010 
 RPT Level = 0.003  Analysis Date = 10/13/2010 
 RPT Level = 0.003  Analysis Date = 09/29/2010 
 RPT Level = 0.003  Analysis Date = 09/29/2010 
 RPT Level = 0.003  Analysis Date = 09/22/2010 
 RPT Level = 0.003  Analysis Date = 09/22/2010 
 RPT Level = 0.003  Analysis Date = 09/16/2010 
 RPT Level = 0.003  Analysis Date = 09/16/2010 
 RPT Level = 0.003  Analysis Date = 09/15/2010 
 RPT Level = 0.003  Analysis Date = 09/15/2010 
 RPT Level = 0.003  Analysis Date = 09/01/2010 
 RPT Level = 0.003  Analysis Date = 09/01/2010 
 RPT Level = 0.003  Analysis Date = 08/25/2010 
 RPT Level = 0.003  Analysis Date = 08/25/2010 
 RPT Level = 0.003  Analysis Date = 08/24/2010 
 RPT Level = 0.003  Analysis Date = 08/24/2010 
 RPT Level = 0.003  Analysis Date = 08/10/2010 
 RPT Level = 0.003  Analysis Date = 08/10/2010 
 RPT Level = 0.003  Analysis Date = 08/03/2010 
 RPT Level = 0.003  Analysis Date = 08/03/2010 
 RPT Level = 0.003  Analysis Date = 08/03/2010 
 RPT Level = 0.003  Analysis Date = 08/03/2010 
 RPT Level = 0.003  Analysis Date = 07/27/2010 
 RPT Level = 0.003  Analysis Date = 07/27/2010 
 RPT Level = 0.003  Analysis Date = 07/22/2010 
 RPT Level = 0.003  Analysis Date = 07/22/2010 
 RPT Level = 0.003  Analysis Date = 07/20/2010 
 RPT Level = 0.003  Analysis Date = 07/20/2010 
 RPT Level = 0.003  Analysis Date = 06/30/2010 
 RPT Level = 0.003  Analysis Date = 06/30/2010 
 RPT Level = 0.003  Analysis Date = 06/24/2010 
 RPT Level = 0.003  Analysis Date = 06/24/2010 
 RPT Level = 0.003  Analysis Date = 06/16/2010 
 RPT Level = 0.003  Analysis Date = 06/16/2010 
 RPT Level = 0.003  Analysis Date = 06/16/2010 
 RPT Level = 0.003  Analysis Date = 06/16/2010 
 RPT Level = 0.003  Analysis Date = 06/09/2010 
 RPT Level = 0.003  Analysis Date = 06/09/2010 
 RPT Level = 0.003  Analysis Date = 06/03/2010 
 RPT Level = 0.003  Analysis Date = 06/03/2010 
 RPT Level = 0.003  Analysis Date = 05/20/2010 
 RPT Level = 0.003  Analysis Date = 05/20/2010 
 RPT Level = 0.003  Analysis Date = 05/12/2010 
 RPT Level = 0.003  Analysis Date = 05/12/2010 
 RPT Level = 0.003  Analysis Date = 05/05/2010 
 RPT Level = 0.003  Analysis Date = 05/05/2010 
 RPT Level = 0.003  Analysis Date = 04/28/2010 
 RPT Level = 0.003  Analysis Date = 04/28/2010 
 RPT Level = 0.003  Analysis Date = 04/21/2010 
 RPT Level = 0.003  Analysis Date = 04/21/2010 
 RPT Level = 0.003  Analysis Date = 04/08/2010 
 RPT Level = 0.003  Analysis Date = 04/08/2010 
 RPT Level = 0.003  Analysis Date = 04/06/2010 
 RPT Level = 0.003  Analysis Date = 04/06/2010 
 RPT Level = 0.003  Analysis Date = 03/30/2010 
 RPT Level = 0.003  Analysis Date = 03/30/2010 
 RPT Level = 0.003  Analysis Date = 03/25/2010 
 RPT Level = 0.003  Analysis Date = 03/25/2010 
 RPT Level = 0.003  Analysis Date = 03/16/2010 
 RPT Level = 0.003  Analysis Date = 03/16/2010 
 RPT Level = 0.003  Analysis Date = 03/10/2010 
 RPT Level = 0.003  Analysis Date = 03/10/2010 
 RPT Level = 0.003  Analysis Date = 03/02/2010 
 RPT Level = 0.003  Analysis Date = 03/02/2010 
 RPT Level = 0.003  Analysis Date = 02/24/2010 
 RPT Level = 0.003  Analysis Date = 02/24/2010 
 RPT Level = 0.003  Analysis Date = 02/12/2010 
 RPT Level = 0.003  Analysis Date = 02/12/2010 
 RPT Level = 0.003  Analysis Date = 02/10/2010 
 RPT Level = 0.003  Analysis Date = 02/10/2010 
 RPT Level = 0.003  Analysis Date = 01/28/2010 
 RPT Level = 0.003  Analysis Date = 01/28/2010 
 RPT Level = 0.003  Analysis Date = 01/26/2010 
 RPT Level = 0.003  Analysis Date = 01/26/2010 
 RPT Level = 0.003  Analysis Date = 01/13/2010 
 RPT Level = 0.003  Analysis Date = 01/13/2010 
 RPT Level = 0.003  Analysis Date = 01/13/2010 
 RPT Level = 0.003  Analysis Date = 01/13/2010 
 RPT Level = 0.003  Analysis Date = 01/06/2010 
 RPT Level = 0.003  Analysis Date = 01/06/2010 
 RPT Level = 0.003  Analysis Date = 01/06/2010 
 RPT Level = 0.003  Analysis Date = 01/06/2010 
 RPT Level = 0.003  Analysis Date = 12/29/2009 
 RPT Level = 0.003  Analysis Date = 12/29/2009 
 RPT Level = 0.003  Analysis Date = 12/21/2009 
 RPT Level = 0.003  Analysis Date = 12/21/2009 
 RPT Level = 0.003  Analysis Date = 12/29/2009 
 RPT Level = 0.003  Analysis Date = 12/29/2009 
 RPT Level = 0.003  Analysis Date = 12/01/2009 
 RPT Level = 0.003  Analysis Date = 12/01/2009 
 RPT Level = 0.003  Analysis Date = 11/27/2009 
 RPT Level = 0.003  Analysis Date = 11/27/2009 
 RPT Level = 0.003  Analysis Date = 11/25/2009 
 RPT Level = 0.003  Analysis Date = 11/25/2009 
 RPT Level = 0.003  Analysis Date = 11/24/2009 
 RPT Level = 0.003  Analysis Date = 11/24/2009 
 RPT Level = 0.003  Analysis Date = 11/18/2009 
 RPT Level = 0.003  Analysis Date = 11/18/2009 
 RPT Level = 0.003  Analysis Date = 11/18/2009 
 RPT Level = 0.003  Analysis Date = 11/18/2009 
 RPT Level = 0.003  Analysis Date = 11/10/2009 
 RPT Level = 0.003  Analysis Date = 11/10/2009 
 RPT Level = 0.003  Analysis Date = 10/28/2009 
 RPT Level = 0.003  Analysis Date = 10/28/2009 
 RPT Level = 0.003  Analysis Date = 10/22/2009 
 RPT Level = 0.003  Analysis Date = 10/22/2009 
 RPT Level = 0.003  Analysis Date = 10/21/2009 
 RPT Level = 0.003  Analysis Date = 10/21/2009 
 RPT Level = 0.003  Analysis Date = 09/24/2009 
 RPT Level = 0.003  Analysis Date = 09/24/2009 
 RPT Level = 0.003  Analysis Date = 09/24/2009 
 RPT Level = 0.003  Analysis Date = 09/24/2009 
 RPT Level = 0.003  Analysis Date = 09/23/2009 
 RPT Level = 0.003  Analysis Date = 09/23/2009 
 RPT Level = 0.003  Analysis Date = 09/15/2009 
 RPT Level = 0.003  Analysis Date = 09/15/2009 
 RPT Level = 0.003  Analysis Date = 09/10/2009 
 RPT Level = 0.003  Analysis Date = 09/10/2009 
 RPT Level = 0.003  Analysis Date = 08/20/2009 
 RPT Level = 0.003  Analysis Date = 08/20/2009 
 RPT Level = 0.003  Analysis Date = 08/12/2009 
 RPT Level = 0.003  Analysis Date = 08/12/2009 
 RPT Level = 0.003  Analysis Date = 08/13/2009 
 RPT Level = 0.003  Analysis Date = 08/13/2009 
 RPT Level = 0.003  Analysis Date = 07/30/2009 
 RPT Level = 0.003  Analysis Date = 07/30/2009 
 RPT Level = 0.003  Analysis Date = 07/23/2009 
 RPT Level = 0.003  Analysis Date = 07/23/2009 
 RPT Level = 0.003  Analysis Date = 07/21/2009 
 RPT Level = 0.003  Analysis Date = 07/21/2009 
 RPT Level = 0.003  Analysis Date = 07/16/2009 
 RPT Level = 0.003  Analysis Date = 07/16/2009 
 RPT Level = 0.003  Analysis Date = 07/01/2009 
 RPT Level = 0.003  Analysis Date = 07/01/2009 
 RPT Level = 0.003  Analysis Date = 06/30/2009 
 RPT Level = 0.003  Analysis Date = 06/30/2009 
 RPT Level = 0.003  Analysis Date = 06/18/2009 
 RPT Level = 0.003  Analysis Date = 06/18/2009 
 RPT Level = 0.003  Analysis Date = 06/11/2009 
 RPT Level = 0.003  Analysis Date = 06/11/2009 
 RPT Level = 0.003  Analysis Date = 06/09/2009 
 RPT Level = 0.003  Analysis Date = 06/09/2009 
 RPT Level = 0.003  Analysis Date = 06/03/2009 
 RPT Level = 0.003  Analysis Date = 06/03/2009 
 RPT Level = 0.003  Analysis Date = 05/27/2009 
 RPT Level = 0.003  Analysis Date = 05/27/2009 
 RPT Level = 0.003  Analysis Date = 05/14/2009 
 RPT Level = 0.003  Analysis Date = 05/14/2009 
 RPT Level = 0.003  Analysis Date = 05/05/2009 
 RPT Level = 0.003  Analysis Date = 05/05/2009 
 RPT Level = 0.003  Analysis Date = 04/29/2009 
 RPT Level = 0.003  Analysis Date = 04/29/2009 
 RPT Level = 0.003  Analysis Date = 04/23/2009 
 RPT Level = 0.003  Analysis Date = 04/23/2009 
 RPT Level = 0.003  Analysis Date = 04/15/2009 
 RPT Level = 0.003  Analysis Date = 04/15/2009 
 RPT Level = 0.003  Analysis Date = 04/15/2009 
 RPT Level = 0.003  Analysis Date = 04/15/2009 
 RPT Level = 0.003  Analysis Date = 04/09/2009 
 RPT Level = 0.003  Analysis Date = 04/09/2009 
 RPT Level = 0.003  Analysis Date = 04/08/2009 
 RPT Level = 0.003  Analysis Date = 04/08/2009 
 RPT Level = 0.003  Analysis Date = 03/12/2009 
 RPT Level = 0.003  Analysis Date = 03/12/2009 
 RPT Level = 0.003  Analysis Date = 03/10/2009 
 RPT Level = 0.003  Analysis Date = 03/10/2009 
 RPT Level = 0.003  Analysis Date = 03/05/2009 
 RPT Level = 0.003  Analysis Date = 03/05/2009 
 RPT Level = 0.003  Analysis Date = 03/03/2009 
 RPT Level = 0.003  Analysis Date = 03/03/2009 
 RPT Level = 0.003  Analysis Date = 02/11/2009 
 RPT Level = 0.003  Analysis Date = 02/11/2009 
 RPT Level = 0.003  Analysis Date = 02/10/2009 
 RPT Level = 0.003  Analysis Date = 02/10/2009 
 RPT Level = 0.003  Analysis Date = 02/05/2009 
 RPT Level = 0.003  Analysis Date = 02/05/2009 
 RPT Level = 0.003  Analysis Date = 01/22/2009 
 RPT Level = 0.003  Analysis Date = 01/22/2009 
 RPT Level = 0.003  Analysis Date = 01/20/2009 
 RPT Level = 0.003  Analysis Date = 01/20/2009 
 RPT Level = 0.003  Analysis Date = 01/09/2009 
 RPT Level = 0.003  Analysis Date = 01/09/2009 
 RPT Level = 0.003  Analysis Date = 01/09/2009 
 RPT Level = 0.003  Analysis Date = 01/09/2009 
 RPT Level = 0.003  Analysis Date = 01/09/2009 
 RPT Level = 0.003  Analysis Date = 01/09/2009 
 RPT Level = 0.003  Analysis Date = 01/13/2009 
 RPT Level = 0.003  Analysis Date = 01/13/2009 
 RPT Level = 0.003  Analysis Date = 01/08/2009 
 RPT Level = 0.003  Analysis Date = 01/08/2009 
 RPT Level = 0.003  Analysis Date = 12/09/2008 
 RPT Level = 0.003  Analysis Date = 12/09/2008 
 RPT Level = 0.003  Analysis Date = 12/09/2008 
 RPT Level = 0.003  Analysis Date = 12/09/2008 
 RPT Level = 0.003  Analysis Date = 11/20/2008 
 RPT Level = 0.003  Analysis Date = 11/20/2008 
 RPT Level = 0.003  Analysis Date = 11/17/2008 
 RPT Level = 0.003  Analysis Date = 11/17/2008 
 RPT Level = 0.003  Analysis Date = 11/13/2008 
 RPT Level = 0.003  Analysis Date = 11/13/2008 
 RPT Level = 0.003  Analysis Date = 11/06/2008 
 RPT Level = 0.003  Analysis Date = 11/06/2008 
 RPT Level = 0.003  Analysis Date = 11/04/2008 
 RPT Level = 0.003  Analysis Date = 11/04/2008 
 RPT Level = 0.003  Analysis Date = 10/21/2008 
 RPT Level = 0.003  Analysis Date = 10/21/2008 
 RPT Level = 0.003  Analysis Date = 10/09/2008 
 RPT Level = 0.003  Analysis Date = 10/09/2008 
 RPT Level = 0.003  Analysis Date = 10/08/2008 
 RPT Level = 0.003  Analysis Date = 10/08/2008 
 RPT Level = 0.003  Analysis Date = 09/30/2008 
 RPT Level = 0.003  Analysis Date = 09/30/2008 
 RPT Level = 0.003  Analysis Date = 09/30/2008 
 RPT Level = 0.003  Analysis Date = 09/30/2008 
 RPT Level = 0.003  Analysis Date = 09/24/2008 
 RPT Level = 0.003  Analysis Date = 09/24/2008 
 RPT Level = 0.003  Analysis Date = 09/11/2008 
 RPT Level = 0.003  Analysis Date = 09/11/2008 
 RPT Level = 0.003  Analysis Date = 09/16/2008 
 RPT Level = 0.003  Analysis Date = 09/16/2008 
 RPT Level = 0.003  Analysis Date = 08/26/2008 
 RPT Level = 0.003  Analysis Date = 08/26/2008 
 RPT Level = 0.003  Analysis Date = 08/14/2008 
 RPT Level = 0.003  Analysis Date = 08/14/2008 
 RPT Level = 0.003  Analysis Date = 08/12/2008 
 RPT Level = 0.003  Analysis Date = 08/12/2008 
 RPT Level = 0.003  Analysis Date = 07/30/2008 
 RPT Level = 0.003  Analysis Date = 07/30/2008 
 RPT Level = 0.003  Analysis Date = 07/23/2008 
 RPT Level = 0.003  Analysis Date = 07/23/2008 
 RPT Level = 0.003  Analysis Date = 07/17/2008 
 RPT Level = 0.003  Analysis Date = 07/17/2008 
 RPT Level = 0.003  Analysis Date = 07/15/2008 
 RPT Level = 0.003  Analysis Date = 07/15/2008 
 RPT Level = 0.003  Analysis Date = 07/08/2008 
 RPT Level = 0.003  Analysis Date = 07/08/2008 
 RPT Level = 0.003  Analysis Date = 07/01/2008 
 RPT Level = 0.003  Analysis Date = 07/01/2008 
 RPT Level = 0.003  Analysis Date = 06/17/2008 
 RPT Level = 0.003  Analysis Date = 06/17/2008 
 RPT Level = 0.003  Analysis Date = 06/17/2008 
 RPT Level = 0.003  Analysis Date = 06/17/2008 
 RPT Level = 0.003  Analysis Date = 06/04/2008 
 RPT Level = 0.003  Analysis Date = 06/04/2008 
 RPT Level = 0.003  Analysis Date = 06/03/2008 
 RPT Level = 0.003  Analysis Date = 06/03/2008 
 RPT Level = 0.003  Analysis Date = 05/21/2008 
 RPT Level = 0.003  Analysis Date = 05/21/2008 
 RPT Level = 0.003  Analysis Date = 05/14/2008 
 RPT Level = 0.003  Analysis Date = 05/14/2008 
 RPT Level = 0.003  Analysis Date = 05/08/2008 
 RPT Level = 0.003  Analysis Date = 05/08/2008 
 RPT Level = 0.003  Analysis Date = 04/30/2008 
 RPT Level = 0.003  Analysis Date = 04/30/2008 
 RPT Level = 0.003  Analysis Date = 04/29/2008 
 RPT Level = 0.003  Analysis Date = 04/29/2008 
 RPT Level = 0.003  Analysis Date = 04/15/2008 
 RPT Level = 0.003  Analysis Date = 04/15/2008 
 RPT Level = 0.003  Analysis Date = 04/08/2008 
 RPT Level = 0.003  Analysis Date = 04/08/2008 
 RPT Level = 0.003  Analysis Date = 04/01/2008 
 RPT Level = 0.003  Analysis Date = 04/01/2008 
 RPT Level = 0.003  Analysis Date = 03/25/2008 
 RPT Level = 0.003  Analysis Date = 03/25/2008 
 RPT Level = 0.003  Analysis Date = 03/12/2008 
 RPT Level = 0.003  Analysis Date = 03/12/2008 
 RPT Level = 0.003  Analysis Date = 03/06/2008 
 RPT Level = 0.003  Analysis Date = 03/06/2008 
 RPT Level = 0.003  Analysis Date = 03/04/2008 
 RPT Level = 0.003  Analysis Date = 03/04/2008 
 RPT Level = 0.003  Analysis Date = 02/28/2008 
 RPT Level = 0.003  Analysis Date = 02/28/2008 
 RPT Level = 0.003  Analysis Date = 02/26/2008 
 RPT Level = 0.003  Analysis Date = 02/26/2008 
 RPT Level = 0.003  Analysis Date = 02/13/2008 
 RPT Level = 0.003  Analysis Date = 02/13/2008 
 RPT Level = 0.003  Analysis Date = 01/31/2008 
 RPT Level = 0.003  Analysis Date = 01/31/2008 
 RPT Level = 0.003  Analysis Date = 01/29/2008 
 RPT Level = 0.003  Analysis Date = 01/29/2008 
 RPT Level = 0.003  Analysis Date = 01/17/2008 
 RPT Level = 0.003  Analysis Date = 01/17/2008 
 RPT Level = 0.003  Analysis Date = 01/11/2008 
 RPT Level = 0.003  Analysis Date = 01/11/2008 
 RPT Level = 0.003  Analysis Date = 01/10/2008 
 RPT Level = 0.003  Analysis Date = 01/10/2008 
 RPT Level = 0.003  Analysis Date = 01/03/2008 
 RPT Level = 0.003  Analysis Date = 01/03/2008 
 RPT Level = 0.003  Analysis Date = 12/12/2007 
 RPT Level = 0.003  Analysis Date = 12/12/2007 
 RPT Level = 0.003  Analysis Date = 12/05/2007 
 RPT Level = 0.003  Analysis Date = 12/05/2007 
 RPT Level = 0.003  Analysis Date = 12/04/2007 
 RPT Level = 0.003  Analysis Date = 12/04/2007 
 RPT Level = 0.003  Analysis Date = 12/03/2007 
 RPT Level = 0.003  Analysis Date = 12/03/2007 
 RPT Level = 0.003  Analysis Date = 11/30/2007 
 RPT Level = 0.003  Analysis Date = 11/30/2007 
 RPT Level = 0.003  Analysis Date = 11/28/2007 
 RPT Level = 0.003  Analysis Date = 11/28/2007 
 RPT Level = 0.003  Analysis Date = 11/19/2007 
 RPT Level = 0.003  Analysis Date = 11/19/2007 
 RPT Level = 0.003  Analysis Date = 11/13/2007 
 RPT Level = 0.003  Analysis Date = 11/13/2007 
 RPT Level = 0.003  Analysis Date = 11/05/2007 
 RPT Level = 0.003  Analysis Date = 11/05/2007 
 RPT Level = 0.003  Analysis Date = 10/22/2007 
 RPT Level = 0.003  Analysis Date = 10/22/2007 
 RPT Level = 0.003  Analysis Date = 10/15/2007 
 RPT Level = 0.003  Analysis Date = 10/15/2007 
 RPT Level = 0.003  Analysis Date = 10/05/2007 
 RPT Level = 0.003  Analysis Date = 10/05/2007 
 RPT Level = 0.003  Analysis Date = 10/03/2007 
 RPT Level = 0.003  Analysis Date = 10/03/2007 
 RPT Level = 0.003  Analysis Date = 09/26/2007 
 RPT Level = 0.003  Analysis Date = 09/26/2007 
 RPT Level = 0.003  Analysis Date = 09/20/2007 
 RPT Level = 0.003  Analysis Date = 09/20/2007 
 RPT Level = 0.003  Analysis Date = 09/06/2007 
 RPT Level = 0.003  Analysis Date = 09/06/2007 
 RPT Level = 0.003  Analysis Date = 08/30/2007 
 RPT Level = 0.003  Analysis Date = 08/30/2007 
 RPT Level = 0.003  Analysis Date = 08/28/2007 
 RPT Level = 0.003  Analysis Date = 08/28/2007 
 RPT Level = 0.003  Analysis Date = 08/20/2007 
 RPT Level = 0.003  Analysis Date = 08/20/2007 
 RPT Level = 0.003  Analysis Date = 08/16/2007 
 RPT Level = 0.003  Analysis Date = 08/16/2007 
 RPT Level = 0.003  Analysis Date = 07/19/2007 
 RPT Level = 0.003  Analysis Date = 07/19/2007 
 RPT Level = 0.003  Analysis Date = 07/19/2007 
 RPT Level = 0.003  Analysis Date = 07/19/2007 
 RPT Level = 0.003  Analysis Date = 07/17/2007 
 RPT Level = 0.003  Analysis Date = 07/17/2007 
 RPT Level = 0.003  Analysis Date = 07/03/2007 
 RPT Level = 0.003  Analysis Date = 07/03/2007 
 RPT Level = 0.003  Analysis Date = 06/21/2007 
 RPT Level = 0.003  Analysis Date = 06/21/2007 
 RPT Level = 0.003  Analysis Date = 06/20/2007 
 RPT Level = 0.003  Analysis Date = 06/20/2007 
 RPT Level = 0.003  Analysis Date = 06/19/2007 
 RPT Level = 0.003  Analysis Date = 06/19/2007 
 RPT Level = 0.003  Analysis Date = 06/13/2007 
 RPT Level = 0.003  Analysis Date = 06/13/2007 
 RPT Level = 0.003  Analysis Date = 06/05/2007 
 RPT Level = 0.003  Analysis Date = 06/05/2007 
 RPT Level = 0.003  Analysis Date = 05/17/2007 
 RPT Level = 0.003  Analysis Date = 05/17/2007 
 RPT Level = 0.003  Analysis Date = 05/15/2007 
 RPT Level = 0.003  Analysis Date = 05/15/2007 
 RPT Level = 0.003  Analysis Date = 05/10/2007 
 RPT Level = 0.003  Analysis Date = 05/10/2007 
 RPT Level = 0.003  Analysis Date = 05/01/2007 
 RPT Level = 0.003  Analysis Date = 05/01/2007 
 RPT Level = 0.003  Analysis Date = 04/19/2007 
 RPT Level = 0.003  Analysis Date = 04/19/2007 
 RPT Level = 0.003  Analysis Date = 04/24/2007 
 RPT Level = 0.003  Analysis Date = 04/24/2007 
 RPT Level = 0.003  Analysis Date = 04/18/2007 
 RPT Level = 0.003  Analysis Date = 04/18/2007 
 RPT Level = 0.003  Analysis Date = 04/18/2007 
 RPT Level = 0.003  Analysis Date = 04/18/2007 
 RPT Level = 0.003  Analysis Date = 03/22/2007 
 RPT Level = 0.003  Analysis Date = 03/22/2007 
 RPT Level = 0.003  Analysis Date = 03/15/2007 
 RPT Level = 0.003  Analysis Date = 03/15/2007 
 RPT Level = 0.003  Analysis Date = 03/15/2007 
 RPT Level = 0.003  Analysis Date = 03/15/2007 
 RPT Level = 0.003  Analysis Date = 03/14/2007 
 RPT Level = 0.003  Analysis Date = 03/14/2007 
 RPT Level = 0.003  Analysis Date = 02/28/2007 
 RPT Level = 0.003  Analysis Date = 02/28/2007 
 RPT Level = 0.003  Analysis Date = 02/28/2007 
 RPT Level = 0.003  Analysis Date = 02/28/2007 
 RPT Level = 0.003  Analysis Date = 02/13/2007 
 RPT Level = 0.003  Analysis Date = 02/13/2007 
 RPT Level = 0.003  Analysis Date = 02/13/2007 
 RPT Level = 0.003  Analysis Date = 02/13/2007 
 RPT Level = 0.003  Analysis Date = 01/18/2007 
 RPT Level = 0.003  Analysis Date = 01/18/2007 
 RPT Level = 0.003  Analysis Date = 01/10/2007 
 RPT Level = 0.003  Analysis Date = 01/10/2007 
 RPT Level = 0.003  Analysis Date = 01/10/2007 
 RPT Level = 0.003  Analysis Date = 01/10/2007 
 RPT Level = 0.003  Analysis Date = 01/04/2007 
 RPT Level = 0.003  Analysis Date = 01/04/2007 
 RPT Level = 0.003  Analysis Date = 12/15/2006 
 RPT Level = 0.003  Analysis Date = 12/15/2006 
 RPT Level = 0.003  Analysis Date = 12/06/2006 
 RPT Level = 0.003  Analysis Date = 12/06/2006 
 RPT Level = 0.003  Analysis Date = 12/08/2006 
 RPT Level = 0.003  Analysis Date = 12/08/2006 
 RPT Level = 0.003  Analysis Date = 11/30/2006 
 RPT Level = 0.003  Analysis Date = 11/30/2006 
 RPT Level = 0.003  Analysis Date = 11/20/2006 
 RPT Level = 0.003  Analysis Date = 11/20/2006 
 RPT Level = 0.003  Analysis Date = 11/08/2006 
 RPT Level = 0.003  Analysis Date = 11/08/2006 
 RPT Level = 0.003  Analysis Date = 11/07/2006 
 RPT Level = 0.003  Analysis Date = 11/07/2006 
 RPT Level = 0.003  Analysis Date = 10/27/2006 
 RPT Level = 0.003  Analysis Date = 10/27/2006 
 RPT Level = 0.003  Analysis Date = 10/25/2006 
 RPT Level = 0.003  Analysis Date = 10/25/2006 
 RPT Level = 0.003  Analysis Date = 10/18/2006 
 RPT Level = 0.003  Analysis Date = 10/18/2006 
 RPT Level = 0.003  Analysis Date = 10/16/2006 
 RPT Level = 0.003  Analysis Date = 10/16/2006 
 RPT Level = 0.003  Analysis Date = 10/05/2006 
 RPT Level = 0.002  Analysis Date = 10/05/2006 
 RPT Level = 0.002  Analysis Date = 09/29/2006 
 RPT Level = 0.002  Analysis Date = 09/29/2006 
 RPT Level = 0.002  Analysis Date = 09/27/2006 
 RPT Level = 0.002  Analysis Date = 09/27/2006 
 RPT Level = 0.002  Analysis Date = 09/15/2006 
 RPT Level = 0.002  Analysis Date = 09/15/2006 
 RPT Level = 0.002  Analysis Date = 08/22/2006 
 RPT Level = 0.002  Analysis Date = 08/22/2006 
 RPT Level = 0.002  Analysis Date = 08/16/2006 
 RPT Level = 0.002  Analysis Date = 08/16/2006 
 RPT Level = 0.002  Analysis Date = 07/28/2006 
 RPT Level = 0.002  Analysis Date = 07/28/2006 
 RPT Level = 0.002  Analysis Date = 07/20/2006 
 RPT Level = 0.002  Analysis Date = 07/20/2006 
 RPT Level = 0.002  Analysis Date = 07/14/2006 
 RPT Level = 0.002  Analysis Date = 07/14/2006 
 RPT Level = 0.002  Analysis Date = 06/30/2006 
 RPT Level = 0.002  Analysis Date = 06/30/2006 
 RPT Level = 0.002  Analysis Date = 06/20/2006 
 RPT Level = 0.002  Analysis Date = 06/20/2006 
 RPT Level = 0.002  Analysis Date = 06/09/2006 
 RPT Level = 0.002  Analysis Date = 06/09/2006 
 RPT Level = 0.002  Analysis Date = 06/01/2006 
 RPT Level = 0.002  Analysis Date = 06/01/2006 
 RPT Level = 0.002  Analysis Date = 05/19/2006 
 RPT Level = 0.002  Analysis Date = 05/19/2006 
 RPT Level = 0.002  Analysis Date = 05/11/2006 
 RPT Level = 0.002  Analysis Date = 05/11/2006 
 RPT Level = 0.002  Analysis Date = 09/29/2005 
 RPT Level = 0.002  Analysis Date = 09/29/2005 
 RPT Level = 0.002  Analysis Date = 09/22/2005 
 RPT Level = 0.002  Analysis Date = 09/22/2005 
 RPT Level = 0.002  Analysis Date = 09/09/2005 
 RPT Level = 0.002  Analysis Date = 09/09/2005 
 RPT Level = 0.002  Analysis Date = 09/09/2005 
 RPT Level = 0.002  Analysis Date = 09/09/2005 
 RPT Level = 0.002  Analysis Date = 09/01/2005 
 RPT Level = 0.002  Analysis Date = 09/01/2005 
 RPT Level = 0.002  Analysis Date = 08/17/2005 
 RPT Level = 0.002  Analysis Date = 08/17/2005 
 RPT Level = 0.002  Analysis Date = 08/17/2005 
 RPT Level = 0.002  Analysis Date = 08/17/2005 
 RPT Level = 0.002  Analysis Date = 08/17/2005 
 RPT Level = 0.002  Analysis Date = 08/17/2005 
 RPT Level = 0.002  Analysis Date = 08/04/2005 
 RPT Level = 0.002  Analysis Date = 08/04/2005 
 RPT Level = 0.002  Analysis Date = 08/02/2005 
 RPT Level = 0.002  Analysis Date = 08/02/2005 
 RPT Level = 0.002  Analysis Date = 07/21/2005 
 RPT Level = 0.002  Analysis Date = 07/21/2005 
 RPT Level = 0.002  Analysis Date = 07/21/2005 
 RPT Level = 0.002  Analysis Date = 07/21/2005 
 RPT Level = 0.002  Analysis Date = 07/11/2005 
 RPT Level = 0.002  Analysis Date = 07/11/2005 
 RPT Level = 0.002  Analysis Date = 07/07/2005 
 RPT Level = 0.002  Analysis Date = 07/07/2005 
 RPT Level = 0.002  Analysis Date = 06/23/2005 
 RPT Level = 0.002  Analysis Date = 06/23/2005 
 RPT Level = 0.002  Analysis Date = 06/23/2005 
 RPT Level = 0.002  Analysis Date = 06/23/2005 
 RPT Level = 0.002  Analysis Date = 06/08/2005 
 RPT Level = 0.002  Analysis Date = 06/08/2005 
 RPT Level = 0.002  Analysis Date = 06/07/2005 
 RPT Level = 0.002  Analysis Date = 06/07/2005 
 RPT Level = 0.002  Analysis Date = 06/02/2005 
 RPT Level = 0.002  Analysis Date = 06/02/2005 
 RPT Level = 0.002  Analysis Date = 06/02/2005 
 RPT Level = 0.002  Analysis Date = 06/02/2005 
 RPT Level = 0.002  Analysis Date = 05/24/2005 
 RPT Level = 0.002  Analysis Date = 05/24/2005 
 RPT Level = 0.002  Analysis Date = 05/19/2005 
 RPT Level = 0.002  Analysis Date = 05/19/2005 
 RPT Level = 0.002  Analysis Date = 04/21/2005 
 RPT Level = 0.002  Analysis Date = 04/21/2005 
 RPT Level = 0.002  Analysis Date = 04/20/2005 
 RPT Level = 0.002  Analysis Date = 04/20/2005 
 RPT Level = 0.002  Analysis Date = 04/20/2005 
 RPT Level = 0.002  Analysis Date = 04/20/2005 
 RPT Level = 0.002  Analysis Date = 04/05/2005 
 RPT Level = 0.002  Analysis Date = 04/05/2005 
 RPT Level = 0.002  Analysis Date = 03/31/2005 
 RPT Level = 0.002  Analysis Date = 03/31/2005 
 RPT Level = 0.002  Analysis Date = 03/17/2005 
 RPT Level = 0.002  Analysis Date = 03/17/2005 
 RPT Level = 0.002  Analysis Date = 03/17/2005 
 RPT Level = 0.002  Analysis Date = 03/17/2005 
 RPT Level = 0.002  Analysis Date = 03/15/2005 
 RPT Level = 0.002  Analysis Date = 03/15/2005 
 RPT Level = 0.002  Analysis Date = 03/02/2005 
 RPT Level = 0.002  Analysis Date = 03/02/2005 
 RPT Level = 0.002  Analysis Date = 02/28/2005 
 RPT Level = 0.002  Analysis Date = 02/28/2005 
 RPT Level = 0.002  Analysis Date = 02/25/2005 
 RPT Level = 0.002  Analysis Date = 02/25/2005 
 RPT Level = 0.002  Analysis Date = 02/25/2005 
 RPT Level = 0.002  Analysis Date = 02/25/2005 
 RPT Level = 0.002  Analysis Date = 02/08/2005 
 RPT Level = 0.002  Analysis Date = 02/08/2005 
 RPT Level = 0.002  Analysis Date = 02/07/2005 
 RPT Level = 0.002  Analysis Date = 02/07/2005 
 RPT Level = 0.002  Analysis Date = 01/27/2005 
 RPT Level = 0.002  Analysis Date = 01/27/2005 
 RPT Level = 0.002  Analysis Date = 01/27/2005 
 RPT Level = 0.002  Analysis Date = 01/27/2005 
 RPT Level = 0.002  Analysis Date = 01/14/2005 
 RPT Level = 0.002  Analysis Date = 01/14/2005 
 RPT Level = 0.002  Analysis Date = 01/14/2005 
 RPT Level = 0.002  Analysis Date = 01/14/2005 
 RPT Level = 0.002  Analysis Date = 01/14/2005 
 RPT Level = 0.002  Analysis Date = 01/14/2005 
 RPT Level = 0.002  Analysis Date = 01/14/2005 
 RPT Level = 0.002  Analysis Date = 01/14/2005 
 RPT Level = 0.002  Analysis Date = 01/14/2005 
 RPT Level = 0.002  Analysis Date = 01/14/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 12/14/2004 
 RPT Level = 0.002  Analysis Date = 12/14/2004 
 RPT Level = 0.002  Analysis Date = 12/14/2004 
 RPT Level = 0.002  Analysis Date = 12/14/2004 
 RPT Level = 0.002  Analysis Date = 12/02/2004 
 RPT Level = 0.002  Analysis Date = 12/02/2004 
 RPT Level = 0.002  Analysis Date = 12/02/2004 
 RPT Level = 0.002  Analysis Date = 12/02/2004 
 RPT Level = 0.002  Analysis Date = 11/30/2004 
 RPT Level = 0.002  Analysis Date = 11/30/2004 
 RPT Level = 0.002  Analysis Date = 09/14/2004 
 RPT Level = 0.002  Analysis Date = 09/14/2004 
 RPT Level = 0.002  Analysis Date = 09/14/2004 
 RPT Level = 0.002  Analysis Date = 09/14/2004 
 RPT Level = 0.002  Analysis Date = 09/14/2004 
 RPT Level = 0.002  Analysis Date = 09/14/2004 
 RPT Level = 0.002  Analysis Date = 09/08/2004 
 RPT Level = 0.002  Analysis Date = 09/08/2004 
 RPT Level = 0.002  Analysis Date = 09/02/2004 
 RPT Level = 0.002  Analysis Date = 09/02/2004 
 RPT Level = 0.002  Analysis Date = 09/02/2004 
 RPT Level = 0.002  Analysis Date = 09/02/2004 
 RPT Level = 0.002  Analysis Date = 08/20/2004 
 RPT Level = 0.002  Analysis Date = 08/20/2004 
 RPT Level = 0.002  Analysis Date = 09/09/2004 
 RPT Level = 0.002  Analysis Date = 09/09/2004 
 RPT Level = 0.002  Analysis Date = 08/13/2004 
 RPT Level = 0.002  Analysis Date = 08/13/2004 
 RPT Level = 0.002  Analysis Date = 08/12/2004 
 RPT Level = 0.002  Analysis Date = 08/12/2004 
 RPT Level = 0.002  Analysis Date = 07/22/2004 
 RPT Level = 0.002  Analysis Date = 07/22/2004 
 RPT Level = 0.002  Analysis Date = 07/15/2004 
 RPT Level = 0.002  Analysis Date = 07/15/2004 
 RPT Level = 0.002  Analysis Date = 07/12/2004 
 RPT Level = 0.002  Analysis Date = 07/12/2004 
 RPT Level = 0.002  Analysis Date = 07/12/2004 
 RPT Level = 0.002  Analysis Date = 07/12/2004 
 RPT Level = 0.002  Analysis Date = 07/01/2004 
 RPT Level = 0.002  Analysis Date = 07/01/2004 
 RPT Level = 0.002  Analysis Date = 06/22/2004 
 RPT Level = 0.002  Analysis Date = 06/22/2004 
 RPT Level = 0.002  Analysis Date = 06/22/2004 
 RPT Level = 0.002  Analysis Date = 06/22/2004 
 RPT Level = 0.002  Analysis Date = 06/17/2004 
 RPT Level = 0.002  Analysis Date = 06/17/2004 
 RPT Level = 0.002  Analysis Date = 06/03/2004 
 RPT Level = 0.002  Analysis Date = 06/03/2004 
 RPT Level = 0.002  Analysis Date = 05/20/2004 
 RPT Level = 0.002  Analysis Date = 05/20/2004 
 RPT Level = 0.002  Analysis Date = 05/06/2004 
 RPT Level = 0.002  Analysis Date = 05/06/2004 
 RPT Level = 0.002  Analysis Date = 04/23/2004 
 RPT Level = 0.002  Analysis Date = 04/23/2004 
 RPT Level = 0.002  Analysis Date = 04/15/2004 
 RPT Level = 0.002  Analysis Date = 04/15/2004 
 RPT Level = 0.002  Analysis Date = 04/12/2004 
 RPT Level = 0.002  Analysis Date = 04/12/2004 
 RPT Level = 0.002  Analysis Date = 04/06/2004 
 RPT Level = 0.002  Analysis Date = 04/06/2004 
 RPT Level = 0.002  Analysis Date = 04/06/2004 
 RPT Level = 0.002  Analysis Date = 04/06/2004 
 RPT Level = 0.002  Analysis Date = 03/26/2004 
 RPT Level = 0.002  Analysis Date = 03/26/2004 
 RPT Level = 0.002  Analysis Date = 03/26/2004 
 RPT Level = 0.002  Analysis Date = 03/26/2004 
 RPT Level = 0.002  Analysis Date = 03/23/2004 
 RPT Level = 0.002  Analysis Date = 03/23/2004 
 RPT Level = 0.002  Analysis Date = 03/23/2004 
 RPT Level = 0.002  Analysis Date = 03/23/2004 
 RPT Level = 0.002  Analysis Date = 03/16/2004 
 RPT Level = 0.002  Analysis Date = 03/16/2004 
 RPT Level = 0.002  Analysis Date = 03/16/2004 
 RPT Level = 0.002  Analysis Date = 03/16/2004 
 RPT Level = 0.002  Analysis Date = 03/09/2004 
 RPT Level = 0.002  Analysis Date = 03/09/2004 
 RPT Level = 0.002  Analysis Date = 03/09/2004 
 RPT Level = 0.002  Analysis Date = 03/09/2004 
 RPT Level = 0.002  Analysis Date = 03/02/2004 
 RPT Level = 0.002  Analysis Date = 03/02/2004 
 RPT Level = 0.002  Analysis Date = 02/25/2004 
 RPT Level = 0.002  Analysis Date = 02/25/2004 
 RPT Level = 0.002  Analysis Date = 02/24/2004 
 RPT Level = 0.002  Analysis Date = 02/24/2004 
 RPT Level = 0.002  Analysis Date = 02/19/2004 
 RPT Level = 0.002  Analysis Date = 02/19/2004 
 RPT Level = 0.002  Analysis Date = 02/17/2004 
 RPT Level = 0.002  Analysis Date = 02/17/2004 
 RPT Level = 0.002  Analysis Date = 02/12/2004 
 RPT Level = 0.002  Analysis Date = 02/12/2004 
 RPT Level = 0.002  Analysis Date = 02/10/2004 
 RPT Level = 0.002  Analysis Date = 02/10/2004 
 RPT Level = 0.002  Analysis Date = 02/10/2004 
 RPT Level = 0.002  Analysis Date = 02/10/2004 
 RPT Level = 0.002  Analysis Date = 02/10/2004 
 RPT Level = 0.002  Analysis Date = 02/10/2004 
 RPT Level = 0.002  Analysis Date = 01/30/2004 
 RPT Level = 0.002  Analysis Date = 01/30/2004 
 RPT Level = 0.002  Analysis Date = 01/27/2004 
 RPT Level = 0.002  Analysis Date = 01/27/2004 
 RPT Level = 0.002  Analysis Date = 01/22/2004 
 RPT Level = 0.002  Analysis Date = 01/22/2004 
 RPT Level = 0.002  Analysis Date = 01/21/2004 
 RPT Level = 0.002  Analysis Date = 01/21/2004 
 RPT Level = 0.002  Analysis Date = 01/16/2004 
 RPT Level = 0.002  Analysis Date = 01/16/2004 
 RPT Level = 0.002  Analysis Date = 01/12/2004 
 RPT Level = 0.002  Analysis Date = 01/12/2004 
 RPT Level = 0.002  Analysis Date = 01/08/2004 
 RPT Level = 0.002  Analysis Date = 01/08/2004 
 RPT Level = 0.002  Analysis Date = 01/08/2004 
 RPT Level = 0.002  Analysis Date = 01/08/2004 
 RPT Level = 0.002  Analysis Date = 09/25/2003 
 RPT Level = 0.0022  Analysis Date = 09/25/2003 
 RPT Level = 0.0022  Analysis Date = 09/22/2003 
 RPT Level = 0.0022  Analysis Date = 09/22/2003 
 RPT Level = 0.0022  Analysis Date = 09/10/2003 
 RPT Level = 0.0022  Analysis Date = 09/10/2003 
 RPT Level = 0.0022  Analysis Date = 09/04/2003 
 RPT Level = 0.0022  Analysis Date = 09/04/2003 
 RPT Level = 0.0022  Analysis Date = 08/27/2003 
 RPT Level = 0.0022  Analysis Date = 08/27/2003 
 RPT Level = 0.0022  Analysis Date = 08/20/2003 
 RPT Level = 0.0022  Analysis Date = 08/20/2003 
 RPT Level = 0.0022  Analysis Date = 08/15/2003 
 RPT Level = 0.0022  Analysis Date = 08/15/2003 
 RPT Level = 0.0022  Analysis Date = 08/07/2003 
 RPT Level = 0.0022  Analysis Date = 08/07/2003 
 RPT Level = 0.0022  Analysis Date = 08/04/2003 
 RPT Level = 0.0022  Analysis Date = 08/04/2003 
 RPT Level = 0.0022  Analysis Date = 07/24/2003 
 RPT Level = 0.0022  Analysis Date = 07/24/2003 
 RPT Level = 0.0022  Analysis Date = 07/16/2003 
 RPT Level = 0.0022  Analysis Date = 07/16/2003 
 RPT Level = 0.0022  Analysis Date = 07/11/2003 
 RPT Level = 0.0022  Analysis Date = 07/11/2003 
 RPT Level = 0.0022  Analysis Date = 07/08/2003 
 RPT Level = 0.0022  Analysis Date = 07/08/2003 
 RPT Level = 0.0022  Analysis Date = 07/02/2003 
 RPT Level = 0.0022  Analysis Date = 07/02/2003 
 RPT Level = 0.0022  Analysis Date = 06/23/2003 
 RPT Level = 0.0022  Analysis Date = 06/23/2003 
 RPT Level = 0.0022  Analysis Date = 06/13/2003 
 RPT Level = 0.0022  Analysis Date = 06/13/2003 
 RPT Level = 0.0022  Analysis Date = 06/10/2003 
 RPT Level = 0.0022  Analysis Date = 06/10/2003 
 RPT Level = 0.0022  Analysis Date = 05/29/2003 
 RPT Level = 0.0022  Analysis Date = 05/29/2003 
 RPT Level = 0.0022  Analysis Date = 05/27/2003 
 RPT Level = 0.0022  Analysis Date = 05/27/2003 
 RPT Level = 0.0022  Analysis Date = 05/21/2003 
 RPT Level = 0.0022  Analysis Date = 05/21/2003 
 RPT Level = 0.0022  Analysis Date = 05/13/2003 
 RPT Level = 0.0022  Analysis Date = 05/13/2003 
 RPT Level = 0.0022  Analysis Date = 05/05/2003 
 RPT Level = 0.0022  Analysis Date = 05/05/2003 
 RPT Level = 0.0022  Analysis Date = 05/01/2003 
 RPT Level = 0.0022  Analysis Date = 05/01/2003 
 RPT Level = 0.0022  Analysis Date = 04/22/2003 
 RPT Level = 0.0022  Analysis Date = 04/22/2003 
 RPT Level = 0.0022  Analysis Date = 04/09/2003 
 RPT Level = 0.0022  Analysis Date = 04/09/2003 
 RPT Level = 0.0022  Analysis Date = 04/04/2003 
 RPT Level = 0.0022  Analysis Date = 04/04/2003 
 RPT Level = 0.0022  Analysis Date = 04/02/2003 
 RPT Level = 0.0022  Analysis Date = 04/02/2003 
 RPT Level = 0.0022  Analysis Date = 04/02/2003 
 RPT Level = 0.0022  Analysis Date = 04/02/2003 
 RPT Level = 0.0022  Analysis Date = 03/13/2003 
 RPT Level = 0.0022  Analysis Date = 03/13/2003 
 RPT Level = 0.0022  Analysis Date = 03/10/2003 
 RPT Level = 0.0022  Analysis Date = 03/10/2003 
 RPT Level = 0.0022  Analysis Date = 03/03/2003 
 RPT Level = 0.0022  Analysis Date = 03/03/2003 
 RPT Level = 0.0022  Analysis Date = 02/27/2003 
 RPT Level = 0.0022  Analysis Date = 02/27/2003 
 RPT Level = 0.0022  Analysis Date = 02/11/2003 
 RPT Level = 0.0022  Analysis Date = 02/11/2003 
 RPT Level = 0.0022  Analysis Date = 02/05/2003 
 RPT Level = 0.0022  Analysis Date = 02/05/2003 
 RPT Level = 0.0022  Analysis Date = 02/05/2003 
 RPT Level = 0.0022  Analysis Date = 02/05/2003 
 RPT Level = 0.0022  Analysis Date = 01/31/2003 
 RPT Level = 0.0022  Analysis Date = 01/31/2003 
 RPT Level = 0.0022  Analysis Date = 01/16/2003 
 RPT Level = 0.0022  Analysis Date = 01/16/2003 
 RPT Level = 0.0022  Analysis Date = 01/16/2003 
 RPT Level = 0.0022  Analysis Date = 01/16/2003 
 RPT Level = 0.0022  Analysis Date = 01/08/2003 
 RPT Level = 0.0022  Analysis Date = 01/08/2003 
 RPT Level = 0.0022  Analysis Date = 01/08/2003 
 RPT Level = 0.0022  Analysis Date = 01/08/2003 
 RPT Level = 0.0022  Analysis Date = 12/17/2002 
 RPT Level = 0.0022  Analysis Date = 12/17/2002 
 RPT Level = 0.0022  Analysis Date = 12/17/2002 
 RPT Level = 0.0022  Analysis Date = 12/17/2002 
 RPT Level = 0.0022  Analysis Date = 12/09/2002 
 RPT Level = 0.0022  Analysis Date = 12/09/2002 
 RPT Level = 0.0022  Analysis Date = 12/09/2002 
 RPT Level = 0.0022  Analysis Date = 12/09/2002 
 RPT Level = 0.0022  Analysis Date = 12/03/2002 
 RPT Level = 0.0022  Analysis Date = 12/03/2002 
 RPT Level = 0.0022  Analysis Date = 12/09/2002 
 RPT Level = 0.0022  Analysis Date = 12/09/2002 
 RPT Level = 0.0022  Analysis Date = 12/03/2002 
 RPT Level = 0.0022  Analysis Date = 12/03/2002 
 RPT Level = 0.0022  Analysis Date = 11/08/2002 
 RPT Level = 0.0022  Analysis Date = 11/08/2002 
 RPT Level = 0.0022  Analysis Date = 10/28/2002 
 RPT Level = 0.0022  Analysis Date = 10/28/2002 
 RPT Level = 0.0022  Analysis Date = 10/28/2002 
 RPT Level = 0.0022  Analysis Date = 10/28/2002 
 RPT Level = 0.0022  Analysis Date = 10/28/2002 
 RPT Level = 0.0022  Analysis Date = 10/28/2002 
 RPT Level = 0.0022  Analysis Date = 10/24/2002 
 RPT Level = 0.0022  Analysis Date = 10/24/2002 
 RPT Level = 0.0022  Analysis Date = 09/05/2002 
 RPT Level = 0.0022  Analysis Date = 09/05/2002 
 RPT Level = 0.0022  Analysis Date = 09/04/2002 
 RPT Level = 0.0022  Analysis Date = 09/04/2002 
 RPT Level = 0.0022  Analysis Date = 08/26/2002 
 RPT Level = 0.0022  Analysis Date = 08/26/2002 
 RPT Level = 0.0022  Analysis Date = 08/19/2002 
 RPT Level = 0.0022  Analysis Date = 08/19/2002 
 RPT Level = 0.0022  Analysis Date = 08/12/2002 
 RPT Level = 0.0022  Analysis Date = 08/12/2002 
 RPT Level = 0.0022  Analysis Date = 08/07/2002 
 RPT Level = 0.0022  Analysis Date = 08/07/2002 
 RPT Level = 0.0022  Analysis Date = 07/29/2002 
 RPT Level = 0.0022  Analysis Date = 07/29/2002 
 RPT Level = 0.0022  Analysis Date = 07/19/2002 
 RPT Level = 0.0022  Analysis Date = 07/19/2002 
 RPT Level = 0.0022  Analysis Date = 07/16/2002 
 RPT Level = 0.0022  Analysis Date = 07/16/2002 
 RPT Level = 0.0022  Analysis Date = 07/08/2002 
 RPT Level = 0.0022  Analysis Date = 07/08/2002 
 RPT Level = 0.0022  Analysis Date = 07/01/2002 
 RPT Level = 0.0022  Analysis Date = 07/01/2002 
 RPT Level = 0.0022  Analysis Date = 06/21/2002 
 RPT Level = 0.0022  Analysis Date = 06/21/2002 
 RPT Level = 0.0022  Analysis Date = 06/18/2002 
 RPT Level = 0.0022  Analysis Date = 06/18/2002 
 RPT Level = 0.0022  Analysis Date = 06/05/2002 
 RPT Level = 0.0022  Analysis Date = 06/05/2002 
 RPT Level = 0.0022  Analysis Date = 06/03/2002 
 RPT Level = 0.0022  Analysis Date = 06/03/2002 
 RPT Level = 0.0022  Analysis Date = 05/28/2002 
 RPT Level = 0.0022  Analysis Date = 05/28/2002 
 RPT Level = 0.0022  Analysis Date = 05/16/2002 
 RPT Level = 0.0022  Analysis Date = 05/16/2002 
 RPT Level = 0.0022  Analysis Date = 05/13/2002 
 RPT Level = 0.0022  Analysis Date = 05/13/2002 
 RPT Level = 0.0022  Analysis Date = 05/07/2002 
 RPT Level = 0.0022  Analysis Date = 05/07/2002 
 RPT Level = 0.0022  Analysis Date = 04/30/2002 
 RPT Level = 0.0022  Analysis Date = 04/30/2002 
 RPT Level = 0.0022  Analysis Date = 04/30/2002 
 RPT Level = 0.0022  Analysis Date = 04/30/2002 
 RPT Level = 0.0022  Analysis Date = 04/12/2002 
 RPT Level = 0.0022  Analysis Date = 04/12/2002 
 RPT Level = 0.0022  Analysis Date = 04/10/2002 
 RPT Level = 0.0022  Analysis Date = 04/10/2002 
 RPT Level = 0.0022  Analysis Date = 04/09/2002 
 RPT Level = 0.0022  Analysis Date = 04/09/2002 
 RPT Level = 0.0022  Analysis Date = 03/26/2002 
 RPT Level = 0.0022  Analysis Date = 03/26/2002 
 RPT Level = 0.0022  Analysis Date = 03/19/2002 
 RPT Level = 0.0022  Analysis Date = 03/19/2002 
 RPT Level = 0.0022  Analysis Date = 03/11/2002 
 RPT Level = 0.0022  Analysis Date = 03/11/2002 
 RPT Level = 0.0022  Analysis Date = 03/05/2002 
 RPT Level = 0.0022  Analysis Date = 03/05/2002 
 RPT Level = 0.0022  Analysis Date = 02/27/2002 
 RPT Level = 0.0022  Analysis Date = 02/27/2002 
 RPT Level = 0.0022  Analysis Date = 02/20/2002 
 RPT Level = 0.0022  Analysis Date = 02/20/2002 
 RPT Level = 0.0022  Analysis Date = 02/06/2002 
 RPT Level = 0.0022  Analysis Date = 02/06/2002 
 RPT Level = 0.0022  Analysis Date = 02/06/2002 
 RPT Level = 0.0022  Analysis Date = 02/06/2002 
 RPT Level = 0.0022  Analysis Date = 01/23/2002 
 RPT Level = 0.0022  Analysis Date = 01/23/2002 
 RPT Level = 0.0022  Analysis Date = 01/16/2002 
 RPT Level = 0.0022  Analysis Date = 01/16/2002 
 RPT Level = 0.0022  Analysis Date = 01/04/2002 
 RPT Level = 0.0022  Analysis Date = 01/04/2002 
 RPT Level = 0.0022  Analysis Date = 01/04/2002 
 RPT Level = 0.0022  Analysis Date = 01/04/2002 
 RPT Level = 0.0022  Analysis Date = 12/19/2001 
 RPT Level = 0.0022  Analysis Date = 12/19/2001 
 RPT Level = 0.0022  Analysis Date = 12/17/2001 
 RPT Level = 0.0022  Analysis Date = 12/17/2001 
 RPT Level = 0.0022  Analysis Date = 12/06/2001 
 RPT Level = 0.0022  Analysis Date = 12/06/2001 
 RPT Level = 0.0022  Analysis Date = 11/08/2001 
 RPT Level = 0.0022  Y = 0
The SGPlot Procedure

False Positive Rate for Phosphorus (as P), FIL, CFA, ACD-P, LL

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Phosphorus (as P), FIL, CFA, ACD-P, LL 00666CL020 2002 40 1 3%
    2003 52 3 6%
    2004 51 3 6%
    2005 50 3 6%
    2006 15 0 0%
    2007 50 1 2%
    2008 50 0 0%
    2009 52 0 0%
    2010 52 0 0%
    2011 52 3 6%
    2012 52 0 0%
    2013 53 2 4%
    2014 47 2 4%
    2015 52 1 2%
    2016 50 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Phosphorus (as P), FIL, CFA, ALK-P -
Blind Blank Results
Lab: NWQL, PCode: 00666, MCode: CL063
Analysis dates: 06/10/04 through 09/22/16
Open Data Set

 Analysis Date = 01/04/2013 
 Lab Value = -0.099 
 RPT Level = 0.01 
 Lab Sample ID = 20123390114  Analysis Date = 01/04/2013 
 Lab Value = -0.099 
 RPT Level = 0.01 
 Lab Sample ID = 20123390114  Analysis Date = 09/22/2016 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20162640178  Analysis Date = 09/19/2016 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20162580021  Analysis Date = 09/14/2016 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20162520021  Analysis Date = 09/06/2016 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20162440129  Analysis Date = 08/26/2016 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20162360202  Analysis Date = 08/24/2016 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20162290136  Analysis Date = 08/18/2016 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20162230012  Analysis Date = 08/09/2016 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20162150194  Analysis Date = 08/03/2016 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20162080237  Analysis Date = 07/28/2016 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20162010261  Analysis Date = 07/18/2016 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20161940115  Analysis Date = 07/07/2016 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20161870038  Analysis Date = 07/01/2016 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20161800089  Analysis Date = 06/27/2016 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20161740080  Analysis Date = 06/15/2016 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20161660157  Analysis Date = 06/08/2016 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20161590161  Analysis Date = 06/02/2016 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20161520029  Analysis Date = 06/01/2016 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20161480203  Analysis Date = 05/10/2016 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20161270015  Analysis Date = 05/04/2016 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20161230047  Analysis Date = 04/28/2016 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20161160095  Analysis Date = 04/20/2016 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20161100131  Analysis Date = 04/15/2016 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20161020031  Analysis Date = 04/06/2016 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20160950050  Analysis Date = 03/30/2016 
 Lab Value = 0.013 
 RPT Level = 0.01 
 Lab Sample ID = 20160880041  Analysis Date = 03/25/2016 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20160810071  Analysis Date = 03/16/2016 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20160740016  Analysis Date = 03/09/2016 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20160670017  Analysis Date = 03/02/2016 
 Lab Value = 0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20160600020  Analysis Date = 02/26/2016 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20160530019  Analysis Date = 02/18/2016 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20160470018  Analysis Date = 02/12/2016 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20160400086  Analysis Date = 02/05/2016 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20160320014  Analysis Date = 01/26/2016 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20160250029  Analysis Date = 01/25/2016 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20160190020  Analysis Date = 01/12/2016 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20160110012  Analysis Date = 01/11/2016 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20160050037  Analysis Date = 01/05/2016 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20153630051  Analysis Date = 12/24/2015 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20153550014  Analysis Date = 12/17/2015 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20153500167  Analysis Date = 12/11/2015 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20153420008  Analysis Date = 12/02/2015 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20153340010  Analysis Date = 11/25/2015 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20153270005  Analysis Date = 11/18/2015 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20153200028  Analysis Date = 11/16/2015 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20153140001  Analysis Date = 11/10/2015 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20153060024  Analysis Date = 11/02/2015 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20152990071  Analysis Date = 10/22/2015 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20152920041  Analysis Date = 10/26/2015 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20152860162  Analysis Date = 10/09/2015 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20152780015  Analysis Date = 09/30/2015 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20152710074  Analysis Date = 09/30/2015 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20152640031  Analysis Date = 09/22/2015 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20152590168  Analysis Date = 09/17/2015 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20152510015  Analysis Date = 09/09/2015 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20152430087  Analysis Date = 09/02/2015 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20152360161  Analysis Date = 08/28/2015 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20152330023  Analysis Date = 08/26/2015 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20152230123  Analysis Date = 08/11/2015 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20152150081  Analysis Date = 08/03/2015 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20152080071  Analysis Date = 07/24/2015 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20152010054  Analysis Date = 07/16/2015 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20151940026  Analysis Date = 07/14/2015 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20151870013  Analysis Date = 07/08/2015 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20151800056  Analysis Date = 06/23/2015 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20151730017  Analysis Date = 06/18/2015 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20151660033  Analysis Date = 06/16/2015 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20151620206  Analysis Date = 06/05/2015 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20151530197  Analysis Date = 06/01/2015 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20151460122  Analysis Date = 05/21/2015 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20151390199  Analysis Date = 05/18/2015 
 Lab Value = -0.014 
 RPT Level = 0.01 
 Lab Sample ID = 20151310072  Analysis Date = 05/08/2015 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20151240056  Analysis Date = 05/05/2015 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20151180075  Analysis Date = 04/29/2015 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20151140034  Analysis Date = 04/22/2015 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20151050043  Analysis Date = 04/13/2015 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20150970077  Analysis Date = 04/13/2015 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20150900047  Analysis Date = 03/31/2015 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20150850046  Analysis Date = 03/27/2015 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20150770030  Analysis Date = 03/31/2015 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20150690110  Analysis Date = 03/11/2015 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20150610108  Analysis Date = 03/06/2015 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20150540035  Analysis Date = 03/02/2015 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20150490026  Analysis Date = 02/24/2015 
 Lab Value = 0.012 
 RPT Level = 0.01 
 Lab Sample ID = 20150400036  Analysis Date = 04/01/2015 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20150330028  Analysis Date = 02/10/2015 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20150260018  Analysis Date = 02/11/2015 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20150200028  Analysis Date = 01/21/2015 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20150120025  Analysis Date = 01/15/2015 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20150050018  Analysis Date = 01/22/2015 
 Lab Value = -0.027 
 RPT Level = 0.01 
 Lab Sample ID = 20143630011  Analysis Date = 01/22/2015 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20143560053  Analysis Date = 12/31/2014 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20143490027  Analysis Date = 12/31/2014 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20143420027  Analysis Date = 12/18/2014 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20143360081  Analysis Date = 12/12/2014 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20143300045  Analysis Date = 12/05/2014 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20143230052  Analysis Date = 11/25/2014 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20143160021  Analysis Date = 11/13/2014 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20143080076  Analysis Date = 11/04/2014 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20143010069  Analysis Date = 11/04/2014 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20142950130  Analysis Date = 10/24/2014 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20142880087  Analysis Date = 10/17/2014 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20142790035  Analysis Date = 10/08/2014 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20142720121  Analysis Date = 10/07/2014 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20142650111  Analysis Date = 10/02/2014 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20142590052  Analysis Date = 09/19/2014 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20142520006  Analysis Date = 09/12/2014 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20142470054  Analysis Date = 08/22/2014 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20142230083  Analysis Date = 08/20/2014 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20142160070  Analysis Date = 08/15/2014 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20142090218  Analysis Date = 08/06/2014 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20142030078  Analysis Date = 08/06/2014 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20141960043  Analysis Date = 07/16/2014 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20141890090  Analysis Date = 07/10/2014 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20141820108  Analysis Date = 07/10/2014 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20141750150  Analysis Date = 07/09/2014 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20141680086  Analysis Date = 07/08/2014 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20141620051  Analysis Date = 06/27/2014 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20141550065  Analysis Date = 06/18/2014 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20141470150  Analysis Date = 06/06/2014 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20141400016  Analysis Date = 06/10/2014 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20141340004  Analysis Date = 05/16/2014 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20141250088  Analysis Date = 05/16/2014 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20141190018  Analysis Date = 05/07/2014 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20141130029  Analysis Date = 04/18/2014 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20141050011  Analysis Date = 04/17/2014 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20140970031  Analysis Date = 04/11/2014 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20140900029  Analysis Date = 04/01/2014 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20140840094  Analysis Date = 03/25/2014 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20140760030  Analysis Date = 03/21/2014 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20140690028  Analysis Date = 03/21/2014 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20140630125  Analysis Date = 03/04/2014 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20140550053  Analysis Date = 03/04/2014 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20140490016  Analysis Date = 02/13/2014 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20140410010  Analysis Date = 02/18/2014 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20140340025  Analysis Date = 02/10/2014 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20140270198  Analysis Date = 02/10/2014 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20140210048  Analysis Date = 02/07/2014 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20140130052  Analysis Date = 02/07/2014 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20140070068  Analysis Date = 01/09/2014 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20133580057  Analysis Date = 01/03/2014 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20133500079  Analysis Date = 12/12/2013 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20133430112  Analysis Date = 12/05/2013 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20133360023  Analysis Date = 12/05/2013 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20133300014  Analysis Date = 11/26/2013 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20133230005  Analysis Date = 12/06/2013 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20133170106  Analysis Date = 11/15/2013 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20133090099  Analysis Date = 11/06/2013 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20133030024  Analysis Date = 11/01/2013 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20132970026  Analysis Date = 10/28/2013 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20132730139  Analysis Date = 10/29/2013 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20132660105  Analysis Date = 10/24/2013 
 Lab Value = -0.012 
 RPT Level = 0.01 
 Lab Sample ID = 20132600014  Analysis Date = 09/24/2013 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20132530114  Analysis Date = 09/05/2013 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20132410016  Analysis Date = 09/05/2013 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20132390009  Analysis Date = 09/04/2013 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20132350026  Analysis Date = 09/03/2013 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20132270020  Analysis Date = 08/21/2013 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20132180211  Analysis Date = 08/27/2013 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20132120021  Analysis Date = 08/21/2013 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20132040023  Analysis Date = 07/24/2013 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20131970026  Analysis Date = 07/16/2013 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20131900089  Analysis Date = 07/16/2013 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20131830080  Analysis Date = 07/10/2013 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20131770012  Analysis Date = 06/28/2013 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20131700039  Analysis Date = 06/26/2013 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20131640007  Analysis Date = 06/19/2013 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20131550030  Analysis Date = 06/11/2013 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20131500023  Analysis Date = 06/11/2013 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20131430201  Analysis Date = 05/28/2013 
 Lab Value = 0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20131350119  Analysis Date = 05/28/2013 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20131270023  Analysis Date = 05/13/2013 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20131220013  Analysis Date = 05/07/2013 
 Lab Value = -0.037 
 RPT Level = 0.01 
 Lab Sample ID = 20131150033  Analysis Date = 05/13/2013 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20131120124  Analysis Date = 05/03/2013 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20131090031  Analysis Date = 04/24/2013 
 Lab Value = -0.012 
 RPT Level = 0.01 
 Lab Sample ID = 20130930088  Analysis Date = 04/08/2013 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20130840059  Analysis Date = 04/08/2013 
 Lab Value = -0.016 
 RPT Level = 0.01 
 Lab Sample ID = 20130770159  Analysis Date = 03/18/2013 
 Lab Value = -0.025 
 RPT Level = 0.01 
 Lab Sample ID = 20130700012  Analysis Date = 03/07/2013 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20130630123  Analysis Date = 03/07/2013 
 Lab Value = -0.012 
 RPT Level = 0.01 
 Lab Sample ID = 20130570008  Analysis Date = 03/07/2013 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20130520007  Analysis Date = 02/28/2013 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20130420053  Analysis Date = 02/22/2013 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20130350030  Analysis Date = 02/07/2013 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20130280040  Analysis Date = 02/07/2013 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20130230100  Analysis Date = 01/29/2013 
 Lab Value = -0.03 
 RPT Level = 0.01 
 Lab Sample ID = 20130140072  Analysis Date = 01/18/2013 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20130070057  Analysis Date = 01/18/2013 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20130020011  Analysis Date = 01/18/2013 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20123620012  Analysis Date = 01/14/2013 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20123530085  Analysis Date = 01/08/2013 
 Lab Value = -0.015 
 RPT Level = 0.01 
 Lab Sample ID = 20123480060  Analysis Date = 01/04/2013 
 Lab Value = -0.061 
 RPT Level = 0.01 
 Lab Sample ID = 20123330011  Analysis Date = 12/12/2012 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20123250064  Analysis Date = 12/12/2012 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20123200055  Analysis Date = 11/29/2012 
 Lab Value = -0.063 
 RPT Level = 0.01 
 Lab Sample ID = 20123120067  Analysis Date = 11/13/2012 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20123040118  Analysis Date = 11/05/2012 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20122980125  Analysis Date = 10/25/2012 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20122900095  Analysis Date = 10/19/2012 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20122830035  Analysis Date = 10/12/2012 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20122750026  Analysis Date = 10/11/2012 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20122700109  Analysis Date = 10/11/2012 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20122690152  Analysis Date = 09/25/2012 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20122550014  Analysis Date = 09/21/2012 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20122490101  Analysis Date = 09/21/2012 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20122410012  Analysis Date = 09/25/2012 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20122350176  Analysis Date = 08/30/2012 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20122280091  Analysis Date = 08/15/2012 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20122190097  Analysis Date = 08/10/2012 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20122140053  Analysis Date = 08/09/2012 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20122050102  Analysis Date = 08/01/2012 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20121990078  Analysis Date = 07/31/2012 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20121910040  Analysis Date = 07/31/2012 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20121870019  Analysis Date = 07/18/2012 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20121780034  Analysis Date = 07/16/2012 
 Lab Value = 0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20121710007  Analysis Date = 06/25/2012 
 Lab Value = 0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20121650053  Analysis Date = 06/21/2012 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20121560124  Analysis Date = 06/19/2012 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20121510025  Analysis Date = 06/01/2012 
 Lab Value = -0.041 
 RPT Level = 0.01 
 Lab Sample ID = 20121430022  Analysis Date = 05/31/2012 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20121370052  Analysis Date = 05/22/2012 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20121290073  Analysis Date = 05/17/2012 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20121210122  Analysis Date = 05/02/2012 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20121150088  Analysis Date = 04/25/2012 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20121080010  Analysis Date = 04/20/2012 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20121010027  Analysis Date = 04/17/2012 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20120930055  Analysis Date = 04/03/2012 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20120870033  Analysis Date = 03/23/2012 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20120790084  Analysis Date = 03/28/2012 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20120730078  Analysis Date = 04/25/2012 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20120660074  Analysis Date = 03/16/2012 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20120580060  Analysis Date = 03/16/2012 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20120530100  Analysis Date = 03/09/2012 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20120450019  Analysis Date = 02/23/2012 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20120370063  Analysis Date = 02/10/2012 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20120310011  Analysis Date = 01/26/2012 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20120230047  Analysis Date = 01/26/2012 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20120180012  Analysis Date = 01/12/2012 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20120090051  Analysis Date = 01/12/2012 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20120030027  Analysis Date = 01/04/2012 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20113610088  Analysis Date = 12/28/2011 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20113530138  Analysis Date = 12/28/2011 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20113490074  Analysis Date = 12/28/2011 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20113460138  Analysis Date = 12/05/2011 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20113320114  Analysis Date = 12/05/2011 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20113250125  Analysis Date = 11/30/2011 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20113180163  Analysis Date = 11/30/2011 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20113110061  Analysis Date = 11/21/2011 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20113050093  Analysis Date = 11/01/2011 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20112970117  Analysis Date = 10/25/2011 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20112910136  Analysis Date = 10/19/2011 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20112840072  Analysis Date = 10/13/2011 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20112760062  Analysis Date = 10/05/2011 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20112690122  Analysis Date = 09/27/2011 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20112630060  Analysis Date = 09/19/2011 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20112560022  Analysis Date = 09/19/2011 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20112510035  Analysis Date = 09/19/2011 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20112500187  Analysis Date = 08/31/2011 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20112360062  Analysis Date = 08/31/2011 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20112300037  Analysis Date = 08/16/2011 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20112200050  Analysis Date = 08/16/2011 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20112130155  Analysis Date = 08/03/2011 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20112060093  Analysis Date = 07/28/2011 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20112010021  Analysis Date = 07/22/2011 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20111920101  Analysis Date = 07/15/2011 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20111860061  Analysis Date = 07/06/2011 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20111780163  Analysis Date = 06/24/2011 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20111710110  Analysis Date = 06/17/2011 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20111640065  Analysis Date = 06/13/2011 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20111570060  Analysis Date = 06/06/2011 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20111510148  Analysis Date = 05/31/2011 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20111430201  Analysis Date = 05/18/2011 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20111360139  Analysis Date = 05/12/2011 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20111290045  Analysis Date = 05/12/2011 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20111220084  Analysis Date = 04/29/2011 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20111150112  Analysis Date = 04/22/2011 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20111080074  Analysis Date = 04/13/2011 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20111010119  Analysis Date = 04/08/2011 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20110950055  Analysis Date = 04/07/2011 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20110870091  Analysis Date = 03/29/2011 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20110800058  Analysis Date = 03/23/2011 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20110750069  Analysis Date = 03/11/2011 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20110660030  Analysis Date = 03/18/2011 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20110590069  Analysis Date = 03/09/2011 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20110530104  Analysis Date = 02/17/2011 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20110450035  Analysis Date = 02/17/2011 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20110410097  Analysis Date = 02/11/2011 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20110400068  Analysis Date = 01/28/2011 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20110240064  Analysis Date = 01/26/2011 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20110180058  Analysis Date = 01/26/2011 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20110110017  Analysis Date = 01/14/2011 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20110030022  Analysis Date = 01/14/2011 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20103610055  Analysis Date = 01/14/2011 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20103540045  Analysis Date = 12/21/2010 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20103470075  Analysis Date = 12/17/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20103400083  Analysis Date = 12/09/2010 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20103330098  Analysis Date = 12/02/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20103260066  Analysis Date = 11/23/2010 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20103190067  Analysis Date = 11/23/2010 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20103120027  Analysis Date = 11/10/2010 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20103060009  Analysis Date = 11/03/2010 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20102990005  Analysis Date = 10/28/2010 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20102920007  Analysis Date = 10/19/2010 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20102850131  Analysis Date = 10/14/2010 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20102770103  Analysis Date = 10/14/2010 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20102700153  Analysis Date = 09/30/2010 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20102640135  Analysis Date = 09/23/2010 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20102570022  Analysis Date = 09/16/2010 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20102510060  Analysis Date = 09/10/2010 
 Lab Value = -0.019 
 RPT Level = 0.01 
 Lab Sample ID = 20102430251  Analysis Date = 09/02/2010 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20102350198  Analysis Date = 08/19/2010 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20102290051  Analysis Date = 08/18/2010 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20102230039  Analysis Date = 08/12/2010 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20102140089  Analysis Date = 08/04/2010 
 Lab Value = -0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20102080018  Analysis Date = 07/27/2010 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20102000187  Analysis Date = 07/20/2010 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20101930105  Analysis Date = 07/13/2010 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20101870061  Analysis Date = 07/07/2010 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20101790122  Analysis Date = 07/08/2010 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20101730069  Analysis Date = 06/23/2010 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20101660063  Analysis Date = 06/18/2010 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20101590013  Analysis Date = 06/18/2010 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20101530121  Analysis Date = 06/08/2010 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20101450016  Analysis Date = 06/02/2010 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20101380022  Analysis Date = 05/20/2010 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20101310096  Analysis Date = 05/13/2010 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20101240078  Analysis Date = 05/04/2010 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20101180040  Analysis Date = 04/29/2010 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20101090060  Analysis Date = 04/20/2010 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20101020074  Analysis Date = 04/14/2010 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20100950035  Analysis Date = 04/02/2010 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20100880050  Analysis Date = 04/02/2010 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20100850063  Analysis Date = 03/26/2010 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20100750001  Analysis Date = 03/16/2010 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20100680015  Analysis Date = 03/05/2010 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20100600068  Analysis Date = 02/24/2010 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20100530047  Analysis Date = 02/24/2010 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20100470026  Analysis Date = 02/11/2010 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20100390037  Analysis Date = 02/11/2010 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20100320021  Analysis Date = 02/05/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20100260064  Analysis Date = 01/28/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20100190104  Analysis Date = 01/28/2010 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20100110097  Analysis Date = 01/28/2010 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20100050015  Analysis Date = 01/28/2010 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20093620045  Analysis Date = 01/28/2010 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20093560035  Analysis Date = 12/23/2009 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20093480065  Analysis Date = 12/10/2009 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20093420008  Analysis Date = 12/10/2009 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20093350069  Analysis Date = 12/10/2009 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20093280016  Analysis Date = 11/25/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20093200089  Analysis Date = 11/19/2009 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20093130060  Analysis Date = 11/10/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20093070203  Analysis Date = 11/10/2009 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20093000108  Analysis Date = 11/04/2009 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20092920099  Analysis Date = 11/04/2009 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20092870072  Analysis Date = 11/02/2009 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20092780069  Analysis Date = 10/20/2009 
 Lab Value = 0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20092720021  Analysis Date = 10/16/2009 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20092640045  Analysis Date = 10/06/2009 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20092570047  Analysis Date = 10/06/2009 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20092520131  Analysis Date = 09/24/2009 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20092430157  Analysis Date = 09/17/2009 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20092360172  Analysis Date = 09/10/2009 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20092290213  Analysis Date = 09/03/2009 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20092220153  Analysis Date = 08/26/2009 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20092150075  Analysis Date = 08/18/2009 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20092090265  Analysis Date = 08/11/2009 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20092010113  Analysis Date = 07/24/2009 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20091950024  Analysis Date = 07/24/2009 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20091870028  Analysis Date = 07/15/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20091800171  Analysis Date = 07/08/2009 
 Lab Value = 0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20091730221  Analysis Date = 06/24/2009 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20091660209  Analysis Date = 06/22/2009 
 Lab Value = -0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20091590089  Analysis Date = 06/11/2009 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20091520153  Analysis Date = 06/04/2009 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20091460191  Analysis Date = 05/29/2009 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20091380124  Analysis Date = 05/22/2009 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20091320021  Analysis Date = 05/22/2009 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20091240122  Analysis Date = 05/07/2009 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20091170108  Analysis Date = 05/01/2009 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20091110107  Analysis Date = 05/07/2009 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20091030084  Analysis Date = 04/14/2009 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20090960052  Analysis Date = 04/14/2009 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20090890067  Analysis Date = 04/01/2009 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20090820026  Analysis Date = 03/20/2009 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20090750045  Analysis Date = 03/20/2009 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20090680047  Analysis Date = 03/10/2009 
 Lab Value = -0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20090610058  Analysis Date = 03/03/2009 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20090540031  Analysis Date = 02/23/2009 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20090480056  Analysis Date = 02/18/2009 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20090400029  Analysis Date = 02/23/2009 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20090330036  Analysis Date = 02/04/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20090260025  Analysis Date = 02/04/2009 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20090200033  Analysis Date = 01/26/2009 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20090120047  Analysis Date = 01/15/2009 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20090050018  Analysis Date = 01/13/2009 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20083650082  Analysis Date = 01/13/2009 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20083570035  Analysis Date = 12/31/2008 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20083520228  Analysis Date = 12/15/2008 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20083450059  Analysis Date = 12/08/2008 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20083360038  Analysis Date = 12/08/2008 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20083290063  Analysis Date = 12/01/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20083220066  Analysis Date = 11/24/2008 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20083150064  Analysis Date = 11/20/2008 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20083080098  Analysis Date = 11/12/2008 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20083010106  Analysis Date = 10/23/2008 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20082940060  Analysis Date = 10/21/2008 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20082880038  Analysis Date = 10/08/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20082800045  Analysis Date = 10/08/2008 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20082730059  Analysis Date = 10/02/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20082660045  Analysis Date = 09/29/2008 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20082590107  Analysis Date = 09/24/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20082520009  Analysis Date = 09/10/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20082460099  Analysis Date = 09/05/2008 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20082380078  Analysis Date = 08/28/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20082310132  Analysis Date = 08/19/2008 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20082250012  Analysis Date = 08/18/2008 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20082190010  Analysis Date = 07/25/2008 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20082030128  Analysis Date = 07/21/2008 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20081970138  Analysis Date = 07/14/2008 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20081890042  Analysis Date = 07/14/2008 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20081820062  Analysis Date = 06/27/2008 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20081750126  Analysis Date = 06/25/2008 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20081680068  Analysis Date = 06/27/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20081620016  Analysis Date = 06/11/2008 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20081540110  Analysis Date = 06/10/2008 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20081480070  Analysis Date = 06/02/2008 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20081400059  Analysis Date = 05/30/2008 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20081330114  Analysis Date = 05/19/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20081260069  Analysis Date = 05/07/2008 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20081190056  Analysis Date = 04/24/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20081120035  Analysis Date = 04/21/2008 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20081050115  Analysis Date = 04/15/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20080980082  Analysis Date = 04/15/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20080920084  Analysis Date = 03/27/2008 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20080840065  Analysis Date = 03/19/2008 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20080770123  Analysis Date = 03/13/2008 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20080700073  Analysis Date = 03/07/2008 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20080630068  Analysis Date = 03/07/2008 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20080560071  Analysis Date = 03/10/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20080510054  Analysis Date = 03/10/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20080420073  Analysis Date = 02/28/2008 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20080360050  Analysis Date = 02/20/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20080280049  Analysis Date = 01/29/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20080230019  Analysis Date = 01/17/2008 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20080140026  Analysis Date = 01/11/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20080070021  Analysis Date = 01/09/2008 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20073620003  Analysis Date = 01/02/2008 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20073510100  Analysis Date = 12/17/2007 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20073440026  Analysis Date = 12/06/2007 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20073370067  Analysis Date = 11/28/2007 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20073300043  Analysis Date = 11/28/2007 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20073230112  Analysis Date = 11/19/2007 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20073170061  Analysis Date = 11/14/2007 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20073100010  Analysis Date = 11/14/2007 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20073020059  Analysis Date = 11/05/2007 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20072960178  Analysis Date = 10/25/2007 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20072890057  Analysis Date = 10/19/2007 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20072850024  Analysis Date = 10/03/2007 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20072670055  Analysis Date = 09/24/2007 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20072600128  Analysis Date = 09/17/2007 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20072540014  Analysis Date = 09/07/2007 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20072480016  Analysis Date = 09/06/2007 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20072400019  Analysis Date = 08/29/2007 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20072330110  Analysis Date = 08/21/2007 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20072260199  Analysis Date = 08/21/2007 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20072210251  Analysis Date = 08/07/2007 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20072110163  Analysis Date = 08/06/2007 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20072040100  Analysis Date = 07/17/2007 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20071900106  Analysis Date = 07/06/2007 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20071830157  Analysis Date = 07/02/2007 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20071770202  Analysis Date = 06/21/2007 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20071690115  Analysis Date = 06/19/2007 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20071620049  Analysis Date = 06/08/2007 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20071560023  Analysis Date = 06/05/2007 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20071500032  Analysis Date = 05/24/2007 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20071410090  Analysis Date = 05/16/2007 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20071340114  Analysis Date = 05/14/2007 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20071280017  Analysis Date = 05/07/2007 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20071200085  Analysis Date = 04/27/2007 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20071130123  Analysis Date = 04/19/2007 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20071070019  Analysis Date = 04/16/2007 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20070990049  Analysis Date = 04/10/2007 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20070930069  Analysis Date = 03/30/2007 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20070860216  Analysis Date = 03/21/2007 
 Lab Value = -0.013 
 RPT Level = 0.01 
 Lab Sample ID = 20070780127  Analysis Date = 03/16/2007 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20070710074  Analysis Date = 03/08/2007 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20070650012  Analysis Date = 03/05/2007 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20070580140  Analysis Date = 02/28/2007 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20070540026  Analysis Date = 02/16/2007 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20070460018  Analysis Date = 02/16/2007 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20070400104  Analysis Date = 01/30/2007 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20070250021  Analysis Date = 01/25/2007 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20070180073  Analysis Date = 01/25/2007 
 Lab Value = -0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20070120011  Analysis Date = 10/12/2006 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20062620014  Analysis Date = 10/10/2006 
 Lab Value = -0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20062540015  Analysis Date = 10/10/2006 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20062500007  Analysis Date = 10/02/2006 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20062350181  Analysis Date = 08/25/2006 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20062270274  Analysis Date = 08/15/2006 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20062220040  Analysis Date = 08/01/2006 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20062020318  Analysis Date = 07/27/2006 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20061950008  Analysis Date = 07/14/2006 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20061880010  Analysis Date = 07/06/2006 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20061730015  Analysis Date = 07/05/2006 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20061670022  Analysis Date = 06/29/2006 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20061580019  Analysis Date = 06/01/2006 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20061370015  Analysis Date = 05/15/2006 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20061280112  Analysis Date = 05/08/2006 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20061220100  Analysis Date = 09/26/2005 
 Lab Value = -0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20052590036  Analysis Date = 09/23/2005 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20052520007  Analysis Date = 09/02/2005 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20052430005  Analysis Date = 08/29/2005 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20052370001  Analysis Date = 08/25/2005 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20052300008  Analysis Date = 08/12/2005 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20052210011  Analysis Date = 08/11/2005 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20052160008  Analysis Date = 08/11/2005 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20052160006  Analysis Date = 07/29/2005 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20052010006  Analysis Date = 07/15/2005 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20051940016  Analysis Date = 07/15/2005 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20051880017  Analysis Date = 07/05/2005 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20051800188  Analysis Date = 06/30/2005 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20051740018  Analysis Date = 06/17/2005 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20051660175  Analysis Date = 06/15/2005 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20051590026  Analysis Date = 06/06/2005 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20051530020  Analysis Date = 05/27/2005 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20051440044  Analysis Date = 05/23/2005 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20051380015  Analysis Date = 05/20/2005 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20051320028  Analysis Date = 05/11/2005 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20051250004  Analysis Date = 05/10/2005 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20051170011  Analysis Date = 04/29/2005 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20051110005  Analysis Date = 04/28/2005 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20051020017  Analysis Date = 04/12/2005 
 Lab Value = -0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20050950045  Analysis Date = 04/05/2005 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20050880117  Analysis Date = 03/30/2005 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20050840097  Analysis Date = 03/21/2005 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20050750005  Analysis Date = 03/15/2005 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20050700006  Analysis Date = 03/15/2005 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20050700005  Analysis Date = 03/14/2005 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20050670011  Analysis Date = 03/08/2005 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20050550023  Analysis Date = 02/24/2005 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20050480006  Analysis Date = 02/16/2005 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20050410008  Analysis Date = 02/14/2005 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20050340022  Analysis Date = 01/27/2005 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20050260023  Analysis Date = 01/26/2005 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20050200049  Analysis Date = 01/20/2005 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20050130092  Analysis Date = 01/11/2005 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20050070015  Analysis Date = 01/07/2005 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20043650003  Analysis Date = 01/07/2005 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20043580036  Analysis Date = 01/07/2005 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20043580034  Analysis Date = 12/22/2004 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20043520024  Analysis Date = 12/22/2004 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20043510017  Analysis Date = 12/15/2004 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20043450068  Analysis Date = 12/15/2004 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20043440148  Analysis Date = 12/15/2004 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20043380004  Analysis Date = 12/15/2004 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20043380003  Analysis Date = 12/01/2004 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20043310058  Analysis Date = 12/01/2004 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20043280049  Analysis Date = 11/26/2004 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20043240013  Analysis Date = 09/08/2004 
 Lab Value = -0.006 
 RPT Level =  
 Lab Sample ID = 20042450137  Analysis Date = 09/01/2004 
 Lab Value = -0.005 
 RPT Level =  
 Lab Sample ID = 20042400090  Analysis Date = 09/01/2004 
 Lab Value = -0.001 
 RPT Level =  
 Lab Sample ID = 20042370106  Analysis Date = 08/25/2004 
 Lab Value = 0.007 
 RPT Level =  
 Lab Sample ID = 20042330207  Analysis Date = 08/25/2004 
 Lab Value = 0 
 RPT Level =  
 Lab Sample ID = 20042320135  Analysis Date = 08/25/2004 
 Lab Value = 0.006 
 RPT Level =  
 Lab Sample ID = 20042320137  Analysis Date = 08/18/2004 
 Lab Value = 0.009 
 RPT Level =  
 Lab Sample ID = 20042240113  Analysis Date = 08/10/2004 
 Lab Value = 0.005 
 RPT Level =  
 Lab Sample ID = 20042170122  Analysis Date = 08/04/2004 
 Lab Value = -0.002 
 RPT Level =  
 Lab Sample ID = 20042110014  Analysis Date = 07/27/2004 
 Lab Value = -0.009 
 RPT Level =  
 Lab Sample ID = 20042040077  Analysis Date = 07/19/2004 
 Lab Value = 0.005 
 RPT Level =  
 Lab Sample ID = 20041960049  Analysis Date = 07/15/2004 
 Lab Value = -0.008 
 RPT Level =  
 Lab Sample ID = 20041900061  Analysis Date = 07/14/2004 
 Lab Value = -0.001 
 RPT Level =  
 Lab Sample ID = 20041820034  Analysis Date = 07/06/2004 
 Lab Value = -0.002 
 RPT Level =  
 Lab Sample ID = 20041750056  Analysis Date = 07/01/2004 
 Lab Value = -0.014 
 RPT Level =  
 Lab Sample ID = 20041700082  Analysis Date = 06/21/2004 
 Lab Value = -0.005 
 RPT Level =  
 Lab Sample ID = 20041610056  Analysis Date = 06/10/2004 
 Lab Value = -0.001 
 RPT Level =  
 Lab Sample ID = 20041550020  Analysis Date = 09/22/2016 
 RPT Level = 0.01  Analysis Date = 09/19/2016 
 RPT Level = 0.01  Analysis Date = 09/19/2016 
 RPT Level = 0.01  Analysis Date = 09/14/2016 
 RPT Level = 0.01  Analysis Date = 09/14/2016 
 RPT Level = 0.01  Analysis Date = 09/06/2016 
 RPT Level = 0.01  Analysis Date = 09/06/2016 
 RPT Level = 0.01  Analysis Date = 08/26/2016 
 RPT Level = 0.01  Analysis Date = 08/26/2016 
 RPT Level = 0.01  Analysis Date = 08/24/2016 
 RPT Level = 0.01  Analysis Date = 08/24/2016 
 RPT Level = 0.01  Analysis Date = 08/18/2016 
 RPT Level = 0.01  Analysis Date = 08/18/2016 
 RPT Level = 0.01  Analysis Date = 08/09/2016 
 RPT Level = 0.01  Analysis Date = 08/09/2016 
 RPT Level = 0.01  Analysis Date = 08/03/2016 
 RPT Level = 0.01  Analysis Date = 08/03/2016 
 RPT Level = 0.01  Analysis Date = 07/28/2016 
 RPT Level = 0.01  Analysis Date = 07/28/2016 
 RPT Level = 0.01  Analysis Date = 07/18/2016 
 RPT Level = 0.01  Analysis Date = 07/18/2016 
 RPT Level = 0.01  Analysis Date = 07/07/2016 
 RPT Level = 0.01  Analysis Date = 07/07/2016 
 RPT Level = 0.01  Analysis Date = 07/01/2016 
 RPT Level = 0.01  Analysis Date = 07/01/2016 
 RPT Level = 0.01  Analysis Date = 06/27/2016 
 RPT Level = 0.01  Analysis Date = 06/27/2016 
 RPT Level = 0.01  Analysis Date = 06/15/2016 
 RPT Level = 0.01  Analysis Date = 06/15/2016 
 RPT Level = 0.01  Analysis Date = 06/08/2016 
 RPT Level = 0.01  Analysis Date = 06/08/2016 
 RPT Level = 0.01  Analysis Date = 06/02/2016 
 RPT Level = 0.01  Analysis Date = 06/02/2016 
 RPT Level = 0.01  Analysis Date = 06/01/2016 
 RPT Level = 0.01  Analysis Date = 06/01/2016 
 RPT Level = 0.01  Analysis Date = 05/10/2016 
 RPT Level = 0.01  Analysis Date = 05/10/2016 
 RPT Level = 0.01  Analysis Date = 05/04/2016 
 RPT Level = 0.01  Analysis Date = 05/04/2016 
 RPT Level = 0.01  Analysis Date = 04/28/2016 
 RPT Level = 0.01  Analysis Date = 04/28/2016 
 RPT Level = 0.01  Analysis Date = 04/20/2016 
 RPT Level = 0.01  Analysis Date = 04/20/2016 
 RPT Level = 0.01  Analysis Date = 04/15/2016 
 RPT Level = 0.01  Analysis Date = 04/15/2016 
 RPT Level = 0.01  Analysis Date = 04/06/2016 
 RPT Level = 0.01  Analysis Date = 04/06/2016 
 RPT Level = 0.01  Analysis Date = 03/30/2016 
 RPT Level = 0.01  Analysis Date = 03/30/2016 
 RPT Level = 0.01  Analysis Date = 03/25/2016 
 RPT Level = 0.01  Analysis Date = 03/25/2016 
 RPT Level = 0.01  Analysis Date = 03/16/2016 
 RPT Level = 0.01  Analysis Date = 03/16/2016 
 RPT Level = 0.01  Analysis Date = 03/09/2016 
 RPT Level = 0.01  Analysis Date = 03/09/2016 
 RPT Level = 0.01  Analysis Date = 03/02/2016 
 RPT Level = 0.01  Analysis Date = 03/02/2016 
 RPT Level = 0.01  Analysis Date = 02/26/2016 
 RPT Level = 0.01  Analysis Date = 02/26/2016 
 RPT Level = 0.01  Analysis Date = 02/18/2016 
 RPT Level = 0.01  Analysis Date = 02/18/2016 
 RPT Level = 0.01  Analysis Date = 02/12/2016 
 RPT Level = 0.01  Analysis Date = 02/12/2016 
 RPT Level = 0.01  Analysis Date = 02/05/2016 
 RPT Level = 0.01  Analysis Date = 02/05/2016 
 RPT Level = 0.01  Analysis Date = 01/26/2016 
 RPT Level = 0.01  Analysis Date = 01/26/2016 
 RPT Level = 0.01  Analysis Date = 01/25/2016 
 RPT Level = 0.01  Analysis Date = 01/25/2016 
 RPT Level = 0.01  Analysis Date = 01/12/2016 
 RPT Level = 0.01  Analysis Date = 01/12/2016 
 RPT Level = 0.01  Analysis Date = 01/11/2016 
 RPT Level = 0.01  Analysis Date = 01/11/2016 
 RPT Level = 0.01  Analysis Date = 01/05/2016 
 RPT Level = 0.01  Analysis Date = 01/05/2016 
 RPT Level = 0.01  Analysis Date = 12/24/2015 
 RPT Level = 0.01  Analysis Date = 12/24/2015 
 RPT Level = 0.01  Analysis Date = 12/17/2015 
 RPT Level = 0.01  Analysis Date = 12/17/2015 
 RPT Level = 0.01  Analysis Date = 12/11/2015 
 RPT Level = 0.01  Analysis Date = 12/11/2015 
 RPT Level = 0.01  Analysis Date = 12/02/2015 
 RPT Level = 0.01  Analysis Date = 12/02/2015 
 RPT Level = 0.01  Analysis Date = 11/25/2015 
 RPT Level = 0.01  Analysis Date = 11/25/2015 
 RPT Level = 0.01  Analysis Date = 11/18/2015 
 RPT Level = 0.01  Analysis Date = 11/18/2015 
 RPT Level = 0.01  Analysis Date = 11/16/2015 
 RPT Level = 0.01  Analysis Date = 11/16/2015 
 RPT Level = 0.01  Analysis Date = 11/10/2015 
 RPT Level = 0.01  Analysis Date = 11/10/2015 
 RPT Level = 0.01  Analysis Date = 11/02/2015 
 RPT Level = 0.01  Analysis Date = 11/02/2015 
 RPT Level = 0.01  Analysis Date = 10/22/2015 
 RPT Level = 0.01  Analysis Date = 10/22/2015 
 RPT Level = 0.01  Analysis Date = 10/26/2015 
 RPT Level = 0.01  Analysis Date = 10/26/2015 
 RPT Level = 0.01  Analysis Date = 10/09/2015 
 RPT Level = 0.01  Analysis Date = 10/09/2015 
 RPT Level = 0.01  Analysis Date = 09/30/2015 
 RPT Level = 0.01  Analysis Date = 09/30/2015 
 RPT Level = 0.01  Analysis Date = 09/30/2015 
 RPT Level = 0.01  Analysis Date = 09/30/2015 
 RPT Level = 0.01  Analysis Date = 09/22/2015 
 RPT Level = 0.01  Analysis Date = 09/22/2015 
 RPT Level = 0.01  Analysis Date = 09/17/2015 
 RPT Level = 0.01  Analysis Date = 09/17/2015 
 RPT Level = 0.01  Analysis Date = 09/09/2015 
 RPT Level = 0.01  Analysis Date = 09/09/2015 
 RPT Level = 0.01  Analysis Date = 09/02/2015 
 RPT Level = 0.01  Analysis Date = 09/02/2015 
 RPT Level = 0.01  Analysis Date = 08/28/2015 
 RPT Level = 0.01  Analysis Date = 08/28/2015 
 RPT Level = 0.01  Analysis Date = 08/26/2015 
 RPT Level = 0.01  Analysis Date = 08/26/2015 
 RPT Level = 0.01  Analysis Date = 08/11/2015 
 RPT Level = 0.01  Analysis Date = 08/11/2015 
 RPT Level = 0.01  Analysis Date = 08/03/2015 
 RPT Level = 0.01  Analysis Date = 08/03/2015 
 RPT Level = 0.01  Analysis Date = 07/24/2015 
 RPT Level = 0.01  Analysis Date = 07/24/2015 
 RPT Level = 0.01  Analysis Date = 07/16/2015 
 RPT Level = 0.01  Analysis Date = 07/16/2015 
 RPT Level = 0.01  Analysis Date = 07/14/2015 
 RPT Level = 0.01  Analysis Date = 07/14/2015 
 RPT Level = 0.01  Analysis Date = 07/08/2015 
 RPT Level = 0.01  Analysis Date = 07/08/2015 
 RPT Level = 0.01  Analysis Date = 06/23/2015 
 RPT Level = 0.01  Analysis Date = 06/23/2015 
 RPT Level = 0.01  Analysis Date = 06/18/2015 
 RPT Level = 0.01  Analysis Date = 06/18/2015 
 RPT Level = 0.01  Analysis Date = 06/16/2015 
 RPT Level = 0.01  Analysis Date = 06/16/2015 
 RPT Level = 0.01  Analysis Date = 06/05/2015 
 RPT Level = 0.01  Analysis Date = 06/05/2015 
 RPT Level = 0.01  Analysis Date = 06/01/2015 
 RPT Level = 0.01  Analysis Date = 06/01/2015 
 RPT Level = 0.01  Analysis Date = 05/21/2015 
 RPT Level = 0.01  Analysis Date = 05/21/2015 
 RPT Level = 0.01  Analysis Date = 05/18/2015 
 RPT Level = 0.01  Analysis Date = 05/18/2015 
 RPT Level = 0.01  Analysis Date = 05/08/2015 
 RPT Level = 0.01  Analysis Date = 05/08/2015 
 RPT Level = 0.01  Analysis Date = 05/05/2015 
 RPT Level = 0.01  Analysis Date = 05/05/2015 
 RPT Level = 0.01  Analysis Date = 04/29/2015 
 RPT Level = 0.01  Analysis Date = 04/29/2015 
 RPT Level = 0.01  Analysis Date = 04/22/2015 
 RPT Level = 0.01  Analysis Date = 04/22/2015 
 RPT Level = 0.01  Analysis Date = 04/13/2015 
 RPT Level = 0.01  Analysis Date = 04/13/2015 
 RPT Level = 0.01  Analysis Date = 04/13/2015 
 RPT Level = 0.01  Analysis Date = 04/13/2015 
 RPT Level = 0.01  Analysis Date = 03/31/2015 
 RPT Level = 0.01  Analysis Date = 03/31/2015 
 RPT Level = 0.01  Analysis Date = 03/27/2015 
 RPT Level = 0.01  Analysis Date = 03/27/2015 
 RPT Level = 0.01  Analysis Date = 03/31/2015 
 RPT Level = 0.01  Analysis Date = 03/31/2015 
 RPT Level = 0.01  Analysis Date = 03/11/2015 
 RPT Level = 0.01  Analysis Date = 03/11/2015 
 RPT Level = 0.01  Analysis Date = 03/06/2015 
 RPT Level = 0.01  Analysis Date = 03/06/2015 
 RPT Level = 0.01  Analysis Date = 03/02/2015 
 RPT Level = 0.01  Analysis Date = 03/02/2015 
 RPT Level = 0.01  Analysis Date = 02/24/2015 
 RPT Level = 0.01  Analysis Date = 02/24/2015 
 RPT Level = 0.01  Analysis Date = 04/01/2015 
 RPT Level = 0.01  Analysis Date = 04/01/2015 
 RPT Level = 0.01  Analysis Date = 02/10/2015 
 RPT Level = 0.01  Analysis Date = 02/10/2015 
 RPT Level = 0.01  Analysis Date = 02/11/2015 
 RPT Level = 0.01  Analysis Date = 02/11/2015 
 RPT Level = 0.01  Analysis Date = 01/21/2015 
 RPT Level = 0.01  Analysis Date = 01/21/2015 
 RPT Level = 0.01  Analysis Date = 01/15/2015 
 RPT Level = 0.01  Analysis Date = 01/15/2015 
 RPT Level = 0.01  Analysis Date = 01/22/2015 
 RPT Level = 0.01  Analysis Date = 01/22/2015 
 RPT Level = 0.01  Analysis Date = 01/22/2015 
 RPT Level = 0.01  Analysis Date = 01/22/2015 
 RPT Level = 0.01  Analysis Date = 12/31/2014 
 RPT Level = 0.01  Analysis Date = 12/31/2014 
 RPT Level = 0.01  Analysis Date = 12/31/2014 
 RPT Level = 0.01  Analysis Date = 12/31/2014 
 RPT Level = 0.01  Analysis Date = 12/18/2014 
 RPT Level = 0.01  Analysis Date = 12/18/2014 
 RPT Level = 0.01  Analysis Date = 12/12/2014 
 RPT Level = 0.01  Analysis Date = 12/12/2014 
 RPT Level = 0.01  Analysis Date = 12/05/2014 
 RPT Level = 0.01  Analysis Date = 12/05/2014 
 RPT Level = 0.01  Analysis Date = 11/25/2014 
 RPT Level = 0.01  Analysis Date = 11/25/2014 
 RPT Level = 0.01  Analysis Date = 11/13/2014 
 RPT Level = 0.01  Analysis Date = 11/13/2014 
 RPT Level = 0.01  Analysis Date = 11/04/2014 
 RPT Level = 0.01  Analysis Date = 11/04/2014 
 RPT Level = 0.01  Analysis Date = 11/04/2014 
 RPT Level = 0.01  Analysis Date = 11/04/2014 
 RPT Level = 0.01  Analysis Date = 10/24/2014 
 RPT Level = 0.01  Analysis Date = 10/24/2014 
 RPT Level = 0.01  Analysis Date = 10/17/2014 
 RPT Level = 0.01  Analysis Date = 10/17/2014 
 RPT Level = 0.01  Analysis Date = 10/08/2014 
 RPT Level = 0.01  Analysis Date = 10/08/2014 
 RPT Level = 0.01  Analysis Date = 10/07/2014 
 RPT Level = 0.01  Analysis Date = 10/07/2014 
 RPT Level = 0.01  Analysis Date = 10/02/2014 
 RPT Level = 0.01  Analysis Date = 10/02/2014 
 RPT Level = 0.01  Analysis Date = 09/19/2014 
 RPT Level = 0.01  Analysis Date = 09/19/2014 
 RPT Level = 0.01  Analysis Date = 09/12/2014 
 RPT Level = 0.01  Analysis Date = 09/12/2014 
 RPT Level = 0.01  Analysis Date = 08/22/2014 
 RPT Level = 0.01  Analysis Date = 08/22/2014 
 RPT Level = 0.01  Analysis Date = 08/20/2014 
 RPT Level = 0.01  Analysis Date = 08/20/2014 
 RPT Level = 0.01  Analysis Date = 08/15/2014 
 RPT Level = 0.01  Analysis Date = 08/15/2014 
 RPT Level = 0.01  Analysis Date = 08/06/2014 
 RPT Level = 0.01  Analysis Date = 08/06/2014 
 RPT Level = 0.01  Analysis Date = 08/06/2014 
 RPT Level = 0.01  Analysis Date = 08/06/2014 
 RPT Level = 0.01  Analysis Date = 07/16/2014 
 RPT Level = 0.01  Analysis Date = 07/16/2014 
 RPT Level = 0.01  Analysis Date = 07/10/2014 
 RPT Level = 0.01  Analysis Date = 07/10/2014 
 RPT Level = 0.01  Analysis Date = 07/10/2014 
 RPT Level = 0.01  Analysis Date = 07/10/2014 
 RPT Level = 0.01  Analysis Date = 07/09/2014 
 RPT Level = 0.01  Analysis Date = 07/09/2014 
 RPT Level = 0.01  Analysis Date = 07/08/2014 
 RPT Level = 0.01  Analysis Date = 07/08/2014 
 RPT Level = 0.01  Analysis Date = 06/27/2014 
 RPT Level = 0.01  Analysis Date = 06/27/2014 
 RPT Level = 0.01  Analysis Date = 06/18/2014 
 RPT Level = 0.01  Analysis Date = 06/18/2014 
 RPT Level = 0.01  Analysis Date = 06/06/2014 
 RPT Level = 0.01  Analysis Date = 06/06/2014 
 RPT Level = 0.01  Analysis Date = 06/10/2014 
 RPT Level = 0.01  Analysis Date = 06/10/2014 
 RPT Level = 0.01  Analysis Date = 05/16/2014 
 RPT Level = 0.01  Analysis Date = 05/16/2014 
 RPT Level = 0.01  Analysis Date = 05/16/2014 
 RPT Level = 0.01  Analysis Date = 05/16/2014 
 RPT Level = 0.01  Analysis Date = 05/07/2014 
 RPT Level = 0.01  Analysis Date = 05/07/2014 
 RPT Level = 0.01  Analysis Date = 04/18/2014 
 RPT Level = 0.01  Analysis Date = 04/18/2014 
 RPT Level = 0.01  Analysis Date = 04/17/2014 
 RPT Level = 0.01  Analysis Date = 04/17/2014 
 RPT Level = 0.01  Analysis Date = 04/11/2014 
 RPT Level = 0.01  Analysis Date = 04/11/2014 
 RPT Level = 0.01  Analysis Date = 04/01/2014 
 RPT Level = 0.01  Analysis Date = 04/01/2014 
 RPT Level = 0.01  Analysis Date = 03/25/2014 
 RPT Level = 0.01  Analysis Date = 03/25/2014 
 RPT Level = 0.01  Analysis Date = 03/21/2014 
 RPT Level = 0.01  Analysis Date = 03/21/2014 
 RPT Level = 0.01  Analysis Date = 03/21/2014 
 RPT Level = 0.01  Analysis Date = 03/21/2014 
 RPT Level = 0.01  Analysis Date = 03/04/2014 
 RPT Level = 0.01  Analysis Date = 03/04/2014 
 RPT Level = 0.01  Analysis Date = 03/04/2014 
 RPT Level = 0.01  Analysis Date = 03/04/2014 
 RPT Level = 0.01  Analysis Date = 02/13/2014 
 RPT Level = 0.01  Analysis Date = 02/13/2014 
 RPT Level = 0.01  Analysis Date = 02/18/2014 
 RPT Level = 0.01  Analysis Date = 02/18/2014 
 RPT Level = 0.01  Analysis Date = 02/10/2014 
 RPT Level = 0.01  Analysis Date = 02/10/2014 
 RPT Level = 0.01  Analysis Date = 02/10/2014 
 RPT Level = 0.01  Analysis Date = 02/10/2014 
 RPT Level = 0.01  Analysis Date = 02/07/2014 
 RPT Level = 0.01  Analysis Date = 02/07/2014 
 RPT Level = 0.01  Analysis Date = 02/07/2014 
 RPT Level = 0.01  Analysis Date = 02/07/2014 
 RPT Level = 0.01  Analysis Date = 01/09/2014 
 RPT Level = 0.01  Analysis Date = 01/09/2014 
 RPT Level = 0.01  Analysis Date = 01/03/2014 
 RPT Level = 0.01  Analysis Date = 01/03/2014 
 RPT Level = 0.01  Analysis Date = 12/12/2013 
 RPT Level = 0.01  Analysis Date = 12/12/2013 
 RPT Level = 0.01  Analysis Date = 12/05/2013 
 RPT Level = 0.01  Analysis Date = 12/05/2013 
 RPT Level = 0.01  Analysis Date = 12/05/2013 
 RPT Level = 0.01  Analysis Date = 12/05/2013 
 RPT Level = 0.01  Analysis Date = 11/26/2013 
 RPT Level = 0.01  Analysis Date = 11/26/2013 
 RPT Level = 0.01  Analysis Date = 12/06/2013 
 RPT Level = 0.01  Analysis Date = 12/06/2013 
 RPT Level = 0.01  Analysis Date = 11/15/2013 
 RPT Level = 0.01  Analysis Date = 11/15/2013 
 RPT Level = 0.01  Analysis Date = 11/06/2013 
 RPT Level = 0.01  Analysis Date = 11/06/2013 
 RPT Level = 0.01  Analysis Date = 11/01/2013 
 RPT Level = 0.01  Analysis Date = 11/01/2013 
 RPT Level = 0.01  Analysis Date = 10/28/2013 
 RPT Level = 0.01  Analysis Date = 10/28/2013 
 RPT Level = 0.01  Analysis Date = 10/29/2013 
 RPT Level = 0.01  Analysis Date = 10/29/2013 
 RPT Level = 0.01  Analysis Date = 10/24/2013 
 RPT Level = 0.01  Analysis Date = 10/24/2013 
 RPT Level = 0.01  Analysis Date = 09/24/2013 
 RPT Level = 0.01  Analysis Date = 09/24/2013 
 RPT Level = 0.01  Analysis Date = 09/05/2013 
 RPT Level = 0.01  Analysis Date = 09/05/2013 
 RPT Level = 0.01  Analysis Date = 09/05/2013 
 RPT Level = 0.01  Analysis Date = 09/05/2013 
 RPT Level = 0.01  Analysis Date = 09/04/2013 
 RPT Level = 0.01  Analysis Date = 09/04/2013 
 RPT Level = 0.01  Analysis Date = 09/03/2013 
 RPT Level = 0.01  Analysis Date = 09/03/2013 
 RPT Level = 0.01  Analysis Date = 08/21/2013 
 RPT Level = 0.01  Analysis Date = 08/21/2013 
 RPT Level = 0.01  Analysis Date = 08/27/2013 
 RPT Level = 0.01  Analysis Date = 08/27/2013 
 RPT Level = 0.01  Analysis Date = 08/21/2013 
 RPT Level = 0.01  Analysis Date = 08/21/2013 
 RPT Level = 0.01  Analysis Date = 07/24/2013 
 RPT Level = 0.01  Analysis Date = 07/24/2013 
 RPT Level = 0.01  Analysis Date = 07/16/2013 
 RPT Level = 0.01  Analysis Date = 07/16/2013 
 RPT Level = 0.01  Analysis Date = 07/16/2013 
 RPT Level = 0.01  Analysis Date = 07/16/2013 
 RPT Level = 0.01  Analysis Date = 07/10/2013 
 RPT Level = 0.01  Analysis Date = 07/10/2013 
 RPT Level = 0.01  Analysis Date = 06/28/2013 
 RPT Level = 0.01  Analysis Date = 06/28/2013 
 RPT Level = 0.01  Analysis Date = 06/26/2013 
 RPT Level = 0.01  Analysis Date = 06/26/2013 
 RPT Level = 0.01  Analysis Date = 06/19/2013 
 RPT Level = 0.01  Analysis Date = 06/19/2013 
 RPT Level = 0.01  Analysis Date = 06/11/2013 
 RPT Level = 0.01  Analysis Date = 06/11/2013 
 RPT Level = 0.01  Analysis Date = 06/11/2013 
 RPT Level = 0.01  Analysis Date = 06/11/2013 
 RPT Level = 0.01  Analysis Date = 05/28/2013 
 RPT Level = 0.01  Analysis Date = 05/28/2013 
 RPT Level = 0.01  Analysis Date = 05/28/2013 
 RPT Level = 0.01  Analysis Date = 05/28/2013 
 RPT Level = 0.01  Analysis Date = 05/13/2013 
 RPT Level = 0.01  Analysis Date = 05/13/2013 
 RPT Level = 0.01  Analysis Date = 05/07/2013 
 RPT Level = 0.01  Analysis Date = 05/07/2013 
 RPT Level = 0.01  Analysis Date = 05/13/2013 
 RPT Level = 0.01  Analysis Date = 05/13/2013 
 RPT Level = 0.01  Analysis Date = 05/03/2013 
 RPT Level = 0.01  Analysis Date = 05/03/2013 
 RPT Level = 0.01  Analysis Date = 04/24/2013 
 RPT Level = 0.01  Analysis Date = 04/24/2013 
 RPT Level = 0.01  Analysis Date = 04/08/2013 
 RPT Level = 0.01  Analysis Date = 04/08/2013 
 RPT Level = 0.01  Analysis Date = 04/08/2013 
 RPT Level = 0.01  Analysis Date = 04/08/2013 
 RPT Level = 0.01  Analysis Date = 03/18/2013 
 RPT Level = 0.01  Analysis Date = 03/18/2013 
 RPT Level = 0.01  Analysis Date = 03/07/2013 
 RPT Level = 0.01  Analysis Date = 03/07/2013 
 RPT Level = 0.01  Analysis Date = 03/07/2013 
 RPT Level = 0.01  Analysis Date = 03/07/2013 
 RPT Level = 0.01  Analysis Date = 03/07/2013 
 RPT Level = 0.01  Analysis Date = 03/07/2013 
 RPT Level = 0.01  Analysis Date = 02/28/2013 
 RPT Level = 0.01  Analysis Date = 02/28/2013 
 RPT Level = 0.01  Analysis Date = 02/22/2013 
 RPT Level = 0.01  Analysis Date = 02/22/2013 
 RPT Level = 0.01  Analysis Date = 02/07/2013 
 RPT Level = 0.01  Analysis Date = 02/07/2013 
 RPT Level = 0.01  Analysis Date = 02/07/2013 
 RPT Level = 0.01  Analysis Date = 02/07/2013 
 RPT Level = 0.01  Analysis Date = 01/29/2013 
 RPT Level = 0.01  Analysis Date = 01/29/2013 
 RPT Level = 0.01  Analysis Date = 01/18/2013 
 RPT Level = 0.01  Analysis Date = 01/18/2013 
 RPT Level = 0.01  Analysis Date = 01/18/2013 
 RPT Level = 0.01  Analysis Date = 01/18/2013 
 RPT Level = 0.01  Analysis Date = 01/18/2013 
 RPT Level = 0.01  Analysis Date = 01/18/2013 
 RPT Level = 0.01  Analysis Date = 01/14/2013 
 RPT Level = 0.01  Analysis Date = 01/14/2013 
 RPT Level = 0.01  Analysis Date = 01/08/2013 
 RPT Level = 0.01  Analysis Date = 01/08/2013 
 RPT Level = 0.01  Analysis Date = 01/04/2013 
 RPT Level = 0.01  Analysis Date = 01/04/2013 
 RPT Level = 0.01  Analysis Date = 01/04/2013 
 RPT Level = 0.01  Analysis Date = 01/04/2013 
 RPT Level = 0.01  Analysis Date = 12/12/2012 
 RPT Level = 0.01  Analysis Date = 12/12/2012 
 RPT Level = 0.01  Analysis Date = 12/12/2012 
 RPT Level = 0.01  Analysis Date = 12/12/2012 
 RPT Level = 0.01  Analysis Date = 11/29/2012 
 RPT Level = 0.01  Analysis Date = 11/29/2012 
 RPT Level = 0.01  Analysis Date = 11/13/2012 
 RPT Level = 0.01  Analysis Date = 11/13/2012 
 RPT Level = 0.01  Analysis Date = 11/05/2012 
 RPT Level = 0.01  Analysis Date = 11/05/2012 
 RPT Level = 0.01  Analysis Date = 10/25/2012 
 RPT Level = 0.01  Analysis Date = 10/25/2012 
 RPT Level = 0.01  Analysis Date = 10/19/2012 
 RPT Level = 0.01  Analysis Date = 10/19/2012 
 RPT Level = 0.01  Analysis Date = 10/12/2012 
 RPT Level = 0.01  Analysis Date = 10/12/2012 
 RPT Level = 0.01  Analysis Date = 10/11/2012 
 RPT Level = 0.01  Analysis Date = 10/11/2012 
 RPT Level = 0.01  Analysis Date = 10/11/2012 
 RPT Level = 0.01  Analysis Date = 10/11/2012 
 RPT Level = 0.01  Analysis Date = 09/25/2012 
 RPT Level = 0.01  Analysis Date = 09/25/2012 
 RPT Level = 0.01  Analysis Date = 09/21/2012 
 RPT Level = 0.01  Analysis Date = 09/21/2012 
 RPT Level = 0.01  Analysis Date = 09/21/2012 
 RPT Level = 0.01  Analysis Date = 09/21/2012 
 RPT Level = 0.01  Analysis Date = 09/25/2012 
 RPT Level = 0.01  Analysis Date = 09/25/2012 
 RPT Level = 0.01  Analysis Date = 08/30/2012 
 RPT Level = 0.01  Analysis Date = 08/30/2012 
 RPT Level = 0.01  Analysis Date = 08/15/2012 
 RPT Level = 0.01  Analysis Date = 08/15/2012 
 RPT Level = 0.01  Analysis Date = 08/10/2012 
 RPT Level = 0.01  Analysis Date = 08/10/2012 
 RPT Level = 0.01  Analysis Date = 08/09/2012 
 RPT Level = 0.01  Analysis Date = 08/09/2012 
 RPT Level = 0.01  Analysis Date = 08/01/2012 
 RPT Level = 0.01  Analysis Date = 08/01/2012 
 RPT Level = 0.01  Analysis Date = 07/31/2012 
 RPT Level = 0.01  Analysis Date = 07/31/2012 
 RPT Level = 0.01  Analysis Date = 07/31/2012 
 RPT Level = 0.01  Analysis Date = 07/31/2012 
 RPT Level = 0.01  Analysis Date = 07/18/2012 
 RPT Level = 0.01  Analysis Date = 07/18/2012 
 RPT Level = 0.01  Analysis Date = 07/16/2012 
 RPT Level = 0.01  Analysis Date = 07/16/2012 
 RPT Level = 0.01  Analysis Date = 06/25/2012 
 RPT Level = 0.01  Analysis Date = 06/25/2012 
 RPT Level = 0.01  Analysis Date = 06/21/2012 
 RPT Level = 0.01  Analysis Date = 06/21/2012 
 RPT Level = 0.01  Analysis Date = 06/19/2012 
 RPT Level = 0.01  Analysis Date = 06/19/2012 
 RPT Level = 0.01  Analysis Date = 06/01/2012 
 RPT Level = 0.01  Analysis Date = 06/01/2012 
 RPT Level = 0.01  Analysis Date = 05/31/2012 
 RPT Level = 0.01  Analysis Date = 05/31/2012 
 RPT Level = 0.01  Analysis Date = 05/22/2012 
 RPT Level = 0.01  Analysis Date = 05/22/2012 
 RPT Level = 0.01  Analysis Date = 05/17/2012 
 RPT Level = 0.01  Analysis Date = 05/17/2012 
 RPT Level = 0.01  Analysis Date = 05/02/2012 
 RPT Level = 0.01  Analysis Date = 05/02/2012 
 RPT Level = 0.01  Analysis Date = 04/25/2012 
 RPT Level = 0.01  Analysis Date = 04/25/2012 
 RPT Level = 0.01  Analysis Date = 04/20/2012 
 RPT Level = 0.01  Analysis Date = 04/20/2012 
 RPT Level = 0.01  Analysis Date = 04/17/2012 
 RPT Level = 0.01  Analysis Date = 04/17/2012 
 RPT Level = 0.01  Analysis Date = 04/03/2012 
 RPT Level = 0.01  Analysis Date = 04/03/2012 
 RPT Level = 0.01  Analysis Date = 03/23/2012 
 RPT Level = 0.01  Analysis Date = 03/23/2012 
 RPT Level = 0.01  Analysis Date = 03/28/2012 
 RPT Level = 0.01  Analysis Date = 03/28/2012 
 RPT Level = 0.01  Analysis Date = 04/25/2012 
 RPT Level = 0.01  Analysis Date = 04/25/2012 
 RPT Level = 0.01  Analysis Date = 03/16/2012 
 RPT Level = 0.01  Analysis Date = 03/16/2012 
 RPT Level = 0.01  Analysis Date = 03/16/2012 
 RPT Level = 0.01  Analysis Date = 03/16/2012 
 RPT Level = 0.01  Analysis Date = 03/09/2012 
 RPT Level = 0.01  Analysis Date = 03/09/2012 
 RPT Level = 0.01  Analysis Date = 02/23/2012 
 RPT Level = 0.01  Analysis Date = 02/23/2012 
 RPT Level = 0.01  Analysis Date = 02/10/2012 
 RPT Level = 0.01  Analysis Date = 02/10/2012 
 RPT Level = 0.01  Analysis Date = 01/26/2012 
 RPT Level = 0.01  Analysis Date = 01/26/2012 
 RPT Level = 0.01  Analysis Date = 01/26/2012 
 RPT Level = 0.01  Analysis Date = 01/26/2012 
 RPT Level = 0.01  Analysis Date = 01/12/2012 
 RPT Level = 0.01  Analysis Date = 01/12/2012 
 RPT Level = 0.01  Analysis Date = 01/12/2012 
 RPT Level = 0.01  Analysis Date = 01/12/2012 
 RPT Level = 0.01  Analysis Date = 01/04/2012 
 RPT Level = 0.01  Analysis Date = 01/04/2012 
 RPT Level = 0.01  Analysis Date = 12/28/2011 
 RPT Level = 0.01  Analysis Date = 12/28/2011 
 RPT Level = 0.01  Analysis Date = 12/28/2011 
 RPT Level = 0.01  Analysis Date = 12/28/2011 
 RPT Level = 0.01  Analysis Date = 12/28/2011 
 RPT Level = 0.01  Analysis Date = 12/28/2011 
 RPT Level = 0.01  Analysis Date = 12/05/2011 
 RPT Level = 0.01  Analysis Date = 12/05/2011 
 RPT Level = 0.01  Analysis Date = 12/05/2011 
 RPT Level = 0.01  Analysis Date = 12/05/2011 
 RPT Level = 0.01  Analysis Date = 11/30/2011 
 RPT Level = 0.01  Analysis Date = 11/30/2011 
 RPT Level = 0.01  Analysis Date = 11/30/2011 
 RPT Level = 0.01  Analysis Date = 11/30/2011 
 RPT Level = 0.01  Analysis Date = 11/21/2011 
 RPT Level = 0.01  Analysis Date = 11/21/2011 
 RPT Level = 0.01  Analysis Date = 11/01/2011 
 RPT Level = 0.01  Analysis Date = 11/01/2011 
 RPT Level = 0.01  Analysis Date = 10/25/2011 
 RPT Level = 0.01  Analysis Date = 10/25/2011 
 RPT Level = 0.01  Analysis Date = 10/19/2011 
 RPT Level = 0.01  Analysis Date = 10/19/2011 
 RPT Level = 0.01  Analysis Date = 10/13/2011 
 RPT Level = 0.01  Analysis Date = 10/13/2011 
 RPT Level = 0.01  Analysis Date = 10/05/2011 
 RPT Level = 0.01  Analysis Date = 10/05/2011 
 RPT Level = 0.01  Analysis Date = 09/27/2011 
 RPT Level = 0.01  Analysis Date = 09/27/2011 
 RPT Level = 0.01  Analysis Date = 09/19/2011 
 RPT Level = 0.01  Analysis Date = 09/19/2011 
 RPT Level = 0.01  Analysis Date = 09/19/2011 
 RPT Level = 0.01  Analysis Date = 09/19/2011 
 RPT Level = 0.01  Analysis Date = 09/19/2011 
 RPT Level = 0.01  Analysis Date = 09/19/2011 
 RPT Level = 0.01  Analysis Date = 08/31/2011 
 RPT Level = 0.01  Analysis Date = 08/31/2011 
 RPT Level = 0.01  Analysis Date = 08/31/2011 
 RPT Level = 0.01  Analysis Date = 08/31/2011 
 RPT Level = 0.01  Analysis Date = 08/16/2011 
 RPT Level = 0.01  Analysis Date = 08/16/2011 
 RPT Level = 0.01  Analysis Date = 08/16/2011 
 RPT Level = 0.01  Analysis Date = 08/16/2011 
 RPT Level = 0.01  Analysis Date = 08/03/2011 
 RPT Level = 0.01  Analysis Date = 08/03/2011 
 RPT Level = 0.01  Analysis Date = 07/28/2011 
 RPT Level = 0.01  Analysis Date = 07/28/2011 
 RPT Level = 0.01  Analysis Date = 07/22/2011 
 RPT Level = 0.01  Analysis Date = 07/22/2011 
 RPT Level = 0.01  Analysis Date = 07/15/2011 
 RPT Level = 0.01  Analysis Date = 07/15/2011 
 RPT Level = 0.01  Analysis Date = 07/06/2011 
 RPT Level = 0.01  Analysis Date = 07/06/2011 
 RPT Level = 0.01  Analysis Date = 06/24/2011 
 RPT Level = 0.01  Analysis Date = 06/24/2011 
 RPT Level = 0.01  Analysis Date = 06/17/2011 
 RPT Level = 0.01  Analysis Date = 06/17/2011 
 RPT Level = 0.01  Analysis Date = 06/13/2011 
 RPT Level = 0.01  Analysis Date = 06/13/2011 
 RPT Level = 0.01  Analysis Date = 06/06/2011 
 RPT Level = 0.01  Analysis Date = 06/06/2011 
 RPT Level = 0.01  Analysis Date = 05/31/2011 
 RPT Level = 0.01  Analysis Date = 05/31/2011 
 RPT Level = 0.01  Analysis Date = 05/18/2011 
 RPT Level = 0.01  Analysis Date = 05/18/2011 
 RPT Level = 0.01  Analysis Date = 05/12/2011 
 RPT Level = 0.01  Analysis Date = 05/12/2011 
 RPT Level = 0.01  Analysis Date = 05/12/2011 
 RPT Level = 0.01  Analysis Date = 05/12/2011 
 RPT Level = 0.01  Analysis Date = 04/29/2011 
 RPT Level = 0.01  Analysis Date = 04/29/2011 
 RPT Level = 0.01  Analysis Date = 04/22/2011 
 RPT Level = 0.01  Analysis Date = 04/22/2011 
 RPT Level = 0.01  Analysis Date = 04/13/2011 
 RPT Level = 0.01  Analysis Date = 04/13/2011 
 RPT Level = 0.01  Analysis Date = 04/08/2011 
 RPT Level = 0.01  Analysis Date = 04/08/2011 
 RPT Level = 0.01  Analysis Date = 04/07/2011 
 RPT Level = 0.01  Analysis Date = 04/07/2011 
 RPT Level = 0.01  Analysis Date = 03/29/2011 
 RPT Level = 0.01  Analysis Date = 03/29/2011 
 RPT Level = 0.01  Analysis Date = 03/23/2011 
 RPT Level = 0.01  Analysis Date = 03/23/2011 
 RPT Level = 0.01  Analysis Date = 03/11/2011 
 RPT Level = 0.01  Analysis Date = 03/11/2011 
 RPT Level = 0.01  Analysis Date = 03/18/2011 
 RPT Level = 0.01  Analysis Date = 03/18/2011 
 RPT Level = 0.01  Analysis Date = 03/09/2011 
 RPT Level = 0.01  Analysis Date = 03/09/2011 
 RPT Level = 0.01  Analysis Date = 02/17/2011 
 RPT Level = 0.01  Analysis Date = 02/17/2011 
 RPT Level = 0.01  Analysis Date = 02/17/2011 
 RPT Level = 0.01  Analysis Date = 02/17/2011 
 RPT Level = 0.01  Analysis Date = 02/11/2011 
 RPT Level = 0.01  Analysis Date = 02/11/2011 
 RPT Level = 0.01  Analysis Date = 01/28/2011 
 RPT Level = 0.01  Analysis Date = 01/28/2011 
 RPT Level = 0.01  Analysis Date = 01/26/2011 
 RPT Level = 0.01  Analysis Date = 01/26/2011 
 RPT Level = 0.01  Analysis Date = 01/26/2011 
 RPT Level = 0.01  Analysis Date = 01/26/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 12/21/2010 
 RPT Level = 0.01  Analysis Date = 12/21/2010 
 RPT Level = 0.01  Analysis Date = 12/17/2010 
 RPT Level = 0.01  Analysis Date = 12/17/2010 
 RPT Level = 0.01  Analysis Date = 12/09/2010 
 RPT Level = 0.01  Analysis Date = 12/09/2010 
 RPT Level = 0.01  Analysis Date = 12/02/2010 
 RPT Level = 0.01  Analysis Date = 12/02/2010 
 RPT Level = 0.01  Analysis Date = 11/23/2010 
 RPT Level = 0.01  Analysis Date = 11/23/2010 
 RPT Level = 0.01  Analysis Date = 11/23/2010 
 RPT Level = 0.01  Analysis Date = 11/23/2010 
 RPT Level = 0.01  Analysis Date = 11/10/2010 
 RPT Level = 0.01  Analysis Date = 11/10/2010 
 RPT Level = 0.01  Analysis Date = 11/03/2010 
 RPT Level = 0.01  Analysis Date = 11/03/2010 
 RPT Level = 0.01  Analysis Date = 10/28/2010 
 RPT Level = 0.01  Analysis Date = 10/28/2010 
 RPT Level = 0.01  Analysis Date = 10/19/2010 
 RPT Level = 0.01  Analysis Date = 10/19/2010 
 RPT Level = 0.01  Analysis Date = 10/14/2010 
 RPT Level = 0.01  Analysis Date = 10/14/2010 
 RPT Level = 0.01  Analysis Date = 10/14/2010 
 RPT Level = 0.01  Analysis Date = 10/14/2010 
 RPT Level = 0.01  Analysis Date = 09/30/2010 
 RPT Level = 0.01  Analysis Date = 09/30/2010 
 RPT Level = 0.01  Analysis Date = 09/23/2010 
 RPT Level = 0.01  Analysis Date = 09/23/2010 
 RPT Level = 0.01  Analysis Date = 09/16/2010 
 RPT Level = 0.01  Analysis Date = 09/16/2010 
 RPT Level = 0.01  Analysis Date = 09/10/2010 
 RPT Level = 0.01  Analysis Date = 09/10/2010 
 RPT Level = 0.01  Analysis Date = 09/02/2010 
 RPT Level = 0.01  Analysis Date = 09/02/2010 
 RPT Level = 0.01  Analysis Date = 08/19/2010 
 RPT Level = 0.01  Analysis Date = 08/19/2010 
 RPT Level = 0.01  Analysis Date = 08/18/2010 
 RPT Level = 0.01  Analysis Date = 08/18/2010 
 RPT Level = 0.01  Analysis Date = 08/12/2010 
 RPT Level = 0.01  Analysis Date = 08/12/2010 
 RPT Level = 0.01  Analysis Date = 08/04/2010 
 RPT Level = 0.01  Analysis Date = 08/04/2010 
 RPT Level = 0.01  Analysis Date = 07/27/2010 
 RPT Level = 0.01  Analysis Date = 07/27/2010 
 RPT Level = 0.01  Analysis Date = 07/20/2010 
 RPT Level = 0.01  Analysis Date = 07/20/2010 
 RPT Level = 0.01  Analysis Date = 07/13/2010 
 RPT Level = 0.01  Analysis Date = 07/13/2010 
 RPT Level = 0.01  Analysis Date = 07/07/2010 
 RPT Level = 0.01  Analysis Date = 07/07/2010 
 RPT Level = 0.01  Analysis Date = 07/08/2010 
 RPT Level = 0.01  Analysis Date = 07/08/2010 
 RPT Level = 0.01  Analysis Date = 06/23/2010 
 RPT Level = 0.01  Analysis Date = 06/23/2010 
 RPT Level = 0.01  Analysis Date = 06/18/2010 
 RPT Level = 0.01  Analysis Date = 06/18/2010 
 RPT Level = 0.01  Analysis Date = 06/18/2010 
 RPT Level = 0.01  Analysis Date = 06/18/2010 
 RPT Level = 0.01  Analysis Date = 06/08/2010 
 RPT Level = 0.01  Analysis Date = 06/08/2010 
 RPT Level = 0.01  Analysis Date = 06/02/2010 
 RPT Level = 0.01  Analysis Date = 06/02/2010 
 RPT Level = 0.01  Analysis Date = 05/20/2010 
 RPT Level = 0.01  Analysis Date = 05/20/2010 
 RPT Level = 0.01  Analysis Date = 05/13/2010 
 RPT Level = 0.01  Analysis Date = 05/13/2010 
 RPT Level = 0.01  Analysis Date = 05/04/2010 
 RPT Level = 0.01  Analysis Date = 05/04/2010 
 RPT Level = 0.01  Analysis Date = 04/29/2010 
 RPT Level = 0.01  Analysis Date = 04/29/2010 
 RPT Level = 0.01  Analysis Date = 04/20/2010 
 RPT Level = 0.01  Analysis Date = 04/20/2010 
 RPT Level = 0.01  Analysis Date = 04/14/2010 
 RPT Level = 0.01  Analysis Date = 04/14/2010 
 RPT Level = 0.01  Analysis Date = 04/02/2010 
 RPT Level = 0.01  Analysis Date = 04/02/2010 
 RPT Level = 0.01  Analysis Date = 04/02/2010 
 RPT Level = 0.01  Analysis Date = 04/02/2010 
 RPT Level = 0.01  Analysis Date = 03/26/2010 
 RPT Level = 0.01  Analysis Date = 03/26/2010 
 RPT Level = 0.01  Analysis Date = 03/16/2010 
 RPT Level = 0.01  Analysis Date = 03/16/2010 
 RPT Level = 0.01  Analysis Date = 03/05/2010 
 RPT Level = 0.01  Analysis Date = 03/05/2010 
 RPT Level = 0.01  Analysis Date = 02/24/2010 
 RPT Level = 0.01  Analysis Date = 02/24/2010 
 RPT Level = 0.01  Analysis Date = 02/24/2010 
 RPT Level = 0.01  Analysis Date = 02/24/2010 
 RPT Level = 0.01  Analysis Date = 02/11/2010 
 RPT Level = 0.01  Analysis Date = 02/11/2010 
 RPT Level = 0.01  Analysis Date = 02/11/2010 
 RPT Level = 0.01  Analysis Date = 02/11/2010 
 RPT Level = 0.01  Analysis Date = 02/05/2010 
 RPT Level = 0.01  Analysis Date = 02/05/2010 
 RPT Level = 0.01  Analysis Date = 01/28/2010 
 RPT Level = 0.01  Analysis Date = 01/28/2010 
 RPT Level = 0.01  Analysis Date = 01/28/2010 
 RPT Level = 0.01  Analysis Date = 01/28/2010 
 RPT Level = 0.01  Analysis Date = 01/28/2010 
 RPT Level = 0.01  Analysis Date = 01/28/2010 
 RPT Level = 0.01  Analysis Date = 01/28/2010 
 RPT Level = 0.01  Analysis Date = 01/28/2010 
 RPT Level = 0.01  Analysis Date = 01/28/2010 
 RPT Level = 0.01  Analysis Date = 01/28/2010 
 RPT Level = 0.01  Analysis Date = 12/23/2009 
 RPT Level = 0.01  Analysis Date = 12/23/2009 
 RPT Level = 0.01  Analysis Date = 12/10/2009 
 RPT Level = 0.01  Analysis Date = 12/10/2009 
 RPT Level = 0.01  Analysis Date = 12/10/2009 
 RPT Level = 0.01  Analysis Date = 12/10/2009 
 RPT Level = 0.01  Analysis Date = 12/10/2009 
 RPT Level = 0.01  Analysis Date = 12/10/2009 
 RPT Level = 0.01  Analysis Date = 11/25/2009 
 RPT Level = 0.01  Analysis Date = 11/25/2009 
 RPT Level = 0.01  Analysis Date = 11/19/2009 
 RPT Level = 0.01  Analysis Date = 11/19/2009 
 RPT Level = 0.01  Analysis Date = 11/10/2009 
 RPT Level = 0.01  Analysis Date = 11/10/2009 
 RPT Level = 0.01  Analysis Date = 11/10/2009 
 RPT Level = 0.01  Analysis Date = 11/10/2009 
 RPT Level = 0.01  Analysis Date = 11/04/2009 
 RPT Level = 0.01  Analysis Date = 11/04/2009 
 RPT Level = 0.01  Analysis Date = 11/04/2009 
 RPT Level = 0.01  Analysis Date = 11/04/2009 
 RPT Level = 0.01  Analysis Date = 11/02/2009 
 RPT Level = 0.01  Analysis Date = 11/02/2009 
 RPT Level = 0.01  Analysis Date = 10/20/2009 
 RPT Level = 0.01  Analysis Date = 10/20/2009 
 RPT Level = 0.01  Analysis Date = 10/16/2009 
 RPT Level = 0.01  Analysis Date = 10/16/2009 
 RPT Level = 0.01  Analysis Date = 10/06/2009 
 RPT Level = 0.01  Analysis Date = 10/06/2009 
 RPT Level = 0.01  Analysis Date = 10/06/2009 
 RPT Level = 0.01  Analysis Date = 10/06/2009 
 RPT Level = 0.01  Analysis Date = 09/24/2009 
 RPT Level = 0.01  Analysis Date = 09/24/2009 
 RPT Level = 0.01  Analysis Date = 09/17/2009 
 RPT Level = 0.01  Analysis Date = 09/17/2009 
 RPT Level = 0.01  Analysis Date = 09/10/2009 
 RPT Level = 0.01  Analysis Date = 09/10/2009 
 RPT Level = 0.01  Analysis Date = 09/03/2009 
 RPT Level = 0.01  Analysis Date = 09/03/2009 
 RPT Level = 0.01  Analysis Date = 08/26/2009 
 RPT Level = 0.01  Analysis Date = 08/26/2009 
 RPT Level = 0.01  Analysis Date = 08/18/2009 
 RPT Level = 0.01  Analysis Date = 08/18/2009 
 RPT Level = 0.01  Analysis Date = 08/11/2009 
 RPT Level = 0.01  Analysis Date = 08/11/2009 
 RPT Level = 0.01  Analysis Date = 07/24/2009 
 RPT Level = 0.01  Analysis Date = 07/24/2009 
 RPT Level = 0.01  Analysis Date = 07/24/2009 
 RPT Level = 0.01  Analysis Date = 07/24/2009 
 RPT Level = 0.01  Analysis Date = 07/15/2009 
 RPT Level = 0.01  Analysis Date = 07/15/2009 
 RPT Level = 0.01  Analysis Date = 07/08/2009 
 RPT Level = 0.01  Analysis Date = 07/08/2009 
 RPT Level = 0.01  Analysis Date = 06/24/2009 
 RPT Level = 0.01  Analysis Date = 06/24/2009 
 RPT Level = 0.01  Analysis Date = 06/22/2009 
 RPT Level = 0.01  Analysis Date = 06/22/2009 
 RPT Level = 0.01  Analysis Date = 06/11/2009 
 RPT Level = 0.01  Analysis Date = 06/11/2009 
 RPT Level = 0.01  Analysis Date = 06/04/2009 
 RPT Level = 0.01  Analysis Date = 06/04/2009 
 RPT Level = 0.01  Analysis Date = 05/29/2009 
 RPT Level = 0.01  Analysis Date = 05/29/2009 
 RPT Level = 0.01  Analysis Date = 05/22/2009 
 RPT Level = 0.01  Analysis Date = 05/22/2009 
 RPT Level = 0.01  Analysis Date = 05/22/2009 
 RPT Level = 0.01  Analysis Date = 05/22/2009 
 RPT Level = 0.01  Analysis Date = 05/07/2009 
 RPT Level = 0.01  Analysis Date = 05/07/2009 
 RPT Level = 0.01  Analysis Date = 05/01/2009 
 RPT Level = 0.01  Analysis Date = 05/01/2009 
 RPT Level = 0.01  Analysis Date = 05/07/2009 
 RPT Level = 0.01  Analysis Date = 05/07/2009 
 RPT Level = 0.01  Analysis Date = 04/14/2009 
 RPT Level = 0.01  Analysis Date = 04/14/2009 
 RPT Level = 0.01  Analysis Date = 04/14/2009 
 RPT Level = 0.01  Analysis Date = 04/14/2009 
 RPT Level = 0.01  Analysis Date = 04/01/2009 
 RPT Level = 0.01  Analysis Date = 04/01/2009 
 RPT Level = 0.01  Analysis Date = 03/20/2009 
 RPT Level = 0.01  Analysis Date = 03/20/2009 
 RPT Level = 0.01  Analysis Date = 03/20/2009 
 RPT Level = 0.01  Analysis Date = 03/20/2009 
 RPT Level = 0.01  Analysis Date = 03/10/2009 
 RPT Level = 0.01  Analysis Date = 03/10/2009 
 RPT Level = 0.01  Analysis Date = 03/03/2009 
 RPT Level = 0.01  Analysis Date = 03/03/2009 
 RPT Level = 0.01  Analysis Date = 02/23/2009 
 RPT Level = 0.01  Analysis Date = 02/23/2009 
 RPT Level = 0.01  Analysis Date = 02/18/2009 
 RPT Level = 0.01  Analysis Date = 02/18/2009 
 RPT Level = 0.01  Analysis Date = 02/23/2009 
 RPT Level = 0.01  Analysis Date = 02/23/2009 
 RPT Level = 0.01  Analysis Date = 02/04/2009 
 RPT Level = 0.01  Analysis Date = 02/04/2009 
 RPT Level = 0.01  Analysis Date = 02/04/2009 
 RPT Level = 0.01  Analysis Date = 02/04/2009 
 RPT Level = 0.01  Analysis Date = 01/26/2009 
 RPT Level = 0.01  Analysis Date = 01/26/2009 
 RPT Level = 0.01  Analysis Date = 01/15/2009 
 RPT Level = 0.01  Analysis Date = 01/15/2009 
 RPT Level = 0.01  Analysis Date = 01/13/2009 
 RPT Level = 0.01  Analysis Date = 01/13/2009 
 RPT Level = 0.01  Analysis Date = 01/13/2009 
 RPT Level = 0.01  Analysis Date = 01/13/2009 
 RPT Level = 0.01  Analysis Date = 12/31/2008 
 RPT Level = 0.01  Analysis Date = 12/31/2008 
 RPT Level = 0.01  Analysis Date = 12/15/2008 
 RPT Level = 0.01  Analysis Date = 12/15/2008 
 RPT Level = 0.01  Analysis Date = 12/08/2008 
 RPT Level = 0.01  Analysis Date = 12/08/2008 
 RPT Level = 0.01  Analysis Date = 12/08/2008 
 RPT Level = 0.01  Analysis Date = 12/08/2008 
 RPT Level = 0.01  Analysis Date = 12/01/2008 
 RPT Level = 0.01  Analysis Date = 12/01/2008 
 RPT Level = 0.01  Analysis Date = 11/24/2008 
 RPT Level = 0.01  Analysis Date = 11/24/2008 
 RPT Level = 0.01  Analysis Date = 11/20/2008 
 RPT Level = 0.01  Analysis Date = 11/20/2008 
 RPT Level = 0.01  Analysis Date = 11/12/2008 
 RPT Level = 0.01  Analysis Date = 11/12/2008 
 RPT Level = 0.01  Analysis Date = 10/23/2008 
 RPT Level = 0.01  Analysis Date = 10/23/2008 
 RPT Level = 0.01  Analysis Date = 10/21/2008 
 RPT Level = 0.01  Analysis Date = 10/21/2008 
 RPT Level = 0.01  Analysis Date = 10/08/2008 
 RPT Level = 0.01  Analysis Date = 10/08/2008 
 RPT Level = 0.01  Analysis Date = 10/08/2008 
 RPT Level = 0.01  Analysis Date = 10/08/2008 
 RPT Level = 0.01  Analysis Date = 10/02/2008 
 RPT Level = 0.01  Analysis Date = 10/02/2008 
 RPT Level = 0.01  Analysis Date = 09/29/2008 
 RPT Level = 0.01  Analysis Date = 09/29/2008 
 RPT Level = 0.01  Analysis Date = 09/24/2008 
 RPT Level = 0.01  Analysis Date = 09/24/2008 
 RPT Level = 0.01  Analysis Date = 09/10/2008 
 RPT Level = 0.01  Analysis Date = 09/10/2008 
 RPT Level = 0.01  Analysis Date = 09/05/2008 
 RPT Level = 0.01  Analysis Date = 09/05/2008 
 RPT Level = 0.01  Analysis Date = 08/28/2008 
 RPT Level = 0.01  Analysis Date = 08/28/2008 
 RPT Level = 0.01  Analysis Date = 08/19/2008 
 RPT Level = 0.01  Analysis Date = 08/19/2008 
 RPT Level = 0.01  Analysis Date = 08/18/2008 
 RPT Level = 0.01  Analysis Date = 08/18/2008 
 RPT Level = 0.01  Analysis Date = 07/25/2008 
 RPT Level = 0.01  Analysis Date = 07/25/2008 
 RPT Level = 0.01  Analysis Date = 07/21/2008 
 RPT Level = 0.01  Analysis Date = 07/21/2008 
 RPT Level = 0.01  Analysis Date = 07/14/2008 
 RPT Level = 0.01  Analysis Date = 07/14/2008 
 RPT Level = 0.01  Analysis Date = 07/14/2008 
 RPT Level = 0.01  Analysis Date = 07/14/2008 
 RPT Level = 0.01  Analysis Date = 06/27/2008 
 RPT Level = 0.01  Analysis Date = 06/27/2008 
 RPT Level = 0.01  Analysis Date = 06/25/2008 
 RPT Level = 0.01  Analysis Date = 06/25/2008 
 RPT Level = 0.01  Analysis Date = 06/27/2008 
 RPT Level = 0.01  Analysis Date = 06/27/2008 
 RPT Level = 0.01  Analysis Date = 06/11/2008 
 RPT Level = 0.01  Analysis Date = 06/11/2008 
 RPT Level = 0.01  Analysis Date = 06/10/2008 
 RPT Level = 0.01  Analysis Date = 06/10/2008 
 RPT Level = 0.01  Analysis Date = 06/02/2008 
 RPT Level = 0.01  Analysis Date = 06/02/2008 
 RPT Level = 0.01  Analysis Date = 05/30/2008 
 RPT Level = 0.01  Analysis Date = 05/30/2008 
 RPT Level = 0.01  Analysis Date = 05/19/2008 
 RPT Level = 0.01  Analysis Date = 05/19/2008 
 RPT Level = 0.01  Analysis Date = 05/07/2008 
 RPT Level = 0.01  Analysis Date = 05/07/2008 
 RPT Level = 0.01  Analysis Date = 04/24/2008 
 RPT Level = 0.01  Analysis Date = 04/24/2008 
 RPT Level = 0.01  Analysis Date = 04/21/2008 
 RPT Level = 0.01  Analysis Date = 04/21/2008 
 RPT Level = 0.01  Analysis Date = 04/15/2008 
 RPT Level = 0.01  Analysis Date = 04/15/2008 
 RPT Level = 0.01  Analysis Date = 04/15/2008 
 RPT Level = 0.01  Analysis Date = 04/15/2008 
 RPT Level = 0.01  Analysis Date = 03/27/2008 
 RPT Level = 0.01  Analysis Date = 03/27/2008 
 RPT Level = 0.01  Analysis Date = 03/19/2008 
 RPT Level = 0.01  Analysis Date = 03/19/2008 
 RPT Level = 0.01  Analysis Date = 03/13/2008 
 RPT Level = 0.01  Analysis Date = 03/13/2008 
 RPT Level = 0.01  Analysis Date = 03/07/2008 
 RPT Level = 0.01  Analysis Date = 03/07/2008 
 RPT Level = 0.01  Analysis Date = 03/07/2008 
 RPT Level = 0.01  Analysis Date = 03/07/2008 
 RPT Level = 0.01  Analysis Date = 03/10/2008 
 RPT Level = 0.01  Analysis Date = 03/10/2008 
 RPT Level = 0.01  Analysis Date = 03/10/2008 
 RPT Level = 0.01  Analysis Date = 03/10/2008 
 RPT Level = 0.01  Analysis Date = 02/28/2008 
 RPT Level = 0.01  Analysis Date = 02/28/2008 
 RPT Level = 0.01  Analysis Date = 02/20/2008 
 RPT Level = 0.01  Analysis Date = 02/20/2008 
 RPT Level = 0.01  Analysis Date = 01/29/2008 
 RPT Level = 0.01  Analysis Date = 01/29/2008 
 RPT Level = 0.01  Analysis Date = 01/17/2008 
 RPT Level = 0.01  Analysis Date = 01/17/2008 
 RPT Level = 0.01  Analysis Date = 01/11/2008 
 RPT Level = 0.01  Analysis Date = 01/11/2008 
 RPT Level = 0.01  Analysis Date = 01/09/2008 
 RPT Level = 0.01  Analysis Date = 01/09/2008 
 RPT Level = 0.01  Analysis Date = 01/02/2008 
 RPT Level = 0.01  Analysis Date = 01/02/2008 
 RPT Level = 0.01  Analysis Date = 12/17/2007 
 RPT Level = 0.01  Analysis Date = 12/17/2007 
 RPT Level = 0.01  Analysis Date = 12/06/2007 
 RPT Level = 0.01  Analysis Date = 12/06/2007 
 RPT Level = 0.01  Analysis Date = 11/28/2007 
 RPT Level = 0.01  Analysis Date = 11/28/2007 
 RPT Level = 0.01  Analysis Date = 11/28/2007 
 RPT Level = 0.01  Analysis Date = 11/28/2007 
 RPT Level = 0.01  Analysis Date = 11/19/2007 
 RPT Level = 0.01  Analysis Date = 11/19/2007 
 RPT Level = 0.01  Analysis Date = 11/14/2007 
 RPT Level = 0.01  Analysis Date = 11/14/2007 
 RPT Level = 0.01  Analysis Date = 11/14/2007 
 RPT Level = 0.01  Analysis Date = 11/14/2007 
 RPT Level = 0.01  Analysis Date = 11/05/2007 
 RPT Level = 0.01  Analysis Date = 11/05/2007 
 RPT Level = 0.01  Analysis Date = 10/25/2007 
 RPT Level = 0.01  Analysis Date = 10/25/2007 
 RPT Level = 0.01  Analysis Date = 10/19/2007 
 RPT Level = 0.01  Analysis Date = 10/19/2007 
 RPT Level = 0.01  Analysis Date = 10/03/2007 
 RPT Level = 0.01  Analysis Date = 10/03/2007 
 RPT Level = 0.01  Analysis Date = 09/24/2007 
 RPT Level = 0.01  Analysis Date = 09/24/2007 
 RPT Level = 0.01  Analysis Date = 09/17/2007 
 RPT Level = 0.01  Analysis Date = 09/17/2007 
 RPT Level = 0.01  Analysis Date = 09/07/2007 
 RPT Level = 0.01  Analysis Date = 09/07/2007 
 RPT Level = 0.01  Analysis Date = 09/06/2007 
 RPT Level = 0.01  Analysis Date = 09/06/2007 
 RPT Level = 0.01  Analysis Date = 08/29/2007 
 RPT Level = 0.01  Analysis Date = 08/29/2007 
 RPT Level = 0.01  Analysis Date = 08/21/2007 
 RPT Level = 0.01  Analysis Date = 08/21/2007 
 RPT Level = 0.01  Analysis Date = 08/21/2007 
 RPT Level = 0.01  Analysis Date = 08/21/2007 
 RPT Level = 0.01  Analysis Date = 08/07/2007 
 RPT Level = 0.01  Analysis Date = 08/07/2007 
 RPT Level = 0.01  Analysis Date = 08/06/2007 
 RPT Level = 0.01  Analysis Date = 08/06/2007 
 RPT Level = 0.01  Analysis Date = 07/17/2007 
 RPT Level = 0.01  Analysis Date = 07/17/2007 
 RPT Level = 0.01  Analysis Date = 07/06/2007 
 RPT Level = 0.01  Analysis Date = 07/06/2007 
 RPT Level = 0.01  Analysis Date = 07/02/2007 
 RPT Level = 0.01  Analysis Date = 07/02/2007 
 RPT Level = 0.01  Analysis Date = 06/21/2007 
 RPT Level = 0.01  Analysis Date = 06/21/2007 
 RPT Level = 0.01  Analysis Date = 06/19/2007 
 RPT Level = 0.01  Analysis Date = 06/19/2007 
 RPT Level = 0.01  Analysis Date = 06/08/2007 
 RPT Level = 0.01  Analysis Date = 06/08/2007 
 RPT Level = 0.01  Analysis Date = 06/05/2007 
 RPT Level = 0.01  Analysis Date = 06/05/2007 
 RPT Level = 0.01  Analysis Date = 05/24/2007 
 RPT Level = 0.01  Analysis Date = 05/24/2007 
 RPT Level = 0.01  Analysis Date = 05/16/2007 
 RPT Level = 0.01  Analysis Date = 05/16/2007 
 RPT Level = 0.01  Analysis Date = 05/14/2007 
 RPT Level = 0.01  Analysis Date = 05/14/2007 
 RPT Level = 0.01  Analysis Date = 05/07/2007 
 RPT Level = 0.01  Analysis Date = 05/07/2007 
 RPT Level = 0.01  Analysis Date = 04/27/2007 
 RPT Level = 0.01  Analysis Date = 04/27/2007 
 RPT Level = 0.01  Analysis Date = 04/19/2007 
 RPT Level = 0.01  Analysis Date = 04/19/2007 
 RPT Level = 0.01  Analysis Date = 04/16/2007 
 RPT Level = 0.01  Analysis Date = 04/16/2007 
 RPT Level = 0.01  Analysis Date = 04/10/2007 
 RPT Level = 0.01  Analysis Date = 04/10/2007 
 RPT Level = 0.01  Analysis Date = 03/30/2007 
 RPT Level = 0.01  Analysis Date = 03/30/2007 
 RPT Level = 0.01  Analysis Date = 03/21/2007 
 RPT Level = 0.01  Analysis Date = 03/21/2007 
 RPT Level = 0.01  Analysis Date = 03/16/2007 
 RPT Level = 0.01  Analysis Date = 03/16/2007 
 RPT Level = 0.01  Analysis Date = 03/08/2007 
 RPT Level = 0.01  Analysis Date = 03/08/2007 
 RPT Level = 0.01  Analysis Date = 03/05/2007 
 RPT Level = 0.01  Analysis Date = 03/05/2007 
 RPT Level = 0.01  Analysis Date = 02/28/2007 
 RPT Level = 0.01  Analysis Date = 02/28/2007 
 RPT Level = 0.01  Analysis Date = 02/16/2007 
 RPT Level = 0.01  Analysis Date = 02/16/2007 
 RPT Level = 0.01  Analysis Date = 02/16/2007 
 RPT Level = 0.01  Analysis Date = 02/16/2007 
 RPT Level = 0.01  Analysis Date = 01/30/2007 
 RPT Level = 0.01  Analysis Date = 01/30/2007 
 RPT Level = 0.01  Analysis Date = 01/25/2007 
 RPT Level = 0.01  Analysis Date = 01/25/2007 
 RPT Level = 0.01  Analysis Date = 01/25/2007 
 RPT Level = 0.01  Analysis Date = 01/25/2007 
 RPT Level = 0.01  Analysis Date = 10/12/2006 
 RPT Level = 0.01  Analysis Date = 10/12/2006 
 RPT Level = 0.01  Analysis Date = 10/10/2006 
 RPT Level = 0.01  Analysis Date = 10/10/2006 
 RPT Level = 0.01  Analysis Date = 10/10/2006 
 RPT Level = 0.01  Analysis Date = 10/10/2006 
 RPT Level = 0.01  Analysis Date = 10/02/2006 
 RPT Level = 0.01  Analysis Date = 10/02/2006 
 RPT Level = 0.01  Analysis Date = 08/25/2006 
 RPT Level = 0.01  Analysis Date = 08/25/2006 
 RPT Level = 0.01  Analysis Date = 08/15/2006 
 RPT Level = 0.01  Analysis Date = 08/15/2006 
 RPT Level = 0.01  Analysis Date = 08/01/2006 
 RPT Level = 0.01  Analysis Date = 08/01/2006 
 RPT Level = 0.01  Analysis Date = 07/27/2006 
 RPT Level = 0.01  Analysis Date = 07/27/2006 
 RPT Level = 0.01  Analysis Date = 07/14/2006 
 RPT Level = 0.01  Analysis Date = 07/14/2006 
 RPT Level = 0.01  Analysis Date = 07/06/2006 
 RPT Level = 0.01  Analysis Date = 07/06/2006 
 RPT Level = 0.01  Analysis Date = 07/05/2006 
 RPT Level = 0.01  Analysis Date = 07/05/2006 
 RPT Level = 0.01  Analysis Date = 06/29/2006 
 RPT Level = 0.01  Analysis Date = 06/29/2006 
 RPT Level = 0.01  Analysis Date = 06/01/2006 
 RPT Level = 0.01  Analysis Date = 06/01/2006 
 RPT Level = 0.01  Analysis Date = 05/15/2006 
 RPT Level = 0.01  Analysis Date = 05/15/2006 
 RPT Level = 0.01  Analysis Date = 05/08/2006 
 RPT Level = 0.01  Analysis Date = 05/08/2006 
 RPT Level = 0.01  Analysis Date = 09/26/2005 
 RPT Level = 0.01  Analysis Date = 09/26/2005 
 RPT Level = 0.01  Analysis Date = 09/23/2005 
 RPT Level = 0.01  Analysis Date = 09/23/2005 
 RPT Level = 0.01  Analysis Date = 09/02/2005 
 RPT Level = 0.01  Analysis Date = 09/02/2005 
 RPT Level = 0.01  Analysis Date = 08/29/2005 
 RPT Level = 0.01  Analysis Date = 08/29/2005 
 RPT Level = 0.01  Analysis Date = 08/25/2005 
 RPT Level = 0.01  Analysis Date = 08/25/2005 
 RPT Level = 0.01  Analysis Date = 08/12/2005 
 RPT Level = 0.01  Analysis Date = 08/12/2005 
 RPT Level = 0.01  Analysis Date = 08/11/2005 
 RPT Level = 0.01  Analysis Date = 08/11/2005 
 RPT Level = 0.01  Analysis Date = 08/11/2005 
 RPT Level = 0.01  Analysis Date = 08/11/2005 
 RPT Level = 0.01  Analysis Date = 07/29/2005 
 RPT Level = 0.01  Analysis Date = 07/29/2005 
 RPT Level = 0.01  Analysis Date = 07/15/2005 
 RPT Level = 0.01  Analysis Date = 07/15/2005 
 RPT Level = 0.01  Analysis Date = 07/15/2005 
 RPT Level = 0.01  Analysis Date = 07/15/2005 
 RPT Level = 0.01  Analysis Date = 07/05/2005 
 RPT Level = 0.01  Analysis Date = 07/05/2005 
 RPT Level = 0.01  Analysis Date = 06/30/2005 
 RPT Level = 0.01  Analysis Date = 06/30/2005 
 RPT Level = 0.01  Analysis Date = 06/17/2005 
 RPT Level = 0.01  Analysis Date = 06/17/2005 
 RPT Level = 0.01  Analysis Date = 06/15/2005 
 RPT Level = 0.01  Analysis Date = 06/15/2005 
 RPT Level = 0.01  Analysis Date = 06/06/2005 
 RPT Level = 0.01  Analysis Date = 06/06/2005 
 RPT Level = 0.01  Analysis Date = 05/27/2005 
 RPT Level = 0.01  Analysis Date = 05/27/2005 
 RPT Level = 0.01  Analysis Date = 05/23/2005 
 RPT Level = 0.01  Analysis Date = 05/23/2005 
 RPT Level = 0.01  Analysis Date = 05/20/2005 
 RPT Level = 0.01  Analysis Date = 05/20/2005 
 RPT Level = 0.01  Analysis Date = 05/11/2005 
 RPT Level = 0.01  Analysis Date = 05/11/2005 
 RPT Level = 0.01  Analysis Date = 05/10/2005 
 RPT Level = 0.01  Analysis Date = 05/10/2005 
 RPT Level = 0.01  Analysis Date = 04/29/2005 
 RPT Level = 0.01  Analysis Date = 04/29/2005 
 RPT Level = 0.01  Analysis Date = 04/28/2005 
 RPT Level = 0.01  Analysis Date = 04/28/2005 
 RPT Level = 0.01  Analysis Date = 04/12/2005 
 RPT Level = 0.01  Analysis Date = 04/12/2005 
 RPT Level = 0.01  Analysis Date = 04/05/2005 
 RPT Level = 0.01  Analysis Date = 04/05/2005 
 RPT Level = 0.01  Analysis Date = 03/30/2005 
 RPT Level = 0.01  Analysis Date = 03/30/2005 
 RPT Level = 0.01  Analysis Date = 03/21/2005 
 RPT Level = 0.01  Analysis Date = 03/21/2005 
 RPT Level = 0.01  Analysis Date = 03/15/2005 
 RPT Level = 0.01  Analysis Date = 03/15/2005 
 RPT Level = 0.01  Analysis Date = 03/15/2005 
 RPT Level = 0.01  Analysis Date = 03/15/2005 
 RPT Level = 0.01  Analysis Date = 03/14/2005 
 RPT Level = 0.01  Analysis Date = 03/14/2005 
 RPT Level = 0.01  Analysis Date = 03/08/2005 
 RPT Level = 0.01  Analysis Date = 03/08/2005 
 RPT Level = 0.01  Analysis Date = 02/24/2005 
 RPT Level = 0.01  Analysis Date = 02/24/2005 
 RPT Level = 0.01  Analysis Date = 02/16/2005 
 RPT Level = 0.01  Analysis Date = 02/16/2005 
 RPT Level = 0.01  Analysis Date = 02/14/2005 
 RPT Level = 0.01  Analysis Date = 02/14/2005 
 RPT Level = 0.01  Analysis Date = 01/27/2005 
 RPT Level = 0.01  Analysis Date = 01/27/2005 
 RPT Level = 0.01  Analysis Date = 01/26/2005 
 RPT Level = 0.01  Analysis Date = 01/26/2005 
 RPT Level = 0.01  Analysis Date = 01/20/2005 
 RPT Level = 0.01  Analysis Date = 01/20/2005 
 RPT Level = 0.01  Analysis Date = 01/11/2005 
 RPT Level = 0.01  Analysis Date = 01/11/2005 
 RPT Level = 0.01  Analysis Date = 01/07/2005 
 RPT Level = 0.01  Analysis Date = 01/07/2005 
 RPT Level = 0.01  Analysis Date = 01/07/2005 
 RPT Level = 0.01  Analysis Date = 01/07/2005 
 RPT Level = 0.01  Analysis Date = 01/07/2005 
 RPT Level = 0.01  Analysis Date = 01/07/2005 
 RPT Level = 0.01  Analysis Date = 12/22/2004 
 RPT Level = 0.01  Analysis Date = 12/22/2004 
 RPT Level = 0.01  Analysis Date = 12/22/2004 
 RPT Level = 0.01  Analysis Date = 12/22/2004 
 RPT Level = 0.01  Analysis Date = 12/15/2004 
 RPT Level = 0.01  Analysis Date = 12/15/2004 
 RPT Level = 0.01  Analysis Date = 12/15/2004 
 RPT Level = 0.01  Analysis Date = 12/15/2004 
 RPT Level = 0.01  Analysis Date = 12/15/2004 
 RPT Level = 0.01  Analysis Date = 12/15/2004 
 RPT Level = 0.01  Analysis Date = 12/15/2004 
 RPT Level = 0.01  Analysis Date = 12/15/2004 
 RPT Level = 0.01  Analysis Date = 12/01/2004 
 RPT Level = 0.01  Analysis Date = 12/01/2004 
 RPT Level = 0.01  Analysis Date = 12/01/2004 
 RPT Level = 0.01  Analysis Date = 12/01/2004 
 RPT Level = 0.01  Analysis Date = 11/26/2004 
 RPT Level = 0.01  Y = 0
The SGPlot Procedure

False Positive Rate for Phosphorus (as P), FIL, CFA, ALK-P

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Phosphorus (as P), FIL, CFA, ALK-P 00666CL063 2004 17 0 0%
    2005 50 0 0%
    2006 15 0 0%
    2007 36 0 0%
    2008 50 0 0%
    2009 52 1 2%
    2010 52 0 0%
    2011 52 0 0%
    2012 52 1 2%
    2013 53 1 2%
    2014 47 0 0%
    2015 52 1 2%
    2016 50 2 4%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Phosphorus (as P), FIL, CFA, ALK-P, ACD -
Blind Blank Results
Lab: NWQL, PCode: 00666, MCode: CL062
Analysis dates: 06/09/04 through 07/14/11
Open Data Set

 Analysis Date = 04/29/2011 
 Lab Value = -0.022 
 RPT Level = 0.01 
 Lab Sample ID = 20111150112  Analysis Date = 04/29/2011 
 Lab Value = -0.022 
 RPT Level = 0.01 
 Lab Sample ID = 20111150112  Analysis Date = 07/07/2009 
 Lab Value = 0.018 
 RPT Level = 0.01 
 Lab Sample ID = 20091730221  Analysis Date = 07/07/2009 
 Lab Value = 0.018 
 RPT Level = 0.01 
 Lab Sample ID = 20091730221  Analysis Date = 07/14/2011 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20111920101  Analysis Date = 07/14/2011 
 Lab Value = 0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20111860061  Analysis Date = 07/14/2011 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20111780163  Analysis Date = 06/24/2011 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20111710110  Analysis Date = 06/17/2011 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20111640065  Analysis Date = 06/13/2011 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20111570060  Analysis Date = 06/13/2011 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20111510148  Analysis Date = 05/31/2011 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20111430201  Analysis Date = 05/31/2011 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20111360139  Analysis Date = 05/12/2011 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20111290045  Analysis Date = 05/12/2011 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20111220084  Analysis Date = 04/26/2011 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20111080074  Analysis Date = 04/13/2011 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20111010119  Analysis Date = 04/13/2011 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20110950055  Analysis Date = 04/06/2011 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20110870091  Analysis Date = 03/23/2011 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20110800058  Analysis Date = 03/23/2011 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20110750069  Analysis Date = 03/14/2011 
 Lab Value = 0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20110660030  Analysis Date = 03/04/2011 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20110590069  Analysis Date = 03/04/2011 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20110530104  Analysis Date = 03/02/2011 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20110450035  Analysis Date = 03/02/2011 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20110410097  Analysis Date = 03/02/2011 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20110400068  Analysis Date = 01/28/2011 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20110240064  Analysis Date = 01/28/2011 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20110180058  Analysis Date = 01/14/2011 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20110110017  Analysis Date = 01/14/2011 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20110030022  Analysis Date = 01/14/2011 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20103610055  Analysis Date = 01/14/2011 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20103540045  Analysis Date = 12/21/2010 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20103470075  Analysis Date = 12/21/2010 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20103400083  Analysis Date = 12/09/2010 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20103330098  Analysis Date = 12/09/2010 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20103260066  Analysis Date = 12/09/2010 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20103190067  Analysis Date = 11/18/2010 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20103120027  Analysis Date = 11/18/2010 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20103060009  Analysis Date = 11/18/2010 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20102990005  Analysis Date = 10/27/2010 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20102920007  Analysis Date = 10/27/2010 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20102850131  Analysis Date = 10/14/2010 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20102770103  Analysis Date = 10/14/2010 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20102700153  Analysis Date = 09/29/2010 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20102640135  Analysis Date = 09/29/2010 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20102570022  Analysis Date = 09/16/2010 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20102510060  Analysis Date = 09/16/2010 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20102430251  Analysis Date = 09/01/2010 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20102350198  Analysis Date = 09/01/2010 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20102290051  Analysis Date = 09/01/2010 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20102230039  Analysis Date = 08/12/2010 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20102140089  Analysis Date = 08/04/2010 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20102080018  Analysis Date = 07/29/2010 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20102000187  Analysis Date = 07/20/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20101930105  Analysis Date = 07/20/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20101870061  Analysis Date = 07/20/2010 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20101790122  Analysis Date = 07/01/2010 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20101730069  Analysis Date = 07/01/2010 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20101660063  Analysis Date = 07/01/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20101590013  Analysis Date = 06/09/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20101530121  Analysis Date = 06/09/2010 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20101450016  Analysis Date = 06/09/2010 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20101380022  Analysis Date = 05/20/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20101310096  Analysis Date = 05/20/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20101240078  Analysis Date = 05/05/2010 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20101180040  Analysis Date = 05/05/2010 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20101090060  Analysis Date = 05/05/2010 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20101020074  Analysis Date = 04/15/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20100950035  Analysis Date = 04/01/2010 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20100880050  Analysis Date = 04/01/2010 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20100850063  Analysis Date = 04/01/2010 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20100750001  Analysis Date = 03/16/2010 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20100680015  Analysis Date = 03/05/2010 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20100600068  Analysis Date = 02/24/2010 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20100530047  Analysis Date = 02/24/2010 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20100470026  Analysis Date = 02/18/2010 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20100390037  Analysis Date = 02/05/2010 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20100320021  Analysis Date = 02/05/2010 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20100260064  Analysis Date = 02/05/2010 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20100190104  Analysis Date = 01/20/2010 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20100110097  Analysis Date = 01/20/2010 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20100050015  Analysis Date = 01/20/2010 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20093620045  Analysis Date = 01/20/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20093560035  Analysis Date = 12/22/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20093480065  Analysis Date = 12/11/2009 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20093420008  Analysis Date = 12/11/2009 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20093350069  Analysis Date = 12/11/2009 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20093280016  Analysis Date = 11/19/2009 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20093200089  Analysis Date = 11/19/2009 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20093130060  Analysis Date = 11/19/2009 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20093070203  Analysis Date = 11/19/2009 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20093000108  Analysis Date = 10/22/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20092920099  Analysis Date = 10/22/2009 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20092870072  Analysis Date = 10/22/2009 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20092780069  Analysis Date = 10/07/2009 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20092720021  Analysis Date = 10/07/2009 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20092640045  Analysis Date = 10/07/2009 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20092570047  Analysis Date = 09/16/2009 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20092520131  Analysis Date = 09/16/2009 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20092430157  Analysis Date = 09/16/2009 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20092360172  Analysis Date = 09/16/2009 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20092290213  Analysis Date = 08/19/2009 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20092220153  Analysis Date = 08/11/2009 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20092150075  Analysis Date = 08/11/2009 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20092090265  Analysis Date = 07/22/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20092010113  Analysis Date = 07/22/2009 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20091950024  Analysis Date = 07/22/2009 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20091870028  Analysis Date = 07/07/2009 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20091800171  Analysis Date = 06/18/2009 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20091660209  Analysis Date = 06/18/2009 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20091590089  Analysis Date = 06/18/2009 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20091520153  Analysis Date = 06/02/2009 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20091460191  Analysis Date = 06/02/2009 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20091380124  Analysis Date = 05/20/2009 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20091320021  Analysis Date = 05/20/2009 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20091240122  Analysis Date = 05/20/2009 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20091170108  Analysis Date = 04/28/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20091110107  Analysis Date = 04/28/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20091030084  Analysis Date = 04/28/2009 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20090960052  Analysis Date = 04/01/2009 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20090890067  Analysis Date = 04/01/2009 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20090820026  Analysis Date = 03/25/2009 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20090750045  Analysis Date = 03/17/2009 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20090680047  Analysis Date = 03/17/2009 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20090610058  Analysis Date = 02/26/2009 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20090540031  Analysis Date = 02/24/2009 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20090480056  Analysis Date = 02/12/2009 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20090400029  Analysis Date = 02/12/2009 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20090330036  Analysis Date = 02/12/2009 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20090260025  Analysis Date = 01/22/2009 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20090200033  Analysis Date = 01/15/2009 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20090120047  Analysis Date = 01/15/2009 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20090050018  Analysis Date = 01/15/2009 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20083650082  Analysis Date = 12/31/2008 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20083570035  Analysis Date = 12/18/2008 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20083520228  Analysis Date = 12/15/2008 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20083450059  Analysis Date = 12/10/2008 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20083360038  Analysis Date = 12/10/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20083290063  Analysis Date = 11/24/2008 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20083220066  Analysis Date = 11/24/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20083150064  Analysis Date = 11/24/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20083080098  Analysis Date = 11/04/2008 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20083010106  Analysis Date = 10/23/2008 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20082940060  Analysis Date = 10/20/2008 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20082880038  Analysis Date = 10/09/2008 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20082800045  Analysis Date = 10/07/2008 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20082730059  Analysis Date = 10/07/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20082660045  Analysis Date = 09/23/2008 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20082590107  Analysis Date = 09/11/2008 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20082520009  Analysis Date = 09/11/2008 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20082460099  Analysis Date = 08/27/2008 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20082380078  Analysis Date = 08/27/2008 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20082310132  Analysis Date = 08/27/2008 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20082250012  Analysis Date = 08/07/2008 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20082190010  Analysis Date = 07/23/2008 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20082030128  Analysis Date = 07/21/2008 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20081970138  Analysis Date = 07/14/2008 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20081890042  Analysis Date = 07/03/2008 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20081820062  Analysis Date = 07/03/2008 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20081750126  Analysis Date = 06/26/2008 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20081680068  Analysis Date = 06/11/2008 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20081620016  Analysis Date = 06/11/2008 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20081540110  Analysis Date = 06/11/2008 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20081480070  Analysis Date = 05/29/2008 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20081400059  Analysis Date = 05/29/2008 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20081330114  Analysis Date = 05/29/2008 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20081260069  Analysis Date = 04/30/2008 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20081190056  Analysis Date = 04/22/2008 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20081120035  Analysis Date = 04/21/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20081050115  Analysis Date = 04/15/2008 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20080980082  Analysis Date = 04/04/2008 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20080920084  Analysis Date = 03/26/2008 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20080840065  Analysis Date = 03/26/2008 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20080770123  Analysis Date = 03/12/2008 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20080700073  Analysis Date = 03/12/2008 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20080630068  Analysis Date = 03/12/2008 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20080560071  Analysis Date = 02/26/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20080510054  Analysis Date = 02/26/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20080420073  Analysis Date = 01/31/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20080280049  Analysis Date = 01/25/2008 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20080230019  Analysis Date = 01/22/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20080140026  Analysis Date = 01/08/2008 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20080070021  Analysis Date = 01/07/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20073620003  Analysis Date = 12/20/2007 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20073510100  Analysis Date = 12/18/2007 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20073440026  Analysis Date = 12/06/2007 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20073370067  Analysis Date = 11/28/2007 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20073300043  Analysis Date = 11/28/2007 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20073230112  Analysis Date = 11/16/2007 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20073170061  Analysis Date = 11/14/2007 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20073100010  Analysis Date = 10/31/2007 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20073020059  Analysis Date = 10/29/2007 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20072960178  Analysis Date = 10/29/2007 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20072890057  Analysis Date = 10/22/2007 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20072850024  Analysis Date = 09/26/2007 
 Lab Value = 0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20072670055  Analysis Date = 09/20/2007 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20072600128  Analysis Date = 09/20/2007 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20072540014  Analysis Date = 09/11/2007 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20072480016  Analysis Date = 09/11/2007 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20072400019  Analysis Date = 08/27/2007 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20072330110  Analysis Date = 08/27/2007 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20072260199  Analysis Date = 08/21/2007 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20072210251  Analysis Date = 08/07/2007 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20072110163  Analysis Date = 08/07/2007 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20072040100  Analysis Date = 08/07/2007 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20071900106  Analysis Date = 07/05/2007 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20071830157  Analysis Date = 07/05/2007 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20071770202  Analysis Date = 06/27/2007 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20071690115  Analysis Date = 06/18/2007 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20071620049  Analysis Date = 06/08/2007 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20071560023  Analysis Date = 06/08/2007 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20071500032  Analysis Date = 05/29/2007 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20071410090  Analysis Date = 05/16/2007 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20071340114  Analysis Date = 05/16/2007 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20071280017  Analysis Date = 05/07/2007 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20071200085  Analysis Date = 05/07/2007 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20071130123  Analysis Date = 04/24/2007 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20071070019  Analysis Date = 04/18/2007 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20070990049  Analysis Date = 04/05/2007 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20070930069  Analysis Date = 04/05/2007 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20070860216  Analysis Date = 03/26/2007 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20070780127  Analysis Date = 03/26/2007 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20070710074  Analysis Date = 03/15/2007 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20070650012  Analysis Date = 03/15/2007 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20070580140  Analysis Date = 03/15/2007 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20070540026  Analysis Date = 02/22/2007 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20070460018  Analysis Date = 02/14/2007 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20070400104  Analysis Date = 02/02/2007 
 Lab Value = -0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20070250021  Analysis Date = 01/25/2007 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20070180073  Analysis Date = 01/25/2007 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20070120011  Analysis Date = 09/22/2005 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20052590036  Analysis Date = 09/22/2005 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20052520007  Analysis Date = 09/22/2005 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20052430005  Analysis Date = 08/31/2005 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20052370001  Analysis Date = 08/31/2005 
 Lab Value = -0.014 
 RPT Level = 0.01 
 Lab Sample ID = 20052300008  Analysis Date = 08/16/2005 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20052210011  Analysis Date = 08/16/2005 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20052160008  Analysis Date = 08/16/2005 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20052160006  Analysis Date = 08/02/2005 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20052010006  Analysis Date = 07/18/2005 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20051940016  Analysis Date = 07/18/2005 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20051880017  Analysis Date = 07/08/2005 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20051800188  Analysis Date = 07/08/2005 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20051740018  Analysis Date = 06/24/2005 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20051660175  Analysis Date = 06/24/2005 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20051590026  Analysis Date = 06/08/2005 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20051530020  Analysis Date = 05/27/2005 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20051440044  Analysis Date = 05/24/2005 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20051380015  Analysis Date = 05/24/2005 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20051320028  Analysis Date = 05/11/2005 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20051250004  Analysis Date = 04/29/2005 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20051170011  Analysis Date = 04/29/2005 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20051110005  Analysis Date = 04/14/2005 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20051020017  Analysis Date = 04/14/2005 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20050950045  Analysis Date = 04/05/2005 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20050880117  Analysis Date = 04/05/2005 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20050840097  Analysis Date = 04/05/2005 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20050750005  Analysis Date = 03/17/2005 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20050700006  Analysis Date = 03/17/2005 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20050700005  Analysis Date = 03/17/2005 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20050670011  Analysis Date = 03/03/2005 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20050550023  Analysis Date = 02/24/2005 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20050480006  Analysis Date = 02/16/2005 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20050410008  Analysis Date = 02/16/2005 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20050340022  Analysis Date = 02/03/2005 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20050260023  Analysis Date = 01/25/2005 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20050200049  Analysis Date = 01/25/2005 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20050130092  Analysis Date = 01/11/2005 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20050070015  Analysis Date = 01/05/2005 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20043650003  Analysis Date = 01/05/2005 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20043580036  Analysis Date = 01/05/2005 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20043580034  Analysis Date = 12/23/2004 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20043520024  Analysis Date = 12/23/2004 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20043510017  Analysis Date = 12/23/2004 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20043450068  Analysis Date = 12/23/2004 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20043440148  Analysis Date = 12/10/2004 
 Lab Value = -0.013 
 RPT Level = 0.01 
 Lab Sample ID = 20043380004  Analysis Date = 12/10/2004 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20043380003  Analysis Date = 12/01/2004 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20043310058  Analysis Date = 12/01/2004 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20043280049  Analysis Date = 11/23/2004 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20043240013  Analysis Date = 09/07/2004 
 Lab Value = -0.003 
 RPT Level =  
 Lab Sample ID = 20042450137  Analysis Date = 09/07/2004 
 Lab Value = -0.003 
 RPT Level =  
 Lab Sample ID = 20042400090  Analysis Date = 09/07/2004 
 Lab Value = 0.002 
 RPT Level =  
 Lab Sample ID = 20042370106  Analysis Date = 08/25/2004 
 Lab Value = -0.001 
 RPT Level =  
 Lab Sample ID = 20042330207  Analysis Date = 08/25/2004 
 Lab Value = 0.002 
 RPT Level =  
 Lab Sample ID = 20042320135  Analysis Date = 08/25/2004 
 Lab Value = -0.004 
 RPT Level =  
 Lab Sample ID = 20042320137  Analysis Date = 08/17/2004 
 Lab Value = 0.001 
 RPT Level =  
 Lab Sample ID = 20042240113  Analysis Date = 08/05/2004 
 Lab Value = -0.003 
 RPT Level =  
 Lab Sample ID = 20042170122  Analysis Date = 08/05/2004 
 Lab Value = -0.002 
 RPT Level =  
 Lab Sample ID = 20042110014  Analysis Date = 07/29/2004 
 Lab Value = 0 
 RPT Level =  
 Lab Sample ID = 20042040077  Analysis Date = 07/21/2004 
 Lab Value = 0.006 
 RPT Level =  
 Lab Sample ID = 20041960049  Analysis Date = 07/13/2004 
 Lab Value = 0.005 
 RPT Level =  
 Lab Sample ID = 20041900061  Analysis Date = 07/13/2004 
 Lab Value = 0.006 
 RPT Level =  
 Lab Sample ID = 20041820034  Analysis Date = 07/13/2004 
 Lab Value = 0.005 
 RPT Level =  
 Lab Sample ID = 20041750056  Analysis Date = 06/22/2004 
 Lab Value = -0.008 
 RPT Level =  
 Lab Sample ID = 20041700082  Analysis Date = 06/22/2004 
 Lab Value = -0.004 
 RPT Level =  
 Lab Sample ID = 20041610056  Analysis Date = 06/09/2004 
 Lab Value = 0 
 RPT Level =  
 Lab Sample ID = 20041550020  Analysis Date = 07/14/2011 
 RPT Level = 0.01  Analysis Date = 07/14/2011 
 RPT Level = 0.01  Analysis Date = 07/14/2011 
 RPT Level = 0.01  Analysis Date = 07/14/2011 
 RPT Level = 0.01  Analysis Date = 07/14/2011 
 RPT Level = 0.01  Analysis Date = 06/24/2011 
 RPT Level = 0.01  Analysis Date = 06/24/2011 
 RPT Level = 0.01  Analysis Date = 06/17/2011 
 RPT Level = 0.01  Analysis Date = 06/17/2011 
 RPT Level = 0.01  Analysis Date = 06/13/2011 
 RPT Level = 0.01  Analysis Date = 06/13/2011 
 RPT Level = 0.01  Analysis Date = 06/13/2011 
 RPT Level = 0.01  Analysis Date = 06/13/2011 
 RPT Level = 0.01  Analysis Date = 05/31/2011 
 RPT Level = 0.01  Analysis Date = 05/31/2011 
 RPT Level = 0.01  Analysis Date = 05/31/2011 
 RPT Level = 0.01  Analysis Date = 05/31/2011 
 RPT Level = 0.01  Analysis Date = 05/12/2011 
 RPT Level = 0.01  Analysis Date = 05/12/2011 
 RPT Level = 0.01  Analysis Date = 05/12/2011 
 RPT Level = 0.01  Analysis Date = 05/12/2011 
 RPT Level = 0.01  Analysis Date = 04/29/2011 
 RPT Level = 0.01  Analysis Date = 04/29/2011 
 RPT Level = 0.01  Analysis Date = 04/26/2011 
 RPT Level = 0.01  Analysis Date = 04/26/2011 
 RPT Level = 0.01  Analysis Date = 04/13/2011 
 RPT Level = 0.01  Analysis Date = 04/13/2011 
 RPT Level = 0.01  Analysis Date = 04/13/2011 
 RPT Level = 0.01  Analysis Date = 04/13/2011 
 RPT Level = 0.01  Analysis Date = 04/06/2011 
 RPT Level = 0.01  Analysis Date = 04/06/2011 
 RPT Level = 0.01  Analysis Date = 03/23/2011 
 RPT Level = 0.01  Analysis Date = 03/23/2011 
 RPT Level = 0.01  Analysis Date = 03/23/2011 
 RPT Level = 0.01  Analysis Date = 03/23/2011 
 RPT Level = 0.01  Analysis Date = 03/14/2011 
 RPT Level = 0.01  Analysis Date = 03/14/2011 
 RPT Level = 0.01  Analysis Date = 03/04/2011 
 RPT Level = 0.01  Analysis Date = 03/04/2011 
 RPT Level = 0.01  Analysis Date = 03/04/2011 
 RPT Level = 0.01  Analysis Date = 03/04/2011 
 RPT Level = 0.01  Analysis Date = 03/02/2011 
 RPT Level = 0.01  Analysis Date = 03/02/2011 
 RPT Level = 0.01  Analysis Date = 03/02/2011 
 RPT Level = 0.01  Analysis Date = 03/02/2011 
 RPT Level = 0.01  Analysis Date = 03/02/2011 
 RPT Level = 0.01  Analysis Date = 03/02/2011 
 RPT Level = 0.01  Analysis Date = 01/28/2011 
 RPT Level = 0.01  Analysis Date = 01/28/2011 
 RPT Level = 0.01  Analysis Date = 01/28/2011 
 RPT Level = 0.01  Analysis Date = 01/28/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 12/21/2010 
 RPT Level = 0.01  Analysis Date = 12/21/2010 
 RPT Level = 0.01  Analysis Date = 12/21/2010 
 RPT Level = 0.01  Analysis Date = 12/21/2010 
 RPT Level = 0.01  Analysis Date = 12/09/2010 
 RPT Level = 0.01  Analysis Date = 12/09/2010 
 RPT Level = 0.01  Analysis Date = 12/09/2010 
 RPT Level = 0.01  Analysis Date = 12/09/2010 
 RPT Level = 0.01  Analysis Date = 12/09/2010 
 RPT Level = 0.01  Analysis Date = 12/09/2010 
 RPT Level = 0.01  Analysis Date = 11/18/2010 
 RPT Level = 0.01  Analysis Date = 11/18/2010 
 RPT Level = 0.01  Analysis Date = 11/18/2010 
 RPT Level = 0.01  Analysis Date = 11/18/2010 
 RPT Level = 0.01  Analysis Date = 11/18/2010 
 RPT Level = 0.01  Analysis Date = 11/18/2010 
 RPT Level = 0.01  Analysis Date = 10/27/2010 
 RPT Level = 0.01  Analysis Date = 10/27/2010 
 RPT Level = 0.01  Analysis Date = 10/27/2010 
 RPT Level = 0.01  Analysis Date = 10/27/2010 
 RPT Level = 0.01  Analysis Date = 10/14/2010 
 RPT Level = 0.01  Analysis Date = 10/14/2010 
 RPT Level = 0.01  Analysis Date = 10/14/2010 
 RPT Level = 0.01  Analysis Date = 10/14/2010 
 RPT Level = 0.01  Analysis Date = 09/29/2010 
 RPT Level = 0.01  Analysis Date = 09/29/2010 
 RPT Level = 0.01  Analysis Date = 09/29/2010 
 RPT Level = 0.01  Analysis Date = 09/29/2010 
 RPT Level = 0.01  Analysis Date = 09/16/2010 
 RPT Level = 0.01  Analysis Date = 09/16/2010 
 RPT Level = 0.01  Analysis Date = 09/16/2010 
 RPT Level = 0.01  Analysis Date = 09/16/2010 
 RPT Level = 0.01  Analysis Date = 09/01/2010 
 RPT Level = 0.01  Analysis Date = 09/01/2010 
 RPT Level = 0.01  Analysis Date = 09/01/2010 
 RPT Level = 0.01  Analysis Date = 09/01/2010 
 RPT Level = 0.01  Analysis Date = 09/01/2010 
 RPT Level = 0.01  Analysis Date = 09/01/2010 
 RPT Level = 0.01  Analysis Date = 08/12/2010 
 RPT Level = 0.01  Analysis Date = 08/12/2010 
 RPT Level = 0.01  Analysis Date = 08/04/2010 
 RPT Level = 0.01  Analysis Date = 08/04/2010 
 RPT Level = 0.01  Analysis Date = 07/29/2010 
 RPT Level = 0.01  Analysis Date = 07/29/2010 
 RPT Level = 0.01  Analysis Date = 07/20/2010 
 RPT Level = 0.01  Analysis Date = 07/20/2010 
 RPT Level = 0.01  Analysis Date = 07/20/2010 
 RPT Level = 0.01  Analysis Date = 07/20/2010 
 RPT Level = 0.01  Analysis Date = 07/20/2010 
 RPT Level = 0.01  Analysis Date = 07/20/2010 
 RPT Level = 0.01  Analysis Date = 07/01/2010 
 RPT Level = 0.01  Analysis Date = 07/01/2010 
 RPT Level = 0.01  Analysis Date = 07/01/2010 
 RPT Level = 0.01  Analysis Date = 07/01/2010 
 RPT Level = 0.01  Analysis Date = 07/01/2010 
 RPT Level = 0.01  Analysis Date = 07/01/2010 
 RPT Level = 0.01  Analysis Date = 06/09/2010 
 RPT Level = 0.01  Analysis Date = 06/09/2010 
 RPT Level = 0.01  Analysis Date = 06/09/2010 
 RPT Level = 0.01  Analysis Date = 06/09/2010 
 RPT Level = 0.01  Analysis Date = 06/09/2010 
 RPT Level = 0.01  Analysis Date = 06/09/2010 
 RPT Level = 0.01  Analysis Date = 05/20/2010 
 RPT Level = 0.01  Analysis Date = 05/20/2010 
 RPT Level = 0.01  Analysis Date = 05/20/2010 
 RPT Level = 0.01  Analysis Date = 05/20/2010 
 RPT Level = 0.01  Analysis Date = 05/05/2010 
 RPT Level = 0.01  Analysis Date = 05/05/2010 
 RPT Level = 0.01  Analysis Date = 05/05/2010 
 RPT Level = 0.01  Analysis Date = 05/05/2010 
 RPT Level = 0.01  Analysis Date = 05/05/2010 
 RPT Level = 0.01  Analysis Date = 05/05/2010 
 RPT Level = 0.01  Analysis Date = 04/15/2010 
 RPT Level = 0.01  Analysis Date = 04/15/2010 
 RPT Level = 0.01  Analysis Date = 04/01/2010 
 RPT Level = 0.01  Analysis Date = 04/01/2010 
 RPT Level = 0.01  Analysis Date = 04/01/2010 
 RPT Level = 0.01  Analysis Date = 04/01/2010 
 RPT Level = 0.01  Analysis Date = 04/01/2010 
 RPT Level = 0.01  Analysis Date = 04/01/2010 
 RPT Level = 0.01  Analysis Date = 03/16/2010 
 RPT Level = 0.01  Analysis Date = 03/16/2010 
 RPT Level = 0.01  Analysis Date = 03/05/2010 
 RPT Level = 0.01  Analysis Date = 03/05/2010 
 RPT Level = 0.01  Analysis Date = 02/24/2010 
 RPT Level = 0.01  Analysis Date = 02/24/2010 
 RPT Level = 0.01  Analysis Date = 02/24/2010 
 RPT Level = 0.01  Analysis Date = 02/24/2010 
 RPT Level = 0.01  Analysis Date = 02/18/2010 
 RPT Level = 0.01  Analysis Date = 02/18/2010 
 RPT Level = 0.01  Analysis Date = 02/05/2010 
 RPT Level = 0.01  Analysis Date = 02/05/2010 
 RPT Level = 0.01  Analysis Date = 02/05/2010 
 RPT Level = 0.01  Analysis Date = 02/05/2010 
 RPT Level = 0.01  Analysis Date = 02/05/2010 
 RPT Level = 0.01  Analysis Date = 02/05/2010 
 RPT Level = 0.01  Analysis Date = 01/20/2010 
 RPT Level = 0.01  Analysis Date = 01/20/2010 
 RPT Level = 0.01  Analysis Date = 01/20/2010 
 RPT Level = 0.01  Analysis Date = 01/20/2010 
 RPT Level = 0.01  Analysis Date = 01/20/2010 
 RPT Level = 0.01  Analysis Date = 01/20/2010 
 RPT Level = 0.01  Analysis Date = 01/20/2010 
 RPT Level = 0.01  Analysis Date = 01/20/2010 
 RPT Level = 0.01  Analysis Date = 12/22/2009 
 RPT Level = 0.01  Analysis Date = 12/22/2009 
 RPT Level = 0.01  Analysis Date = 12/11/2009 
 RPT Level = 0.01  Analysis Date = 12/11/2009 
 RPT Level = 0.01  Analysis Date = 12/11/2009 
 RPT Level = 0.01  Analysis Date = 12/11/2009 
 RPT Level = 0.01  Analysis Date = 12/11/2009 
 RPT Level = 0.01  Analysis Date = 12/11/2009 
 RPT Level = 0.01  Analysis Date = 11/19/2009 
 RPT Level = 0.01  Analysis Date = 11/19/2009 
 RPT Level = 0.01  Analysis Date = 11/19/2009 
 RPT Level = 0.01  Analysis Date = 11/19/2009 
 RPT Level = 0.01  Analysis Date = 11/19/2009 
 RPT Level = 0.01  Analysis Date = 11/19/2009 
 RPT Level = 0.01  Analysis Date = 11/19/2009 
 RPT Level = 0.01  Analysis Date = 11/19/2009 
 RPT Level = 0.01  Analysis Date = 10/22/2009 
 RPT Level = 0.01  Analysis Date = 10/22/2009 
 RPT Level = 0.01  Analysis Date = 10/22/2009 
 RPT Level = 0.01  Analysis Date = 10/22/2009 
 RPT Level = 0.01  Analysis Date = 10/22/2009 
 RPT Level = 0.01  Analysis Date = 10/22/2009 
 RPT Level = 0.01  Analysis Date = 10/07/2009 
 RPT Level = 0.01  Analysis Date = 10/07/2009 
 RPT Level = 0.01  Analysis Date = 10/07/2009 
 RPT Level = 0.01  Analysis Date = 10/07/2009 
 RPT Level = 0.01  Analysis Date = 10/07/2009 
 RPT Level = 0.01  Analysis Date = 10/07/2009 
 RPT Level = 0.01  Analysis Date = 09/16/2009 
 RPT Level = 0.01  Analysis Date = 09/16/2009 
 RPT Level = 0.01  Analysis Date = 09/16/2009 
 RPT Level = 0.01  Analysis Date = 09/16/2009 
 RPT Level = 0.01  Analysis Date = 09/16/2009 
 RPT Level = 0.01  Analysis Date = 09/16/2009 
 RPT Level = 0.01  Analysis Date = 09/16/2009 
 RPT Level = 0.01  Analysis Date = 09/16/2009 
 RPT Level = 0.01  Analysis Date = 08/19/2009 
 RPT Level = 0.01  Analysis Date = 08/19/2009 
 RPT Level = 0.01  Analysis Date = 08/11/2009 
 RPT Level = 0.01  Analysis Date = 08/11/2009 
 RPT Level = 0.01  Analysis Date = 08/11/2009 
 RPT Level = 0.01  Analysis Date = 08/11/2009 
 RPT Level = 0.01  Analysis Date = 07/22/2009 
 RPT Level = 0.01  Analysis Date = 07/22/2009 
 RPT Level = 0.01  Analysis Date = 07/22/2009 
 RPT Level = 0.01  Analysis Date = 07/22/2009 
 RPT Level = 0.01  Analysis Date = 07/22/2009 
 RPT Level = 0.01  Analysis Date = 07/22/2009 
 RPT Level = 0.01  Analysis Date = 07/07/2009 
 RPT Level = 0.01  Analysis Date = 07/07/2009 
 RPT Level = 0.01  Analysis Date = 07/07/2009 
 RPT Level = 0.01  Analysis Date = 07/07/2009 
 RPT Level = 0.01  Analysis Date = 06/18/2009 
 RPT Level = 0.01  Analysis Date = 06/18/2009 
 RPT Level = 0.01  Analysis Date = 06/18/2009 
 RPT Level = 0.01  Analysis Date = 06/18/2009 
 RPT Level = 0.01  Analysis Date = 06/18/2009 
 RPT Level = 0.01  Analysis Date = 06/18/2009 
 RPT Level = 0.01  Analysis Date = 06/02/2009 
 RPT Level = 0.01  Analysis Date = 06/02/2009 
 RPT Level = 0.01  Analysis Date = 06/02/2009 
 RPT Level = 0.01  Analysis Date = 06/02/2009 
 RPT Level = 0.01  Analysis Date = 05/20/2009 
 RPT Level = 0.01  Analysis Date = 05/20/2009 
 RPT Level = 0.01  Analysis Date = 05/20/2009 
 RPT Level = 0.01  Analysis Date = 05/20/2009 
 RPT Level = 0.01  Analysis Date = 05/20/2009 
 RPT Level = 0.01  Analysis Date = 05/20/2009 
 RPT Level = 0.01  Analysis Date = 04/28/2009 
 RPT Level = 0.01  Analysis Date = 04/28/2009 
 RPT Level = 0.01  Analysis Date = 04/28/2009 
 RPT Level = 0.01  Analysis Date = 04/28/2009 
 RPT Level = 0.01  Analysis Date = 04/28/2009 
 RPT Level = 0.01  Analysis Date = 04/28/2009 
 RPT Level = 0.01  Analysis Date = 04/01/2009 
 RPT Level = 0.01  Analysis Date = 04/01/2009 
 RPT Level = 0.01  Analysis Date = 04/01/2009 
 RPT Level = 0.01  Analysis Date = 04/01/2009 
 RPT Level = 0.01  Analysis Date = 03/25/2009 
 RPT Level = 0.01  Analysis Date = 03/25/2009 
 RPT Level = 0.01  Analysis Date = 03/17/2009 
 RPT Level = 0.01  Analysis Date = 03/17/2009 
 RPT Level = 0.01  Analysis Date = 03/17/2009 
 RPT Level = 0.01  Analysis Date = 03/17/2009 
 RPT Level = 0.01  Analysis Date = 02/26/2009 
 RPT Level = 0.01  Analysis Date = 02/26/2009 
 RPT Level = 0.01  Analysis Date = 02/24/2009 
 RPT Level = 0.01  Analysis Date = 02/24/2009 
 RPT Level = 0.01  Analysis Date = 02/12/2009 
 RPT Level = 0.01  Analysis Date = 02/12/2009 
 RPT Level = 0.01  Analysis Date = 02/12/2009 
 RPT Level = 0.01  Analysis Date = 02/12/2009 
 RPT Level = 0.01  Analysis Date = 02/12/2009 
 RPT Level = 0.01  Analysis Date = 02/12/2009 
 RPT Level = 0.01  Analysis Date = 01/22/2009 
 RPT Level = 0.01  Analysis Date = 01/22/2009 
 RPT Level = 0.01  Analysis Date = 01/15/2009 
 RPT Level = 0.01  Analysis Date = 01/15/2009 
 RPT Level = 0.01  Analysis Date = 01/15/2009 
 RPT Level = 0.01  Analysis Date = 01/15/2009 
 RPT Level = 0.01  Analysis Date = 01/15/2009 
 RPT Level = 0.01  Analysis Date = 01/15/2009 
 RPT Level = 0.01  Analysis Date = 12/31/2008 
 RPT Level = 0.01  Analysis Date = 12/31/2008 
 RPT Level = 0.01  Analysis Date = 12/18/2008 
 RPT Level = 0.01  Analysis Date = 12/18/2008 
 RPT Level = 0.01  Analysis Date = 12/15/2008 
 RPT Level = 0.01  Analysis Date = 12/15/2008 
 RPT Level = 0.01  Analysis Date = 12/10/2008 
 RPT Level = 0.01  Analysis Date = 12/10/2008 
 RPT Level = 0.01  Analysis Date = 12/10/2008 
 RPT Level = 0.01  Analysis Date = 12/10/2008 
 RPT Level = 0.01  Analysis Date = 11/24/2008 
 RPT Level = 0.01  Analysis Date = 11/24/2008 
 RPT Level = 0.01  Analysis Date = 11/24/2008 
 RPT Level = 0.01  Analysis Date = 11/24/2008 
 RPT Level = 0.01  Analysis Date = 11/24/2008 
 RPT Level = 0.01  Analysis Date = 11/24/2008 
 RPT Level = 0.01  Analysis Date = 11/04/2008 
 RPT Level = 0.01  Analysis Date = 11/04/2008 
 RPT Level = 0.01  Analysis Date = 10/23/2008 
 RPT Level = 0.01  Analysis Date = 10/23/2008 
 RPT Level = 0.01  Analysis Date = 10/20/2008 
 RPT Level = 0.01  Analysis Date = 10/20/2008 
 RPT Level = 0.01  Analysis Date = 10/09/2008 
 RPT Level = 0.01  Analysis Date = 10/09/2008 
 RPT Level = 0.01  Analysis Date = 10/07/2008 
 RPT Level = 0.01  Analysis Date = 10/07/2008 
 RPT Level = 0.01  Analysis Date = 10/07/2008 
 RPT Level = 0.01  Analysis Date = 10/07/2008 
 RPT Level = 0.01  Analysis Date = 09/23/2008 
 RPT Level = 0.01  Analysis Date = 09/23/2008 
 RPT Level = 0.01  Analysis Date = 09/11/2008 
 RPT Level = 0.01  Analysis Date = 09/11/2008 
 RPT Level = 0.01  Analysis Date = 09/11/2008 
 RPT Level = 0.01  Analysis Date = 09/11/2008 
 RPT Level = 0.01  Analysis Date = 08/27/2008 
 RPT Level = 0.01  Analysis Date = 08/27/2008 
 RPT Level = 0.01  Analysis Date = 08/27/2008 
 RPT Level = 0.01  Analysis Date = 08/27/2008 
 RPT Level = 0.01  Analysis Date = 08/27/2008 
 RPT Level = 0.01  Analysis Date = 08/27/2008 
 RPT Level = 0.01  Analysis Date = 08/07/2008 
 RPT Level = 0.01  Analysis Date = 08/07/2008 
 RPT Level = 0.01  Analysis Date = 07/23/2008 
 RPT Level = 0.01  Analysis Date = 07/23/2008 
 RPT Level = 0.01  Analysis Date = 07/21/2008 
 RPT Level = 0.01  Analysis Date = 07/21/2008 
 RPT Level = 0.01  Analysis Date = 07/14/2008 
 RPT Level = 0.01  Analysis Date = 07/14/2008 
 RPT Level = 0.01  Analysis Date = 07/03/2008 
 RPT Level = 0.01  Analysis Date = 07/03/2008 
 RPT Level = 0.01  Analysis Date = 07/03/2008 
 RPT Level = 0.01  Analysis Date = 07/03/2008 
 RPT Level = 0.01  Analysis Date = 06/26/2008 
 RPT Level = 0.01  Analysis Date = 06/26/2008 
 RPT Level = 0.01  Analysis Date = 06/11/2008 
 RPT Level = 0.01  Analysis Date = 06/11/2008 
 RPT Level = 0.01  Analysis Date = 06/11/2008 
 RPT Level = 0.01  Analysis Date = 06/11/2008 
 RPT Level = 0.01  Analysis Date = 06/11/2008 
 RPT Level = 0.01  Analysis Date = 06/11/2008 
 RPT Level = 0.01  Analysis Date = 05/29/2008 
 RPT Level = 0.01  Analysis Date = 05/29/2008 
 RPT Level = 0.01  Analysis Date = 05/29/2008 
 RPT Level = 0.01  Analysis Date = 05/29/2008 
 RPT Level = 0.01  Analysis Date = 05/29/2008 
 RPT Level = 0.01  Analysis Date = 05/29/2008 
 RPT Level = 0.01  Analysis Date = 04/30/2008 
 RPT Level = 0.01  Analysis Date = 04/30/2008 
 RPT Level = 0.01  Analysis Date = 04/22/2008 
 RPT Level = 0.01  Analysis Date = 04/22/2008 
 RPT Level = 0.01  Analysis Date = 04/21/2008 
 RPT Level = 0.01  Analysis Date = 04/21/2008 
 RPT Level = 0.01  Analysis Date = 04/15/2008 
 RPT Level = 0.01  Analysis Date = 04/15/2008 
 RPT Level = 0.01  Analysis Date = 04/04/2008 
 RPT Level = 0.01  Analysis Date = 04/04/2008 
 RPT Level = 0.01  Analysis Date = 03/26/2008 
 RPT Level = 0.01  Analysis Date = 03/26/2008 
 RPT Level = 0.01  Analysis Date = 03/26/2008 
 RPT Level = 0.01  Analysis Date = 03/26/2008 
 RPT Level = 0.01  Analysis Date = 03/12/2008 
 RPT Level = 0.01  Analysis Date = 03/12/2008 
 RPT Level = 0.01  Analysis Date = 03/12/2008 
 RPT Level = 0.01  Analysis Date = 03/12/2008 
 RPT Level = 0.01  Analysis Date = 03/12/2008 
 RPT Level = 0.01  Analysis Date = 03/12/2008 
 RPT Level = 0.01  Analysis Date = 02/26/2008 
 RPT Level = 0.01  Analysis Date = 02/26/2008 
 RPT Level = 0.01  Analysis Date = 02/26/2008 
 RPT Level = 0.01  Analysis Date = 02/26/2008 
 RPT Level = 0.01  Analysis Date = 01/31/2008 
 RPT Level = 0.01  Analysis Date = 01/31/2008 
 RPT Level = 0.01  Analysis Date = 01/25/2008 
 RPT Level = 0.01  Analysis Date = 01/25/2008 
 RPT Level = 0.01  Analysis Date = 01/22/2008 
 RPT Level = 0.01  Analysis Date = 01/22/2008 
 RPT Level = 0.01  Analysis Date = 01/08/2008 
 RPT Level = 0.01  Analysis Date = 01/08/2008 
 RPT Level = 0.01  Analysis Date = 01/07/2008 
 RPT Level = 0.01  Analysis Date = 01/07/2008 
 RPT Level = 0.01  Analysis Date = 12/20/2007 
 RPT Level = 0.01  Analysis Date = 12/20/2007 
 RPT Level = 0.01  Analysis Date = 12/18/2007 
 RPT Level = 0.01  Analysis Date = 12/18/2007 
 RPT Level = 0.01  Analysis Date = 12/06/2007 
 RPT Level = 0.01  Analysis Date = 12/06/2007 
 RPT Level = 0.01  Analysis Date = 11/28/2007 
 RPT Level = 0.01  Analysis Date = 11/28/2007 
 RPT Level = 0.01  Analysis Date = 11/28/2007 
 RPT Level = 0.01  Analysis Date = 11/28/2007 
 RPT Level = 0.01  Analysis Date = 11/16/2007 
 RPT Level = 0.01  Analysis Date = 11/16/2007 
 RPT Level = 0.01  Analysis Date = 11/14/2007 
 RPT Level = 0.01  Analysis Date = 11/14/2007 
 RPT Level = 0.01  Analysis Date = 10/31/2007 
 RPT Level = 0.01  Analysis Date = 10/31/2007 
 RPT Level = 0.01  Analysis Date = 10/29/2007 
 RPT Level = 0.01  Analysis Date = 10/29/2007 
 RPT Level = 0.01  Analysis Date = 10/29/2007 
 RPT Level = 0.01  Analysis Date = 10/29/2007 
 RPT Level = 0.01  Analysis Date = 10/22/2007 
 RPT Level = 0.01  Analysis Date = 10/22/2007 
 RPT Level = 0.01  Analysis Date = 09/26/2007 
 RPT Level = 0.01  Analysis Date = 09/26/2007 
 RPT Level = 0.01  Analysis Date = 09/20/2007 
 RPT Level = 0.01  Analysis Date = 09/20/2007 
 RPT Level = 0.01  Analysis Date = 09/20/2007 
 RPT Level = 0.01  Analysis Date = 09/20/2007 
 RPT Level = 0.01  Analysis Date = 09/11/2007 
 RPT Level = 0.01  Analysis Date = 09/11/2007 
 RPT Level = 0.01  Analysis Date = 09/11/2007 
 RPT Level = 0.01  Analysis Date = 09/11/2007 
 RPT Level = 0.01  Analysis Date = 08/27/2007 
 RPT Level = 0.01  Analysis Date = 08/27/2007 
 RPT Level = 0.01  Analysis Date = 08/27/2007 
 RPT Level = 0.01  Analysis Date = 08/27/2007 
 RPT Level = 0.01  Analysis Date = 08/21/2007 
 RPT Level = 0.01  Analysis Date = 08/21/2007 
 RPT Level = 0.01  Analysis Date = 08/07/2007 
 RPT Level = 0.01  Analysis Date = 08/07/2007 
 RPT Level = 0.01  Analysis Date = 08/07/2007 
 RPT Level = 0.01  Analysis Date = 08/07/2007 
 RPT Level = 0.01  Analysis Date = 08/07/2007 
 RPT Level = 0.01  Analysis Date = 08/07/2007 
 RPT Level = 0.01  Analysis Date = 07/05/2007 
 RPT Level = 0.01  Analysis Date = 07/05/2007 
 RPT Level = 0.01  Analysis Date = 07/05/2007 
 RPT Level = 0.01  Analysis Date = 07/05/2007 
 RPT Level = 0.01  Analysis Date = 06/27/2007 
 RPT Level = 0.01  Analysis Date = 06/27/2007 
 RPT Level = 0.01  Analysis Date = 06/18/2007 
 RPT Level = 0.01  Analysis Date = 06/18/2007 
 RPT Level = 0.01  Analysis Date = 06/08/2007 
 RPT Level = 0.01  Analysis Date = 06/08/2007 
 RPT Level = 0.01  Analysis Date = 06/08/2007 
 RPT Level = 0.01  Analysis Date = 06/08/2007 
 RPT Level = 0.01  Analysis Date = 05/29/2007 
 RPT Level = 0.01  Analysis Date = 05/29/2007 
 RPT Level = 0.01  Analysis Date = 05/16/2007 
 RPT Level = 0.01  Analysis Date = 05/16/2007 
 RPT Level = 0.01  Analysis Date = 05/16/2007 
 RPT Level = 0.01  Analysis Date = 05/16/2007 
 RPT Level = 0.01  Analysis Date = 05/07/2007 
 RPT Level = 0.01  Analysis Date = 05/07/2007 
 RPT Level = 0.01  Analysis Date = 05/07/2007 
 RPT Level = 0.01  Analysis Date = 05/07/2007 
 RPT Level = 0.01  Analysis Date = 04/24/2007 
 RPT Level = 0.01  Analysis Date = 04/24/2007 
 RPT Level = 0.01  Analysis Date = 04/18/2007 
 RPT Level = 0.01  Analysis Date = 04/18/2007 
 RPT Level = 0.01  Analysis Date = 04/05/2007 
 RPT Level = 0.01  Analysis Date = 04/05/2007 
 RPT Level = 0.01  Analysis Date = 04/05/2007 
 RPT Level = 0.01  Analysis Date = 04/05/2007 
 RPT Level = 0.01  Analysis Date = 03/26/2007 
 RPT Level = 0.01  Analysis Date = 03/26/2007 
 RPT Level = 0.01  Analysis Date = 03/26/2007 
 RPT Level = 0.01  Analysis Date = 03/26/2007 
 RPT Level = 0.01  Analysis Date = 03/15/2007 
 RPT Level = 0.01  Analysis Date = 03/15/2007 
 RPT Level = 0.01  Analysis Date = 03/15/2007 
 RPT Level = 0.01  Analysis Date = 03/15/2007 
 RPT Level = 0.01  Analysis Date = 03/15/2007 
 RPT Level = 0.01  Analysis Date = 03/15/2007 
 RPT Level = 0.01  Analysis Date = 02/22/2007 
 RPT Level = 0.01  Analysis Date = 02/22/2007 
 RPT Level = 0.01  Analysis Date = 02/14/2007 
 RPT Level = 0.01  Analysis Date = 02/14/2007 
 RPT Level = 0.01  Analysis Date = 02/02/2007 
 RPT Level = 0.01  Analysis Date = 02/02/2007 
 RPT Level = 0.01  Analysis Date = 01/25/2007 
 RPT Level = 0.01  Analysis Date = 01/25/2007 
 RPT Level = 0.01  Analysis Date = 01/25/2007 
 RPT Level = 0.01  Analysis Date = 01/25/2007 
 RPT Level = 0.01  Analysis Date = 09/22/2005 
 RPT Level = 0.01  Analysis Date = 09/22/2005 
 RPT Level = 0.01  Analysis Date = 09/22/2005 
 RPT Level = 0.01  Analysis Date = 09/22/2005 
 RPT Level = 0.01  Analysis Date = 09/22/2005 
 RPT Level = 0.01  Analysis Date = 09/22/2005 
 RPT Level = 0.01  Analysis Date = 08/31/2005 
 RPT Level = 0.01  Analysis Date = 08/31/2005 
 RPT Level = 0.01  Analysis Date = 08/31/2005 
 RPT Level = 0.01  Analysis Date = 08/31/2005 
 RPT Level = 0.01  Analysis Date = 08/16/2005 
 RPT Level = 0.01  Analysis Date = 08/16/2005 
 RPT Level = 0.01  Analysis Date = 08/16/2005 
 RPT Level = 0.01  Analysis Date = 08/16/2005 
 RPT Level = 0.01  Analysis Date = 08/16/2005 
 RPT Level = 0.01  Analysis Date = 08/16/2005 
 RPT Level = 0.01  Analysis Date = 08/02/2005 
 RPT Level = 0.01  Analysis Date = 08/02/2005 
 RPT Level = 0.01  Analysis Date = 07/18/2005 
 RPT Level = 0.01  Analysis Date = 07/18/2005 
 RPT Level = 0.01  Analysis Date = 07/18/2005 
 RPT Level = 0.01  Analysis Date = 07/18/2005 
 RPT Level = 0.01  Analysis Date = 07/08/2005 
 RPT Level = 0.01  Analysis Date = 07/08/2005 
 RPT Level = 0.01  Analysis Date = 07/08/2005 
 RPT Level = 0.01  Analysis Date = 07/08/2005 
 RPT Level = 0.01  Analysis Date = 06/24/2005 
 RPT Level = 0.01  Analysis Date = 06/24/2005 
 RPT Level = 0.01  Analysis Date = 06/24/2005 
 RPT Level = 0.01  Analysis Date = 06/24/2005 
 RPT Level = 0.01  Analysis Date = 06/08/2005 
 RPT Level = 0.01  Analysis Date = 06/08/2005 
 RPT Level = 0.01  Analysis Date = 05/27/2005 
 RPT Level = 0.01  Analysis Date = 05/27/2005 
 RPT Level = 0.01  Analysis Date = 05/24/2005 
 RPT Level = 0.01  Analysis Date = 05/24/2005 
 RPT Level = 0.01  Analysis Date = 05/24/2005 
 RPT Level = 0.01  Analysis Date = 05/24/2005 
 RPT Level = 0.01  Analysis Date = 05/11/2005 
 RPT Level = 0.01  Analysis Date = 05/11/2005 
 RPT Level = 0.01  Analysis Date = 04/29/2005 
 RPT Level = 0.01  Analysis Date = 04/29/2005 
 RPT Level = 0.01  Analysis Date = 04/29/2005 
 RPT Level = 0.01  Analysis Date = 04/29/2005 
 RPT Level = 0.01  Analysis Date = 04/14/2005 
 RPT Level = 0.01  Analysis Date = 04/14/2005 
 RPT Level = 0.01  Analysis Date = 04/14/2005 
 RPT Level = 0.01  Analysis Date = 04/14/2005 
 RPT Level = 0.01  Analysis Date = 04/05/2005 
 RPT Level = 0.01  Analysis Date = 04/05/2005 
 RPT Level = 0.01  Analysis Date = 04/05/2005 
 RPT Level = 0.01  Analysis Date = 04/05/2005 
 RPT Level = 0.01  Analysis Date = 04/05/2005 
 RPT Level = 0.01  Analysis Date = 04/05/2005 
 RPT Level = 0.01  Analysis Date = 03/17/2005 
 RPT Level = 0.01  Analysis Date = 03/17/2005 
 RPT Level = 0.01  Analysis Date = 03/17/2005 
 RPT Level = 0.01  Analysis Date = 03/17/2005 
 RPT Level = 0.01  Analysis Date = 03/17/2005 
 RPT Level = 0.01  Analysis Date = 03/17/2005 
 RPT Level = 0.01  Analysis Date = 03/03/2005 
 RPT Level = 0.01  Analysis Date = 03/03/2005 
 RPT Level = 0.01  Analysis Date = 02/24/2005 
 RPT Level = 0.01  Analysis Date = 02/24/2005 
 RPT Level = 0.01  Analysis Date = 02/16/2005 
 RPT Level = 0.01  Analysis Date = 02/16/2005 
 RPT Level = 0.01  Analysis Date = 02/16/2005 
 RPT Level = 0.01  Analysis Date = 02/16/2005 
 RPT Level = 0.01  Analysis Date = 02/03/2005 
 RPT Level = 0.01  Analysis Date = 02/03/2005 
 RPT Level = 0.01  Analysis Date = 01/25/2005 
 RPT Level = 0.01  Analysis Date = 01/25/2005 
 RPT Level = 0.01  Analysis Date = 01/25/2005 
 RPT Level = 0.01  Analysis Date = 01/25/2005 
 RPT Level = 0.01  Analysis Date = 01/11/2005 
 RPT Level = 0.01  Analysis Date = 01/11/2005 
 RPT Level = 0.01  Analysis Date = 01/05/2005 
 RPT Level = 0.01  Analysis Date = 01/05/2005 
 RPT Level = 0.01  Analysis Date = 01/05/2005 
 RPT Level = 0.01  Analysis Date = 01/05/2005 
 RPT Level = 0.01  Analysis Date = 01/05/2005 
 RPT Level = 0.01  Analysis Date = 01/05/2005 
 RPT Level = 0.01  Analysis Date = 12/23/2004 
 RPT Level = 0.01  Analysis Date = 12/23/2004 
 RPT Level = 0.01  Analysis Date = 12/23/2004 
 RPT Level = 0.01  Analysis Date = 12/23/2004 
 RPT Level = 0.01  Analysis Date = 12/23/2004 
 RPT Level = 0.01  Analysis Date = 12/23/2004 
 RPT Level = 0.01  Analysis Date = 12/23/2004 
 RPT Level = 0.01  Analysis Date = 12/23/2004 
 RPT Level = 0.01  Analysis Date = 12/10/2004 
 RPT Level = 0.01  Analysis Date = 12/10/2004 
 RPT Level = 0.01  Analysis Date = 12/10/2004 
 RPT Level = 0.01  Analysis Date = 12/10/2004 
 RPT Level = 0.01  Analysis Date = 12/01/2004 
 RPT Level = 0.01  Analysis Date = 12/01/2004 
 RPT Level = 0.01  Analysis Date = 12/01/2004 
 RPT Level = 0.01  Analysis Date = 12/01/2004 
 RPT Level = 0.01  Analysis Date = 11/23/2004 
 RPT Level = 0.01  Y = 0
The SGPlot Procedure

False Positive Rate for Phosphorus (as P), FIL, CFA, ALK-P, ACD

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Phosphorus (as P), FIL, CFA, ALK-P, ACD 00666CL062 2004 17 0 0%
    2005 50 0 0%
    2007 36 0 0%
    2008 49 0 0%
    2009 52 1 2%
    2010 52 0 0%
    2011 41 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Phosphorus (as P), FIL, CFA, Kjeldahl -
Blind Blank Results
Lab: NWQL, PCode: 00666, MCode: KJ005
Analysis dates: 11/08/01 through 09/30/16
Open Data Set

 Analysis Date = 05/26/2010 
 Lab Value = -0.029 
 RPT Level = 0.02 
 Lab Sample ID = 20101380021  Analysis Date = 05/26/2010 
 Lab Value = -0.029 
 RPT Level = 0.02 
 Lab Sample ID = 20101380021  Analysis Date = 10/22/2010 
 Lab Value = 0.034 
 RPT Level = 0.02 
 Lab Sample ID = 20102920006  Analysis Date = 10/22/2010 
 Lab Value = 0.034 
 RPT Level = 0.02 
 Lab Sample ID = 20102920006  Analysis Date = 09/30/2016 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20162640173  Analysis Date = 09/22/2016 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20162580012  Analysis Date = 09/15/2016 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20162520025  Analysis Date = 09/13/2016 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20162440121  Analysis Date = 08/30/2016 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20162360195  Analysis Date = 08/22/2016 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20162290137  Analysis Date = 08/11/2016 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20162230008  Analysis Date = 08/08/2016 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20162150204  Analysis Date = 08/02/2016 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20162080232  Analysis Date = 07/25/2016 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20162010257  Analysis Date = 07/15/2016 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20161940107  Analysis Date = 07/12/2016 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20161870031  Analysis Date = 07/05/2016 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20161800082  Analysis Date = 06/24/2016 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20161740071  Analysis Date = 06/21/2016 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20161660156  Analysis Date = 06/14/2016 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20161590152  Analysis Date = 06/10/2016 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20161520025  Analysis Date = 06/10/2016 
 Lab Value = -0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20161480189  Analysis Date = 05/17/2016 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20161270006  Analysis Date = 05/10/2016 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20161230045  Analysis Date = 05/03/2016 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20161160091  Analysis Date = 04/26/2016 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20161100126  Analysis Date = 04/18/2016 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20161020027  Analysis Date = 04/07/2016 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20160950044  Analysis Date = 03/31/2016 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20160880040  Analysis Date = 03/28/2016 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20160810065  Analysis Date = 03/17/2016 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20160740013  Analysis Date = 03/11/2016 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20160670014  Analysis Date = 03/04/2016 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20160600013  Analysis Date = 02/29/2016 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20160530013  Analysis Date = 02/18/2016 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20160470015  Analysis Date = 02/16/2016 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20160400084  Analysis Date = 02/03/2016 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20160320011  Analysis Date = 02/01/2016 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20160250031  Analysis Date = 01/21/2016 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20160190011  Analysis Date = 01/14/2016 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20160110011  Analysis Date = 01/08/2016 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20160050030  Analysis Date = 01/04/2016 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20153630045  Analysis Date = 12/23/2015 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20153550011  Analysis Date = 12/21/2015 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20153500160  Analysis Date = 12/15/2015 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20153420017  Analysis Date = 12/09/2015 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20153340016  Analysis Date = 12/04/2015 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20153270012  Analysis Date = 11/24/2015 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20153200025  Analysis Date = 11/17/2015 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20153140011  Analysis Date = 11/04/2015 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20153060033  Analysis Date = 11/02/2015 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20152990066  Analysis Date = 10/26/2015 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20152920036  Analysis Date = 10/22/2015 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20152860152  Analysis Date = 10/14/2015 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20152780012  Analysis Date = 10/07/2015 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20152710066  Analysis Date = 09/30/2015 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20152640026  Analysis Date = 09/28/2015 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20152590157  Analysis Date = 09/22/2015 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20152510009  Analysis Date = 09/16/2015 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20152430096  Analysis Date = 09/01/2015 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20152360157  Analysis Date = 09/01/2015 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20152330007  Analysis Date = 08/19/2015 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20152230132  Analysis Date = 08/10/2015 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20152150073  Analysis Date = 07/31/2015 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20152080065  Analysis Date = 07/27/2015 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20152010051  Analysis Date = 07/23/2015 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20151940024  Analysis Date = 07/14/2015 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20151870009  Analysis Date = 07/10/2015 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20151800049  Analysis Date = 07/01/2015 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20151730016  Analysis Date = 06/26/2015 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20151660034  Analysis Date = 06/23/2015 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20151620213  Analysis Date = 06/16/2015 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20151530198  Analysis Date = 06/05/2015 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20151460121  Analysis Date = 05/29/2015 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20151390198  Analysis Date = 05/20/2015 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20151310070  Analysis Date = 05/13/2015 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20151240065  Analysis Date = 05/08/2015 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20151180073  Analysis Date = 05/01/2015 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20151140024  Analysis Date = 04/22/2015 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20151050039  Analysis Date = 04/17/2015 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20150970052  Analysis Date = 04/02/2015 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20150900037  Analysis Date = 03/30/2015 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20150850041  Analysis Date = 03/19/2015 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20150770031  Analysis Date = 03/13/2015 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20150690109  Analysis Date = 03/04/2015 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20150610104  Analysis Date = 02/25/2015 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20150540029  Analysis Date = 02/20/2015 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20150490025  Analysis Date = 02/12/2015 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20150400033  Analysis Date = 02/06/2015 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20150330024  Analysis Date = 02/03/2015 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20150260015  Analysis Date = 01/23/2015 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20150200036  Analysis Date = 01/16/2015 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20150120017  Analysis Date = 01/08/2015 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20150050006  Analysis Date = 01/08/2015 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20143630008  Analysis Date = 12/31/2014 
 Lab Value = -0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20143560049  Analysis Date = 12/19/2014 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20143490026  Analysis Date = 12/10/2014 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20143420020  Analysis Date = 12/05/2014 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20143360073  Analysis Date = 12/05/2014 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20143300036  Analysis Date = 12/03/2014 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20143230047  Analysis Date = 11/26/2014 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20143160029  Analysis Date = 11/18/2014 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20143080087  Analysis Date = 11/06/2014 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20143010065  Analysis Date = 11/18/2014 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20142950122  Analysis Date = 10/31/2014 
 Lab Value = 0.018 
 RPT Level = 0.02 
 Lab Sample ID = 20142880084  Analysis Date = 10/24/2014 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20142790031  Analysis Date = 10/24/2014 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20142720101  Analysis Date = 10/21/2014 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20142650106  Analysis Date = 10/14/2014 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20142590046  Analysis Date = 10/03/2014 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20142520024  Analysis Date = 10/02/2014 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20142470052  Analysis Date = 09/09/2014 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20142230082  Analysis Date = 08/28/2014 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20142160063  Analysis Date = 08/21/2014 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20142090217  Analysis Date = 08/07/2014 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20142030069  Analysis Date = 08/01/2014 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20141960042  Analysis Date = 08/01/2014 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20141890083  Analysis Date = 07/25/2014 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20141820118  Analysis Date = 07/17/2014 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20141750143  Analysis Date = 07/10/2014 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20141680085  Analysis Date = 07/01/2014 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20141620033  Analysis Date = 06/26/2014 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20141550058  Analysis Date = 06/17/2014 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20141470144  Analysis Date = 06/04/2014 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20141400011  Analysis Date = 05/27/2014 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20141340002  Analysis Date = 05/07/2014 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20141250086  Analysis Date = 05/05/2014 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20141190022  Analysis Date = 04/29/2014 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20141130021  Analysis Date = 04/17/2014 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20141050008  Analysis Date = 04/10/2014 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20140970044  Analysis Date = 04/01/2014 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20140900020  Analysis Date = 03/28/2014 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20140840099  Analysis Date = 03/24/2014 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20140760039  Analysis Date = 03/18/2014 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20140690021  Analysis Date = 03/13/2014 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20140630120  Analysis Date = 03/03/2014 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20140550042  Analysis Date = 02/27/2014 
 Lab Value = 0.018 
 RPT Level = 0.02 
 Lab Sample ID = 20140490012  Analysis Date = 02/25/2014 
 Lab Value = 0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20140410005  Analysis Date = 02/28/2014 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20140340022  Analysis Date = 02/18/2014 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20140270193  Analysis Date = 01/27/2014 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20140210036  Analysis Date = 01/21/2014 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20140130049  Analysis Date = 01/10/2014 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20140070067  Analysis Date = 12/31/2013 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20133580053  Analysis Date = 12/20/2013 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20133500067  Analysis Date = 12/17/2013 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20133430107  Analysis Date = 12/06/2013 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20133360022  Analysis Date = 12/04/2013 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20133300012  Analysis Date = 11/27/2013 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20133230003  Analysis Date = 11/22/2013 
 Lab Value = 0.027 
 RPT Level = 0.02 
 Lab Sample ID = 20133170105  Analysis Date = 11/14/2013 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20133090098  Analysis Date = 11/07/2013 
 Lab Value = 0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20133030027  Analysis Date = 11/01/2013 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20132970027  Analysis Date = 10/25/2013 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20132730140  Analysis Date = 10/21/2013 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20132660104  Analysis Date = 09/24/2013 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20132600015  Analysis Date = 09/18/2013 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20132530113  Analysis Date = 09/09/2013 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20132410009  Analysis Date = 09/03/2013 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20132390012  Analysis Date = 08/29/2013 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20132350027  Analysis Date = 08/19/2013 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20132270018  Analysis Date = 08/15/2013 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20132180181  Analysis Date = 08/02/2013 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20132120027  Analysis Date = 07/29/2013 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20132040021  Analysis Date = 07/17/2013 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20131970028  Analysis Date = 07/11/2013 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20131900090  Analysis Date = 07/03/2013 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20131830073  Analysis Date = 07/02/2013 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20131770013  Analysis Date = 06/21/2013 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20131700038  Analysis Date = 06/19/2013 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20131640004  Analysis Date = 06/12/2013 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20131550029  Analysis Date = 06/11/2013 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20131500013  Analysis Date = 06/07/2013 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20131430198  Analysis Date = 05/28/2013 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20131350129  Analysis Date = 05/16/2013 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20131270022  Analysis Date = 05/03/2013 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20131220014  Analysis Date = 04/30/2013 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20131150015  Analysis Date = 04/26/2013 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20131120125  Analysis Date = 04/25/2013 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20131090030  Analysis Date = 04/09/2013 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20130930087  Analysis Date = 03/28/2013 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20130840058  Analysis Date = 03/21/2013 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20130770160  Analysis Date = 03/18/2013 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20130700013  Analysis Date = 03/12/2013 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20130630124  Analysis Date = 03/07/2013 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20130570007  Analysis Date = 03/05/2013 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20130520006  Analysis Date = 02/26/2013 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20130420052  Analysis Date = 02/06/2013 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20130350029  Analysis Date = 01/31/2013 
 Lab Value = -0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20130280039  Analysis Date = 01/28/2013 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20130230099  Analysis Date = 01/18/2013 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20130140071  Analysis Date = 01/11/2013 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20130070056  Analysis Date = 01/07/2013 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20130020010  Analysis Date = 01/04/2013 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20123620011  Analysis Date = 12/20/2012 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20123530084  Analysis Date = 12/20/2012 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20123480061  Analysis Date = 12/12/2012 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20123390115  Analysis Date = 12/03/2012 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20123330010  Analysis Date = 11/27/2012 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20123250063  Analysis Date = 11/19/2012 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20123200054  Analysis Date = 11/13/2012 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20123120066  Analysis Date = 11/05/2012 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20123040119  Analysis Date = 10/31/2012 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20122980126  Analysis Date = 10/18/2012 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20122900096  Analysis Date = 10/11/2012 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20122830034  Analysis Date = 10/04/2012 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20122750025  Analysis Date = 10/04/2012 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20122700110  Analysis Date = 10/02/2012 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20122690153  Analysis Date = 09/14/2012 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20122550016  Analysis Date = 09/12/2012 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20122490102  Analysis Date = 09/10/2012 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20122410013  Analysis Date = 08/30/2012 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20122350175  Analysis Date = 08/23/2012 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20122280090  Analysis Date = 08/08/2012 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20122190099  Analysis Date = 08/03/2012 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20122140050  Analysis Date = 07/27/2012 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20122050101  Analysis Date = 07/18/2012 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20121990080  Analysis Date = 07/10/2012 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20121910041  Analysis Date = 07/10/2012 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20121870014  Analysis Date = 06/28/2012 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20121780033  Analysis Date = 06/20/2012 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20121710006  Analysis Date = 06/15/2012 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20121650052  Analysis Date = 06/07/2012 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20121560125  Analysis Date = 06/05/2012 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20121510037  Analysis Date = 05/24/2012 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20121430021  Analysis Date = 05/18/2012 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20121370053  Analysis Date = 05/11/2012 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20121290072  Analysis Date = 05/08/2012 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20121210123  Analysis Date = 04/27/2012 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20121150089  Analysis Date = 04/25/2012 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20121080009  Analysis Date = 04/18/2012 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20121010029  Analysis Date = 04/13/2012 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20120930058  Analysis Date = 04/11/2012 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20120870035  Analysis Date = 04/06/2012 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20120790085  Analysis Date = 03/15/2012 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20120730079  Analysis Date = 03/15/2012 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20120660073  Analysis Date = 02/29/2012 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20120580047  Analysis Date = 02/24/2012 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20120530099  Analysis Date = 02/16/2012 
 Lab Value = 0.018 
 RPT Level = 0.02 
 Lab Sample ID = 20120450020  Analysis Date = 02/08/2012 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20120370064  Analysis Date = 02/07/2012 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20120310012  Analysis Date = 01/26/2012 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20120230046  Analysis Date = 01/19/2012 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20120180013  Analysis Date = 01/17/2012 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20120090052  Analysis Date = 01/09/2012 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20120030028  Analysis Date = 12/29/2011 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20113610089  Analysis Date = 12/22/2011 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20113530139  Analysis Date = 12/16/2011 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20113490075  Analysis Date = 12/15/2011 
 Lab Value = -0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20113460137  Analysis Date = 12/02/2011 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20113320115  Analysis Date = 11/30/2011 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20113250126  Analysis Date = 11/23/2011 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20113180164  Analysis Date = 11/10/2011 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20113110062  Analysis Date = 11/08/2011 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20113050092  Analysis Date = 11/02/2011 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20112970118  Analysis Date = 10/28/2011 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20112910137  Analysis Date = 10/18/2011 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20112840071  Analysis Date = 10/05/2011 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20112760061  Analysis Date = 09/30/2011 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20112690123  Analysis Date = 09/23/2011 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20112630061  Analysis Date = 09/16/2011 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20112560021  Analysis Date = 09/13/2011 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20112510037  Analysis Date = 09/13/2011 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20112500188  Analysis Date = 08/30/2011 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20112360063  Analysis Date = 08/23/2011 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20112300036  Analysis Date = 08/15/2011 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20112200051  Analysis Date = 08/04/2011 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20112130154  Analysis Date = 08/02/2011 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20112060094  Analysis Date = 07/28/2011 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20112010020  Analysis Date = 07/13/2011 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20111920099  Analysis Date = 07/07/2011 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20111860062  Analysis Date = 07/20/2011 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20111780166  Analysis Date = 06/23/2011 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20111710111  Analysis Date = 06/17/2011 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20111640067  Analysis Date = 06/15/2011 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20111570061  Analysis Date = 06/08/2011 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20111510151  Analysis Date = 05/26/2011 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20111430203  Analysis Date = 05/19/2011 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20111360146  Analysis Date = 05/11/2011 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20111290046  Analysis Date = 05/09/2011 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20111220086  Analysis Date = 05/03/2011 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20111150114  Analysis Date = 04/20/2011 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20111080073  Analysis Date = 04/14/2011 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20111010118  Analysis Date = 04/07/2011 
 Lab Value = -0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20110950054  Analysis Date = 03/30/2011 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20110870089  Analysis Date = 03/22/2011 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20110800059  Analysis Date = 03/17/2011 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20110750067  Analysis Date = 03/09/2011 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20110660032  Analysis Date = 03/04/2011 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20110590070  Analysis Date = 02/24/2011 
 Lab Value = -0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20110530105  Analysis Date = 02/16/2011 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20110450036  Analysis Date = 02/14/2011 
 Lab Value = -0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20110410098  Analysis Date = 02/10/2011 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20110400069  Analysis Date = 01/26/2011 
 Lab Value = -0.018 
 RPT Level = 0.02 
 Lab Sample ID = 20110240065  Analysis Date = 01/20/2011 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20110180057  Analysis Date = 01/18/2011 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20110110016  Analysis Date = 01/06/2011 
 Lab Value = -0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20110030021  Analysis Date = 12/29/2010 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20103610054  Analysis Date = 12/22/2010 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20103540047  Analysis Date = 12/29/2010 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20103470078  Analysis Date = 12/13/2010 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20103400086  Analysis Date = 12/07/2010 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20103330099  Analysis Date = 12/08/2010 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20103260065  Analysis Date = 11/18/2010 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20103190064  Analysis Date = 11/16/2010 
 Lab Value = -0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20103120026  Analysis Date = 11/09/2010 
 Lab Value = -0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20103060008  Analysis Date = 11/02/2010 
 Lab Value = -0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20102990006  Analysis Date = 10/15/2010 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20102850132  Analysis Date = 10/18/2010 
 Lab Value = 0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20102770110  Analysis Date = 10/05/2010 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20102700152  Analysis Date = 10/01/2010 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20102640136  Analysis Date = 09/24/2010 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20102570015  Analysis Date = 09/16/2010 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20102510062  Analysis Date = 09/15/2010 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20102430249  Analysis Date = 09/09/2010 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20102350196  Analysis Date = 08/20/2010 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20102290049  Analysis Date = 08/16/2010 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20102230041  Analysis Date = 08/05/2010 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20102140090  Analysis Date = 07/28/2010 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20102080005  Analysis Date = 07/23/2010 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20102000188  Analysis Date = 07/14/2010 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20101930104  Analysis Date = 07/08/2010 
 Lab Value = -0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20101870059  Analysis Date = 07/07/2010 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20101790124  Analysis Date = 07/01/2010 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20101730068  Analysis Date = 06/24/2010 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20101660061  Analysis Date = 06/18/2010 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20101590005  Analysis Date = 06/10/2010 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20101530090  Analysis Date = 06/09/2010 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20101440165  Analysis Date = 05/19/2010 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20101310098  Analysis Date = 05/12/2010 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20101240080  Analysis Date = 05/05/2010 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20101180043  Analysis Date = 04/28/2010 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20101090063  Analysis Date = 04/16/2010 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20101020075  Analysis Date = 04/08/2010 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20100950036  Analysis Date = 04/05/2010 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20100880044  Analysis Date = 03/29/2010 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20100850066  Analysis Date = 03/18/2010 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20100750002  Analysis Date = 03/11/2010 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20100680014  Analysis Date = 03/03/2010 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20100600067  Analysis Date = 02/25/2010 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20100530048  Analysis Date = 02/25/2010 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20100470025  Analysis Date = 02/17/2010 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20100390038  Analysis Date = 02/04/2010 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20100320023  Analysis Date = 01/29/2010 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20100260065  Analysis Date = 01/22/2010 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20100190102  Analysis Date = 01/14/2010 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20100110099  Analysis Date = 01/07/2010 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20100050014  Analysis Date = 01/07/2010 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20093620042  Analysis Date = 01/04/2010 
 Lab Value = -0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20093560033  Analysis Date = 12/29/2009 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20093480064  Analysis Date = 12/16/2009 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20093420004  Analysis Date = 12/15/2009 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20093350070  Analysis Date = 12/15/2009 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20093280015  Analysis Date = 11/19/2009 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20093200062  Analysis Date = 11/17/2009 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20093130061  Analysis Date = 11/16/2009 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20093070201  Analysis Date = 11/10/2009 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20093000106  Analysis Date = 11/03/2009 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20092920096  Analysis Date = 10/22/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20092870073  Analysis Date = 10/08/2009 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20092780071  Analysis Date = 10/06/2009 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20092720011  Analysis Date = 09/29/2009 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20092640026  Analysis Date = 09/22/2009 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20092570049  Analysis Date = 09/16/2009 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20092520132  Analysis Date = 09/03/2009 
 Lab Value = -0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20092430155  Analysis Date = 09/09/2009 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20092360171  Analysis Date = 08/27/2009 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20092290211  Analysis Date = 08/13/2009 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20092220169  Analysis Date = 08/06/2009 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20092150073  Analysis Date = 07/31/2009 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20092090263  Analysis Date = 07/24/2009 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20092010116  Analysis Date = 07/16/2009 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20091950026  Analysis Date = 07/13/2009 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20091870025  Analysis Date = 07/08/2009 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20091800174  Analysis Date = 07/07/2009 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20091730218  Analysis Date = 06/17/2009 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20091660206  Analysis Date = 06/10/2009 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20091590088  Analysis Date = 06/05/2009 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20091520151  Analysis Date = 05/28/2009 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20091460188  Analysis Date = 05/21/2009 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20091380122  Analysis Date = 05/19/2009 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20091320020  Analysis Date = 05/07/2009 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20091240123  Analysis Date = 05/06/2009 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20091170110  Analysis Date = 05/06/2009 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20091110135  Analysis Date = 04/16/2009 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20091030081  Analysis Date = 04/08/2009 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20090960054  Analysis Date = 04/02/2009 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20090890069  Analysis Date = 03/27/2009 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20090820029  Analysis Date = 03/19/2009 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20090750048  Analysis Date = 03/11/2009 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20090680045  Analysis Date = 03/05/2009 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20090610057  Analysis Date = 02/24/2009 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20090540030  Analysis Date = 02/18/2009 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20090480058  Analysis Date = 02/17/2009 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20090400032  Analysis Date = 02/05/2009 
 Lab Value = 0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20090330037  Analysis Date = 01/29/2009 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20090260027  Analysis Date = 01/26/2009 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20090200036  Analysis Date = 01/15/2009 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20090120049  Analysis Date = 01/13/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20090050019  Analysis Date = 01/13/2009 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20083650083  Analysis Date = 01/05/2009 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20083570034  Analysis Date = 12/18/2008 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20083500071  Analysis Date = 12/16/2008 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20083450064  Analysis Date = 12/04/2008 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20083360040  Analysis Date = 12/04/2008 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20083290062  Analysis Date = 11/24/2008 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20083220064  Analysis Date = 11/13/2008 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20083150065  Analysis Date = 11/13/2008 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20083080100  Analysis Date = 10/30/2008 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20083010109  Analysis Date = 10/22/2008 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20082940063  Analysis Date = 10/21/2008 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20082880040  Analysis Date = 10/08/2008 
 Lab Value = -0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20082800042  Analysis Date = 10/06/2008 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20082730062  Analysis Date = 09/30/2008 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20082660047  Analysis Date = 09/17/2008 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20082590105  Analysis Date = 09/15/2008 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20082520008  Analysis Date = 09/10/2008 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20082460098  Analysis Date = 09/02/2008 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20082380080  Analysis Date = 08/22/2008 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20082310131  Analysis Date = 08/18/2008 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20082250010  Analysis Date = 08/11/2008 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20082190011  Analysis Date = 07/24/2008 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20082030127  Analysis Date = 07/22/2008 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20081970139  Analysis Date = 07/14/2008 
 Lab Value = -0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20081890044  Analysis Date = 07/07/2008 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20081820059  Analysis Date = 06/26/2008 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20081750128  Analysis Date = 06/23/2008 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20081680067  Analysis Date = 06/11/2008 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20081620017  Analysis Date = 06/10/2008 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20081540109  Analysis Date = 06/04/2008 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20081480068  Analysis Date = 05/29/2008 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20081400061  Analysis Date = 05/13/2008 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20081330112  Analysis Date = 05/07/2008 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20081260070  Analysis Date = 04/29/2008 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20081190055  Analysis Date = 04/24/2008 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20081120033  Analysis Date = 04/22/2008 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20081050114  Analysis Date = 04/10/2008 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20080980084  Analysis Date = 04/08/2008 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20080920083  Analysis Date = 03/31/2008 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20080840064  Analysis Date = 03/27/2008 
 Lab Value = 0.02 
 RPT Level = 0.02 
 Lab Sample ID = 20080770124  Analysis Date = 03/12/2008 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20080700074  Analysis Date = 03/05/2008 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20080630067  Analysis Date = 03/03/2008 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20080560070  Analysis Date = 03/03/2008 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20080510055  Analysis Date = 02/19/2008 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20080420072  Analysis Date = 02/11/2008 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20080360051  Analysis Date = 02/01/2008 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20080280050  Analysis Date = 01/24/2008 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20080230021  Analysis Date = 01/23/2008 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20080140027  Analysis Date = 01/15/2008 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20080070023  Analysis Date = 01/15/2008 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20073620004  Analysis Date = 01/09/2008 
 Lab Value = -0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20073510098  Analysis Date = 12/18/2007 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20073440039  Analysis Date = 12/05/2007 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20073370069  Analysis Date = 12/04/2007 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20073300042  Analysis Date = 11/26/2007 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20073230113  Analysis Date = 11/19/2007 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20073170062  Analysis Date = 11/14/2007 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20073100012  Analysis Date = 11/01/2007 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20073020065  Analysis Date = 10/29/2007 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20072960186  Analysis Date = 10/23/2007 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20072890056  Analysis Date = 10/18/2007 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20072850025  Analysis Date = 10/04/2007 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20072670056  Analysis Date = 09/24/2007 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20072600129  Analysis Date = 09/20/2007 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20072540015  Analysis Date = 09/17/2007 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20072480018  Analysis Date = 09/10/2007 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20072400035  Analysis Date = 08/28/2007 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20072330109  Analysis Date = 08/17/2007 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20072260198  Analysis Date = 08/16/2007 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20072210252  Analysis Date = 08/06/2007 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20072110162  Analysis Date = 07/30/2007 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20072040101  Analysis Date = 07/17/2007 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20071900105  Analysis Date = 07/16/2007 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20071830158  Analysis Date = 06/29/2007 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20071770201  Analysis Date = 06/25/2007 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20071690119  Analysis Date = 06/14/2007 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20071620045  Analysis Date = 06/12/2007 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20071560026  Analysis Date = 06/04/2007 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20071500033  Analysis Date = 06/07/2007 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20071410089  Analysis Date = 05/21/2007 
 Lab Value = 0.024 
 RPT Level = 0.02 
 Lab Sample ID = 20071340113  Analysis Date = 05/10/2007 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20071280019  Analysis Date = 05/03/2007 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20071200089  Analysis Date = 05/01/2007 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20071130120  Analysis Date = 04/19/2007 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20071070021  Analysis Date = 04/12/2007 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20070990050  Analysis Date = 04/10/2007 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20070930070  Analysis Date = 04/04/2007 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20070860217  Analysis Date = 03/30/2007 
 Lab Value = -0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20070780128  Analysis Date = 04/16/2007 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20070710075  Analysis Date = 03/12/2007 
 Lab Value = -0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20070650009  Analysis Date = 03/05/2007 
 Lab Value = 0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20070580141  Analysis Date = 03/01/2007 
 Lab Value = 0.022 
 RPT Level = 0.02 
 Lab Sample ID = 20070540023  Analysis Date = 02/26/2007 
 Lab Value = 0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20070460015  Analysis Date = 02/15/2007 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20070400103  Analysis Date = 01/29/2007 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20070250023  Analysis Date = 01/22/2007 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20070180071  Analysis Date = 01/17/2007 
 Lab Value = 0.021 
 RPT Level = 0.02 
 Lab Sample ID = 20070120012  Analysis Date = 01/09/2007 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20070040013  Analysis Date = 01/09/2007 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20063610084  Analysis Date = 01/04/2007 
 Lab Value = -0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20063520072  Analysis Date = 12/14/2006 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20063450081  Analysis Date = 12/07/2006 
 Lab Value = -0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20063380055  Analysis Date = 12/08/2006 
 Lab Value = -0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20063310047  Analysis Date = 11/28/2006 
 Lab Value = -0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20063240079  Analysis Date = 11/16/2006 
 Lab Value = -0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20063180103  Analysis Date = 11/22/2006 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20063100080  Analysis Date = 11/07/2006 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20063030096  Analysis Date = 11/01/2006 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20062960133  Analysis Date = 10/31/2006 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20062910013  Analysis Date = 10/16/2006 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20062850014  Analysis Date = 10/11/2006 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20062780050  Analysis Date = 09/20/2006 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20062620013  Analysis Date = 09/15/2006 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20062540016  Analysis Date = 09/11/2006 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20062500008  Analysis Date = 08/28/2006 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20062350182  Analysis Date = 08/17/2006 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20062270273  Analysis Date = 08/14/2006 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20062220039  Analysis Date = 07/25/2006 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20062020314  Analysis Date = 07/18/2006 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20061950007  Analysis Date = 07/11/2006 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20061880009  Analysis Date = 06/23/2006 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20061730014  Analysis Date = 06/19/2006 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20061670021  Analysis Date = 06/08/2006 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20061580018  Analysis Date = 05/18/2006 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20061370016  Analysis Date = 05/10/2006 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20061280111  Analysis Date = 05/15/2006 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20061220099  Analysis Date = 09/21/2005 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20052590035  Analysis Date = 09/13/2005 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20052520006  Analysis Date = 09/02/2005 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20052430006  Analysis Date = 08/30/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20052370002  Analysis Date = 08/19/2005 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20052300009  Analysis Date = 08/10/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20052210012  Analysis Date = 08/05/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20052160007  Analysis Date = 08/05/2005 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20052160005  Analysis Date = 07/21/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20052010007  Analysis Date = 07/18/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20051940015  Analysis Date = 07/11/2005 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20051880018  Analysis Date = 07/06/2005 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20051800189  Analysis Date = 06/24/2005 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20051740019  Analysis Date = 06/21/2005 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20051660174  Analysis Date = 06/13/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20051590025  Analysis Date = 06/06/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20051530021  Analysis Date = 05/25/2005 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20051440043  Analysis Date = 05/23/2005 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20051380014  Analysis Date = 05/17/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20051320029  Analysis Date = 05/11/2005 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20051250003  Analysis Date = 04/28/2005 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20051170012  Analysis Date = 04/25/2005 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20051110007  Analysis Date = 04/14/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20051020018  Analysis Date = 04/07/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20050950044  Analysis Date = 04/04/2005 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20050880116  Analysis Date = 03/29/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20050840096  Analysis Date = 03/18/2005 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20050750004  Analysis Date = 03/14/2005 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20050700007  Analysis Date = 03/14/2005 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20050700004  Analysis Date = 03/10/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20050670011  Analysis Date = 03/01/2005 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20050550024  Analysis Date = 02/18/2005 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20050480005  Analysis Date = 02/15/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20050410004  Analysis Date = 02/04/2005 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20050340020  Analysis Date = 01/27/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20050260024  Analysis Date = 01/21/2005 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20050200048  Analysis Date = 01/18/2005 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20050130091  Analysis Date = 01/10/2005 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20050070016  Analysis Date = 01/04/2005 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20043650002  Analysis Date = 12/28/2004 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20043580037  Analysis Date = 12/28/2004 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20043580035  Analysis Date = 12/20/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20043520023  Analysis Date = 12/20/2004 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20043510018  Analysis Date = 12/13/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20043450069  Analysis Date = 12/13/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20043440147  Analysis Date = 12/06/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20043380005  Analysis Date = 12/06/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20043380002  Analysis Date = 12/06/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20043310059  Analysis Date = 11/29/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20043280048  Analysis Date = 11/23/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20043240012  Analysis Date = 09/02/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20042450138  Analysis Date = 08/31/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20042400089  Analysis Date = 08/25/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20042370105  Analysis Date = 08/23/2004 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20042330206  Analysis Date = 08/23/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20042320136  Analysis Date = 08/23/2004 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20042320138  Analysis Date = 08/13/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20042240114  Analysis Date = 08/05/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20042170123  Analysis Date = 08/03/2004 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20042110015  Analysis Date = 07/26/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20042040039  Analysis Date = 07/20/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20041960050  Analysis Date = 07/09/2004 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20041900062  Analysis Date = 07/07/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20041820035  Analysis Date = 06/28/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20041750057  Analysis Date = 06/23/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20041700080  Analysis Date = 06/10/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20041610055  Analysis Date = 06/04/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20041550019  Analysis Date = 06/01/2004 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20041470132  Analysis Date = 05/21/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20041400016  Analysis Date = 05/07/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20041260099  Analysis Date = 05/03/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20041200046  Analysis Date = 04/26/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20041130016  Analysis Date = 04/20/2004 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20041050022  Analysis Date = 04/12/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20040980007  Analysis Date = 04/05/2004 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20040930009  Analysis Date = 04/05/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20040910012  Analysis Date = 03/30/2004 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20040850021  Analysis Date = 03/30/2004 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20040830056  Analysis Date = 03/23/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20040790023  Analysis Date = 03/18/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20040760010  Analysis Date = 03/16/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20040720029  Analysis Date = 03/16/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20040710005  Analysis Date = 03/12/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20040680093  Analysis Date = 03/12/2004 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20040650001  Analysis Date = 03/01/2004 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20040580032  Analysis Date = 02/26/2004 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20040550018  Analysis Date = 02/24/2004 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20040510134  Analysis Date = 02/23/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20040490025  Analysis Date = 02/23/2004 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20040440035  Analysis Date = 02/12/2004 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20040420001  Analysis Date = 02/09/2004 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20040370017  Analysis Date = 02/09/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20040340024  Analysis Date = 02/03/2004 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20040300012  Analysis Date = 01/30/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20040270036  Analysis Date = 01/27/2004 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20040230030  Analysis Date = 01/22/2004 
 Lab Value = -0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20040210154  Analysis Date = 01/22/2004 
 Lab Value = -0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20040200023  Analysis Date = 01/16/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040150075  Analysis Date = 01/13/2004 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20040090020  Analysis Date = 01/13/2004 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20040070032  Analysis Date = 01/06/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20040050016  Analysis Date = 09/29/2003 
 Lab Value = -0.003 
 RPT Level = 0.018 
 Lab Sample ID = 20032660009  Analysis Date = 09/19/2003 
 Lab Value = 0.016 
 RPT Level = 0.018 
 Lab Sample ID = 20032600107  Analysis Date = 09/12/2003 
 Lab Value = 0.001 
 RPT Level = 0.018 
 Lab Sample ID = 20032520179  Analysis Date = 09/05/2003 
 Lab Value = -0.005 
 RPT Level = 0.018 
 Lab Sample ID = 20032450195  Analysis Date = 08/27/2003 
 Lab Value = 0.004 
 RPT Level = 0.018 
 Lab Sample ID = 20032380029  Analysis Date = 08/21/2003 
 Lab Value = -0.003 
 RPT Level = 0.018 
 Lab Sample ID = 20032310028  Analysis Date = 08/14/2003 
 Lab Value = 0.001 
 RPT Level = 0.018 
 Lab Sample ID = 20032250256  Analysis Date = 08/08/2003 
 Lab Value = 0.006 
 RPT Level = 0.018 
 Lab Sample ID = 20032180019  Analysis Date = 08/04/2003 
 Lab Value = 0.004 
 RPT Level = 0.018 
 Lab Sample ID = 20032100004  Analysis Date = 07/24/2003 
 Lab Value = 0.019 
 RPT Level = 0.018 
 Lab Sample ID = 20032040043  Analysis Date = 07/16/2003 
 Lab Value = -0.004 
 RPT Level = 0.018 
 Lab Sample ID = 20031960025  Analysis Date = 07/15/2003 
 Lab Value = -0.001 
 RPT Level = 0.018 
 Lab Sample ID = 20031900098  Analysis Date = 07/03/2003 
 Lab Value = 0.018 
 RPT Level = 0.018 
 Lab Sample ID = 20031820037  Analysis Date = 07/01/2003 
 Lab Value = 0.003 
 RPT Level = 0.018 
 Lab Sample ID = 20031770041  Analysis Date = 06/23/2003 
 Lab Value = 0.004 
 RPT Level = 0.018 
 Lab Sample ID = 20031700013  Analysis Date = 06/16/2003 
 Lab Value = 0.015 
 RPT Level = 0.018 
 Lab Sample ID = 20031630053  Analysis Date = 06/13/2003 
 Lab Value = 0.005 
 RPT Level = 0.018 
 Lab Sample ID = 20031600109  Analysis Date = 05/29/2003 
 Lab Value = -0.006 
 RPT Level = 0.018 
 Lab Sample ID = 20031480059  Analysis Date = 05/28/2003 
 Lab Value = 0.006 
 RPT Level = 0.018 
 Lab Sample ID = 20031430019  Analysis Date = 05/22/2003 
 Lab Value = 0.009 
 RPT Level = 0.018 
 Lab Sample ID = 20031400115  Analysis Date = 05/14/2003 
 Lab Value = -0.013 
 RPT Level = 0.018 
 Lab Sample ID = 20031290084  Analysis Date = 05/06/2003 
 Lab Value = 0.001 
 RPT Level = 0.018 
 Lab Sample ID = 20031220070  Analysis Date = 05/01/2003 
 Lab Value = 0.001 
 RPT Level = 0.018 
 Lab Sample ID = 20031200043  Analysis Date = 04/22/2003 
 Lab Value = 0 
 RPT Level = 0.018 
 Lab Sample ID = 20031080208  Analysis Date = 04/08/2003 
 Lab Value = 0.007 
 RPT Level = 0.018 
 Lab Sample ID = 20030970018  Analysis Date = 04/03/2003 
 Lab Value = 0.004 
 RPT Level = 0.018 
 Lab Sample ID = 20030920027  Analysis Date = 04/02/2003 
 Lab Value = 0.022 
 RPT Level = 0.018 
 Lab Sample ID = 20030900015  Analysis Date = 04/02/2003 
 Lab Value = -0.006 
 RPT Level = 0.018 
 Lab Sample ID = 20030860023  Analysis Date = 03/14/2003 
 Lab Value = -0.008 
 RPT Level = 0.018 
 Lab Sample ID = 20030710021  Analysis Date = 03/12/2003 
 Lab Value = 0.006 
 RPT Level = 0.018 
 Lab Sample ID = 20030660148  Analysis Date = 03/06/2003 
 Lab Value = 0 
 RPT Level = 0.018 
 Lab Sample ID = 20030590040  Analysis Date = 02/27/2003 
 Lab Value = -0.005 
 RPT Level = 0.018 
 Lab Sample ID = 20030570061  Analysis Date = 02/12/2003 
 Lab Value = 0.007 
 RPT Level = 0.018 
 Lab Sample ID = 20030410034  Analysis Date = 02/07/2003 
 Lab Value = 0.003 
 RPT Level = 0.018 
 Lab Sample ID = 20030350008  Analysis Date = 02/03/2003 
 Lab Value = -0.001 
 RPT Level = 0.018 
 Lab Sample ID = 20030310028  Analysis Date = 01/31/2003 
 Lab Value = 0.009 
 RPT Level = 0.018 
 Lab Sample ID = 20030300004  Analysis Date = 01/16/2003 
 Lab Value = -0.006 
 RPT Level = 0.018 
 Lab Sample ID = 20030150009  Analysis Date = 01/17/2003 
 Lab Value = 0.019 
 RPT Level = 0.018 
 Lab Sample ID = 20030140019  Analysis Date = 01/08/2003 
 Lab Value = 0.012 
 RPT Level = 0.018 
 Lab Sample ID = 20030020002  Analysis Date = 01/06/2003 
 Lab Value = -0.018 
 RPT Level = 0.018 
 Lab Sample ID = 20023650009  Analysis Date = 12/18/2002 
 Lab Value = 0.005 
 RPT Level = 0.018 
 Lab Sample ID = 20023500166  Analysis Date = 12/18/2002 
 Lab Value = 0.018 
 RPT Level = 0.018 
 Lab Sample ID = 20023500092  Analysis Date = 12/06/2002 
 Lab Value = 0.004 
 RPT Level = 0.018 
 Lab Sample ID = 20023370026  Analysis Date = 12/11/2002 
 Lab Value = 0.015 
 RPT Level = 0.018 
 Lab Sample ID = 20023370025  Analysis Date = 12/04/2002 
 Lab Value = -0.015 
 RPT Level = 0.018 
 Lab Sample ID = 20023330096  Analysis Date = 12/11/2002 
 Lab Value = 0.01 
 RPT Level = 0.018 
 Lab Sample ID = 20023360020  Analysis Date = 12/04/2002 
 Lab Value = -0.006 
 RPT Level = 0.018 
 Lab Sample ID = 20023310020  Analysis Date = 11/04/2002 
 Lab Value = 0.019 
 RPT Level = 0.018 
 Lab Sample ID = 20023040033  Analysis Date = 10/25/2002 
 Lab Value = 0.011 
 RPT Level = 0.018 
 Lab Sample ID = 20022970050  Analysis Date = 10/25/2002 
 Lab Value = 0.015 
 RPT Level = 0.018 
 Lab Sample ID = 20022970049  Analysis Date = 10/25/2002 
 Lab Value = 0.01 
 RPT Level = 0.018 
 Lab Sample ID = 20022970048  Analysis Date = 10/24/2002 
 Lab Value = 0.002 
 RPT Level = 0.018 
 Lab Sample ID = 20022960022  Analysis Date = 09/05/2002 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20022470018  Analysis Date = 09/05/2002 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20022460135  Analysis Date = 08/26/2002 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20022340186  Analysis Date = 08/19/2002 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20022280008  Analysis Date = 08/13/2002 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20022210007  Analysis Date = 08/06/2002 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20022170107  Analysis Date = 07/29/2002 
 Lab Value = 0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20022060077  Analysis Date = 07/19/2002 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20021970116  Analysis Date = 07/19/2002 
 Lab Value = 0.015 
 RPT Level = 0.03 
 Lab Sample ID = 20021960234  Analysis Date = 07/03/2002 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20021830026  Analysis Date = 07/01/2002 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20021790006  Analysis Date = 06/21/2002 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20021690011  Analysis Date = 06/21/2002 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20021650005  Analysis Date = 06/05/2002 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20021550019  Analysis Date = 06/05/2002 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20021510057  Analysis Date = 05/28/2002 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20021420157  Analysis Date = 05/16/2002 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20021330223  Analysis Date = 05/13/2002 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20021300001  Analysis Date = 05/03/2002 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20021210086  Analysis Date = 04/25/2002 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20021140037  Analysis Date = 04/25/2002 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20021140036  Analysis Date = 04/15/2002 
 Lab Value = 0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20021010016  Analysis Date = 04/04/2002 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20020930112  Analysis Date = 03/28/2002 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20020850091  Analysis Date = 03/26/2002 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20020810192  Analysis Date = 03/18/2002 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20020730104  Analysis Date = 03/11/2002 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20020670021  Analysis Date = 03/05/2002 
 Lab Value = -0.019 
 RPT Level = 0.03 
 Lab Sample ID = 20020600005  Analysis Date = 02/28/2002 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20020570018  Analysis Date = 02/21/2002 
 Lab Value = 0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20020460048  Analysis Date = 02/07/2002 
 Lab Value = -0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20020360005  Analysis Date = 02/07/2002 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20020320102  Analysis Date = 01/24/2002 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20020220079  Analysis Date = 01/16/2002 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20020110003  Analysis Date = 01/04/2002 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20020020005  Analysis Date = 01/04/2002 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20013600207  Analysis Date = 12/21/2001 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20013520042  Analysis Date = 12/19/2001 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20013480008  Analysis Date = 12/07/2001 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20013390010  Analysis Date = 11/08/2001 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20013110130  Analysis Date = 09/30/2016 
 RPT Level = 0.02  Analysis Date = 09/22/2016 
 RPT Level = 0.02  Analysis Date = 09/22/2016 
 RPT Level = 0.02  Analysis Date = 09/15/2016 
 RPT Level = 0.02  Analysis Date = 09/15/2016 
 RPT Level = 0.02  Analysis Date = 09/13/2016 
 RPT Level = 0.02  Analysis Date = 09/13/2016 
 RPT Level = 0.02  Analysis Date = 08/30/2016 
 RPT Level = 0.02  Analysis Date = 08/30/2016 
 RPT Level = 0.02  Analysis Date = 08/22/2016 
 RPT Level = 0.02  Analysis Date = 08/22/2016 
 RPT Level = 0.02  Analysis Date = 08/11/2016 
 RPT Level = 0.02  Analysis Date = 08/11/2016 
 RPT Level = 0.02  Analysis Date = 08/08/2016 
 RPT Level = 0.02  Analysis Date = 08/08/2016 
 RPT Level = 0.02  Analysis Date = 08/02/2016 
 RPT Level = 0.02  Analysis Date = 08/02/2016 
 RPT Level = 0.02  Analysis Date = 07/25/2016 
 RPT Level = 0.02  Analysis Date = 07/25/2016 
 RPT Level = 0.02  Analysis Date = 07/15/2016 
 RPT Level = 0.02  Analysis Date = 07/15/2016 
 RPT Level = 0.02  Analysis Date = 07/12/2016 
 RPT Level = 0.02  Analysis Date = 07/12/2016 
 RPT Level = 0.02  Analysis Date = 07/05/2016 
 RPT Level = 0.02  Analysis Date = 07/05/2016 
 RPT Level = 0.02  Analysis Date = 06/24/2016 
 RPT Level = 0.02  Analysis Date = 06/24/2016 
 RPT Level = 0.02  Analysis Date = 06/21/2016 
 RPT Level = 0.02  Analysis Date = 06/21/2016 
 RPT Level = 0.02  Analysis Date = 06/14/2016 
 RPT Level = 0.02  Analysis Date = 06/14/2016 
 RPT Level = 0.02  Analysis Date = 06/10/2016 
 RPT Level = 0.02  Analysis Date = 06/10/2016 
 RPT Level = 0.02  Analysis Date = 06/10/2016 
 RPT Level = 0.02  Analysis Date = 06/10/2016 
 RPT Level = 0.02  Analysis Date = 05/17/2016 
 RPT Level = 0.02  Analysis Date = 05/17/2016 
 RPT Level = 0.02  Analysis Date = 05/10/2016 
 RPT Level = 0.02  Analysis Date = 05/10/2016 
 RPT Level = 0.02  Analysis Date = 05/03/2016 
 RPT Level = 0.02  Analysis Date = 05/03/2016 
 RPT Level = 0.02  Analysis Date = 04/26/2016 
 RPT Level = 0.02  Analysis Date = 04/26/2016 
 RPT Level = 0.02  Analysis Date = 04/18/2016 
 RPT Level = 0.02  Analysis Date = 04/18/2016 
 RPT Level = 0.02  Analysis Date = 04/07/2016 
 RPT Level = 0.02  Analysis Date = 04/07/2016 
 RPT Level = 0.02  Analysis Date = 03/31/2016 
 RPT Level = 0.02  Analysis Date = 03/31/2016 
 RPT Level = 0.02  Analysis Date = 03/28/2016 
 RPT Level = 0.02  Analysis Date = 03/28/2016 
 RPT Level = 0.02  Analysis Date = 03/17/2016 
 RPT Level = 0.02  Analysis Date = 03/17/2016 
 RPT Level = 0.02  Analysis Date = 03/11/2016 
 RPT Level = 0.02  Analysis Date = 03/11/2016 
 RPT Level = 0.02  Analysis Date = 03/04/2016 
 RPT Level = 0.02  Analysis Date = 03/04/2016 
 RPT Level = 0.02  Analysis Date = 02/29/2016 
 RPT Level = 0.02  Analysis Date = 02/29/2016 
 RPT Level = 0.02  Analysis Date = 02/18/2016 
 RPT Level = 0.02  Analysis Date = 02/18/2016 
 RPT Level = 0.02  Analysis Date = 02/16/2016 
 RPT Level = 0.02  Analysis Date = 02/16/2016 
 RPT Level = 0.02  Analysis Date = 02/03/2016 
 RPT Level = 0.02  Analysis Date = 02/03/2016 
 RPT Level = 0.02  Analysis Date = 02/01/2016 
 RPT Level = 0.02  Analysis Date = 02/01/2016 
 RPT Level = 0.02  Analysis Date = 01/21/2016 
 RPT Level = 0.02  Analysis Date = 01/21/2016 
 RPT Level = 0.02  Analysis Date = 01/14/2016 
 RPT Level = 0.02  Analysis Date = 01/14/2016 
 RPT Level = 0.02  Analysis Date = 01/08/2016 
 RPT Level = 0.02  Analysis Date = 01/08/2016 
 RPT Level = 0.02  Analysis Date = 01/04/2016 
 RPT Level = 0.02  Analysis Date = 01/04/2016 
 RPT Level = 0.02  Analysis Date = 12/23/2015 
 RPT Level = 0.02  Analysis Date = 12/23/2015 
 RPT Level = 0.02  Analysis Date = 12/21/2015 
 RPT Level = 0.02  Analysis Date = 12/21/2015 
 RPT Level = 0.02  Analysis Date = 12/15/2015 
 RPT Level = 0.02  Analysis Date = 12/15/2015 
 RPT Level = 0.02  Analysis Date = 12/09/2015 
 RPT Level = 0.02  Analysis Date = 12/09/2015 
 RPT Level = 0.02  Analysis Date = 12/04/2015 
 RPT Level = 0.02  Analysis Date = 12/04/2015 
 RPT Level = 0.02  Analysis Date = 11/24/2015 
 RPT Level = 0.02  Analysis Date = 11/24/2015 
 RPT Level = 0.02  Analysis Date = 11/17/2015 
 RPT Level = 0.02  Analysis Date = 11/17/2015 
 RPT Level = 0.02  Analysis Date = 11/04/2015 
 RPT Level = 0.02  Analysis Date = 11/04/2015 
 RPT Level = 0.02  Analysis Date = 11/02/2015 
 RPT Level = 0.02  Analysis Date = 11/02/2015 
 RPT Level = 0.02  Analysis Date = 10/26/2015 
 RPT Level = 0.02  Analysis Date = 10/26/2015 
 RPT Level = 0.02  Analysis Date = 10/22/2015 
 RPT Level = 0.02  Analysis Date = 10/22/2015 
 RPT Level = 0.02  Analysis Date = 10/14/2015 
 RPT Level = 0.02  Analysis Date = 10/14/2015 
 RPT Level = 0.02  Analysis Date = 10/07/2015 
 RPT Level = 0.02  Analysis Date = 10/07/2015 
 RPT Level = 0.02  Analysis Date = 09/30/2015 
 RPT Level = 0.02  Analysis Date = 09/30/2015 
 RPT Level = 0.02  Analysis Date = 09/28/2015 
 RPT Level = 0.02  Analysis Date = 09/28/2015 
 RPT Level = 0.02  Analysis Date = 09/22/2015 
 RPT Level = 0.02  Analysis Date = 09/22/2015 
 RPT Level = 0.02  Analysis Date = 09/16/2015 
 RPT Level = 0.02  Analysis Date = 09/16/2015 
 RPT Level = 0.02  Analysis Date = 09/01/2015 
 RPT Level = 0.02  Analysis Date = 09/01/2015 
 RPT Level = 0.02  Analysis Date = 09/01/2015 
 RPT Level = 0.02  Analysis Date = 09/01/2015 
 RPT Level = 0.02  Analysis Date = 08/19/2015 
 RPT Level = 0.02  Analysis Date = 08/19/2015 
 RPT Level = 0.02  Analysis Date = 08/10/2015 
 RPT Level = 0.02  Analysis Date = 08/10/2015 
 RPT Level = 0.02  Analysis Date = 07/31/2015 
 RPT Level = 0.02  Analysis Date = 07/31/2015 
 RPT Level = 0.02  Analysis Date = 07/27/2015 
 RPT Level = 0.02  Analysis Date = 07/27/2015 
 RPT Level = 0.02  Analysis Date = 07/23/2015 
 RPT Level = 0.02  Analysis Date = 07/23/2015 
 RPT Level = 0.02  Analysis Date = 07/14/2015 
 RPT Level = 0.02  Analysis Date = 07/14/2015 
 RPT Level = 0.02  Analysis Date = 07/10/2015 
 RPT Level = 0.02  Analysis Date = 07/10/2015 
 RPT Level = 0.02  Analysis Date = 07/01/2015 
 RPT Level = 0.02  Analysis Date = 07/01/2015 
 RPT Level = 0.02  Analysis Date = 06/26/2015 
 RPT Level = 0.02  Analysis Date = 06/26/2015 
 RPT Level = 0.02  Analysis Date = 06/23/2015 
 RPT Level = 0.02  Analysis Date = 06/23/2015 
 RPT Level = 0.02  Analysis Date = 06/16/2015 
 RPT Level = 0.02  Analysis Date = 06/16/2015 
 RPT Level = 0.02  Analysis Date = 06/05/2015 
 RPT Level = 0.02  Analysis Date = 06/05/2015 
 RPT Level = 0.02  Analysis Date = 05/29/2015 
 RPT Level = 0.02  Analysis Date = 05/29/2015 
 RPT Level = 0.02  Analysis Date = 05/20/2015 
 RPT Level = 0.02  Analysis Date = 05/20/2015 
 RPT Level = 0.02  Analysis Date = 05/13/2015 
 RPT Level = 0.02  Analysis Date = 05/13/2015 
 RPT Level = 0.02  Analysis Date = 05/08/2015 
 RPT Level = 0.02  Analysis Date = 05/08/2015 
 RPT Level = 0.02  Analysis Date = 05/01/2015 
 RPT Level = 0.02  Analysis Date = 05/01/2015 
 RPT Level = 0.02  Analysis Date = 04/22/2015 
 RPT Level = 0.02  Analysis Date = 04/22/2015 
 RPT Level = 0.02  Analysis Date = 04/17/2015 
 RPT Level = 0.02  Analysis Date = 04/17/2015 
 RPT Level = 0.02  Analysis Date = 04/02/2015 
 RPT Level = 0.02  Analysis Date = 04/02/2015 
 RPT Level = 0.02  Analysis Date = 03/30/2015 
 RPT Level = 0.02  Analysis Date = 03/30/2015 
 RPT Level = 0.02  Analysis Date = 03/19/2015 
 RPT Level = 0.02  Analysis Date = 03/19/2015 
 RPT Level = 0.02  Analysis Date = 03/13/2015 
 RPT Level = 0.02  Analysis Date = 03/13/2015 
 RPT Level = 0.02  Analysis Date = 03/04/2015 
 RPT Level = 0.02  Analysis Date = 03/04/2015 
 RPT Level = 0.02  Analysis Date = 02/25/2015 
 RPT Level = 0.02  Analysis Date = 02/25/2015 
 RPT Level = 0.02  Analysis Date = 02/20/2015 
 RPT Level = 0.02  Analysis Date = 02/20/2015 
 RPT Level = 0.02  Analysis Date = 02/12/2015 
 RPT Level = 0.02  Analysis Date = 02/12/2015 
 RPT Level = 0.02  Analysis Date = 02/06/2015 
 RPT Level = 0.02  Analysis Date = 02/06/2015 
 RPT Level = 0.02  Analysis Date = 02/03/2015 
 RPT Level = 0.02  Analysis Date = 02/03/2015 
 RPT Level = 0.02  Analysis Date = 01/23/2015 
 RPT Level = 0.02  Analysis Date = 01/23/2015 
 RPT Level = 0.02  Analysis Date = 01/16/2015 
 RPT Level = 0.02  Analysis Date = 01/16/2015 
 RPT Level = 0.02  Analysis Date = 01/08/2015 
 RPT Level = 0.02  Analysis Date = 01/08/2015 
 RPT Level = 0.02  Analysis Date = 01/08/2015 
 RPT Level = 0.02  Analysis Date = 01/08/2015 
 RPT Level = 0.02  Analysis Date = 12/31/2014 
 RPT Level = 0.02  Analysis Date = 12/31/2014 
 RPT Level = 0.02  Analysis Date = 12/19/2014 
 RPT Level = 0.02  Analysis Date = 12/19/2014 
 RPT Level = 0.02  Analysis Date = 12/10/2014 
 RPT Level = 0.02  Analysis Date = 12/10/2014 
 RPT Level = 0.02  Analysis Date = 12/05/2014 
 RPT Level = 0.02  Analysis Date = 12/05/2014 
 RPT Level = 0.02  Analysis Date = 12/05/2014 
 RPT Level = 0.02  Analysis Date = 12/05/2014 
 RPT Level = 0.02  Analysis Date = 12/03/2014 
 RPT Level = 0.02  Analysis Date = 12/03/2014 
 RPT Level = 0.02  Analysis Date = 11/26/2014 
 RPT Level = 0.02  Analysis Date = 11/26/2014 
 RPT Level = 0.02  Analysis Date = 11/18/2014 
 RPT Level = 0.02  Analysis Date = 11/18/2014 
 RPT Level = 0.02  Analysis Date = 11/06/2014 
 RPT Level = 0.02  Analysis Date = 11/06/2014 
 RPT Level = 0.02  Analysis Date = 11/18/2014 
 RPT Level = 0.02  Analysis Date = 11/18/2014 
 RPT Level = 0.02  Analysis Date = 10/31/2014 
 RPT Level = 0.02  Analysis Date = 10/31/2014 
 RPT Level = 0.02  Analysis Date = 10/24/2014 
 RPT Level = 0.02  Analysis Date = 10/24/2014 
 RPT Level = 0.02  Analysis Date = 10/24/2014 
 RPT Level = 0.02  Analysis Date = 10/24/2014 
 RPT Level = 0.02  Analysis Date = 10/21/2014 
 RPT Level = 0.02  Analysis Date = 10/21/2014 
 RPT Level = 0.02  Analysis Date = 10/14/2014 
 RPT Level = 0.02  Analysis Date = 10/14/2014 
 RPT Level = 0.02  Analysis Date = 10/03/2014 
 RPT Level = 0.02  Analysis Date = 10/03/2014 
 RPT Level = 0.02  Analysis Date = 10/02/2014 
 RPT Level = 0.02  Analysis Date = 10/02/2014 
 RPT Level = 0.02  Analysis Date = 09/09/2014 
 RPT Level = 0.02  Analysis Date = 09/09/2014 
 RPT Level = 0.02  Analysis Date = 08/28/2014 
 RPT Level = 0.02  Analysis Date = 08/28/2014 
 RPT Level = 0.02  Analysis Date = 08/21/2014 
 RPT Level = 0.02  Analysis Date = 08/21/2014 
 RPT Level = 0.02  Analysis Date = 08/07/2014 
 RPT Level = 0.02  Analysis Date = 08/07/2014 
 RPT Level = 0.02  Analysis Date = 08/01/2014 
 RPT Level = 0.02  Analysis Date = 08/01/2014 
 RPT Level = 0.02  Analysis Date = 08/01/2014 
 RPT Level = 0.02  Analysis Date = 08/01/2014 
 RPT Level = 0.02  Analysis Date = 07/25/2014 
 RPT Level = 0.02  Analysis Date = 07/25/2014 
 RPT Level = 0.02  Analysis Date = 07/17/2014 
 RPT Level = 0.02  Analysis Date = 07/17/2014 
 RPT Level = 0.02  Analysis Date = 07/10/2014 
 RPT Level = 0.02  Analysis Date = 07/10/2014 
 RPT Level = 0.02  Analysis Date = 07/01/2014 
 RPT Level = 0.02  Analysis Date = 07/01/2014 
 RPT Level = 0.02  Analysis Date = 06/26/2014 
 RPT Level = 0.02  Analysis Date = 06/26/2014 
 RPT Level = 0.02  Analysis Date = 06/17/2014 
 RPT Level = 0.02  Analysis Date = 06/17/2014 
 RPT Level = 0.02  Analysis Date = 06/04/2014 
 RPT Level = 0.02  Analysis Date = 06/04/2014 
 RPT Level = 0.02  Analysis Date = 05/27/2014 
 RPT Level = 0.02  Analysis Date = 05/27/2014 
 RPT Level = 0.02  Analysis Date = 05/07/2014 
 RPT Level = 0.02  Analysis Date = 05/07/2014 
 RPT Level = 0.02  Analysis Date = 05/05/2014 
 RPT Level = 0.02  Analysis Date = 05/05/2014 
 RPT Level = 0.02  Analysis Date = 04/29/2014 
 RPT Level = 0.02  Analysis Date = 04/29/2014 
 RPT Level = 0.02  Analysis Date = 04/17/2014 
 RPT Level = 0.02  Analysis Date = 04/17/2014 
 RPT Level = 0.02  Analysis Date = 04/10/2014 
 RPT Level = 0.02  Analysis Date = 04/10/2014 
 RPT Level = 0.02  Analysis Date = 04/01/2014 
 RPT Level = 0.02  Analysis Date = 04/01/2014 
 RPT Level = 0.02  Analysis Date = 03/28/2014 
 RPT Level = 0.02  Analysis Date = 03/28/2014 
 RPT Level = 0.02  Analysis Date = 03/24/2014 
 RPT Level = 0.02  Analysis Date = 03/24/2014 
 RPT Level = 0.02  Analysis Date = 03/18/2014 
 RPT Level = 0.02  Analysis Date = 03/18/2014 
 RPT Level = 0.02  Analysis Date = 03/13/2014 
 RPT Level = 0.02  Analysis Date = 03/13/2014 
 RPT Level = 0.02  Analysis Date = 03/03/2014 
 RPT Level = 0.02  Analysis Date = 03/03/2014 
 RPT Level = 0.02  Analysis Date = 02/27/2014 
 RPT Level = 0.02  Analysis Date = 02/27/2014 
 RPT Level = 0.02  Analysis Date = 02/25/2014 
 RPT Level = 0.02  Analysis Date = 02/25/2014 
 RPT Level = 0.02  Analysis Date = 02/28/2014 
 RPT Level = 0.02  Analysis Date = 02/28/2014 
 RPT Level = 0.02  Analysis Date = 02/18/2014 
 RPT Level = 0.02  Analysis Date = 02/18/2014 
 RPT Level = 0.02  Analysis Date = 01/27/2014 
 RPT Level = 0.02  Analysis Date = 01/27/2014 
 RPT Level = 0.02  Analysis Date = 01/21/2014 
 RPT Level = 0.02  Analysis Date = 01/21/2014 
 RPT Level = 0.02  Analysis Date = 01/10/2014 
 RPT Level = 0.02  Analysis Date = 01/10/2014 
 RPT Level = 0.02  Analysis Date = 12/31/2013 
 RPT Level = 0.02  Analysis Date = 12/31/2013 
 RPT Level = 0.02  Analysis Date = 12/20/2013 
 RPT Level = 0.02  Analysis Date = 12/20/2013 
 RPT Level = 0.02  Analysis Date = 12/17/2013 
 RPT Level = 0.02  Analysis Date = 12/17/2013 
 RPT Level = 0.02  Analysis Date = 12/06/2013 
 RPT Level = 0.02  Analysis Date = 12/06/2013 
 RPT Level = 0.02  Analysis Date = 12/04/2013 
 RPT Level = 0.02  Analysis Date = 12/04/2013 
 RPT Level = 0.02  Analysis Date = 11/27/2013 
 RPT Level = 0.02  Analysis Date = 11/27/2013 
 RPT Level = 0.02  Analysis Date = 11/22/2013 
 RPT Level = 0.02  Analysis Date = 11/22/2013 
 RPT Level = 0.02  Analysis Date = 11/14/2013 
 RPT Level = 0.02  Analysis Date = 11/14/2013 
 RPT Level = 0.02  Analysis Date = 11/07/2013 
 RPT Level = 0.02  Analysis Date = 11/07/2013 
 RPT Level = 0.02  Analysis Date = 11/01/2013 
 RPT Level = 0.02  Analysis Date = 11/01/2013 
 RPT Level = 0.02  Analysis Date = 10/25/2013 
 RPT Level = 0.02  Analysis Date = 10/25/2013 
 RPT Level = 0.02  Analysis Date = 10/21/2013 
 RPT Level = 0.02  Analysis Date = 10/21/2013 
 RPT Level = 0.02  Analysis Date = 09/24/2013 
 RPT Level = 0.02  Analysis Date = 09/24/2013 
 RPT Level = 0.02  Analysis Date = 09/18/2013 
 RPT Level = 0.02  Analysis Date = 09/18/2013 
 RPT Level = 0.02  Analysis Date = 09/09/2013 
 RPT Level = 0.02  Analysis Date = 09/09/2013 
 RPT Level = 0.02  Analysis Date = 09/03/2013 
 RPT Level = 0.02  Analysis Date = 09/03/2013 
 RPT Level = 0.02  Analysis Date = 08/29/2013 
 RPT Level = 0.02  Analysis Date = 08/29/2013 
 RPT Level = 0.02  Analysis Date = 08/19/2013 
 RPT Level = 0.02  Analysis Date = 08/19/2013 
 RPT Level = 0.02  Analysis Date = 08/15/2013 
 RPT Level = 0.02  Analysis Date = 08/15/2013 
 RPT Level = 0.02  Analysis Date = 08/02/2013 
 RPT Level = 0.02  Analysis Date = 08/02/2013 
 RPT Level = 0.02  Analysis Date = 07/29/2013 
 RPT Level = 0.02  Analysis Date = 07/29/2013 
 RPT Level = 0.02  Analysis Date = 07/17/2013 
 RPT Level = 0.02  Analysis Date = 07/17/2013 
 RPT Level = 0.02  Analysis Date = 07/11/2013 
 RPT Level = 0.02  Analysis Date = 07/11/2013 
 RPT Level = 0.02  Analysis Date = 07/03/2013 
 RPT Level = 0.02  Analysis Date = 07/03/2013 
 RPT Level = 0.02  Analysis Date = 07/02/2013 
 RPT Level = 0.02  Analysis Date = 07/02/2013 
 RPT Level = 0.02  Analysis Date = 06/21/2013 
 RPT Level = 0.02  Analysis Date = 06/21/2013 
 RPT Level = 0.02  Analysis Date = 06/19/2013 
 RPT Level = 0.02  Analysis Date = 06/19/2013 
 RPT Level = 0.02  Analysis Date = 06/12/2013 
 RPT Level = 0.02  Analysis Date = 06/12/2013 
 RPT Level = 0.02  Analysis Date = 06/11/2013 
 RPT Level = 0.02  Analysis Date = 06/11/2013 
 RPT Level = 0.02  Analysis Date = 06/07/2013 
 RPT Level = 0.02  Analysis Date = 06/07/2013 
 RPT Level = 0.02  Analysis Date = 05/28/2013 
 RPT Level = 0.02  Analysis Date = 05/28/2013 
 RPT Level = 0.02  Analysis Date = 05/16/2013 
 RPT Level = 0.02  Analysis Date = 05/16/2013 
 RPT Level = 0.02  Analysis Date = 05/03/2013 
 RPT Level = 0.02  Analysis Date = 05/03/2013 
 RPT Level = 0.02  Analysis Date = 04/30/2013 
 RPT Level = 0.02  Analysis Date = 04/30/2013 
 RPT Level = 0.02  Analysis Date = 04/26/2013 
 RPT Level = 0.02  Analysis Date = 04/26/2013 
 RPT Level = 0.02  Analysis Date = 04/25/2013 
 RPT Level = 0.02  Analysis Date = 04/25/2013 
 RPT Level = 0.02  Analysis Date = 04/09/2013 
 RPT Level = 0.02  Analysis Date = 04/09/2013 
 RPT Level = 0.02  Analysis Date = 03/28/2013 
 RPT Level = 0.02  Analysis Date = 03/28/2013 
 RPT Level = 0.02  Analysis Date = 03/21/2013 
 RPT Level = 0.02  Analysis Date = 03/21/2013 
 RPT Level = 0.02  Analysis Date = 03/18/2013 
 RPT Level = 0.02  Analysis Date = 03/18/2013 
 RPT Level = 0.02  Analysis Date = 03/12/2013 
 RPT Level = 0.02  Analysis Date = 03/12/2013 
 RPT Level = 0.02  Analysis Date = 03/07/2013 
 RPT Level = 0.02  Analysis Date = 03/07/2013 
 RPT Level = 0.02  Analysis Date = 03/05/2013 
 RPT Level = 0.02  Analysis Date = 03/05/2013 
 RPT Level = 0.02  Analysis Date = 02/26/2013 
 RPT Level = 0.02  Analysis Date = 02/26/2013 
 RPT Level = 0.02  Analysis Date = 02/06/2013 
 RPT Level = 0.02  Analysis Date = 02/06/2013 
 RPT Level = 0.02  Analysis Date = 01/31/2013 
 RPT Level = 0.02  Analysis Date = 01/31/2013 
 RPT Level = 0.02  Analysis Date = 01/28/2013 
 RPT Level = 0.02  Analysis Date = 01/28/2013 
 RPT Level = 0.02  Analysis Date = 01/18/2013 
 RPT Level = 0.02  Analysis Date = 01/18/2013 
 RPT Level = 0.02  Analysis Date = 01/11/2013 
 RPT Level = 0.02  Analysis Date = 01/11/2013 
 RPT Level = 0.02  Analysis Date = 01/07/2013 
 RPT Level = 0.02  Analysis Date = 01/07/2013 
 RPT Level = 0.02  Analysis Date = 01/04/2013 
 RPT Level = 0.02  Analysis Date = 01/04/2013 
 RPT Level = 0.02  Analysis Date = 12/20/2012 
 RPT Level = 0.02  Analysis Date = 12/20/2012 
 RPT Level = 0.02  Analysis Date = 12/20/2012 
 RPT Level = 0.02  Analysis Date = 12/20/2012 
 RPT Level = 0.02  Analysis Date = 12/12/2012 
 RPT Level = 0.02  Analysis Date = 12/12/2012 
 RPT Level = 0.02  Analysis Date = 12/03/2012 
 RPT Level = 0.02  Analysis Date = 12/03/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 11/27/2012 
 RPT Level = 0.02  Analysis Date = 11/19/2012 
 RPT Level = 0.02  Analysis Date = 11/19/2012 
 RPT Level = 0.02  Analysis Date = 11/13/2012 
 RPT Level = 0.02  Analysis Date = 11/13/2012 
 RPT Level = 0.02  Analysis Date = 11/05/2012 
 RPT Level = 0.02  Analysis Date = 11/05/2012 
 RPT Level = 0.02  Analysis Date = 10/31/2012 
 RPT Level = 0.02  Analysis Date = 10/31/2012 
 RPT Level = 0.02  Analysis Date = 10/18/2012 
 RPT Level = 0.02  Analysis Date = 10/18/2012 
 RPT Level = 0.02  Analysis Date = 10/11/2012 
 RPT Level = 0.02  Analysis Date = 10/11/2012 
 RPT Level = 0.02  Analysis Date = 10/04/2012 
 RPT Level = 0.02  Analysis Date = 10/04/2012 
 RPT Level = 0.02  Analysis Date = 10/04/2012 
 RPT Level = 0.02  Analysis Date = 10/04/2012 
 RPT Level = 0.02  Analysis Date = 10/02/2012 
 RPT Level = 0.02  Analysis Date = 10/02/2012 
 RPT Level = 0.02  Analysis Date = 09/14/2012 
 RPT Level = 0.02  Analysis Date = 09/14/2012 
 RPT Level = 0.02  Analysis Date = 09/12/2012 
 RPT Level = 0.02  Analysis Date = 09/12/2012 
 RPT Level = 0.02  Analysis Date = 09/10/2012 
 RPT Level = 0.02  Analysis Date = 09/10/2012 
 RPT Level = 0.02  Analysis Date = 08/30/2012 
 RPT Level = 0.02  Analysis Date = 08/30/2012 
 RPT Level = 0.02  Analysis Date = 08/23/2012 
 RPT Level = 0.02  Analysis Date = 08/23/2012 
 RPT Level = 0.02  Analysis Date = 08/08/2012 
 RPT Level = 0.02  Analysis Date = 08/08/2012 
 RPT Level = 0.02  Analysis Date = 08/03/2012 
 RPT Level = 0.02  Analysis Date = 08/03/2012 
 RPT Level = 0.02  Analysis Date = 07/27/2012 
 RPT Level = 0.02  Analysis Date = 07/27/2012 
 RPT Level = 0.02  Analysis Date = 07/18/2012 
 RPT Level = 0.02  Analysis Date = 07/18/2012 
 RPT Level = 0.02  Analysis Date = 07/10/2012 
 RPT Level = 0.02  Analysis Date = 07/10/2012 
 RPT Level = 0.02  Analysis Date = 07/10/2012 
 RPT Level = 0.02  Analysis Date = 07/10/2012 
 RPT Level = 0.02  Analysis Date = 06/28/2012 
 RPT Level = 0.02  Analysis Date = 06/28/2012 
 RPT Level = 0.02  Analysis Date = 06/20/2012 
 RPT Level = 0.02  Analysis Date = 06/20/2012 
 RPT Level = 0.02  Analysis Date = 06/15/2012 
 RPT Level = 0.02  Analysis Date = 06/15/2012 
 RPT Level = 0.02  Analysis Date = 06/07/2012 
 RPT Level = 0.02  Analysis Date = 06/07/2012 
 RPT Level = 0.02  Analysis Date = 06/05/2012 
 RPT Level = 0.02  Analysis Date = 06/05/2012 
 RPT Level = 0.02  Analysis Date = 05/24/2012 
 RPT Level = 0.02  Analysis Date = 05/24/2012 
 RPT Level = 0.02  Analysis Date = 05/18/2012 
 RPT Level = 0.02  Analysis Date = 05/18/2012 
 RPT Level = 0.02  Analysis Date = 05/11/2012 
 RPT Level = 0.02  Analysis Date = 05/11/2012 
 RPT Level = 0.02  Analysis Date = 05/08/2012 
 RPT Level = 0.02  Analysis Date = 05/08/2012 
 RPT Level = 0.02  Analysis Date = 04/27/2012 
 RPT Level = 0.02  Analysis Date = 04/27/2012 
 RPT Level = 0.02  Analysis Date = 04/25/2012 
 RPT Level = 0.02  Analysis Date = 04/25/2012 
 RPT Level = 0.02  Analysis Date = 04/18/2012 
 RPT Level = 0.02  Analysis Date = 04/18/2012 
 RPT Level = 0.02  Analysis Date = 04/13/2012 
 RPT Level = 0.02  Analysis Date = 04/13/2012 
 RPT Level = 0.02  Analysis Date = 04/11/2012 
 RPT Level = 0.02  Analysis Date = 04/11/2012 
 RPT Level = 0.02  Analysis Date = 04/06/2012 
 RPT Level = 0.02  Analysis Date = 04/06/2012 
 RPT Level = 0.02  Analysis Date = 03/15/2012 
 RPT Level = 0.02  Analysis Date = 03/15/2012 
 RPT Level = 0.02  Analysis Date = 03/15/2012 
 RPT Level = 0.02  Analysis Date = 03/15/2012 
 RPT Level = 0.02  Analysis Date = 02/29/2012 
 RPT Level = 0.02  Analysis Date = 02/29/2012 
 RPT Level = 0.02  Analysis Date = 02/24/2012 
 RPT Level = 0.02  Analysis Date = 02/24/2012 
 RPT Level = 0.02  Analysis Date = 02/16/2012 
 RPT Level = 0.02  Analysis Date = 02/16/2012 
 RPT Level = 0.02  Analysis Date = 02/08/2012 
 RPT Level = 0.02  Analysis Date = 02/08/2012 
 RPT Level = 0.02  Analysis Date = 02/07/2012 
 RPT Level = 0.02  Analysis Date = 02/07/2012 
 RPT Level = 0.02  Analysis Date = 01/26/2012 
 RPT Level = 0.02  Analysis Date = 01/26/2012 
 RPT Level = 0.02  Analysis Date = 01/19/2012 
 RPT Level = 0.02  Analysis Date = 01/19/2012 
 RPT Level = 0.02  Analysis Date = 01/17/2012 
 RPT Level = 0.02  Analysis Date = 01/17/2012 
 RPT Level = 0.02  Analysis Date = 01/09/2012 
 RPT Level = 0.02  Analysis Date = 01/09/2012 
 RPT Level = 0.02  Analysis Date = 12/29/2011 
 RPT Level = 0.02  Analysis Date = 12/29/2011 
 RPT Level = 0.02  Analysis Date = 12/22/2011 
 RPT Level = 0.02  Analysis Date = 12/22/2011 
 RPT Level = 0.02  Analysis Date = 12/16/2011 
 RPT Level = 0.02  Analysis Date = 12/16/2011 
 RPT Level = 0.02  Analysis Date = 12/15/2011 
 RPT Level = 0.02  Analysis Date = 12/15/2011 
 RPT Level = 0.02  Analysis Date = 12/02/2011 
 RPT Level = 0.02  Analysis Date = 12/02/2011 
 RPT Level = 0.02  Analysis Date = 11/30/2011 
 RPT Level = 0.02  Analysis Date = 11/30/2011 
 RPT Level = 0.02  Analysis Date = 11/23/2011 
 RPT Level = 0.02  Analysis Date = 11/23/2011 
 RPT Level = 0.02  Analysis Date = 11/10/2011 
 RPT Level = 0.02  Analysis Date = 11/10/2011 
 RPT Level = 0.02  Analysis Date = 11/08/2011 
 RPT Level = 0.02  Analysis Date = 11/08/2011 
 RPT Level = 0.02  Analysis Date = 11/02/2011 
 RPT Level = 0.02  Analysis Date = 11/02/2011 
 RPT Level = 0.02  Analysis Date = 10/28/2011 
 RPT Level = 0.02  Analysis Date = 10/28/2011 
 RPT Level = 0.02  Analysis Date = 10/18/2011 
 RPT Level = 0.02  Analysis Date = 10/18/2011 
 RPT Level = 0.02  Analysis Date = 10/05/2011 
 RPT Level = 0.02  Analysis Date = 10/05/2011 
 RPT Level = 0.02  Analysis Date = 09/30/2011 
 RPT Level = 0.02  Analysis Date = 09/30/2011 
 RPT Level = 0.02  Analysis Date = 09/23/2011 
 RPT Level = 0.02  Analysis Date = 09/23/2011 
 RPT Level = 0.02  Analysis Date = 09/16/2011 
 RPT Level = 0.02  Analysis Date = 09/16/2011 
 RPT Level = 0.02  Analysis Date = 09/13/2011 
 RPT Level = 0.02  Analysis Date = 09/13/2011 
 RPT Level = 0.02  Analysis Date = 09/13/2011 
 RPT Level = 0.02  Analysis Date = 09/13/2011 
 RPT Level = 0.02  Analysis Date = 08/30/2011 
 RPT Level = 0.02  Analysis Date = 08/30/2011 
 RPT Level = 0.02  Analysis Date = 08/23/2011 
 RPT Level = 0.02  Analysis Date = 08/23/2011 
 RPT Level = 0.02  Analysis Date = 08/15/2011 
 RPT Level = 0.02  Analysis Date = 08/15/2011 
 RPT Level = 0.02  Analysis Date = 08/04/2011 
 RPT Level = 0.02  Analysis Date = 08/04/2011 
 RPT Level = 0.02  Analysis Date = 08/02/2011 
 RPT Level = 0.02  Analysis Date = 08/02/2011 
 RPT Level = 0.02  Analysis Date = 07/28/2011 
 RPT Level = 0.02  Analysis Date = 07/28/2011 
 RPT Level = 0.02  Analysis Date = 07/13/2011 
 RPT Level = 0.02  Analysis Date = 07/13/2011 
 RPT Level = 0.02  Analysis Date = 07/07/2011 
 RPT Level = 0.02  Analysis Date = 07/07/2011 
 RPT Level = 0.02  Analysis Date = 07/20/2011 
 RPT Level = 0.02  Analysis Date = 07/20/2011 
 RPT Level = 0.02  Analysis Date = 06/23/2011 
 RPT Level = 0.02  Analysis Date = 06/23/2011 
 RPT Level = 0.02  Analysis Date = 06/17/2011 
 RPT Level = 0.02  Analysis Date = 06/17/2011 
 RPT Level = 0.02  Analysis Date = 06/15/2011 
 RPT Level = 0.02  Analysis Date = 06/15/2011 
 RPT Level = 0.02  Analysis Date = 06/08/2011 
 RPT Level = 0.02  Analysis Date = 06/08/2011 
 RPT Level = 0.02  Analysis Date = 05/26/2011 
 RPT Level = 0.02  Analysis Date = 05/26/2011 
 RPT Level = 0.02  Analysis Date = 05/19/2011 
 RPT Level = 0.02  Analysis Date = 05/19/2011 
 RPT Level = 0.02  Analysis Date = 05/11/2011 
 RPT Level = 0.02  Analysis Date = 05/11/2011 
 RPT Level = 0.02  Analysis Date = 05/09/2011 
 RPT Level = 0.02  Analysis Date = 05/09/2011 
 RPT Level = 0.02  Analysis Date = 05/03/2011 
 RPT Level = 0.02  Analysis Date = 05/03/2011 
 RPT Level = 0.02  Analysis Date = 04/20/2011 
 RPT Level = 0.02  Analysis Date = 04/20/2011 
 RPT Level = 0.02  Analysis Date = 04/14/2011 
 RPT Level = 0.02  Analysis Date = 04/14/2011 
 RPT Level = 0.02  Analysis Date = 04/07/2011 
 RPT Level = 0.02  Analysis Date = 04/07/2011 
 RPT Level = 0.02  Analysis Date = 03/30/2011 
 RPT Level = 0.02  Analysis Date = 03/30/2011 
 RPT Level = 0.02  Analysis Date = 03/22/2011 
 RPT Level = 0.02  Analysis Date = 03/22/2011 
 RPT Level = 0.02  Analysis Date = 03/17/2011 
 RPT Level = 0.02  Analysis Date = 03/17/2011 
 RPT Level = 0.02  Analysis Date = 03/09/2011 
 RPT Level = 0.02  Analysis Date = 03/09/2011 
 RPT Level = 0.02  Analysis Date = 03/04/2011 
 RPT Level = 0.02  Analysis Date = 03/04/2011 
 RPT Level = 0.02  Analysis Date = 02/24/2011 
 RPT Level = 0.02  Analysis Date = 02/24/2011 
 RPT Level = 0.02  Analysis Date = 02/16/2011 
 RPT Level = 0.02  Analysis Date = 02/16/2011 
 RPT Level = 0.02  Analysis Date = 02/14/2011 
 RPT Level = 0.02  Analysis Date = 02/14/2011 
 RPT Level = 0.02  Analysis Date = 02/10/2011 
 RPT Level = 0.02  Analysis Date = 02/10/2011 
 RPT Level = 0.02  Analysis Date = 01/26/2011 
 RPT Level = 0.02  Analysis Date = 01/26/2011 
 RPT Level = 0.02  Analysis Date = 01/20/2011 
 RPT Level = 0.02  Analysis Date = 01/20/2011 
 RPT Level = 0.02  Analysis Date = 01/18/2011 
 RPT Level = 0.02  Analysis Date = 01/18/2011 
 RPT Level = 0.02  Analysis Date = 01/06/2011 
 RPT Level = 0.02  Analysis Date = 01/06/2011 
 RPT Level = 0.02  Analysis Date = 12/29/2010 
 RPT Level = 0.02  Analysis Date = 12/29/2010 
 RPT Level = 0.02  Analysis Date = 12/22/2010 
 RPT Level = 0.02  Analysis Date = 12/22/2010 
 RPT Level = 0.02  Analysis Date = 12/29/2010 
 RPT Level = 0.02  Analysis Date = 12/29/2010 
 RPT Level = 0.02  Analysis Date = 12/13/2010 
 RPT Level = 0.02  Analysis Date = 12/13/2010 
 RPT Level = 0.02  Analysis Date = 12/07/2010 
 RPT Level = 0.02  Analysis Date = 12/07/2010 
 RPT Level = 0.02  Analysis Date = 12/08/2010 
 RPT Level = 0.02  Analysis Date = 12/08/2010 
 RPT Level = 0.02  Analysis Date = 11/18/2010 
 RPT Level = 0.02  Analysis Date = 11/18/2010 
 RPT Level = 0.02  Analysis Date = 11/16/2010 
 RPT Level = 0.02  Analysis Date = 11/16/2010 
 RPT Level = 0.02  Analysis Date = 11/09/2010 
 RPT Level = 0.02  Analysis Date = 11/09/2010 
 RPT Level = 0.02  Analysis Date = 11/02/2010 
 RPT Level = 0.02  Analysis Date = 11/02/2010 
 RPT Level = 0.02  Analysis Date = 10/22/2010 
 RPT Level = 0.02  Analysis Date = 10/22/2010 
 RPT Level = 0.02  Analysis Date = 10/15/2010 
 RPT Level = 0.02  Analysis Date = 10/15/2010 
 RPT Level = 0.02  Analysis Date = 10/18/2010 
 RPT Level = 0.02  Analysis Date = 10/18/2010 
 RPT Level = 0.02  Analysis Date = 10/05/2010 
 RPT Level = 0.02  Analysis Date = 10/05/2010 
 RPT Level = 0.02  Analysis Date = 10/01/2010 
 RPT Level = 0.02  Analysis Date = 10/01/2010 
 RPT Level = 0.02  Analysis Date = 09/24/2010 
 RPT Level = 0.02  Analysis Date = 09/24/2010 
 RPT Level = 0.02  Analysis Date = 09/16/2010 
 RPT Level = 0.02  Analysis Date = 09/16/2010 
 RPT Level = 0.02  Analysis Date = 09/15/2010 
 RPT Level = 0.02  Analysis Date = 09/15/2010 
 RPT Level = 0.02  Analysis Date = 09/09/2010 
 RPT Level = 0.02  Analysis Date = 09/09/2010 
 RPT Level = 0.02  Analysis Date = 08/20/2010 
 RPT Level = 0.02  Analysis Date = 08/20/2010 
 RPT Level = 0.02  Analysis Date = 08/16/2010 
 RPT Level = 0.02  Analysis Date = 08/16/2010 
 RPT Level = 0.02  Analysis Date = 08/05/2010 
 RPT Level = 0.02  Analysis Date = 08/05/2010 
 RPT Level = 0.02  Analysis Date = 07/28/2010 
 RPT Level = 0.02  Analysis Date = 07/28/2010 
 RPT Level = 0.02  Analysis Date = 07/23/2010 
 RPT Level = 0.02  Analysis Date = 07/23/2010 
 RPT Level = 0.02  Analysis Date = 07/14/2010 
 RPT Level = 0.02  Analysis Date = 07/14/2010 
 RPT Level = 0.02  Analysis Date = 07/08/2010 
 RPT Level = 0.02  Analysis Date = 07/08/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 07/07/2010 
 RPT Level = 0.02  Analysis Date = 07/01/2010 
 RPT Level = 0.02  Analysis Date = 07/01/2010 
 RPT Level = 0.02  Analysis Date = 06/24/2010 
 RPT Level = 0.02  Analysis Date = 06/24/2010 
 RPT Level = 0.02  Analysis Date = 06/18/2010 
 RPT Level = 0.02  Analysis Date = 06/18/2010 
 RPT Level = 0.02  Analysis Date = 06/10/2010 
 RPT Level = 0.02  Analysis Date = 06/10/2010 
 RPT Level = 0.02  Analysis Date = 06/09/2010 
 RPT Level = 0.02  Analysis Date = 06/09/2010 
 RPT Level = 0.02  Analysis Date = 05/26/2010 
 RPT Level = 0.02  Analysis Date = 05/26/2010 
 RPT Level = 0.02  Analysis Date = 05/19/2010 
 RPT Level = 0.02  Analysis Date = 05/19/2010 
 RPT Level = 0.02  Analysis Date = 05/12/2010 
 RPT Level = 0.02  Analysis Date = 05/12/2010 
 RPT Level = 0.02  Analysis Date = 05/05/2010 
 RPT Level = 0.02  Analysis Date = 05/05/2010 
 RPT Level = 0.02  Analysis Date = 04/28/2010 
 RPT Level = 0.02  Analysis Date = 04/28/2010 
 RPT Level = 0.02  Analysis Date = 04/16/2010 
 RPT Level = 0.02  Analysis Date = 04/16/2010 
 RPT Level = 0.02  Analysis Date = 04/08/2010 
 RPT Level = 0.02  Analysis Date = 04/08/2010 
 RPT Level = 0.02  Analysis Date = 04/05/2010 
 RPT Level = 0.02  Analysis Date = 04/05/2010 
 RPT Level = 0.02  Analysis Date = 03/29/2010 
 RPT Level = 0.02  Analysis Date = 03/29/2010 
 RPT Level = 0.02  Analysis Date = 03/18/2010 
 RPT Level = 0.02  Analysis Date = 03/18/2010 
 RPT Level = 0.02  Analysis Date = 03/11/2010 
 RPT Level = 0.02  Analysis Date = 03/11/2010 
 RPT Level = 0.02  Analysis Date = 03/03/2010 
 RPT Level = 0.02  Analysis Date = 03/03/2010 
 RPT Level = 0.02  Analysis Date = 02/25/2010 
 RPT Level = 0.02  Analysis Date = 02/25/2010 
 RPT Level = 0.02  Analysis Date = 02/25/2010 
 RPT Level = 0.02  Analysis Date = 02/25/2010 
 RPT Level = 0.02  Analysis Date = 02/17/2010 
 RPT Level = 0.02  Analysis Date = 02/17/2010 
 RPT Level = 0.02  Analysis Date = 02/04/2010 
 RPT Level = 0.02  Analysis Date = 02/04/2010 
 RPT Level = 0.02  Analysis Date = 01/29/2010 
 RPT Level = 0.02  Analysis Date = 01/29/2010 
 RPT Level = 0.02  Analysis Date = 01/22/2010 
 RPT Level = 0.02  Analysis Date = 01/22/2010 
 RPT Level = 0.02  Analysis Date = 01/14/2010 
 RPT Level = 0.02  Analysis Date = 01/14/2010 
 RPT Level = 0.02  Analysis Date = 01/07/2010 
 RPT Level = 0.02  Analysis Date = 01/07/2010 
 RPT Level = 0.02  Analysis Date = 01/07/2010 
 RPT Level = 0.02  Analysis Date = 01/07/2010 
 RPT Level = 0.02  Analysis Date = 01/04/2010 
 RPT Level = 0.02  Analysis Date = 01/04/2010 
 RPT Level = 0.02  Analysis Date = 12/29/2009 
 RPT Level = 0.02  Analysis Date = 12/29/2009 
 RPT Level = 0.02  Analysis Date = 12/16/2009 
 RPT Level = 0.02  Analysis Date = 12/16/2009 
 RPT Level = 0.02  Analysis Date = 12/15/2009 
 RPT Level = 0.02  Analysis Date = 12/15/2009 
 RPT Level = 0.02  Analysis Date = 12/15/2009 
 RPT Level = 0.02  Analysis Date = 12/15/2009 
 RPT Level = 0.02  Analysis Date = 11/19/2009 
 RPT Level = 0.02  Analysis Date = 11/19/2009 
 RPT Level = 0.02  Analysis Date = 11/17/2009 
 RPT Level = 0.02  Analysis Date = 11/17/2009 
 RPT Level = 0.02  Analysis Date = 11/16/2009 
 RPT Level = 0.02  Analysis Date = 11/16/2009 
 RPT Level = 0.02  Analysis Date = 11/10/2009 
 RPT Level = 0.02  Analysis Date = 11/10/2009 
 RPT Level = 0.02  Analysis Date = 11/03/2009 
 RPT Level = 0.02  Analysis Date = 11/03/2009 
 RPT Level = 0.02  Analysis Date = 10/22/2009 
 RPT Level = 0.02  Analysis Date = 10/22/2009 
 RPT Level = 0.02  Analysis Date = 10/08/2009 
 RPT Level = 0.02  Analysis Date = 10/08/2009 
 RPT Level = 0.02  Analysis Date = 10/06/2009 
 RPT Level = 0.02  Analysis Date = 10/06/2009 
 RPT Level = 0.02  Analysis Date = 09/29/2009 
 RPT Level = 0.02  Analysis Date = 09/29/2009 
 RPT Level = 0.02  Analysis Date = 09/22/2009 
 RPT Level = 0.02  Analysis Date = 09/22/2009 
 RPT Level = 0.02  Analysis Date = 09/16/2009 
 RPT Level = 0.02  Analysis Date = 09/16/2009 
 RPT Level = 0.02  Analysis Date = 09/03/2009 
 RPT Level = 0.02  Analysis Date = 09/03/2009 
 RPT Level = 0.02  Analysis Date = 09/09/2009 
 RPT Level = 0.02  Analysis Date = 09/09/2009 
 RPT Level = 0.02  Analysis Date = 08/27/2009 
 RPT Level = 0.02  Analysis Date = 08/27/2009 
 RPT Level = 0.02  Analysis Date = 08/13/2009 
 RPT Level = 0.02  Analysis Date = 08/13/2009 
 RPT Level = 0.02  Analysis Date = 08/06/2009 
 RPT Level = 0.02  Analysis Date = 08/06/2009 
 RPT Level = 0.02  Analysis Date = 07/31/2009 
 RPT Level = 0.02  Analysis Date = 07/31/2009 
 RPT Level = 0.02  Analysis Date = 07/24/2009 
 RPT Level = 0.02  Analysis Date = 07/24/2009 
 RPT Level = 0.02  Analysis Date = 07/16/2009 
 RPT Level = 0.02  Analysis Date = 07/16/2009 
 RPT Level = 0.02  Analysis Date = 07/13/2009 
 RPT Level = 0.02  Analysis Date = 07/13/2009 
 RPT Level = 0.02  Analysis Date = 07/08/2009 
 RPT Level = 0.02  Analysis Date = 07/08/2009 
 RPT Level = 0.02  Analysis Date = 07/07/2009 
 RPT Level = 0.02  Analysis Date = 07/07/2009 
 RPT Level = 0.02  Analysis Date = 06/17/2009 
 RPT Level = 0.02  Analysis Date = 06/17/2009 
 RPT Level = 0.02  Analysis Date = 06/10/2009 
 RPT Level = 0.02  Analysis Date = 06/10/2009 
 RPT Level = 0.02  Analysis Date = 06/05/2009 
 RPT Level = 0.02  Analysis Date = 06/05/2009 
 RPT Level = 0.02  Analysis Date = 05/28/2009 
 RPT Level = 0.02  Analysis Date = 05/28/2009 
 RPT Level = 0.02  Analysis Date = 05/21/2009 
 RPT Level = 0.02  Analysis Date = 05/21/2009 
 RPT Level = 0.02  Analysis Date = 05/19/2009 
 RPT Level = 0.02  Analysis Date = 05/19/2009 
 RPT Level = 0.02  Analysis Date = 05/07/2009 
 RPT Level = 0.02  Analysis Date = 05/07/2009 
 RPT Level = 0.02  Analysis Date = 05/06/2009 
 RPT Level = 0.02  Analysis Date = 05/06/2009 
 RPT Level = 0.02  Analysis Date = 05/06/2009 
 RPT Level = 0.02  Analysis Date = 05/06/2009 
 RPT Level = 0.02  Analysis Date = 04/16/2009 
 RPT Level = 0.02  Analysis Date = 04/16/2009 
 RPT Level = 0.02  Analysis Date = 04/08/2009 
 RPT Level = 0.02  Analysis Date = 04/08/2009 
 RPT Level = 0.02  Analysis Date = 04/02/2009 
 RPT Level = 0.02  Analysis Date = 04/02/2009 
 RPT Level = 0.02  Analysis Date = 03/27/2009 
 RPT Level = 0.02  Analysis Date = 03/27/2009 
 RPT Level = 0.02  Analysis Date = 03/19/2009 
 RPT Level = 0.02  Analysis Date = 03/19/2009 
 RPT Level = 0.02  Analysis Date = 03/11/2009 
 RPT Level = 0.02  Analysis Date = 03/11/2009 
 RPT Level = 0.02  Analysis Date = 03/05/2009 
 RPT Level = 0.02  Analysis Date = 03/05/2009 
 RPT Level = 0.02  Analysis Date = 02/24/2009 
 RPT Level = 0.02  Analysis Date = 02/24/2009 
 RPT Level = 0.02  Analysis Date = 02/18/2009 
 RPT Level = 0.02  Analysis Date = 02/18/2009 
 RPT Level = 0.02  Analysis Date = 02/17/2009 
 RPT Level = 0.02  Analysis Date = 02/17/2009 
 RPT Level = 0.02  Analysis Date = 02/05/2009 
 RPT Level = 0.02  Analysis Date = 02/05/2009 
 RPT Level = 0.02  Analysis Date = 01/29/2009 
 RPT Level = 0.02  Analysis Date = 01/29/2009 
 RPT Level = 0.02  Analysis Date = 01/26/2009 
 RPT Level = 0.02  Analysis Date = 01/26/2009 
 RPT Level = 0.02  Analysis Date = 01/15/2009 
 RPT Level = 0.02  Analysis Date = 01/15/2009 
 RPT Level = 0.02  Analysis Date = 01/13/2009 
 RPT Level = 0.02  Analysis Date = 01/13/2009 
 RPT Level = 0.02  Analysis Date = 01/13/2009 
 RPT Level = 0.02  Analysis Date = 01/13/2009 
 RPT Level = 0.02  Analysis Date = 01/05/2009 
 RPT Level = 0.02  Analysis Date = 01/05/2009 
 RPT Level = 0.02  Analysis Date = 12/18/2008 
 RPT Level = 0.02  Analysis Date = 12/18/2008 
 RPT Level = 0.02  Analysis Date = 12/16/2008 
 RPT Level = 0.02  Analysis Date = 12/16/2008 
 RPT Level = 0.02  Analysis Date = 12/04/2008 
 RPT Level = 0.02  Analysis Date = 12/04/2008 
 RPT Level = 0.02  Analysis Date = 12/04/2008 
 RPT Level = 0.02  Analysis Date = 12/04/2008 
 RPT Level = 0.02  Analysis Date = 11/24/2008 
 RPT Level = 0.02  Analysis Date = 11/24/2008 
 RPT Level = 0.02  Analysis Date = 11/13/2008 
 RPT Level = 0.02  Analysis Date = 11/13/2008 
 RPT Level = 0.02  Analysis Date = 11/13/2008 
 RPT Level = 0.02  Analysis Date = 11/13/2008 
 RPT Level = 0.02  Analysis Date = 10/30/2008 
 RPT Level = 0.02  Analysis Date = 10/30/2008 
 RPT Level = 0.02  Analysis Date = 10/22/2008 
 RPT Level = 0.02  Analysis Date = 10/22/2008 
 RPT Level = 0.02  Analysis Date = 10/21/2008 
 RPT Level = 0.02  Analysis Date = 10/21/2008 
 RPT Level = 0.02  Analysis Date = 10/08/2008 
 RPT Level = 0.02  Analysis Date = 10/08/2008 
 RPT Level = 0.02  Analysis Date = 10/06/2008 
 RPT Level = 0.02  Analysis Date = 10/06/2008 
 RPT Level = 0.02  Analysis Date = 09/30/2008 
 RPT Level = 0.02  Analysis Date = 09/30/2008 
 RPT Level = 0.02  Analysis Date = 09/17/2008 
 RPT Level = 0.02  Analysis Date = 09/17/2008 
 RPT Level = 0.02  Analysis Date = 09/15/2008 
 RPT Level = 0.02  Analysis Date = 09/15/2008 
 RPT Level = 0.02  Analysis Date = 09/10/2008 
 RPT Level = 0.02  Analysis Date = 09/10/2008 
 RPT Level = 0.02  Analysis Date = 09/02/2008 
 RPT Level = 0.02  Analysis Date = 09/02/2008 
 RPT Level = 0.02  Analysis Date = 08/22/2008 
 RPT Level = 0.02  Analysis Date = 08/22/2008 
 RPT Level = 0.02  Analysis Date = 08/18/2008 
 RPT Level = 0.02  Analysis Date = 08/18/2008 
 RPT Level = 0.02  Analysis Date = 08/11/2008 
 RPT Level = 0.02  Analysis Date = 08/11/2008 
 RPT Level = 0.02  Analysis Date = 07/24/2008 
 RPT Level = 0.02  Analysis Date = 07/24/2008 
 RPT Level = 0.02  Analysis Date = 07/22/2008 
 RPT Level = 0.02  Analysis Date = 07/22/2008 
 RPT Level = 0.02  Analysis Date = 07/14/2008 
 RPT Level = 0.02  Analysis Date = 07/14/2008 
 RPT Level = 0.02  Analysis Date = 07/07/2008 
 RPT Level = 0.02  Analysis Date = 07/07/2008 
 RPT Level = 0.02  Analysis Date = 06/26/2008 
 RPT Level = 0.02  Analysis Date = 06/26/2008 
 RPT Level = 0.02  Analysis Date = 06/23/2008 
 RPT Level = 0.02  Analysis Date = 06/23/2008 
 RPT Level = 0.02  Analysis Date = 06/11/2008 
 RPT Level = 0.02  Analysis Date = 06/11/2008 
 RPT Level = 0.02  Analysis Date = 06/10/2008 
 RPT Level = 0.02  Analysis Date = 06/10/2008 
 RPT Level = 0.02  Analysis Date = 06/04/2008 
 RPT Level = 0.02  Analysis Date = 06/04/2008 
 RPT Level = 0.02  Analysis Date = 05/29/2008 
 RPT Level = 0.02  Analysis Date = 05/29/2008 
 RPT Level = 0.02  Analysis Date = 05/13/2008 
 RPT Level = 0.02  Analysis Date = 05/13/2008 
 RPT Level = 0.02  Analysis Date = 05/07/2008 
 RPT Level = 0.02  Analysis Date = 05/07/2008 
 RPT Level = 0.02  Analysis Date = 04/29/2008 
 RPT Level = 0.02  Analysis Date = 04/29/2008 
 RPT Level = 0.02  Analysis Date = 04/24/2008 
 RPT Level = 0.02  Analysis Date = 04/24/2008 
 RPT Level = 0.02  Analysis Date = 04/22/2008 
 RPT Level = 0.02  Analysis Date = 04/22/2008 
 RPT Level = 0.02  Analysis Date = 04/10/2008 
 RPT Level = 0.02  Analysis Date = 04/10/2008 
 RPT Level = 0.02  Analysis Date = 04/08/2008 
 RPT Level = 0.02  Analysis Date = 04/08/2008 
 RPT Level = 0.02  Analysis Date = 03/31/2008 
 RPT Level = 0.02  Analysis Date = 03/31/2008 
 RPT Level = 0.02  Analysis Date = 03/27/2008 
 RPT Level = 0.02  Analysis Date = 03/27/2008 
 RPT Level = 0.02  Analysis Date = 03/12/2008 
 RPT Level = 0.02  Analysis Date = 03/12/2008 
 RPT Level = 0.02  Analysis Date = 03/05/2008 
 RPT Level = 0.02  Analysis Date = 03/05/2008 
 RPT Level = 0.02  Analysis Date = 03/03/2008 
 RPT Level = 0.02  Analysis Date = 03/03/2008 
 RPT Level = 0.02  Analysis Date = 03/03/2008 
 RPT Level = 0.02  Analysis Date = 03/03/2008 
 RPT Level = 0.02  Analysis Date = 02/19/2008 
 RPT Level = 0.02  Analysis Date = 02/19/2008 
 RPT Level = 0.02  Analysis Date = 02/11/2008 
 RPT Level = 0.02  Analysis Date = 02/11/2008 
 RPT Level = 0.02  Analysis Date = 02/01/2008 
 RPT Level = 0.02  Analysis Date = 02/01/2008 
 RPT Level = 0.02  Analysis Date = 01/24/2008 
 RPT Level = 0.02  Analysis Date = 01/24/2008 
 RPT Level = 0.02  Analysis Date = 01/23/2008 
 RPT Level = 0.02  Analysis Date = 01/23/2008 
 RPT Level = 0.02  Analysis Date = 01/15/2008 
 RPT Level = 0.02  Analysis Date = 01/15/2008 
 RPT Level = 0.02  Analysis Date = 01/15/2008 
 RPT Level = 0.02  Analysis Date = 01/15/2008 
 RPT Level = 0.02  Analysis Date = 01/09/2008 
 RPT Level = 0.02  Analysis Date = 01/09/2008 
 RPT Level = 0.02  Analysis Date = 12/18/2007 
 RPT Level = 0.02  Analysis Date = 12/18/2007 
 RPT Level = 0.02  Analysis Date = 12/05/2007 
 RPT Level = 0.02  Analysis Date = 12/05/2007 
 RPT Level = 0.02  Analysis Date = 12/04/2007 
 RPT Level = 0.02  Analysis Date = 12/04/2007 
 RPT Level = 0.02  Analysis Date = 11/26/2007 
 RPT Level = 0.02  Analysis Date = 11/26/2007 
 RPT Level = 0.02  Analysis Date = 11/19/2007 
 RPT Level = 0.02  Analysis Date = 11/19/2007 
 RPT Level = 0.02  Analysis Date = 11/14/2007 
 RPT Level = 0.02  Analysis Date = 11/14/2007 
 RPT Level = 0.02  Analysis Date = 11/01/2007 
 RPT Level = 0.02  Analysis Date = 11/01/2007 
 RPT Level = 0.02  Analysis Date = 10/29/2007 
 RPT Level = 0.02  Analysis Date = 10/29/2007 
 RPT Level = 0.02  Analysis Date = 10/23/2007 
 RPT Level = 0.02  Analysis Date = 10/23/2007 
 RPT Level = 0.02  Analysis Date = 10/18/2007 
 RPT Level = 0.02  Analysis Date = 10/18/2007 
 RPT Level = 0.02  Analysis Date = 10/04/2007 
 RPT Level = 0.02  Analysis Date = 10/04/2007 
 RPT Level = 0.02  Analysis Date = 09/24/2007 
 RPT Level = 0.02  Analysis Date = 09/24/2007 
 RPT Level = 0.02  Analysis Date = 09/20/2007 
 RPT Level = 0.02  Analysis Date = 09/20/2007 
 RPT Level = 0.02  Analysis Date = 09/17/2007 
 RPT Level = 0.02  Analysis Date = 09/17/2007 
 RPT Level = 0.02  Analysis Date = 09/10/2007 
 RPT Level = 0.02  Analysis Date = 09/10/2007 
 RPT Level = 0.02  Analysis Date = 08/28/2007 
 RPT Level = 0.02  Analysis Date = 08/28/2007 
 RPT Level = 0.02  Analysis Date = 08/17/2007 
 RPT Level = 0.02  Analysis Date = 08/17/2007 
 RPT Level = 0.02  Analysis Date = 08/16/2007 
 RPT Level = 0.02  Analysis Date = 08/16/2007 
 RPT Level = 0.02  Analysis Date = 08/06/2007 
 RPT Level = 0.02  Analysis Date = 08/06/2007 
 RPT Level = 0.02  Analysis Date = 07/30/2007 
 RPT Level = 0.02  Analysis Date = 07/30/2007 
 RPT Level = 0.02  Analysis Date = 07/17/2007 
 RPT Level = 0.02  Analysis Date = 07/17/2007 
 RPT Level = 0.02  Analysis Date = 07/16/2007 
 RPT Level = 0.02  Analysis Date = 07/16/2007 
 RPT Level = 0.02  Analysis Date = 06/29/2007 
 RPT Level = 0.02  Analysis Date = 06/29/2007 
 RPT Level = 0.02  Analysis Date = 06/25/2007 
 RPT Level = 0.02  Analysis Date = 06/25/2007 
 RPT Level = 0.02  Analysis Date = 06/14/2007 
 RPT Level = 0.02  Analysis Date = 06/14/2007 
 RPT Level = 0.02  Analysis Date = 06/12/2007 
 RPT Level = 0.02  Analysis Date = 06/12/2007 
 RPT Level = 0.02  Analysis Date = 06/04/2007 
 RPT Level = 0.02  Analysis Date = 06/04/2007 
 RPT Level = 0.02  Analysis Date = 06/07/2007 
 RPT Level = 0.02  Analysis Date = 06/07/2007 
 RPT Level = 0.02  Analysis Date = 05/21/2007 
 RPT Level = 0.02  Analysis Date = 05/21/2007 
 RPT Level = 0.02  Analysis Date = 05/10/2007 
 RPT Level = 0.02  Analysis Date = 05/10/2007 
 RPT Level = 0.02  Analysis Date = 05/03/2007 
 RPT Level = 0.02  Analysis Date = 05/03/2007 
 RPT Level = 0.02  Analysis Date = 05/01/2007 
 RPT Level = 0.02  Analysis Date = 05/01/2007 
 RPT Level = 0.02  Analysis Date = 04/19/2007 
 RPT Level = 0.02  Analysis Date = 04/19/2007 
 RPT Level = 0.02  Analysis Date = 04/12/2007 
 RPT Level = 0.02  Analysis Date = 04/12/2007 
 RPT Level = 0.02  Analysis Date = 04/10/2007 
 RPT Level = 0.02  Analysis Date = 04/10/2007 
 RPT Level = 0.02  Analysis Date = 04/04/2007 
 RPT Level = 0.02  Analysis Date = 04/04/2007 
 RPT Level = 0.02  Analysis Date = 03/30/2007 
 RPT Level = 0.02  Analysis Date = 03/30/2007 
 RPT Level = 0.02  Analysis Date = 04/16/2007 
 RPT Level = 0.02  Analysis Date = 04/16/2007 
 RPT Level = 0.02  Analysis Date = 03/12/2007 
 RPT Level = 0.02  Analysis Date = 03/12/2007 
 RPT Level = 0.02  Analysis Date = 03/05/2007 
 RPT Level = 0.02  Analysis Date = 03/05/2007 
 RPT Level = 0.02  Analysis Date = 03/01/2007 
 RPT Level = 0.02  Analysis Date = 03/01/2007 
 RPT Level = 0.02  Analysis Date = 02/26/2007 
 RPT Level = 0.02  Analysis Date = 02/26/2007 
 RPT Level = 0.02  Analysis Date = 02/15/2007 
 RPT Level = 0.02  Analysis Date = 02/15/2007 
 RPT Level = 0.02  Analysis Date = 01/29/2007 
 RPT Level = 0.02  Analysis Date = 01/29/2007 
 RPT Level = 0.02  Analysis Date = 01/22/2007 
 RPT Level = 0.02  Analysis Date = 01/22/2007 
 RPT Level = 0.02  Analysis Date = 01/17/2007 
 RPT Level = 0.02  Analysis Date = 01/17/2007 
 RPT Level = 0.02  Analysis Date = 01/09/2007 
 RPT Level = 0.02  Analysis Date = 01/09/2007 
 RPT Level = 0.02  Analysis Date = 01/09/2007 
 RPT Level = 0.02  Analysis Date = 01/09/2007 
 RPT Level = 0.02  Analysis Date = 01/04/2007 
 RPT Level = 0.02  Analysis Date = 01/04/2007 
 RPT Level = 0.02  Analysis Date = 12/14/2006 
 RPT Level = 0.02  Analysis Date = 12/14/2006 
 RPT Level = 0.02  Analysis Date = 12/07/2006 
 RPT Level = 0.02  Analysis Date = 12/07/2006 
 RPT Level = 0.02  Analysis Date = 12/08/2006 
 RPT Level = 0.02  Analysis Date = 12/08/2006 
 RPT Level = 0.02  Analysis Date = 11/28/2006 
 RPT Level = 0.02  Analysis Date = 11/28/2006 
 RPT Level = 0.02  Analysis Date = 11/16/2006 
 RPT Level = 0.02  Analysis Date = 11/16/2006 
 RPT Level = 0.02  Analysis Date = 11/22/2006 
 RPT Level = 0.02  Analysis Date = 11/22/2006 
 RPT Level = 0.02  Analysis Date = 11/07/2006 
 RPT Level = 0.02  Analysis Date = 11/07/2006 
 RPT Level = 0.02  Analysis Date = 11/01/2006 
 RPT Level = 0.02  Analysis Date = 11/01/2006 
 RPT Level = 0.02  Analysis Date = 10/31/2006 
 RPT Level = 0.02  Analysis Date = 10/31/2006 
 RPT Level = 0.02  Analysis Date = 10/16/2006 
 RPT Level = 0.02  Analysis Date = 10/16/2006 
 RPT Level = 0.02  Analysis Date = 10/11/2006 
 RPT Level = 0.02  Analysis Date = 10/11/2006 
 RPT Level = 0.02  Analysis Date = 09/20/2006 
 RPT Level = 0.02  Analysis Date = 09/20/2006 
 RPT Level = 0.02  Analysis Date = 09/15/2006 
 RPT Level = 0.02  Analysis Date = 09/15/2006 
 RPT Level = 0.02  Analysis Date = 09/11/2006 
 RPT Level = 0.02  Analysis Date = 09/11/2006 
 RPT Level = 0.02  Analysis Date = 08/28/2006 
 RPT Level = 0.02  Analysis Date = 08/28/2006 
 RPT Level = 0.02  Analysis Date = 08/17/2006 
 RPT Level = 0.02  Analysis Date = 08/17/2006 
 RPT Level = 0.02  Analysis Date = 08/14/2006 
 RPT Level = 0.02  Analysis Date = 08/14/2006 
 RPT Level = 0.02  Analysis Date = 07/25/2006 
 RPT Level = 0.02  Analysis Date = 07/25/2006 
 RPT Level = 0.02  Analysis Date = 07/18/2006 
 RPT Level = 0.02  Analysis Date = 07/18/2006 
 RPT Level = 0.02  Analysis Date = 07/11/2006 
 RPT Level = 0.02  Analysis Date = 07/11/2006 
 RPT Level = 0.02  Analysis Date = 06/23/2006 
 RPT Level = 0.02  Analysis Date = 06/23/2006 
 RPT Level = 0.02  Analysis Date = 06/19/2006 
 RPT Level = 0.02  Analysis Date = 06/19/2006 
 RPT Level = 0.02  Analysis Date = 06/08/2006 
 RPT Level = 0.02  Analysis Date = 06/08/2006 
 RPT Level = 0.02  Analysis Date = 05/18/2006 
 RPT Level = 0.02  Analysis Date = 05/18/2006 
 RPT Level = 0.02  Analysis Date = 05/10/2006 
 RPT Level = 0.02  Analysis Date = 05/10/2006 
 RPT Level = 0.02  Analysis Date = 05/15/2006 
 RPT Level = 0.02  Analysis Date = 05/15/2006 
 RPT Level = 0.02  Analysis Date = 09/21/2005 
 RPT Level = 0.02  Analysis Date = 09/21/2005 
 RPT Level = 0.02  Analysis Date = 09/13/2005 
 RPT Level = 0.02  Analysis Date = 09/13/2005 
 RPT Level = 0.02  Analysis Date = 09/02/2005 
 RPT Level = 0.02  Analysis Date = 09/02/2005 
 RPT Level = 0.02  Analysis Date = 08/30/2005 
 RPT Level = 0.02  Analysis Date = 08/30/2005 
 RPT Level = 0.02  Analysis Date = 08/19/2005 
 RPT Level = 0.02  Analysis Date = 08/19/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/05/2005 
 RPT Level = 0.02  Analysis Date = 08/05/2005 
 RPT Level = 0.02  Analysis Date = 08/05/2005 
 RPT Level = 0.02  Analysis Date = 08/05/2005 
 RPT Level = 0.02  Analysis Date = 07/21/2005 
 RPT Level = 0.02  Analysis Date = 07/21/2005 
 RPT Level = 0.02  Analysis Date = 07/18/2005 
 RPT Level = 0.02  Analysis Date = 07/18/2005 
 RPT Level = 0.02  Analysis Date = 07/11/2005 
 RPT Level = 0.02  Analysis Date = 07/11/2005 
 RPT Level = 0.02  Analysis Date = 07/06/2005 
 RPT Level = 0.02  Analysis Date = 07/06/2005 
 RPT Level = 0.02  Analysis Date = 06/24/2005 
 RPT Level = 0.02  Analysis Date = 06/24/2005 
 RPT Level = 0.02  Analysis Date = 06/21/2005 
 RPT Level = 0.02  Analysis Date = 06/21/2005 
 RPT Level = 0.02  Analysis Date = 06/13/2005 
 RPT Level = 0.02  Analysis Date = 06/13/2005 
 RPT Level = 0.02  Analysis Date = 06/06/2005 
 RPT Level = 0.02  Analysis Date = 06/06/2005 
 RPT Level = 0.02  Analysis Date = 05/25/2005 
 RPT Level = 0.02  Analysis Date = 05/25/2005 
 RPT Level = 0.02  Analysis Date = 05/23/2005 
 RPT Level = 0.02  Analysis Date = 05/23/2005 
 RPT Level = 0.02  Analysis Date = 05/17/2005 
 RPT Level = 0.02  Analysis Date = 05/17/2005 
 RPT Level = 0.02  Analysis Date = 05/11/2005 
 RPT Level = 0.02  Analysis Date = 05/11/2005 
 RPT Level = 0.02  Analysis Date = 04/28/2005 
 RPT Level = 0.02  Analysis Date = 04/28/2005 
 RPT Level = 0.02  Analysis Date = 04/25/2005 
 RPT Level = 0.02  Analysis Date = 04/25/2005 
 RPT Level = 0.02  Analysis Date = 04/14/2005 
 RPT Level = 0.02  Analysis Date = 04/14/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/04/2005 
 RPT Level = 0.02  Analysis Date = 04/04/2005 
 RPT Level = 0.02  Analysis Date = 03/29/2005 
 RPT Level = 0.02  Analysis Date = 03/29/2005 
 RPT Level = 0.02  Analysis Date = 03/18/2005 
 RPT Level = 0.02  Analysis Date = 03/18/2005 
 RPT Level = 0.02  Analysis Date = 03/14/2005 
 RPT Level = 0.02  Analysis Date = 03/14/2005 
 RPT Level = 0.02  Analysis Date = 03/14/2005 
 RPT Level = 0.02  Analysis Date = 03/14/2005 
 RPT Level = 0.02  Analysis Date = 03/10/2005 
 RPT Level = 0.02  Analysis Date = 03/10/2005 
 RPT Level = 0.02  Analysis Date = 03/01/2005 
 RPT Level = 0.02  Analysis Date = 03/01/2005 
 RPT Level = 0.02  Analysis Date = 02/18/2005 
 RPT Level = 0.02  Analysis Date = 02/18/2005 
 RPT Level = 0.02  Analysis Date = 02/15/2005 
 RPT Level = 0.02  Analysis Date = 02/15/2005 
 RPT Level = 0.02  Analysis Date = 02/04/2005 
 RPT Level = 0.02  Analysis Date = 02/04/2005 
 RPT Level = 0.02  Analysis Date = 01/27/2005 
 RPT Level = 0.02  Analysis Date = 01/27/2005 
 RPT Level = 0.02  Analysis Date = 01/21/2005 
 RPT Level = 0.02  Analysis Date = 01/21/2005 
 RPT Level = 0.02  Analysis Date = 01/18/2005 
 RPT Level = 0.02  Analysis Date = 01/18/2005 
 RPT Level = 0.02  Analysis Date = 01/10/2005 
 RPT Level = 0.02  Analysis Date = 01/10/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 12/28/2004 
 RPT Level = 0.02  Analysis Date = 12/28/2004 
 RPT Level = 0.02  Analysis Date = 12/28/2004 
 RPT Level = 0.02  Analysis Date = 12/28/2004 
 RPT Level = 0.02  Analysis Date = 12/20/2004 
 RPT Level = 0.02  Analysis Date = 12/20/2004 
 RPT Level = 0.02  Analysis Date = 12/20/2004 
 RPT Level = 0.02  Analysis Date = 12/20/2004 
 RPT Level = 0.02  Analysis Date = 12/13/2004 
 RPT Level = 0.02  Analysis Date = 12/13/2004 
 RPT Level = 0.02  Analysis Date = 12/13/2004 
 RPT Level = 0.02  Analysis Date = 12/13/2004 
 RPT Level = 0.02  Analysis Date = 12/06/2004 
 RPT Level = 0.02  Analysis Date = 12/06/2004 
 RPT Level = 0.02  Analysis Date = 12/06/2004 
 RPT Level = 0.02  Analysis Date = 12/06/2004 
 RPT Level = 0.02  Analysis Date = 12/06/2004 
 RPT Level = 0.02  Analysis Date = 12/06/2004 
 RPT Level = 0.02  Analysis Date = 11/29/2004 
 RPT Level = 0.02  Analysis Date = 11/29/2004 
 RPT Level = 0.02  Analysis Date = 11/23/2004 
 RPT Level = 0.02  Analysis Date = 11/23/2004 
 RPT Level = 0.02  Analysis Date = 09/02/2004 
 RPT Level = 0.02  Analysis Date = 09/02/2004 
 RPT Level = 0.02  Analysis Date = 08/31/2004 
 RPT Level = 0.02  Analysis Date = 08/31/2004 
 RPT Level = 0.02  Analysis Date = 08/25/2004 
 RPT Level = 0.02  Analysis Date = 08/25/2004 
 RPT Level = 0.02  Analysis Date = 08/23/2004 
 RPT Level = 0.02  Analysis Date = 08/23/2004 
 RPT Level = 0.02  Analysis Date = 08/23/2004 
 RPT Level = 0.02  Analysis Date = 08/23/2004 
 RPT Level = 0.02  Analysis Date = 08/23/2004 
 RPT Level = 0.02  Analysis Date = 08/23/2004 
 RPT Level = 0.02  Analysis Date = 08/13/2004 
 RPT Level = 0.02  Analysis Date = 08/13/2004 
 RPT Level = 0.02  Analysis Date = 08/05/2004 
 RPT Level = 0.02  Analysis Date = 08/05/2004 
 RPT Level = 0.02  Analysis Date = 08/03/2004 
 RPT Level = 0.02  Analysis Date = 08/03/2004 
 RPT Level = 0.02  Analysis Date = 07/26/2004 
 RPT Level = 0.02  Analysis Date = 07/26/2004 
 RPT Level = 0.02  Analysis Date = 07/20/2004 
 RPT Level = 0.02  Analysis Date = 07/20/2004 
 RPT Level = 0.02  Analysis Date = 07/09/2004 
 RPT Level = 0.02  Analysis Date = 07/09/2004 
 RPT Level = 0.02  Analysis Date = 07/07/2004 
 RPT Level = 0.02  Analysis Date = 07/07/2004 
 RPT Level = 0.02  Analysis Date = 06/28/2004 
 RPT Level = 0.02  Analysis Date = 06/28/2004 
 RPT Level = 0.02  Analysis Date = 06/23/2004 
 RPT Level = 0.02  Analysis Date = 06/23/2004 
 RPT Level = 0.02  Analysis Date = 06/10/2004 
 RPT Level = 0.02  Analysis Date = 06/10/2004 
 RPT Level = 0.02  Analysis Date = 06/04/2004 
 RPT Level = 0.02  Analysis Date = 06/04/2004 
 RPT Level = 0.02  Analysis Date = 06/01/2004 
 RPT Level = 0.02  Analysis Date = 06/01/2004 
 RPT Level = 0.02  Analysis Date = 05/21/2004 
 RPT Level = 0.02  Analysis Date = 05/21/2004 
 RPT Level = 0.02  Analysis Date = 05/07/2004 
 RPT Level = 0.02  Analysis Date = 05/07/2004 
 RPT Level = 0.02  Analysis Date = 05/03/2004 
 RPT Level = 0.02  Analysis Date = 05/03/2004 
 RPT Level = 0.02  Analysis Date = 04/26/2004 
 RPT Level = 0.02  Analysis Date = 04/26/2004 
 RPT Level = 0.02  Analysis Date = 04/20/2004 
 RPT Level = 0.02  Analysis Date = 04/20/2004 
 RPT Level = 0.02  Analysis Date = 04/12/2004 
 RPT Level = 0.02  Analysis Date = 04/12/2004 
 RPT Level = 0.02  Analysis Date = 04/05/2004 
 RPT Level = 0.02  Analysis Date = 04/05/2004 
 RPT Level = 0.02  Analysis Date = 04/05/2004 
 RPT Level = 0.02  Analysis Date = 04/05/2004 
 RPT Level = 0.02  Analysis Date = 03/30/2004 
 RPT Level = 0.02  Analysis Date = 03/30/2004 
 RPT Level = 0.02  Analysis Date = 03/30/2004 
 RPT Level = 0.02  Analysis Date = 03/30/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/23/2004 
 RPT Level = 0.02  Analysis Date = 03/18/2004 
 RPT Level = 0.02  Analysis Date = 03/18/2004 
 RPT Level = 0.02  Analysis Date = 03/16/2004 
 RPT Level = 0.02  Analysis Date = 03/16/2004 
 RPT Level = 0.02  Analysis Date = 03/16/2004 
 RPT Level = 0.02  Analysis Date = 03/16/2004 
 RPT Level = 0.02  Analysis Date = 03/12/2004 
 RPT Level = 0.02  Analysis Date = 03/12/2004 
 RPT Level = 0.02  Analysis Date = 03/12/2004 
 RPT Level = 0.02  Analysis Date = 03/12/2004 
 RPT Level = 0.02  Analysis Date = 03/01/2004 
 RPT Level = 0.02  Analysis Date = 03/01/2004 
 RPT Level = 0.02  Analysis Date = 02/26/2004 
 RPT Level = 0.02  Analysis Date = 02/26/2004 
 RPT Level = 0.02  Analysis Date = 02/24/2004 
 RPT Level = 0.02  Analysis Date = 02/24/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/12/2004 
 RPT Level = 0.02  Analysis Date = 02/12/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/03/2004 
 RPT Level = 0.02  Analysis Date = 02/03/2004 
 RPT Level = 0.02  Analysis Date = 01/30/2004 
 RPT Level = 0.02  Analysis Date = 01/30/2004 
 RPT Level = 0.02  Analysis Date = 01/27/2004 
 RPT Level = 0.02  Analysis Date = 01/27/2004 
 RPT Level = 0.02  Analysis Date = 01/22/2004 
 RPT Level = 0.02  Analysis Date = 01/22/2004 
 RPT Level = 0.02  Analysis Date = 01/22/2004 
 RPT Level = 0.02  Analysis Date = 01/22/2004 
 RPT Level = 0.02  Analysis Date = 01/16/2004 
 RPT Level = 0.02  Analysis Date = 01/16/2004 
 RPT Level = 0.02  Analysis Date = 01/13/2004 
 RPT Level = 0.02  Analysis Date = 01/13/2004 
 RPT Level = 0.02  Analysis Date = 01/13/2004 
 RPT Level = 0.02  Analysis Date = 01/13/2004 
 RPT Level = 0.02  Analysis Date = 01/06/2004 
 RPT Level = 0.02  Analysis Date = 01/06/2004 
 RPT Level = 0.02  Analysis Date = 09/29/2003 
 RPT Level = 0.018  Analysis Date = 09/29/2003 
 RPT Level = 0.018  Analysis Date = 09/19/2003 
 RPT Level = 0.018  Analysis Date = 09/19/2003 
 RPT Level = 0.018  Analysis Date = 09/12/2003 
 RPT Level = 0.018  Analysis Date = 09/12/2003 
 RPT Level = 0.018  Analysis Date = 09/05/2003 
 RPT Level = 0.018  Analysis Date = 09/05/2003 
 RPT Level = 0.018  Analysis Date = 08/27/2003 
 RPT Level = 0.018  Analysis Date = 08/27/2003 
 RPT Level = 0.018  Analysis Date = 08/21/2003 
 RPT Level = 0.018  Analysis Date = 08/21/2003 
 RPT Level = 0.018  Analysis Date = 08/14/2003 
 RPT Level = 0.018  Analysis Date = 08/14/2003 
 RPT Level = 0.018  Analysis Date = 08/08/2003 
 RPT Level = 0.018  Analysis Date = 08/08/2003 
 RPT Level = 0.018  Analysis Date = 08/04/2003 
 RPT Level = 0.018  Analysis Date = 08/04/2003 
 RPT Level = 0.018  Analysis Date = 07/24/2003 
 RPT Level = 0.018  Analysis Date = 07/24/2003 
 RPT Level = 0.018  Analysis Date = 07/16/2003 
 RPT Level = 0.018  Analysis Date = 07/16/2003 
 RPT Level = 0.018  Analysis Date = 07/15/2003 
 RPT Level = 0.018  Analysis Date = 07/15/2003 
 RPT Level = 0.018  Analysis Date = 07/03/2003 
 RPT Level = 0.018  Analysis Date = 07/03/2003 
 RPT Level = 0.018  Analysis Date = 07/01/2003 
 RPT Level = 0.018  Analysis Date = 07/01/2003 
 RPT Level = 0.018  Analysis Date = 06/23/2003 
 RPT Level = 0.018  Analysis Date = 06/23/2003 
 RPT Level = 0.018  Analysis Date = 06/16/2003 
 RPT Level = 0.018  Analysis Date = 06/16/2003 
 RPT Level = 0.018  Analysis Date = 06/13/2003 
 RPT Level = 0.018  Analysis Date = 06/13/2003 
 RPT Level = 0.018  Analysis Date = 05/29/2003 
 RPT Level = 0.018  Analysis Date = 05/29/2003 
 RPT Level = 0.018  Analysis Date = 05/28/2003 
 RPT Level = 0.018  Analysis Date = 05/28/2003 
 RPT Level = 0.018  Analysis Date = 05/22/2003 
 RPT Level = 0.018  Analysis Date = 05/22/2003 
 RPT Level = 0.018  Analysis Date = 05/14/2003 
 RPT Level = 0.018  Analysis Date = 05/14/2003 
 RPT Level = 0.018  Analysis Date = 05/06/2003 
 RPT Level = 0.018  Analysis Date = 05/06/2003 
 RPT Level = 0.018  Analysis Date = 05/01/2003 
 RPT Level = 0.018  Analysis Date = 05/01/2003 
 RPT Level = 0.018  Analysis Date = 04/22/2003 
 RPT Level = 0.018  Analysis Date = 04/22/2003 
 RPT Level = 0.018  Analysis Date = 04/08/2003 
 RPT Level = 0.018  Analysis Date = 04/08/2003 
 RPT Level = 0.018  Analysis Date = 04/03/2003 
 RPT Level = 0.018  Analysis Date = 04/03/2003 
 RPT Level = 0.018  Analysis Date = 04/02/2003 
 RPT Level = 0.018  Analysis Date = 04/02/2003 
 RPT Level = 0.018  Analysis Date = 04/02/2003 
 RPT Level = 0.018  Analysis Date = 04/02/2003 
 RPT Level = 0.018  Analysis Date = 03/14/2003 
 RPT Level = 0.018  Analysis Date = 03/14/2003 
 RPT Level = 0.018  Analysis Date = 03/12/2003 
 RPT Level = 0.018  Analysis Date = 03/12/2003 
 RPT Level = 0.018  Analysis Date = 03/06/2003 
 RPT Level = 0.018  Analysis Date = 03/06/2003 
 RPT Level = 0.018  Analysis Date = 02/27/2003 
 RPT Level = 0.018  Analysis Date = 02/27/2003 
 RPT Level = 0.018  Analysis Date = 02/12/2003 
 RPT Level = 0.018  Analysis Date = 02/12/2003 
 RPT Level = 0.018  Analysis Date = 02/07/2003 
 RPT Level = 0.018  Analysis Date = 02/07/2003 
 RPT Level = 0.018  Analysis Date = 02/03/2003 
 RPT Level = 0.018  Analysis Date = 02/03/2003 
 RPT Level = 0.018  Analysis Date = 01/31/2003 
 RPT Level = 0.018  Analysis Date = 01/31/2003 
 RPT Level = 0.018  Analysis Date = 01/16/2003 
 RPT Level = 0.018  Analysis Date = 01/16/2003 
 RPT Level = 0.018  Analysis Date = 01/17/2003 
 RPT Level = 0.018  Analysis Date = 01/17/2003 
 RPT Level = 0.018  Analysis Date = 01/08/2003 
 RPT Level = 0.018  Analysis Date = 01/08/2003 
 RPT Level = 0.018  Analysis Date = 01/06/2003 
 RPT Level = 0.018  Analysis Date = 01/06/2003 
 RPT Level = 0.018  Analysis Date = 12/18/2002 
 RPT Level = 0.018  Analysis Date = 12/18/2002 
 RPT Level = 0.018  Analysis Date = 12/18/2002 
 RPT Level = 0.018  Analysis Date = 12/18/2002 
 RPT Level = 0.018  Analysis Date = 12/06/2002 
 RPT Level = 0.018  Analysis Date = 12/06/2002 
 RPT Level = 0.018  Analysis Date = 12/11/2002 
 RPT Level = 0.018  Analysis Date = 12/11/2002 
 RPT Level = 0.018  Analysis Date = 12/04/2002 
 RPT Level = 0.018  Analysis Date = 12/04/2002 
 RPT Level = 0.018  Analysis Date = 12/11/2002 
 RPT Level = 0.018  Analysis Date = 12/11/2002 
 RPT Level = 0.018  Analysis Date = 12/04/2002 
 RPT Level = 0.018  Analysis Date = 12/04/2002 
 RPT Level = 0.018  Analysis Date = 11/04/2002 
 RPT Level = 0.018  Analysis Date = 11/04/2002 
 RPT Level = 0.018  Analysis Date = 10/25/2002 
 RPT Level = 0.018  Analysis Date = 10/25/2002 
 RPT Level = 0.018  Analysis Date = 10/25/2002 
 RPT Level = 0.018  Analysis Date = 10/25/2002 
 RPT Level = 0.018  Analysis Date = 10/25/2002 
 RPT Level = 0.018  Analysis Date = 10/25/2002 
 RPT Level = 0.018  Analysis Date = 10/24/2002 
 RPT Level = 0.018  Analysis Date = 10/24/2002 
 RPT Level = 0.018  Analysis Date = 09/05/2002 
 RPT Level = 0.03  Analysis Date = 09/05/2002 
 RPT Level = 0.03  Analysis Date = 09/05/2002 
 RPT Level = 0.03  Analysis Date = 09/05/2002 
 RPT Level = 0.03  Analysis Date = 08/26/2002 
 RPT Level = 0.03  Analysis Date = 08/26/2002 
 RPT Level = 0.03  Analysis Date = 08/19/2002 
 RPT Level = 0.03  Analysis Date = 08/19/2002 
 RPT Level = 0.03  Analysis Date = 08/13/2002 
 RPT Level = 0.03  Analysis Date = 08/13/2002 
 RPT Level = 0.03  Analysis Date = 08/06/2002 
 RPT Level = 0.03  Analysis Date = 08/06/2002 
 RPT Level = 0.03  Analysis Date = 07/29/2002 
 RPT Level = 0.03  Analysis Date = 07/29/2002 
 RPT Level = 0.03  Analysis Date = 07/19/2002 
 RPT Level = 0.03  Analysis Date = 07/19/2002 
 RPT Level = 0.03  Analysis Date = 07/19/2002 
 RPT Level = 0.03  Analysis Date = 07/19/2002 
 RPT Level = 0.03  Analysis Date = 07/03/2002 
 RPT Level = 0.03  Analysis Date = 07/03/2002 
 RPT Level = 0.03  Analysis Date = 07/01/2002 
 RPT Level = 0.03  Analysis Date = 07/01/2002 
 RPT Level = 0.03  Analysis Date = 06/21/2002 
 RPT Level = 0.03  Analysis Date = 06/21/2002 
 RPT Level = 0.03  Analysis Date = 06/21/2002 
 RPT Level = 0.03  Analysis Date = 06/21/2002 
 RPT Level = 0.03  Analysis Date = 06/05/2002 
 RPT Level = 0.03  Analysis Date = 06/05/2002 
 RPT Level = 0.03  Analysis Date = 06/05/2002 
 RPT Level = 0.03  Analysis Date = 06/05/2002 
 RPT Level = 0.03  Analysis Date = 05/28/2002 
 RPT Level = 0.03  Analysis Date = 05/28/2002 
 RPT Level = 0.03  Analysis Date = 05/16/2002 
 RPT Level = 0.03  Analysis Date = 05/16/2002 
 RPT Level = 0.03  Analysis Date = 05/13/2002 
 RPT Level = 0.03  Analysis Date = 05/13/2002 
 RPT Level = 0.03  Analysis Date = 05/03/2002 
 RPT Level = 0.03  Analysis Date = 05/03/2002 
 RPT Level = 0.03  Analysis Date = 04/25/2002 
 RPT Level = 0.03  Analysis Date = 04/25/2002 
 RPT Level = 0.03  Analysis Date = 04/25/2002 
 RPT Level = 0.03  Analysis Date = 04/25/2002 
 RPT Level = 0.03  Analysis Date = 04/15/2002 
 RPT Level = 0.03  Analysis Date = 04/15/2002 
 RPT Level = 0.03  Analysis Date = 04/04/2002 
 RPT Level = 0.03  Analysis Date = 04/04/2002 
 RPT Level = 0.03  Analysis Date = 03/28/2002 
 RPT Level = 0.03  Analysis Date = 03/28/2002 
 RPT Level = 0.03  Analysis Date = 03/26/2002 
 RPT Level = 0.03  Analysis Date = 03/26/2002 
 RPT Level = 0.03  Analysis Date = 03/18/2002 
 RPT Level = 0.03  Analysis Date = 03/18/2002 
 RPT Level = 0.03  Analysis Date = 03/11/2002 
 RPT Level = 0.03  Analysis Date = 03/11/2002 
 RPT Level = 0.03  Analysis Date = 03/05/2002 
 RPT Level = 0.03  Analysis Date = 03/05/2002 
 RPT Level = 0.03  Analysis Date = 02/28/2002 
 RPT Level = 0.03  Analysis Date = 02/28/2002 
 RPT Level = 0.03  Analysis Date = 02/21/2002 
 RPT Level = 0.03  Analysis Date = 02/21/2002 
 RPT Level = 0.03  Analysis Date = 02/07/2002 
 RPT Level = 0.03  Analysis Date = 02/07/2002 
 RPT Level = 0.03  Analysis Date = 02/07/2002 
 RPT Level = 0.03  Analysis Date = 02/07/2002 
 RPT Level = 0.03  Analysis Date = 01/24/2002 
 RPT Level = 0.03  Analysis Date = 01/24/2002 
 RPT Level = 0.03  Analysis Date = 01/16/2002 
 RPT Level = 0.03  Analysis Date = 01/16/2002 
 RPT Level = 0.03  Analysis Date = 01/04/2002 
 RPT Level = 0.03  Analysis Date = 01/04/2002 
 RPT Level = 0.03  Analysis Date = 01/04/2002 
 RPT Level = 0.03  Analysis Date = 01/04/2002 
 RPT Level = 0.03  Analysis Date = 12/21/2001 
 RPT Level = 0.03  Analysis Date = 12/21/2001 
 RPT Level = 0.03  Analysis Date = 12/19/2001 
 RPT Level = 0.03  Analysis Date = 12/19/2001 
 RPT Level = 0.03  Analysis Date = 12/07/2001 
 RPT Level = 0.03  Analysis Date = 12/07/2001 
 RPT Level = 0.03  Analysis Date = 11/08/2001 
 RPT Level = 0.03  Y = 0
The SGPlot Procedure

False Positive Rate for Phosphorus (as P), FIL, CFA, Kjeldahl

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Phosphorus (as P), FIL, CFA, Kjeldahl 00666KJ005 2002 40 0 0%
    2003 52 4 8%
    2004 51 0 0%
    2005 50 0 0%
    2006 15 0 0%
    2007 50 3 6%
    2008 50 0 0%
    2009 52 0 0%
    2010 52 0 0%
    2011 52 1 2%
    2012 52 0 0%
    2013 53 0 0%
    2014 47 1 2%
    2015 52 0 0%
    2016 50 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Phosphorus (as P), FIL, EPA -
Blind Blank Results
Lab: NWQL, PCode: 00666, MCode: KJ004
Analysis dates: 11/15/01 through 09/28/05
Open Data Set

 Analysis Date = 09/28/2005 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20052590035  Analysis Date = 09/16/2005 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20052520006  Analysis Date = 09/02/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20052430006  Analysis Date = 08/30/2005 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20052370002  Analysis Date = 08/23/2005 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20052300009  Analysis Date = 08/16/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20052210012  Analysis Date = 08/09/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20052160007  Analysis Date = 08/09/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20052160005  Analysis Date = 07/25/2005 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20052010007  Analysis Date = 07/25/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20051940015  Analysis Date = 07/12/2005 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20051880018  Analysis Date = 07/05/2005 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20051800189  Analysis Date = 07/05/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20051740019  Analysis Date = 06/16/2005 
 Lab Value = -0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20051660174  Analysis Date = 06/16/2005 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20051590025  Analysis Date = 06/08/2005 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20051530021  Analysis Date = 06/02/2005 
 Lab Value = 0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20051440043  Analysis Date = 05/24/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20051380014  Analysis Date = 05/19/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20051320029  Analysis Date = 05/10/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20051250003  Analysis Date = 04/29/2005 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20051170012  Analysis Date = 04/29/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20051110007  Analysis Date = 04/19/2005 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20051020018  Analysis Date = 04/07/2005 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20050950044  Analysis Date = 04/07/2005 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20050880116  Analysis Date = 04/07/2005 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20050840096  Analysis Date = 03/24/2005 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20050750004  Analysis Date = 03/17/2005 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20050700007  Analysis Date = 03/17/2005 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20050700004  Analysis Date = 03/17/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20050670011  Analysis Date = 02/28/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20050550024  Analysis Date = 02/18/2005 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20050480005  Analysis Date = 02/15/2005 
 Lab Value = -0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20050410004  Analysis Date = 02/08/2005 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20050340020  Analysis Date = 02/02/2005 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20050260024  Analysis Date = 01/25/2005 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20050200048  Analysis Date = 01/20/2005 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20050130091  Analysis Date = 01/12/2005 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20050070016  Analysis Date = 01/04/2005 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20043650002  Analysis Date = 12/28/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20043580037  Analysis Date = 12/28/2004 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20043580035  Analysis Date = 12/20/2004 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20043520023  Analysis Date = 12/28/2004 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20043510018  Analysis Date = 12/20/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20043450069  Analysis Date = 12/20/2004 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20043440147  Analysis Date = 12/09/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20043380005  Analysis Date = 12/09/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20043380002  Analysis Date = 12/02/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20043310059  Analysis Date = 11/24/2004 
 Lab Value = 0.018 
 RPT Level = 0.02 
 Lab Sample ID = 20043280048  Analysis Date = 11/24/2004 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20043240012  Analysis Date = 09/03/2004 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20042450138  Analysis Date = 09/01/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20042400089  Analysis Date = 08/26/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20042370105  Analysis Date = 08/24/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20042330206  Analysis Date = 09/01/2004 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20042320136  Analysis Date = 09/01/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20042320138  Analysis Date = 08/13/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20042240114  Analysis Date = 08/09/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20042170123  Analysis Date = 08/02/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20042110015  Analysis Date = 07/28/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20042040039  Analysis Date = 07/21/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20041960050  Analysis Date = 07/13/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20041900062  Analysis Date = 07/06/2004 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20041820035  Analysis Date = 07/06/2004 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20041750057  Analysis Date = 06/22/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20041700080  Analysis Date = 06/10/2004 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20041610055  Analysis Date = 06/10/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20041550019  Analysis Date = 06/03/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20041470132  Analysis Date = 05/26/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20041400016  Analysis Date = 05/07/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20041260099  Analysis Date = 05/07/2004 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20041200046  Analysis Date = 04/28/2004 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20041130016  Analysis Date = 04/21/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20041050022  Analysis Date = 04/14/2004 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20040980007  Analysis Date = 04/07/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20040930009  Analysis Date = 04/01/2004 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20040910012  Analysis Date = 04/01/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040850021  Analysis Date = 03/24/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040830056  Analysis Date = 03/24/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20040790023  Analysis Date = 03/24/2004 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20040760010  Analysis Date = 03/16/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040720029  Analysis Date = 03/16/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040710005  Analysis Date = 03/16/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040680093  Analysis Date = 03/16/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040650001  Analysis Date = 03/03/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040580032  Analysis Date = 03/03/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20040550018  Analysis Date = 02/23/2004 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20040510134  Analysis Date = 02/23/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20040490025  Analysis Date = 02/23/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20040440035  Analysis Date = 02/12/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20040420001  Analysis Date = 02/12/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20040370017  Analysis Date = 02/12/2004 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20040340024  Analysis Date = 02/03/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20040300012  Analysis Date = 01/30/2004 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20040270036  Analysis Date = 01/30/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20040230030  Analysis Date = 01/22/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040210154  Analysis Date = 01/21/2004 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20040200023  Analysis Date = 01/21/2004 
 Lab Value = 0.029 
 RPT Level = 0.02 
 Lab Sample ID = 20040150075  Analysis Date = 01/14/2004 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20040090020  Analysis Date = 01/14/2004 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20040070032  Analysis Date = 01/14/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20040050016  Analysis Date = 09/29/2003 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20032660009  Analysis Date = 09/19/2003 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20032600107  Analysis Date = 09/12/2003 
 Lab Value = -0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20032520179  Analysis Date = 09/12/2003 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20032450195  Analysis Date = 08/28/2003 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20032380029  Analysis Date = 08/22/2003 
 Lab Value = -0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20032310028  Analysis Date = 08/20/2003 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20032250256  Analysis Date = 08/15/2003 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20032180019  Analysis Date = 08/04/2003 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20032100004  Analysis Date = 07/25/2003 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20032040043  Analysis Date = 07/18/2003 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20031960025  Analysis Date = 07/18/2003 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20031900098  Analysis Date = 07/08/2003 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20031820037  Analysis Date = 07/08/2003 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20031770041  Analysis Date = 06/26/2003 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20031700013  Analysis Date = 06/17/2003 
 Lab Value = -0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20031630053  Analysis Date = 06/13/2003 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20031600109  Analysis Date = 05/29/2003 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20031480059  Analysis Date = 05/29/2003 
 Lab Value = -0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20031430019  Analysis Date = 05/28/2003 
 Lab Value = 0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20031400115  Analysis Date = 05/15/2003 
 Lab Value = 0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20031290084  Analysis Date = 05/09/2003 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20031220070  Analysis Date = 05/05/2003 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20031200043  Analysis Date = 05/05/2003 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20031080208  Analysis Date = 04/10/2003 
 Lab Value = 0.022 
 RPT Level = 0.03 
 Lab Sample ID = 20030970018  Analysis Date = 04/03/2003 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20030920027  Analysis Date = 04/03/2003 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20030900015  Analysis Date = 04/03/2003 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20030860023  Analysis Date = 03/24/2003 
 Lab Value = 0.024 
 RPT Level = 0.03 
 Lab Sample ID = 20030710021  Analysis Date = 03/24/2003 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20030660148  Analysis Date = 03/04/2003 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20030590040  Analysis Date = 02/27/2003 
 Lab Value = -0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20030570061  Analysis Date = 02/12/2003 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20030410034  Analysis Date = 02/07/2003 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20030350008  Analysis Date = 02/07/2003 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20030310028  Analysis Date = 02/07/2003 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20030300004  Analysis Date = 01/22/2003 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20030150009  Analysis Date = 01/22/2003 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20030140019  Analysis Date = 01/08/2003 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20030020002  Analysis Date = 01/08/2003 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20023650009  Analysis Date = 12/20/2002 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20023500166  Analysis Date = 12/20/2002 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20023500092  Analysis Date = 12/10/2002 
 Lab Value = 0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20023370026  Analysis Date = 12/10/2002 
 Lab Value = 0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20023370025  Analysis Date = 12/03/2002 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20023330096  Analysis Date = 12/10/2002 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20023360020  Analysis Date = 12/03/2002 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20023310020  Analysis Date = 11/15/2002 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20023040033  Analysis Date = 10/28/2002 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20022970050  Analysis Date = 10/28/2002 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20022970049  Analysis Date = 10/28/2002 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20022970048  Analysis Date = 10/28/2002 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20022960022  Analysis Date = 05/17/2002 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20021300002  Analysis Date = 05/02/2002 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20021140038  Analysis Date = 04/15/2002 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20021010015  Analysis Date = 04/02/2002 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20020850092  Analysis Date = 03/21/2002 
 Lab Value = 0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20020730105  Analysis Date = 03/08/2002 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20020600006  Analysis Date = 02/20/2002 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20020460047  Analysis Date = 02/14/2002 
 Lab Value = -0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20020320104  Analysis Date = 01/16/2002 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20020110002  Analysis Date = 01/04/2002 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20013600206  Analysis Date = 12/21/2001 
 Lab Value = -0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20013480007  Analysis Date = 11/15/2001 
 Lab Value = 0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20013110129  Analysis Date = 09/28/2005 
 RPT Level = 0.02  Analysis Date = 09/16/2005 
 RPT Level = 0.02  Analysis Date = 09/16/2005 
 RPT Level = 0.02  Analysis Date = 09/02/2005 
 RPT Level = 0.02  Analysis Date = 09/02/2005 
 RPT Level = 0.02  Analysis Date = 08/30/2005 
 RPT Level = 0.02  Analysis Date = 08/30/2005 
 RPT Level = 0.02  Analysis Date = 08/23/2005 
 RPT Level = 0.02  Analysis Date = 08/23/2005 
 RPT Level = 0.02  Analysis Date = 08/16/2005 
 RPT Level = 0.02  Analysis Date = 08/16/2005 
 RPT Level = 0.02  Analysis Date = 08/09/2005 
 RPT Level = 0.02  Analysis Date = 08/09/2005 
 RPT Level = 0.02  Analysis Date = 08/09/2005 
 RPT Level = 0.02  Analysis Date = 08/09/2005 
 RPT Level = 0.02  Analysis Date = 07/25/2005 
 RPT Level = 0.02  Analysis Date = 07/25/2005 
 RPT Level = 0.02  Analysis Date = 07/25/2005 
 RPT Level = 0.02  Analysis Date = 07/25/2005 
 RPT Level = 0.02  Analysis Date = 07/12/2005 
 RPT Level = 0.02  Analysis Date = 07/12/2005 
 RPT Level = 0.02  Analysis Date = 07/05/2005 
 RPT Level = 0.02  Analysis Date = 07/05/2005 
 RPT Level = 0.02  Analysis Date = 07/05/2005 
 RPT Level = 0.02  Analysis Date = 07/05/2005 
 RPT Level = 0.02  Analysis Date = 06/16/2005 
 RPT Level = 0.02  Analysis Date = 06/16/2005 
 RPT Level = 0.02  Analysis Date = 06/16/2005 
 RPT Level = 0.02  Analysis Date = 06/16/2005 
 RPT Level = 0.02  Analysis Date = 06/08/2005 
 RPT Level = 0.02  Analysis Date = 06/08/2005 
 RPT Level = 0.02  Analysis Date = 06/02/2005 
 RPT Level = 0.02  Analysis Date = 06/02/2005 
 RPT Level = 0.02  Analysis Date = 05/24/2005 
 RPT Level = 0.02  Analysis Date = 05/24/2005 
 RPT Level = 0.02  Analysis Date = 05/19/2005 
 RPT Level = 0.02  Analysis Date = 05/19/2005 
 RPT Level = 0.02  Analysis Date = 05/10/2005 
 RPT Level = 0.02  Analysis Date = 05/10/2005 
 RPT Level = 0.02  Analysis Date = 04/29/2005 
 RPT Level = 0.02  Analysis Date = 04/29/2005 
 RPT Level = 0.02  Analysis Date = 04/29/2005 
 RPT Level = 0.02  Analysis Date = 04/29/2005 
 RPT Level = 0.02  Analysis Date = 04/19/2005 
 RPT Level = 0.02  Analysis Date = 04/19/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 03/24/2005 
 RPT Level = 0.02  Analysis Date = 03/24/2005 
 RPT Level = 0.02  Analysis Date = 03/17/2005 
 RPT Level = 0.02  Analysis Date = 03/17/2005 
 RPT Level = 0.02  Analysis Date = 03/17/2005 
 RPT Level = 0.02  Analysis Date = 03/17/2005 
 RPT Level = 0.02  Analysis Date = 03/17/2005 
 RPT Level = 0.02  Analysis Date = 03/17/2005 
 RPT Level = 0.02  Analysis Date = 02/28/2005 
 RPT Level = 0.02  Analysis Date = 02/28/2005 
 RPT Level = 0.02  Analysis Date = 02/18/2005 
 RPT Level = 0.02  Analysis Date = 02/18/2005 
 RPT Level = 0.02  Analysis Date = 02/15/2005 
 RPT Level = 0.02  Analysis Date = 02/15/2005 
 RPT Level = 0.02  Analysis Date = 02/08/2005 
 RPT Level = 0.02  Analysis Date = 02/08/2005 
 RPT Level = 0.02  Analysis Date = 02/02/2005 
 RPT Level = 0.02  Analysis Date = 02/02/2005 
 RPT Level = 0.02  Analysis Date = 01/25/2005 
 RPT Level = 0.02  Analysis Date = 01/25/2005 
 RPT Level = 0.02  Analysis Date = 01/20/2005 
 RPT Level = 0.02  Analysis Date = 01/20/2005 
 RPT Level = 0.02  Analysis Date = 01/12/2005 
 RPT Level = 0.02  Analysis Date = 01/12/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 01/04/2005 
 RPT Level = 0.02  Analysis Date = 12/28/2004 
 RPT Level = 0.02  Analysis Date = 12/28/2004 
 RPT Level = 0.02  Analysis Date = 12/28/2004 
 RPT Level = 0.02  Analysis Date = 12/28/2004 
 RPT Level = 0.02  Analysis Date = 12/20/2004 
 RPT Level = 0.02  Analysis Date = 12/20/2004 
 RPT Level = 0.02  Analysis Date = 12/28/2004 
 RPT Level = 0.02  Analysis Date = 12/28/2004 
 RPT Level = 0.02  Analysis Date = 12/20/2004 
 RPT Level = 0.02  Analysis Date = 12/20/2004 
 RPT Level = 0.02  Analysis Date = 12/20/2004 
 RPT Level = 0.02  Analysis Date = 12/20/2004 
 RPT Level = 0.02  Analysis Date = 12/09/2004 
 RPT Level = 0.02  Analysis Date = 12/09/2004 
 RPT Level = 0.02  Analysis Date = 12/09/2004 
 RPT Level = 0.02  Analysis Date = 12/09/2004 
 RPT Level = 0.02  Analysis Date = 12/02/2004 
 RPT Level = 0.02  Analysis Date = 12/02/2004 
 RPT Level = 0.02  Analysis Date = 11/24/2004 
 RPT Level = 0.02  Analysis Date = 11/24/2004 
 RPT Level = 0.02  Analysis Date = 11/24/2004 
 RPT Level = 0.02  Analysis Date = 11/24/2004 
 RPT Level = 0.02  Analysis Date = 09/03/2004 
 RPT Level = 0.02  Analysis Date = 09/03/2004 
 RPT Level = 0.02  Analysis Date = 09/01/2004 
 RPT Level = 0.02  Analysis Date = 09/01/2004 
 RPT Level = 0.02  Analysis Date = 08/26/2004 
 RPT Level = 0.02  Analysis Date = 08/26/2004 
 RPT Level = 0.02  Analysis Date = 08/24/2004 
 RPT Level = 0.02  Analysis Date = 08/24/2004 
 RPT Level = 0.02  Analysis Date = 09/01/2004 
 RPT Level = 0.02  Analysis Date = 09/01/2004 
 RPT Level = 0.02  Analysis Date = 09/01/2004 
 RPT Level = 0.02  Analysis Date = 09/01/2004 
 RPT Level = 0.02  Analysis Date = 08/13/2004 
 RPT Level = 0.02  Analysis Date = 08/13/2004 
 RPT Level = 0.02  Analysis Date = 08/09/2004 
 RPT Level = 0.02  Analysis Date = 08/09/2004 
 RPT Level = 0.02  Analysis Date = 08/02/2004 
 RPT Level = 0.02  Analysis Date = 08/02/2004 
 RPT Level = 0.02  Analysis Date = 07/28/2004 
 RPT Level = 0.02  Analysis Date = 07/28/2004 
 RPT Level = 0.02  Analysis Date = 07/21/2004 
 RPT Level = 0.02  Analysis Date = 07/21/2004 
 RPT Level = 0.02  Analysis Date = 07/13/2004 
 RPT Level = 0.02  Analysis Date = 07/13/2004 
 RPT Level = 0.02  Analysis Date = 07/06/2004 
 RPT Level = 0.02  Analysis Date = 07/06/2004 
 RPT Level = 0.02  Analysis Date = 07/06/2004 
 RPT Level = 0.02  Analysis Date = 07/06/2004 
 RPT Level = 0.02  Analysis Date = 06/22/2004 
 RPT Level = 0.02  Analysis Date = 06/22/2004 
 RPT Level = 0.02  Analysis Date = 06/10/2004 
 RPT Level = 0.02  Analysis Date = 06/10/2004 
 RPT Level = 0.02  Analysis Date = 06/10/2004 
 RPT Level = 0.02  Analysis Date = 06/10/2004 
 RPT Level = 0.02  Analysis Date = 06/03/2004 
 RPT Level = 0.02  Analysis Date = 06/03/2004 
 RPT Level = 0.02  Analysis Date = 05/26/2004 
 RPT Level = 0.02  Analysis Date = 05/26/2004 
 RPT Level = 0.02  Analysis Date = 05/07/2004 
 RPT Level = 0.02  Analysis Date = 05/07/2004 
 RPT Level = 0.02  Analysis Date = 05/07/2004 
 RPT Level = 0.02  Analysis Date = 05/07/2004 
 RPT Level = 0.02  Analysis Date = 04/28/2004 
 RPT Level = 0.02  Analysis Date = 04/28/2004 
 RPT Level = 0.02  Analysis Date = 04/21/2004 
 RPT Level = 0.02  Analysis Date = 04/21/2004 
 RPT Level = 0.02  Analysis Date = 04/14/2004 
 RPT Level = 0.02  Analysis Date = 04/14/2004 
 RPT Level = 0.02  Analysis Date = 04/07/2004 
 RPT Level = 0.02  Analysis Date = 04/07/2004 
 RPT Level = 0.02  Analysis Date = 04/01/2004 
 RPT Level = 0.02  Analysis Date = 04/01/2004 
 RPT Level = 0.02  Analysis Date = 04/01/2004 
 RPT Level = 0.02  Analysis Date = 04/01/2004 
 RPT Level = 0.02  Analysis Date = 03/24/2004 
 RPT Level = 0.02  Analysis Date = 03/24/2004 
 RPT Level = 0.02  Analysis Date = 03/24/2004 
 RPT Level = 0.02  Analysis Date = 03/24/2004 
 RPT Level = 0.02  Analysis Date = 03/24/2004 
 RPT Level = 0.02  Analysis Date = 03/24/2004 
 RPT Level = 0.02  Analysis Date = 03/16/2004 
 RPT Level = 0.02  Analysis Date = 03/16/2004 
 RPT Level = 0.02  Analysis Date = 03/16/2004 
 RPT Level = 0.02  Analysis Date = 03/16/2004 
 RPT Level = 0.02  Analysis Date = 03/16/2004 
 RPT Level = 0.02  Analysis Date = 03/16/2004 
 RPT Level = 0.02  Analysis Date = 03/16/2004 
 RPT Level = 0.02  Analysis Date = 03/16/2004 
 RPT Level = 0.02  Analysis Date = 03/03/2004 
 RPT Level = 0.02  Analysis Date = 03/03/2004 
 RPT Level = 0.02  Analysis Date = 03/03/2004 
 RPT Level = 0.02  Analysis Date = 03/03/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/23/2004 
 RPT Level = 0.02  Analysis Date = 02/12/2004 
 RPT Level = 0.02  Analysis Date = 02/12/2004 
 RPT Level = 0.02  Analysis Date = 02/12/2004 
 RPT Level = 0.02  Analysis Date = 02/12/2004 
 RPT Level = 0.02  Analysis Date = 02/12/2004 
 RPT Level = 0.02  Analysis Date = 02/12/2004 
 RPT Level = 0.02  Analysis Date = 02/03/2004 
 RPT Level = 0.02  Analysis Date = 02/03/2004 
 RPT Level = 0.02  Analysis Date = 01/30/2004 
 RPT Level = 0.02  Analysis Date = 01/30/2004 
 RPT Level = 0.02  Analysis Date = 01/30/2004 
 RPT Level = 0.02  Analysis Date = 01/30/2004 
 RPT Level = 0.02  Analysis Date = 01/22/2004 
 RPT Level = 0.02  Analysis Date = 01/22/2004 
 RPT Level = 0.02  Analysis Date = 01/21/2004 
 RPT Level = 0.02  Analysis Date = 01/21/2004 
 RPT Level = 0.02  Analysis Date = 01/21/2004 
 RPT Level = 0.02  Analysis Date = 01/21/2004 
 RPT Level = 0.02  Analysis Date = 01/14/2004 
 RPT Level = 0.02  Analysis Date = 01/14/2004 
 RPT Level = 0.02  Analysis Date = 01/14/2004 
 RPT Level = 0.02  Analysis Date = 01/14/2004 
 RPT Level = 0.02  Analysis Date = 01/14/2004 
 RPT Level = 0.02  Analysis Date = 01/14/2004 
 RPT Level = 0.02  Analysis Date = 09/29/2003 
 RPT Level = 0.03  Analysis Date = 09/29/2003 
 RPT Level = 0.03  Analysis Date = 09/19/2003 
 RPT Level = 0.03  Analysis Date = 09/19/2003 
 RPT Level = 0.03  Analysis Date = 09/12/2003 
 RPT Level = 0.03  Analysis Date = 09/12/2003 
 RPT Level = 0.03  Analysis Date = 09/12/2003 
 RPT Level = 0.03  Analysis Date = 09/12/2003 
 RPT Level = 0.03  Analysis Date = 08/28/2003 
 RPT Level = 0.03  Analysis Date = 08/28/2003 
 RPT Level = 0.03  Analysis Date = 08/22/2003 
 RPT Level = 0.03  Analysis Date = 08/22/2003 
 RPT Level = 0.03  Analysis Date = 08/20/2003 
 RPT Level = 0.03  Analysis Date = 08/20/2003 
 RPT Level = 0.03  Analysis Date = 08/15/2003 
 RPT Level = 0.03  Analysis Date = 08/15/2003 
 RPT Level = 0.03  Analysis Date = 08/04/2003 
 RPT Level = 0.03  Analysis Date = 08/04/2003 
 RPT Level = 0.03  Analysis Date = 07/25/2003 
 RPT Level = 0.03  Analysis Date = 07/25/2003 
 RPT Level = 0.03  Analysis Date = 07/18/2003 
 RPT Level = 0.03  Analysis Date = 07/18/2003 
 RPT Level = 0.03  Analysis Date = 07/18/2003 
 RPT Level = 0.03  Analysis Date = 07/18/2003 
 RPT Level = 0.03  Analysis Date = 07/08/2003 
 RPT Level = 0.03  Analysis Date = 07/08/2003 
 RPT Level = 0.03  Analysis Date = 07/08/2003 
 RPT Level = 0.03  Analysis Date = 07/08/2003 
 RPT Level = 0.03  Analysis Date = 06/26/2003 
 RPT Level = 0.03  Analysis Date = 06/26/2003 
 RPT Level = 0.03  Analysis Date = 06/17/2003 
 RPT Level = 0.03  Analysis Date = 06/17/2003 
 RPT Level = 0.03  Analysis Date = 06/13/2003 
 RPT Level = 0.03  Analysis Date = 06/13/2003 
 RPT Level = 0.03  Analysis Date = 05/29/2003 
 RPT Level = 0.03  Analysis Date = 05/29/2003 
 RPT Level = 0.03  Analysis Date = 05/29/2003 
 RPT Level = 0.03  Analysis Date = 05/29/2003 
 RPT Level = 0.03  Analysis Date = 05/28/2003 
 RPT Level = 0.03  Analysis Date = 05/28/2003 
 RPT Level = 0.03  Analysis Date = 05/15/2003 
 RPT Level = 0.03  Analysis Date = 05/15/2003 
 RPT Level = 0.03  Analysis Date = 05/09/2003 
 RPT Level = 0.03  Analysis Date = 05/09/2003 
 RPT Level = 0.03  Analysis Date = 05/05/2003 
 RPT Level = 0.03  Analysis Date = 05/05/2003 
 RPT Level = 0.03  Analysis Date = 05/05/2003 
 RPT Level = 0.03  Analysis Date = 05/05/2003 
 RPT Level = 0.03  Analysis Date = 04/10/2003 
 RPT Level = 0.03  Analysis Date = 04/10/2003 
 RPT Level = 0.03  Analysis Date = 04/03/2003 
 RPT Level = 0.03  Analysis Date = 04/03/2003 
 RPT Level = 0.03  Analysis Date = 04/03/2003 
 RPT Level = 0.03  Analysis Date = 04/03/2003 
 RPT Level = 0.03  Analysis Date = 04/03/2003 
 RPT Level = 0.03  Analysis Date = 04/03/2003 
 RPT Level = 0.03  Analysis Date = 03/24/2003 
 RPT Level = 0.03  Analysis Date = 03/24/2003 
 RPT Level = 0.03  Analysis Date = 03/24/2003 
 RPT Level = 0.03  Analysis Date = 03/24/2003 
 RPT Level = 0.03  Analysis Date = 03/04/2003 
 RPT Level = 0.03  Analysis Date = 03/04/2003 
 RPT Level = 0.03  Analysis Date = 02/27/2003 
 RPT Level = 0.03  Analysis Date = 02/27/2003 
 RPT Level = 0.03  Analysis Date = 02/12/2003 
 RPT Level = 0.03  Analysis Date = 02/12/2003 
 RPT Level = 0.03  Analysis Date = 02/07/2003 
 RPT Level = 0.03  Analysis Date = 02/07/2003 
 RPT Level = 0.03  Analysis Date = 02/07/2003 
 RPT Level = 0.03  Analysis Date = 02/07/2003 
 RPT Level = 0.03  Analysis Date = 02/07/2003 
 RPT Level = 0.03  Analysis Date = 02/07/2003 
 RPT Level = 0.03  Analysis Date = 01/22/2003 
 RPT Level = 0.03  Analysis Date = 01/22/2003 
 RPT Level = 0.03  Analysis Date = 01/22/2003 
 RPT Level = 0.03  Analysis Date = 01/22/2003 
 RPT Level = 0.03  Analysis Date = 01/08/2003 
 RPT Level = 0.03  Analysis Date = 01/08/2003 
 RPT Level = 0.03  Analysis Date = 01/08/2003 
 RPT Level = 0.03  Analysis Date = 01/08/2003 
 RPT Level = 0.03  Analysis Date = 12/20/2002 
 RPT Level = 0.03  Analysis Date = 12/20/2002 
 RPT Level = 0.03  Analysis Date = 12/20/2002 
 RPT Level = 0.03  Analysis Date = 12/20/2002 
 RPT Level = 0.03  Analysis Date = 12/10/2002 
 RPT Level = 0.03  Analysis Date = 12/10/2002 
 RPT Level = 0.03  Analysis Date = 12/10/2002 
 RPT Level = 0.03  Analysis Date = 12/10/2002 
 RPT Level = 0.03  Analysis Date = 12/03/2002 
 RPT Level = 0.03  Analysis Date = 12/03/2002 
 RPT Level = 0.03  Analysis Date = 12/10/2002 
 RPT Level = 0.03  Analysis Date = 12/10/2002 
 RPT Level = 0.03  Analysis Date = 12/03/2002 
 RPT Level = 0.03  Analysis Date = 12/03/2002 
 RPT Level = 0.03  Analysis Date = 11/15/2002 
 RPT Level = 0.03  Analysis Date = 11/15/2002 
 RPT Level = 0.03  Analysis Date = 10/28/2002 
 RPT Level = 0.03  Analysis Date = 10/28/2002 
 RPT Level = 0.03  Analysis Date = 10/28/2002 
 RPT Level = 0.03  Analysis Date = 10/28/2002 
 RPT Level = 0.03  Analysis Date = 10/28/2002 
 RPT Level = 0.03  Analysis Date = 10/28/2002 
 RPT Level = 0.03  Analysis Date = 10/28/2002 
 RPT Level = 0.03  Analysis Date = 10/28/2002 
 RPT Level = 0.03  Analysis Date = 05/17/2002 
 RPT Level = 0.03  Analysis Date = 05/17/2002 
 RPT Level = 0.03  Analysis Date = 05/02/2002 
 RPT Level = 0.03  Analysis Date = 05/02/2002 
 RPT Level = 0.03  Analysis Date = 04/15/2002 
 RPT Level = 0.03  Analysis Date = 04/15/2002 
 RPT Level = 0.03  Analysis Date = 04/02/2002 
 RPT Level = 0.03  Analysis Date = 04/02/2002 
 RPT Level = 0.03  Analysis Date = 03/21/2002 
 RPT Level = 0.03  Analysis Date = 03/21/2002 
 RPT Level = 0.03  Analysis Date = 03/08/2002 
 RPT Level = 0.03  Analysis Date = 03/08/2002 
 RPT Level = 0.03  Analysis Date = 02/20/2002 
 RPT Level = 0.03  Analysis Date = 02/20/2002 
 RPT Level = 0.03  Analysis Date = 02/14/2002 
 RPT Level = 0.03  Analysis Date = 02/14/2002 
 RPT Level = 0.03  Analysis Date = 01/16/2002 
 RPT Level = 0.03  Analysis Date = 01/16/2002 
 RPT Level = 0.03  Analysis Date = 01/04/2002 
 RPT Level = 0.03  Analysis Date = 01/04/2002 
 RPT Level = 0.03  Analysis Date = 12/21/2001 
 RPT Level = 0.03  Analysis Date = 12/21/2001 
 RPT Level = 0.03  Analysis Date = 11/15/2001 
 RPT Level = 0.03  Y = 0
The SGPlot Procedure

False Positive Rate for Phosphorus (as P), FIL, EPA

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Phosphorus (as P), FIL, EPA 00666KJ004 2002 12 0 0%
    2003 52 0 0%
    2004 51 1 2%
    2005 50 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Phosphorus (as P), UNF, ASF, Kjeldahl -
Blind Blank Results
Lab: NWQL, PCode: 00665, MCode: KJ009
Analysis dates: 11/13/01 through 09/30/16
Open Data Set

 Analysis Date = 09/30/2016 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20162640178  Analysis Date = 09/23/2016 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20162580021  Analysis Date = 09/19/2016 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20162520021  Analysis Date = 09/14/2016 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20162440129  Analysis Date = 09/01/2016 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20162360202  Analysis Date = 08/18/2016 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20162290136  Analysis Date = 08/12/2016 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20162230012  Analysis Date = 08/09/2016 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20162150194  Analysis Date = 07/29/2016 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20162080237  Analysis Date = 07/25/2016 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20162010261  Analysis Date = 07/15/2016 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20161940115  Analysis Date = 07/12/2016 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20161870038  Analysis Date = 07/05/2016 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20161800089  Analysis Date = 06/27/2016 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20161740080  Analysis Date = 06/20/2016 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20161660157  Analysis Date = 06/14/2016 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20161590161  Analysis Date = 06/09/2016 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20161520029  Analysis Date = 06/09/2016 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20161480203  Analysis Date = 05/17/2016 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20161270015  Analysis Date = 05/11/2016 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20161230047  Analysis Date = 05/03/2016 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20161160095  Analysis Date = 04/25/2016 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20161100131  Analysis Date = 04/18/2016 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20161020031  Analysis Date = 04/07/2016 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20160950050  Analysis Date = 03/31/2016 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20160880041  Analysis Date = 03/25/2016 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20160810071  Analysis Date = 03/17/2016 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20160740016  Analysis Date = 03/09/2016 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20160670017  Analysis Date = 03/03/2016 
 Lab Value = 0.021 
 RPT Level = 0.02 
 Lab Sample ID = 20160600020  Analysis Date = 02/23/2016 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20160530019  Analysis Date = 02/18/2016 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20160470018  Analysis Date = 02/16/2016 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20160400086  Analysis Date = 02/03/2016 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20160320014  Analysis Date = 01/28/2016 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20160250029  Analysis Date = 01/22/2016 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20160190020  Analysis Date = 01/13/2016 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20160110012  Analysis Date = 01/07/2016 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20160050037  Analysis Date = 01/05/2016 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20153630051  Analysis Date = 12/23/2015 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20153550014  Analysis Date = 12/21/2015 
 Lab Value = 0.018 
 RPT Level = 0.02 
 Lab Sample ID = 20153500167  Analysis Date = 12/14/2015 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20153420008  Analysis Date = 12/04/2015 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20153340010  Analysis Date = 12/02/2015 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20153270005  Analysis Date = 11/24/2015 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20153200028  Analysis Date = 11/17/2015 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20153140001  Analysis Date = 11/06/2015 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20153060024  Analysis Date = 11/02/2015 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20152990071  Analysis Date = 10/26/2015 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20152920041  Analysis Date = 10/20/2015 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20152860162  Analysis Date = 10/14/2015 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20152780015  Analysis Date = 10/07/2015 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20152710074  Analysis Date = 09/30/2015 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20152640031  Analysis Date = 09/28/2015 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20152590168  Analysis Date = 09/22/2015 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20152510015  Analysis Date = 09/17/2015 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20152430087  Analysis Date = 09/08/2015 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20152360161  Analysis Date = 08/31/2015 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20152330023  Analysis Date = 08/19/2015 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20152230123  Analysis Date = 08/12/2015 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20152150081  Analysis Date = 08/03/2015 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20152080071  Analysis Date = 07/28/2015 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20152010054  Analysis Date = 07/22/2015 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20151940026  Analysis Date = 07/09/2015 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20151870013  Analysis Date = 07/09/2015 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20151800056  Analysis Date = 06/29/2015 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20151730017  Analysis Date = 06/29/2015 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20151660033  Analysis Date = 06/22/2015 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20151620206  Analysis Date = 06/12/2015 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20151530197  Analysis Date = 06/05/2015 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20151460122  Analysis Date = 06/01/2015 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20151390199  Analysis Date = 05/21/2015 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20151310072  Analysis Date = 05/14/2015 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20151240056  Analysis Date = 05/05/2015 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20151180075  Analysis Date = 04/29/2015 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20151140034  Analysis Date = 04/23/2015 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20151050043  Analysis Date = 04/15/2015 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20150970077  Analysis Date = 04/02/2015 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20150900047  Analysis Date = 03/31/2015 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20150850046  Analysis Date = 03/24/2015 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20150770030  Analysis Date = 03/12/2015 
 Lab Value = 0.021 
 RPT Level = 0.02 
 Lab Sample ID = 20150690110  Analysis Date = 03/04/2015 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20150610108  Analysis Date = 02/26/2015 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20150540035  Analysis Date = 02/23/2015 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20150490026  Analysis Date = 02/12/2015 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20150400036  Analysis Date = 02/06/2015 
 Lab Value = 0.018 
 RPT Level = 0.02 
 Lab Sample ID = 20150330028  Analysis Date = 01/29/2015 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20150260018  Analysis Date = 01/27/2015 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20150200028  Analysis Date = 01/22/2015 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20150120025  Analysis Date = 01/08/2015 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20150050018  Analysis Date = 01/08/2015 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20143630011  Analysis Date = 01/08/2015 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20143560053  Analysis Date = 01/05/2015 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20143490027  Analysis Date = 12/15/2014 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20143420027  Analysis Date = 12/09/2014 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20143360081  Analysis Date = 12/08/2014 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20143300045  Analysis Date = 12/02/2014 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20143230052  Analysis Date = 11/24/2014 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20143160021  Analysis Date = 11/18/2014 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20143080076  Analysis Date = 11/07/2014 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20143010069  Analysis Date = 11/07/2014 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20142950130  Analysis Date = 10/31/2014 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20142880087  Analysis Date = 10/24/2014 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20142790035  Analysis Date = 10/23/2014 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20142720121  Analysis Date = 10/22/2014 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20142650111  Analysis Date = 10/14/2014 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20142590052  Analysis Date = 10/08/2014 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20142520006  Analysis Date = 10/06/2014 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20142470054  Analysis Date = 09/15/2014 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20142230083  Analysis Date = 08/27/2014 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20142160070  Analysis Date = 08/22/2014 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20142090218  Analysis Date = 08/06/2014 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20142030078  Analysis Date = 08/04/2014 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20141960043  Analysis Date = 07/29/2014 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20141890090  Analysis Date = 07/25/2014 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20141820108  Analysis Date = 07/16/2014 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20141750150  Analysis Date = 07/11/2014 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20141680086  Analysis Date = 07/03/2014 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20141620051  Analysis Date = 06/24/2014 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20141550065  Analysis Date = 06/18/2014 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20141470150  Analysis Date = 06/09/2014 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20141400016  Analysis Date = 05/28/2014 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20141340004  Analysis Date = 05/16/2014 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20141250088  Analysis Date = 05/02/2014 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20141190018  Analysis Date = 04/25/2014 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20141130029  Analysis Date = 04/18/2014 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20141050011  Analysis Date = 04/09/2014 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20140970031  Analysis Date = 04/03/2014 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20140900029  Analysis Date = 03/28/2014 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20140840094  Analysis Date = 03/21/2014 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20140760030  Analysis Date = 03/17/2014 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20140690028  Analysis Date = 03/13/2014 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20140630125  Analysis Date = 03/10/2014 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20140550053  Analysis Date = 03/05/2014 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20140490016  Analysis Date = 02/19/2014 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20140410010  Analysis Date = 02/06/2014 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20140340025  Analysis Date = 01/30/2014 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20140270198  Analysis Date = 01/24/2014 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20140210048  Analysis Date = 01/16/2014 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20140130052  Analysis Date = 01/13/2014 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20140070068  Analysis Date = 12/30/2013 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20133580057  Analysis Date = 12/19/2013 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20133500079  Analysis Date = 12/16/2013 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20133430112  Analysis Date = 12/10/2013 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20133360023  Analysis Date = 12/05/2013 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20133300014  Analysis Date = 11/26/2013 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20133230005  Analysis Date = 11/21/2013 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20133170106  Analysis Date = 11/18/2013 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20133090099  Analysis Date = 11/08/2013 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20133030024  Analysis Date = 10/31/2013 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20132970026  Analysis Date = 10/29/2013 
 Lab Value = 0.02 
 RPT Level = 0.02 
 Lab Sample ID = 20132730139  Analysis Date = 10/18/2013 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20132660105  Analysis Date = 09/23/2013 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20132600014  Analysis Date = 09/18/2013 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20132530114  Analysis Date = 09/09/2013 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20132410016  Analysis Date = 08/30/2013 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20132390009  Analysis Date = 08/28/2013 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20132350026  Analysis Date = 08/20/2013 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20132270020  Analysis Date = 08/14/2013 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20132180211  Analysis Date = 08/08/2013 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20132120021  Analysis Date = 07/26/2013 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20132040023  Analysis Date = 07/17/2013 
 Lab Value = 0.022 
 RPT Level = 0.02 
 Lab Sample ID = 20131970026  Analysis Date = 07/11/2013 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20131900089  Analysis Date = 07/08/2013 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20131830080  Analysis Date = 06/28/2013 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20131770012  Analysis Date = 06/21/2013 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20131700039  Analysis Date = 06/19/2013 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20131640007  Analysis Date = 06/12/2013 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20131550030  Analysis Date = 06/10/2013 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20131500023  Analysis Date = 06/03/2013 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20131430201  Analysis Date = 05/22/2013 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20131350119  Analysis Date = 05/14/2013 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20131270023  Analysis Date = 05/03/2013 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20131220013  Analysis Date = 04/29/2013 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20131150033  Analysis Date = 04/24/2013 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20131120124  Analysis Date = 04/24/2013 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20131090031  Analysis Date = 04/04/2013 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20130930088  Analysis Date = 03/29/2013 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20130840059  Analysis Date = 03/26/2013 
 Lab Value = 0.02 
 RPT Level = 0.02 
 Lab Sample ID = 20130770159  Analysis Date = 03/15/2013 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20130700012  Analysis Date = 03/11/2013 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20130630123  Analysis Date = 03/06/2013 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20130570008  Analysis Date = 03/05/2013 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20130520007  Analysis Date = 09/21/2005 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20052590035  Analysis Date = 09/12/2005 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20052520006  Analysis Date = 09/02/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20052430006  Analysis Date = 08/29/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20052370002  Analysis Date = 08/19/2005 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20052300009  Analysis Date = 08/10/2005 
 Lab Value = 0.02 
 RPT Level = 0.02 
 Lab Sample ID = 20052210012  Analysis Date = 08/05/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20052160007  Analysis Date = 08/05/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20052160005  Analysis Date = 07/21/2005 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20052010007  Analysis Date = 07/18/2005 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20051940015  Analysis Date = 07/12/2005 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20051880018  Analysis Date = 07/05/2005 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20051800189  Analysis Date = 06/24/2005 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20051740019  Analysis Date = 06/20/2005 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20051660174  Analysis Date = 06/10/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20051590025  Analysis Date = 06/06/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20051530021  Analysis Date = 05/25/2005 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20051440043  Analysis Date = 05/19/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20051380014  Analysis Date = 05/17/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20051320029  Analysis Date = 05/09/2005 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20051250003  Analysis Date = 04/28/2005 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20051170012  Analysis Date = 04/25/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20051110007  Analysis Date = 04/14/2005 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20051020018  Analysis Date = 04/07/2005 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20050950044  Analysis Date = 04/06/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20050880116  Analysis Date = 03/31/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20050840096  Analysis Date = 03/18/2005 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20050750004  Analysis Date = 03/16/2005 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20050700007  Analysis Date = 03/16/2005 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20050700004  Analysis Date = 03/10/2005 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20050670011  Analysis Date = 02/28/2005 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20050550024  Analysis Date = 02/18/2005 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20050480005  Analysis Date = 02/15/2005 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20050410004  Analysis Date = 02/04/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20050340020  Analysis Date = 02/01/2005 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20050260024  Analysis Date = 01/21/2005 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20050200048  Analysis Date = 01/18/2005 
 Lab Value = -0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20050130091  Analysis Date = 01/10/2005 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20050070016  Analysis Date = 01/06/2005 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20043650002  Analysis Date = 12/28/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20043580037  Analysis Date = 12/28/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20043580035  Analysis Date = 12/21/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20043520023  Analysis Date = 12/20/2004 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20043510018  Analysis Date = 12/13/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20043450069  Analysis Date = 12/13/2004 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20043440147  Analysis Date = 12/09/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20043380005  Analysis Date = 12/09/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20043380002  Analysis Date = 12/02/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20043310059  Analysis Date = 11/29/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20043280048  Analysis Date = 11/23/2004 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20043240012  Analysis Date = 09/02/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20042450138  Analysis Date = 08/31/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20042400089  Analysis Date = 08/26/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20042370105  Analysis Date = 08/23/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20042330206  Analysis Date = 08/24/2004 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20042320136  Analysis Date = 08/24/2004 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20042320138  Analysis Date = 08/12/2004 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20042240114  Analysis Date = 08/05/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20042170123  Analysis Date = 08/02/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20042110015  Analysis Date = 07/23/2004 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20042040039  Analysis Date = 07/20/2004 
 Lab Value = -0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20041960050  Analysis Date = 07/09/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20041900062  Analysis Date = 07/07/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20041820035  Analysis Date = 06/25/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20041750057  Analysis Date = 06/22/2004 
 Lab Value = -0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20041700080  Analysis Date = 06/10/2004 
 Lab Value = 0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20041610055  Analysis Date = 06/04/2004 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20041550019  Analysis Date = 06/01/2004 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20041470132  Analysis Date = 05/21/2004 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20041400016  Analysis Date = 05/10/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20041260099  Analysis Date = 05/03/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20041200046  Analysis Date = 04/27/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20041130016  Analysis Date = 04/19/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20041050022  Analysis Date = 04/08/2004 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20040980007  Analysis Date = 04/07/2004 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20040930009  Analysis Date = 04/01/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20040910012  Analysis Date = 03/30/2004 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20040850021  Analysis Date = 03/24/2004 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20040830056  Analysis Date = 03/22/2004 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20040790023  Analysis Date = 03/18/2004 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20040760010  Analysis Date = 03/15/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20040720029  Analysis Date = 03/15/2004 
 Lab Value = -0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20040710005  Analysis Date = 03/12/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20040680093  Analysis Date = 03/08/2004 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20040650001  Analysis Date = 03/01/2004 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20040580032  Analysis Date = 02/26/2004 
 Lab Value = 0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20040550018  Analysis Date = 02/24/2004 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040510134  Analysis Date = 02/19/2004 
 Lab Value = -0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20040490025  Analysis Date = 02/19/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20040440035  Analysis Date = 02/12/2004 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20040420001  Analysis Date = 02/09/2004 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20040370017  Analysis Date = 02/09/2004 
 Lab Value = -0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20040340024  Analysis Date = 02/09/2004 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20040300012  Analysis Date = 01/30/2004 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20040270036  Analysis Date = 01/26/2004 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20040230030  Analysis Date = 01/22/2004 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20040210154  Analysis Date = 01/21/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20040200023  Analysis Date = 01/20/2004 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20040150075  Analysis Date = 01/16/2004 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20040090020  Analysis Date = 01/16/2004 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20040070032  Analysis Date = 01/16/2004 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20040050016  Analysis Date = 09/25/2003 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20032660009  Analysis Date = 09/18/2003 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20032600107  Analysis Date = 09/11/2003 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20032520179  Analysis Date = 09/04/2003 
 Lab Value = 0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20032450195  Analysis Date = 08/27/2003 
 Lab Value = -0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20032380029  Analysis Date = 08/21/2003 
 Lab Value = 0 
 RPT Level = 0.02 
 Lab Sample ID = 20032310028  Analysis Date = 08/14/2003 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20032250256  Analysis Date = 08/08/2003 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20032180019  Analysis Date = 08/04/2003 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20032100004  Analysis Date = 07/24/2003 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20032040043  Analysis Date = 07/17/2003 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20031960025  Analysis Date = 07/10/2003 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20031900098  Analysis Date = 07/03/2003 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20031820037  Analysis Date = 07/02/2003 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20031770041  Analysis Date = 06/23/2003 
 Lab Value = 0.017 
 RPT Level = 0.02 
 Lab Sample ID = 20031700013  Analysis Date = 06/17/2003 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20031630053  Analysis Date = 06/10/2003 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20031600109  Analysis Date = 05/29/2003 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20031480059  Analysis Date = 05/27/2003 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20031430019  Analysis Date = 05/22/2003 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20031400115  Analysis Date = 05/14/2003 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20031290084  Analysis Date = 05/07/2003 
 Lab Value = 0.021 
 RPT Level = 0.02 
 Lab Sample ID = 20031220070  Analysis Date = 05/01/2003 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20031200043  Analysis Date = 04/22/2003 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20031080208  Analysis Date = 04/08/2003 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20030970018  Analysis Date = 04/03/2003 
 Lab Value = 0.015 
 RPT Level = 0.02 
 Lab Sample ID = 20030920027  Analysis Date = 04/02/2003 
 Lab Value = 0.018 
 RPT Level = 0.02 
 Lab Sample ID = 20030900015  Analysis Date = 04/01/2003 
 Lab Value = 0.02 
 RPT Level = 0.02 
 Lab Sample ID = 20030860023  Analysis Date = 03/17/2003 
 Lab Value = 0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20030710021  Analysis Date = 03/13/2003 
 Lab Value = 0.011 
 RPT Level = 0.02 
 Lab Sample ID = 20030660148  Analysis Date = 03/04/2003 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20030590040  Analysis Date = 02/27/2003 
 Lab Value = -0.003 
 RPT Level = 0.02 
 Lab Sample ID = 20030570061  Analysis Date = 02/11/2003 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20030410034  Analysis Date = 02/06/2003 
 Lab Value = 0.014 
 RPT Level = 0.02 
 Lab Sample ID = 20030350008  Analysis Date = 02/03/2003 
 Lab Value = 0.01 
 RPT Level = 0.02 
 Lab Sample ID = 20030310028  Analysis Date = 01/31/2003 
 Lab Value = -0.001 
 RPT Level = 0.02 
 Lab Sample ID = 20030300004  Analysis Date = 01/24/2003 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20030150009  Analysis Date = 01/15/2003 
 Lab Value = -0.006 
 RPT Level = 0.02 
 Lab Sample ID = 20030140019  Analysis Date = 01/06/2003 
 Lab Value = 0.019 
 RPT Level = 0.02 
 Lab Sample ID = 20030020002  Analysis Date = 01/06/2003 
 Lab Value = 0.007 
 RPT Level = 0.02 
 Lab Sample ID = 20023650009  Analysis Date = 12/19/2002 
 Lab Value = 0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20023500166  Analysis Date = 12/18/2002 
 Lab Value = 0.03 
 RPT Level = 0.02 
 Lab Sample ID = 20023500092  Analysis Date = 12/05/2002 
 Lab Value = -0.004 
 RPT Level = 0.02 
 Lab Sample ID = 20023370026  Analysis Date = 12/05/2002 
 Lab Value = 0.016 
 RPT Level = 0.02 
 Lab Sample ID = 20023370025  Analysis Date = 12/03/2002 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20023330096  Analysis Date = 12/05/2002 
 Lab Value = 0.009 
 RPT Level = 0.02 
 Lab Sample ID = 20023360020  Analysis Date = 12/03/2002 
 Lab Value = -0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20023310020  Analysis Date = 11/01/2002 
 Lab Value = 0.005 
 RPT Level = 0.02 
 Lab Sample ID = 20023040033  Analysis Date = 10/25/2002 
 Lab Value = 0.013 
 RPT Level = 0.02 
 Lab Sample ID = 20022970050  Analysis Date = 10/25/2002 
 Lab Value = 0.008 
 RPT Level = 0.02 
 Lab Sample ID = 20022970049  Analysis Date = 10/25/2002 
 Lab Value = 0.012 
 RPT Level = 0.02 
 Lab Sample ID = 20022970048  Analysis Date = 10/24/2002 
 Lab Value = 0.002 
 RPT Level = 0.02 
 Lab Sample ID = 20022960022  Analysis Date = 09/06/2002 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20022470017  Analysis Date = 09/06/2002 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20022460136  Analysis Date = 08/26/2002 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20022340198  Analysis Date = 08/19/2002 
 Lab Value = -0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20022280007  Analysis Date = 08/13/2002 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20022210008  Analysis Date = 08/06/2002 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20022170110  Analysis Date = 08/06/2002 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20022170109  Analysis Date = 07/19/2002 
 Lab Value = 0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20021970115  Analysis Date = 07/17/2002 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20021960233  Analysis Date = 07/03/2002 
 Lab Value = 0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20021830021  Analysis Date = 07/01/2002 
 Lab Value = 0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20021790005  Analysis Date = 06/20/2002 
 Lab Value = 0.019 
 RPT Level = 0.03 
 Lab Sample ID = 20021690012  Analysis Date = 06/17/2002 
 Lab Value = 0.017 
 RPT Level = 0.03 
 Lab Sample ID = 20021650006  Analysis Date = 06/05/2002 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20021550018  Analysis Date = 06/04/2002 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20021510056  Analysis Date = 05/24/2002 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20021420159  Analysis Date = 05/16/2002 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20021330223  Analysis Date = 05/13/2002 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20021300001  Analysis Date = 05/08/2002 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20021210086  Analysis Date = 04/25/2002 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20021140037  Analysis Date = 04/25/2002 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20021140036  Analysis Date = 04/12/2002 
 Lab Value = 0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20021010016  Analysis Date = 04/04/2002 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20020930112  Analysis Date = 03/28/2002 
 Lab Value = -0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20020850091  Analysis Date = 03/26/2002 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20020810192  Analysis Date = 03/19/2002 
 Lab Value = 0.015 
 RPT Level = 0.03 
 Lab Sample ID = 20020730104  Analysis Date = 03/11/2002 
 Lab Value = 0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20020670021  Analysis Date = 03/04/2002 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20020600005  Analysis Date = 02/27/2002 
 Lab Value = 0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20020570018  Analysis Date = 02/20/2002 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20020460048  Analysis Date = 02/06/2002 
 Lab Value = -0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20020360005  Analysis Date = 02/06/2002 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20020320102  Analysis Date = 01/24/2002 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20020220079  Analysis Date = 01/14/2002 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20020110003  Analysis Date = 01/04/2002 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20020020005  Analysis Date = 01/03/2002 
 Lab Value = 0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20013600207  Analysis Date = 12/20/2001 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20013520042  Analysis Date = 12/19/2001 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20013480008  Analysis Date = 12/07/2001 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20013390010  Analysis Date = 11/13/2001 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20013110130  Analysis Date = 09/30/2016 
 RPT Level = 0.02  Analysis Date = 09/23/2016 
 RPT Level = 0.02  Analysis Date = 09/23/2016 
 RPT Level = 0.02  Analysis Date = 09/19/2016 
 RPT Level = 0.02  Analysis Date = 09/19/2016 
 RPT Level = 0.02  Analysis Date = 09/14/2016 
 RPT Level = 0.02  Analysis Date = 09/14/2016 
 RPT Level = 0.02  Analysis Date = 09/01/2016 
 RPT Level = 0.02  Analysis Date = 09/01/2016 
 RPT Level = 0.02  Analysis Date = 08/18/2016 
 RPT Level = 0.02  Analysis Date = 08/18/2016 
 RPT Level = 0.02  Analysis Date = 08/12/2016 
 RPT Level = 0.02  Analysis Date = 08/12/2016 
 RPT Level = 0.02  Analysis Date = 08/09/2016 
 RPT Level = 0.02  Analysis Date = 08/09/2016 
 RPT Level = 0.02  Analysis Date = 07/29/2016 
 RPT Level = 0.02  Analysis Date = 07/29/2016 
 RPT Level = 0.02  Analysis Date = 07/25/2016 
 RPT Level = 0.02  Analysis Date = 07/25/2016 
 RPT Level = 0.02  Analysis Date = 07/15/2016 
 RPT Level = 0.02  Analysis Date = 07/15/2016 
 RPT Level = 0.02  Analysis Date = 07/12/2016 
 RPT Level = 0.02  Analysis Date = 07/12/2016 
 RPT Level = 0.02  Analysis Date = 07/05/2016 
 RPT Level = 0.02  Analysis Date = 07/05/2016 
 RPT Level = 0.02  Analysis Date = 06/27/2016 
 RPT Level = 0.02  Analysis Date = 06/27/2016 
 RPT Level = 0.02  Analysis Date = 06/20/2016 
 RPT Level = 0.02  Analysis Date = 06/20/2016 
 RPT Level = 0.02  Analysis Date = 06/14/2016 
 RPT Level = 0.02  Analysis Date = 06/14/2016 
 RPT Level = 0.02  Analysis Date = 06/09/2016 
 RPT Level = 0.02  Analysis Date = 06/09/2016 
 RPT Level = 0.02  Analysis Date = 06/09/2016 
 RPT Level = 0.02  Analysis Date = 06/09/2016 
 RPT Level = 0.02  Analysis Date = 05/17/2016 
 RPT Level = 0.02  Analysis Date = 05/17/2016 
 RPT Level = 0.02  Analysis Date = 05/11/2016 
 RPT Level = 0.02  Analysis Date = 05/11/2016 
 RPT Level = 0.02  Analysis Date = 05/03/2016 
 RPT Level = 0.02  Analysis Date = 05/03/2016 
 RPT Level = 0.02  Analysis Date = 04/25/2016 
 RPT Level = 0.02  Analysis Date = 04/25/2016 
 RPT Level = 0.02  Analysis Date = 04/18/2016 
 RPT Level = 0.02  Analysis Date = 04/18/2016 
 RPT Level = 0.02  Analysis Date = 04/07/2016 
 RPT Level = 0.02  Analysis Date = 04/07/2016 
 RPT Level = 0.02  Analysis Date = 03/31/2016 
 RPT Level = 0.02  Analysis Date = 03/31/2016 
 RPT Level = 0.02  Analysis Date = 03/25/2016 
 RPT Level = 0.02  Analysis Date = 03/25/2016 
 RPT Level = 0.02  Analysis Date = 03/17/2016 
 RPT Level = 0.02  Analysis Date = 03/17/2016 
 RPT Level = 0.02  Analysis Date = 03/09/2016 
 RPT Level = 0.02  Analysis Date = 03/09/2016 
 RPT Level = 0.02  Analysis Date = 03/03/2016 
 RPT Level = 0.02  Analysis Date = 03/03/2016 
 RPT Level = 0.02  Analysis Date = 02/23/2016 
 RPT Level = 0.02  Analysis Date = 02/23/2016 
 RPT Level = 0.02  Analysis Date = 02/18/2016 
 RPT Level = 0.02  Analysis Date = 02/18/2016 
 RPT Level = 0.02  Analysis Date = 02/16/2016 
 RPT Level = 0.02  Analysis Date = 02/16/2016 
 RPT Level = 0.02  Analysis Date = 02/03/2016 
 RPT Level = 0.02  Analysis Date = 02/03/2016 
 RPT Level = 0.02  Analysis Date = 01/28/2016 
 RPT Level = 0.02  Analysis Date = 01/28/2016 
 RPT Level = 0.02  Analysis Date = 01/22/2016 
 RPT Level = 0.02  Analysis Date = 01/22/2016 
 RPT Level = 0.02  Analysis Date = 01/13/2016 
 RPT Level = 0.02  Analysis Date = 01/13/2016 
 RPT Level = 0.02  Analysis Date = 01/07/2016 
 RPT Level = 0.02  Analysis Date = 01/07/2016 
 RPT Level = 0.02  Analysis Date = 01/05/2016 
 RPT Level = 0.02  Analysis Date = 01/05/2016 
 RPT Level = 0.02  Analysis Date = 12/23/2015 
 RPT Level = 0.02  Analysis Date = 12/23/2015 
 RPT Level = 0.02  Analysis Date = 12/21/2015 
 RPT Level = 0.02  Analysis Date = 12/21/2015 
 RPT Level = 0.02  Analysis Date = 12/14/2015 
 RPT Level = 0.02  Analysis Date = 12/14/2015 
 RPT Level = 0.02  Analysis Date = 12/04/2015 
 RPT Level = 0.02  Analysis Date = 12/04/2015 
 RPT Level = 0.02  Analysis Date = 12/02/2015 
 RPT Level = 0.02  Analysis Date = 12/02/2015 
 RPT Level = 0.02  Analysis Date = 11/24/2015 
 RPT Level = 0.02  Analysis Date = 11/24/2015 
 RPT Level = 0.02  Analysis Date = 11/17/2015 
 RPT Level = 0.02  Analysis Date = 11/17/2015 
 RPT Level = 0.02  Analysis Date = 11/06/2015 
 RPT Level = 0.02  Analysis Date = 11/06/2015 
 RPT Level = 0.02  Analysis Date = 11/02/2015 
 RPT Level = 0.02  Analysis Date = 11/02/2015 
 RPT Level = 0.02  Analysis Date = 10/26/2015 
 RPT Level = 0.02  Analysis Date = 10/26/2015 
 RPT Level = 0.02  Analysis Date = 10/20/2015 
 RPT Level = 0.02  Analysis Date = 10/20/2015 
 RPT Level = 0.02  Analysis Date = 10/14/2015 
 RPT Level = 0.02  Analysis Date = 10/14/2015 
 RPT Level = 0.02  Analysis Date = 10/07/2015 
 RPT Level = 0.02  Analysis Date = 10/07/2015 
 RPT Level = 0.02  Analysis Date = 09/30/2015 
 RPT Level = 0.02  Analysis Date = 09/30/2015 
 RPT Level = 0.02  Analysis Date = 09/28/2015 
 RPT Level = 0.02  Analysis Date = 09/28/2015 
 RPT Level = 0.02  Analysis Date = 09/22/2015 
 RPT Level = 0.02  Analysis Date = 09/22/2015 
 RPT Level = 0.02  Analysis Date = 09/17/2015 
 RPT Level = 0.02  Analysis Date = 09/17/2015 
 RPT Level = 0.02  Analysis Date = 09/08/2015 
 RPT Level = 0.02  Analysis Date = 09/08/2015 
 RPT Level = 0.02  Analysis Date = 08/31/2015 
 RPT Level = 0.02  Analysis Date = 08/31/2015 
 RPT Level = 0.02  Analysis Date = 08/19/2015 
 RPT Level = 0.02  Analysis Date = 08/19/2015 
 RPT Level = 0.02  Analysis Date = 08/12/2015 
 RPT Level = 0.02  Analysis Date = 08/12/2015 
 RPT Level = 0.02  Analysis Date = 08/03/2015 
 RPT Level = 0.02  Analysis Date = 08/03/2015 
 RPT Level = 0.02  Analysis Date = 07/28/2015 
 RPT Level = 0.02  Analysis Date = 07/28/2015 
 RPT Level = 0.02  Analysis Date = 07/22/2015 
 RPT Level = 0.02  Analysis Date = 07/22/2015 
 RPT Level = 0.02  Analysis Date = 07/09/2015 
 RPT Level = 0.02  Analysis Date = 07/09/2015 
 RPT Level = 0.02  Analysis Date = 07/09/2015 
 RPT Level = 0.02  Analysis Date = 07/09/2015 
 RPT Level = 0.02  Analysis Date = 06/29/2015 
 RPT Level = 0.02  Analysis Date = 06/29/2015 
 RPT Level = 0.02  Analysis Date = 06/29/2015 
 RPT Level = 0.02  Analysis Date = 06/29/2015 
 RPT Level = 0.02  Analysis Date = 06/22/2015 
 RPT Level = 0.02  Analysis Date = 06/22/2015 
 RPT Level = 0.02  Analysis Date = 06/12/2015 
 RPT Level = 0.02  Analysis Date = 06/12/2015 
 RPT Level = 0.02  Analysis Date = 06/05/2015 
 RPT Level = 0.02  Analysis Date = 06/05/2015 
 RPT Level = 0.02  Analysis Date = 06/01/2015 
 RPT Level = 0.02  Analysis Date = 06/01/2015 
 RPT Level = 0.02  Analysis Date = 05/21/2015 
 RPT Level = 0.02  Analysis Date = 05/21/2015 
 RPT Level = 0.02  Analysis Date = 05/14/2015 
 RPT Level = 0.02  Analysis Date = 05/14/2015 
 RPT Level = 0.02  Analysis Date = 05/05/2015 
 RPT Level = 0.02  Analysis Date = 05/05/2015 
 RPT Level = 0.02  Analysis Date = 04/29/2015 
 RPT Level = 0.02  Analysis Date = 04/29/2015 
 RPT Level = 0.02  Analysis Date = 04/23/2015 
 RPT Level = 0.02  Analysis Date = 04/23/2015 
 RPT Level = 0.02  Analysis Date = 04/15/2015 
 RPT Level = 0.02  Analysis Date = 04/15/2015 
 RPT Level = 0.02  Analysis Date = 04/02/2015 
 RPT Level = 0.02  Analysis Date = 04/02/2015 
 RPT Level = 0.02  Analysis Date = 03/31/2015 
 RPT Level = 0.02  Analysis Date = 03/31/2015 
 RPT Level = 0.02  Analysis Date = 03/24/2015 
 RPT Level = 0.02  Analysis Date = 03/24/2015 
 RPT Level = 0.02  Analysis Date = 03/12/2015 
 RPT Level = 0.02  Analysis Date = 03/12/2015 
 RPT Level = 0.02  Analysis Date = 03/04/2015 
 RPT Level = 0.02  Analysis Date = 03/04/2015 
 RPT Level = 0.02  Analysis Date = 02/26/2015 
 RPT Level = 0.02  Analysis Date = 02/26/2015 
 RPT Level = 0.02  Analysis Date = 02/23/2015 
 RPT Level = 0.02  Analysis Date = 02/23/2015 
 RPT Level = 0.02  Analysis Date = 02/12/2015 
 RPT Level = 0.02  Analysis Date = 02/12/2015 
 RPT Level = 0.02  Analysis Date = 02/06/2015 
 RPT Level = 0.02  Analysis Date = 02/06/2015 
 RPT Level = 0.02  Analysis Date = 01/29/2015 
 RPT Level = 0.02  Analysis Date = 01/29/2015 
 RPT Level = 0.02  Analysis Date = 01/27/2015 
 RPT Level = 0.02  Analysis Date = 01/27/2015 
 RPT Level = 0.02  Analysis Date = 01/22/2015 
 RPT Level = 0.02  Analysis Date = 01/22/2015 
 RPT Level = 0.02  Analysis Date = 01/08/2015 
 RPT Level = 0.02  Analysis Date = 01/08/2015 
 RPT Level = 0.02  Analysis Date = 01/08/2015 
 RPT Level = 0.02  Analysis Date = 01/08/2015 
 RPT Level = 0.02  Analysis Date = 01/08/2015 
 RPT Level = 0.02  Analysis Date = 01/08/2015 
 RPT Level = 0.02  Analysis Date = 01/05/2015 
 RPT Level = 0.02  Analysis Date = 01/05/2015 
 RPT Level = 0.02  Analysis Date = 12/15/2014 
 RPT Level = 0.02  Analysis Date = 12/15/2014 
 RPT Level = 0.02  Analysis Date = 12/09/2014 
 RPT Level = 0.02  Analysis Date = 12/09/2014 
 RPT Level = 0.02  Analysis Date = 12/08/2014 
 RPT Level = 0.02  Analysis Date = 12/08/2014 
 RPT Level = 0.02  Analysis Date = 12/02/2014 
 RPT Level = 0.02  Analysis Date = 12/02/2014 
 RPT Level = 0.02  Analysis Date = 11/24/2014 
 RPT Level = 0.02  Analysis Date = 11/24/2014 
 RPT Level = 0.02  Analysis Date = 11/18/2014 
 RPT Level = 0.02  Analysis Date = 11/18/2014 
 RPT Level = 0.02  Analysis Date = 11/07/2014 
 RPT Level = 0.02  Analysis Date = 11/07/2014 
 RPT Level = 0.02  Analysis Date = 11/07/2014 
 RPT Level = 0.02  Analysis Date = 11/07/2014 
 RPT Level = 0.02  Analysis Date = 10/31/2014 
 RPT Level = 0.02  Analysis Date = 10/31/2014 
 RPT Level = 0.02  Analysis Date = 10/24/2014 
 RPT Level = 0.02  Analysis Date = 10/24/2014 
 RPT Level = 0.02  Analysis Date = 10/23/2014 
 RPT Level = 0.02  Analysis Date = 10/23/2014 
 RPT Level = 0.02  Analysis Date = 10/22/2014 
 RPT Level = 0.02  Analysis Date = 10/22/2014 
 RPT Level = 0.02  Analysis Date = 10/14/2014 
 RPT Level = 0.02  Analysis Date = 10/14/2014 
 RPT Level = 0.02  Analysis Date = 10/08/2014 
 RPT Level = 0.02  Analysis Date = 10/08/2014 
 RPT Level = 0.02  Analysis Date = 10/06/2014 
 RPT Level = 0.02  Analysis Date = 10/06/2014 
 RPT Level = 0.02  Analysis Date = 09/15/2014 
 RPT Level = 0.02  Analysis Date = 09/15/2014 
 RPT Level = 0.02  Analysis Date = 08/27/2014 
 RPT Level = 0.02  Analysis Date = 08/27/2014 
 RPT Level = 0.02  Analysis Date = 08/22/2014 
 RPT Level = 0.02  Analysis Date = 08/22/2014 
 RPT Level = 0.02  Analysis Date = 08/06/2014 
 RPT Level = 0.02  Analysis Date = 08/06/2014 
 RPT Level = 0.02  Analysis Date = 08/04/2014 
 RPT Level = 0.02  Analysis Date = 08/04/2014 
 RPT Level = 0.02  Analysis Date = 07/29/2014 
 RPT Level = 0.02  Analysis Date = 07/29/2014 
 RPT Level = 0.02  Analysis Date = 07/25/2014 
 RPT Level = 0.02  Analysis Date = 07/25/2014 
 RPT Level = 0.02  Analysis Date = 07/16/2014 
 RPT Level = 0.02  Analysis Date = 07/16/2014 
 RPT Level = 0.02  Analysis Date = 07/11/2014 
 RPT Level = 0.02  Analysis Date = 07/11/2014 
 RPT Level = 0.02  Analysis Date = 07/03/2014 
 RPT Level = 0.02  Analysis Date = 07/03/2014 
 RPT Level = 0.02  Analysis Date = 06/24/2014 
 RPT Level = 0.02  Analysis Date = 06/24/2014 
 RPT Level = 0.02  Analysis Date = 06/18/2014 
 RPT Level = 0.02  Analysis Date = 06/18/2014 
 RPT Level = 0.02  Analysis Date = 06/09/2014 
 RPT Level = 0.02  Analysis Date = 06/09/2014 
 RPT Level = 0.02  Analysis Date = 05/28/2014 
 RPT Level = 0.02  Analysis Date = 05/28/2014 
 RPT Level = 0.02  Analysis Date = 05/16/2014 
 RPT Level = 0.02  Analysis Date = 05/16/2014 
 RPT Level = 0.02  Analysis Date = 05/02/2014 
 RPT Level = 0.02  Analysis Date = 05/02/2014 
 RPT Level = 0.02  Analysis Date = 04/25/2014 
 RPT Level = 0.02  Analysis Date = 04/25/2014 
 RPT Level = 0.02  Analysis Date = 04/18/2014 
 RPT Level = 0.02  Analysis Date = 04/18/2014 
 RPT Level = 0.02  Analysis Date = 04/09/2014 
 RPT Level = 0.02  Analysis Date = 04/09/2014 
 RPT Level = 0.02  Analysis Date = 04/03/2014 
 RPT Level = 0.02  Analysis Date = 04/03/2014 
 RPT Level = 0.02  Analysis Date = 03/28/2014 
 RPT Level = 0.02  Analysis Date = 03/28/2014 
 RPT Level = 0.02  Analysis Date = 03/21/2014 
 RPT Level = 0.02  Analysis Date = 03/21/2014 
 RPT Level = 0.02  Analysis Date = 03/17/2014 
 RPT Level = 0.02  Analysis Date = 03/17/2014 
 RPT Level = 0.02  Analysis Date = 03/13/2014 
 RPT Level = 0.02  Analysis Date = 03/13/2014 
 RPT Level = 0.02  Analysis Date = 03/10/2014 
 RPT Level = 0.02  Analysis Date = 03/10/2014 
 RPT Level = 0.02  Analysis Date = 03/05/2014 
 RPT Level = 0.02  Analysis Date = 03/05/2014 
 RPT Level = 0.02  Analysis Date = 02/19/2014 
 RPT Level = 0.02  Analysis Date = 02/19/2014 
 RPT Level = 0.02  Analysis Date = 02/06/2014 
 RPT Level = 0.02  Analysis Date = 02/06/2014 
 RPT Level = 0.02  Analysis Date = 01/30/2014 
 RPT Level = 0.02  Analysis Date = 01/30/2014 
 RPT Level = 0.02  Analysis Date = 01/24/2014 
 RPT Level = 0.02  Analysis Date = 01/24/2014 
 RPT Level = 0.02  Analysis Date = 01/16/2014 
 RPT Level = 0.02  Analysis Date = 01/16/2014 
 RPT Level = 0.02  Analysis Date = 01/13/2014 
 RPT Level = 0.02  Analysis Date = 01/13/2014 
 RPT Level = 0.02  Analysis Date = 12/30/2013 
 RPT Level = 0.02  Analysis Date = 12/30/2013 
 RPT Level = 0.02  Analysis Date = 12/19/2013 
 RPT Level = 0.02  Analysis Date = 12/19/2013 
 RPT Level = 0.02  Analysis Date = 12/16/2013 
 RPT Level = 0.02  Analysis Date = 12/16/2013 
 RPT Level = 0.02  Analysis Date = 12/10/2013 
 RPT Level = 0.02  Analysis Date = 12/10/2013 
 RPT Level = 0.02  Analysis Date = 12/05/2013 
 RPT Level = 0.02  Analysis Date = 12/05/2013 
 RPT Level = 0.02  Analysis Date = 11/26/2013 
 RPT Level = 0.02  Analysis Date = 11/26/2013 
 RPT Level = 0.02  Analysis Date = 11/21/2013 
 RPT Level = 0.02  Analysis Date = 11/21/2013 
 RPT Level = 0.02  Analysis Date = 11/18/2013 
 RPT Level = 0.02  Analysis Date = 11/18/2013 
 RPT Level = 0.02  Analysis Date = 11/08/2013 
 RPT Level = 0.02  Analysis Date = 11/08/2013 
 RPT Level = 0.02  Analysis Date = 10/31/2013 
 RPT Level = 0.02  Analysis Date = 10/31/2013 
 RPT Level = 0.02  Analysis Date = 10/29/2013 
 RPT Level = 0.02  Analysis Date = 10/29/2013 
 RPT Level = 0.02  Analysis Date = 10/18/2013 
 RPT Level = 0.02  Analysis Date = 10/18/2013 
 RPT Level = 0.02  Analysis Date = 09/23/2013 
 RPT Level = 0.02  Analysis Date = 09/23/2013 
 RPT Level = 0.02  Analysis Date = 09/18/2013 
 RPT Level = 0.02  Analysis Date = 09/18/2013 
 RPT Level = 0.02  Analysis Date = 09/09/2013 
 RPT Level = 0.02  Analysis Date = 09/09/2013 
 RPT Level = 0.02  Analysis Date = 08/30/2013 
 RPT Level = 0.02  Analysis Date = 08/30/2013 
 RPT Level = 0.02  Analysis Date = 08/28/2013 
 RPT Level = 0.02  Analysis Date = 08/28/2013 
 RPT Level = 0.02  Analysis Date = 08/20/2013 
 RPT Level = 0.02  Analysis Date = 08/20/2013 
 RPT Level = 0.02  Analysis Date = 08/14/2013 
 RPT Level = 0.02  Analysis Date = 08/14/2013 
 RPT Level = 0.02  Analysis Date = 08/08/2013 
 RPT Level = 0.02  Analysis Date = 08/08/2013 
 RPT Level = 0.02  Analysis Date = 07/26/2013 
 RPT Level = 0.02  Analysis Date = 07/26/2013 
 RPT Level = 0.02  Analysis Date = 07/17/2013 
 RPT Level = 0.02  Analysis Date = 07/17/2013 
 RPT Level = 0.02  Analysis Date = 07/11/2013 
 RPT Level = 0.02  Analysis Date = 07/11/2013 
 RPT Level = 0.02  Analysis Date = 07/08/2013 
 RPT Level = 0.02  Analysis Date = 07/08/2013 
 RPT Level = 0.02  Analysis Date = 06/28/2013 
 RPT Level = 0.02  Analysis Date = 06/28/2013 
 RPT Level = 0.02  Analysis Date = 06/21/2013 
 RPT Level = 0.02  Analysis Date = 06/21/2013 
 RPT Level = 0.02  Analysis Date = 06/19/2013 
 RPT Level = 0.02  Analysis Date = 06/19/2013 
 RPT Level = 0.02  Analysis Date = 06/12/2013 
 RPT Level = 0.02  Analysis Date = 06/12/2013 
 RPT Level = 0.02  Analysis Date = 06/10/2013 
 RPT Level = 0.02  Analysis Date = 06/10/2013 
 RPT Level = 0.02  Analysis Date = 06/03/2013 
 RPT Level = 0.02  Analysis Date = 06/03/2013 
 RPT Level = 0.02  Analysis Date = 05/22/2013 
 RPT Level = 0.02  Analysis Date = 05/22/2013 
 RPT Level = 0.02  Analysis Date = 05/14/2013 
 RPT Level = 0.02  Analysis Date = 05/14/2013 
 RPT Level = 0.02  Analysis Date = 05/03/2013 
 RPT Level = 0.02  Analysis Date = 05/03/2013 
 RPT Level = 0.02  Analysis Date = 04/29/2013 
 RPT Level = 0.02  Analysis Date = 04/29/2013 
 RPT Level = 0.02  Analysis Date = 04/24/2013 
 RPT Level = 0.02  Analysis Date = 04/24/2013 
 RPT Level = 0.02  Analysis Date = 04/24/2013 
 RPT Level = 0.02  Analysis Date = 04/24/2013 
 RPT Level = 0.02  Analysis Date = 04/04/2013 
 RPT Level = 0.02  Analysis Date = 04/04/2013 
 RPT Level = 0.02  Analysis Date = 03/29/2013 
 RPT Level = 0.02  Analysis Date = 03/29/2013 
 RPT Level = 0.02  Analysis Date = 03/26/2013 
 RPT Level = 0.02  Analysis Date = 03/26/2013 
 RPT Level = 0.02  Analysis Date = 03/15/2013 
 RPT Level = 0.02  Analysis Date = 03/15/2013 
 RPT Level = 0.02  Analysis Date = 03/11/2013 
 RPT Level = 0.02  Analysis Date = 03/11/2013 
 RPT Level = 0.02  Analysis Date = 03/06/2013 
 RPT Level = 0.02  Analysis Date = 03/06/2013 
 RPT Level = 0.02  Analysis Date = 03/05/2013 
 RPT Level = 0.02  Analysis Date = 03/05/2013 
 RPT Level = 0.02  Analysis Date = 09/21/2005 
 RPT Level = 0.02  Analysis Date = 09/21/2005 
 RPT Level = 0.02  Analysis Date = 09/12/2005 
 RPT Level = 0.02  Analysis Date = 09/12/2005 
 RPT Level = 0.02  Analysis Date = 09/02/2005 
 RPT Level = 0.02  Analysis Date = 09/02/2005 
 RPT Level = 0.02  Analysis Date = 08/29/2005 
 RPT Level = 0.02  Analysis Date = 08/29/2005 
 RPT Level = 0.02  Analysis Date = 08/19/2005 
 RPT Level = 0.02  Analysis Date = 08/19/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/10/2005 
 RPT Level = 0.02  Analysis Date = 08/05/2005 
 RPT Level = 0.02  Analysis Date = 08/05/2005 
 RPT Level = 0.02  Analysis Date = 08/05/2005 
 RPT Level = 0.02  Analysis Date = 08/05/2005 
 RPT Level = 0.02  Analysis Date = 07/21/2005 
 RPT Level = 0.02  Analysis Date = 07/21/2005 
 RPT Level = 0.02  Analysis Date = 07/18/2005 
 RPT Level = 0.02  Analysis Date = 07/18/2005 
 RPT Level = 0.02  Analysis Date = 07/12/2005 
 RPT Level = 0.02  Analysis Date = 07/12/2005 
 RPT Level = 0.02  Analysis Date = 07/05/2005 
 RPT Level = 0.02  Analysis Date = 07/05/2005 
 RPT Level = 0.02  Analysis Date = 06/24/2005 
 RPT Level = 0.02  Analysis Date = 06/24/2005 
 RPT Level = 0.02  Analysis Date = 06/20/2005 
 RPT Level = 0.02  Analysis Date = 06/20/2005 
 RPT Level = 0.02  Analysis Date = 06/10/2005 
 RPT Level = 0.02  Analysis Date = 06/10/2005 
 RPT Level = 0.02  Analysis Date = 06/06/2005 
 RPT Level = 0.02  Analysis Date = 06/06/2005 
 RPT Level = 0.02  Analysis Date = 05/25/2005 
 RPT Level = 0.02  Analysis Date = 05/25/2005 
 RPT Level = 0.02  Analysis Date = 05/19/2005 
 RPT Level = 0.02  Analysis Date = 05/19/2005 
 RPT Level = 0.02  Analysis Date = 05/17/2005 
 RPT Level = 0.02  Analysis Date = 05/17/2005 
 RPT Level = 0.02  Analysis Date = 05/09/2005 
 RPT Level = 0.02  Analysis Date = 05/09/2005 
 RPT Level = 0.02  Analysis Date = 04/28/2005 
 RPT Level = 0.02  Analysis Date = 04/28/2005 
 RPT Level = 0.02  Analysis Date = 04/25/2005 
 RPT Level = 0.02  Analysis Date = 04/25/2005 
 RPT Level = 0.02  Analysis Date = 04/14/2005 
 RPT Level = 0.02  Analysis Date = 04/14/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/07/2005 
 RPT Level = 0.02  Analysis Date = 04/06/2005 
 RPT Level = 0.02  Analysis Date = 04/06/2005 
 RPT Level = 0.02  Analysis Date = 03/31/2005 
 RPT Level = 0.02  Analysis Date = 03/31/2005 
 RPT Level = 0.02  Analysis Date = 03/18/2005 
 RPT Level = 0.02  Analysis Date = 03/18/2005 
 RPT Level = 0.02  Analysis Date = 03/16/2005 
 RPT Level = 0.02  Analysis Date = 03/16/2005 
 RPT Level = 0.02  Analysis Date = 03/16/2005 
 RPT Level = 0.02  Analysis Date = 03/16/2005 
 RPT Level = 0.02  Analysis Date = 03/10/2005 
 RPT Level = 0.02  Analysis Date = 03/10/2005 
 RPT Level = 0.02  Analysis Date = 02/28/2005 
 RPT Level = 0.02  Analysis Date = 02/28/2005 
 RPT Level = 0.02  Analysis Date = 02/18/2005 
 RPT Level = 0.02  Analysis Date = 02/18/2005 
 RPT Level = 0.02  Analysis Date = 02/15/2005 
 RPT Level = 0.02  Analysis Date = 02/15/2005 
 RPT Level = 0.02  Analysis Date = 02/04/2005 
 RPT Level = 0.02  Analysis Date = 02/04/2005 
 RPT Level = 0.02  Analysis Date = 02/01/2005 
 RPT Level = 0.02  Analysis Date = 02/01/2005 
 RPT Level = 0.02  Analysis Date = 01/21/2005 
 RPT Level = 0.02  Analysis Date = 01/21/2005 
 RPT Level = 0.02  Analysis Date = 01/18/2005 
 RPT Level = 0.02  Analysis Date = 01/18/2005 
 RPT Level = 0.02  Analysis Date = 01/10/2005 
 RPT Level = 0.02  Analysis Date = 01/10/2005 
 RPT Level = 0.02  Analysis Date = 01/06/2005 
 RPT Level = 0.02  Analysis Date = 01/06/2005 
 RPT Level = 0.02  Analysis Date = 12/28/2004 
 RPT Level = 0.02  Analysis Date = 12/28/2004 
 RPT Level = 0.02  Analysis Date = 12/28/2004 
 RPT Level = 0.02  Analysis Date = 12/28/2004 
 RPT Level = 0.02  Analysis Date = 12/21/2004 
 RPT Level = 0.02  Analysis Date = 12/21/2004 
 RPT Level = 0.02  Analysis Date = 12/20/2004 
 RPT Level = 0.02  Analysis Date = 12/20/2004 
 RPT Level = 0.02  Analysis Date = 12/13/2004 
 RPT Level = 0.02  Analysis Date = 12/13/2004 
 RPT Level = 0.02  Analysis Date = 12/13/2004 
 RPT Level = 0.02  Analysis Date = 12/13/2004 
 RPT Level = 0.02  Analysis Date = 12/09/2004 
 RPT Level = 0.02  Analysis Date = 12/09/2004 
 RPT Level = 0.02  Analysis Date = 12/09/2004 
 RPT Level = 0.02  Analysis Date = 12/09/2004 
 RPT Level = 0.02  Analysis Date = 12/02/2004 
 RPT Level = 0.02  Analysis Date = 12/02/2004 
 RPT Level = 0.02  Analysis Date = 11/29/2004 
 RPT Level = 0.02  Analysis Date = 11/29/2004 
 RPT Level = 0.02  Analysis Date = 11/23/2004 
 RPT Level = 0.02  Analysis Date = 11/23/2004 
 RPT Level = 0.02  Analysis Date = 09/02/2004 
 RPT Level = 0.02  Analysis Date = 09/02/2004 
 RPT Level = 0.02  Analysis Date = 08/31/2004 
 RPT Level = 0.02  Analysis Date = 08/31/2004 
 RPT Level = 0.02  Analysis Date = 08/26/2004 
 RPT Level = 0.02  Analysis Date = 08/26/2004 
 RPT Level = 0.02  Analysis Date = 08/23/2004 
 RPT Level = 0.02  Analysis Date = 08/23/2004 
 RPT Level = 0.02  Analysis Date = 08/24/2004 
 RPT Level = 0.02  Analysis Date = 08/24/2004 
 RPT Level = 0.02  Analysis Date = 08/24/2004 
 RPT Level = 0.02  Analysis Date = 08/24/2004 
 RPT Level = 0.02  Analysis Date = 08/12/2004 
 RPT Level = 0.02  Analysis Date = 08/12/2004 
 RPT Level = 0.02  Analysis Date = 08/05/2004 
 RPT Level = 0.02  Analysis Date = 08/05/2004 
 RPT Level = 0.02  Analysis Date = 08/02/2004 
 RPT Level = 0.02  Analysis Date = 08/02/2004 
 RPT Level = 0.02  Analysis Date = 07/23/2004 
 RPT Level = 0.02  Analysis Date = 07/23/2004 
 RPT Level = 0.02  Analysis Date = 07/20/2004 
 RPT Level = 0.02  Analysis Date = 07/20/2004 
 RPT Level = 0.02  Analysis Date = 07/09/2004 
 RPT Level = 0.02  Analysis Date = 07/09/2004 
 RPT Level = 0.02  Analysis Date = 07/07/2004 
 RPT Level = 0.02  Analysis Date = 07/07/2004 
 RPT Level = 0.02  Analysis Date = 06/25/2004 
 RPT Level = 0.02  Analysis Date = 06/25/2004 
 RPT Level = 0.02  Analysis Date = 06/22/2004 
 RPT Level = 0.02  Analysis Date = 06/22/2004 
 RPT Level = 0.02  Analysis Date = 06/10/2004 
 RPT Level = 0.02  Analysis Date = 06/10/2004 
 RPT Level = 0.02  Analysis Date = 06/04/2004 
 RPT Level = 0.02  Analysis Date = 06/04/2004 
 RPT Level = 0.02  Analysis Date = 06/01/2004 
 RPT Level = 0.02  Analysis Date = 06/01/2004 
 RPT Level = 0.02  Analysis Date = 05/21/2004 
 RPT Level = 0.02  Analysis Date = 05/21/2004 
 RPT Level = 0.02  Analysis Date = 05/10/2004 
 RPT Level = 0.02  Analysis Date = 05/10/2004 
 RPT Level = 0.02  Analysis Date = 05/03/2004 
 RPT Level = 0.02  Analysis Date = 05/03/2004 
 RPT Level = 0.02  Analysis Date = 04/27/2004 
 RPT Level = 0.02  Analysis Date = 04/27/2004 
 RPT Level = 0.02  Analysis Date = 04/19/2004 
 RPT Level = 0.02  Analysis Date = 04/19/2004 
 RPT Level = 0.02  Analysis Date = 04/08/2004 
 RPT Level = 0.02  Analysis Date = 04/08/2004 
 RPT Level = 0.02  Analysis Date = 04/07/2004 
 RPT Level = 0.02  Analysis Date = 04/07/2004 
 RPT Level = 0.02  Analysis Date = 04/01/2004 
 RPT Level = 0.02  Analysis Date = 04/01/2004 
 RPT Level = 0.02  Analysis Date = 03/30/2004 
 RPT Level = 0.02  Analysis Date = 03/30/2004 
 RPT Level = 0.02  Analysis Date = 03/24/2004 
 RPT Level = 0.02  Analysis Date = 03/24/2004 
 RPT Level = 0.02  Analysis Date = 03/22/2004 
 RPT Level = 0.02  Analysis Date = 03/22/2004 
 RPT Level = 0.02  Analysis Date = 03/18/2004 
 RPT Level = 0.02  Analysis Date = 03/18/2004 
 RPT Level = 0.02  Analysis Date = 03/15/2004 
 RPT Level = 0.02  Analysis Date = 03/15/2004 
 RPT Level = 0.02  Analysis Date = 03/15/2004 
 RPT Level = 0.02  Analysis Date = 03/15/2004 
 RPT Level = 0.02  Analysis Date = 03/12/2004 
 RPT Level = 0.02  Analysis Date = 03/12/2004 
 RPT Level = 0.02  Analysis Date = 03/08/2004 
 RPT Level = 0.02  Analysis Date = 03/08/2004 
 RPT Level = 0.02  Analysis Date = 03/01/2004 
 RPT Level = 0.02  Analysis Date = 03/01/2004 
 RPT Level = 0.02  Analysis Date = 02/26/2004 
 RPT Level = 0.02  Analysis Date = 02/26/2004 
 RPT Level = 0.02  Analysis Date = 02/24/2004 
 RPT Level = 0.02  Analysis Date = 02/24/2004 
 RPT Level = 0.02  Analysis Date = 02/19/2004 
 RPT Level = 0.02  Analysis Date = 02/19/2004 
 RPT Level = 0.02  Analysis Date = 02/19/2004 
 RPT Level = 0.02  Analysis Date = 02/19/2004 
 RPT Level = 0.02  Analysis Date = 02/12/2004 
 RPT Level = 0.02  Analysis Date = 02/12/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 02/09/2004 
 RPT Level = 0.02  Analysis Date = 01/30/2004 
 RPT Level = 0.02  Analysis Date = 01/30/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/26/2004 
 RPT Level = 0.02  Analysis Date = 01/22/2004 
 RPT Level = 0.02  Analysis Date = 01/22/2004 
 RPT Level = 0.02  Analysis Date = 01/21/2004 
 RPT Level = 0.02  Analysis Date = 01/21/2004 
 RPT Level = 0.02  Analysis Date = 01/20/2004 
 RPT Level = 0.02  Analysis Date = 01/20/2004 
 RPT Level = 0.02  Analysis Date = 01/16/2004 
 RPT Level = 0.02  Analysis Date = 01/16/2004 
 RPT Level = 0.02  Analysis Date = 01/16/2004 
 RPT Level = 0.02  Analysis Date = 01/16/2004 
 RPT Level = 0.02  Analysis Date = 01/16/2004 
 RPT Level = 0.02  Analysis Date = 01/16/2004 
 RPT Level = 0.02  Analysis Date = 09/25/2003 
 RPT Level = 0.02  Analysis Date = 09/25/2003 
 RPT Level = 0.02  Analysis Date = 09/18/2003 
 RPT Level = 0.02  Analysis Date = 09/18/2003 
 RPT Level = 0.02  Analysis Date = 09/11/2003 
 RPT Level = 0.02  Analysis Date = 09/11/2003 
 RPT Level = 0.02  Analysis Date = 09/04/2003 
 RPT Level = 0.02  Analysis Date = 09/04/2003 
 RPT Level = 0.02  Analysis Date = 08/27/2003 
 RPT Level = 0.02  Analysis Date = 08/27/2003 
 RPT Level = 0.02  Analysis Date = 08/21/2003 
 RPT Level = 0.02  Analysis Date = 08/21/2003 
 RPT Level = 0.02  Analysis Date = 08/14/2003 
 RPT Level = 0.02  Analysis Date = 08/14/2003 
 RPT Level = 0.02  Analysis Date = 08/08/2003 
 RPT Level = 0.02  Analysis Date = 08/08/2003 
 RPT Level = 0.02  Analysis Date = 08/04/2003 
 RPT Level = 0.02  Analysis Date = 08/04/2003 
 RPT Level = 0.02  Analysis Date = 07/24/2003 
 RPT Level = 0.02  Analysis Date = 07/24/2003 
 RPT Level = 0.02  Analysis Date = 07/17/2003 
 RPT Level = 0.02  Analysis Date = 07/17/2003 
 RPT Level = 0.02  Analysis Date = 07/10/2003 
 RPT Level = 0.02  Analysis Date = 07/10/2003 
 RPT Level = 0.02  Analysis Date = 07/03/2003 
 RPT Level = 0.02  Analysis Date = 07/03/2003 
 RPT Level = 0.02  Analysis Date = 07/02/2003 
 RPT Level = 0.02  Analysis Date = 07/02/2003 
 RPT Level = 0.02  Analysis Date = 06/23/2003 
 RPT Level = 0.02  Analysis Date = 06/23/2003 
 RPT Level = 0.02  Analysis Date = 06/17/2003 
 RPT Level = 0.02  Analysis Date = 06/17/2003 
 RPT Level = 0.02  Analysis Date = 06/10/2003 
 RPT Level = 0.02  Analysis Date = 06/10/2003 
 RPT Level = 0.02  Analysis Date = 05/29/2003 
 RPT Level = 0.02  Analysis Date = 05/29/2003 
 RPT Level = 0.02  Analysis Date = 05/27/2003 
 RPT Level = 0.02  Analysis Date = 05/27/2003 
 RPT Level = 0.02  Analysis Date = 05/22/2003 
 RPT Level = 0.02  Analysis Date = 05/22/2003 
 RPT Level = 0.02  Analysis Date = 05/14/2003 
 RPT Level = 0.02  Analysis Date = 05/14/2003 
 RPT Level = 0.02  Analysis Date = 05/07/2003 
 RPT Level = 0.02  Analysis Date = 05/07/2003 
 RPT Level = 0.02  Analysis Date = 05/01/2003 
 RPT Level = 0.02  Analysis Date = 05/01/2003 
 RPT Level = 0.02  Analysis Date = 04/22/2003 
 RPT Level = 0.02  Analysis Date = 04/22/2003 
 RPT Level = 0.02  Analysis Date = 04/08/2003 
 RPT Level = 0.02  Analysis Date = 04/08/2003 
 RPT Level = 0.02  Analysis Date = 04/03/2003 
 RPT Level = 0.02  Analysis Date = 04/03/2003 
 RPT Level = 0.02  Analysis Date = 04/02/2003 
 RPT Level = 0.02  Analysis Date = 04/02/2003 
 RPT Level = 0.02  Analysis Date = 04/01/2003 
 RPT Level = 0.02  Analysis Date = 04/01/2003 
 RPT Level = 0.02  Analysis Date = 03/17/2003 
 RPT Level = 0.02  Analysis Date = 03/17/2003 
 RPT Level = 0.02  Analysis Date = 03/13/2003 
 RPT Level = 0.02  Analysis Date = 03/13/2003 
 RPT Level = 0.02  Analysis Date = 03/04/2003 
 RPT Level = 0.02  Analysis Date = 03/04/2003 
 RPT Level = 0.02  Analysis Date = 02/27/2003 
 RPT Level = 0.02  Analysis Date = 02/27/2003 
 RPT Level = 0.02  Analysis Date = 02/11/2003 
 RPT Level = 0.02  Analysis Date = 02/11/2003 
 RPT Level = 0.02  Analysis Date = 02/06/2003 
 RPT Level = 0.02  Analysis Date = 02/06/2003 
 RPT Level = 0.02  Analysis Date = 02/03/2003 
 RPT Level = 0.02  Analysis Date = 02/03/2003 
 RPT Level = 0.02  Analysis Date = 01/31/2003 
 RPT Level = 0.02  Analysis Date = 01/31/2003 
 RPT Level = 0.02  Analysis Date = 01/24/2003 
 RPT Level = 0.02  Analysis Date = 01/24/2003 
 RPT Level = 0.02  Analysis Date = 01/15/2003 
 RPT Level = 0.02  Analysis Date = 01/15/2003 
 RPT Level = 0.02  Analysis Date = 01/06/2003 
 RPT Level = 0.02  Analysis Date = 01/06/2003 
 RPT Level = 0.02  Analysis Date = 01/06/2003 
 RPT Level = 0.02  Analysis Date = 01/06/2003 
 RPT Level = 0.02  Analysis Date = 12/19/2002 
 RPT Level = 0.02  Analysis Date = 12/19/2002 
 RPT Level = 0.02  Analysis Date = 12/18/2002 
 RPT Level = 0.02  Analysis Date = 12/18/2002 
 RPT Level = 0.02  Analysis Date = 12/05/2002 
 RPT Level = 0.02  Analysis Date = 12/05/2002 
 RPT Level = 0.02  Analysis Date = 12/05/2002 
 RPT Level = 0.02  Analysis Date = 12/05/2002 
 RPT Level = 0.02  Analysis Date = 12/03/2002 
 RPT Level = 0.02  Analysis Date = 12/03/2002 
 RPT Level = 0.02  Analysis Date = 12/05/2002 
 RPT Level = 0.02  Analysis Date = 12/05/2002 
 RPT Level = 0.02  Analysis Date = 12/03/2002 
 RPT Level = 0.02  Analysis Date = 12/03/2002 
 RPT Level = 0.02  Analysis Date = 11/01/2002 
 RPT Level = 0.02  Analysis Date = 11/01/2002 
 RPT Level = 0.02  Analysis Date = 10/25/2002 
 RPT Level = 0.02  Analysis Date = 10/25/2002 
 RPT Level = 0.02  Analysis Date = 10/25/2002 
 RPT Level = 0.02  Analysis Date = 10/25/2002 
 RPT Level = 0.02  Analysis Date = 10/25/2002 
 RPT Level = 0.02  Analysis Date = 10/25/2002 
 RPT Level = 0.02  Analysis Date = 10/24/2002 
 RPT Level = 0.02  Analysis Date = 10/24/2002 
 RPT Level = 0.02  Analysis Date = 09/06/2002 
 RPT Level = 0.03  Analysis Date = 09/06/2002 
 RPT Level = 0.03  Analysis Date = 09/06/2002 
 RPT Level = 0.03  Analysis Date = 09/06/2002 
 RPT Level = 0.03  Analysis Date = 08/26/2002 
 RPT Level = 0.03  Analysis Date = 08/26/2002 
 RPT Level = 0.03  Analysis Date = 08/19/2002 
 RPT Level = 0.03  Analysis Date = 08/19/2002 
 RPT Level = 0.03  Analysis Date = 08/13/2002 
 RPT Level = 0.03  Analysis Date = 08/13/2002 
 RPT Level = 0.03  Analysis Date = 08/06/2002 
 RPT Level = 0.03  Analysis Date = 08/06/2002 
 RPT Level = 0.03  Analysis Date = 08/06/2002 
 RPT Level = 0.03  Analysis Date = 08/06/2002 
 RPT Level = 0.03  Analysis Date = 07/19/2002 
 RPT Level = 0.03  Analysis Date = 07/19/2002 
 RPT Level = 0.03  Analysis Date = 07/17/2002 
 RPT Level = 0.03  Analysis Date = 07/17/2002 
 RPT Level = 0.03  Analysis Date = 07/03/2002 
 RPT Level = 0.03  Analysis Date = 07/03/2002 
 RPT Level = 0.03  Analysis Date = 07/01/2002 
 RPT Level = 0.03  Analysis Date = 07/01/2002 
 RPT Level = 0.03  Analysis Date = 06/20/2002 
 RPT Level = 0.03  Analysis Date = 06/20/2002 
 RPT Level = 0.03  Analysis Date = 06/17/2002 
 RPT Level = 0.03  Analysis Date = 06/17/2002 
 RPT Level = 0.03  Analysis Date = 06/05/2002 
 RPT Level = 0.03  Analysis Date = 06/05/2002 
 RPT Level = 0.03  Analysis Date = 06/04/2002 
 RPT Level = 0.03  Analysis Date = 06/04/2002 
 RPT Level = 0.03  Analysis Date = 05/24/2002 
 RPT Level = 0.03  Analysis Date = 05/24/2002 
 RPT Level = 0.03  Analysis Date = 05/16/2002 
 RPT Level = 0.03  Analysis Date = 05/16/2002 
 RPT Level = 0.03  Analysis Date = 05/13/2002 
 RPT Level = 0.03  Analysis Date = 05/13/2002 
 RPT Level = 0.03  Analysis Date = 05/08/2002 
 RPT Level = 0.03  Analysis Date = 05/08/2002 
 RPT Level = 0.03  Analysis Date = 04/25/2002 
 RPT Level = 0.03  Analysis Date = 04/25/2002 
 RPT Level = 0.03  Analysis Date = 04/25/2002 
 RPT Level = 0.03  Analysis Date = 04/25/2002 
 RPT Level = 0.03  Analysis Date = 04/12/2002 
 RPT Level = 0.03  Analysis Date = 04/12/2002 
 RPT Level = 0.03  Analysis Date = 04/04/2002 
 RPT Level = 0.03  Analysis Date = 04/04/2002 
 RPT Level = 0.03  Analysis Date = 03/28/2002 
 RPT Level = 0.03  Analysis Date = 03/28/2002 
 RPT Level = 0.03  Analysis Date = 03/26/2002 
 RPT Level = 0.03  Analysis Date = 03/26/2002 
 RPT Level = 0.03  Analysis Date = 03/19/2002 
 RPT Level = 0.03  Analysis Date = 03/19/2002 
 RPT Level = 0.03  Analysis Date = 03/11/2002 
 RPT Level = 0.03  Analysis Date = 03/11/2002 
 RPT Level = 0.03  Analysis Date = 03/04/2002 
 RPT Level = 0.03  Analysis Date = 03/04/2002 
 RPT Level = 0.03  Analysis Date = 02/27/2002 
 RPT Level = 0.03  Analysis Date = 02/27/2002 
 RPT Level = 0.03  Analysis Date = 02/20/2002 
 RPT Level = 0.03  Analysis Date = 02/20/2002 
 RPT Level = 0.03  Analysis Date = 02/06/2002 
 RPT Level = 0.03  Analysis Date = 02/06/2002 
 RPT Level = 0.03  Analysis Date = 02/06/2002 
 RPT Level = 0.03  Analysis Date = 02/06/2002 
 RPT Level = 0.03  Analysis Date = 01/24/2002 
 RPT Level = 0.03  Analysis Date = 01/24/2002 
 RPT Level = 0.03  Analysis Date = 01/14/2002 
 RPT Level = 0.03  Analysis Date = 01/14/2002 
 RPT Level = 0.03  Analysis Date = 01/04/2002 
 RPT Level = 0.03  Analysis Date = 01/04/2002 
 RPT Level = 0.03  Analysis Date = 01/03/2002 
 RPT Level = 0.03  Analysis Date = 01/03/2002 
 RPT Level = 0.03  Analysis Date = 12/20/2001 
 RPT Level = 0.03  Analysis Date = 12/20/2001 
 RPT Level = 0.03  Analysis Date = 12/19/2001 
 RPT Level = 0.03  Analysis Date = 12/19/2001 
 RPT Level = 0.03  Analysis Date = 12/07/2001 
 RPT Level = 0.03  Analysis Date = 12/07/2001 
 RPT Level = 0.03  Analysis Date = 11/13/2001 
 RPT Level = 0.03  Y = 0
The SGPlot Procedure

False Positive Rate for Phosphorus (as P), UNF, ASF, Kjeldahl

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Phosphorus (as P), UNF, ASF, Kjeldahl 00665KJ009 2002 40 0 0%
    2003 52 2 4%
    2004 51 0 0%
    2005 50 0 0%
    2013 33 1 3%
    2014 47 0 0%
    2015 52 1 2%
    2016 50 1 2%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Phosphorus (as P), UNF, CFA, ACD-P, LL -
Blind Blank Results
Lab: NWQL, PCode: 00665, MCode: CL021
Analysis dates: 11/08/01 through 09/29/16
Open Data Set

 Analysis Date = 02/20/2014 
 Lab Value = -0.005 
 RPT Level = 0.004 
 Lab Sample ID = 20140490016  Analysis Date = 02/20/2014 
 Lab Value = -0.005 
 RPT Level = 0.004 
 Lab Sample ID = 20140490016  Analysis Date = 07/22/2009 
 Lab Value = 0.0115 
 RPT Level = 0.004 
 Lab Sample ID = 20091800174  Analysis Date = 11/27/2007 
 Lab Value = 0.0061 
 RPT Level = 0.004 
 Lab Sample ID = 20073100012  Analysis Date = 10/11/2007 
 Lab Value = 0.0072 
 RPT Level = 0.004 
 Lab Sample ID = 20072670056  Analysis Date = 07/22/2009 
 Lab Value = 0.0115 
 RPT Level = 0.004 
 Lab Sample ID = 20091800174  Analysis Date = 11/27/2007 
 Lab Value = 0.0061 
 RPT Level = 0.004 
 Lab Sample ID = 20073100012  Analysis Date = 10/11/2007 
 Lab Value = 0.0072 
 RPT Level = 0.004 
 Lab Sample ID = 20072670056  Analysis Date = 09/21/2016 
 Lab Value = 0.0034 
 RPT Level = 0.004 
 Lab Sample ID = 20162580021  Analysis Date = 09/21/2016 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20162520021  Analysis Date = 09/29/2016 
 Lab Value = 0.0038 
 RPT Level = 0.004 
 Lab Sample ID = 20162440129  Analysis Date = 09/08/2016 
 Lab Value = 0.0022 
 RPT Level = 0.004 
 Lab Sample ID = 20162360202  Analysis Date = 09/29/2016 
 Lab Value = 0.0049 
 RPT Level = 0.004 
 Lab Sample ID = 20162290136  Analysis Date = 08/17/2016 
 Lab Value = 0.0037 
 RPT Level = 0.004 
 Lab Sample ID = 20162230012  Analysis Date = 08/16/2016 
 Lab Value = 0.003 
 RPT Level = 0.004 
 Lab Sample ID = 20162150194  Analysis Date = 08/03/2016 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20162080237  Analysis Date = 07/27/2016 
 Lab Value = 0.0036 
 RPT Level = 0.004 
 Lab Sample ID = 20162010261  Analysis Date = 07/20/2016 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20161940115  Analysis Date = 07/14/2016 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20161870038  Analysis Date = 07/13/2016 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20161800089  Analysis Date = 06/28/2016 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20161740080  Analysis Date = 06/21/2016 
 Lab Value = 0.0023 
 RPT Level = 0.004 
 Lab Sample ID = 20161660157  Analysis Date = 06/14/2016 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20161590161  Analysis Date = 06/07/2016 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20161520029  Analysis Date = 06/07/2016 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20161480203  Analysis Date = 05/17/2016 
 Lab Value = 0.0021 
 RPT Level = 0.004 
 Lab Sample ID = 20161270015  Analysis Date = 05/11/2016 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20161230047  Analysis Date = 05/03/2016 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20161160095  Analysis Date = 04/27/2016 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20161100131  Analysis Date = 04/25/2016 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20161020031  Analysis Date = 04/13/2016 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20160950050  Analysis Date = 04/12/2016 
 Lab Value = 0.0026 
 RPT Level = 0.004 
 Lab Sample ID = 20160880041  Analysis Date = 03/30/2016 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20160810071  Analysis Date = 03/29/2016 
 Lab Value = -.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20160740016  Analysis Date = 03/16/2016 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20160670017  Analysis Date = 03/16/2016 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20160600020  Analysis Date = 03/02/2016 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20160530019  Analysis Date = 03/02/2016 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20160470018  Analysis Date = 02/18/2016 
 Lab Value = 0.0026 
 RPT Level = 0.004 
 Lab Sample ID = 20160400086  Analysis Date = 02/04/2016 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20160320014  Analysis Date = 02/03/2016 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20160250029  Analysis Date = 02/03/2016 
 Lab Value = 0.0022 
 RPT Level = 0.004 
 Lab Sample ID = 20160190020  Analysis Date = 01/14/2016 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20160110012  Analysis Date = 01/13/2016 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20160050037  Analysis Date = 01/08/2016 
 Lab Value = 0.0027 
 RPT Level = 0.004 
 Lab Sample ID = 20153630051  Analysis Date = 01/07/2016 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20153550014  Analysis Date = 01/05/2016 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20153500167  Analysis Date = 12/16/2015 
 Lab Value = 0.0022 
 RPT Level = 0.004 
 Lab Sample ID = 20153420008  Analysis Date = 12/08/2015 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20153340010  Analysis Date = 12/08/2015 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20153270005  Analysis Date = 12/01/2015 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20153200028  Analysis Date = 11/17/2015 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20153140001  Analysis Date = 11/10/2015 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20153060024  Analysis Date = 11/05/2015 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20152990071  Analysis Date = 10/27/2015 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20152920041  Analysis Date = 10/22/2015 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20152860162  Analysis Date = 10/07/2015 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20152780015  Analysis Date = 10/07/2015 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20152710074  Analysis Date = 10/06/2015 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20152640031  Analysis Date = 09/30/2015 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20152590168  Analysis Date = 09/17/2015 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20152510015  Analysis Date = 09/16/2015 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20152430087  Analysis Date = 09/01/2015 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20152360161  Analysis Date = 08/25/2015 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20152330023  Analysis Date = 08/20/2015 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20152230123  Analysis Date = 08/19/2015 
 Lab Value = -.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20152150081  Analysis Date = 08/05/2015 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20152080071  Analysis Date = 07/29/2015 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20152010054  Analysis Date = 07/27/2015 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20151940026  Analysis Date = 07/09/2015 
 Lab Value = 0.0031 
 RPT Level = 0.004 
 Lab Sample ID = 20151870013  Analysis Date = 07/08/2015 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20151800056  Analysis Date = 07/07/2015 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20151730017  Analysis Date = 06/29/2015 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20151660033  Analysis Date = 06/24/2015 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20151620206  Analysis Date = 06/10/2015 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20151530197  Analysis Date = 06/04/2015 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20151460122  Analysis Date = 05/28/2015 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20151390199  Analysis Date = 05/20/2015 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20151310072  Analysis Date = 05/14/2015 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20151240056  Analysis Date = 05/11/2015 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20151180075  Analysis Date = 05/11/2015 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20151140034  Analysis Date = 04/29/2015 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20151050043  Analysis Date = 04/21/2015 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20150970077  Analysis Date = 05/07/2015 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20150900047  Analysis Date = 04/09/2015 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20150850046  Analysis Date = 04/09/2015 
 Lab Value = -.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20150770030  Analysis Date = 03/19/2015 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20150690110  Analysis Date = 03/17/2015 
 Lab Value = 0.0051 
 RPT Level = 0.004 
 Lab Sample ID = 20150610108  Analysis Date = 03/05/2015 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20150540035  Analysis Date = 03/03/2015 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20150490026  Analysis Date = 02/26/2015 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20150400036  Analysis Date = 02/26/2015 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20150330028  Analysis Date = 02/18/2015 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20150260018  Analysis Date = 02/04/2015 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20150200028  Analysis Date = 01/15/2015 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20150120025  Analysis Date = 01/13/2015 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20150050018  Analysis Date = 01/13/2015 
 Lab Value = 0.0023 
 RPT Level = 0.004 
 Lab Sample ID = 20143630011  Analysis Date = 01/08/2015 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20143560053  Analysis Date = 01/07/2015 
 Lab Value = 0.0017 
 RPT Level = 0.004 
 Lab Sample ID = 20143490027  Analysis Date = 12/17/2014 
 Lab Value = -.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20143420027  Analysis Date = 12/17/2014 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20143360081  Analysis Date = 12/10/2014 
 Lab Value = -.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20143300045  Analysis Date = 12/10/2014 
 Lab Value = -.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20143230052  Analysis Date = 12/03/2014 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20143160021  Analysis Date = 11/18/2014 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20143080076  Analysis Date = 11/04/2014 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20143010069  Analysis Date = 10/30/2014 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20142950130  Analysis Date = 10/28/2014 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20142880087  Analysis Date = 10/16/2014 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20142790035  Analysis Date = 10/15/2014 
 Lab Value = 0.0023 
 RPT Level = 0.004 
 Lab Sample ID = 20142720121  Analysis Date = 10/08/2014 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20142650111  Analysis Date = 10/02/2014 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20142590052  Analysis Date = 09/25/2014 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20142520006  Analysis Date = 09/18/2014 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20142470054  Analysis Date = 08/20/2014 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20142230083  Analysis Date = 08/14/2014 
 Lab Value = -.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20142160070  Analysis Date = 08/05/2014 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20142090218  Analysis Date = 07/30/2014 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20142030078  Analysis Date = 07/23/2014 
 Lab Value = -.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20141960043  Analysis Date = 07/22/2014 
 Lab Value = -.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20141890090  Analysis Date = 07/17/2014 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20141820108  Analysis Date = 07/02/2014 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20141750150  Analysis Date = 07/09/2014 
 Lab Value = -.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20141680086  Analysis Date = 06/16/2014 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20141620051  Analysis Date = 06/09/2014 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20141550065  Analysis Date = 06/04/2014 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20141470150  Analysis Date = 05/28/2014 
 Lab Value = 0.0022 
 RPT Level = 0.004 
 Lab Sample ID = 20141400016  Analysis Date = 05/20/2014 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20141340004  Analysis Date = 05/13/2014 
 Lab Value = 0.0024 
 RPT Level = 0.004 
 Lab Sample ID = 20141250088  Analysis Date = 05/06/2014 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20141190018  Analysis Date = 04/29/2014 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20141130029  Analysis Date = 04/17/2014 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20141050011  Analysis Date = 04/15/2014 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20140970031  Analysis Date = 04/03/2014 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20140900029  Analysis Date = 04/02/2014 
 Lab Value = -.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20140840094  Analysis Date = 03/25/2014 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20140760030  Analysis Date = 03/20/2014 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20140690028  Analysis Date = 03/20/2014 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20140630125  Analysis Date = 02/27/2014 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20140550053  Analysis Date = 02/12/2014 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20140410010  Analysis Date = 02/10/2014 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20140340025  Analysis Date = 02/06/2014 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20140270198  Analysis Date = 01/29/2014 
 Lab Value = 0.0021 
 RPT Level = 0.004 
 Lab Sample ID = 20140210048  Analysis Date = 01/28/2014 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20140130052  Analysis Date = 01/23/2014 
 Lab Value = 0.0022 
 RPT Level = 0.004 
 Lab Sample ID = 20140070068  Analysis Date = 01/21/2014 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20133580057  Analysis Date = 01/09/2014 
 Lab Value = 0.0039 
 RPT Level = 0.004 
 Lab Sample ID = 20133500079  Analysis Date = 01/08/2014 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20133430112  Analysis Date = 12/12/2013 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20133360023  Analysis Date = 12/12/2013 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20133300014  Analysis Date = 10/21/2009 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20092720011  Analysis Date = 10/08/2009 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20092640026  Analysis Date = 10/01/2009 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20092570049  Analysis Date = 09/30/2009 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20092520132  Analysis Date = 09/17/2009 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20092430155  Analysis Date = 09/03/2009 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20092360171  Analysis Date = 09/02/2009 
 Lab Value = -.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20092290211  Analysis Date = 08/21/2009 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20092220169  Analysis Date = 08/13/2009 
 Lab Value = -.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20092150073  Analysis Date = 08/07/2009 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20092090263  Analysis Date = 07/30/2009 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20092010116  Analysis Date = 07/22/2009 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20091950026  Analysis Date = 07/16/2009 
 Lab Value = -.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20091870025  Analysis Date = 07/08/2009 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20091730218  Analysis Date = 06/25/2009 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20091660206  Analysis Date = 07/07/2009 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20091590088  Analysis Date = 06/10/2009 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20091520151  Analysis Date = 06/04/2009 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20091460188  Analysis Date = 05/28/2009 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20091380122  Analysis Date = 05/27/2009 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20091320020  Analysis Date = 05/14/2009 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20091240123  Analysis Date = 05/06/2009 
 Lab Value = -.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20091170110  Analysis Date = 04/30/2009 
 Lab Value = -.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20091110135  Analysis Date = 04/23/2009 
 Lab Value = 0.0028 
 RPT Level = 0.004 
 Lab Sample ID = 20091030081  Analysis Date = 04/16/2009 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20090960054  Analysis Date = 04/15/2009 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20090890069  Analysis Date = 04/08/2009 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20090820029  Analysis Date = 04/02/2009 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20090750048  Analysis Date = 03/31/2009 
 Lab Value = -.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20090680045  Analysis Date = 03/10/2009 
 Lab Value = 0.0024 
 RPT Level = 0.004 
 Lab Sample ID = 20090610057  Analysis Date = 03/05/2009 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20090540030  Analysis Date = 02/26/2009 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20090480058  Analysis Date = 02/19/2009 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20090400032  Analysis Date = 02/10/2009 
 Lab Value = -.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20090330037  Analysis Date = 02/05/2009 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20090260027  Analysis Date = 01/22/2009 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20090200036  Analysis Date = 03/03/2009 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20090120049  Analysis Date = 01/15/2009 
 Lab Value = 0.0024 
 RPT Level = 0.004 
 Lab Sample ID = 20090050019  Analysis Date = 01/14/2009 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20083650083  Analysis Date = 01/14/2009 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20083570034  Analysis Date = 01/08/2009 
 Lab Value = 0.0035 
 RPT Level = 0.004 
 Lab Sample ID = 20083500071  Analysis Date = 01/02/2009 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20083450064  Analysis Date = 12/04/2008 
 Lab Value = 0.0017 
 RPT Level = 0.004 
 Lab Sample ID = 20083360040  Analysis Date = 12/04/2008 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20083290062  Analysis Date = 12/02/2008 
 Lab Value = 0.0029 
 RPT Level = 0.004 
 Lab Sample ID = 20083220064  Analysis Date = 11/19/2008 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20083150065  Analysis Date = 11/06/2008 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20083080100  Analysis Date = 11/04/2008 
 Lab Value = -.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20083010109  Analysis Date = 10/22/2008 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20082940063  Analysis Date = 10/22/2008 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20082880040  Analysis Date = 10/21/2008 
 Lab Value = 0.0021 
 RPT Level = 0.004 
 Lab Sample ID = 20082800042  Analysis Date = 10/08/2008 
 Lab Value = 0.0021 
 RPT Level = 0.004 
 Lab Sample ID = 20082730062  Analysis Date = 10/01/2008 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20082660047  Analysis Date = 09/24/2008 
 Lab Value = -.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20082590105  Analysis Date = 09/17/2008 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20082520008  Analysis Date = 09/11/2008 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20082460098  Analysis Date = 09/11/2008 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20082380080  Analysis Date = 08/26/2008 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20082310131  Analysis Date = 08/19/2008 
 Lab Value = -.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20082250010  Analysis Date = 08/13/2008 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20082190011  Analysis Date = 07/29/2008 
 Lab Value = 0.0031 
 RPT Level = 0.004 
 Lab Sample ID = 20082030127  Analysis Date = 07/24/2008 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20081970139  Analysis Date = 07/22/2008 
 Lab Value = -.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20081890044  Analysis Date = 07/15/2008 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20081820059  Analysis Date = 07/08/2008 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20081750128  Analysis Date = 07/01/2008 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20081680067  Analysis Date = 06/24/2008 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20081620017  Analysis Date = 06/11/2008 
 Lab Value = 0.0027 
 RPT Level = 0.004 
 Lab Sample ID = 20081540109  Analysis Date = 06/05/2008 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20081480068  Analysis Date = 06/04/2008 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20081400061  Analysis Date = 05/22/2008 
 Lab Value = 0.0012 
 RPT Level = 0.004 
 Lab Sample ID = 20081330112  Analysis Date = 05/08/2008 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20081260070  Analysis Date = 05/06/2008 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20081190055  Analysis Date = 04/29/2008 
 Lab Value = 0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20081120033  Analysis Date = 04/23/2008 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20081050114  Analysis Date = 04/10/2008 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20080980084  Analysis Date = 04/08/2008 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20080920083  Analysis Date = 04/01/2008 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20080840064  Analysis Date = 03/25/2008 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20080770124  Analysis Date = 03/19/2008 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20080700074  Analysis Date = 03/12/2008 
 Lab Value = 0.0008 
 RPT Level = 0.004 
 Lab Sample ID = 20080630067  Analysis Date = 03/04/2008 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20080560070  Analysis Date = 02/28/2008 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20080510055  Analysis Date = 02/21/2008 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20080420072  Analysis Date = 02/14/2008 
 Lab Value = -0.002 
 RPT Level = 0.004 
 Lab Sample ID = 20080360051  Analysis Date = 01/31/2008 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20080280050  Analysis Date = 01/29/2008 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20080230021  Analysis Date = 01/17/2008 
 Lab Value = 0.0015 
 RPT Level = 0.004 
 Lab Sample ID = 20080140027  Analysis Date = 01/11/2008 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20080070023  Analysis Date = 01/09/2008 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20073620004  Analysis Date = 01/04/2008 
 Lab Value = 0.0017 
 RPT Level = 0.004 
 Lab Sample ID = 20073510098  Analysis Date = 01/03/2008 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20073440039  Analysis Date = 12/13/2007 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20073370069  Analysis Date = 12/03/2007 
 Lab Value = 0.0021 
 RPT Level = 0.004 
 Lab Sample ID = 20073300042  Analysis Date = 12/06/2007 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20073230113  Analysis Date = 11/29/2007 
 Lab Value = 0.0053 
 RPT Level = 0.004 
 Lab Sample ID = 20073170062  Analysis Date = 11/27/2007 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20073020065  Analysis Date = 11/13/2007 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20072960186  Analysis Date = 11/05/2007 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20072890056  Analysis Date = 10/18/2007 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20072850025  Analysis Date = 10/10/2007 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20072600129  Analysis Date = 09/27/2007 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20072540015  Analysis Date = 09/19/2007 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20072480018  Analysis Date = 09/13/2007 
 Lab Value = -.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20072400035  Analysis Date = 09/06/2007 
 Lab Value = 0.0026 
 RPT Level = 0.004 
 Lab Sample ID = 20072330109  Analysis Date = 08/29/2007 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20072260198  Analysis Date = 08/28/2007 
 Lab Value = 0.0038 
 RPT Level = 0.004 
 Lab Sample ID = 20072210252  Analysis Date = 08/16/2007 
 Lab Value = 0.0018 
 RPT Level = 0.004 
 Lab Sample ID = 20072110162  Analysis Date = 08/09/2007 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20072040101  Analysis Date = 08/02/2007 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20071900105  Analysis Date = 07/24/2007 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20071830158  Analysis Date = 07/18/2007 
 Lab Value = 0.0024 
 RPT Level = 0.004 
 Lab Sample ID = 20071770201  Analysis Date = 07/03/2007 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20071690119  Analysis Date = 06/21/2007 
 Lab Value = 0.0007 
 RPT Level = 0.004 
 Lab Sample ID = 20071620045  Analysis Date = 06/21/2007 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20071560026  Analysis Date = 06/14/2007 
 Lab Value = 0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20071500033  Analysis Date = 06/06/2007 
 Lab Value = 0.0029 
 RPT Level = 0.004 
 Lab Sample ID = 20071410089  Analysis Date = 05/22/2007 
 Lab Value = 0.0011 
 RPT Level = 0.004 
 Lab Sample ID = 20071340113  Analysis Date = 05/17/2007 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20071280019  Analysis Date = 05/16/2007 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20071200089  Analysis Date = 05/03/2007 
 Lab Value = 0.0014 
 RPT Level = 0.004 
 Lab Sample ID = 20071130120  Analysis Date = 05/02/2007 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20071070021  Analysis Date = 04/24/2007 
 Lab Value = 0.0019 
 RPT Level = 0.004 
 Lab Sample ID = 20070990050  Analysis Date = 04/19/2007 
 Lab Value = 0 
 RPT Level = 0.004 
 Lab Sample ID = 20070930070  Analysis Date = 04/12/2007 
 Lab Value = 0.0024 
 RPT Level = 0.004 
 Lab Sample ID = 20070860217  Analysis Date = 04/10/2007 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20070780128  Analysis Date = 03/28/2007 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20070710075  Analysis Date = 03/20/2007 
 Lab Value = 0.0042 
 RPT Level = 0.004 
 Lab Sample ID = 20070650009  Analysis Date = 03/14/2007 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20070580141  Analysis Date = 03/08/2007 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20070540023  Analysis Date = 03/01/2007 
 Lab Value = 0.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20070460015  Analysis Date = 03/01/2007 
 Lab Value = 0.0022 
 RPT Level = 0.004 
 Lab Sample ID = 20070400103  Analysis Date = 02/13/2007 
 Lab Value = 0.0017 
 RPT Level = 0.004 
 Lab Sample ID = 20070250023  Analysis Date = 01/24/2007 
 Lab Value = -.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20070180071  Analysis Date = 01/17/2007 
 Lab Value = 0.0004 
 RPT Level = 0.004 
 Lab Sample ID = 20070120012  Analysis Date = 01/11/2007 
 Lab Value = 0.0001 
 RPT Level = 0.004 
 Lab Sample ID = 20070040013  Analysis Date = 01/11/2007 
 Lab Value = 0.0025 
 RPT Level = 0.004 
 Lab Sample ID = 20063610084  Analysis Date = 01/09/2007 
 Lab Value = 0.0006 
 RPT Level = 0.004 
 Lab Sample ID = 20063520072  Analysis Date = 01/05/2007 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20063450081  Analysis Date = 12/14/2006 
 Lab Value = 0.0002 
 RPT Level = 0.004 
 Lab Sample ID = 20063380055  Analysis Date = 12/12/2006 
 Lab Value = 0.003 
 RPT Level = 0.004 
 Lab Sample ID = 20063310047  Analysis Date = 12/07/2006 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20063240079  Analysis Date = 11/29/2006 
 Lab Value = -0.001 
 RPT Level = 0.004 
 Lab Sample ID = 20063180103  Analysis Date = 11/20/2006 
 Lab Value = 0.0005 
 RPT Level = 0.004 
 Lab Sample ID = 20063100080  Analysis Date = 11/02/2006 
 Lab Value = 0.0013 
 RPT Level = 0.004 
 Lab Sample ID = 20063030096  Analysis Date = 10/27/2006 
 Lab Value = -.0003 
 RPT Level = 0.004 
 Lab Sample ID = 20062960133  Analysis Date = 10/26/2006 
 Lab Value = 0.0016 
 RPT Level = 0.004 
 Lab Sample ID = 20062910013  Analysis Date = 10/18/2006 
 Lab Value = 0.0009 
 RPT Level = 0.004 
 Lab Sample ID = 20062850014  Analysis Date = 10/17/2006 
 Lab Value = 0.0059 
 RPT Level = 0.004 
 Lab Sample ID = 20062780050  Analysis Date = 10/04/2006 
 Lab Value = 0.0012 
 RPT Level = 0.002 
 Lab Sample ID = 20062620013  Analysis Date = 10/12/2006 
 Lab Value = 0.0018 
 RPT Level = 0.002 
 Lab Sample ID = 20062540016  Analysis Date = 09/25/2006 
 Lab Value = 0.003 
 RPT Level = 0.002 
 Lab Sample ID = 20062500008  Analysis Date = 09/13/2006 
 Lab Value = 0.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20062350182  Analysis Date = 08/23/2006 
 Lab Value = -.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20062270273  Analysis Date = 08/16/2006 
 Lab Value = 0.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20062220039  Analysis Date = 07/27/2006 
 Lab Value = 0.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20062020314  Analysis Date = 07/20/2006 
 Lab Value = -.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20061950007  Analysis Date = 07/11/2006 
 Lab Value = 0.0027 
 RPT Level = 0.002 
 Lab Sample ID = 20061880009  Analysis Date = 06/27/2006 
 Lab Value = 0.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20061730014  Analysis Date = 06/21/2006 
 Lab Value = 0.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20061670021  Analysis Date = 06/13/2006 
 Lab Value = -.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20061580018  Analysis Date = 05/25/2006 
 Lab Value = 0.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20061370016  Analysis Date = 05/12/2006 
 Lab Value = -0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20061280111  Analysis Date = 05/10/2006 
 Lab Value = 0.0059 
 RPT Level = 0.002 
 Lab Sample ID = 20061220099  Analysis Date = 09/28/2005 
 Lab Value = 0 
 RPT Level = 0.002 
 Lab Sample ID = 20052590035  Analysis Date = 09/16/2005 
 Lab Value = -0.003 
 RPT Level = 0.002 
 Lab Sample ID = 20052520006  Analysis Date = 09/15/2005 
 Lab Value = 0.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20052430006  Analysis Date = 09/08/2005 
 Lab Value = -.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20052370002  Analysis Date = 09/01/2005 
 Lab Value = 0.0014 
 RPT Level = 0.002 
 Lab Sample ID = 20052300009  Analysis Date = 08/25/2005 
 Lab Value = 0.0047 
 RPT Level = 0.002 
 Lab Sample ID = 20052210012  Analysis Date = 08/23/2005 
 Lab Value = 0.0001 
 RPT Level = 0.002 
 Lab Sample ID = 20052160007  Analysis Date = 08/23/2005 
 Lab Value = 0.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20052160005  Analysis Date = 07/28/2005 
 Lab Value = -.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20052010007  Analysis Date = 08/04/2005 
 Lab Value = -0.002 
 RPT Level = 0.002 
 Lab Sample ID = 20051940015  Analysis Date = 07/20/2005 
 Lab Value = -.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20051880018  Analysis Date = 07/20/2005 
 Lab Value = -0.002 
 RPT Level = 0.002 
 Lab Sample ID = 20051800189  Analysis Date = 07/19/2005 
 Lab Value = -0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20051740019  Analysis Date = 07/11/2005 
 Lab Value = 0.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20051660174  Analysis Date = 06/29/2005 
 Lab Value = 0.0001 
 RPT Level = 0.002 
 Lab Sample ID = 20051590025  Analysis Date = 06/22/2005 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20051530021  Analysis Date = 06/13/2005 
 Lab Value = 0.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20051440043  Analysis Date = 06/09/2005 
 Lab Value = 0.0017 
 RPT Level = 0.002 
 Lab Sample ID = 20051380014  Analysis Date = 05/26/2005 
 Lab Value = -0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20051320029  Analysis Date = 05/25/2005 
 Lab Value = 0.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20051250003  Analysis Date = 05/11/2005 
 Lab Value = 0 
 RPT Level = 0.002 
 Lab Sample ID = 20051170012  Analysis Date = 05/05/2005 
 Lab Value = -.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20051110007  Analysis Date = 04/27/2005 
 Lab Value = 0.0019 
 RPT Level = 0.002 
 Lab Sample ID = 20051020018  Analysis Date = 04/14/2005 
 Lab Value = 0.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20050950044  Analysis Date = 04/14/2005 
 Lab Value = -.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20050880116  Analysis Date = 04/07/2005 
 Lab Value = 0.0023 
 RPT Level = 0.002 
 Lab Sample ID = 20050840096  Analysis Date = 03/31/2005 
 Lab Value = -0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20050750004  Analysis Date = 03/17/2005 
 Lab Value = -.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20050700007  Analysis Date = 03/17/2005 
 Lab Value = -.0001 
 RPT Level = 0.002 
 Lab Sample ID = 20050700004  Analysis Date = 03/15/2005 
 Lab Value = 0.0012 
 RPT Level = 0.002 
 Lab Sample ID = 20050670011  Analysis Date = 03/03/2005 
 Lab Value = 0.0011 
 RPT Level = 0.002 
 Lab Sample ID = 20050550024  Analysis Date = 03/01/2005 
 Lab Value = 0.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20050480005  Analysis Date = 02/25/2005 
 Lab Value = 0.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20050410004  Analysis Date = 02/17/2005 
 Lab Value = 0.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20050340020  Analysis Date = 02/16/2005 
 Lab Value = 0.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20050260024  Analysis Date = 02/09/2005 
 Lab Value = -.0006 
 RPT Level = 0.002 
 Lab Sample ID = 20050200048  Analysis Date = 02/08/2005 
 Lab Value = 0.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20050130091  Analysis Date = 01/18/2005 
 Lab Value = -0.002 
 RPT Level = 0.002 
 Lab Sample ID = 20050070016  Analysis Date = 01/14/2005 
 Lab Value = 0.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20043650002  Analysis Date = 01/11/2005 
 Lab Value = 0.0012 
 RPT Level = 0.002 
 Lab Sample ID = 20043580037  Analysis Date = 01/11/2005 
 Lab Value = 0.0015 
 RPT Level = 0.002 
 Lab Sample ID = 20043580035  Analysis Date = 01/06/2005 
 Lab Value = 0.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20043520023  Analysis Date = 01/06/2005 
 Lab Value = -.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20043510018  Analysis Date = 12/29/2004 
 Lab Value = 0 
 RPT Level = 0.002 
 Lab Sample ID = 20043450069  Analysis Date = 12/29/2004 
 Lab Value = 0.002 
 RPT Level = 0.002 
 Lab Sample ID = 20043440147  Analysis Date = 12/22/2004 
 Lab Value = 0.0012 
 RPT Level = 0.002 
 Lab Sample ID = 20043380005  Analysis Date = 12/22/2004 
 Lab Value = -.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20043380002  Analysis Date = 12/13/2004 
 Lab Value = 0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20043310059  Analysis Date = 12/14/2004 
 Lab Value = 0.0019 
 RPT Level = 0.002 
 Lab Sample ID = 20043280048  Analysis Date = 11/24/2004 
 Lab Value = 0.0016 
 RPT Level = 0.002 
 Lab Sample ID = 20043240012  Analysis Date = 09/23/2004 
 Lab Value = 0.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20042450138  Analysis Date = 09/22/2004 
 Lab Value = 0.0054 
 RPT Level = 0.002 
 Lab Sample ID = 20042400089  Analysis Date = 09/09/2004 
 Lab Value = 0.0017 
 RPT Level = 0.002 
 Lab Sample ID = 20042370105  Analysis Date = 09/02/2004 
 Lab Value = 0.0018 
 RPT Level = 0.002 
 Lab Sample ID = 20042330206  Analysis Date = 09/02/2004 
 Lab Value = 0.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20042320136  Analysis Date = 09/02/2004 
 Lab Value = 0.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20042320138  Analysis Date = 08/25/2004 
 Lab Value = -0.002 
 RPT Level = 0.002 
 Lab Sample ID = 20042240114  Analysis Date = 08/17/2004 
 Lab Value = 0.0013 
 RPT Level = 0.002 
 Lab Sample ID = 20042170123  Analysis Date = 08/11/2004 
 Lab Value = 0.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20042110015  Analysis Date = 08/03/2004 
 Lab Value = 0 
 RPT Level = 0.002 
 Lab Sample ID = 20042040039  Analysis Date = 07/21/2004 
 Lab Value = 0.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20041960050  Analysis Date = 07/20/2004 
 Lab Value = -0.002 
 RPT Level = 0.002 
 Lab Sample ID = 20041900062  Analysis Date = 07/20/2004 
 Lab Value = 0.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20041820035  Analysis Date = 06/29/2004 
 Lab Value = -.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20041750057  Analysis Date = 07/08/2004 
 Lab Value = -.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20041700080  Analysis Date = 06/29/2004 
 Lab Value = 0 
 RPT Level = 0.002 
 Lab Sample ID = 20041610055  Analysis Date = 06/24/2004 
 Lab Value = 0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20041550019  Analysis Date = 06/17/2004 
 Lab Value = -.0001 
 RPT Level = 0.002 
 Lab Sample ID = 20041470132  Analysis Date = 06/08/2004 
 Lab Value = -.0001 
 RPT Level = 0.002 
 Lab Sample ID = 20041400016  Analysis Date = 05/19/2004 
 Lab Value = 0.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20041260099  Analysis Date = 05/11/2004 
 Lab Value = -.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20041200046  Analysis Date = 04/23/2004 
 Lab Value = 0.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20041130016  Analysis Date = 04/15/2004 
 Lab Value = 0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20041050022  Analysis Date = 04/08/2004 
 Lab Value = -.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20040980007  Analysis Date = 04/06/2004 
 Lab Value = 0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20040930009  Analysis Date = 04/02/2004 
 Lab Value = 0.0003 
 RPT Level = 0.002 
 Lab Sample ID = 20040910012  Analysis Date = 03/26/2004 
 Lab Value = 0.0016 
 RPT Level = 0.002 
 Lab Sample ID = 20040850021  Analysis Date = 03/26/2004 
 Lab Value = 0.0046 
 RPT Level = 0.002 
 Lab Sample ID = 20040830056  Analysis Date = 03/23/2004 
 Lab Value = 0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20040790023  Analysis Date = 03/17/2004 
 Lab Value = 0.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20040760010  Analysis Date = 03/16/2004 
 Lab Value = 0.003 
 RPT Level = 0.002 
 Lab Sample ID = 20040720029  Analysis Date = 03/16/2004 
 Lab Value = 0.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20040710005  Analysis Date = 03/11/2004 
 Lab Value = 0.0012 
 RPT Level = 0.002 
 Lab Sample ID = 20040680093  Analysis Date = 03/09/2004 
 Lab Value = -.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20040650001  Analysis Date = 03/03/2004 
 Lab Value = 0.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20040580032  Analysis Date = 02/25/2004 
 Lab Value = 0.0033 
 RPT Level = 0.002 
 Lab Sample ID = 20040550018  Analysis Date = 02/24/2004 
 Lab Value = 0.0023 
 RPT Level = 0.002 
 Lab Sample ID = 20040510134  Analysis Date = 02/19/2004 
 Lab Value = 0.0008 
 RPT Level = 0.002 
 Lab Sample ID = 20040490025  Analysis Date = 02/17/2004 
 Lab Value = 0.0012 
 RPT Level = 0.002 
 Lab Sample ID = 20040440035  Analysis Date = 02/17/2004 
 Lab Value = 0.0022 
 RPT Level = 0.002 
 Lab Sample ID = 20040420001  Analysis Date = 02/10/2004 
 Lab Value = 0.0014 
 RPT Level = 0.002 
 Lab Sample ID = 20040370017  Analysis Date = 02/09/2004 
 Lab Value = 0.0001 
 RPT Level = 0.002 
 Lab Sample ID = 20040340024  Analysis Date = 02/03/2004 
 Lab Value = -.0004 
 RPT Level = 0.002 
 Lab Sample ID = 20040300012  Analysis Date = 02/03/2004 
 Lab Value = -.0007 
 RPT Level = 0.002 
 Lab Sample ID = 20040270036  Analysis Date = 01/27/2004 
 Lab Value = 0.001 
 RPT Level = 0.002 
 Lab Sample ID = 20040230030  Analysis Date = 01/22/2004 
 Lab Value = 0.0012 
 RPT Level = 0.002 
 Lab Sample ID = 20040210154  Analysis Date = 01/21/2004 
 Lab Value = -.0002 
 RPT Level = 0.002 
 Lab Sample ID = 20040200023  Analysis Date = 01/16/2004 
 Lab Value = 0.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20040150075  Analysis Date = 01/12/2004 
 Lab Value = 0.0009 
 RPT Level = 0.002 
 Lab Sample ID = 20040090020  Analysis Date = 01/08/2004 
 Lab Value = 0 
 RPT Level = 0.002 
 Lab Sample ID = 20040070032  Analysis Date = 01/08/2004 
 Lab Value = 0.0005 
 RPT Level = 0.002 
 Lab Sample ID = 20040050016  Analysis Date = 09/25/2003 
 Lab Value = -.0002 
 RPT Level = 0.0019 
 Lab Sample ID = 20032660009  Analysis Date = 09/23/2003 
 Lab Value = 0.0006 
 RPT Level = 0.0019 
 Lab Sample ID = 20032600107  Analysis Date = 09/10/2003 
 Lab Value = 0.0007 
 RPT Level = 0.0019 
 Lab Sample ID = 20032520179  Analysis Date = 09/04/2003 
 Lab Value = -.0004 
 RPT Level = 0.0019 
 Lab Sample ID = 20032450195  Analysis Date = 08/27/2003 
 Lab Value = 0.0039 
 RPT Level = 0.0019 
 Lab Sample ID = 20032380029  Analysis Date = 08/20/2003 
 Lab Value = -.0005 
 RPT Level = 0.0019 
 Lab Sample ID = 20032310028  Analysis Date = 08/15/2003 
 Lab Value = 0.0004 
 RPT Level = 0.0019 
 Lab Sample ID = 20032250256  Analysis Date = 08/07/2003 
 Lab Value = 0.0006 
 RPT Level = 0.0019 
 Lab Sample ID = 20032180019  Analysis Date = 08/01/2003 
 Lab Value = 0.0012 
 RPT Level = 0.0019 
 Lab Sample ID = 20032100004  Analysis Date = 07/24/2003 
 Lab Value = 0.0016 
 RPT Level = 0.0019 
 Lab Sample ID = 20032040043  Analysis Date = 07/16/2003 
 Lab Value = 0.0004 
 RPT Level = 0.0019 
 Lab Sample ID = 20031960025  Analysis Date = 07/10/2003 
 Lab Value = 0.0005 
 RPT Level = 0.0019 
 Lab Sample ID = 20031900098  Analysis Date = 07/08/2003 
 Lab Value = 0.0009 
 RPT Level = 0.0019 
 Lab Sample ID = 20031820037  Analysis Date = 07/07/2003 
 Lab Value = 0.0005 
 RPT Level = 0.0019 
 Lab Sample ID = 20031770041  Analysis Date = 06/20/2003 
 Lab Value = 0.0013 
 RPT Level = 0.0019 
 Lab Sample ID = 20031700013  Analysis Date = 06/13/2003 
 Lab Value = 0.0004 
 RPT Level = 0.0019 
 Lab Sample ID = 20031630053  Analysis Date = 06/11/2003 
 Lab Value = 0.0035 
 RPT Level = 0.0019 
 Lab Sample ID = 20031600109  Analysis Date = 05/29/2003 
 Lab Value = 0.0013 
 RPT Level = 0.0019 
 Lab Sample ID = 20031480059  Analysis Date = 05/27/2003 
 Lab Value = 0.0003 
 RPT Level = 0.0019 
 Lab Sample ID = 20031430019  Analysis Date = 05/21/2003 
 Lab Value = -.0002 
 RPT Level = 0.0019 
 Lab Sample ID = 20031400115  Analysis Date = 05/13/2003 
 Lab Value = 0.0003 
 RPT Level = 0.0019 
 Lab Sample ID = 20031290084  Analysis Date = 05/05/2003 
 Lab Value = -0.002 
 RPT Level = 0.0019 
 Lab Sample ID = 20031220070  Analysis Date = 05/01/2003 
 Lab Value = 0.0009 
 RPT Level = 0.0019 
 Lab Sample ID = 20031200043  Analysis Date = 04/22/2003 
 Lab Value = -.0001 
 RPT Level = 0.0019 
 Lab Sample ID = 20031080208  Analysis Date = 04/08/2003 
 Lab Value = 0.0011 
 RPT Level = 0.0019 
 Lab Sample ID = 20030970018  Analysis Date = 04/03/2003 
 Lab Value = 0.0011 
 RPT Level = 0.0019 
 Lab Sample ID = 20030920027  Analysis Date = 04/03/2003 
 Lab Value = 0.003 
 RPT Level = 0.0019 
 Lab Sample ID = 20030900015  Analysis Date = 03/28/2003 
 Lab Value = 0.0011 
 RPT Level = 0.0019 
 Lab Sample ID = 20030860023  Analysis Date = 03/13/2003 
 Lab Value = 0.0003 
 RPT Level = 0.0019 
 Lab Sample ID = 20030710021  Analysis Date = 03/13/2003 
 Lab Value = -0.001 
 RPT Level = 0.0019 
 Lab Sample ID = 20030660148  Analysis Date = 03/03/2003 
 Lab Value = 0.0002 
 RPT Level = 0.0019 
 Lab Sample ID = 20030590040  Analysis Date = 02/27/2003 
 Lab Value = 0.0014 
 RPT Level = 0.0019 
 Lab Sample ID = 20030570061  Analysis Date = 02/11/2003 
 Lab Value = 0.0014 
 RPT Level = 0.0019 
 Lab Sample ID = 20030410034  Analysis Date = 02/05/2003 
 Lab Value = 0.0005 
 RPT Level = 0.0019 
 Lab Sample ID = 20030350008  Analysis Date = 02/05/2003 
 Lab Value = 0.0009 
 RPT Level = 0.0019 
 Lab Sample ID = 20030310028  Analysis Date = 01/31/2003 
 Lab Value = 0.0012 
 RPT Level = 0.0019 
 Lab Sample ID = 20030300004  Analysis Date = 01/16/2003 
 Lab Value = 0.0011 
 RPT Level = 0.0019 
 Lab Sample ID = 20030150009  Analysis Date = 01/15/2003 
 Lab Value = 0.0008 
 RPT Level = 0.0019 
 Lab Sample ID = 20030140019  Analysis Date = 01/08/2003 
 Lab Value = -0.001 
 RPT Level = 0.0019 
 Lab Sample ID = 20030020002  Analysis Date = 01/08/2003 
 Lab Value = 0.0003 
 RPT Level = 0.0019 
 Lab Sample ID = 20023650009  Analysis Date = 12/18/2002 
 Lab Value = -0.001 
 RPT Level = 0.0019 
 Lab Sample ID = 20023500166  Analysis Date = 12/18/2002 
 Lab Value = 0.0008 
 RPT Level = 0.0019 
 Lab Sample ID = 20023500092  Analysis Date = 12/04/2002 
 Lab Value = 0.0009 
 RPT Level = 0.0019 
 Lab Sample ID = 20023370026  Analysis Date = 12/04/2002 
 Lab Value = 0.001 
 RPT Level = 0.0019 
 Lab Sample ID = 20023370025  Analysis Date = 12/04/2002 
 Lab Value = 0.0005 
 RPT Level = 0.0019 
 Lab Sample ID = 20023330096  Analysis Date = 12/04/2002 
 Lab Value = 0.0016 
 RPT Level = 0.0019 
 Lab Sample ID = 20023360020  Analysis Date = 12/04/2002 
 Lab Value = 0.001 
 RPT Level = 0.0019 
 Lab Sample ID = 20023310020  Analysis Date = 11/07/2002 
 Lab Value = 0.0014 
 RPT Level = 0.0019 
 Lab Sample ID = 20023040033  Analysis Date = 10/28/2002 
 Lab Value = -0.001 
 RPT Level = 0.0019 
 Lab Sample ID = 20022970050  Analysis Date = 10/28/2002 
 Lab Value = -.0006 
 RPT Level = 0.0019 
 Lab Sample ID = 20022970049  Analysis Date = 10/28/2002 
 Lab Value = 0.0005 
 RPT Level = 0.0019 
 Lab Sample ID = 20022970048  Analysis Date = 10/24/2002 
 Lab Value = 0.0015 
 RPT Level = 0.0019 
 Lab Sample ID = 20022960022  Analysis Date = 09/05/2002 
 Lab Value = 0.0015 
 RPT Level = 0.0019 
 Lab Sample ID = 20022470017  Analysis Date = 09/04/2002 
 Lab Value = 0.0022 
 RPT Level = 0.0019 
 Lab Sample ID = 20022460136  Analysis Date = 08/23/2002 
 Lab Value = -.0003 
 RPT Level = 0.0019 
 Lab Sample ID = 20022340198  Analysis Date = 08/19/2002 
 Lab Value = 0.0006 
 RPT Level = 0.0019 
 Lab Sample ID = 20022280007  Analysis Date = 08/12/2002 
 Lab Value = 0.0009 
 RPT Level = 0.0019 
 Lab Sample ID = 20022210008  Analysis Date = 08/06/2002 
 Lab Value = 0.0012 
 RPT Level = 0.0019 
 Lab Sample ID = 20022170110  Analysis Date = 08/06/2002 
 Lab Value = 0.0003 
 RPT Level = 0.0019 
 Lab Sample ID = 20022170109  Analysis Date = 07/17/2002 
 Lab Value = 0.0008 
 RPT Level = 0.0019 
 Lab Sample ID = 20021970115  Analysis Date = 07/17/2002 
 Lab Value = 0.001 
 RPT Level = 0.0019 
 Lab Sample ID = 20021960233  Analysis Date = 07/03/2002 
 Lab Value = 0.001 
 RPT Level = 0.0019 
 Lab Sample ID = 20021830021  Analysis Date = 07/01/2002 
 Lab Value = 0.0008 
 RPT Level = 0.0019 
 Lab Sample ID = 20021790005  Analysis Date = 06/20/2002 
 Lab Value = 0 
 RPT Level = 0.0019 
 Lab Sample ID = 20021690012  Analysis Date = 06/17/2002 
 Lab Value = 0.0019 
 RPT Level = 0.0019 
 Lab Sample ID = 20021650006  Analysis Date = 06/05/2002 
 Lab Value = 0.0011 
 RPT Level = 0.0019 
 Lab Sample ID = 20021550018  Analysis Date = 06/03/2002 
 Lab Value = 0.0013 
 RPT Level = 0.0019 
 Lab Sample ID = 20021510056  Analysis Date = 05/29/2002 
 Lab Value = 0.0002 
 RPT Level = 0.0019 
 Lab Sample ID = 20021420159  Analysis Date = 05/14/2002 
 Lab Value = 0.0014 
 RPT Level = 0.0019 
 Lab Sample ID = 20021330224  Analysis Date = 05/14/2002 
 Lab Value = 0 
 RPT Level = 0.0019 
 Lab Sample ID = 20021300018  Analysis Date = 05/07/2002 
 Lab Value = 0.0016 
 RPT Level = 0.0019 
 Lab Sample ID = 20021210087  Analysis Date = 04/30/2002 
 Lab Value = 0.0009 
 RPT Level = 0.0019 
 Lab Sample ID = 20021140035  Analysis Date = 04/30/2002 
 Lab Value = 0.0003 
 RPT Level = 0.0019 
 Lab Sample ID = 20021140034  Analysis Date = 04/16/2002 
 Lab Value = 0.0019 
 RPT Level = 0.0019 
 Lab Sample ID = 20021010014  Analysis Date = 04/09/2002 
 Lab Value = 0.0017 
 RPT Level = 0.0019 
 Lab Sample ID = 20020930111  Analysis Date = 04/09/2002 
 Lab Value = 0.0013 
 RPT Level = 0.0019 
 Lab Sample ID = 20020850093  Analysis Date = 03/26/2002 
 Lab Value = 0.0017 
 RPT Level = 0.0019 
 Lab Sample ID = 20020810193  Analysis Date = 03/19/2002 
 Lab Value = 0 
 RPT Level = 0.0019 
 Lab Sample ID = 20020730106  Analysis Date = 03/11/2002 
 Lab Value = 0.0006 
 RPT Level = 0.0019 
 Lab Sample ID = 20020670024  Analysis Date = 03/05/2002 
 Lab Value = 0.0005 
 RPT Level = 0.0019 
 Lab Sample ID = 20020600007  Analysis Date = 02/27/2002 
 Lab Value = 0.0004 
 RPT Level = 0.0019 
 Lab Sample ID = 20020570017  Analysis Date = 02/20/2002 
 Lab Value = 0.0012 
 RPT Level = 0.0019 
 Lab Sample ID = 20020460046  Analysis Date = 02/06/2002 
 Lab Value = -.0007 
 RPT Level = 0.0019 
 Lab Sample ID = 20020360013  Analysis Date = 02/05/2002 
 Lab Value = -.0002 
 RPT Level = 0.0019 
 Lab Sample ID = 20020320103  Analysis Date = 01/24/2002 
 Lab Value = 0.0002 
 RPT Level = 0.0019 
 Lab Sample ID = 20020220080  Analysis Date = 01/15/2002 
 Lab Value = 0.0017 
 RPT Level = 0.0019 
 Lab Sample ID = 20020110004  Analysis Date = 01/04/2002 
 Lab Value = 0.0004 
 RPT Level = 0.0019 
 Lab Sample ID = 20020020006  Analysis Date = 01/03/2002 
 Lab Value = -.0001 
 RPT Level = 0.0019 
 Lab Sample ID = 20013600208  Analysis Date = 12/20/2001 
 Lab Value = 0.0003 
 RPT Level = 0.0019 
 Lab Sample ID = 20013520043  Analysis Date = 12/17/2001 
 Lab Value = -.0006 
 RPT Level = 0.0019 
 Lab Sample ID = 20013480009  Analysis Date = 12/06/2001 
 Lab Value = 0 
 RPT Level = 0.0019 
 Lab Sample ID = 20013390004  Analysis Date = 11/08/2001 
 Lab Value = 0 
 RPT Level = 0.0019 
 Lab Sample ID = 20013110128  Analysis Date = 09/21/2016 
 RPT Level = 0.004  Analysis Date = 09/21/2016 
 RPT Level = 0.004  Analysis Date = 09/21/2016 
 RPT Level = 0.004  Analysis Date = 09/29/2016 
 RPT Level = 0.004  Analysis Date = 09/29/2016 
 RPT Level = 0.004  Analysis Date = 09/08/2016 
 RPT Level = 0.004  Analysis Date = 09/08/2016 
 RPT Level = 0.004  Analysis Date = 09/29/2016 
 RPT Level = 0.004  Analysis Date = 09/29/2016 
 RPT Level = 0.004  Analysis Date = 08/17/2016 
 RPT Level = 0.004  Analysis Date = 08/17/2016 
 RPT Level = 0.004  Analysis Date = 08/16/2016 
 RPT Level = 0.004  Analysis Date = 08/16/2016 
 RPT Level = 0.004  Analysis Date = 08/03/2016 
 RPT Level = 0.004  Analysis Date = 08/03/2016 
 RPT Level = 0.004  Analysis Date = 07/27/2016 
 RPT Level = 0.004  Analysis Date = 07/27/2016 
 RPT Level = 0.004  Analysis Date = 07/20/2016 
 RPT Level = 0.004  Analysis Date = 07/20/2016 
 RPT Level = 0.004  Analysis Date = 07/14/2016 
 RPT Level = 0.004  Analysis Date = 07/14/2016 
 RPT Level = 0.004  Analysis Date = 07/13/2016 
 RPT Level = 0.004  Analysis Date = 07/13/2016 
 RPT Level = 0.004  Analysis Date = 06/28/2016 
 RPT Level = 0.004  Analysis Date = 06/28/2016 
 RPT Level = 0.004  Analysis Date = 06/21/2016 
 RPT Level = 0.004  Analysis Date = 06/21/2016 
 RPT Level = 0.004  Analysis Date = 06/14/2016 
 RPT Level = 0.004  Analysis Date = 06/14/2016 
 RPT Level = 0.004  Analysis Date = 06/07/2016 
 RPT Level = 0.004  Analysis Date = 06/07/2016 
 RPT Level = 0.004  Analysis Date = 06/07/2016 
 RPT Level = 0.004  Analysis Date = 06/07/2016 
 RPT Level = 0.004  Analysis Date = 05/17/2016 
 RPT Level = 0.004  Analysis Date = 05/17/2016 
 RPT Level = 0.004  Analysis Date = 05/11/2016 
 RPT Level = 0.004  Analysis Date = 05/11/2016 
 RPT Level = 0.004  Analysis Date = 05/03/2016 
 RPT Level = 0.004  Analysis Date = 05/03/2016 
 RPT Level = 0.004  Analysis Date = 04/27/2016 
 RPT Level = 0.004  Analysis Date = 04/27/2016 
 RPT Level = 0.004  Analysis Date = 04/25/2016 
 RPT Level = 0.004  Analysis Date = 04/25/2016 
 RPT Level = 0.004  Analysis Date = 04/13/2016 
 RPT Level = 0.004  Analysis Date = 04/13/2016 
 RPT Level = 0.004  Analysis Date = 04/12/2016 
 RPT Level = 0.004  Analysis Date = 04/12/2016 
 RPT Level = 0.004  Analysis Date = 03/30/2016 
 RPT Level = 0.004  Analysis Date = 03/30/2016 
 RPT Level = 0.004  Analysis Date = 03/29/2016 
 RPT Level = 0.004  Analysis Date = 03/29/2016 
 RPT Level = 0.004  Analysis Date = 03/16/2016 
 RPT Level = 0.004  Analysis Date = 03/16/2016 
 RPT Level = 0.004  Analysis Date = 03/16/2016 
 RPT Level = 0.004  Analysis Date = 03/16/2016 
 RPT Level = 0.004  Analysis Date = 03/02/2016 
 RPT Level = 0.004  Analysis Date = 03/02/2016 
 RPT Level = 0.004  Analysis Date = 03/02/2016 
 RPT Level = 0.004  Analysis Date = 03/02/2016 
 RPT Level = 0.004  Analysis Date = 02/18/2016 
 RPT Level = 0.004  Analysis Date = 02/18/2016 
 RPT Level = 0.004  Analysis Date = 02/04/2016 
 RPT Level = 0.004  Analysis Date = 02/04/2016 
 RPT Level = 0.004  Analysis Date = 02/03/2016 
 RPT Level = 0.004  Analysis Date = 02/03/2016 
 RPT Level = 0.004  Analysis Date = 02/03/2016 
 RPT Level = 0.004  Analysis Date = 02/03/2016 
 RPT Level = 0.004  Analysis Date = 01/14/2016 
 RPT Level = 0.004  Analysis Date = 01/14/2016 
 RPT Level = 0.004  Analysis Date = 01/13/2016 
 RPT Level = 0.004  Analysis Date = 01/13/2016 
 RPT Level = 0.004  Analysis Date = 01/08/2016 
 RPT Level = 0.004  Analysis Date = 01/08/2016 
 RPT Level = 0.004  Analysis Date = 01/07/2016 
 RPT Level = 0.004  Analysis Date = 01/07/2016 
 RPT Level = 0.004  Analysis Date = 01/05/2016 
 RPT Level = 0.004  Analysis Date = 01/05/2016 
 RPT Level = 0.004  Analysis Date = 12/16/2015 
 RPT Level = 0.004  Analysis Date = 12/16/2015 
 RPT Level = 0.004  Analysis Date = 12/08/2015 
 RPT Level = 0.004  Analysis Date = 12/08/2015 
 RPT Level = 0.004  Analysis Date = 12/08/2015 
 RPT Level = 0.004  Analysis Date = 12/08/2015 
 RPT Level = 0.004  Analysis Date = 12/01/2015 
 RPT Level = 0.004  Analysis Date = 12/01/2015 
 RPT Level = 0.004  Analysis Date = 11/17/2015 
 RPT Level = 0.004  Analysis Date = 11/17/2015 
 RPT Level = 0.004  Analysis Date = 11/10/2015 
 RPT Level = 0.004  Analysis Date = 11/10/2015 
 RPT Level = 0.004  Analysis Date = 11/05/2015 
 RPT Level = 0.004  Analysis Date = 11/05/2015 
 RPT Level = 0.004  Analysis Date = 10/27/2015 
 RPT Level = 0.004  Analysis Date = 10/27/2015 
 RPT Level = 0.004  Analysis Date = 10/22/2015 
 RPT Level = 0.004  Analysis Date = 10/22/2015 
 RPT Level = 0.004  Analysis Date = 10/07/2015 
 RPT Level = 0.004  Analysis Date = 10/07/2015 
 RPT Level = 0.004  Analysis Date = 10/07/2015 
 RPT Level = 0.004  Analysis Date = 10/07/2015 
 RPT Level = 0.004  Analysis Date = 10/06/2015 
 RPT Level = 0.004  Analysis Date = 10/06/2015 
 RPT Level = 0.004  Analysis Date = 09/30/2015 
 RPT Level = 0.004  Analysis Date = 09/30/2015 
 RPT Level = 0.004  Analysis Date = 09/17/2015 
 RPT Level = 0.004  Analysis Date = 09/17/2015 
 RPT Level = 0.004  Analysis Date = 09/16/2015 
 RPT Level = 0.004  Analysis Date = 09/16/2015 
 RPT Level = 0.004  Analysis Date = 09/01/2015 
 RPT Level = 0.004  Analysis Date = 09/01/2015 
 RPT Level = 0.004  Analysis Date = 08/25/2015 
 RPT Level = 0.004  Analysis Date = 08/25/2015 
 RPT Level = 0.004  Analysis Date = 08/20/2015 
 RPT Level = 0.004  Analysis Date = 08/20/2015 
 RPT Level = 0.004  Analysis Date = 08/19/2015 
 RPT Level = 0.004  Analysis Date = 08/19/2015 
 RPT Level = 0.004  Analysis Date = 08/05/2015 
 RPT Level = 0.004  Analysis Date = 08/05/2015 
 RPT Level = 0.004  Analysis Date = 07/29/2015 
 RPT Level = 0.004  Analysis Date = 07/29/2015 
 RPT Level = 0.004  Analysis Date = 07/27/2015 
 RPT Level = 0.004  Analysis Date = 07/27/2015 
 RPT Level = 0.004  Analysis Date = 07/09/2015 
 RPT Level = 0.004  Analysis Date = 07/09/2015 
 RPT Level = 0.004  Analysis Date = 07/08/2015 
 RPT Level = 0.004  Analysis Date = 07/08/2015 
 RPT Level = 0.004  Analysis Date = 07/07/2015 
 RPT Level = 0.004  Analysis Date = 07/07/2015 
 RPT Level = 0.004  Analysis Date = 06/29/2015 
 RPT Level = 0.004  Analysis Date = 06/29/2015 
 RPT Level = 0.004  Analysis Date = 06/24/2015 
 RPT Level = 0.004  Analysis Date = 06/24/2015 
 RPT Level = 0.004  Analysis Date = 06/10/2015 
 RPT Level = 0.004  Analysis Date = 06/10/2015 
 RPT Level = 0.004  Analysis Date = 06/04/2015 
 RPT Level = 0.004  Analysis Date = 06/04/2015 
 RPT Level = 0.004  Analysis Date = 05/28/2015 
 RPT Level = 0.004  Analysis Date = 05/28/2015 
 RPT Level = 0.004  Analysis Date = 05/20/2015 
 RPT Level = 0.004  Analysis Date = 05/20/2015 
 RPT Level = 0.004  Analysis Date = 05/14/2015 
 RPT Level = 0.004  Analysis Date = 05/14/2015 
 RPT Level = 0.004  Analysis Date = 05/11/2015 
 RPT Level = 0.004  Analysis Date = 05/11/2015 
 RPT Level = 0.004  Analysis Date = 05/11/2015 
 RPT Level = 0.004  Analysis Date = 05/11/2015 
 RPT Level = 0.004  Analysis Date = 04/29/2015 
 RPT Level = 0.004  Analysis Date = 04/29/2015 
 RPT Level = 0.004  Analysis Date = 04/21/2015 
 RPT Level = 0.004  Analysis Date = 04/21/2015 
 RPT Level = 0.004  Analysis Date = 05/07/2015 
 RPT Level = 0.004  Analysis Date = 05/07/2015 
 RPT Level = 0.004  Analysis Date = 04/09/2015 
 RPT Level = 0.004  Analysis Date = 04/09/2015 
 RPT Level = 0.004  Analysis Date = 04/09/2015 
 RPT Level = 0.004  Analysis Date = 04/09/2015 
 RPT Level = 0.004  Analysis Date = 03/19/2015 
 RPT Level = 0.004  Analysis Date = 03/19/2015 
 RPT Level = 0.004  Analysis Date = 03/17/2015 
 RPT Level = 0.004  Analysis Date = 03/17/2015 
 RPT Level = 0.004  Analysis Date = 03/05/2015 
 RPT Level = 0.004  Analysis Date = 03/05/2015 
 RPT Level = 0.004  Analysis Date = 03/03/2015 
 RPT Level = 0.004  Analysis Date = 03/03/2015 
 RPT Level = 0.004  Analysis Date = 02/26/2015 
 RPT Level = 0.004  Analysis Date = 02/26/2015 
 RPT Level = 0.004  Analysis Date = 02/26/2015 
 RPT Level = 0.004  Analysis Date = 02/26/2015 
 RPT Level = 0.004  Analysis Date = 02/18/2015 
 RPT Level = 0.004  Analysis Date = 02/18/2015 
 RPT Level = 0.004  Analysis Date = 02/04/2015 
 RPT Level = 0.004  Analysis Date = 02/04/2015 
 RPT Level = 0.004  Analysis Date = 01/15/2015 
 RPT Level = 0.004  Analysis Date = 01/15/2015 
 RPT Level = 0.004  Analysis Date = 01/13/2015 
 RPT Level = 0.004  Analysis Date = 01/13/2015 
 RPT Level = 0.004  Analysis Date = 01/13/2015 
 RPT Level = 0.004  Analysis Date = 01/13/2015 
 RPT Level = 0.004  Analysis Date = 01/08/2015 
 RPT Level = 0.004  Analysis Date = 01/08/2015 
 RPT Level = 0.004  Analysis Date = 01/07/2015 
 RPT Level = 0.004  Analysis Date = 01/07/2015 
 RPT Level = 0.004  Analysis Date = 12/17/2014 
 RPT Level = 0.004  Analysis Date = 12/17/2014 
 RPT Level = 0.004  Analysis Date = 12/17/2014 
 RPT Level = 0.004  Analysis Date = 12/17/2014 
 RPT Level = 0.004  Analysis Date = 12/10/2014 
 RPT Level = 0.004  Analysis Date = 12/10/2014 
 RPT Level = 0.004  Analysis Date = 12/10/2014 
 RPT Level = 0.004  Analysis Date = 12/10/2014 
 RPT Level = 0.004  Analysis Date = 12/03/2014 
 RPT Level = 0.004  Analysis Date = 12/03/2014 
 RPT Level = 0.004  Analysis Date = 11/18/2014 
 RPT Level = 0.004  Analysis Date = 11/18/2014 
 RPT Level = 0.004  Analysis Date = 11/04/2014 
 RPT Level = 0.004  Analysis Date = 11/04/2014 
 RPT Level = 0.004  Analysis Date = 10/30/2014 
 RPT Level = 0.004  Analysis Date = 10/30/2014 
 RPT Level = 0.004  Analysis Date = 10/28/2014 
 RPT Level = 0.004  Analysis Date = 10/28/2014 
 RPT Level = 0.004  Analysis Date = 10/16/2014 
 RPT Level = 0.004  Analysis Date = 10/16/2014 
 RPT Level = 0.004  Analysis Date = 10/15/2014 
 RPT Level = 0.004  Analysis Date = 10/15/2014 
 RPT Level = 0.004  Analysis Date = 10/08/2014 
 RPT Level = 0.004  Analysis Date = 10/08/2014 
 RPT Level = 0.004  Analysis Date = 10/02/2014 
 RPT Level = 0.004  Analysis Date = 10/02/2014 
 RPT Level = 0.004  Analysis Date = 09/25/2014 
 RPT Level = 0.004  Analysis Date = 09/25/2014 
 RPT Level = 0.004  Analysis Date = 09/18/2014 
 RPT Level = 0.004  Analysis Date = 09/18/2014 
 RPT Level = 0.004  Analysis Date = 08/20/2014 
 RPT Level = 0.004  Analysis Date = 08/20/2014 
 RPT Level = 0.004  Analysis Date = 08/14/2014 
 RPT Level = 0.004  Analysis Date = 08/14/2014 
 RPT Level = 0.004  Analysis Date = 08/05/2014 
 RPT Level = 0.004  Analysis Date = 08/05/2014 
 RPT Level = 0.004  Analysis Date = 07/30/2014 
 RPT Level = 0.004  Analysis Date = 07/30/2014 
 RPT Level = 0.004  Analysis Date = 07/23/2014 
 RPT Level = 0.004  Analysis Date = 07/23/2014 
 RPT Level = 0.004  Analysis Date = 07/22/2014 
 RPT Level = 0.004  Analysis Date = 07/22/2014 
 RPT Level = 0.004  Analysis Date = 07/17/2014 
 RPT Level = 0.004  Analysis Date = 07/17/2014 
 RPT Level = 0.004  Analysis Date = 07/02/2014 
 RPT Level = 0.004  Analysis Date = 07/02/2014 
 RPT Level = 0.004  Analysis Date = 07/09/2014 
 RPT Level = 0.004  Analysis Date = 07/09/2014 
 RPT Level = 0.004  Analysis Date = 06/16/2014 
 RPT Level = 0.004  Analysis Date = 06/16/2014 
 RPT Level = 0.004  Analysis Date = 06/09/2014 
 RPT Level = 0.004  Analysis Date = 06/09/2014 
 RPT Level = 0.004  Analysis Date = 06/04/2014 
 RPT Level = 0.004  Analysis Date = 06/04/2014 
 RPT Level = 0.004  Analysis Date = 05/28/2014 
 RPT Level = 0.004  Analysis Date = 05/28/2014 
 RPT Level = 0.004  Analysis Date = 05/20/2014 
 RPT Level = 0.004  Analysis Date = 05/20/2014 
 RPT Level = 0.004  Analysis Date = 05/13/2014 
 RPT Level = 0.004  Analysis Date = 05/13/2014 
 RPT Level = 0.004  Analysis Date = 05/06/2014 
 RPT Level = 0.004  Analysis Date = 05/06/2014 
 RPT Level = 0.004  Analysis Date = 04/29/2014 
 RPT Level = 0.004  Analysis Date = 04/29/2014 
 RPT Level = 0.004  Analysis Date = 04/17/2014 
 RPT Level = 0.004  Analysis Date = 04/17/2014 
 RPT Level = 0.004  Analysis Date = 04/15/2014 
 RPT Level = 0.004  Analysis Date = 04/15/2014 
 RPT Level = 0.004  Analysis Date = 04/03/2014 
 RPT Level = 0.004  Analysis Date = 04/03/2014 
 RPT Level = 0.004  Analysis Date = 04/02/2014 
 RPT Level = 0.004  Analysis Date = 04/02/2014 
 RPT Level = 0.004  Analysis Date = 03/25/2014 
 RPT Level = 0.004  Analysis Date = 03/25/2014 
 RPT Level = 0.004  Analysis Date = 03/20/2014 
 RPT Level = 0.004  Analysis Date = 03/20/2014 
 RPT Level = 0.004  Analysis Date = 03/20/2014 
 RPT Level = 0.004  Analysis Date = 03/20/2014 
 RPT Level = 0.004  Analysis Date = 02/27/2014 
 RPT Level = 0.004  Analysis Date = 02/27/2014 
 RPT Level = 0.004  Analysis Date = 02/20/2014 
 RPT Level = 0.004  Analysis Date = 02/20/2014 
 RPT Level = 0.004  Analysis Date = 02/12/2014 
 RPT Level = 0.004  Analysis Date = 02/12/2014 
 RPT Level = 0.004  Analysis Date = 02/10/2014 
 RPT Level = 0.004  Analysis Date = 02/10/2014 
 RPT Level = 0.004  Analysis Date = 02/06/2014 
 RPT Level = 0.004  Analysis Date = 02/06/2014 
 RPT Level = 0.004  Analysis Date = 01/29/2014 
 RPT Level = 0.004  Analysis Date = 01/29/2014 
 RPT Level = 0.004  Analysis Date = 01/28/2014 
 RPT Level = 0.004  Analysis Date = 01/28/2014 
 RPT Level = 0.004  Analysis Date = 01/23/2014 
 RPT Level = 0.004  Analysis Date = 01/23/2014 
 RPT Level = 0.004  Analysis Date = 01/21/2014 
 RPT Level = 0.004  Analysis Date = 01/21/2014 
 RPT Level = 0.004  Analysis Date = 01/09/2014 
 RPT Level = 0.004  Analysis Date = 01/09/2014 
 RPT Level = 0.004  Analysis Date = 01/08/2014 
 RPT Level = 0.004  Analysis Date = 01/08/2014 
 RPT Level = 0.004  Analysis Date = 12/12/2013 
 RPT Level = 0.004  Analysis Date = 12/12/2013 
 RPT Level = 0.004  Analysis Date = 12/12/2013 
 RPT Level = 0.004  Analysis Date = 12/12/2013 
 RPT Level = 0.004  Analysis Date = 10/21/2009 
 RPT Level = 0.004  Analysis Date = 10/21/2009 
 RPT Level = 0.004  Analysis Date = 10/08/2009 
 RPT Level = 0.004  Analysis Date = 10/08/2009 
 RPT Level = 0.004  Analysis Date = 10/01/2009 
 RPT Level = 0.004  Analysis Date = 10/01/2009 
 RPT Level = 0.004  Analysis Date = 09/30/2009 
 RPT Level = 0.004  Analysis Date = 09/30/2009 
 RPT Level = 0.004  Analysis Date = 09/17/2009 
 RPT Level = 0.004  Analysis Date = 09/17/2009 
 RPT Level = 0.004  Analysis Date = 09/03/2009 
 RPT Level = 0.004  Analysis Date = 09/03/2009 
 RPT Level = 0.004  Analysis Date = 09/02/2009 
 RPT Level = 0.004  Analysis Date = 09/02/2009 
 RPT Level = 0.004  Analysis Date = 08/21/2009 
 RPT Level = 0.004  Analysis Date = 08/21/2009 
 RPT Level = 0.004  Analysis Date = 08/13/2009 
 RPT Level = 0.004  Analysis Date = 08/13/2009 
 RPT Level = 0.004  Analysis Date = 08/07/2009 
 RPT Level = 0.004  Analysis Date = 08/07/2009 
 RPT Level = 0.004  Analysis Date = 07/30/2009 
 RPT Level = 0.004  Analysis Date = 07/30/2009 
 RPT Level = 0.004  Analysis Date = 07/22/2009 
 RPT Level = 0.004  Analysis Date = 07/22/2009 
 RPT Level = 0.004  Analysis Date = 07/16/2009 
 RPT Level = 0.004  Analysis Date = 07/16/2009 
 RPT Level = 0.004  Analysis Date = 07/22/2009 
 RPT Level = 0.004  Analysis Date = 07/22/2009 
 RPT Level = 0.004  Analysis Date = 07/08/2009 
 RPT Level = 0.004  Analysis Date = 07/08/2009 
 RPT Level = 0.004  Analysis Date = 06/25/2009 
 RPT Level = 0.004  Analysis Date = 06/25/2009 
 RPT Level = 0.004  Analysis Date = 07/07/2009 
 RPT Level = 0.004  Analysis Date = 07/07/2009 
 RPT Level = 0.004  Analysis Date = 06/10/2009 
 RPT Level = 0.004  Analysis Date = 06/10/2009 
 RPT Level = 0.004  Analysis Date = 06/04/2009 
 RPT Level = 0.004  Analysis Date = 06/04/2009 
 RPT Level = 0.004  Analysis Date = 05/28/2009 
 RPT Level = 0.004  Analysis Date = 05/28/2009 
 RPT Level = 0.004  Analysis Date = 05/27/2009 
 RPT Level = 0.004  Analysis Date = 05/27/2009 
 RPT Level = 0.004  Analysis Date = 05/14/2009 
 RPT Level = 0.004  Analysis Date = 05/14/2009 
 RPT Level = 0.004  Analysis Date = 05/06/2009 
 RPT Level = 0.004  Analysis Date = 05/06/2009 
 RPT Level = 0.004  Analysis Date = 04/30/2009 
 RPT Level = 0.004  Analysis Date = 04/30/2009 
 RPT Level = 0.004  Analysis Date = 04/23/2009 
 RPT Level = 0.004  Analysis Date = 04/23/2009 
 RPT Level = 0.004  Analysis Date = 04/16/2009 
 RPT Level = 0.004  Analysis Date = 04/16/2009 
 RPT Level = 0.004  Analysis Date = 04/15/2009 
 RPT Level = 0.004  Analysis Date = 04/15/2009 
 RPT Level = 0.004  Analysis Date = 04/08/2009 
 RPT Level = 0.004  Analysis Date = 04/08/2009 
 RPT Level = 0.004  Analysis Date = 04/02/2009 
 RPT Level = 0.004  Analysis Date = 04/02/2009 
 RPT Level = 0.004  Analysis Date = 03/31/2009 
 RPT Level = 0.004  Analysis Date = 03/31/2009 
 RPT Level = 0.004  Analysis Date = 03/10/2009 
 RPT Level = 0.004  Analysis Date = 03/10/2009 
 RPT Level = 0.004  Analysis Date = 03/05/2009 
 RPT Level = 0.004  Analysis Date = 03/05/2009 
 RPT Level = 0.004  Analysis Date = 02/26/2009 
 RPT Level = 0.004  Analysis Date = 02/26/2009 
 RPT Level = 0.004  Analysis Date = 02/19/2009 
 RPT Level = 0.004  Analysis Date = 02/19/2009 
 RPT Level = 0.004  Analysis Date = 02/10/2009 
 RPT Level = 0.004  Analysis Date = 02/10/2009 
 RPT Level = 0.004  Analysis Date = 02/05/2009 
 RPT Level = 0.004  Analysis Date = 02/05/2009 
 RPT Level = 0.004  Analysis Date = 01/22/2009 
 RPT Level = 0.004  Analysis Date = 01/22/2009 
 RPT Level = 0.004  Analysis Date = 03/03/2009 
 RPT Level = 0.004  Analysis Date = 03/03/2009 
 RPT Level = 0.004  Analysis Date = 01/15/2009 
 RPT Level = 0.004  Analysis Date = 01/15/2009 
 RPT Level = 0.004  Analysis Date = 01/14/2009 
 RPT Level = 0.004  Analysis Date = 01/14/2009 
 RPT Level = 0.004  Analysis Date = 01/14/2009 
 RPT Level = 0.004  Analysis Date = 01/14/2009 
 RPT Level = 0.004  Analysis Date = 01/08/2009 
 RPT Level = 0.004  Analysis Date = 01/08/2009 
 RPT Level = 0.004  Analysis Date = 01/02/2009 
 RPT Level = 0.004  Analysis Date = 01/02/2009 
 RPT Level = 0.004  Analysis Date = 12/04/2008 
 RPT Level = 0.004  Analysis Date = 12/04/2008 
 RPT Level = 0.004  Analysis Date = 12/04/2008 
 RPT Level = 0.004  Analysis Date = 12/04/2008 
 RPT Level = 0.004  Analysis Date = 12/02/2008 
 RPT Level = 0.004  Analysis Date = 12/02/2008 
 RPT Level = 0.004  Analysis Date = 11/19/2008 
 RPT Level = 0.004  Analysis Date = 11/19/2008 
 RPT Level = 0.004  Analysis Date = 11/06/2008 
 RPT Level = 0.004  Analysis Date = 11/06/2008 
 RPT Level = 0.004  Analysis Date = 11/04/2008 
 RPT Level = 0.004  Analysis Date = 11/04/2008 
 RPT Level = 0.004  Analysis Date = 10/22/2008 
 RPT Level = 0.004  Analysis Date = 10/22/2008 
 RPT Level = 0.004  Analysis Date = 10/22/2008 
 RPT Level = 0.004  Analysis Date = 10/22/2008 
 RPT Level = 0.004  Analysis Date = 10/21/2008 
 RPT Level = 0.004  Analysis Date = 10/21/2008 
 RPT Level = 0.004  Analysis Date = 10/08/2008 
 RPT Level = 0.004  Analysis Date = 10/08/2008 
 RPT Level = 0.004  Analysis Date = 10/01/2008 
 RPT Level = 0.004  Analysis Date = 10/01/2008 
 RPT Level = 0.004  Analysis Date = 09/24/2008 
 RPT Level = 0.004  Analysis Date = 09/24/2008 
 RPT Level = 0.004  Analysis Date = 09/17/2008 
 RPT Level = 0.004  Analysis Date = 09/17/2008 
 RPT Level = 0.004  Analysis Date = 09/11/2008 
 RPT Level = 0.004  Analysis Date = 09/11/2008 
 RPT Level = 0.004  Analysis Date = 09/11/2008 
 RPT Level = 0.004  Analysis Date = 09/11/2008 
 RPT Level = 0.004  Analysis Date = 08/26/2008 
 RPT Level = 0.004  Analysis Date = 08/26/2008 
 RPT Level = 0.004  Analysis Date = 08/19/2008 
 RPT Level = 0.004  Analysis Date = 08/19/2008 
 RPT Level = 0.004  Analysis Date = 08/13/2008 
 RPT Level = 0.004  Analysis Date = 08/13/2008 
 RPT Level = 0.004  Analysis Date = 07/29/2008 
 RPT Level = 0.004  Analysis Date = 07/29/2008 
 RPT Level = 0.004  Analysis Date = 07/24/2008 
 RPT Level = 0.004  Analysis Date = 07/24/2008 
 RPT Level = 0.004  Analysis Date = 07/22/2008 
 RPT Level = 0.004  Analysis Date = 07/22/2008 
 RPT Level = 0.004  Analysis Date = 07/15/2008 
 RPT Level = 0.004  Analysis Date = 07/15/2008 
 RPT Level = 0.004  Analysis Date = 07/08/2008 
 RPT Level = 0.004  Analysis Date = 07/08/2008 
 RPT Level = 0.004  Analysis Date = 07/01/2008 
 RPT Level = 0.004  Analysis Date = 07/01/2008 
 RPT Level = 0.004  Analysis Date = 06/24/2008 
 RPT Level = 0.004  Analysis Date = 06/24/2008 
 RPT Level = 0.004  Analysis Date = 06/11/2008 
 RPT Level = 0.004  Analysis Date = 06/11/2008 
 RPT Level = 0.004  Analysis Date = 06/05/2008 
 RPT Level = 0.004  Analysis Date = 06/05/2008 
 RPT Level = 0.004  Analysis Date = 06/04/2008 
 RPT Level = 0.004  Analysis Date = 06/04/2008 
 RPT Level = 0.004  Analysis Date = 05/22/2008 
 RPT Level = 0.004  Analysis Date = 05/22/2008 
 RPT Level = 0.004  Analysis Date = 05/08/2008 
 RPT Level = 0.004  Analysis Date = 05/08/2008 
 RPT Level = 0.004  Analysis Date = 05/06/2008 
 RPT Level = 0.004  Analysis Date = 05/06/2008 
 RPT Level = 0.004  Analysis Date = 04/29/2008 
 RPT Level = 0.004  Analysis Date = 04/29/2008 
 RPT Level = 0.004  Analysis Date = 04/23/2008 
 RPT Level = 0.004  Analysis Date = 04/23/2008 
 RPT Level = 0.004  Analysis Date = 04/10/2008 
 RPT Level = 0.004  Analysis Date = 04/10/2008 
 RPT Level = 0.004  Analysis Date = 04/08/2008 
 RPT Level = 0.004  Analysis Date = 04/08/2008 
 RPT Level = 0.004  Analysis Date = 04/01/2008 
 RPT Level = 0.004  Analysis Date = 04/01/2008 
 RPT Level = 0.004  Analysis Date = 03/25/2008 
 RPT Level = 0.004  Analysis Date = 03/25/2008 
 RPT Level = 0.004  Analysis Date = 03/19/2008 
 RPT Level = 0.004  Analysis Date = 03/19/2008 
 RPT Level = 0.004  Analysis Date = 03/12/2008 
 RPT Level = 0.004  Analysis Date = 03/12/2008 
 RPT Level = 0.004  Analysis Date = 03/04/2008 
 RPT Level = 0.004  Analysis Date = 03/04/2008 
 RPT Level = 0.004  Analysis Date = 02/28/2008 
 RPT Level = 0.004  Analysis Date = 02/28/2008 
 RPT Level = 0.004  Analysis Date = 02/21/2008 
 RPT Level = 0.004  Analysis Date = 02/21/2008 
 RPT Level = 0.004  Analysis Date = 02/14/2008 
 RPT Level = 0.004  Analysis Date = 02/14/2008 
 RPT Level = 0.004  Analysis Date = 01/31/2008 
 RPT Level = 0.004  Analysis Date = 01/31/2008 
 RPT Level = 0.004  Analysis Date = 01/29/2008 
 RPT Level = 0.004  Analysis Date = 01/29/2008 
 RPT Level = 0.004  Analysis Date = 01/17/2008 
 RPT Level = 0.004  Analysis Date = 01/17/2008 
 RPT Level = 0.004  Analysis Date = 01/11/2008 
 RPT Level = 0.004  Analysis Date = 01/11/2008 
 RPT Level = 0.004  Analysis Date = 01/09/2008 
 RPT Level = 0.004  Analysis Date = 01/09/2008 
 RPT Level = 0.004  Analysis Date = 01/04/2008 
 RPT Level = 0.004  Analysis Date = 01/04/2008 
 RPT Level = 0.004  Analysis Date = 01/03/2008 
 RPT Level = 0.004  Analysis Date = 01/03/2008 
 RPT Level = 0.004  Analysis Date = 12/13/2007 
 RPT Level = 0.004  Analysis Date = 12/13/2007 
 RPT Level = 0.004  Analysis Date = 12/03/2007 
 RPT Level = 0.004  Analysis Date = 12/03/2007 
 RPT Level = 0.004  Analysis Date = 12/06/2007 
 RPT Level = 0.004  Analysis Date = 12/06/2007 
 RPT Level = 0.004  Analysis Date = 11/29/2007 
 RPT Level = 0.004  Analysis Date = 11/29/2007 
 RPT Level = 0.004  Analysis Date = 11/27/2007 
 RPT Level = 0.004  Analysis Date = 11/27/2007 
 RPT Level = 0.004  Analysis Date = 11/27/2007 
 RPT Level = 0.004  Analysis Date = 11/27/2007 
 RPT Level = 0.004  Analysis Date = 11/13/2007 
 RPT Level = 0.004  Analysis Date = 11/13/2007 
 RPT Level = 0.004  Analysis Date = 11/05/2007 
 RPT Level = 0.004  Analysis Date = 11/05/2007 
 RPT Level = 0.004  Analysis Date = 10/18/2007 
 RPT Level = 0.004  Analysis Date = 10/18/2007 
 RPT Level = 0.004  Analysis Date = 10/11/2007 
 RPT Level = 0.004  Analysis Date = 10/11/2007 
 RPT Level = 0.004  Analysis Date = 10/10/2007 
 RPT Level = 0.004  Analysis Date = 10/10/2007 
 RPT Level = 0.004  Analysis Date = 09/27/2007 
 RPT Level = 0.004  Analysis Date = 09/27/2007 
 RPT Level = 0.004  Analysis Date = 09/19/2007 
 RPT Level = 0.004  Analysis Date = 09/19/2007 
 RPT Level = 0.004  Analysis Date = 09/13/2007 
 RPT Level = 0.004  Analysis Date = 09/13/2007 
 RPT Level = 0.004  Analysis Date = 09/06/2007 
 RPT Level = 0.004  Analysis Date = 09/06/2007 
 RPT Level = 0.004  Analysis Date = 08/29/2007 
 RPT Level = 0.004  Analysis Date = 08/29/2007 
 RPT Level = 0.004  Analysis Date = 08/28/2007 
 RPT Level = 0.004  Analysis Date = 08/28/2007 
 RPT Level = 0.004  Analysis Date = 08/16/2007 
 RPT Level = 0.004  Analysis Date = 08/16/2007 
 RPT Level = 0.004  Analysis Date = 08/09/2007 
 RPT Level = 0.004  Analysis Date = 08/09/2007 
 RPT Level = 0.004  Analysis Date = 08/02/2007 
 RPT Level = 0.004  Analysis Date = 08/02/2007 
 RPT Level = 0.004  Analysis Date = 07/24/2007 
 RPT Level = 0.004  Analysis Date = 07/24/2007 
 RPT Level = 0.004  Analysis Date = 07/18/2007 
 RPT Level = 0.004  Analysis Date = 07/18/2007 
 RPT Level = 0.004  Analysis Date = 07/03/2007 
 RPT Level = 0.004  Analysis Date = 07/03/2007 
 RPT Level = 0.004  Analysis Date = 06/21/2007 
 RPT Level = 0.004  Analysis Date = 06/21/2007 
 RPT Level = 0.004  Analysis Date = 06/21/2007 
 RPT Level = 0.004  Analysis Date = 06/21/2007 
 RPT Level = 0.004  Analysis Date = 06/14/2007 
 RPT Level = 0.004  Analysis Date = 06/14/2007 
 RPT Level = 0.004  Analysis Date = 06/06/2007 
 RPT Level = 0.004  Analysis Date = 06/06/2007 
 RPT Level = 0.004  Analysis Date = 05/22/2007 
 RPT Level = 0.004  Analysis Date = 05/22/2007 
 RPT Level = 0.004  Analysis Date = 05/17/2007 
 RPT Level = 0.004  Analysis Date = 05/17/2007 
 RPT Level = 0.004  Analysis Date = 05/16/2007 
 RPT Level = 0.004  Analysis Date = 05/16/2007 
 RPT Level = 0.004  Analysis Date = 05/03/2007 
 RPT Level = 0.004  Analysis Date = 05/03/2007 
 RPT Level = 0.004  Analysis Date = 05/02/2007 
 RPT Level = 0.004  Analysis Date = 05/02/2007 
 RPT Level = 0.004  Analysis Date = 04/24/2007 
 RPT Level = 0.004  Analysis Date = 04/24/2007 
 RPT Level = 0.004  Analysis Date = 04/19/2007 
 RPT Level = 0.004  Analysis Date = 04/19/2007 
 RPT Level = 0.004  Analysis Date = 04/12/2007 
 RPT Level = 0.004  Analysis Date = 04/12/2007 
 RPT Level = 0.004  Analysis Date = 04/10/2007 
 RPT Level = 0.004  Analysis Date = 04/10/2007 
 RPT Level = 0.004  Analysis Date = 03/28/2007 
 RPT Level = 0.004  Analysis Date = 03/28/2007 
 RPT Level = 0.004  Analysis Date = 03/20/2007 
 RPT Level = 0.004  Analysis Date = 03/20/2007 
 RPT Level = 0.004  Analysis Date = 03/14/2007 
 RPT Level = 0.004  Analysis Date = 03/14/2007 
 RPT Level = 0.004  Analysis Date = 03/08/2007 
 RPT Level = 0.004  Analysis Date = 03/08/2007 
 RPT Level = 0.004  Analysis Date = 03/01/2007 
 RPT Level = 0.004  Analysis Date = 03/01/2007 
 RPT Level = 0.004  Analysis Date = 03/01/2007 
 RPT Level = 0.004  Analysis Date = 03/01/2007 
 RPT Level = 0.004  Analysis Date = 02/13/2007 
 RPT Level = 0.004  Analysis Date = 02/13/2007 
 RPT Level = 0.004  Analysis Date = 01/24/2007 
 RPT Level = 0.004  Analysis Date = 01/24/2007 
 RPT Level = 0.004  Analysis Date = 01/17/2007 
 RPT Level = 0.004  Analysis Date = 01/17/2007 
 RPT Level = 0.004  Analysis Date = 01/11/2007 
 RPT Level = 0.004  Analysis Date = 01/11/2007 
 RPT Level = 0.004  Analysis Date = 01/11/2007 
 RPT Level = 0.004  Analysis Date = 01/11/2007 
 RPT Level = 0.004  Analysis Date = 01/09/2007 
 RPT Level = 0.004  Analysis Date = 01/09/2007 
 RPT Level = 0.004  Analysis Date = 01/05/2007 
 RPT Level = 0.004  Analysis Date = 01/05/2007 
 RPT Level = 0.004  Analysis Date = 12/14/2006 
 RPT Level = 0.004  Analysis Date = 12/14/2006 
 RPT Level = 0.004  Analysis Date = 12/12/2006 
 RPT Level = 0.004  Analysis Date = 12/12/2006 
 RPT Level = 0.004  Analysis Date = 12/07/2006 
 RPT Level = 0.004  Analysis Date = 12/07/2006 
 RPT Level = 0.004  Analysis Date = 11/29/2006 
 RPT Level = 0.004  Analysis Date = 11/29/2006 
 RPT Level = 0.004  Analysis Date = 11/20/2006 
 RPT Level = 0.004  Analysis Date = 11/20/2006 
 RPT Level = 0.004  Analysis Date = 11/02/2006 
 RPT Level = 0.004  Analysis Date = 11/02/2006 
 RPT Level = 0.004  Analysis Date = 10/27/2006 
 RPT Level = 0.004  Analysis Date = 10/27/2006 
 RPT Level = 0.004  Analysis Date = 10/26/2006 
 RPT Level = 0.004  Analysis Date = 10/26/2006 
 RPT Level = 0.004  Analysis Date = 10/18/2006 
 RPT Level = 0.004  Analysis Date = 10/18/2006 
 RPT Level = 0.004  Analysis Date = 10/17/2006 
 RPT Level = 0.004  Analysis Date = 10/17/2006 
 RPT Level = 0.004  Analysis Date = 10/04/2006 
 RPT Level = 0.002  Analysis Date = 10/04/2006 
 RPT Level = 0.002  Analysis Date = 10/12/2006 
 RPT Level = 0.002  Analysis Date = 10/12/2006 
 RPT Level = 0.002  Analysis Date = 09/25/2006 
 RPT Level = 0.002  Analysis Date = 09/25/2006 
 RPT Level = 0.002  Analysis Date = 09/13/2006 
 RPT Level = 0.002  Analysis Date = 09/13/2006 
 RPT Level = 0.002  Analysis Date = 08/23/2006 
 RPT Level = 0.002  Analysis Date = 08/23/2006 
 RPT Level = 0.002  Analysis Date = 08/16/2006 
 RPT Level = 0.002  Analysis Date = 08/16/2006 
 RPT Level = 0.002  Analysis Date = 07/27/2006 
 RPT Level = 0.002  Analysis Date = 07/27/2006 
 RPT Level = 0.002  Analysis Date = 07/20/2006 
 RPT Level = 0.002  Analysis Date = 07/20/2006 
 RPT Level = 0.002  Analysis Date = 07/11/2006 
 RPT Level = 0.002  Analysis Date = 07/11/2006 
 RPT Level = 0.002  Analysis Date = 06/27/2006 
 RPT Level = 0.002  Analysis Date = 06/27/2006 
 RPT Level = 0.002  Analysis Date = 06/21/2006 
 RPT Level = 0.002  Analysis Date = 06/21/2006 
 RPT Level = 0.002  Analysis Date = 06/13/2006 
 RPT Level = 0.002  Analysis Date = 06/13/2006 
 RPT Level = 0.002  Analysis Date = 05/25/2006 
 RPT Level = 0.002  Analysis Date = 05/25/2006 
 RPT Level = 0.002  Analysis Date = 05/12/2006 
 RPT Level = 0.002  Analysis Date = 05/12/2006 
 RPT Level = 0.002  Analysis Date = 05/10/2006 
 RPT Level = 0.002  Analysis Date = 05/10/2006 
 RPT Level = 0.002  Analysis Date = 09/28/2005 
 RPT Level = 0.002  Analysis Date = 09/28/2005 
 RPT Level = 0.002  Analysis Date = 09/16/2005 
 RPT Level = 0.002  Analysis Date = 09/16/2005 
 RPT Level = 0.002  Analysis Date = 09/15/2005 
 RPT Level = 0.002  Analysis Date = 09/15/2005 
 RPT Level = 0.002  Analysis Date = 09/08/2005 
 RPT Level = 0.002  Analysis Date = 09/08/2005 
 RPT Level = 0.002  Analysis Date = 09/01/2005 
 RPT Level = 0.002  Analysis Date = 09/01/2005 
 RPT Level = 0.002  Analysis Date = 08/25/2005 
 RPT Level = 0.002  Analysis Date = 08/25/2005 
 RPT Level = 0.002  Analysis Date = 08/23/2005 
 RPT Level = 0.002  Analysis Date = 08/23/2005 
 RPT Level = 0.002  Analysis Date = 08/23/2005 
 RPT Level = 0.002  Analysis Date = 08/23/2005 
 RPT Level = 0.002  Analysis Date = 07/28/2005 
 RPT Level = 0.002  Analysis Date = 07/28/2005 
 RPT Level = 0.002  Analysis Date = 08/04/2005 
 RPT Level = 0.002  Analysis Date = 08/04/2005 
 RPT Level = 0.002  Analysis Date = 07/20/2005 
 RPT Level = 0.002  Analysis Date = 07/20/2005 
 RPT Level = 0.002  Analysis Date = 07/20/2005 
 RPT Level = 0.002  Analysis Date = 07/20/2005 
 RPT Level = 0.002  Analysis Date = 07/19/2005 
 RPT Level = 0.002  Analysis Date = 07/19/2005 
 RPT Level = 0.002  Analysis Date = 07/11/2005 
 RPT Level = 0.002  Analysis Date = 07/11/2005 
 RPT Level = 0.002  Analysis Date = 06/29/2005 
 RPT Level = 0.002  Analysis Date = 06/29/2005 
 RPT Level = 0.002  Analysis Date = 06/22/2005 
 RPT Level = 0.002  Analysis Date = 06/22/2005 
 RPT Level = 0.002  Analysis Date = 06/13/2005 
 RPT Level = 0.002  Analysis Date = 06/13/2005 
 RPT Level = 0.002  Analysis Date = 06/09/2005 
 RPT Level = 0.002  Analysis Date = 06/09/2005 
 RPT Level = 0.002  Analysis Date = 05/26/2005 
 RPT Level = 0.002  Analysis Date = 05/26/2005 
 RPT Level = 0.002  Analysis Date = 05/25/2005 
 RPT Level = 0.002  Analysis Date = 05/25/2005 
 RPT Level = 0.002  Analysis Date = 05/11/2005 
 RPT Level = 0.002  Analysis Date = 05/11/2005 
 RPT Level = 0.002  Analysis Date = 05/05/2005 
 RPT Level = 0.002  Analysis Date = 05/05/2005 
 RPT Level = 0.002  Analysis Date = 04/27/2005 
 RPT Level = 0.002  Analysis Date = 04/27/2005 
 RPT Level = 0.002  Analysis Date = 04/14/2005 
 RPT Level = 0.002  Analysis Date = 04/14/2005 
 RPT Level = 0.002  Analysis Date = 04/14/2005 
 RPT Level = 0.002  Analysis Date = 04/14/2005 
 RPT Level = 0.002  Analysis Date = 04/07/2005 
 RPT Level = 0.002  Analysis Date = 04/07/2005 
 RPT Level = 0.002  Analysis Date = 03/31/2005 
 RPT Level = 0.002  Analysis Date = 03/31/2005 
 RPT Level = 0.002  Analysis Date = 03/17/2005 
 RPT Level = 0.002  Analysis Date = 03/17/2005 
 RPT Level = 0.002  Analysis Date = 03/17/2005 
 RPT Level = 0.002  Analysis Date = 03/17/2005 
 RPT Level = 0.002  Analysis Date = 03/15/2005 
 RPT Level = 0.002  Analysis Date = 03/15/2005 
 RPT Level = 0.002  Analysis Date = 03/03/2005 
 RPT Level = 0.002  Analysis Date = 03/03/2005 
 RPT Level = 0.002  Analysis Date = 03/01/2005 
 RPT Level = 0.002  Analysis Date = 03/01/2005 
 RPT Level = 0.002  Analysis Date = 02/25/2005 
 RPT Level = 0.002  Analysis Date = 02/25/2005 
 RPT Level = 0.002  Analysis Date = 02/17/2005 
 RPT Level = 0.002  Analysis Date = 02/17/2005 
 RPT Level = 0.002  Analysis Date = 02/16/2005 
 RPT Level = 0.002  Analysis Date = 02/16/2005 
 RPT Level = 0.002  Analysis Date = 02/09/2005 
 RPT Level = 0.002  Analysis Date = 02/09/2005 
 RPT Level = 0.002  Analysis Date = 02/08/2005 
 RPT Level = 0.002  Analysis Date = 02/08/2005 
 RPT Level = 0.002  Analysis Date = 01/18/2005 
 RPT Level = 0.002  Analysis Date = 01/18/2005 
 RPT Level = 0.002  Analysis Date = 01/14/2005 
 RPT Level = 0.002  Analysis Date = 01/14/2005 
 RPT Level = 0.002  Analysis Date = 01/11/2005 
 RPT Level = 0.002  Analysis Date = 01/11/2005 
 RPT Level = 0.002  Analysis Date = 01/11/2005 
 RPT Level = 0.002  Analysis Date = 01/11/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 01/06/2005 
 RPT Level = 0.002  Analysis Date = 12/29/2004 
 RPT Level = 0.002  Analysis Date = 12/29/2004 
 RPT Level = 0.002  Analysis Date = 12/29/2004 
 RPT Level = 0.002  Analysis Date = 12/29/2004 
 RPT Level = 0.002  Analysis Date = 12/22/2004 
 RPT Level = 0.002  Analysis Date = 12/22/2004 
 RPT Level = 0.002  Analysis Date = 12/22/2004 
 RPT Level = 0.002  Analysis Date = 12/22/2004 
 RPT Level = 0.002  Analysis Date = 12/13/2004 
 RPT Level = 0.002  Analysis Date = 12/13/2004 
 RPT Level = 0.002  Analysis Date = 12/14/2004 
 RPT Level = 0.002  Analysis Date = 12/14/2004 
 RPT Level = 0.002  Analysis Date = 11/24/2004 
 RPT Level = 0.002  Analysis Date = 11/24/2004 
 RPT Level = 0.002  Analysis Date = 09/23/2004 
 RPT Level = 0.002  Analysis Date = 09/23/2004 
 RPT Level = 0.002  Analysis Date = 09/22/2004 
 RPT Level = 0.002  Analysis Date = 09/22/2004 
 RPT Level = 0.002  Analysis Date = 09/09/2004 
 RPT Level = 0.002  Analysis Date = 09/09/2004 
 RPT Level = 0.002  Analysis Date = 09/02/2004 
 RPT Level = 0.002  Analysis Date = 09/02/2004 
 RPT Level = 0.002  Analysis Date = 09/02/2004 
 RPT Level = 0.002  Analysis Date = 09/02/2004 
 RPT Level = 0.002  Analysis Date = 09/02/2004 
 RPT Level = 0.002  Analysis Date = 09/02/2004 
 RPT Level = 0.002  Analysis Date = 08/25/2004 
 RPT Level = 0.002  Analysis Date = 08/25/2004 
 RPT Level = 0.002  Analysis Date = 08/17/2004 
 RPT Level = 0.002  Analysis Date = 08/17/2004 
 RPT Level = 0.002  Analysis Date = 08/11/2004 
 RPT Level = 0.002  Analysis Date = 08/11/2004 
 RPT Level = 0.002  Analysis Date = 08/03/2004 
 RPT Level = 0.002  Analysis Date = 08/03/2004 
 RPT Level = 0.002  Analysis Date = 07/21/2004 
 RPT Level = 0.002  Analysis Date = 07/21/2004 
 RPT Level = 0.002  Analysis Date = 07/20/2004 
 RPT Level = 0.002  Analysis Date = 07/20/2004 
 RPT Level = 0.002  Analysis Date = 07/20/2004 
 RPT Level = 0.002  Analysis Date = 07/20/2004 
 RPT Level = 0.002  Analysis Date = 06/29/2004 
 RPT Level = 0.002  Analysis Date = 06/29/2004 
 RPT Level = 0.002  Analysis Date = 07/08/2004 
 RPT Level = 0.002  Analysis Date = 07/08/2004 
 RPT Level = 0.002  Analysis Date = 06/29/2004 
 RPT Level = 0.002  Analysis Date = 06/29/2004 
 RPT Level = 0.002  Analysis Date = 06/24/2004 
 RPT Level = 0.002  Analysis Date = 06/24/2004 
 RPT Level = 0.002  Analysis Date = 06/17/2004 
 RPT Level = 0.002  Analysis Date = 06/17/2004 
 RPT Level = 0.002  Analysis Date = 06/08/2004 
 RPT Level = 0.002  Analysis Date = 06/08/2004 
 RPT Level = 0.002  Analysis Date = 05/19/2004 
 RPT Level = 0.002  Analysis Date = 05/19/2004 
 RPT Level = 0.002  Analysis Date = 05/11/2004 
 RPT Level = 0.002  Analysis Date = 05/11/2004 
 RPT Level = 0.002  Analysis Date = 04/23/2004 
 RPT Level = 0.002  Analysis Date = 04/23/2004 
 RPT Level = 0.002  Analysis Date = 04/15/2004 
 RPT Level = 0.002  Analysis Date = 04/15/2004 
 RPT Level = 0.002  Analysis Date = 04/08/2004 
 RPT Level = 0.002  Analysis Date = 04/08/2004 
 RPT Level = 0.002  Analysis Date = 04/06/2004 
 RPT Level = 0.002  Analysis Date = 04/06/2004 
 RPT Level = 0.002  Analysis Date = 04/02/2004 
 RPT Level = 0.002  Analysis Date = 04/02/2004 
 RPT Level = 0.002  Analysis Date = 03/26/2004 
 RPT Level = 0.002  Analysis Date = 03/26/2004 
 RPT Level = 0.002  Analysis Date = 03/26/2004 
 RPT Level = 0.002  Analysis Date = 03/26/2004 
 RPT Level = 0.002  Analysis Date = 03/23/2004 
 RPT Level = 0.002  Analysis Date = 03/23/2004 
 RPT Level = 0.002  Analysis Date = 03/17/2004 
 RPT Level = 0.002  Analysis Date = 03/17/2004 
 RPT Level = 0.002  Analysis Date = 03/16/2004 
 RPT Level = 0.002  Analysis Date = 03/16/2004 
 RPT Level = 0.002  Analysis Date = 03/16/2004 
 RPT Level = 0.002  Analysis Date = 03/16/2004 
 RPT Level = 0.002  Analysis Date = 03/11/2004 
 RPT Level = 0.002  Analysis Date = 03/11/2004 
 RPT Level = 0.002  Analysis Date = 03/09/2004 
 RPT Level = 0.002  Analysis Date = 03/09/2004 
 RPT Level = 0.002  Analysis Date = 03/03/2004 
 RPT Level = 0.002  Analysis Date = 03/03/2004 
 RPT Level = 0.002  Analysis Date = 02/25/2004 
 RPT Level = 0.002  Analysis Date = 02/25/2004 
 RPT Level = 0.002  Analysis Date = 02/24/2004 
 RPT Level = 0.002  Analysis Date = 02/24/2004 
 RPT Level = 0.002  Analysis Date = 02/19/2004 
 RPT Level = 0.002  Analysis Date = 02/19/2004 
 RPT Level = 0.002  Analysis Date = 02/17/2004 
 RPT Level = 0.002  Analysis Date = 02/17/2004 
 RPT Level = 0.002  Analysis Date = 02/17/2004 
 RPT Level = 0.002  Analysis Date = 02/17/2004 
 RPT Level = 0.002  Analysis Date = 02/10/2004 
 RPT Level = 0.002  Analysis Date = 02/10/2004 
 RPT Level = 0.002  Analysis Date = 02/09/2004 
 RPT Level = 0.002  Analysis Date = 02/09/2004 
 RPT Level = 0.002  Analysis Date = 02/03/2004 
 RPT Level = 0.002  Analysis Date = 02/03/2004 
 RPT Level = 0.002  Analysis Date = 02/03/2004 
 RPT Level = 0.002  Analysis Date = 02/03/2004 
 RPT Level = 0.002  Analysis Date = 01/27/2004 
 RPT Level = 0.002  Analysis Date = 01/27/2004 
 RPT Level = 0.002  Analysis Date = 01/22/2004 
 RPT Level = 0.002  Analysis Date = 01/22/2004 
 RPT Level = 0.002  Analysis Date = 01/21/2004 
 RPT Level = 0.002  Analysis Date = 01/21/2004 
 RPT Level = 0.002  Analysis Date = 01/16/2004 
 RPT Level = 0.002  Analysis Date = 01/16/2004 
 RPT Level = 0.002  Analysis Date = 01/12/2004 
 RPT Level = 0.002  Analysis Date = 01/12/2004 
 RPT Level = 0.002  Analysis Date = 01/08/2004 
 RPT Level = 0.002  Analysis Date = 01/08/2004 
 RPT Level = 0.002  Analysis Date = 01/08/2004 
 RPT Level = 0.002  Analysis Date = 01/08/2004 
 RPT Level = 0.002  Analysis Date = 09/25/2003 
 RPT Level = 0.0019  Analysis Date = 09/25/2003 
 RPT Level = 0.0019  Analysis Date = 09/23/2003 
 RPT Level = 0.0019  Analysis Date = 09/23/2003 
 RPT Level = 0.0019  Analysis Date = 09/10/2003 
 RPT Level = 0.0019  Analysis Date = 09/10/2003 
 RPT Level = 0.0019  Analysis Date = 09/04/2003 
 RPT Level = 0.0019  Analysis Date = 09/04/2003 
 RPT Level = 0.0019  Analysis Date = 08/27/2003 
 RPT Level = 0.0019  Analysis Date = 08/27/2003 
 RPT Level = 0.0019  Analysis Date = 08/20/2003 
 RPT Level = 0.0019  Analysis Date = 08/20/2003 
 RPT Level = 0.0019  Analysis Date = 08/15/2003 
 RPT Level = 0.0019  Analysis Date = 08/15/2003 
 RPT Level = 0.0019  Analysis Date = 08/07/2003 
 RPT Level = 0.0019  Analysis Date = 08/07/2003 
 RPT Level = 0.0019  Analysis Date = 08/01/2003 
 RPT Level = 0.0019  Analysis Date = 08/01/2003 
 RPT Level = 0.0019  Analysis Date = 07/24/2003 
 RPT Level = 0.0019  Analysis Date = 07/24/2003 
 RPT Level = 0.0019  Analysis Date = 07/16/2003 
 RPT Level = 0.0019  Analysis Date = 07/16/2003 
 RPT Level = 0.0019  Analysis Date = 07/10/2003 
 RPT Level = 0.0019  Analysis Date = 07/10/2003 
 RPT Level = 0.0019  Analysis Date = 07/08/2003 
 RPT Level = 0.0019  Analysis Date = 07/08/2003 
 RPT Level = 0.0019  Analysis Date = 07/07/2003 
 RPT Level = 0.0019  Analysis Date = 07/07/2003 
 RPT Level = 0.0019  Analysis Date = 06/20/2003 
 RPT Level = 0.0019  Analysis Date = 06/20/2003 
 RPT Level = 0.0019  Analysis Date = 06/13/2003 
 RPT Level = 0.0019  Analysis Date = 06/13/2003 
 RPT Level = 0.0019  Analysis Date = 06/11/2003 
 RPT Level = 0.0019  Analysis Date = 06/11/2003 
 RPT Level = 0.0019  Analysis Date = 05/29/2003 
 RPT Level = 0.0019  Analysis Date = 05/29/2003 
 RPT Level = 0.0019  Analysis Date = 05/27/2003 
 RPT Level = 0.0019  Analysis Date = 05/27/2003 
 RPT Level = 0.0019  Analysis Date = 05/21/2003 
 RPT Level = 0.0019  Analysis Date = 05/21/2003 
 RPT Level = 0.0019  Analysis Date = 05/13/2003 
 RPT Level = 0.0019  Analysis Date = 05/13/2003 
 RPT Level = 0.0019  Analysis Date = 05/05/2003 
 RPT Level = 0.0019  Analysis Date = 05/05/2003 
 RPT Level = 0.0019  Analysis Date = 05/01/2003 
 RPT Level = 0.0019  Analysis Date = 05/01/2003 
 RPT Level = 0.0019  Analysis Date = 04/22/2003 
 RPT Level = 0.0019  Analysis Date = 04/22/2003 
 RPT Level = 0.0019  Analysis Date = 04/08/2003 
 RPT Level = 0.0019  Analysis Date = 04/08/2003 
 RPT Level = 0.0019  Analysis Date = 04/03/2003 
 RPT Level = 0.0019  Analysis Date = 04/03/2003 
 RPT Level = 0.0019  Analysis Date = 04/03/2003 
 RPT Level = 0.0019  Analysis Date = 04/03/2003 
 RPT Level = 0.0019  Analysis Date = 03/28/2003 
 RPT Level = 0.0019  Analysis Date = 03/28/2003 
 RPT Level = 0.0019  Analysis Date = 03/13/2003 
 RPT Level = 0.0019  Analysis Date = 03/13/2003 
 RPT Level = 0.0019  Analysis Date = 03/13/2003 
 RPT Level = 0.0019  Analysis Date = 03/13/2003 
 RPT Level = 0.0019  Analysis Date = 03/03/2003 
 RPT Level = 0.0019  Analysis Date = 03/03/2003 
 RPT Level = 0.0019  Analysis Date = 02/27/2003 
 RPT Level = 0.0019  Analysis Date = 02/27/2003 
 RPT Level = 0.0019  Analysis Date = 02/11/2003 
 RPT Level = 0.0019  Analysis Date = 02/11/2003 
 RPT Level = 0.0019  Analysis Date = 02/05/2003 
 RPT Level = 0.0019  Analysis Date = 02/05/2003 
 RPT Level = 0.0019  Analysis Date = 02/05/2003 
 RPT Level = 0.0019  Analysis Date = 02/05/2003 
 RPT Level = 0.0019  Analysis Date = 01/31/2003 
 RPT Level = 0.0019  Analysis Date = 01/31/2003 
 RPT Level = 0.0019  Analysis Date = 01/16/2003 
 RPT Level = 0.0019  Analysis Date = 01/16/2003 
 RPT Level = 0.0019  Analysis Date = 01/15/2003 
 RPT Level = 0.0019  Analysis Date = 01/15/2003 
 RPT Level = 0.0019  Analysis Date = 01/08/2003 
 RPT Level = 0.0019  Analysis Date = 01/08/2003 
 RPT Level = 0.0019  Analysis Date = 01/08/2003 
 RPT Level = 0.0019  Analysis Date = 01/08/2003 
 RPT Level = 0.0019  Analysis Date = 12/18/2002 
 RPT Level = 0.0019  Analysis Date = 12/18/2002 
 RPT Level = 0.0019  Analysis Date = 12/18/2002 
 RPT Level = 0.0019  Analysis Date = 12/18/2002 
 RPT Level = 0.0019  Analysis Date = 12/04/2002 
 RPT Level = 0.0019  Analysis Date = 12/04/2002 
 RPT Level = 0.0019  Analysis Date = 12/04/2002 
 RPT Level = 0.0019  Analysis Date = 12/04/2002 
 RPT Level = 0.0019  Analysis Date = 12/04/2002 
 RPT Level = 0.0019  Analysis Date = 12/04/2002 
 RPT Level = 0.0019  Analysis Date = 12/04/2002 
 RPT Level = 0.0019  Analysis Date = 12/04/2002 
 RPT Level = 0.0019  Analysis Date = 12/04/2002 
 RPT Level = 0.0019  Analysis Date = 12/04/2002 
 RPT Level = 0.0019  Analysis Date = 11/07/2002 
 RPT Level = 0.0019  Analysis Date = 11/07/2002 
 RPT Level = 0.0019  Analysis Date = 10/28/2002 
 RPT Level = 0.0019  Analysis Date = 10/28/2002 
 RPT Level = 0.0019  Analysis Date = 10/28/2002 
 RPT Level = 0.0019  Analysis Date = 10/28/2002 
 RPT Level = 0.0019  Analysis Date = 10/28/2002 
 RPT Level = 0.0019  Analysis Date = 10/28/2002 
 RPT Level = 0.0019  Analysis Date = 10/24/2002 
 RPT Level = 0.0019  Analysis Date = 10/24/2002 
 RPT Level = 0.0019  Analysis Date = 09/05/2002 
 RPT Level = 0.0019  Analysis Date = 09/05/2002 
 RPT Level = 0.0019  Analysis Date = 09/04/2002 
 RPT Level = 0.0019  Analysis Date = 09/04/2002 
 RPT Level = 0.0019  Analysis Date = 08/23/2002 
 RPT Level = 0.0019  Analysis Date = 08/23/2002 
 RPT Level = 0.0019  Analysis Date = 08/19/2002 
 RPT Level = 0.0019  Analysis Date = 08/19/2002 
 RPT Level = 0.0019  Analysis Date = 08/12/2002 
 RPT Level = 0.0019  Analysis Date = 08/12/2002 
 RPT Level = 0.0019  Analysis Date = 08/06/2002 
 RPT Level = 0.0019  Analysis Date = 08/06/2002 
 RPT Level = 0.0019  Analysis Date = 08/06/2002 
 RPT Level = 0.0019  Analysis Date = 08/06/2002 
 RPT Level = 0.0019  Analysis Date = 07/17/2002 
 RPT Level = 0.0019  Analysis Date = 07/17/2002 
 RPT Level = 0.0019  Analysis Date = 07/17/2002 
 RPT Level = 0.0019  Analysis Date = 07/17/2002 
 RPT Level = 0.0019  Analysis Date = 07/03/2002 
 RPT Level = 0.0019  Analysis Date = 07/03/2002 
 RPT Level = 0.0019  Analysis Date = 07/01/2002 
 RPT Level = 0.0019  Analysis Date = 07/01/2002 
 RPT Level = 0.0019  Analysis Date = 06/20/2002 
 RPT Level = 0.0019  Analysis Date = 06/20/2002 
 RPT Level = 0.0019  Analysis Date = 06/17/2002 
 RPT Level = 0.0019  Analysis Date = 06/17/2002 
 RPT Level = 0.0019  Analysis Date = 06/05/2002 
 RPT Level = 0.0019  Analysis Date = 06/05/2002 
 RPT Level = 0.0019  Analysis Date = 06/03/2002 
 RPT Level = 0.0019  Analysis Date = 06/03/2002 
 RPT Level = 0.0019  Analysis Date = 05/29/2002 
 RPT Level = 0.0019  Analysis Date = 05/29/2002 
 RPT Level = 0.0019  Analysis Date = 05/14/2002 
 RPT Level = 0.0019  Analysis Date = 05/14/2002 
 RPT Level = 0.0019  Analysis Date = 05/14/2002 
 RPT Level = 0.0019  Analysis Date = 05/14/2002 
 RPT Level = 0.0019  Analysis Date = 05/07/2002 
 RPT Level = 0.0019  Analysis Date = 05/07/2002 
 RPT Level = 0.0019  Analysis Date = 04/30/2002 
 RPT Level = 0.0019  Analysis Date = 04/30/2002 
 RPT Level = 0.0019  Analysis Date = 04/30/2002 
 RPT Level = 0.0019  Analysis Date = 04/30/2002 
 RPT Level = 0.0019  Analysis Date = 04/16/2002 
 RPT Level = 0.0019  Analysis Date = 04/16/2002 
 RPT Level = 0.0019  Analysis Date = 04/09/2002 
 RPT Level = 0.0019  Analysis Date = 04/09/2002 
 RPT Level = 0.0019  Analysis Date = 04/09/2002 
 RPT Level = 0.0019  Analysis Date = 04/09/2002 
 RPT Level = 0.0019  Analysis Date = 03/26/2002 
 RPT Level = 0.0019  Analysis Date = 03/26/2002 
 RPT Level = 0.0019  Analysis Date = 03/19/2002 
 RPT Level = 0.0019  Analysis Date = 03/19/2002 
 RPT Level = 0.0019  Analysis Date = 03/11/2002 
 RPT Level = 0.0019  Analysis Date = 03/11/2002 
 RPT Level = 0.0019  Analysis Date = 03/05/2002 
 RPT Level = 0.0019  Analysis Date = 03/05/2002 
 RPT Level = 0.0019  Analysis Date = 02/27/2002 
 RPT Level = 0.0019  Analysis Date = 02/27/2002 
 RPT Level = 0.0019  Analysis Date = 02/20/2002 
 RPT Level = 0.0019  Analysis Date = 02/20/2002 
 RPT Level = 0.0019  Analysis Date = 02/06/2002 
 RPT Level = 0.0019  Analysis Date = 02/06/2002 
 RPT Level = 0.0019  Analysis Date = 02/05/2002 
 RPT Level = 0.0019  Analysis Date = 02/05/2002 
 RPT Level = 0.0019  Analysis Date = 01/24/2002 
 RPT Level = 0.0019  Analysis Date = 01/24/2002 
 RPT Level = 0.0019  Analysis Date = 01/15/2002 
 RPT Level = 0.0019  Analysis Date = 01/15/2002 
 RPT Level = 0.0019  Analysis Date = 01/04/2002 
 RPT Level = 0.0019  Analysis Date = 01/04/2002 
 RPT Level = 0.0019  Analysis Date = 01/03/2002 
 RPT Level = 0.0019  Analysis Date = 01/03/2002 
 RPT Level = 0.0019  Analysis Date = 12/20/2001 
 RPT Level = 0.0019  Analysis Date = 12/20/2001 
 RPT Level = 0.0019  Analysis Date = 12/17/2001 
 RPT Level = 0.0019  Analysis Date = 12/17/2001 
 RPT Level = 0.0019  Analysis Date = 12/06/2001 
 RPT Level = 0.0019  Analysis Date = 12/06/2001 
 RPT Level = 0.0019  Analysis Date = 11/08/2001 
 RPT Level = 0.0019  Y = 0
The SGPlot Procedure

False Positive Rate for Phosphorus (as P), UNF, CFA, ACD-P, LL

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Phosphorus (as P), UNF, CFA, ACD-P, LL 00665CL021 2002 40 1 3%
    2003 52 3 6%
    2004 51 6 12%
    2005 50 2 4%
    2006 15 3 20%
    2007 50 3 6%
    2008 50 2 4%
    2009 52 1 2%
    2014 42 0 0%
    2015 52 1 2%
    2016 49 1 2%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Phosphorus (as P), UNF, CFA, ALK-P, ACD -
Blind Blank Results
Lab: NWQL, PCode: 00665, MCode: AKP01
Analysis dates: 06/23/04 through 09/26/16
Open Data Set

 Analysis Date = 12/11/2014 
 Lab Value = 1.019 
 RPT Level = 0.01 
 Lab Sample ID = 20143360081  Analysis Date = 05/29/2012 
 Lab Value = 0.022 
 RPT Level = 0.01 
 Lab Sample ID = 20121370052  Analysis Date = 12/11/2014 
 Lab Value = 1.019 
 RPT Level = 0.01 
 Lab Sample ID = 20143360081  Analysis Date = 05/29/2012 
 Lab Value = 0.022 
 RPT Level = 0.01 
 Lab Sample ID = 20121370052  Analysis Date = 09/26/2016 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20162640178  Analysis Date = 09/21/2016 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20162580021  Analysis Date = 09/15/2016 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20162520021  Analysis Date = 09/07/2016 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20162440129  Analysis Date = 08/26/2016 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20162360202  Analysis Date = 08/22/2016 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20162290136  Analysis Date = 08/17/2016 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20162230012  Analysis Date = 08/11/2016 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20162150194  Analysis Date = 08/09/2016 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20162080237  Analysis Date = 07/29/2016 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20162010261  Analysis Date = 07/19/2016 
 Lab Value = 0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20161940115  Analysis Date = 07/08/2016 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20161870038  Analysis Date = 06/30/2016 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20161800089  Analysis Date = 06/24/2016 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20161740080  Analysis Date = 06/21/2016 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20161660157  Analysis Date = 06/14/2016 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20161590161  Analysis Date = 06/03/2016 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20161520029  Analysis Date = 05/31/2016 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20161480203  Analysis Date = 05/12/2016 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20161270015  Analysis Date = 05/04/2016 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20161230047  Analysis Date = 04/29/2016 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20161160095  Analysis Date = 04/29/2016 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20161100131  Analysis Date = 04/15/2016 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20161020031  Analysis Date = 04/07/2016 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20160950050  Analysis Date = 04/01/2016 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20160880041  Analysis Date = 03/30/2016 
 Lab Value = 0.014 
 RPT Level = 0.01 
 Lab Sample ID = 20160810071  Analysis Date = 03/16/2016 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20160740016  Analysis Date = 03/09/2016 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20160670017  Analysis Date = 03/03/2016 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20160600020  Analysis Date = 02/24/2016 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20160530019  Analysis Date = 02/17/2016 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20160470018  Analysis Date = 02/16/2016 
 Lab Value = 0.013 
 RPT Level = 0.01 
 Lab Sample ID = 20160400086  Analysis Date = 02/05/2016 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20160320014  Analysis Date = 01/27/2016 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20160250029  Analysis Date = 01/22/2016 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20160190020  Analysis Date = 01/13/2016 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20160110012  Analysis Date = 01/08/2016 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20160050037  Analysis Date = 01/05/2016 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20153630051  Analysis Date = 12/23/2015 
 Lab Value = 0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20153550014  Analysis Date = 12/21/2015 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20153500167  Analysis Date = 12/11/2015 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20153420008  Analysis Date = 12/02/2015 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20153340010  Analysis Date = 11/30/2015 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20153270005  Analysis Date = 11/17/2015 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20153200028  Analysis Date = 11/16/2015 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20153140001  Analysis Date = 11/03/2015 
 Lab Value = 0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20153060024  Analysis Date = 11/02/2015 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20152990071  Analysis Date = 10/29/2015 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20152920041  Analysis Date = 10/20/2015 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20152860162  Analysis Date = 10/15/2015 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20152780015  Analysis Date = 10/01/2015 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20152710074  Analysis Date = 09/28/2015 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20152640031  Analysis Date = 09/22/2015 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20152590168  Analysis Date = 09/17/2015 
 Lab Value = -0.014 
 RPT Level = 0.01 
 Lab Sample ID = 20152510015  Analysis Date = 09/18/2015 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20152430087  Analysis Date = 09/01/2015 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20152360161  Analysis Date = 09/01/2015 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20152330023  Analysis Date = 08/19/2015 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20152230123  Analysis Date = 08/10/2015 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20152150081  Analysis Date = 08/10/2015 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20152080071  Analysis Date = 07/28/2015 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20152010054  Analysis Date = 07/16/2015 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20151940026  Analysis Date = 07/13/2015 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20151870013  Analysis Date = 07/01/2015 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20151800056  Analysis Date = 06/24/2015 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20151730017  Analysis Date = 06/22/2015 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20151660033  Analysis Date = 06/17/2015 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20151620206  Analysis Date = 06/05/2015 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20151530197  Analysis Date = 06/03/2015 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20151460122  Analysis Date = 05/28/2015 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20151390199  Analysis Date = 05/15/2015 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20151310072  Analysis Date = 05/07/2015 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20151240056  Analysis Date = 05/05/2015 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20151180075  Analysis Date = 05/01/2015 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20151140034  Analysis Date = 04/22/2015 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20151050043  Analysis Date = 04/15/2015 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20150970077  Analysis Date = 04/03/2015 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20150900047  Analysis Date = 04/03/2015 
 Lab Value = -0.012 
 RPT Level = 0.01 
 Lab Sample ID = 20150850046  Analysis Date = 04/02/2015 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20150770030  Analysis Date = 03/16/2015 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20150690110  Analysis Date = 03/10/2015 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20150610108  Analysis Date = 03/05/2015 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20150540035  Analysis Date = 03/03/2015 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20150490026  Analysis Date = 02/19/2015 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20150400036  Analysis Date = 02/20/2015 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20150330028  Analysis Date = 03/03/2015 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20150260018  Analysis Date = 02/05/2015 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20150200028  Analysis Date = 02/05/2015 
 Lab Value = 0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20150120025  Analysis Date = 02/10/2015 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20150050018  Analysis Date = 01/07/2015 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20143630011  Analysis Date = 01/07/2015 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20143560053  Analysis Date = 12/31/2014 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20143490027  Analysis Date = 12/31/2014 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20143420027  Analysis Date = 12/04/2014 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20143300045  Analysis Date = 12/10/2014 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20143230052  Analysis Date = 11/25/2014 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20143160021  Analysis Date = 11/19/2014 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20143080076  Analysis Date = 11/05/2014 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20143010069  Analysis Date = 11/05/2014 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20142950130  Analysis Date = 10/24/2014 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20142880087  Analysis Date = 10/24/2014 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20142790035  Analysis Date = 10/16/2014 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20142720121  Analysis Date = 10/07/2014 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20142650111  Analysis Date = 09/30/2014 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20142590052  Analysis Date = 09/19/2014 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20142520006  Analysis Date = 09/17/2014 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20142470054  Analysis Date = 08/19/2014 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20142230083  Analysis Date = 08/19/2014 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20142160070  Analysis Date = 08/14/2014 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20142090218  Analysis Date = 08/05/2014 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20142030078  Analysis Date = 08/05/2014 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20141960043  Analysis Date = 07/24/2014 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20141890090  Analysis Date = 07/15/2014 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20141820108  Analysis Date = 07/09/2014 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20141750150  Analysis Date = 07/08/2014 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20141680086  Analysis Date = 07/01/2014 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20141620051  Analysis Date = 06/25/2014 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20141550065  Analysis Date = 06/16/2014 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20141470150  Analysis Date = 06/11/2014 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20141400016  Analysis Date = 05/28/2014 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20141340004  Analysis Date = 05/20/2014 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20141250088  Analysis Date = 05/15/2014 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20141190018  Analysis Date = 05/12/2014 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20141130029  Analysis Date = 04/24/2014 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20141050011  Analysis Date = 04/21/2014 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20140970031  Analysis Date = 04/11/2014 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20140900029  Analysis Date = 04/02/2014 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20140840094  Analysis Date = 04/02/2014 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20140760030  Analysis Date = 03/20/2014 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20140690028  Analysis Date = 03/20/2014 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20140630125  Analysis Date = 03/20/2014 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20140550053  Analysis Date = 03/06/2014 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20140490016  Analysis Date = 02/19/2014 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20140410010  Analysis Date = 02/19/2014 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20140340025  Analysis Date = 02/19/2014 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20140270198  Analysis Date = 02/11/2014 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20140210048  Analysis Date = 01/15/2014 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20140130052  Analysis Date = 01/15/2014 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20140070068  Analysis Date = 01/09/2014 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20133580057  Analysis Date = 01/09/2014 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20133500079  Analysis Date = 01/03/2014 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20133430112  Analysis Date = 12/18/2013 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20133360023  Analysis Date = 12/16/2013 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20133300014  Analysis Date = 11/27/2013 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20133230005  Analysis Date = 11/20/2013 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20133170106  Analysis Date = 11/14/2013 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20133090099  Analysis Date = 11/06/2013 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20133030024  Analysis Date = 10/31/2013 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20132970026  Analysis Date = 10/31/2013 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20132730139  Analysis Date = 10/25/2013 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20132660105  Analysis Date = 10/25/2013 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20132600014  Analysis Date = 09/17/2013 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20132530114  Analysis Date = 09/09/2013 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20132410016  Analysis Date = 09/05/2013 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20132390009  Analysis Date = 09/05/2013 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20132350026  Analysis Date = 08/30/2013 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20132270020  Analysis Date = 08/29/2013 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20132180211  Analysis Date = 08/26/2013 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20132120021  Analysis Date = 08/13/2013 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20132040023  Analysis Date = 07/30/2013 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20131970026  Analysis Date = 08/06/2013 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20131900089  Analysis Date = 07/23/2013 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20131830080  Analysis Date = 07/10/2013 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20131770012  Analysis Date = 07/08/2013 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20131700039  Analysis Date = 06/26/2013 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20131640007  Analysis Date = 06/14/2013 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20131550030  Analysis Date = 06/03/2013 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20131500023  Analysis Date = 06/03/2013 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20131430201  Analysis Date = 05/23/2013 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20131350119  Analysis Date = 05/21/2013 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20131270023  Analysis Date = 05/08/2013 
 Lab Value = 0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20131220013  Analysis Date = 04/30/2013 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20131150033  Analysis Date = 05/02/2013 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20131120124  Analysis Date = 04/30/2013 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20131090031  Analysis Date = 04/18/2013 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20130930088  Analysis Date = 04/04/2013 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20130840059  Analysis Date = 03/27/2013 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20130770159  Analysis Date = 03/19/2013 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20130700012  Analysis Date = 03/11/2013 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20130630123  Analysis Date = 03/11/2013 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20130570008  Analysis Date = 02/26/2013 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20130520007  Analysis Date = 02/26/2013 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20130420053  Analysis Date = 02/21/2013 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20130350030  Analysis Date = 02/07/2013 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20130280040  Analysis Date = 02/07/2013 
 Lab Value = 0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20130230100  Analysis Date = 01/31/2013 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20130140072  Analysis Date = 01/18/2013 
 Lab Value = -0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20130070057  Analysis Date = 01/18/2013 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20130020011  Analysis Date = 01/11/2013 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20123620012  Analysis Date = 01/11/2013 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20123530085  Analysis Date = 01/11/2013 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20123480060  Analysis Date = 12/20/2012 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20123390114  Analysis Date = 12/20/2012 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20123330011  Analysis Date = 12/14/2012 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20123250064  Analysis Date = 12/14/2012 
 Lab Value = -0.013 
 RPT Level = 0.01 
 Lab Sample ID = 20123200055  Analysis Date = 11/15/2012 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20123120067  Analysis Date = 11/07/2012 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20123040118  Analysis Date = 11/06/2012 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20122980125  Analysis Date = 10/29/2012 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20122900095  Analysis Date = 10/19/2012 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20122830035  Analysis Date = 10/19/2012 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20122750026  Analysis Date = 10/12/2012 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20122700109  Analysis Date = 10/11/2012 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20122690152  Analysis Date = 09/21/2012 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20122550014  Analysis Date = 09/18/2012 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20122490101  Analysis Date = 09/05/2012 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20122410012  Analysis Date = 09/04/2012 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20122350176  Analysis Date = 09/18/2012 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20122280091  Analysis Date = 08/21/2012 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20122190097  Analysis Date = 08/21/2012 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20122140053  Analysis Date = 08/23/2012 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20122050102  Analysis Date = 08/08/2012 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20121990078  Analysis Date = 08/03/2012 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20121910040  Analysis Date = 07/26/2012 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20121870019  Analysis Date = 07/18/2012 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20121780034  Analysis Date = 07/09/2012 
 Lab Value = 0.013 
 RPT Level = 0.01 
 Lab Sample ID = 20121710007  Analysis Date = 07/09/2012 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20121650053  Analysis Date = 06/14/2012 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20121560124  Analysis Date = 06/05/2012 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20121510025  Analysis Date = 06/08/2012 
 Lab Value = 0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20121430022  Analysis Date = 05/25/2012 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20121290073  Analysis Date = 05/17/2012 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20121210122  Analysis Date = 05/03/2012 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20121150088  Analysis Date = 04/26/2012 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20121080010  Analysis Date = 04/19/2012 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20121010027  Analysis Date = 04/04/2012 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20120930055  Analysis Date = 04/12/2012 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20120870033  Analysis Date = 04/04/2012 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20120790084  Analysis Date = 03/29/2012 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20120730078  Analysis Date = 03/29/2012 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20120660074  Analysis Date = 03/15/2012 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20120580060  Analysis Date = 03/15/2012 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20120530100  Analysis Date = 02/24/2012 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20120450019  Analysis Date = 02/15/2012 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20120370063  Analysis Date = 02/09/2012 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20120310011  Analysis Date = 01/31/2012 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20120230047  Analysis Date = 01/25/2012 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20120180012  Analysis Date = 01/11/2012 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20120090051  Analysis Date = 01/11/2012 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20120030027  Analysis Date = 01/12/2012 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20113610088  Analysis Date = 12/29/2011 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20113530138  Analysis Date = 12/22/2011 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20113490074  Analysis Date = 12/22/2011 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20113460138  Analysis Date = 12/15/2011 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20113320114  Analysis Date = 12/06/2011 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20113250125  Analysis Date = 11/23/2011 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20113180163  Analysis Date = 11/16/2011 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20113110061  Analysis Date = 11/08/2011 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20113050093  Analysis Date = 11/01/2011 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20112970117  Analysis Date = 10/25/2011 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20112910136  Analysis Date = 10/19/2011 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20112840072  Analysis Date = 10/13/2011 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20112760062  Analysis Date = 10/04/2011 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20112690122  Analysis Date = 09/27/2011 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20112630060  Analysis Date = 09/21/2011 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20112560022  Analysis Date = 09/20/2011 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20112510035  Analysis Date = 09/20/2011 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20112500187  Analysis Date = 08/30/2011 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20112360062  Analysis Date = 08/24/2011 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20112300037  Analysis Date = 08/12/2011 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20112200050  Analysis Date = 08/04/2011 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20112130155  Analysis Date = 08/02/2011 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20112060093  Analysis Date = 07/27/2011 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20112010021  Analysis Date = 07/19/2011 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20111920101  Analysis Date = 07/14/2011 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20111860061  Analysis Date = 07/06/2011 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20111780163  Analysis Date = 06/23/2011 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20111710110  Analysis Date = 06/21/2011 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20111640065  Analysis Date = 06/09/2011 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20111570060  Analysis Date = 06/09/2011 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20111510148  Analysis Date = 06/14/2011 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20111430201  Analysis Date = 05/25/2011 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20111360139  Analysis Date = 05/12/2011 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20111290045  Analysis Date = 05/06/2011 
 Lab Value = -0.012 
 RPT Level = 0.01 
 Lab Sample ID = 20111220084  Analysis Date = 04/29/2011 
 Lab Value = -0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20111150112  Analysis Date = 04/22/2011 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20111080074  Analysis Date = 05/06/2011 
 Lab Value = -0.014 
 RPT Level = 0.01 
 Lab Sample ID = 20111010119  Analysis Date = 04/07/2011 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20110950055  Analysis Date = 03/30/2011 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20110870091  Analysis Date = 04/06/2011 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20110800058  Analysis Date = 03/18/2011 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20110750069  Analysis Date = 03/11/2011 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20110660030  Analysis Date = 03/11/2011 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20110590069  Analysis Date = 03/02/2011 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20110530104  Analysis Date = 03/16/2011 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20110450035  Analysis Date = 02/17/2011 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20110410097  Analysis Date = 02/17/2011 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20110400068  Analysis Date = 01/28/2011 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20110240064  Analysis Date = 01/19/2011 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20110180058  Analysis Date = 01/14/2011 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20110110017  Analysis Date = 01/13/2011 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20110030022  Analysis Date = 01/13/2011 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20103610055  Analysis Date = 01/13/2011 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20103540045  Analysis Date = 12/21/2010 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20103470075  Analysis Date = 12/17/2010 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20103400083  Analysis Date = 12/09/2010 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20103330098  Analysis Date = 12/09/2010 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20103260066  Analysis Date = 11/23/2010 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20103190067  Analysis Date = 11/18/2010 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20103120027  Analysis Date = 11/10/2010 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20103060009  Analysis Date = 11/05/2010 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20102990005  Analysis Date = 10/27/2010 
 Lab Value = -0.013 
 RPT Level = 0.01 
 Lab Sample ID = 20102920007  Analysis Date = 10/19/2010 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20102850131  Analysis Date = 10/19/2010 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20102770103  Analysis Date = 10/14/2010 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20102700153  Analysis Date = 09/29/2010 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20102640135  Analysis Date = 09/23/2010 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20102570022  Analysis Date = 09/23/2010 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20102510060  Analysis Date = 09/10/2010 
 Lab Value = -0.018 
 RPT Level = 0.01 
 Lab Sample ID = 20102430251  Analysis Date = 09/02/2010 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20102350198  Analysis Date = 08/26/2010 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20102290051  Analysis Date = 08/19/2010 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20102230039  Analysis Date = 08/11/2010 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20102140089  Analysis Date = 08/03/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20102080018  Analysis Date = 07/27/2010 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20102000187  Analysis Date = 07/20/2010 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20101930105  Analysis Date = 07/13/2010 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20101870061  Analysis Date = 07/20/2010 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20101790122  Analysis Date = 07/01/2010 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20101730069  Analysis Date = 06/23/2010 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20101660063  Analysis Date = 06/23/2010 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20101590013  Analysis Date = 06/23/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20101530121  Analysis Date = 06/09/2010 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20101450016  Analysis Date = 06/02/2010 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20101380022  Analysis Date = 05/20/2010 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20101310096  Analysis Date = 05/13/2010 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20101240078  Analysis Date = 05/05/2010 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20101180040  Analysis Date = 04/30/2010 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20101090060  Analysis Date = 04/20/2010 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20101020074  Analysis Date = 04/15/2010 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20100950035  Analysis Date = 04/07/2010 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20100880050  Analysis Date = 04/07/2010 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20100850063  Analysis Date = 03/25/2010 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20100750001  Analysis Date = 03/16/2010 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20100680015  Analysis Date = 03/05/2010 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20100600068  Analysis Date = 02/24/2010 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20100530047  Analysis Date = 02/24/2010 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20100470026  Analysis Date = 02/11/2010 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20100390037  Analysis Date = 02/11/2010 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20100320021  Analysis Date = 02/05/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20100260064  Analysis Date = 01/27/2010 
 Lab Value = -0.012 
 RPT Level = 0.01 
 Lab Sample ID = 20100190104  Analysis Date = 01/27/2010 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20100110097  Analysis Date = 01/22/2010 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20100050015  Analysis Date = 01/22/2010 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20093620045  Analysis Date = 01/22/2010 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20093560035  Analysis Date = 12/22/2009 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20093480065  Analysis Date = 12/16/2009 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20093420008  Analysis Date = 12/16/2009 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20093350069  Analysis Date = 12/11/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20093280016  Analysis Date = 11/24/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20093200089  Analysis Date = 11/24/2009 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20093130060  Analysis Date = 11/19/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20093070203  Analysis Date = 11/13/2009 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20093000108  Analysis Date = 11/05/2009 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20092920099  Analysis Date = 10/30/2009 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20092870072  Analysis Date = 10/22/2009 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20092780069  Analysis Date = 10/22/2009 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20092720021  Analysis Date = 10/07/2009 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20092640045  Analysis Date = 10/08/2009 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20092570047  Analysis Date = 10/02/2009 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20092520131  Analysis Date = 09/24/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20092430157  Analysis Date = 09/18/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20092360172  Analysis Date = 09/09/2009 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20092290213  Analysis Date = 08/31/2009 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20092220153  Analysis Date = 08/19/2009 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20092150075  Analysis Date = 08/19/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20092090265  Analysis Date = 08/05/2009 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20092010113  Analysis Date = 07/28/2009 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20091950024  Analysis Date = 07/22/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20091870028  Analysis Date = 07/16/2009 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20091800171  Analysis Date = 06/30/2009 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20091730221  Analysis Date = 06/26/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20091660209  Analysis Date = 06/26/2009 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20091590089  Analysis Date = 06/09/2009 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20091520153  Analysis Date = 06/05/2009 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20091460191  Analysis Date = 06/02/2009 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20091380124  Analysis Date = 06/02/2009 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20091320021  Analysis Date = 05/20/2009 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20091240122  Analysis Date = 05/15/2009 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20091170108  Analysis Date = 05/04/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20091110107  Analysis Date = 04/23/2009 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20091030084  Analysis Date = 04/21/2009 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20090960052  Analysis Date = 04/03/2009 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20090890067  Analysis Date = 04/01/2009 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20090820026  Analysis Date = 04/14/2009 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20090750045  Analysis Date = 03/13/2009 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20090680047  Analysis Date = 03/13/2009 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20090610058  Analysis Date = 03/03/2009 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20090540031  Analysis Date = 02/23/2009 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20090480056  Analysis Date = 02/12/2009 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20090400029  Analysis Date = 02/12/2009 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20090330036  Analysis Date = 02/04/2009 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20090260025  Analysis Date = 01/26/2009 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20090200033  Analysis Date = 01/21/2009 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20090120047  Analysis Date = 01/15/2009 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20090050018  Analysis Date = 01/08/2009 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20083650082  Analysis Date = 01/08/2009 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20083570035  Analysis Date = 01/07/2009 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20083520228  Analysis Date = 12/15/2008 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20083450059  Analysis Date = 12/08/2008 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20083360038  Analysis Date = 12/08/2008 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20083290063  Analysis Date = 11/25/2008 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20083220066  Analysis Date = 11/24/2008 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20083150064  Analysis Date = 11/12/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20083080098  Analysis Date = 11/04/2008 
 Lab Value = 0.013 
 RPT Level = 0.01 
 Lab Sample ID = 20083010106  Analysis Date = 10/23/2008 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20082940060  Analysis Date = 10/17/2008 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20082880038  Analysis Date = 10/09/2008 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20082800045  Analysis Date = 10/09/2008 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20082730059  Analysis Date = 10/01/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20082660045  Analysis Date = 09/25/2008 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20082590107  Analysis Date = 09/24/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20082520009  Analysis Date = 09/11/2008 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20082460099  Analysis Date = 08/28/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20082380078  Analysis Date = 08/27/2008 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20082310132  Analysis Date = 08/19/2008 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20082250012  Analysis Date = 08/14/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20082190010  Analysis Date = 07/29/2008 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20082030128  Analysis Date = 07/21/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20081970138  Analysis Date = 07/14/2008 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20081890042  Analysis Date = 07/09/2008 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20081820062  Analysis Date = 06/27/2008 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20081750126  Analysis Date = 06/26/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20081680068  Analysis Date = 06/20/2008 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20081620016  Analysis Date = 06/11/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20081540110  Analysis Date = 06/05/2008 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20081480070  Analysis Date = 05/30/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20081400059  Analysis Date = 05/19/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20081330114  Analysis Date = 05/15/2008 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20081260069  Analysis Date = 04/30/2008 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20081190056  Analysis Date = 04/24/2008 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20081120035  Analysis Date = 04/21/2008 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20081050115  Analysis Date = 04/15/2008 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20080980082  Analysis Date = 04/04/2008 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20080920084  Analysis Date = 03/27/2008 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20080840065  Analysis Date = 03/21/2008 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20080770123  Analysis Date = 03/26/2008 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20080700073  Analysis Date = 03/12/2008 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20080630068  Analysis Date = 03/06/2008 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20080560071  Analysis Date = 03/06/2008 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20080510054  Analysis Date = 03/04/2008 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20080420073  Analysis Date = 02/21/2008 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20080360050  Analysis Date = 01/31/2008 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20080280049  Analysis Date = 01/25/2008 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20080230019  Analysis Date = 01/24/2008 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20080140026  Analysis Date = 01/08/2008 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20080070021  Analysis Date = 01/07/2008 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20073620003  Analysis Date = 12/26/2007 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20073510100  Analysis Date = 12/17/2007 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20073440026  Analysis Date = 12/06/2007 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20073370067  Analysis Date = 11/28/2007 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20073300043  Analysis Date = 11/28/2007 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20073230112  Analysis Date = 11/16/2007 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20073170061  Analysis Date = 11/14/2007 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20073100010  Analysis Date = 10/31/2007 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20073020059  Analysis Date = 11/01/2007 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20072960178  Analysis Date = 10/22/2007 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20072890057  Analysis Date = 10/22/2007 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20072850024  Analysis Date = 10/05/2007 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20072670055  Analysis Date = 10/05/2007 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20072600128  Analysis Date = 09/20/2007 
 Lab Value = 0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20072540014  Analysis Date = 09/07/2007 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20072480016  Analysis Date = 09/05/2007 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20072400019  Analysis Date = 08/27/2007 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20072330110  Analysis Date = 08/21/2007 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20072260199  Analysis Date = 08/16/2007 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20072210251  Analysis Date = 08/09/2007 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20072110163  Analysis Date = 08/02/2007 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20072040100  Analysis Date = 07/12/2007 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20071900106  Analysis Date = 07/09/2007 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20071830157  Analysis Date = 07/03/2007 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20071770202  Analysis Date = 06/22/2007 
 Lab Value = 0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20071690115  Analysis Date = 06/14/2007 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20071620049  Analysis Date = 06/08/2007 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20071560023  Analysis Date = 06/05/2007 
 Lab Value = -0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20071500032  Analysis Date = 05/24/2007 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20071410090  Analysis Date = 05/17/2007 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20071340114  Analysis Date = 05/11/2007 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20071280017  Analysis Date = 05/07/2007 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20071200085  Analysis Date = 04/27/2007 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20071130123  Analysis Date = 04/19/2007 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20071070019  Analysis Date = 04/16/2007 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20070990049  Analysis Date = 04/05/2007 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20070930069  Analysis Date = 04/05/2007 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20070860216  Analysis Date = 03/26/2007 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20070780127  Analysis Date = 03/15/2007 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20070710074  Analysis Date = 03/08/2007 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20070650012  Analysis Date = 03/08/2007 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20070580140  Analysis Date = 02/28/2007 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20070540026  Analysis Date = 02/22/2007 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20070460018  Analysis Date = 02/14/2007 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20070400104  Analysis Date = 01/30/2007 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20070250021  Analysis Date = 01/25/2007 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20070180073  Analysis Date = 01/25/2007 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20070120011  Analysis Date = 01/11/2007 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20070040014  Analysis Date = 01/04/2007 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20063610085  Analysis Date = 12/28/2006 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20063520073  Analysis Date = 12/18/2006 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20063450082  Analysis Date = 12/07/2006 
 Lab Value = 0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20063380054  Analysis Date = 12/04/2006 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20063310046  Analysis Date = 11/30/2006 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20063240080  Analysis Date = 11/21/2006 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20063180102  Analysis Date = 11/13/2006 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20063100081  Analysis Date = 11/09/2006 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20063030095  Analysis Date = 10/31/2006 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20062960134  Analysis Date = 10/23/2006 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20062910014  Analysis Date = 10/19/2006 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20062850013  Analysis Date = 10/18/2006 
 Lab Value = 0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20062780051  Analysis Date = 10/16/2006 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20062620014  Analysis Date = 10/13/2006 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20062540015  Analysis Date = 10/10/2006 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20062500007  Analysis Date = 09/27/2006 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20062350181  Analysis Date = 09/27/2006 
 Lab Value = -0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20062270274  Analysis Date = 08/17/2006 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20062220040  Analysis Date = 07/31/2006 
 Lab Value = -0.014 
 RPT Level = 0.01 
 Lab Sample ID = 20062020318  Analysis Date = 07/27/2006 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20061950008  Analysis Date = 07/17/2006 
 Lab Value = -0.007 
 RPT Level = 0.01 
 Lab Sample ID = 20061880010  Analysis Date = 07/10/2006 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20061730015  Analysis Date = 06/27/2006 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20061670022  Analysis Date = 06/26/2006 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20061580019  Analysis Date = 06/02/2006 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20061370015  Analysis Date = 05/31/2006 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20061280112  Analysis Date = 05/08/2006 
 Lab Value = -0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20061220100  Analysis Date = 09/22/2005 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20052590036  Analysis Date = 09/14/2005 
 Lab Value = 0.014 
 RPT Level = 0.01 
 Lab Sample ID = 20052520007  Analysis Date = 09/02/2005 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20052430005  Analysis Date = 08/29/2005 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20052370001  Analysis Date = 08/24/2005 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20052300008  Analysis Date = 08/15/2005 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20052210011  Analysis Date = 08/12/2005 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20052160008  Analysis Date = 08/12/2005 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20052160006  Analysis Date = 07/21/2005 
 Lab Value = -0.008 
 RPT Level = 0.01 
 Lab Sample ID = 20052010006  Analysis Date = 07/18/2005 
 Lab Value = -0.009 
 RPT Level = 0.01 
 Lab Sample ID = 20051940016  Analysis Date = 07/12/2005 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20051880017  Analysis Date = 07/08/2005 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20051800188  Analysis Date = 06/30/2005 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20051740018  Analysis Date = 06/21/2005 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20051660175  Analysis Date = 06/14/2005 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20051590026  Analysis Date = 06/06/2005 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20051530020  Analysis Date = 05/27/2005 
 Lab Value = -0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20051440044  Analysis Date = 05/23/2005 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20051380015  Analysis Date = 05/18/2005 
 Lab Value = 0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20051320028  Analysis Date = 05/11/2005 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20051250004  Analysis Date = 05/06/2005 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20051170011  Analysis Date = 04/29/2005 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20051110005  Analysis Date = 04/14/2005 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20051020017  Analysis Date = 04/12/2005 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20050950045  Analysis Date = 04/05/2005 
 Lab Value = 0.01 
 RPT Level = 0.01 
 Lab Sample ID = 20050880117  Analysis Date = 03/30/2005 
 Lab Value = -0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20050840097  Analysis Date = 03/18/2005 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20050750005  Analysis Date = 03/17/2005 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20050700006  Analysis Date = 03/17/2005 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20050700005  Analysis Date = 03/17/2005 
 Lab Value = -0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20050670011  Analysis Date = 03/08/2005 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20050550023  Analysis Date = 02/24/2005 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20050480006  Analysis Date = 02/16/2005 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20050410008  Analysis Date = 02/14/2005 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20050340022  Analysis Date = 01/27/2005 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20050260023  Analysis Date = 01/25/2005 
 Lab Value = 0.001 
 RPT Level = 0.01 
 Lab Sample ID = 20050200049  Analysis Date = 01/20/2005 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20050130092  Analysis Date = 01/12/2005 
 Lab Value = -0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20050070015  Analysis Date = 01/07/2005 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20043650003  Analysis Date = 01/07/2005 
 Lab Value = -0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20043580036  Analysis Date = 01/07/2005 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20043580034  Analysis Date = 12/21/2004 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20043520024  Analysis Date = 12/21/2004 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20043510017  Analysis Date = 12/16/2004 
 Lab Value = 0.005 
 RPT Level = 0.01 
 Lab Sample ID = 20043450068  Analysis Date = 12/21/2004 
 Lab Value = -0.011 
 RPT Level = 0.01 
 Lab Sample ID = 20043440148  Analysis Date = 12/10/2004 
 Lab Value = 0.002 
 RPT Level = 0.01 
 Lab Sample ID = 20043380004  Analysis Date = 12/10/2004 
 Lab Value = 0.004 
 RPT Level = 0.01 
 Lab Sample ID = 20043380003  Analysis Date = 12/01/2004 
 Lab Value = 0 
 RPT Level = 0.01 
 Lab Sample ID = 20043310058  Analysis Date = 11/26/2004 
 Lab Value = 0.006 
 RPT Level = 0.01 
 Lab Sample ID = 20043280049  Analysis Date = 11/23/2004 
 Lab Value = -0.003 
 RPT Level = 0.01 
 Lab Sample ID = 20043240013  Analysis Date = 09/09/2004 
 Lab Value = -0.001 
 RPT Level =  
 Lab Sample ID = 20042450137  Analysis Date = 09/03/2004 
 Lab Value = 0.001 
 RPT Level =  
 Lab Sample ID = 20042400090  Analysis Date = 09/07/2004 
 Lab Value = 0.003 
 RPT Level =  
 Lab Sample ID = 20042370106  Analysis Date = 08/25/2004 
 Lab Value = 0.006 
 RPT Level =  
 Lab Sample ID = 20042330207  Analysis Date = 08/24/2004 
 Lab Value = -0.001 
 RPT Level =  
 Lab Sample ID = 20042320135  Analysis Date = 08/24/2004 
 Lab Value = -0.002 
 RPT Level =  
 Lab Sample ID = 20042320137  Analysis Date = 08/16/2004 
 Lab Value = 0.004 
 RPT Level =  
 Lab Sample ID = 20042240113  Analysis Date = 08/09/2004 
 Lab Value = 0.002 
 RPT Level =  
 Lab Sample ID = 20042170122  Analysis Date = 08/03/2004 
 Lab Value = -0.001 
 RPT Level =  
 Lab Sample ID = 20042110014  Analysis Date = 07/27/2004 
 Lab Value = -0.001 
 RPT Level =  
 Lab Sample ID = 20042040077  Analysis Date = 07/19/2004 
 Lab Value = -0.006 
 RPT Level =  
 Lab Sample ID = 20041960049  Analysis Date = 07/15/2004 
 Lab Value = 0.009 
 RPT Level =  
 Lab Sample ID = 20041900061  Analysis Date = 07/14/2004 
 Lab Value = -0.005 
 RPT Level =  
 Lab Sample ID = 20041820034  Analysis Date = 07/09/2004 
 Lab Value = 0 
 RPT Level =  
 Lab Sample ID = 20041750056  Analysis Date = 06/30/2004 
 Lab Value = -0.01 
 RPT Level =  
 Lab Sample ID = 20041700082  Analysis Date = 06/28/2004 
 Lab Value = -0.007 
 RPT Level =  
 Lab Sample ID = 20041610056  Analysis Date = 06/23/2004 
 Lab Value = 0.002 
 RPT Level =  
 Lab Sample ID = 20041550020  Analysis Date = 09/26/2016 
 RPT Level = 0.01  Analysis Date = 09/21/2016 
 RPT Level = 0.01  Analysis Date = 09/21/2016 
 RPT Level = 0.01  Analysis Date = 09/15/2016 
 RPT Level = 0.01  Analysis Date = 09/15/2016 
 RPT Level = 0.01  Analysis Date = 09/07/2016 
 RPT Level = 0.01  Analysis Date = 09/07/2016 
 RPT Level = 0.01  Analysis Date = 08/26/2016 
 RPT Level = 0.01  Analysis Date = 08/26/2016 
 RPT Level = 0.01  Analysis Date = 08/22/2016 
 RPT Level = 0.01  Analysis Date = 08/22/2016 
 RPT Level = 0.01  Analysis Date = 08/17/2016 
 RPT Level = 0.01  Analysis Date = 08/17/2016 
 RPT Level = 0.01  Analysis Date = 08/11/2016 
 RPT Level = 0.01  Analysis Date = 08/11/2016 
 RPT Level = 0.01  Analysis Date = 08/09/2016 
 RPT Level = 0.01  Analysis Date = 08/09/2016 
 RPT Level = 0.01  Analysis Date = 07/29/2016 
 RPT Level = 0.01  Analysis Date = 07/29/2016 
 RPT Level = 0.01  Analysis Date = 07/19/2016 
 RPT Level = 0.01  Analysis Date = 07/19/2016 
 RPT Level = 0.01  Analysis Date = 07/08/2016 
 RPT Level = 0.01  Analysis Date = 07/08/2016 
 RPT Level = 0.01  Analysis Date = 06/30/2016 
 RPT Level = 0.01  Analysis Date = 06/30/2016 
 RPT Level = 0.01  Analysis Date = 06/24/2016 
 RPT Level = 0.01  Analysis Date = 06/24/2016 
 RPT Level = 0.01  Analysis Date = 06/21/2016 
 RPT Level = 0.01  Analysis Date = 06/21/2016 
 RPT Level = 0.01  Analysis Date = 06/14/2016 
 RPT Level = 0.01  Analysis Date = 06/14/2016 
 RPT Level = 0.01  Analysis Date = 06/03/2016 
 RPT Level = 0.01  Analysis Date = 06/03/2016 
 RPT Level = 0.01  Analysis Date = 05/31/2016 
 RPT Level = 0.01  Analysis Date = 05/31/2016 
 RPT Level = 0.01  Analysis Date = 05/12/2016 
 RPT Level = 0.01  Analysis Date = 05/12/2016 
 RPT Level = 0.01  Analysis Date = 05/04/2016 
 RPT Level = 0.01  Analysis Date = 05/04/2016 
 RPT Level = 0.01  Analysis Date = 04/29/2016 
 RPT Level = 0.01  Analysis Date = 04/29/2016 
 RPT Level = 0.01  Analysis Date = 04/29/2016 
 RPT Level = 0.01  Analysis Date = 04/29/2016 
 RPT Level = 0.01  Analysis Date = 04/15/2016 
 RPT Level = 0.01  Analysis Date = 04/15/2016 
 RPT Level = 0.01  Analysis Date = 04/07/2016 
 RPT Level = 0.01  Analysis Date = 04/07/2016 
 RPT Level = 0.01  Analysis Date = 04/01/2016 
 RPT Level = 0.01  Analysis Date = 04/01/2016 
 RPT Level = 0.01  Analysis Date = 03/30/2016 
 RPT Level = 0.01  Analysis Date = 03/30/2016 
 RPT Level = 0.01  Analysis Date = 03/16/2016 
 RPT Level = 0.01  Analysis Date = 03/16/2016 
 RPT Level = 0.01  Analysis Date = 03/09/2016 
 RPT Level = 0.01  Analysis Date = 03/09/2016 
 RPT Level = 0.01  Analysis Date = 03/03/2016 
 RPT Level = 0.01  Analysis Date = 03/03/2016 
 RPT Level = 0.01  Analysis Date = 02/24/2016 
 RPT Level = 0.01  Analysis Date = 02/24/2016 
 RPT Level = 0.01  Analysis Date = 02/17/2016 
 RPT Level = 0.01  Analysis Date = 02/17/2016 
 RPT Level = 0.01  Analysis Date = 02/16/2016 
 RPT Level = 0.01  Analysis Date = 02/16/2016 
 RPT Level = 0.01  Analysis Date = 02/05/2016 
 RPT Level = 0.01  Analysis Date = 02/05/2016 
 RPT Level = 0.01  Analysis Date = 01/27/2016 
 RPT Level = 0.01  Analysis Date = 01/27/2016 
 RPT Level = 0.01  Analysis Date = 01/22/2016 
 RPT Level = 0.01  Analysis Date = 01/22/2016 
 RPT Level = 0.01  Analysis Date = 01/13/2016 
 RPT Level = 0.01  Analysis Date = 01/13/2016 
 RPT Level = 0.01  Analysis Date = 01/08/2016 
 RPT Level = 0.01  Analysis Date = 01/08/2016 
 RPT Level = 0.01  Analysis Date = 01/05/2016 
 RPT Level = 0.01  Analysis Date = 01/05/2016 
 RPT Level = 0.01  Analysis Date = 12/23/2015 
 RPT Level = 0.01  Analysis Date = 12/23/2015 
 RPT Level = 0.01  Analysis Date = 12/21/2015 
 RPT Level = 0.01  Analysis Date = 12/21/2015 
 RPT Level = 0.01  Analysis Date = 12/11/2015 
 RPT Level = 0.01  Analysis Date = 12/11/2015 
 RPT Level = 0.01  Analysis Date = 12/02/2015 
 RPT Level = 0.01  Analysis Date = 12/02/2015 
 RPT Level = 0.01  Analysis Date = 11/30/2015 
 RPT Level = 0.01  Analysis Date = 11/30/2015 
 RPT Level = 0.01  Analysis Date = 11/17/2015 
 RPT Level = 0.01  Analysis Date = 11/17/2015 
 RPT Level = 0.01  Analysis Date = 11/16/2015 
 RPT Level = 0.01  Analysis Date = 11/16/2015 
 RPT Level = 0.01  Analysis Date = 11/03/2015 
 RPT Level = 0.01  Analysis Date = 11/03/2015 
 RPT Level = 0.01  Analysis Date = 11/02/2015 
 RPT Level = 0.01  Analysis Date = 11/02/2015 
 RPT Level = 0.01  Analysis Date = 10/29/2015 
 RPT Level = 0.01  Analysis Date = 10/29/2015 
 RPT Level = 0.01  Analysis Date = 10/20/2015 
 RPT Level = 0.01  Analysis Date = 10/20/2015 
 RPT Level = 0.01  Analysis Date = 10/15/2015 
 RPT Level = 0.01  Analysis Date = 10/15/2015 
 RPT Level = 0.01  Analysis Date = 10/01/2015 
 RPT Level = 0.01  Analysis Date = 10/01/2015 
 RPT Level = 0.01  Analysis Date = 09/28/2015 
 RPT Level = 0.01  Analysis Date = 09/28/2015 
 RPT Level = 0.01  Analysis Date = 09/22/2015 
 RPT Level = 0.01  Analysis Date = 09/22/2015 
 RPT Level = 0.01  Analysis Date = 09/17/2015 
 RPT Level = 0.01  Analysis Date = 09/17/2015 
 RPT Level = 0.01  Analysis Date = 09/18/2015 
 RPT Level = 0.01  Analysis Date = 09/18/2015 
 RPT Level = 0.01  Analysis Date = 09/01/2015 
 RPT Level = 0.01  Analysis Date = 09/01/2015 
 RPT Level = 0.01  Analysis Date = 09/01/2015 
 RPT Level = 0.01  Analysis Date = 09/01/2015 
 RPT Level = 0.01  Analysis Date = 08/19/2015 
 RPT Level = 0.01  Analysis Date = 08/19/2015 
 RPT Level = 0.01  Analysis Date = 08/10/2015 
 RPT Level = 0.01  Analysis Date = 08/10/2015 
 RPT Level = 0.01  Analysis Date = 08/10/2015 
 RPT Level = 0.01  Analysis Date = 08/10/2015 
 RPT Level = 0.01  Analysis Date = 07/28/2015 
 RPT Level = 0.01  Analysis Date = 07/28/2015 
 RPT Level = 0.01  Analysis Date = 07/16/2015 
 RPT Level = 0.01  Analysis Date = 07/16/2015 
 RPT Level = 0.01  Analysis Date = 07/13/2015 
 RPT Level = 0.01  Analysis Date = 07/13/2015 
 RPT Level = 0.01  Analysis Date = 07/01/2015 
 RPT Level = 0.01  Analysis Date = 07/01/2015 
 RPT Level = 0.01  Analysis Date = 06/24/2015 
 RPT Level = 0.01  Analysis Date = 06/24/2015 
 RPT Level = 0.01  Analysis Date = 06/22/2015 
 RPT Level = 0.01  Analysis Date = 06/22/2015 
 RPT Level = 0.01  Analysis Date = 06/17/2015 
 RPT Level = 0.01  Analysis Date = 06/17/2015 
 RPT Level = 0.01  Analysis Date = 06/05/2015 
 RPT Level = 0.01  Analysis Date = 06/05/2015 
 RPT Level = 0.01  Analysis Date = 06/03/2015 
 RPT Level = 0.01  Analysis Date = 06/03/2015 
 RPT Level = 0.01  Analysis Date = 05/28/2015 
 RPT Level = 0.01  Analysis Date = 05/28/2015 
 RPT Level = 0.01  Analysis Date = 05/15/2015 
 RPT Level = 0.01  Analysis Date = 05/15/2015 
 RPT Level = 0.01  Analysis Date = 05/07/2015 
 RPT Level = 0.01  Analysis Date = 05/07/2015 
 RPT Level = 0.01  Analysis Date = 05/05/2015 
 RPT Level = 0.01  Analysis Date = 05/05/2015 
 RPT Level = 0.01  Analysis Date = 05/01/2015 
 RPT Level = 0.01  Analysis Date = 05/01/2015 
 RPT Level = 0.01  Analysis Date = 04/22/2015 
 RPT Level = 0.01  Analysis Date = 04/22/2015 
 RPT Level = 0.01  Analysis Date = 04/15/2015 
 RPT Level = 0.01  Analysis Date = 04/15/2015 
 RPT Level = 0.01  Analysis Date = 04/03/2015 
 RPT Level = 0.01  Analysis Date = 04/03/2015 
 RPT Level = 0.01  Analysis Date = 04/03/2015 
 RPT Level = 0.01  Analysis Date = 04/03/2015 
 RPT Level = 0.01  Analysis Date = 04/02/2015 
 RPT Level = 0.01  Analysis Date = 04/02/2015 
 RPT Level = 0.01  Analysis Date = 03/16/2015 
 RPT Level = 0.01  Analysis Date = 03/16/2015 
 RPT Level = 0.01  Analysis Date = 03/10/2015 
 RPT Level = 0.01  Analysis Date = 03/10/2015 
 RPT Level = 0.01  Analysis Date = 03/05/2015 
 RPT Level = 0.01  Analysis Date = 03/05/2015 
 RPT Level = 0.01  Analysis Date = 03/03/2015 
 RPT Level = 0.01  Analysis Date = 03/03/2015 
 RPT Level = 0.01  Analysis Date = 02/19/2015 
 RPT Level = 0.01  Analysis Date = 02/19/2015 
 RPT Level = 0.01  Analysis Date = 02/20/2015 
 RPT Level = 0.01  Analysis Date = 02/20/2015 
 RPT Level = 0.01  Analysis Date = 03/03/2015 
 RPT Level = 0.01  Analysis Date = 03/03/2015 
 RPT Level = 0.01  Analysis Date = 02/05/2015 
 RPT Level = 0.01  Analysis Date = 02/05/2015 
 RPT Level = 0.01  Analysis Date = 02/05/2015 
 RPT Level = 0.01  Analysis Date = 02/05/2015 
 RPT Level = 0.01  Analysis Date = 02/10/2015 
 RPT Level = 0.01  Analysis Date = 02/10/2015 
 RPT Level = 0.01  Analysis Date = 01/07/2015 
 RPT Level = 0.01  Analysis Date = 01/07/2015 
 RPT Level = 0.01  Analysis Date = 01/07/2015 
 RPT Level = 0.01  Analysis Date = 01/07/2015 
 RPT Level = 0.01  Analysis Date = 12/31/2014 
 RPT Level = 0.01  Analysis Date = 12/31/2014 
 RPT Level = 0.01  Analysis Date = 12/31/2014 
 RPT Level = 0.01  Analysis Date = 12/31/2014 
 RPT Level = 0.01  Analysis Date = 12/11/2014 
 RPT Level = 0.01  Analysis Date = 12/11/2014 
 RPT Level = 0.01  Analysis Date = 12/04/2014 
 RPT Level = 0.01  Analysis Date = 12/04/2014 
 RPT Level = 0.01  Analysis Date = 12/10/2014 
 RPT Level = 0.01  Analysis Date = 12/10/2014 
 RPT Level = 0.01  Analysis Date = 11/25/2014 
 RPT Level = 0.01  Analysis Date = 11/25/2014 
 RPT Level = 0.01  Analysis Date = 11/19/2014 
 RPT Level = 0.01  Analysis Date = 11/19/2014 
 RPT Level = 0.01  Analysis Date = 11/05/2014 
 RPT Level = 0.01  Analysis Date = 11/05/2014 
 RPT Level = 0.01  Analysis Date = 11/05/2014 
 RPT Level = 0.01  Analysis Date = 11/05/2014 
 RPT Level = 0.01  Analysis Date = 10/24/2014 
 RPT Level = 0.01  Analysis Date = 10/24/2014 
 RPT Level = 0.01  Analysis Date = 10/24/2014 
 RPT Level = 0.01  Analysis Date = 10/24/2014 
 RPT Level = 0.01  Analysis Date = 10/16/2014 
 RPT Level = 0.01  Analysis Date = 10/16/2014 
 RPT Level = 0.01  Analysis Date = 10/07/2014 
 RPT Level = 0.01  Analysis Date = 10/07/2014 
 RPT Level = 0.01  Analysis Date = 09/30/2014 
 RPT Level = 0.01  Analysis Date = 09/30/2014 
 RPT Level = 0.01  Analysis Date = 09/19/2014 
 RPT Level = 0.01  Analysis Date = 09/19/2014 
 RPT Level = 0.01  Analysis Date = 09/17/2014 
 RPT Level = 0.01  Analysis Date = 09/17/2014 
 RPT Level = 0.01  Analysis Date = 08/19/2014 
 RPT Level = 0.01  Analysis Date = 08/19/2014 
 RPT Level = 0.01  Analysis Date = 08/19/2014 
 RPT Level = 0.01  Analysis Date = 08/19/2014 
 RPT Level = 0.01  Analysis Date = 08/14/2014 
 RPT Level = 0.01  Analysis Date = 08/14/2014 
 RPT Level = 0.01  Analysis Date = 08/05/2014 
 RPT Level = 0.01  Analysis Date = 08/05/2014 
 RPT Level = 0.01  Analysis Date = 08/05/2014 
 RPT Level = 0.01  Analysis Date = 08/05/2014 
 RPT Level = 0.01  Analysis Date = 07/24/2014 
 RPT Level = 0.01  Analysis Date = 07/24/2014 
 RPT Level = 0.01  Analysis Date = 07/15/2014 
 RPT Level = 0.01  Analysis Date = 07/15/2014 
 RPT Level = 0.01  Analysis Date = 07/09/2014 
 RPT Level = 0.01  Analysis Date = 07/09/2014 
 RPT Level = 0.01  Analysis Date = 07/08/2014 
 RPT Level = 0.01  Analysis Date = 07/08/2014 
 RPT Level = 0.01  Analysis Date = 07/01/2014 
 RPT Level = 0.01  Analysis Date = 07/01/2014 
 RPT Level = 0.01  Analysis Date = 06/25/2014 
 RPT Level = 0.01  Analysis Date = 06/25/2014 
 RPT Level = 0.01  Analysis Date = 06/16/2014 
 RPT Level = 0.01  Analysis Date = 06/16/2014 
 RPT Level = 0.01  Analysis Date = 06/11/2014 
 RPT Level = 0.01  Analysis Date = 06/11/2014 
 RPT Level = 0.01  Analysis Date = 05/28/2014 
 RPT Level = 0.01  Analysis Date = 05/28/2014 
 RPT Level = 0.01  Analysis Date = 05/20/2014 
 RPT Level = 0.01  Analysis Date = 05/20/2014 
 RPT Level = 0.01  Analysis Date = 05/15/2014 
 RPT Level = 0.01  Analysis Date = 05/15/2014 
 RPT Level = 0.01  Analysis Date = 05/12/2014 
 RPT Level = 0.01  Analysis Date = 05/12/2014 
 RPT Level = 0.01  Analysis Date = 04/24/2014 
 RPT Level = 0.01  Analysis Date = 04/24/2014 
 RPT Level = 0.01  Analysis Date = 04/21/2014 
 RPT Level = 0.01  Analysis Date = 04/21/2014 
 RPT Level = 0.01  Analysis Date = 04/11/2014 
 RPT Level = 0.01  Analysis Date = 04/11/2014 
 RPT Level = 0.01  Analysis Date = 04/02/2014 
 RPT Level = 0.01  Analysis Date = 04/02/2014 
 RPT Level = 0.01  Analysis Date = 04/02/2014 
 RPT Level = 0.01  Analysis Date = 04/02/2014 
 RPT Level = 0.01  Analysis Date = 03/20/2014 
 RPT Level = 0.01  Analysis Date = 03/20/2014 
 RPT Level = 0.01  Analysis Date = 03/20/2014 
 RPT Level = 0.01  Analysis Date = 03/20/2014 
 RPT Level = 0.01  Analysis Date = 03/20/2014 
 RPT Level = 0.01  Analysis Date = 03/20/2014 
 RPT Level = 0.01  Analysis Date = 03/06/2014 
 RPT Level = 0.01  Analysis Date = 03/06/2014 
 RPT Level = 0.01  Analysis Date = 02/19/2014 
 RPT Level = 0.01  Analysis Date = 02/19/2014 
 RPT Level = 0.01  Analysis Date = 02/19/2014 
 RPT Level = 0.01  Analysis Date = 02/19/2014 
 RPT Level = 0.01  Analysis Date = 02/19/2014 
 RPT Level = 0.01  Analysis Date = 02/19/2014 
 RPT Level = 0.01  Analysis Date = 02/11/2014 
 RPT Level = 0.01  Analysis Date = 02/11/2014 
 RPT Level = 0.01  Analysis Date = 01/15/2014 
 RPT Level = 0.01  Analysis Date = 01/15/2014 
 RPT Level = 0.01  Analysis Date = 01/15/2014 
 RPT Level = 0.01  Analysis Date = 01/15/2014 
 RPT Level = 0.01  Analysis Date = 01/09/2014 
 RPT Level = 0.01  Analysis Date = 01/09/2014 
 RPT Level = 0.01  Analysis Date = 01/09/2014 
 RPT Level = 0.01  Analysis Date = 01/09/2014 
 RPT Level = 0.01  Analysis Date = 01/03/2014 
 RPT Level = 0.01  Analysis Date = 01/03/2014 
 RPT Level = 0.01  Analysis Date = 12/18/2013 
 RPT Level = 0.01  Analysis Date = 12/18/2013 
 RPT Level = 0.01  Analysis Date = 12/16/2013 
 RPT Level = 0.01  Analysis Date = 12/16/2013 
 RPT Level = 0.01  Analysis Date = 11/27/2013 
 RPT Level = 0.01  Analysis Date = 11/27/2013 
 RPT Level = 0.01  Analysis Date = 11/20/2013 
 RPT Level = 0.01  Analysis Date = 11/20/2013 
 RPT Level = 0.01  Analysis Date = 11/14/2013 
 RPT Level = 0.01  Analysis Date = 11/14/2013 
 RPT Level = 0.01  Analysis Date = 11/06/2013 
 RPT Level = 0.01  Analysis Date = 11/06/2013 
 RPT Level = 0.01  Analysis Date = 10/31/2013 
 RPT Level = 0.01  Analysis Date = 10/31/2013 
 RPT Level = 0.01  Analysis Date = 10/31/2013 
 RPT Level = 0.01  Analysis Date = 10/31/2013 
 RPT Level = 0.01  Analysis Date = 10/25/2013 
 RPT Level = 0.01  Analysis Date = 10/25/2013 
 RPT Level = 0.01  Analysis Date = 10/25/2013 
 RPT Level = 0.01  Analysis Date = 10/25/2013 
 RPT Level = 0.01  Analysis Date = 09/17/2013 
 RPT Level = 0.01  Analysis Date = 09/17/2013 
 RPT Level = 0.01  Analysis Date = 09/09/2013 
 RPT Level = 0.01  Analysis Date = 09/09/2013 
 RPT Level = 0.01  Analysis Date = 09/05/2013 
 RPT Level = 0.01  Analysis Date = 09/05/2013 
 RPT Level = 0.01  Analysis Date = 09/05/2013 
 RPT Level = 0.01  Analysis Date = 09/05/2013 
 RPT Level = 0.01  Analysis Date = 08/30/2013 
 RPT Level = 0.01  Analysis Date = 08/30/2013 
 RPT Level = 0.01  Analysis Date = 08/29/2013 
 RPT Level = 0.01  Analysis Date = 08/29/2013 
 RPT Level = 0.01  Analysis Date = 08/26/2013 
 RPT Level = 0.01  Analysis Date = 08/26/2013 
 RPT Level = 0.01  Analysis Date = 08/13/2013 
 RPT Level = 0.01  Analysis Date = 08/13/2013 
 RPT Level = 0.01  Analysis Date = 07/30/2013 
 RPT Level = 0.01  Analysis Date = 07/30/2013 
 RPT Level = 0.01  Analysis Date = 08/06/2013 
 RPT Level = 0.01  Analysis Date = 08/06/2013 
 RPT Level = 0.01  Analysis Date = 07/23/2013 
 RPT Level = 0.01  Analysis Date = 07/23/2013 
 RPT Level = 0.01  Analysis Date = 07/10/2013 
 RPT Level = 0.01  Analysis Date = 07/10/2013 
 RPT Level = 0.01  Analysis Date = 07/08/2013 
 RPT Level = 0.01  Analysis Date = 07/08/2013 
 RPT Level = 0.01  Analysis Date = 06/26/2013 
 RPT Level = 0.01  Analysis Date = 06/26/2013 
 RPT Level = 0.01  Analysis Date = 06/14/2013 
 RPT Level = 0.01  Analysis Date = 06/14/2013 
 RPT Level = 0.01  Analysis Date = 06/03/2013 
 RPT Level = 0.01  Analysis Date = 06/03/2013 
 RPT Level = 0.01  Analysis Date = 06/03/2013 
 RPT Level = 0.01  Analysis Date = 06/03/2013 
 RPT Level = 0.01  Analysis Date = 05/23/2013 
 RPT Level = 0.01  Analysis Date = 05/23/2013 
 RPT Level = 0.01  Analysis Date = 05/21/2013 
 RPT Level = 0.01  Analysis Date = 05/21/2013 
 RPT Level = 0.01  Analysis Date = 05/08/2013 
 RPT Level = 0.01  Analysis Date = 05/08/2013 
 RPT Level = 0.01  Analysis Date = 04/30/2013 
 RPT Level = 0.01  Analysis Date = 04/30/2013 
 RPT Level = 0.01  Analysis Date = 05/02/2013 
 RPT Level = 0.01  Analysis Date = 05/02/2013 
 RPT Level = 0.01  Analysis Date = 04/30/2013 
 RPT Level = 0.01  Analysis Date = 04/30/2013 
 RPT Level = 0.01  Analysis Date = 04/18/2013 
 RPT Level = 0.01  Analysis Date = 04/18/2013 
 RPT Level = 0.01  Analysis Date = 04/04/2013 
 RPT Level = 0.01  Analysis Date = 04/04/2013 
 RPT Level = 0.01  Analysis Date = 03/27/2013 
 RPT Level = 0.01  Analysis Date = 03/27/2013 
 RPT Level = 0.01  Analysis Date = 03/19/2013 
 RPT Level = 0.01  Analysis Date = 03/19/2013 
 RPT Level = 0.01  Analysis Date = 03/11/2013 
 RPT Level = 0.01  Analysis Date = 03/11/2013 
 RPT Level = 0.01  Analysis Date = 03/11/2013 
 RPT Level = 0.01  Analysis Date = 03/11/2013 
 RPT Level = 0.01  Analysis Date = 02/26/2013 
 RPT Level = 0.01  Analysis Date = 02/26/2013 
 RPT Level = 0.01  Analysis Date = 02/26/2013 
 RPT Level = 0.01  Analysis Date = 02/26/2013 
 RPT Level = 0.01  Analysis Date = 02/21/2013 
 RPT Level = 0.01  Analysis Date = 02/21/2013 
 RPT Level = 0.01  Analysis Date = 02/07/2013 
 RPT Level = 0.01  Analysis Date = 02/07/2013 
 RPT Level = 0.01  Analysis Date = 02/07/2013 
 RPT Level = 0.01  Analysis Date = 02/07/2013 
 RPT Level = 0.01  Analysis Date = 01/31/2013 
 RPT Level = 0.01  Analysis Date = 01/31/2013 
 RPT Level = 0.01  Analysis Date = 01/18/2013 
 RPT Level = 0.01  Analysis Date = 01/18/2013 
 RPT Level = 0.01  Analysis Date = 01/18/2013 
 RPT Level = 0.01  Analysis Date = 01/18/2013 
 RPT Level = 0.01  Analysis Date = 01/11/2013 
 RPT Level = 0.01  Analysis Date = 01/11/2013 
 RPT Level = 0.01  Analysis Date = 01/11/2013 
 RPT Level = 0.01  Analysis Date = 01/11/2013 
 RPT Level = 0.01  Analysis Date = 01/11/2013 
 RPT Level = 0.01  Analysis Date = 01/11/2013 
 RPT Level = 0.01  Analysis Date = 12/20/2012 
 RPT Level = 0.01  Analysis Date = 12/20/2012 
 RPT Level = 0.01  Analysis Date = 12/20/2012 
 RPT Level = 0.01  Analysis Date = 12/20/2012 
 RPT Level = 0.01  Analysis Date = 12/14/2012 
 RPT Level = 0.01  Analysis Date = 12/14/2012 
 RPT Level = 0.01  Analysis Date = 12/14/2012 
 RPT Level = 0.01  Analysis Date = 12/14/2012 
 RPT Level = 0.01  Analysis Date = 11/15/2012 
 RPT Level = 0.01  Analysis Date = 11/15/2012 
 RPT Level = 0.01  Analysis Date = 11/07/2012 
 RPT Level = 0.01  Analysis Date = 11/07/2012 
 RPT Level = 0.01  Analysis Date = 11/06/2012 
 RPT Level = 0.01  Analysis Date = 11/06/2012 
 RPT Level = 0.01  Analysis Date = 10/29/2012 
 RPT Level = 0.01  Analysis Date = 10/29/2012 
 RPT Level = 0.01  Analysis Date = 10/19/2012 
 RPT Level = 0.01  Analysis Date = 10/19/2012 
 RPT Level = 0.01  Analysis Date = 10/19/2012 
 RPT Level = 0.01  Analysis Date = 10/19/2012 
 RPT Level = 0.01  Analysis Date = 10/12/2012 
 RPT Level = 0.01  Analysis Date = 10/12/2012 
 RPT Level = 0.01  Analysis Date = 10/11/2012 
 RPT Level = 0.01  Analysis Date = 10/11/2012 
 RPT Level = 0.01  Analysis Date = 09/21/2012 
 RPT Level = 0.01  Analysis Date = 09/21/2012 
 RPT Level = 0.01  Analysis Date = 09/18/2012 
 RPT Level = 0.01  Analysis Date = 09/18/2012 
 RPT Level = 0.01  Analysis Date = 09/05/2012 
 RPT Level = 0.01  Analysis Date = 09/05/2012 
 RPT Level = 0.01  Analysis Date = 09/04/2012 
 RPT Level = 0.01  Analysis Date = 09/04/2012 
 RPT Level = 0.01  Analysis Date = 09/18/2012 
 RPT Level = 0.01  Analysis Date = 09/18/2012 
 RPT Level = 0.01  Analysis Date = 08/21/2012 
 RPT Level = 0.01  Analysis Date = 08/21/2012 
 RPT Level = 0.01  Analysis Date = 08/21/2012 
 RPT Level = 0.01  Analysis Date = 08/21/2012 
 RPT Level = 0.01  Analysis Date = 08/23/2012 
 RPT Level = 0.01  Analysis Date = 08/23/2012 
 RPT Level = 0.01  Analysis Date = 08/08/2012 
 RPT Level = 0.01  Analysis Date = 08/08/2012 
 RPT Level = 0.01  Analysis Date = 08/03/2012 
 RPT Level = 0.01  Analysis Date = 08/03/2012 
 RPT Level = 0.01  Analysis Date = 07/26/2012 
 RPT Level = 0.01  Analysis Date = 07/26/2012 
 RPT Level = 0.01  Analysis Date = 07/18/2012 
 RPT Level = 0.01  Analysis Date = 07/18/2012 
 RPT Level = 0.01  Analysis Date = 07/09/2012 
 RPT Level = 0.01  Analysis Date = 07/09/2012 
 RPT Level = 0.01  Analysis Date = 07/09/2012 
 RPT Level = 0.01  Analysis Date = 07/09/2012 
 RPT Level = 0.01  Analysis Date = 06/14/2012 
 RPT Level = 0.01  Analysis Date = 06/14/2012 
 RPT Level = 0.01  Analysis Date = 06/05/2012 
 RPT Level = 0.01  Analysis Date = 06/05/2012 
 RPT Level = 0.01  Analysis Date = 06/08/2012 
 RPT Level = 0.01  Analysis Date = 06/08/2012 
 RPT Level = 0.01  Analysis Date = 05/29/2012 
 RPT Level = 0.01  Analysis Date = 05/29/2012 
 RPT Level = 0.01  Analysis Date = 05/25/2012 
 RPT Level = 0.01  Analysis Date = 05/25/2012 
 RPT Level = 0.01  Analysis Date = 05/17/2012 
 RPT Level = 0.01  Analysis Date = 05/17/2012 
 RPT Level = 0.01  Analysis Date = 05/03/2012 
 RPT Level = 0.01  Analysis Date = 05/03/2012 
 RPT Level = 0.01  Analysis Date = 04/26/2012 
 RPT Level = 0.01  Analysis Date = 04/26/2012 
 RPT Level = 0.01  Analysis Date = 04/19/2012 
 RPT Level = 0.01  Analysis Date = 04/19/2012 
 RPT Level = 0.01  Analysis Date = 04/04/2012 
 RPT Level = 0.01  Analysis Date = 04/04/2012 
 RPT Level = 0.01  Analysis Date = 04/12/2012 
 RPT Level = 0.01  Analysis Date = 04/12/2012 
 RPT Level = 0.01  Analysis Date = 04/04/2012 
 RPT Level = 0.01  Analysis Date = 04/04/2012 
 RPT Level = 0.01  Analysis Date = 03/29/2012 
 RPT Level = 0.01  Analysis Date = 03/29/2012 
 RPT Level = 0.01  Analysis Date = 03/29/2012 
 RPT Level = 0.01  Analysis Date = 03/29/2012 
 RPT Level = 0.01  Analysis Date = 03/15/2012 
 RPT Level = 0.01  Analysis Date = 03/15/2012 
 RPT Level = 0.01  Analysis Date = 03/15/2012 
 RPT Level = 0.01  Analysis Date = 03/15/2012 
 RPT Level = 0.01  Analysis Date = 02/24/2012 
 RPT Level = 0.01  Analysis Date = 02/24/2012 
 RPT Level = 0.01  Analysis Date = 02/15/2012 
 RPT Level = 0.01  Analysis Date = 02/15/2012 
 RPT Level = 0.01  Analysis Date = 02/09/2012 
 RPT Level = 0.01  Analysis Date = 02/09/2012 
 RPT Level = 0.01  Analysis Date = 01/31/2012 
 RPT Level = 0.01  Analysis Date = 01/31/2012 
 RPT Level = 0.01  Analysis Date = 01/25/2012 
 RPT Level = 0.01  Analysis Date = 01/25/2012 
 RPT Level = 0.01  Analysis Date = 01/11/2012 
 RPT Level = 0.01  Analysis Date = 01/11/2012 
 RPT Level = 0.01  Analysis Date = 01/11/2012 
 RPT Level = 0.01  Analysis Date = 01/11/2012 
 RPT Level = 0.01  Analysis Date = 01/12/2012 
 RPT Level = 0.01  Analysis Date = 01/12/2012 
 RPT Level = 0.01  Analysis Date = 12/29/2011 
 RPT Level = 0.01  Analysis Date = 12/29/2011 
 RPT Level = 0.01  Analysis Date = 12/22/2011 
 RPT Level = 0.01  Analysis Date = 12/22/2011 
 RPT Level = 0.01  Analysis Date = 12/22/2011 
 RPT Level = 0.01  Analysis Date = 12/22/2011 
 RPT Level = 0.01  Analysis Date = 12/15/2011 
 RPT Level = 0.01  Analysis Date = 12/15/2011 
 RPT Level = 0.01  Analysis Date = 12/06/2011 
 RPT Level = 0.01  Analysis Date = 12/06/2011 
 RPT Level = 0.01  Analysis Date = 11/23/2011 
 RPT Level = 0.01  Analysis Date = 11/23/2011 
 RPT Level = 0.01  Analysis Date = 11/16/2011 
 RPT Level = 0.01  Analysis Date = 11/16/2011 
 RPT Level = 0.01  Analysis Date = 11/08/2011 
 RPT Level = 0.01  Analysis Date = 11/08/2011 
 RPT Level = 0.01  Analysis Date = 11/01/2011 
 RPT Level = 0.01  Analysis Date = 11/01/2011 
 RPT Level = 0.01  Analysis Date = 10/25/2011 
 RPT Level = 0.01  Analysis Date = 10/25/2011 
 RPT Level = 0.01  Analysis Date = 10/19/2011 
 RPT Level = 0.01  Analysis Date = 10/19/2011 
 RPT Level = 0.01  Analysis Date = 10/13/2011 
 RPT Level = 0.01  Analysis Date = 10/13/2011 
 RPT Level = 0.01  Analysis Date = 10/04/2011 
 RPT Level = 0.01  Analysis Date = 10/04/2011 
 RPT Level = 0.01  Analysis Date = 09/27/2011 
 RPT Level = 0.01  Analysis Date = 09/27/2011 
 RPT Level = 0.01  Analysis Date = 09/21/2011 
 RPT Level = 0.01  Analysis Date = 09/21/2011 
 RPT Level = 0.01  Analysis Date = 09/20/2011 
 RPT Level = 0.01  Analysis Date = 09/20/2011 
 RPT Level = 0.01  Analysis Date = 09/20/2011 
 RPT Level = 0.01  Analysis Date = 09/20/2011 
 RPT Level = 0.01  Analysis Date = 08/30/2011 
 RPT Level = 0.01  Analysis Date = 08/30/2011 
 RPT Level = 0.01  Analysis Date = 08/24/2011 
 RPT Level = 0.01  Analysis Date = 08/24/2011 
 RPT Level = 0.01  Analysis Date = 08/12/2011 
 RPT Level = 0.01  Analysis Date = 08/12/2011 
 RPT Level = 0.01  Analysis Date = 08/04/2011 
 RPT Level = 0.01  Analysis Date = 08/04/2011 
 RPT Level = 0.01  Analysis Date = 08/02/2011 
 RPT Level = 0.01  Analysis Date = 08/02/2011 
 RPT Level = 0.01  Analysis Date = 07/27/2011 
 RPT Level = 0.01  Analysis Date = 07/27/2011 
 RPT Level = 0.01  Analysis Date = 07/19/2011 
 RPT Level = 0.01  Analysis Date = 07/19/2011 
 RPT Level = 0.01  Analysis Date = 07/14/2011 
 RPT Level = 0.01  Analysis Date = 07/14/2011 
 RPT Level = 0.01  Analysis Date = 07/06/2011 
 RPT Level = 0.01  Analysis Date = 07/06/2011 
 RPT Level = 0.01  Analysis Date = 06/23/2011 
 RPT Level = 0.01  Analysis Date = 06/23/2011 
 RPT Level = 0.01  Analysis Date = 06/21/2011 
 RPT Level = 0.01  Analysis Date = 06/21/2011 
 RPT Level = 0.01  Analysis Date = 06/09/2011 
 RPT Level = 0.01  Analysis Date = 06/09/2011 
 RPT Level = 0.01  Analysis Date = 06/09/2011 
 RPT Level = 0.01  Analysis Date = 06/09/2011 
 RPT Level = 0.01  Analysis Date = 06/14/2011 
 RPT Level = 0.01  Analysis Date = 06/14/2011 
 RPT Level = 0.01  Analysis Date = 05/25/2011 
 RPT Level = 0.01  Analysis Date = 05/25/2011 
 RPT Level = 0.01  Analysis Date = 05/12/2011 
 RPT Level = 0.01  Analysis Date = 05/12/2011 
 RPT Level = 0.01  Analysis Date = 05/06/2011 
 RPT Level = 0.01  Analysis Date = 05/06/2011 
 RPT Level = 0.01  Analysis Date = 04/29/2011 
 RPT Level = 0.01  Analysis Date = 04/29/2011 
 RPT Level = 0.01  Analysis Date = 04/22/2011 
 RPT Level = 0.01  Analysis Date = 04/22/2011 
 RPT Level = 0.01  Analysis Date = 05/06/2011 
 RPT Level = 0.01  Analysis Date = 05/06/2011 
 RPT Level = 0.01  Analysis Date = 04/07/2011 
 RPT Level = 0.01  Analysis Date = 04/07/2011 
 RPT Level = 0.01  Analysis Date = 03/30/2011 
 RPT Level = 0.01  Analysis Date = 03/30/2011 
 RPT Level = 0.01  Analysis Date = 04/06/2011 
 RPT Level = 0.01  Analysis Date = 04/06/2011 
 RPT Level = 0.01  Analysis Date = 03/18/2011 
 RPT Level = 0.01  Analysis Date = 03/18/2011 
 RPT Level = 0.01  Analysis Date = 03/11/2011 
 RPT Level = 0.01  Analysis Date = 03/11/2011 
 RPT Level = 0.01  Analysis Date = 03/11/2011 
 RPT Level = 0.01  Analysis Date = 03/11/2011 
 RPT Level = 0.01  Analysis Date = 03/02/2011 
 RPT Level = 0.01  Analysis Date = 03/02/2011 
 RPT Level = 0.01  Analysis Date = 03/16/2011 
 RPT Level = 0.01  Analysis Date = 03/16/2011 
 RPT Level = 0.01  Analysis Date = 02/17/2011 
 RPT Level = 0.01  Analysis Date = 02/17/2011 
 RPT Level = 0.01  Analysis Date = 02/17/2011 
 RPT Level = 0.01  Analysis Date = 02/17/2011 
 RPT Level = 0.01  Analysis Date = 01/28/2011 
 RPT Level = 0.01  Analysis Date = 01/28/2011 
 RPT Level = 0.01  Analysis Date = 01/19/2011 
 RPT Level = 0.01  Analysis Date = 01/19/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 01/14/2011 
 RPT Level = 0.01  Analysis Date = 01/13/2011 
 RPT Level = 0.01  Analysis Date = 01/13/2011 
 RPT Level = 0.01  Analysis Date = 01/13/2011 
 RPT Level = 0.01  Analysis Date = 01/13/2011 
 RPT Level = 0.01  Analysis Date = 01/13/2011 
 RPT Level = 0.01  Analysis Date = 01/13/2011 
 RPT Level = 0.01  Analysis Date = 12/21/2010 
 RPT Level = 0.01  Analysis Date = 12/21/2010 
 RPT Level = 0.01  Analysis Date = 12/17/2010 
 RPT Level = 0.01  Analysis Date = 12/17/2010 
 RPT Level = 0.01  Analysis Date = 12/09/2010 
 RPT Level = 0.01  Analysis Date = 12/09/2010 
 RPT Level = 0.01  Analysis Date = 12/09/2010 
 RPT Level = 0.01  Analysis Date = 12/09/2010 
 RPT Level = 0.01  Analysis Date = 11/23/2010 
 RPT Level = 0.01  Analysis Date = 11/23/2010 
 RPT Level = 0.01  Analysis Date = 11/18/2010 
 RPT Level = 0.01  Analysis Date = 11/18/2010 
 RPT Level = 0.01  Analysis Date = 11/10/2010 
 RPT Level = 0.01  Analysis Date = 11/10/2010 
 RPT Level = 0.01  Analysis Date = 11/05/2010 
 RPT Level = 0.01  Analysis Date = 11/05/2010 
 RPT Level = 0.01  Analysis Date = 10/27/2010 
 RPT Level = 0.01  Analysis Date = 10/27/2010 
 RPT Level = 0.01  Analysis Date = 10/19/2010 
 RPT Level = 0.01  Analysis Date = 10/19/2010 
 RPT Level = 0.01  Analysis Date = 10/19/2010 
 RPT Level = 0.01  Analysis Date = 10/19/2010 
 RPT Level = 0.01  Analysis Date = 10/14/2010 
 RPT Level = 0.01  Analysis Date = 10/14/2010 
 RPT Level = 0.01  Analysis Date = 09/29/2010 
 RPT Level = 0.01  Analysis Date = 09/29/2010 
 RPT Level = 0.01  Analysis Date = 09/23/2010 
 RPT Level = 0.01  Analysis Date = 09/23/2010 
 RPT Level = 0.01  Analysis Date = 09/23/2010 
 RPT Level = 0.01  Analysis Date = 09/23/2010 
 RPT Level = 0.01  Analysis Date = 09/10/2010 
 RPT Level = 0.01  Analysis Date = 09/10/2010 
 RPT Level = 0.01  Analysis Date = 09/02/2010 
 RPT Level = 0.01  Analysis Date = 09/02/2010 
 RPT Level = 0.01  Analysis Date = 08/26/2010 
 RPT Level = 0.01  Analysis Date = 08/26/2010 
 RPT Level = 0.01  Analysis Date = 08/19/2010 
 RPT Level = 0.01  Analysis Date = 08/19/2010 
 RPT Level = 0.01  Analysis Date = 08/11/2010 
 RPT Level = 0.01  Analysis Date = 08/11/2010 
 RPT Level = 0.01  Analysis Date = 08/03/2010 
 RPT Level = 0.01  Analysis Date = 08/03/2010 
 RPT Level = 0.01  Analysis Date = 07/27/2010 
 RPT Level = 0.01  Analysis Date = 07/27/2010 
 RPT Level = 0.01  Analysis Date = 07/20/2010 
 RPT Level = 0.01  Analysis Date = 07/20/2010 
 RPT Level = 0.01  Analysis Date = 07/13/2010 
 RPT Level = 0.01  Analysis Date = 07/13/2010 
 RPT Level = 0.01  Analysis Date = 07/20/2010 
 RPT Level = 0.01  Analysis Date = 07/20/2010 
 RPT Level = 0.01  Analysis Date = 07/01/2010 
 RPT Level = 0.01  Analysis Date = 07/01/2010 
 RPT Level = 0.01  Analysis Date = 06/23/2010 
 RPT Level = 0.01  Analysis Date = 06/23/2010 
 RPT Level = 0.01  Analysis Date = 06/23/2010 
 RPT Level = 0.01  Analysis Date = 06/23/2010 
 RPT Level = 0.01  Analysis Date = 06/23/2010 
 RPT Level = 0.01  Analysis Date = 06/23/2010 
 RPT Level = 0.01  Analysis Date = 06/09/2010 
 RPT Level = 0.01  Analysis Date = 06/09/2010 
 RPT Level = 0.01  Analysis Date = 06/02/2010 
 RPT Level = 0.01  Analysis Date = 06/02/2010 
 RPT Level = 0.01  Analysis Date = 05/20/2010 
 RPT Level = 0.01  Analysis Date = 05/20/2010 
 RPT Level = 0.01  Analysis Date = 05/13/2010 
 RPT Level = 0.01  Analysis Date = 05/13/2010 
 RPT Level = 0.01  Analysis Date = 05/05/2010 
 RPT Level = 0.01  Analysis Date = 05/05/2010 
 RPT Level = 0.01  Analysis Date = 04/30/2010 
 RPT Level = 0.01  Analysis Date = 04/30/2010 
 RPT Level = 0.01  Analysis Date = 04/20/2010 
 RPT Level = 0.01  Analysis Date = 04/20/2010 
 RPT Level = 0.01  Analysis Date = 04/15/2010 
 RPT Level = 0.01  Analysis Date = 04/15/2010 
 RPT Level = 0.01  Analysis Date = 04/07/2010 
 RPT Level = 0.01  Analysis Date = 04/07/2010 
 RPT Level = 0.01  Analysis Date = 04/07/2010 
 RPT Level = 0.01  Analysis Date = 04/07/2010 
 RPT Level = 0.01  Analysis Date = 03/25/2010 
 RPT Level = 0.01  Analysis Date = 03/25/2010 
 RPT Level = 0.01  Analysis Date = 03/16/2010 
 RPT Level = 0.01  Analysis Date = 03/16/2010 
 RPT Level = 0.01  Analysis Date = 03/05/2010 
 RPT Level = 0.01  Analysis Date = 03/05/2010 
 RPT Level = 0.01  Analysis Date = 02/24/2010 
 RPT Level = 0.01  Analysis Date = 02/24/2010 
 RPT Level = 0.01  Analysis Date = 02/24/2010 
 RPT Level = 0.01  Analysis Date = 02/24/2010 
 RPT Level = 0.01  Analysis Date = 02/11/2010 
 RPT Level = 0.01  Analysis Date = 02/11/2010 
 RPT Level = 0.01  Analysis Date = 02/11/2010 
 RPT Level = 0.01  Analysis Date = 02/11/2010 
 RPT Level = 0.01  Analysis Date = 02/05/2010 
 RPT Level = 0.01  Analysis Date = 02/05/2010 
 RPT Level = 0.01  Analysis Date = 01/27/2010 
 RPT Level = 0.01  Analysis Date = 01/27/2010 
 RPT Level = 0.01  Analysis Date = 01/27/2010 
 RPT Level = 0.01  Analysis Date = 01/27/2010 
 RPT Level = 0.01  Analysis Date = 01/22/2010 
 RPT Level = 0.01  Analysis Date = 01/22/2010 
 RPT Level = 0.01  Analysis Date = 01/22/2010 
 RPT Level = 0.01  Analysis Date = 01/22/2010 
 RPT Level = 0.01  Analysis Date = 01/22/2010 
 RPT Level = 0.01  Analysis Date = 01/22/2010 
 RPT Level = 0.01  Analysis Date = 12/22/2009 
 RPT Level = 0.01  Analysis Date = 12/22/2009 
 RPT Level = 0.01  Analysis Date = 12/16/2009 
 RPT Level = 0.01  Analysis Date = 12/16/2009 
 RPT Level = 0.01  Analysis Date = 12/16/2009 
 RPT Level = 0.01  Analysis Date = 12/16/2009 
 RPT Level = 0.01  Analysis Date = 12/11/2009 
 RPT Level = 0.01  Analysis Date = 12/11/2009 
 RPT Level = 0.01  Analysis Date = 11/24/2009 
 RPT Level = 0.01  Analysis Date = 11/24/2009 
 RPT Level = 0.01  Analysis Date = 11/24/2009 
 RPT Level = 0.01  Analysis Date = 11/24/2009 
 RPT Level = 0.01  Analysis Date = 11/19/2009 
 RPT Level = 0.01  Analysis Date = 11/19/2009 
 RPT Level = 0.01  Analysis Date = 11/13/2009 
 RPT Level = 0.01  Analysis Date = 11/13/2009 
 RPT Level = 0.01  Analysis Date = 11/05/2009 
 RPT Level = 0.01  Analysis Date = 11/05/2009 
 RPT Level = 0.01  Analysis Date = 10/30/2009 
 RPT Level = 0.01  Analysis Date = 10/30/2009 
 RPT Level = 0.01  Analysis Date = 10/22/2009 
 RPT Level = 0.01  Analysis Date = 10/22/2009 
 RPT Level = 0.01  Analysis Date = 10/22/2009 
 RPT Level = 0.01  Analysis Date = 10/22/2009 
 RPT Level = 0.01  Analysis Date = 10/07/2009 
 RPT Level = 0.01  Analysis Date = 10/07/2009 
 RPT Level = 0.01  Analysis Date = 10/08/2009 
 RPT Level = 0.01  Analysis Date = 10/08/2009 
 RPT Level = 0.01  Analysis Date = 10/02/2009 
 RPT Level = 0.01  Analysis Date = 10/02/2009 
 RPT Level = 0.01  Analysis Date = 09/24/2009 
 RPT Level = 0.01  Analysis Date = 09/24/2009 
 RPT Level = 0.01  Analysis Date = 09/18/2009 
 RPT Level = 0.01  Analysis Date = 09/18/2009 
 RPT Level = 0.01  Analysis Date = 09/09/2009 
 RPT Level = 0.01  Analysis Date = 09/09/2009 
 RPT Level = 0.01  Analysis Date = 08/31/2009 
 RPT Level = 0.01  Analysis Date = 08/31/2009 
 RPT Level = 0.01  Analysis Date = 08/19/2009 
 RPT Level = 0.01  Analysis Date = 08/19/2009 
 RPT Level = 0.01  Analysis Date = 08/19/2009 
 RPT Level = 0.01  Analysis Date = 08/19/2009 
 RPT Level = 0.01  Analysis Date = 08/05/2009 
 RPT Level = 0.01  Analysis Date = 08/05/2009 
 RPT Level = 0.01  Analysis Date = 07/28/2009 
 RPT Level = 0.01  Analysis Date = 07/28/2009 
 RPT Level = 0.01  Analysis Date = 07/22/2009 
 RPT Level = 0.01  Analysis Date = 07/22/2009 
 RPT Level = 0.01  Analysis Date = 07/16/2009 
 RPT Level = 0.01  Analysis Date = 07/16/2009 
 RPT Level = 0.01  Analysis Date = 06/30/2009 
 RPT Level = 0.01  Analysis Date = 06/30/2009 
 RPT Level = 0.01  Analysis Date = 06/26/2009 
 RPT Level = 0.01  Analysis Date = 06/26/2009 
 RPT Level = 0.01  Analysis Date = 06/26/2009 
 RPT Level = 0.01  Analysis Date = 06/26/2009 
 RPT Level = 0.01  Analysis Date = 06/09/2009 
 RPT Level = 0.01  Analysis Date = 06/09/2009 
 RPT Level = 0.01  Analysis Date = 06/05/2009 
 RPT Level = 0.01  Analysis Date = 06/05/2009 
 RPT Level = 0.01  Analysis Date = 06/02/2009 
 RPT Level = 0.01  Analysis Date = 06/02/2009 
 RPT Level = 0.01  Analysis Date = 06/02/2009 
 RPT Level = 0.01  Analysis Date = 06/02/2009 
 RPT Level = 0.01  Analysis Date = 05/20/2009 
 RPT Level = 0.01  Analysis Date = 05/20/2009 
 RPT Level = 0.01  Analysis Date = 05/15/2009 
 RPT Level = 0.01  Analysis Date = 05/15/2009 
 RPT Level = 0.01  Analysis Date = 05/04/2009 
 RPT Level = 0.01  Analysis Date = 05/04/2009 
 RPT Level = 0.01  Analysis Date = 04/23/2009 
 RPT Level = 0.01  Analysis Date = 04/23/2009 
 RPT Level = 0.01  Analysis Date = 04/21/2009 
 RPT Level = 0.01  Analysis Date = 04/21/2009 
 RPT Level = 0.01  Analysis Date = 04/03/2009 
 RPT Level = 0.01  Analysis Date = 04/03/2009 
 RPT Level = 0.01  Analysis Date = 04/01/2009 
 RPT Level = 0.01  Analysis Date = 04/01/2009 
 RPT Level = 0.01  Analysis Date = 04/14/2009 
 RPT Level = 0.01  Analysis Date = 04/14/2009 
 RPT Level = 0.01  Analysis Date = 03/13/2009 
 RPT Level = 0.01  Analysis Date = 03/13/2009 
 RPT Level = 0.01  Analysis Date = 03/13/2009 
 RPT Level = 0.01  Analysis Date = 03/13/2009 
 RPT Level = 0.01  Analysis Date = 03/03/2009 
 RPT Level = 0.01  Analysis Date = 03/03/2009 
 RPT Level = 0.01  Analysis Date = 02/23/2009 
 RPT Level = 0.01  Analysis Date = 02/23/2009 
 RPT Level = 0.01  Analysis Date = 02/12/2009 
 RPT Level = 0.01  Analysis Date = 02/12/2009 
 RPT Level = 0.01  Analysis Date = 02/12/2009 
 RPT Level = 0.01  Analysis Date = 02/12/2009 
 RPT Level = 0.01  Analysis Date = 02/04/2009 
 RPT Level = 0.01  Analysis Date = 02/04/2009 
 RPT Level = 0.01  Analysis Date = 01/26/2009 
 RPT Level = 0.01  Analysis Date = 01/26/2009 
 RPT Level = 0.01  Analysis Date = 01/21/2009 
 RPT Level = 0.01  Analysis Date = 01/21/2009 
 RPT Level = 0.01  Analysis Date = 01/15/2009 
 RPT Level = 0.01  Analysis Date = 01/15/2009 
 RPT Level = 0.01  Analysis Date = 01/08/2009 
 RPT Level = 0.01  Analysis Date = 01/08/2009 
 RPT Level = 0.01  Analysis Date = 01/08/2009 
 RPT Level = 0.01  Analysis Date = 01/08/2009 
 RPT Level = 0.01  Analysis Date = 01/07/2009 
 RPT Level = 0.01  Analysis Date = 01/07/2009 
 RPT Level = 0.01  Analysis Date = 12/15/2008 
 RPT Level = 0.01  Analysis Date = 12/15/2008 
 RPT Level = 0.01  Analysis Date = 12/08/2008 
 RPT Level = 0.01  Analysis Date = 12/08/2008 
 RPT Level = 0.01  Analysis Date = 12/08/2008 
 RPT Level = 0.01  Analysis Date = 12/08/2008 
 RPT Level = 0.01  Analysis Date = 11/25/2008 
 RPT Level = 0.01  Analysis Date = 11/25/2008 
 RPT Level = 0.01  Analysis Date = 11/24/2008 
 RPT Level = 0.01  Analysis Date = 11/24/2008 
 RPT Level = 0.01  Analysis Date = 11/12/2008 
 RPT Level = 0.01  Analysis Date = 11/12/2008 
 RPT Level = 0.01  Analysis Date = 11/04/2008 
 RPT Level = 0.01  Analysis Date = 11/04/2008 
 RPT Level = 0.01  Analysis Date = 10/23/2008 
 RPT Level = 0.01  Analysis Date = 10/23/2008 
 RPT Level = 0.01  Analysis Date = 10/17/2008 
 RPT Level = 0.01  Analysis Date = 10/17/2008 
 RPT Level = 0.01  Analysis Date = 10/09/2008 
 RPT Level = 0.01  Analysis Date = 10/09/2008 
 RPT Level = 0.01  Analysis Date = 10/09/2008 
 RPT Level = 0.01  Analysis Date = 10/09/2008 
 RPT Level = 0.01  Analysis Date = 10/01/2008 
 RPT Level = 0.01  Analysis Date = 10/01/2008 
 RPT Level = 0.01  Analysis Date = 09/25/2008 
 RPT Level = 0.01  Analysis Date = 09/25/2008 
 RPT Level = 0.01  Analysis Date = 09/24/2008 
 RPT Level = 0.01  Analysis Date = 09/24/2008 
 RPT Level = 0.01  Analysis Date = 09/11/2008 
 RPT Level = 0.01  Analysis Date = 09/11/2008 
 RPT Level = 0.01  Analysis Date = 08/28/2008 
 RPT Level = 0.01  Analysis Date = 08/28/2008 
 RPT Level = 0.01  Analysis Date = 08/27/2008 
 RPT Level = 0.01  Analysis Date = 08/27/2008 
 RPT Level = 0.01  Analysis Date = 08/19/2008 
 RPT Level = 0.01  Analysis Date = 08/19/2008 
 RPT Level = 0.01  Analysis Date = 08/14/2008 
 RPT Level = 0.01  Analysis Date = 08/14/2008 
 RPT Level = 0.01  Analysis Date = 07/29/2008 
 RPT Level = 0.01  Analysis Date = 07/29/2008 
 RPT Level = 0.01  Analysis Date = 07/21/2008 
 RPT Level = 0.01  Analysis Date = 07/21/2008 
 RPT Level = 0.01  Analysis Date = 07/14/2008 
 RPT Level = 0.01  Analysis Date = 07/14/2008 
 RPT Level = 0.01  Analysis Date = 07/09/2008 
 RPT Level = 0.01  Analysis Date = 07/09/2008 
 RPT Level = 0.01  Analysis Date = 06/27/2008 
 RPT Level = 0.01  Analysis Date = 06/27/2008 
 RPT Level = 0.01  Analysis Date = 06/26/2008 
 RPT Level = 0.01  Analysis Date = 06/26/2008 
 RPT Level = 0.01  Analysis Date = 06/20/2008 
 RPT Level = 0.01  Analysis Date = 06/20/2008 
 RPT Level = 0.01  Analysis Date = 06/11/2008 
 RPT Level = 0.01  Analysis Date = 06/11/2008 
 RPT Level = 0.01  Analysis Date = 06/05/2008 
 RPT Level = 0.01  Analysis Date = 06/05/2008 
 RPT Level = 0.01  Analysis Date = 05/30/2008 
 RPT Level = 0.01  Analysis Date = 05/30/2008 
 RPT Level = 0.01  Analysis Date = 05/19/2008 
 RPT Level = 0.01  Analysis Date = 05/19/2008 
 RPT Level = 0.01  Analysis Date = 05/15/2008 
 RPT Level = 0.01  Analysis Date = 05/15/2008 
 RPT Level = 0.01  Analysis Date = 04/30/2008 
 RPT Level = 0.01  Analysis Date = 04/30/2008 
 RPT Level = 0.01  Analysis Date = 04/24/2008 
 RPT Level = 0.01  Analysis Date = 04/24/2008 
 RPT Level = 0.01  Analysis Date = 04/21/2008 
 RPT Level = 0.01  Analysis Date = 04/21/2008 
 RPT Level = 0.01  Analysis Date = 04/15/2008 
 RPT Level = 0.01  Analysis Date = 04/15/2008 
 RPT Level = 0.01  Analysis Date = 04/04/2008 
 RPT Level = 0.01  Analysis Date = 04/04/2008 
 RPT Level = 0.01  Analysis Date = 03/27/2008 
 RPT Level = 0.01  Analysis Date = 03/27/2008 
 RPT Level = 0.01  Analysis Date = 03/21/2008 
 RPT Level = 0.01  Analysis Date = 03/21/2008 
 RPT Level = 0.01  Analysis Date = 03/26/2008 
 RPT Level = 0.01  Analysis Date = 03/26/2008 
 RPT Level = 0.01  Analysis Date = 03/12/2008 
 RPT Level = 0.01  Analysis Date = 03/12/2008 
 RPT Level = 0.01  Analysis Date = 03/06/2008 
 RPT Level = 0.01  Analysis Date = 03/06/2008 
 RPT Level = 0.01  Analysis Date = 03/06/2008 
 RPT Level = 0.01  Analysis Date = 03/06/2008 
 RPT Level = 0.01  Analysis Date = 03/04/2008 
 RPT Level = 0.01  Analysis Date = 03/04/2008 
 RPT Level = 0.01  Analysis Date = 02/21/2008 
 RPT Level = 0.01  Analysis Date = 02/21/2008 
 RPT Level = 0.01  Analysis Date = 01/31/2008 
 RPT Level = 0.01  Analysis Date = 01/31/2008 
 RPT Level = 0.01  Analysis Date = 01/25/2008 
 RPT Level = 0.01  Analysis Date = 01/25/2008 
 RPT Level = 0.01  Analysis Date = 01/24/2008 
 RPT Level = 0.01  Analysis Date = 01/24/2008 
 RPT Level = 0.01  Analysis Date = 01/08/2008 
 RPT Level = 0.01  Analysis Date = 01/08/2008 
 RPT Level = 0.01  Analysis Date = 01/07/2008 
 RPT Level = 0.01  Analysis Date = 01/07/2008 
 RPT Level = 0.01  Analysis Date = 12/26/2007 
 RPT Level = 0.01  Analysis Date = 12/26/2007 
 RPT Level = 0.01  Analysis Date = 12/17/2007 
 RPT Level = 0.01  Analysis Date = 12/17/2007 
 RPT Level = 0.01  Analysis Date = 12/06/2007 
 RPT Level = 0.01  Analysis Date = 12/06/2007 
 RPT Level = 0.01  Analysis Date = 11/28/2007 
 RPT Level = 0.01  Analysis Date = 11/28/2007 
 RPT Level = 0.01  Analysis Date = 11/28/2007 
 RPT Level = 0.01  Analysis Date = 11/28/2007 
 RPT Level = 0.01  Analysis Date = 11/16/2007 
 RPT Level = 0.01  Analysis Date = 11/16/2007 
 RPT Level = 0.01  Analysis Date = 11/14/2007 
 RPT Level = 0.01  Analysis Date = 11/14/2007 
 RPT Level = 0.01  Analysis Date = 10/31/2007 
 RPT Level = 0.01  Analysis Date = 10/31/2007 
 RPT Level = 0.01  Analysis Date = 11/01/2007 
 RPT Level = 0.01  Analysis Date = 11/01/2007 
 RPT Level = 0.01  Analysis Date = 10/22/2007 
 RPT Level = 0.01  Analysis Date = 10/22/2007 
 RPT Level = 0.01  Analysis Date = 10/22/2007 
 RPT Level = 0.01  Analysis Date = 10/22/2007 
 RPT Level = 0.01  Analysis Date = 10/05/2007 
 RPT Level = 0.01  Analysis Date = 10/05/2007 
 RPT Level = 0.01  Analysis Date = 10/05/2007 
 RPT Level = 0.01  Analysis Date = 10/05/2007 
 RPT Level = 0.01  Analysis Date = 09/20/2007 
 RPT Level = 0.01  Analysis Date = 09/20/2007 
 RPT Level = 0.01  Analysis Date = 09/07/2007 
 RPT Level = 0.01  Analysis Date = 09/07/2007 
 RPT Level = 0.01  Analysis Date = 09/05/2007 
 RPT Level = 0.01  Analysis Date = 09/05/2007 
 RPT Level = 0.01  Analysis Date = 08/27/2007 
 RPT Level = 0.01  Analysis Date = 08/27/2007 
 RPT Level = 0.01  Analysis Date = 08/21/2007 
 RPT Level = 0.01  Analysis Date = 08/21/2007 
 RPT Level = 0.01  Analysis Date = 08/16/2007 
 RPT Level = 0.01  Analysis Date = 08/16/2007 
 RPT Level = 0.01  Analysis Date = 08/09/2007 
 RPT Level = 0.01  Analysis Date = 08/09/2007 
 RPT Level = 0.01  Analysis Date = 08/02/2007 
 RPT Level = 0.01  Analysis Date = 08/02/2007 
 RPT Level = 0.01  Analysis Date = 07/12/2007 
 RPT Level = 0.01  Analysis Date = 07/12/2007 
 RPT Level = 0.01  Analysis Date = 07/09/2007 
 RPT Level = 0.01  Analysis Date = 07/09/2007 
 RPT Level = 0.01  Analysis Date = 07/03/2007 
 RPT Level = 0.01  Analysis Date = 07/03/2007 
 RPT Level = 0.01  Analysis Date = 06/22/2007 
 RPT Level = 0.01  Analysis Date = 06/22/2007 
 RPT Level = 0.01  Analysis Date = 06/14/2007 
 RPT Level = 0.01  Analysis Date = 06/14/2007 
 RPT Level = 0.01  Analysis Date = 06/08/2007 
 RPT Level = 0.01  Analysis Date = 06/08/2007 
 RPT Level = 0.01  Analysis Date = 06/05/2007 
 RPT Level = 0.01  Analysis Date = 06/05/2007 
 RPT Level = 0.01  Analysis Date = 05/24/2007 
 RPT Level = 0.01  Analysis Date = 05/24/2007 
 RPT Level = 0.01  Analysis Date = 05/17/2007 
 RPT Level = 0.01  Analysis Date = 05/17/2007 
 RPT Level = 0.01  Analysis Date = 05/11/2007 
 RPT Level = 0.01  Analysis Date = 05/11/2007 
 RPT Level = 0.01  Analysis Date = 05/07/2007 
 RPT Level = 0.01  Analysis Date = 05/07/2007 
 RPT Level = 0.01  Analysis Date = 04/27/2007 
 RPT Level = 0.01  Analysis Date = 04/27/2007 
 RPT Level = 0.01  Analysis Date = 04/19/2007 
 RPT Level = 0.01  Analysis Date = 04/19/2007 
 RPT Level = 0.01  Analysis Date = 04/16/2007 
 RPT Level = 0.01  Analysis Date = 04/16/2007 
 RPT Level = 0.01  Analysis Date = 04/05/2007 
 RPT Level = 0.01  Analysis Date = 04/05/2007 
 RPT Level = 0.01  Analysis Date = 04/05/2007 
 RPT Level = 0.01  Analysis Date = 04/05/2007 
 RPT Level = 0.01  Analysis Date = 03/26/2007 
 RPT Level = 0.01  Analysis Date = 03/26/2007 
 RPT Level = 0.01  Analysis Date = 03/15/2007 
 RPT Level = 0.01  Analysis Date = 03/15/2007 
 RPT Level = 0.01  Analysis Date = 03/08/2007 
 RPT Level = 0.01  Analysis Date = 03/08/2007 
 RPT Level = 0.01  Analysis Date = 03/08/2007 
 RPT Level = 0.01  Analysis Date = 03/08/2007 
 RPT Level = 0.01  Analysis Date = 02/28/2007 
 RPT Level = 0.01  Analysis Date = 02/28/2007 
 RPT Level = 0.01  Analysis Date = 02/22/2007 
 RPT Level = 0.01  Analysis Date = 02/22/2007 
 RPT Level = 0.01  Analysis Date = 02/14/2007 
 RPT Level = 0.01  Analysis Date = 02/14/2007 
 RPT Level = 0.01  Analysis Date = 01/30/2007 
 RPT Level = 0.01  Analysis Date = 01/30/2007 
 RPT Level = 0.01  Analysis Date = 01/25/2007 
 RPT Level = 0.01  Analysis Date = 01/25/2007 
 RPT Level = 0.01  Analysis Date = 01/25/2007 
 RPT Level = 0.01  Analysis Date = 01/25/2007 
 RPT Level = 0.01  Analysis Date = 01/11/2007 
 RPT Level = 0.01  Analysis Date = 01/11/2007 
 RPT Level = 0.01  Analysis Date = 01/04/2007 
 RPT Level = 0.01  Analysis Date = 01/04/2007 
 RPT Level = 0.01  Analysis Date = 12/28/2006 
 RPT Level = 0.01  Analysis Date = 12/28/2006 
 RPT Level = 0.01  Analysis Date = 12/18/2006 
 RPT Level = 0.01  Analysis Date = 12/18/2006 
 RPT Level = 0.01  Analysis Date = 12/07/2006 
 RPT Level = 0.01  Analysis Date = 12/07/2006 
 RPT Level = 0.01  Analysis Date = 12/04/2006 
 RPT Level = 0.01  Analysis Date = 12/04/2006 
 RPT Level = 0.01  Analysis Date = 11/30/2006 
 RPT Level = 0.01  Analysis Date = 11/30/2006 
 RPT Level = 0.01  Analysis Date = 11/21/2006 
 RPT Level = 0.01  Analysis Date = 11/21/2006 
 RPT Level = 0.01  Analysis Date = 11/13/2006 
 RPT Level = 0.01  Analysis Date = 11/13/2006 
 RPT Level = 0.01  Analysis Date = 11/09/2006 
 RPT Level = 0.01  Analysis Date = 11/09/2006 
 RPT Level = 0.01  Analysis Date = 10/31/2006 
 RPT Level = 0.01  Analysis Date = 10/31/2006 
 RPT Level = 0.01  Analysis Date = 10/23/2006 
 RPT Level = 0.01  Analysis Date = 10/23/2006 
 RPT Level = 0.01  Analysis Date = 10/19/2006 
 RPT Level = 0.01  Analysis Date = 10/19/2006 
 RPT Level = 0.01  Analysis Date = 10/18/2006 
 RPT Level = 0.01  Analysis Date = 10/18/2006 
 RPT Level = 0.01  Analysis Date = 10/16/2006 
 RPT Level = 0.01  Analysis Date = 10/16/2006 
 RPT Level = 0.01  Analysis Date = 10/13/2006 
 RPT Level = 0.01  Analysis Date = 10/13/2006 
 RPT Level = 0.01  Analysis Date = 10/10/2006 
 RPT Level = 0.01  Analysis Date = 10/10/2006 
 RPT Level = 0.01  Analysis Date = 09/27/2006 
 RPT Level = 0.01  Analysis Date = 09/27/2006 
 RPT Level = 0.01  Analysis Date = 09/27/2006 
 RPT Level = 0.01  Analysis Date = 09/27/2006 
 RPT Level = 0.01  Analysis Date = 08/17/2006 
 RPT Level = 0.01  Analysis Date = 08/17/2006 
 RPT Level = 0.01  Analysis Date = 07/31/2006 
 RPT Level = 0.01  Analysis Date = 07/31/2006 
 RPT Level = 0.01  Analysis Date = 07/27/2006 
 RPT Level = 0.01  Analysis Date = 07/27/2006 
 RPT Level = 0.01  Analysis Date = 07/17/2006 
 RPT Level = 0.01  Analysis Date = 07/17/2006 
 RPT Level = 0.01  Analysis Date = 07/10/2006 
 RPT Level = 0.01  Analysis Date = 07/10/2006 
 RPT Level = 0.01  Analysis Date = 06/27/2006 
 RPT Level = 0.01  Analysis Date = 06/27/2006 
 RPT Level = 0.01  Analysis Date = 06/26/2006 
 RPT Level = 0.01  Analysis Date = 06/26/2006 
 RPT Level = 0.01  Analysis Date = 06/02/2006 
 RPT Level = 0.01  Analysis Date = 06/02/2006 
 RPT Level = 0.01  Analysis Date = 05/31/2006 
 RPT Level = 0.01  Analysis Date = 05/31/2006 
 RPT Level = 0.01  Analysis Date = 05/08/2006 
 RPT Level = 0.01  Analysis Date = 05/08/2006 
 RPT Level = 0.01  Analysis Date = 09/22/2005 
 RPT Level = 0.01  Analysis Date = 09/22/2005 
 RPT Level = 0.01  Analysis Date = 09/14/2005 
 RPT Level = 0.01  Analysis Date = 09/14/2005 
 RPT Level = 0.01  Analysis Date = 09/02/2005 
 RPT Level = 0.01  Analysis Date = 09/02/2005 
 RPT Level = 0.01  Analysis Date = 08/29/2005 
 RPT Level = 0.01  Analysis Date = 08/29/2005 
 RPT Level = 0.01  Analysis Date = 08/24/2005 
 RPT Level = 0.01  Analysis Date = 08/24/2005 
 RPT Level = 0.01  Analysis Date = 08/15/2005 
 RPT Level = 0.01  Analysis Date = 08/15/2005 
 RPT Level = 0.01  Analysis Date = 08/12/2005 
 RPT Level = 0.01  Analysis Date = 08/12/2005 
 RPT Level = 0.01  Analysis Date = 08/12/2005 
 RPT Level = 0.01  Analysis Date = 08/12/2005 
 RPT Level = 0.01  Analysis Date = 07/21/2005 
 RPT Level = 0.01  Analysis Date = 07/21/2005 
 RPT Level = 0.01  Analysis Date = 07/18/2005 
 RPT Level = 0.01  Analysis Date = 07/18/2005 
 RPT Level = 0.01  Analysis Date = 07/12/2005 
 RPT Level = 0.01  Analysis Date = 07/12/2005 
 RPT Level = 0.01  Analysis Date = 07/08/2005 
 RPT Level = 0.01  Analysis Date = 07/08/2005 
 RPT Level = 0.01  Analysis Date = 06/30/2005 
 RPT Level = 0.01  Analysis Date = 06/30/2005 
 RPT Level = 0.01  Analysis Date = 06/21/2005 
 RPT Level = 0.01  Analysis Date = 06/21/2005 
 RPT Level = 0.01  Analysis Date = 06/14/2005 
 RPT Level = 0.01  Analysis Date = 06/14/2005 
 RPT Level = 0.01  Analysis Date = 06/06/2005 
 RPT Level = 0.01  Analysis Date = 06/06/2005 
 RPT Level = 0.01  Analysis Date = 05/27/2005 
 RPT Level = 0.01  Analysis Date = 05/27/2005 
 RPT Level = 0.01  Analysis Date = 05/23/2005 
 RPT Level = 0.01  Analysis Date = 05/23/2005 
 RPT Level = 0.01  Analysis Date = 05/18/2005 
 RPT Level = 0.01  Analysis Date = 05/18/2005 
 RPT Level = 0.01  Analysis Date = 05/11/2005 
 RPT Level = 0.01  Analysis Date = 05/11/2005 
 RPT Level = 0.01  Analysis Date = 05/06/2005 
 RPT Level = 0.01  Analysis Date = 05/06/2005 
 RPT Level = 0.01  Analysis Date = 04/29/2005 
 RPT Level = 0.01  Analysis Date = 04/29/2005 
 RPT Level = 0.01  Analysis Date = 04/14/2005 
 RPT Level = 0.01  Analysis Date = 04/14/2005 
 RPT Level = 0.01  Analysis Date = 04/12/2005 
 RPT Level = 0.01  Analysis Date = 04/12/2005 
 RPT Level = 0.01  Analysis Date = 04/05/2005 
 RPT Level = 0.01  Analysis Date = 04/05/2005 
 RPT Level = 0.01  Analysis Date = 03/30/2005 
 RPT Level = 0.01  Analysis Date = 03/30/2005 
 RPT Level = 0.01  Analysis Date = 03/18/2005 
 RPT Level = 0.01  Analysis Date = 03/18/2005 
 RPT Level = 0.01  Analysis Date = 03/17/2005 
 RPT Level = 0.01  Analysis Date = 03/17/2005 
 RPT Level = 0.01  Analysis Date = 03/17/2005 
 RPT Level = 0.01  Analysis Date = 03/17/2005 
 RPT Level = 0.01  Analysis Date = 03/17/2005 
 RPT Level = 0.01  Analysis Date = 03/17/2005 
 RPT Level = 0.01  Analysis Date = 03/08/2005 
 RPT Level = 0.01  Analysis Date = 03/08/2005 
 RPT Level = 0.01  Analysis Date = 02/24/2005 
 RPT Level = 0.01  Analysis Date = 02/24/2005 
 RPT Level = 0.01  Analysis Date = 02/16/2005 
 RPT Level = 0.01  Analysis Date = 02/16/2005 
 RPT Level = 0.01  Analysis Date = 02/14/2005 
 RPT Level = 0.01  Analysis Date = 02/14/2005 
 RPT Level = 0.01  Analysis Date = 01/27/2005 
 RPT Level = 0.01  Analysis Date = 01/27/2005 
 RPT Level = 0.01  Analysis Date = 01/25/2005 
 RPT Level = 0.01  Analysis Date = 01/25/2005 
 RPT Level = 0.01  Analysis Date = 01/20/2005 
 RPT Level = 0.01  Analysis Date = 01/20/2005 
 RPT Level = 0.01  Analysis Date = 01/12/2005 
 RPT Level = 0.01  Analysis Date = 01/12/2005 
 RPT Level = 0.01  Analysis Date = 01/07/2005 
 RPT Level = 0.01  Analysis Date = 01/07/2005 
 RPT Level = 0.01  Analysis Date = 01/07/2005 
 RPT Level = 0.01  Analysis Date = 01/07/2005 
 RPT Level = 0.01  Analysis Date = 01/07/2005 
 RPT Level = 0.01  Analysis Date = 01/07/2005 
 RPT Level = 0.01  Analysis Date = 12/21/2004 
 RPT Level = 0.01  Analysis Date = 12/21/2004 
 RPT Level = 0.01  Analysis Date = 12/21/2004 
 RPT Level = 0.01  Analysis Date = 12/21/2004 
 RPT Level = 0.01  Analysis Date = 12/16/2004 
 RPT Level = 0.01  Analysis Date = 12/16/2004 
 RPT Level = 0.01  Analysis Date = 12/21/2004 
 RPT Level = 0.01  Analysis Date = 12/21/2004 
 RPT Level = 0.01  Analysis Date = 12/10/2004 
 RPT Level = 0.01  Analysis Date = 12/10/2004 
 RPT Level = 0.01  Analysis Date = 12/10/2004 
 RPT Level = 0.01  Analysis Date = 12/10/2004 
 RPT Level = 0.01  Analysis Date = 12/01/2004 
 RPT Level = 0.01  Analysis Date = 12/01/2004 
 RPT Level = 0.01  Analysis Date = 11/26/2004 
 RPT Level = 0.01  Analysis Date = 11/26/2004 
 RPT Level = 0.01  Analysis Date = 11/23/2004 
 RPT Level = 0.01  Y = 0
The SGPlot Procedure

False Positive Rate for Phosphorus (as P), UNF, CFA, ALK-P, ACD

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Phosphorus (as P), UNF, CFA, ALK-P, ACD 00665AKP01 2004 17 0 0%
    2005 50 1 2%
    2006 15 0 0%
    2007 50 0 0%
    2008 50 0 0%
    2009 52 1 2%
    2010 52 0 0%
    2011 52 0 0%
    2012 52 3 6%
    2013 53 1 2%
    2014 47 0 0%
    2015 52 1 2%
    2016 50 4 8%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Total Nitrogen (NH3+NO3+NO2+org N as N), FIL, CFA, ALK-P -
Blind Blank Results
Lab: NWQL, PCode: 62854, MCode: CL063
Analysis dates: 06/10/04 through 09/22/16
Open Data Set

 Analysis Date = 01/29/2013 
 Lab Value = -0.3 
 RPT Level = 0.05 
 Lab Sample ID = 20130140072  Analysis Date = 01/04/2013 
 Lab Value = -0.274 
 RPT Level = 0.05 
 Lab Sample ID = 20123330011  Analysis Date = 01/29/2013 
 Lab Value = -0.3 
 RPT Level = 0.05 
 Lab Sample ID = 20130140072  Analysis Date = 01/04/2013 
 Lab Value = -0.274 
 RPT Level = 0.05 
 Lab Sample ID = 20123330011  Analysis Date = 09/22/2016 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20162640178  Analysis Date = 09/19/2016 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20162580021  Analysis Date = 09/14/2016 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20162520021  Analysis Date = 09/06/2016 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20162440129  Analysis Date = 09/09/2016 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20162360202  Analysis Date = 08/24/2016 
 Lab Value = 0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20162290136  Analysis Date = 08/18/2016 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20162230012  Analysis Date = 08/09/2016 
 Lab Value = 0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20162150194  Analysis Date = 08/03/2016 
 Lab Value = -0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20162080237  Analysis Date = 07/28/2016 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20162010261  Analysis Date = 07/18/2016 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20161940115  Analysis Date = 07/07/2016 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20161870038  Analysis Date = 07/01/2016 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20161800089  Analysis Date = 06/27/2016 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20161740080  Analysis Date = 06/15/2016 
 Lab Value = 0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20161660157  Analysis Date = 06/08/2016 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20161590161  Analysis Date = 06/02/2016 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20161520029  Analysis Date = 06/01/2016 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20161480203  Analysis Date = 05/10/2016 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20161270015  Analysis Date = 05/04/2016 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20161230047  Analysis Date = 04/28/2016 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20161160095  Analysis Date = 04/20/2016 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20161100131  Analysis Date = 04/15/2016 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20161020031  Analysis Date = 04/06/2016 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20160950050  Analysis Date = 03/30/2016 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20160880041  Analysis Date = 03/25/2016 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20160810071  Analysis Date = 03/16/2016 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20160740016  Analysis Date = 03/09/2016 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20160670017  Analysis Date = 03/02/2016 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20160600020  Analysis Date = 02/26/2016 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20160530019  Analysis Date = 02/18/2016 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20160470018  Analysis Date = 02/12/2016 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20160400086  Analysis Date = 02/05/2016 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20160320014  Analysis Date = 01/26/2016 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20160250029  Analysis Date = 01/25/2016 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20160190020  Analysis Date = 01/12/2016 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20160110012  Analysis Date = 01/11/2016 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20160050037  Analysis Date = 01/05/2016 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20153630051  Analysis Date = 12/24/2015 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20153550014  Analysis Date = 12/17/2015 
 Lab Value = 0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20153500167  Analysis Date = 12/11/2015 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20153420008  Analysis Date = 12/02/2015 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20153340010  Analysis Date = 11/25/2015 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20153270005  Analysis Date = 11/18/2015 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20153200028  Analysis Date = 11/16/2015 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20153140001  Analysis Date = 11/10/2015 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20153060024  Analysis Date = 11/02/2015 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20152990071  Analysis Date = 10/22/2015 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20152920041  Analysis Date = 10/19/2015 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20152860162  Analysis Date = 10/09/2015 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20152780015  Analysis Date = 09/30/2015 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20152710074  Analysis Date = 09/30/2015 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20152640031  Analysis Date = 09/22/2015 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20152590168  Analysis Date = 09/17/2015 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20152510015  Analysis Date = 09/09/2015 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20152430087  Analysis Date = 09/02/2015 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20152360161  Analysis Date = 08/28/2015 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20152330023  Analysis Date = 08/17/2015 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20152230123  Analysis Date = 08/11/2015 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20152150081  Analysis Date = 08/03/2015 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20152080071  Analysis Date = 07/24/2015 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20152010054  Analysis Date = 07/16/2015 
 Lab Value = -0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20151940026  Analysis Date = 07/14/2015 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20151870013  Analysis Date = 07/08/2015 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20151800056  Analysis Date = 06/23/2015 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20151730017  Analysis Date = 06/18/2015 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20151660033  Analysis Date = 06/16/2015 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20151620206  Analysis Date = 06/05/2015 
 Lab Value = -0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20151530197  Analysis Date = 06/01/2015 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20151460122  Analysis Date = 05/21/2015 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20151390199  Analysis Date = 05/18/2015 
 Lab Value = -0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20151310072  Analysis Date = 05/08/2015 
 Lab Value = 0.116 
 RPT Level = 0.05 
 Lab Sample ID = 20151240056  Analysis Date = 05/05/2015 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20151180075  Analysis Date = 04/29/2015 
 Lab Value = -0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20151140034  Analysis Date = 04/22/2015 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20151050043  Analysis Date = 04/13/2015 
 Lab Value = -0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20150970077  Analysis Date = 04/13/2015 
 Lab Value = -0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20150900047  Analysis Date = 03/31/2015 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20150850046  Analysis Date = 03/27/2015 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20150770030  Analysis Date = 03/19/2015 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20150690110  Analysis Date = 03/11/2015 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20150610108  Analysis Date = 03/06/2015 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20150540035  Analysis Date = 03/02/2015 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20150490026  Analysis Date = 02/24/2015 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20150400036  Analysis Date = 02/25/2015 
 Lab Value = 0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20150330028  Analysis Date = 02/10/2015 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20150260018  Analysis Date = 02/11/2015 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20150200028  Analysis Date = 01/21/2015 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20150120025  Analysis Date = 01/15/2015 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20150050018  Analysis Date = 01/08/2015 
 Lab Value = 0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20143630011  Analysis Date = 01/08/2015 
 Lab Value = 0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20143560053  Analysis Date = 12/31/2014 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20143490027  Analysis Date = 12/16/2014 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20143420027  Analysis Date = 12/18/2014 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20143360081  Analysis Date = 12/12/2014 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20143300045  Analysis Date = 12/05/2014 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20143230052  Analysis Date = 11/25/2014 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20143160021  Analysis Date = 11/13/2014 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20143080076  Analysis Date = 11/04/2014 
 Lab Value = -0.051 
 RPT Level = 0.05 
 Lab Sample ID = 20143010069  Analysis Date = 11/04/2014 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20142950130  Analysis Date = 10/24/2014 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20142880087  Analysis Date = 10/17/2014 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20142790035  Analysis Date = 10/08/2014 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20142720121  Analysis Date = 10/07/2014 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20142650111  Analysis Date = 10/02/2014 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20142590052  Analysis Date = 09/19/2014 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20142520006  Analysis Date = 09/12/2014 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20142470054  Analysis Date = 08/22/2014 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20142230083  Analysis Date = 08/20/2014 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20142160070  Analysis Date = 08/15/2014 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20142090218  Analysis Date = 08/06/2014 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20142030078  Analysis Date = 07/28/2014 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20141960043  Analysis Date = 07/16/2014 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20141890090  Analysis Date = 07/10/2014 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20141820108  Analysis Date = 07/10/2014 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20141750150  Analysis Date = 07/09/2014 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20141680086  Analysis Date = 07/08/2014 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20141620051  Analysis Date = 06/27/2014 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20141550065  Analysis Date = 06/18/2014 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20141470150  Analysis Date = 06/06/2014 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20141400016  Analysis Date = 06/10/2014 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20141340004  Analysis Date = 05/16/2014 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20141250088  Analysis Date = 05/16/2014 
 Lab Value = 0.036 
 RPT Level = 0.05 
 Lab Sample ID = 20141190018  Analysis Date = 05/07/2014 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20141130029  Analysis Date = 04/18/2014 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20141050011  Analysis Date = 04/17/2014 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20140970031  Analysis Date = 04/11/2014 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20140900029  Analysis Date = 04/01/2014 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20140840094  Analysis Date = 03/25/2014 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20140760030  Analysis Date = 03/21/2014 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20140690028  Analysis Date = 03/21/2014 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20140630125  Analysis Date = 03/04/2014 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20140550053  Analysis Date = 03/04/2014 
 Lab Value = -0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20140490016  Analysis Date = 02/13/2014 
 Lab Value = -0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20140410010  Analysis Date = 02/18/2014 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20140340025  Analysis Date = 02/10/2014 
 Lab Value = -0.047 
 RPT Level = 0.05 
 Lab Sample ID = 20140270198  Analysis Date = 02/10/2014 
 Lab Value = -0.048 
 RPT Level = 0.05 
 Lab Sample ID = 20140210048  Analysis Date = 02/07/2014 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20140130052  Analysis Date = 02/07/2014 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20140070068  Analysis Date = 01/09/2014 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20133580057  Analysis Date = 01/03/2014 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20133500079  Analysis Date = 12/12/2013 
 Lab Value = -0.048 
 RPT Level = 0.05 
 Lab Sample ID = 20133430112  Analysis Date = 12/05/2013 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20133360023  Analysis Date = 12/05/2013 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20133300014  Analysis Date = 11/26/2013 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20133230005  Analysis Date = 11/20/2013 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20133170106  Analysis Date = 11/15/2013 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20133090099  Analysis Date = 11/06/2013 
 Lab Value = -0.056 
 RPT Level = 0.05 
 Lab Sample ID = 20133030024  Analysis Date = 11/01/2013 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20132970026  Analysis Date = 10/28/2013 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20132730139  Analysis Date = 10/29/2013 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20132660105  Analysis Date = 10/24/2013 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20132600014  Analysis Date = 09/24/2013 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20132530114  Analysis Date = 09/05/2013 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20132410016  Analysis Date = 09/05/2013 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20132390009  Analysis Date = 09/04/2013 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20132350026  Analysis Date = 09/03/2013 
 Lab Value = -0.057 
 RPT Level = 0.05 
 Lab Sample ID = 20132270020  Analysis Date = 08/21/2013 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20132180211  Analysis Date = 08/27/2013 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20132120021  Analysis Date = 08/14/2013 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20132040023  Analysis Date = 07/24/2013 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20131970026  Analysis Date = 07/16/2013 
 Lab Value = 0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20131900089  Analysis Date = 07/16/2013 
 Lab Value = -0.05 
 RPT Level = 0.05 
 Lab Sample ID = 20131830080  Analysis Date = 07/10/2013 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20131770012  Analysis Date = 06/28/2013 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20131700039  Analysis Date = 06/26/2013 
 Lab Value = -0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20131640007  Analysis Date = 06/19/2013 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20131550030  Analysis Date = 06/11/2013 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20131500023  Analysis Date = 06/11/2013 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20131430201  Analysis Date = 05/28/2013 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20131350119  Analysis Date = 05/28/2013 
 Lab Value = -0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20131270023  Analysis Date = 05/13/2013 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20131220013  Analysis Date = 05/07/2013 
 Lab Value = 0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20131150033  Analysis Date = 05/13/2013 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20131120124  Analysis Date = 05/03/2013 
 Lab Value = 0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20131090031  Analysis Date = 04/12/2013 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20130930088  Analysis Date = 04/08/2013 
 Lab Value = -0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20130840059  Analysis Date = 04/08/2013 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20130770159  Analysis Date = 03/18/2013 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20130700012  Analysis Date = 03/07/2013 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20130630123  Analysis Date = 03/07/2013 
 Lab Value = -0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20130570008  Analysis Date = 03/07/2013 
 Lab Value = -0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20130520007  Analysis Date = 02/28/2013 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20130420053  Analysis Date = 02/22/2013 
 Lab Value = -0.039 
 RPT Level = 0.05 
 Lab Sample ID = 20130350030  Analysis Date = 02/07/2013 
 Lab Value = -0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20130280040  Analysis Date = 02/07/2013 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20130230100  Analysis Date = 01/11/2013 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20130070057  Analysis Date = 01/11/2013 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20130020011  Analysis Date = 01/11/2013 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20123620012  Analysis Date = 01/14/2013 
 Lab Value = -0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20123530085  Analysis Date = 01/08/2013 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20123480060  Analysis Date = 01/04/2013 
 Lab Value = -0.187 
 RPT Level = 0.05 
 Lab Sample ID = 20123390114  Analysis Date = 12/12/2012 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20123250064  Analysis Date = 12/12/2012 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20123200055  Analysis Date = 11/29/2012 
 Lab Value = 0.141 
 RPT Level = 0.05 
 Lab Sample ID = 20123120067  Analysis Date = 11/13/2012 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20123040118  Analysis Date = 11/05/2012 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20122980125  Analysis Date = 10/25/2012 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20122900095  Analysis Date = 10/19/2012 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20122830035  Analysis Date = 10/12/2012 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20122750026  Analysis Date = 10/11/2012 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20122700109  Analysis Date = 10/11/2012 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20122690152  Analysis Date = 09/25/2012 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20122550014  Analysis Date = 09/21/2012 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20122490101  Analysis Date = 09/21/2012 
 Lab Value = -0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20122410012  Analysis Date = 09/07/2012 
 Lab Value = -0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20122350176  Analysis Date = 08/30/2012 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20122280091  Analysis Date = 08/15/2012 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20122190097  Analysis Date = 08/10/2012 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20122140053  Analysis Date = 08/09/2012 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20122050102  Analysis Date = 08/01/2012 
 Lab Value = 0.052 
 RPT Level = 0.05 
 Lab Sample ID = 20121990078  Analysis Date = 07/31/2012 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20121910040  Analysis Date = 07/31/2012 
 Lab Value = -0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20121870019  Analysis Date = 07/18/2012 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20121780034  Analysis Date = 07/16/2012 
 Lab Value = 0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20121710007  Analysis Date = 06/25/2012 
 Lab Value = -0.045 
 RPT Level = 0.05 
 Lab Sample ID = 20121650053  Analysis Date = 06/21/2012 
 Lab Value = -0.036 
 RPT Level = 0.05 
 Lab Sample ID = 20121560124  Analysis Date = 06/19/2012 
 Lab Value = -0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20121510025  Analysis Date = 06/01/2012 
 Lab Value = -0.108 
 RPT Level = 0.05 
 Lab Sample ID = 20121430022  Analysis Date = 05/31/2012 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20121370052  Analysis Date = 05/22/2012 
 Lab Value = -0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20121290073  Analysis Date = 05/17/2012 
 Lab Value = -0.045 
 RPT Level = 0.05 
 Lab Sample ID = 20121210122  Analysis Date = 05/02/2012 
 Lab Value = -0.043 
 RPT Level = 0.05 
 Lab Sample ID = 20121150088  Analysis Date = 04/25/2012 
 Lab Value = 0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20121080010  Analysis Date = 04/20/2012 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20121010027  Analysis Date = 04/17/2012 
 Lab Value = -0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20120930055  Analysis Date = 04/03/2012 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20120870033  Analysis Date = 03/23/2012 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20120790084  Analysis Date = 03/28/2012 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20120730078  Analysis Date = 04/25/2012 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20120660074  Analysis Date = 03/16/2012 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20120580060  Analysis Date = 03/23/2012 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20120530100  Analysis Date = 03/09/2012 
 Lab Value = -0.085 
 RPT Level = 0.05 
 Lab Sample ID = 20120450019  Analysis Date = 02/23/2012 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20120370063  Analysis Date = 02/10/2012 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20120310011  Analysis Date = 01/26/2012 
 Lab Value = -0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20120230047  Analysis Date = 01/26/2012 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20120180012  Analysis Date = 01/12/2012 
 Lab Value = 0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20120090051  Analysis Date = 01/12/2012 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20120030027  Analysis Date = 01/04/2012 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20113610088  Analysis Date = 12/28/2011 
 Lab Value = 0.065 
 RPT Level = 0.05 
 Lab Sample ID = 20113530138  Analysis Date = 12/28/2011 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20113490074  Analysis Date = 12/28/2011 
 Lab Value = -0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20113460138  Analysis Date = 12/13/2011 
 Lab Value = -0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20113320114  Analysis Date = 12/13/2011 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20113250125  Analysis Date = 11/30/2011 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20113180163  Analysis Date = 11/30/2011 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20113110061  Analysis Date = 11/21/2011 
 Lab Value = -0.041 
 RPT Level = 0.05 
 Lab Sample ID = 20113050093  Analysis Date = 11/01/2011 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20112970117  Analysis Date = 10/25/2011 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20112910136  Analysis Date = 10/19/2011 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20112840072  Analysis Date = 10/13/2011 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20112760062  Analysis Date = 10/05/2011 
 Lab Value = 0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20112690122  Analysis Date = 09/27/2011 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20112630060  Analysis Date = 09/19/2011 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20112560022  Analysis Date = 09/19/2011 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20112510035  Analysis Date = 09/19/2011 
 Lab Value = -0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20112500187  Analysis Date = 08/31/2011 
 Lab Value = -0.065 
 RPT Level = 0.05 
 Lab Sample ID = 20112360062  Analysis Date = 08/31/2011 
 Lab Value = -0.058 
 RPT Level = 0.05 
 Lab Sample ID = 20112300037  Analysis Date = 08/16/2011 
 Lab Value = -0.065 
 RPT Level = 0.05 
 Lab Sample ID = 20112200050  Analysis Date = 08/04/2011 
 Lab Value = -0.064 
 RPT Level = 0.05 
 Lab Sample ID = 20112130155  Analysis Date = 08/03/2011 
 Lab Value = -0.045 
 RPT Level = 0.05 
 Lab Sample ID = 20112060093  Analysis Date = 08/04/2011 
 Lab Value = -0.043 
 RPT Level = 0.05 
 Lab Sample ID = 20112010021  Analysis Date = 07/22/2011 
 Lab Value = -0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20111920101  Analysis Date = 07/15/2011 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20111860061  Analysis Date = 07/06/2011 
 Lab Value = -0.061 
 RPT Level = 0.05 
 Lab Sample ID = 20111780163  Analysis Date = 06/24/2011 
 Lab Value = -0.038 
 RPT Level = 0.05 
 Lab Sample ID = 20111710110  Analysis Date = 06/17/2011 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20111640065  Analysis Date = 06/13/2011 
 Lab Value = -0.044 
 RPT Level = 0.05 
 Lab Sample ID = 20111570060  Analysis Date = 06/06/2011 
 Lab Value = -0.049 
 RPT Level = 0.05 
 Lab Sample ID = 20111510148  Analysis Date = 05/31/2011 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20111430201  Analysis Date = 05/18/2011 
 Lab Value = -0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20111360139  Analysis Date = 05/12/2011 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20111290045  Analysis Date = 05/12/2011 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20111220084  Analysis Date = 04/29/2011 
 Lab Value = -0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20111150112  Analysis Date = 04/22/2011 
 Lab Value = 0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20111080074  Analysis Date = 04/13/2011 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20111010119  Analysis Date = 04/08/2011 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20110950055  Analysis Date = 04/07/2011 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20110870091  Analysis Date = 03/29/2011 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20110800058  Analysis Date = 03/23/2011 
 Lab Value = -0.04 
 RPT Level = 0.05 
 Lab Sample ID = 20110750069  Analysis Date = 03/11/2011 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20110660030  Analysis Date = 03/18/2011 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20110590069  Analysis Date = 03/09/2011 
 Lab Value = 0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20110530104  Analysis Date = 02/17/2011 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20110450035  Analysis Date = 02/17/2011 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20110410097  Analysis Date = 02/11/2011 
 Lab Value = -0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20110400068  Analysis Date = 01/28/2011 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20110240064  Analysis Date = 01/26/2011 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20110180058  Analysis Date = 01/26/2011 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20110110017  Analysis Date = 01/14/2011 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20110030022  Analysis Date = 01/14/2011 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20103610055  Analysis Date = 01/14/2011 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20103540045  Analysis Date = 12/21/2010 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20103470075  Analysis Date = 12/17/2010 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20103400083  Analysis Date = 12/09/2010 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20103330098  Analysis Date = 12/02/2010 
 Lab Value = 0.13 
 RPT Level = 0.05 
 Lab Sample ID = 20103260066  Analysis Date = 11/23/2010 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20103190067  Analysis Date = 11/23/2010 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20103120027  Analysis Date = 11/10/2010 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20103060009  Analysis Date = 11/03/2010 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20102990005  Analysis Date = 10/28/2010 
 Lab Value = -0.046 
 RPT Level = 0.05 
 Lab Sample ID = 20102920007  Analysis Date = 10/19/2010 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20102850131  Analysis Date = 10/14/2010 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20102770103  Analysis Date = 10/14/2010 
 Lab Value = -0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20102700153  Analysis Date = 09/30/2010 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20102640135  Analysis Date = 09/23/2010 
 Lab Value = -0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20102570022  Analysis Date = 09/16/2010 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20102510060  Analysis Date = 09/10/2010 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20102430251  Analysis Date = 09/02/2010 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20102350198  Analysis Date = 08/19/2010 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20102290051  Analysis Date = 08/18/2010 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20102230039  Analysis Date = 08/12/2010 
 Lab Value = -0.053 
 RPT Level = 0.05 
 Lab Sample ID = 20102140089  Analysis Date = 08/04/2010 
 Lab Value = -0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20102080018  Analysis Date = 07/27/2010 
 Lab Value = -0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20102000187  Analysis Date = 07/20/2010 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20101930105  Analysis Date = 07/13/2010 
 Lab Value = -0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20101870061  Analysis Date = 07/07/2010 
 Lab Value = -0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20101790122  Analysis Date = 07/08/2010 
 Lab Value = -0.039 
 RPT Level = 0.05 
 Lab Sample ID = 20101730069  Analysis Date = 06/23/2010 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20101660063  Analysis Date = 06/18/2010 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20101590013  Analysis Date = 06/18/2010 
 Lab Value = 0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20101530121  Analysis Date = 06/08/2010 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20101450016  Analysis Date = 06/02/2010 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20101380022  Analysis Date = 05/20/2010 
 Lab Value = -0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20101310096  Analysis Date = 05/13/2010 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20101240078  Analysis Date = 05/04/2010 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20101180040  Analysis Date = 04/29/2010 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20101090060  Analysis Date = 04/20/2010 
 Lab Value = -0.041 
 RPT Level = 0.05 
 Lab Sample ID = 20101020074  Analysis Date = 04/14/2010 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20100950035  Analysis Date = 04/02/2010 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20100880050  Analysis Date = 04/02/2010 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20100850063  Analysis Date = 03/26/2010 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20100750001  Analysis Date = 03/16/2010 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20100680015  Analysis Date = 03/05/2010 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20100600068  Analysis Date = 02/24/2010 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20100530047  Analysis Date = 02/24/2010 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20100470026  Analysis Date = 02/11/2010 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20100390037  Analysis Date = 02/11/2010 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20100320021  Analysis Date = 02/05/2010 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20100260064  Analysis Date = 01/28/2010 
 Lab Value = -0.052 
 RPT Level = 0.05 
 Lab Sample ID = 20100190104  Analysis Date = 01/28/2010 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20100110097  Analysis Date = 01/28/2010 
 Lab Value = -0.048 
 RPT Level = 0.05 
 Lab Sample ID = 20100050015  Analysis Date = 01/28/2010 
 Lab Value = -0.051 
 RPT Level = 0.05 
 Lab Sample ID = 20093620045  Analysis Date = 01/28/2010 
 Lab Value = -0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20093560035  Analysis Date = 12/23/2009 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20093480065  Analysis Date = 12/10/2009 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20093420008  Analysis Date = 12/10/2009 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20093350069  Analysis Date = 12/10/2009 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20093280016  Analysis Date = 11/25/2009 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20093200089  Analysis Date = 11/19/2009 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20093130060  Analysis Date = 11/10/2009 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20093070203  Analysis Date = 11/10/2009 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20093000108  Analysis Date = 11/04/2009 
 Lab Value = -0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20092920099  Analysis Date = 11/04/2009 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20092870072  Analysis Date = 11/02/2009 
 Lab Value = -0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20092780069  Analysis Date = 10/20/2009 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20092720021  Analysis Date = 10/16/2009 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20092640045  Analysis Date = 10/06/2009 
 Lab Value = -0.043 
 RPT Level = 0.05 
 Lab Sample ID = 20092570047  Analysis Date = 10/16/2009 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20092520131  Analysis Date = 09/24/2009 
 Lab Value = -0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20092430157  Analysis Date = 09/17/2009 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20092360172  Analysis Date = 09/10/2009 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20092290213  Analysis Date = 09/03/2009 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20092220153  Analysis Date = 08/26/2009 
 Lab Value = -0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20092150075  Analysis Date = 08/18/2009 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20092090265  Analysis Date = 08/11/2009 
 Lab Value = -0.055 
 RPT Level = 0.05 
 Lab Sample ID = 20092010113  Analysis Date = 07/24/2009 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20091950024  Analysis Date = 07/24/2009 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20091870028  Analysis Date = 07/15/2009 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20091800171  Analysis Date = 07/08/2009 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20091730221  Analysis Date = 06/24/2009 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20091660209  Analysis Date = 06/22/2009 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20091590089  Analysis Date = 06/11/2009 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20091520153  Analysis Date = 06/04/2009 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20091460191  Analysis Date = 05/29/2009 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20091380124  Analysis Date = 05/22/2009 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20091320021  Analysis Date = 05/22/2009 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20091240122  Analysis Date = 05/07/2009 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20091170108  Analysis Date = 05/01/2009 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20091110107  Analysis Date = 04/23/2009 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20091030084  Analysis Date = 04/14/2009 
 Lab Value = -0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20090960052  Analysis Date = 04/14/2009 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20090890067  Analysis Date = 04/01/2009 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20090820026  Analysis Date = 03/20/2009 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20090750045  Analysis Date = 03/19/2009 
 Lab Value = 0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20090680047  Analysis Date = 03/10/2009 
 Lab Value = -0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20090610058  Analysis Date = 02/26/2009 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20090540031  Analysis Date = 02/23/2009 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20090480056  Analysis Date = 02/18/2009 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20090400029  Analysis Date = 02/10/2009 
 Lab Value = -0.053 
 RPT Level = 0.05 
 Lab Sample ID = 20090330036  Analysis Date = 02/04/2009 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20090260025  Analysis Date = 02/04/2009 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20090200033  Analysis Date = 01/26/2009 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20090120047  Analysis Date = 01/15/2009 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20090050018  Analysis Date = 01/13/2009 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20083650082  Analysis Date = 01/13/2009 
 Lab Value = -0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20083570035  Analysis Date = 12/31/2008 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20083520228  Analysis Date = 12/15/2008 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20083450059  Analysis Date = 12/08/2008 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20083360038  Analysis Date = 12/08/2008 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20083290063  Analysis Date = 12/01/2008 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20083220066  Analysis Date = 11/24/2008 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20083150064  Analysis Date = 11/20/2008 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20083080098  Analysis Date = 11/12/2008 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20083010106  Analysis Date = 10/23/2008 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20082940060  Analysis Date = 10/21/2008 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20082880038  Analysis Date = 10/08/2008 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20082800045  Analysis Date = 10/08/2008 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20082730059  Analysis Date = 10/02/2008 
 Lab Value = -0.017 
 RPT Level = 0.03 
 Lab Sample ID = 20082660045  Analysis Date = 09/29/2008 
 Lab Value = -0.039 
 RPT Level = 0.03 
 Lab Sample ID = 20082590107  Analysis Date = 09/24/2008 
 Lab Value = -0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20082520009  Analysis Date = 09/10/2008 
 Lab Value = -0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20082460099  Analysis Date = 09/05/2008 
 Lab Value = -0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20082380078  Analysis Date = 08/25/2008 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20082310132  Analysis Date = 08/19/2008 
 Lab Value = -0.037 
 RPT Level = 0.03 
 Lab Sample ID = 20082250012  Analysis Date = 08/18/2008 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20082190010  Analysis Date = 07/25/2008 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20082030128  Analysis Date = 07/21/2008 
 Lab Value = -0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20081970138  Analysis Date = 07/14/2008 
 Lab Value = -0.02 
 RPT Level = 0.03 
 Lab Sample ID = 20081890042  Analysis Date = 07/14/2008 
 Lab Value = -0.026 
 RPT Level = 0.03 
 Lab Sample ID = 20081820062  Analysis Date = 06/27/2008 
 Lab Value = -0.015 
 RPT Level = 0.03 
 Lab Sample ID = 20081750126  Analysis Date = 06/25/2008 
 Lab Value = -0.041 
 RPT Level = 0.03 
 Lab Sample ID = 20081680068  Analysis Date = 06/18/2008 
 Lab Value = -0.033 
 RPT Level = 0.03 
 Lab Sample ID = 20081620016  Analysis Date = 06/11/2008 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20081540110  Analysis Date = 06/10/2008 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20081480070  Analysis Date = 06/02/2008 
 Lab Value = -0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20081400059  Analysis Date = 05/30/2008 
 Lab Value = -0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20081330114  Analysis Date = 05/19/2008 
 Lab Value = -0.021 
 RPT Level = 0.03 
 Lab Sample ID = 20081260069  Analysis Date = 05/07/2008 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20081190056  Analysis Date = 04/24/2008 
 Lab Value = -0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20081120035  Analysis Date = 04/21/2008 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20081050115  Analysis Date = 04/15/2008 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20080980082  Analysis Date = 04/15/2008 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20080920084  Analysis Date = 03/27/2008 
 Lab Value = -0.026 
 RPT Level = 0.03 
 Lab Sample ID = 20080840065  Analysis Date = 03/19/2008 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20080770123  Analysis Date = 03/13/2008 
 Lab Value = -0.018 
 RPT Level = 0.03 
 Lab Sample ID = 20080700073  Analysis Date = 03/07/2008 
 Lab Value = -0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20080630068  Analysis Date = 03/04/2008 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20080560071  Analysis Date = 03/10/2008 
 Lab Value = -0.046 
 RPT Level = 0.03 
 Lab Sample ID = 20080510054  Analysis Date = 03/10/2008 
 Lab Value = -0.033 
 RPT Level = 0.03 
 Lab Sample ID = 20080420073  Analysis Date = 02/28/2008 
 Lab Value = -0.025 
 RPT Level = 0.03 
 Lab Sample ID = 20080360050  Analysis Date = 02/20/2008 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20080280049  Analysis Date = 01/29/2008 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20080230019  Analysis Date = 01/17/2008 
 Lab Value = -0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20080140026  Analysis Date = 01/11/2008 
 Lab Value = -0.017 
 RPT Level = 0.03 
 Lab Sample ID = 20080070021  Analysis Date = 01/07/2008 
 Lab Value = -0.024 
 RPT Level = 0.03 
 Lab Sample ID = 20073620003  Analysis Date = 01/02/2008 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20073510100  Analysis Date = 12/17/2007 
 Lab Value = -0.017 
 RPT Level = 0.03 
 Lab Sample ID = 20073440026  Analysis Date = 12/06/2007 
 Lab Value = -0.058 
 RPT Level = 0.03 
 Lab Sample ID = 20073370067  Analysis Date = 11/28/2007 
 Lab Value = -0.027 
 RPT Level = 0.03 
 Lab Sample ID = 20073300043  Analysis Date = 11/28/2007 
 Lab Value = -0.062 
 RPT Level = 0.03 
 Lab Sample ID = 20073230112  Analysis Date = 11/19/2007 
 Lab Value = -0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20073170061  Analysis Date = 11/14/2007 
 Lab Value = -0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20073100010  Analysis Date = 11/14/2007 
 Lab Value = -0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20073020059  Analysis Date = 11/05/2007 
 Lab Value = -0.054 
 RPT Level = 0.03 
 Lab Sample ID = 20072960178  Analysis Date = 10/25/2007 
 Lab Value = -0.058 
 RPT Level = 0.03 
 Lab Sample ID = 20072890057  Analysis Date = 10/19/2007 
 Lab Value = -0.102 
 RPT Level = 0.03 
 Lab Sample ID = 20072850024  Analysis Date = 10/03/2007 
 Lab Value = -0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20072670055  Analysis Date = 09/24/2007 
 Lab Value = -0.017 
 RPT Level = 0.03 
 Lab Sample ID = 20072600128  Analysis Date = 09/17/2007 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20072540014  Analysis Date = 09/07/2007 
 Lab Value = -0.019 
 RPT Level = 0.03 
 Lab Sample ID = 20072480016  Analysis Date = 09/06/2007 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20072400019  Analysis Date = 08/29/2007 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20072330110  Analysis Date = 08/21/2007 
 Lab Value = -0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20072260199  Analysis Date = 08/14/2007 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20072210251  Analysis Date = 08/07/2007 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20072110163  Analysis Date = 08/06/2007 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20072040100  Analysis Date = 07/17/2007 
 Lab Value = -0.02 
 RPT Level = 0.03 
 Lab Sample ID = 20071900106  Analysis Date = 07/06/2007 
 Lab Value = 0.031 
 RPT Level = 0.03 
 Lab Sample ID = 20071830157  Analysis Date = 07/02/2007 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20071770202  Analysis Date = 06/21/2007 
 Lab Value = -0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20071690115  Analysis Date = 06/19/2007 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20071620049  Analysis Date = 06/08/2007 
 Lab Value = 0.017 
 RPT Level = 0.03 
 Lab Sample ID = 20071560023  Analysis Date = 06/05/2007 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20071500032  Analysis Date = 05/24/2007 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20071410090  Analysis Date = 05/16/2007 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20071340114  Analysis Date = 05/14/2007 
 Lab Value = -0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20071280017  Analysis Date = 05/07/2007 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20071200085  Analysis Date = 04/27/2007 
 Lab Value = -0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20071130123  Analysis Date = 04/19/2007 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20071070019  Analysis Date = 04/16/2007 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20070990049  Analysis Date = 04/10/2007 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20070930069  Analysis Date = 04/05/2007 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20070860216  Analysis Date = 03/21/2007 
 Lab Value = -0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20070780127  Analysis Date = 03/16/2007 
 Lab Value = 0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20070710074  Analysis Date = 03/08/2007 
 Lab Value = -0.024 
 RPT Level = 0.03 
 Lab Sample ID = 20070650012  Analysis Date = 03/05/2007 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20070580140  Analysis Date = 02/28/2007 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20070540026  Analysis Date = 02/16/2007 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20070460018  Analysis Date = 02/14/2007 
 Lab Value = -0.036 
 RPT Level = 0.03 
 Lab Sample ID = 20070400104  Analysis Date = 01/30/2007 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20070250021  Analysis Date = 01/25/2007 
 Lab Value = -0.026 
 RPT Level = 0.03 
 Lab Sample ID = 20070180073  Analysis Date = 01/25/2007 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20070120011  Analysis Date = 01/10/2007 
 Lab Value = -0.027 
 RPT Level = 0.03 
 Lab Sample ID = 20070040014  Analysis Date = 01/04/2007 
 Lab Value = 0.023 
 RPT Level = 0.03 
 Lab Sample ID = 20063610085  Analysis Date = 12/22/2006 
 Lab Value = 0.019 
 RPT Level = 0.03 
 Lab Sample ID = 20063520073  Analysis Date = 12/14/2006 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20063450082  Analysis Date = 12/08/2006 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20063380054  Analysis Date = 11/30/2006 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20063310046  Analysis Date = 11/29/2006 
 Lab Value = 0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20063240080  Analysis Date = 11/16/2006 
 Lab Value = 0.02 
 RPT Level = 0.03 
 Lab Sample ID = 20063180102  Analysis Date = 11/09/2006 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20063100081  Analysis Date = 11/09/2006 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20063030095  Analysis Date = 10/31/2006 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20062960134  Analysis Date = 10/23/2006 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20062910014  Analysis Date = 10/19/2006 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20062850013  Analysis Date = 10/19/2006 
 Lab Value = 0.04 
 RPT Level = 0.03 
 Lab Sample ID = 20062780051  Analysis Date = 10/12/2006 
 Lab Value = -0.043 
 RPT Level = 0.03 
 Lab Sample ID = 20062620014  Analysis Date = 10/10/2006 
 Lab Value = 0.029 
 RPT Level = 0.03 
 Lab Sample ID = 20062540015  Analysis Date = 10/10/2006 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20062500007  Analysis Date = 10/02/2006 
 Lab Value = 0.015 
 RPT Level = 0.03 
 Lab Sample ID = 20062350181  Analysis Date = 08/25/2006 
 Lab Value = -0.04 
 RPT Level = 0.03 
 Lab Sample ID = 20062270274  Analysis Date = 08/15/2006 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20062220040  Analysis Date = 09/06/2006 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20062020318  Analysis Date = 07/27/2006 
 Lab Value = 0.036 
 RPT Level = 0.03 
 Lab Sample ID = 20061950008  Analysis Date = 07/14/2006 
 Lab Value = -0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20061880010  Analysis Date = 07/06/2006 
 Lab Value = -0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20061730015  Analysis Date = 07/05/2006 
 Lab Value = 0.026 
 RPT Level = 0.03 
 Lab Sample ID = 20061670022  Analysis Date = 07/05/2006 
 Lab Value = 0.062 
 RPT Level = 0.03 
 Lab Sample ID = 20061580019  Analysis Date = 06/01/2006 
 Lab Value = -0.047 
 RPT Level = 0.03 
 Lab Sample ID = 20061370015  Analysis Date = 05/15/2006 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20061280112  Analysis Date = 05/15/2006 
 Lab Value = -0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20061220100  Analysis Date = 09/26/2005 
 Lab Value = -0.021 
 RPT Level = 0.03 
 Lab Sample ID = 20052590036  Analysis Date = 09/23/2005 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20052520007  Analysis Date = 09/02/2005 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20052430005  Analysis Date = 08/29/2005 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20052370001  Analysis Date = 08/25/2005 
 Lab Value = 0.042 
 RPT Level = 0.03 
 Lab Sample ID = 20052300008  Analysis Date = 08/12/2005 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20052210011  Analysis Date = 08/11/2005 
 Lab Value = -0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20052160008  Analysis Date = 08/11/2005 
 Lab Value = -0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20052160006  Analysis Date = 07/29/2005 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20052010006  Analysis Date = 07/15/2005 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20051940016  Analysis Date = 07/15/2005 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20051880017  Analysis Date = 07/05/2005 
 Lab Value = -0.015 
 RPT Level = 0.03 
 Lab Sample ID = 20051800188  Analysis Date = 06/30/2005 
 Lab Value = 0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20051740018  Analysis Date = 06/17/2005 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20051660175  Analysis Date = 06/15/2005 
 Lab Value = -0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20051590026  Analysis Date = 06/06/2005 
 Lab Value = -0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20051530020  Analysis Date = 05/27/2005 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20051440044  Analysis Date = 05/23/2005 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20051380015  Analysis Date = 05/20/2005 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20051320028  Analysis Date = 05/11/2005 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20051250004  Analysis Date = 05/10/2005 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20051170011  Analysis Date = 04/29/2005 
 Lab Value = -0.019 
 RPT Level = 0.03 
 Lab Sample ID = 20051110005  Analysis Date = 04/28/2005 
 Lab Value = -0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20051020017  Analysis Date = 04/12/2005 
 Lab Value = -0.026 
 RPT Level = 0.03 
 Lab Sample ID = 20050950045  Analysis Date = 04/05/2005 
 Lab Value = -0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20050880117  Analysis Date = 03/30/2005 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20050840097  Analysis Date = 03/21/2005 
 Lab Value = -0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20050750005  Analysis Date = 03/15/2005 
 Lab Value = -0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20050700006  Analysis Date = 03/15/2005 
 Lab Value = -0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20050700005  Analysis Date = 03/14/2005 
 Lab Value = 0.045 
 RPT Level = 0.03 
 Lab Sample ID = 20050670011  Analysis Date = 03/08/2005 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20050550023  Analysis Date = 02/24/2005 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20050480006  Analysis Date = 02/16/2005 
 Lab Value = -0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20050410008  Analysis Date = 02/14/2005 
 Lab Value = -0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20050340022  Analysis Date = 01/27/2005 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20050260023  Analysis Date = 01/26/2005 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20050200049  Analysis Date = 01/20/2005 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20050130092  Analysis Date = 01/11/2005 
 Lab Value = -0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20050070015  Analysis Date = 01/07/2005 
 Lab Value = -0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20043650003  Analysis Date = 01/07/2005 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20043580036  Analysis Date = 01/07/2005 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20043580034  Analysis Date = 12/22/2004 
 Lab Value = -0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20043520024  Analysis Date = 12/22/2004 
 Lab Value = -0.022 
 RPT Level = 0.03 
 Lab Sample ID = 20043510017  Analysis Date = 12/15/2004 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20043450068  Analysis Date = 12/15/2004 
 Lab Value = -0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20043440148  Analysis Date = 12/15/2004 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20043380004  Analysis Date = 12/15/2004 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20043380003  Analysis Date = 12/10/2004 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20043310058  Analysis Date = 12/10/2004 
 Lab Value = -0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20043280049  Analysis Date = 11/26/2004 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20043240013  Analysis Date = 09/08/2004 
 Lab Value = -0.018 
 RPT Level =  
 Lab Sample ID = 20042450137  Analysis Date = 09/01/2004 
 Lab Value = -0.023 
 RPT Level =  
 Lab Sample ID = 20042400090  Analysis Date = 09/01/2004 
 Lab Value = -0.01 
 RPT Level =  
 Lab Sample ID = 20042370106  Analysis Date = 08/25/2004 
 Lab Value = 0.009 
 RPT Level =  
 Lab Sample ID = 20042330207  Analysis Date = 08/25/2004 
 Lab Value = -0.003 
 RPT Level =  
 Lab Sample ID = 20042320135  Analysis Date = 08/25/2004 
 Lab Value = -0.004 
 RPT Level =  
 Lab Sample ID = 20042320137  Analysis Date = 08/18/2004 
 Lab Value = 0.015 
 RPT Level =  
 Lab Sample ID = 20042240113  Analysis Date = 08/10/2004 
 Lab Value = -0.01 
 RPT Level =  
 Lab Sample ID = 20042170122  Analysis Date = 08/04/2004 
 Lab Value = 0.019 
 RPT Level =  
 Lab Sample ID = 20042110014  Analysis Date = 07/27/2004 
 Lab Value = 0.004 
 RPT Level =  
 Lab Sample ID = 20042040077  Analysis Date = 07/19/2004 
 Lab Value = 0.008 
 RPT Level =  
 Lab Sample ID = 20041960049  Analysis Date = 07/15/2004 
 Lab Value = 0.002 
 RPT Level =  
 Lab Sample ID = 20041900061  Analysis Date = 07/14/2004 
 Lab Value = 0.009 
 RPT Level =  
 Lab Sample ID = 20041820034  Analysis Date = 07/06/2004 
 Lab Value = 0.005 
 RPT Level =  
 Lab Sample ID = 20041750056  Analysis Date = 07/01/2004 
 Lab Value = -0.013 
 RPT Level =  
 Lab Sample ID = 20041700082  Analysis Date = 06/21/2004 
 Lab Value = -0.02 
 RPT Level =  
 Lab Sample ID = 20041610056  Analysis Date = 06/10/2004 
 Lab Value = 0.002 
 RPT Level =  
 Lab Sample ID = 20041550020  Analysis Date = 09/22/2016 
 RPT Level = 0.05  Analysis Date = 09/19/2016 
 RPT Level = 0.05  Analysis Date = 09/19/2016 
 RPT Level = 0.05  Analysis Date = 09/14/2016 
 RPT Level = 0.05  Analysis Date = 09/14/2016 
 RPT Level = 0.05  Analysis Date = 09/06/2016 
 RPT Level = 0.05  Analysis Date = 09/06/2016 
 RPT Level = 0.05  Analysis Date = 09/09/2016 
 RPT Level = 0.05  Analysis Date = 09/09/2016 
 RPT Level = 0.05  Analysis Date = 08/24/2016 
 RPT Level = 0.05  Analysis Date = 08/24/2016 
 RPT Level = 0.05  Analysis Date = 08/18/2016 
 RPT Level = 0.05  Analysis Date = 08/18/2016 
 RPT Level = 0.05  Analysis Date = 08/09/2016 
 RPT Level = 0.05  Analysis Date = 08/09/2016 
 RPT Level = 0.05  Analysis Date = 08/03/2016 
 RPT Level = 0.05  Analysis Date = 08/03/2016 
 RPT Level = 0.05  Analysis Date = 07/28/2016 
 RPT Level = 0.05  Analysis Date = 07/28/2016 
 RPT Level = 0.05  Analysis Date = 07/18/2016 
 RPT Level = 0.05  Analysis Date = 07/18/2016 
 RPT Level = 0.05  Analysis Date = 07/07/2016 
 RPT Level = 0.05  Analysis Date = 07/07/2016 
 RPT Level = 0.05  Analysis Date = 07/01/2016 
 RPT Level = 0.05  Analysis Date = 07/01/2016 
 RPT Level = 0.05  Analysis Date = 06/27/2016 
 RPT Level = 0.05  Analysis Date = 06/27/2016 
 RPT Level = 0.05  Analysis Date = 06/15/2016 
 RPT Level = 0.05  Analysis Date = 06/15/2016 
 RPT Level = 0.05  Analysis Date = 06/08/2016 
 RPT Level = 0.05  Analysis Date = 06/08/2016 
 RPT Level = 0.05  Analysis Date = 06/02/2016 
 RPT Level = 0.05  Analysis Date = 06/02/2016 
 RPT Level = 0.05  Analysis Date = 06/01/2016 
 RPT Level = 0.05  Analysis Date = 06/01/2016 
 RPT Level = 0.05  Analysis Date = 05/10/2016 
 RPT Level = 0.05  Analysis Date = 05/10/2016 
 RPT Level = 0.05  Analysis Date = 05/04/2016 
 RPT Level = 0.05  Analysis Date = 05/04/2016 
 RPT Level = 0.05  Analysis Date = 04/28/2016 
 RPT Level = 0.05  Analysis Date = 04/28/2016 
 RPT Level = 0.05  Analysis Date = 04/20/2016 
 RPT Level = 0.05  Analysis Date = 04/20/2016 
 RPT Level = 0.05  Analysis Date = 04/15/2016 
 RPT Level = 0.05  Analysis Date = 04/15/2016 
 RPT Level = 0.05  Analysis Date = 04/06/2016 
 RPT Level = 0.05  Analysis Date = 04/06/2016 
 RPT Level = 0.05  Analysis Date = 03/30/2016 
 RPT Level = 0.05  Analysis Date = 03/30/2016 
 RPT Level = 0.05  Analysis Date = 03/25/2016 
 RPT Level = 0.05  Analysis Date = 03/25/2016 
 RPT Level = 0.05  Analysis Date = 03/16/2016 
 RPT Level = 0.05  Analysis Date = 03/16/2016 
 RPT Level = 0.05  Analysis Date = 03/09/2016 
 RPT Level = 0.05  Analysis Date = 03/09/2016 
 RPT Level = 0.05  Analysis Date = 03/02/2016 
 RPT Level = 0.05  Analysis Date = 03/02/2016 
 RPT Level = 0.05  Analysis Date = 02/26/2016 
 RPT Level = 0.05  Analysis Date = 02/26/2016 
 RPT Level = 0.05  Analysis Date = 02/18/2016 
 RPT Level = 0.05  Analysis Date = 02/18/2016 
 RPT Level = 0.05  Analysis Date = 02/12/2016 
 RPT Level = 0.05  Analysis Date = 02/12/2016 
 RPT Level = 0.05  Analysis Date = 02/05/2016 
 RPT Level = 0.05  Analysis Date = 02/05/2016 
 RPT Level = 0.05  Analysis Date = 01/26/2016 
 RPT Level = 0.05  Analysis Date = 01/26/2016 
 RPT Level = 0.05  Analysis Date = 01/25/2016 
 RPT Level = 0.05  Analysis Date = 01/25/2016 
 RPT Level = 0.05  Analysis Date = 01/12/2016 
 RPT Level = 0.05  Analysis Date = 01/12/2016 
 RPT Level = 0.05  Analysis Date = 01/11/2016 
 RPT Level = 0.05  Analysis Date = 01/11/2016 
 RPT Level = 0.05  Analysis Date = 01/05/2016 
 RPT Level = 0.05  Analysis Date = 01/05/2016 
 RPT Level = 0.05  Analysis Date = 12/24/2015 
 RPT Level = 0.05  Analysis Date = 12/24/2015 
 RPT Level = 0.05  Analysis Date = 12/17/2015 
 RPT Level = 0.05  Analysis Date = 12/17/2015 
 RPT Level = 0.05  Analysis Date = 12/11/2015 
 RPT Level = 0.05  Analysis Date = 12/11/2015 
 RPT Level = 0.05  Analysis Date = 12/02/2015 
 RPT Level = 0.05  Analysis Date = 12/02/2015 
 RPT Level = 0.05  Analysis Date = 11/25/2015 
 RPT Level = 0.05  Analysis Date = 11/25/2015 
 RPT Level = 0.05  Analysis Date = 11/18/2015 
 RPT Level = 0.05  Analysis Date = 11/18/2015 
 RPT Level = 0.05  Analysis Date = 11/16/2015 
 RPT Level = 0.05  Analysis Date = 11/16/2015 
 RPT Level = 0.05  Analysis Date = 11/10/2015 
 RPT Level = 0.05  Analysis Date = 11/10/2015 
 RPT Level = 0.05  Analysis Date = 11/02/2015 
 RPT Level = 0.05  Analysis Date = 11/02/2015 
 RPT Level = 0.05  Analysis Date = 10/22/2015 
 RPT Level = 0.05  Analysis Date = 10/22/2015 
 RPT Level = 0.05  Analysis Date = 10/19/2015 
 RPT Level = 0.05  Analysis Date = 10/19/2015 
 RPT Level = 0.05  Analysis Date = 10/09/2015 
 RPT Level = 0.05  Analysis Date = 10/09/2015 
 RPT Level = 0.05  Analysis Date = 09/30/2015 
 RPT Level = 0.05  Analysis Date = 09/30/2015 
 RPT Level = 0.05  Analysis Date = 09/30/2015 
 RPT Level = 0.05  Analysis Date = 09/30/2015 
 RPT Level = 0.05  Analysis Date = 09/22/2015 
 RPT Level = 0.05  Analysis Date = 09/22/2015 
 RPT Level = 0.05  Analysis Date = 09/17/2015 
 RPT Level = 0.05  Analysis Date = 09/17/2015 
 RPT Level = 0.05  Analysis Date = 09/09/2015 
 RPT Level = 0.05  Analysis Date = 09/09/2015 
 RPT Level = 0.05  Analysis Date = 09/02/2015 
 RPT Level = 0.05  Analysis Date = 09/02/2015 
 RPT Level = 0.05  Analysis Date = 08/28/2015 
 RPT Level = 0.05  Analysis Date = 08/28/2015 
 RPT Level = 0.05  Analysis Date = 08/17/2015 
 RPT Level = 0.05  Analysis Date = 08/17/2015 
 RPT Level = 0.05  Analysis Date = 08/11/2015 
 RPT Level = 0.05  Analysis Date = 08/11/2015 
 RPT Level = 0.05  Analysis Date = 08/03/2015 
 RPT Level = 0.05  Analysis Date = 08/03/2015 
 RPT Level = 0.05  Analysis Date = 07/24/2015 
 RPT Level = 0.05  Analysis Date = 07/24/2015 
 RPT Level = 0.05  Analysis Date = 07/16/2015 
 RPT Level = 0.05  Analysis Date = 07/16/2015 
 RPT Level = 0.05  Analysis Date = 07/14/2015 
 RPT Level = 0.05  Analysis Date = 07/14/2015 
 RPT Level = 0.05  Analysis Date = 07/08/2015 
 RPT Level = 0.05  Analysis Date = 07/08/2015 
 RPT Level = 0.05  Analysis Date = 06/23/2015 
 RPT Level = 0.05  Analysis Date = 06/23/2015 
 RPT Level = 0.05  Analysis Date = 06/18/2015 
 RPT Level = 0.05  Analysis Date = 06/18/2015 
 RPT Level = 0.05  Analysis Date = 06/16/2015 
 RPT Level = 0.05  Analysis Date = 06/16/2015 
 RPT Level = 0.05  Analysis Date = 06/05/2015 
 RPT Level = 0.05  Analysis Date = 06/05/2015 
 RPT Level = 0.05  Analysis Date = 06/01/2015 
 RPT Level = 0.05  Analysis Date = 06/01/2015 
 RPT Level = 0.05  Analysis Date = 05/21/2015 
 RPT Level = 0.05  Analysis Date = 05/21/2015 
 RPT Level = 0.05  Analysis Date = 05/18/2015 
 RPT Level = 0.05  Analysis Date = 05/18/2015 
 RPT Level = 0.05  Analysis Date = 05/08/2015 
 RPT Level = 0.05  Analysis Date = 05/08/2015 
 RPT Level = 0.05  Analysis Date = 05/05/2015 
 RPT Level = 0.05  Analysis Date = 05/05/2015 
 RPT Level = 0.05  Analysis Date = 04/29/2015 
 RPT Level = 0.05  Analysis Date = 04/29/2015 
 RPT Level = 0.05  Analysis Date = 04/22/2015 
 RPT Level = 0.05  Analysis Date = 04/22/2015 
 RPT Level = 0.05  Analysis Date = 04/13/2015 
 RPT Level = 0.05  Analysis Date = 04/13/2015 
 RPT Level = 0.05  Analysis Date = 04/13/2015 
 RPT Level = 0.05  Analysis Date = 04/13/2015 
 RPT Level = 0.05  Analysis Date = 03/31/2015 
 RPT Level = 0.05  Analysis Date = 03/31/2015 
 RPT Level = 0.05  Analysis Date = 03/27/2015 
 RPT Level = 0.05  Analysis Date = 03/27/2015 
 RPT Level = 0.05  Analysis Date = 03/19/2015 
 RPT Level = 0.05  Analysis Date = 03/19/2015 
 RPT Level = 0.05  Analysis Date = 03/11/2015 
 RPT Level = 0.05  Analysis Date = 03/11/2015 
 RPT Level = 0.05  Analysis Date = 03/06/2015 
 RPT Level = 0.05  Analysis Date = 03/06/2015 
 RPT Level = 0.05  Analysis Date = 03/02/2015 
 RPT Level = 0.05  Analysis Date = 03/02/2015 
 RPT Level = 0.05  Analysis Date = 02/24/2015 
 RPT Level = 0.05  Analysis Date = 02/24/2015 
 RPT Level = 0.05  Analysis Date = 02/25/2015 
 RPT Level = 0.05  Analysis Date = 02/25/2015 
 RPT Level = 0.05  Analysis Date = 02/10/2015 
 RPT Level = 0.05  Analysis Date = 02/10/2015 
 RPT Level = 0.05  Analysis Date = 02/11/2015 
 RPT Level = 0.05  Analysis Date = 02/11/2015 
 RPT Level = 0.05  Analysis Date = 01/21/2015 
 RPT Level = 0.05  Analysis Date = 01/21/2015 
 RPT Level = 0.05  Analysis Date = 01/15/2015 
 RPT Level = 0.05  Analysis Date = 01/15/2015 
 RPT Level = 0.05  Analysis Date = 01/08/2015 
 RPT Level = 0.05  Analysis Date = 01/08/2015 
 RPT Level = 0.05  Analysis Date = 01/08/2015 
 RPT Level = 0.05  Analysis Date = 01/08/2015 
 RPT Level = 0.05  Analysis Date = 12/31/2014 
 RPT Level = 0.05  Analysis Date = 12/31/2014 
 RPT Level = 0.05  Analysis Date = 12/16/2014 
 RPT Level = 0.05  Analysis Date = 12/16/2014 
 RPT Level = 0.05  Analysis Date = 12/18/2014 
 RPT Level = 0.05  Analysis Date = 12/18/2014 
 RPT Level = 0.05  Analysis Date = 12/12/2014 
 RPT Level = 0.05  Analysis Date = 12/12/2014 
 RPT Level = 0.05  Analysis Date = 12/05/2014 
 RPT Level = 0.05  Analysis Date = 12/05/2014 
 RPT Level = 0.05  Analysis Date = 11/25/2014 
 RPT Level = 0.05  Analysis Date = 11/25/2014 
 RPT Level = 0.05  Analysis Date = 11/13/2014 
 RPT Level = 0.05  Analysis Date = 11/13/2014 
 RPT Level = 0.05  Analysis Date = 11/04/2014 
 RPT Level = 0.05  Analysis Date = 11/04/2014 
 RPT Level = 0.05  Analysis Date = 11/04/2014 
 RPT Level = 0.05  Analysis Date = 11/04/2014 
 RPT Level = 0.05  Analysis Date = 10/24/2014 
 RPT Level = 0.05  Analysis Date = 10/24/2014 
 RPT Level = 0.05  Analysis Date = 10/17/2014 
 RPT Level = 0.05  Analysis Date = 10/17/2014 
 RPT Level = 0.05  Analysis Date = 10/08/2014 
 RPT Level = 0.05  Analysis Date = 10/08/2014 
 RPT Level = 0.05  Analysis Date = 10/07/2014 
 RPT Level = 0.05  Analysis Date = 10/07/2014 
 RPT Level = 0.05  Analysis Date = 10/02/2014 
 RPT Level = 0.05  Analysis Date = 10/02/2014 
 RPT Level = 0.05  Analysis Date = 09/19/2014 
 RPT Level = 0.05  Analysis Date = 09/19/2014 
 RPT Level = 0.05  Analysis Date = 09/12/2014 
 RPT Level = 0.05  Analysis Date = 09/12/2014 
 RPT Level = 0.05  Analysis Date = 08/22/2014 
 RPT Level = 0.05  Analysis Date = 08/22/2014 
 RPT Level = 0.05  Analysis Date = 08/20/2014 
 RPT Level = 0.05  Analysis Date = 08/20/2014 
 RPT Level = 0.05  Analysis Date = 08/15/2014 
 RPT Level = 0.05  Analysis Date = 08/15/2014 
 RPT Level = 0.05  Analysis Date = 08/06/2014 
 RPT Level = 0.05  Analysis Date = 08/06/2014 
 RPT Level = 0.05  Analysis Date = 07/28/2014 
 RPT Level = 0.05  Analysis Date = 07/28/2014 
 RPT Level = 0.05  Analysis Date = 07/16/2014 
 RPT Level = 0.05  Analysis Date = 07/16/2014 
 RPT Level = 0.05  Analysis Date = 07/10/2014 
 RPT Level = 0.05  Analysis Date = 07/10/2014 
 RPT Level = 0.05  Analysis Date = 07/10/2014 
 RPT Level = 0.05  Analysis Date = 07/10/2014 
 RPT Level = 0.05  Analysis Date = 07/09/2014 
 RPT Level = 0.05  Analysis Date = 07/09/2014 
 RPT Level = 0.05  Analysis Date = 07/08/2014 
 RPT Level = 0.05  Analysis Date = 07/08/2014 
 RPT Level = 0.05  Analysis Date = 06/27/2014 
 RPT Level = 0.05  Analysis Date = 06/27/2014 
 RPT Level = 0.05  Analysis Date = 06/18/2014 
 RPT Level = 0.05  Analysis Date = 06/18/2014 
 RPT Level = 0.05  Analysis Date = 06/06/2014 
 RPT Level = 0.05  Analysis Date = 06/06/2014 
 RPT Level = 0.05  Analysis Date = 06/10/2014 
 RPT Level = 0.05  Analysis Date = 06/10/2014 
 RPT Level = 0.05  Analysis Date = 05/16/2014 
 RPT Level = 0.05  Analysis Date = 05/16/2014 
 RPT Level = 0.05  Analysis Date = 05/16/2014 
 RPT Level = 0.05  Analysis Date = 05/16/2014 
 RPT Level = 0.05  Analysis Date = 05/07/2014 
 RPT Level = 0.05  Analysis Date = 05/07/2014 
 RPT Level = 0.05  Analysis Date = 04/18/2014 
 RPT Level = 0.05  Analysis Date = 04/18/2014 
 RPT Level = 0.05  Analysis Date = 04/17/2014 
 RPT Level = 0.05  Analysis Date = 04/17/2014 
 RPT Level = 0.05  Analysis Date = 04/11/2014 
 RPT Level = 0.05  Analysis Date = 04/11/2014 
 RPT Level = 0.05  Analysis Date = 04/01/2014 
 RPT Level = 0.05  Analysis Date = 04/01/2014 
 RPT Level = 0.05  Analysis Date = 03/25/2014 
 RPT Level = 0.05  Analysis Date = 03/25/2014 
 RPT Level = 0.05  Analysis Date = 03/21/2014 
 RPT Level = 0.05  Analysis Date = 03/21/2014 
 RPT Level = 0.05  Analysis Date = 03/21/2014 
 RPT Level = 0.05  Analysis Date = 03/21/2014 
 RPT Level = 0.05  Analysis Date = 03/04/2014 
 RPT Level = 0.05  Analysis Date = 03/04/2014 
 RPT Level = 0.05  Analysis Date = 03/04/2014 
 RPT Level = 0.05  Analysis Date = 03/04/2014 
 RPT Level = 0.05  Analysis Date = 02/13/2014 
 RPT Level = 0.05  Analysis Date = 02/13/2014 
 RPT Level = 0.05  Analysis Date = 02/18/2014 
 RPT Level = 0.05  Analysis Date = 02/18/2014 
 RPT Level = 0.05  Analysis Date = 02/10/2014 
 RPT Level = 0.05  Analysis Date = 02/10/2014 
 RPT Level = 0.05  Analysis Date = 02/10/2014 
 RPT Level = 0.05  Analysis Date = 02/10/2014 
 RPT Level = 0.05  Analysis Date = 02/07/2014 
 RPT Level = 0.05  Analysis Date = 02/07/2014 
 RPT Level = 0.05  Analysis Date = 02/07/2014 
 RPT Level = 0.05  Analysis Date = 02/07/2014 
 RPT Level = 0.05  Analysis Date = 01/09/2014 
 RPT Level = 0.05  Analysis Date = 01/09/2014 
 RPT Level = 0.05  Analysis Date = 01/03/2014 
 RPT Level = 0.05  Analysis Date = 01/03/2014 
 RPT Level = 0.05  Analysis Date = 12/12/2013 
 RPT Level = 0.05  Analysis Date = 12/12/2013 
 RPT Level = 0.05  Analysis Date = 12/05/2013 
 RPT Level = 0.05  Analysis Date = 12/05/2013 
 RPT Level = 0.05  Analysis Date = 12/05/2013 
 RPT Level = 0.05  Analysis Date = 12/05/2013 
 RPT Level = 0.05  Analysis Date = 11/26/2013 
 RPT Level = 0.05  Analysis Date = 11/26/2013 
 RPT Level = 0.05  Analysis Date = 11/20/2013 
 RPT Level = 0.05  Analysis Date = 11/20/2013 
 RPT Level = 0.05  Analysis Date = 11/15/2013 
 RPT Level = 0.05  Analysis Date = 11/15/2013 
 RPT Level = 0.05  Analysis Date = 11/06/2013 
 RPT Level = 0.05  Analysis Date = 11/06/2013 
 RPT Level = 0.05  Analysis Date = 11/01/2013 
 RPT Level = 0.05  Analysis Date = 11/01/2013 
 RPT Level = 0.05  Analysis Date = 10/28/2013 
 RPT Level = 0.05  Analysis Date = 10/28/2013 
 RPT Level = 0.05  Analysis Date = 10/29/2013 
 RPT Level = 0.05  Analysis Date = 10/29/2013 
 RPT Level = 0.05  Analysis Date = 10/24/2013 
 RPT Level = 0.05  Analysis Date = 10/24/2013 
 RPT Level = 0.05  Analysis Date = 09/24/2013 
 RPT Level = 0.05  Analysis Date = 09/24/2013 
 RPT Level = 0.05  Analysis Date = 09/05/2013 
 RPT Level = 0.05  Analysis Date = 09/05/2013 
 RPT Level = 0.05  Analysis Date = 09/05/2013 
 RPT Level = 0.05  Analysis Date = 09/05/2013 
 RPT Level = 0.05  Analysis Date = 09/04/2013 
 RPT Level = 0.05  Analysis Date = 09/04/2013 
 RPT Level = 0.05  Analysis Date = 09/03/2013 
 RPT Level = 0.05  Analysis Date = 09/03/2013 
 RPT Level = 0.05  Analysis Date = 08/21/2013 
 RPT Level = 0.05  Analysis Date = 08/21/2013 
 RPT Level = 0.05  Analysis Date = 08/27/2013 
 RPT Level = 0.05  Analysis Date = 08/27/2013 
 RPT Level = 0.05  Analysis Date = 08/14/2013 
 RPT Level = 0.05  Analysis Date = 08/14/2013 
 RPT Level = 0.05  Analysis Date = 07/24/2013 
 RPT Level = 0.05  Analysis Date = 07/24/2013 
 RPT Level = 0.05  Analysis Date = 07/16/2013 
 RPT Level = 0.05  Analysis Date = 07/16/2013 
 RPT Level = 0.05  Analysis Date = 07/16/2013 
 RPT Level = 0.05  Analysis Date = 07/16/2013 
 RPT Level = 0.05  Analysis Date = 07/10/2013 
 RPT Level = 0.05  Analysis Date = 07/10/2013 
 RPT Level = 0.05  Analysis Date = 06/28/2013 
 RPT Level = 0.05  Analysis Date = 06/28/2013 
 RPT Level = 0.05  Analysis Date = 06/26/2013 
 RPT Level = 0.05  Analysis Date = 06/26/2013 
 RPT Level = 0.05  Analysis Date = 06/19/2013 
 RPT Level = 0.05  Analysis Date = 06/19/2013 
 RPT Level = 0.05  Analysis Date = 06/11/2013 
 RPT Level = 0.05  Analysis Date = 06/11/2013 
 RPT Level = 0.05  Analysis Date = 06/11/2013 
 RPT Level = 0.05  Analysis Date = 06/11/2013 
 RPT Level = 0.05  Analysis Date = 05/28/2013 
 RPT Level = 0.05  Analysis Date = 05/28/2013 
 RPT Level = 0.05  Analysis Date = 05/28/2013 
 RPT Level = 0.05  Analysis Date = 05/28/2013 
 RPT Level = 0.05  Analysis Date = 05/13/2013 
 RPT Level = 0.05  Analysis Date = 05/13/2013 
 RPT Level = 0.05  Analysis Date = 05/07/2013 
 RPT Level = 0.05  Analysis Date = 05/07/2013 
 RPT Level = 0.05  Analysis Date = 05/13/2013 
 RPT Level = 0.05  Analysis Date = 05/13/2013 
 RPT Level = 0.05  Analysis Date = 05/03/2013 
 RPT Level = 0.05  Analysis Date = 05/03/2013 
 RPT Level = 0.05  Analysis Date = 04/12/2013 
 RPT Level = 0.05  Analysis Date = 04/12/2013 
 RPT Level = 0.05  Analysis Date = 04/08/2013 
 RPT Level = 0.05  Analysis Date = 04/08/2013 
 RPT Level = 0.05  Analysis Date = 04/08/2013 
 RPT Level = 0.05  Analysis Date = 04/08/2013 
 RPT Level = 0.05  Analysis Date = 03/18/2013 
 RPT Level = 0.05  Analysis Date = 03/18/2013 
 RPT Level = 0.05  Analysis Date = 03/07/2013 
 RPT Level = 0.05  Analysis Date = 03/07/2013 
 RPT Level = 0.05  Analysis Date = 03/07/2013 
 RPT Level = 0.05  Analysis Date = 03/07/2013 
 RPT Level = 0.05  Analysis Date = 03/07/2013 
 RPT Level = 0.05  Analysis Date = 03/07/2013 
 RPT Level = 0.05  Analysis Date = 02/28/2013 
 RPT Level = 0.05  Analysis Date = 02/28/2013 
 RPT Level = 0.05  Analysis Date = 02/22/2013 
 RPT Level = 0.05  Analysis Date = 02/22/2013 
 RPT Level = 0.05  Analysis Date = 02/07/2013 
 RPT Level = 0.05  Analysis Date = 02/07/2013 
 RPT Level = 0.05  Analysis Date = 02/07/2013 
 RPT Level = 0.05  Analysis Date = 02/07/2013 
 RPT Level = 0.05  Analysis Date = 01/29/2013 
 RPT Level = 0.05  Analysis Date = 01/29/2013 
 RPT Level = 0.05  Analysis Date = 01/11/2013 
 RPT Level = 0.05  Analysis Date = 01/11/2013 
 RPT Level = 0.05  Analysis Date = 01/11/2013 
 RPT Level = 0.05  Analysis Date = 01/11/2013 
 RPT Level = 0.05  Analysis Date = 01/11/2013 
 RPT Level = 0.05  Analysis Date = 01/11/2013 
 RPT Level = 0.05  Analysis Date = 01/14/2013 
 RPT Level = 0.05  Analysis Date = 01/14/2013 
 RPT Level = 0.05  Analysis Date = 01/08/2013 
 RPT Level = 0.05  Analysis Date = 01/08/2013 
 RPT Level = 0.05  Analysis Date = 01/04/2013 
 RPT Level = 0.05  Analysis Date = 01/04/2013 
 RPT Level = 0.05  Analysis Date = 01/04/2013 
 RPT Level = 0.05  Analysis Date = 01/04/2013 
 RPT Level = 0.05  Analysis Date = 12/12/2012 
 RPT Level = 0.05  Analysis Date = 12/12/2012 
 RPT Level = 0.05  Analysis Date = 12/12/2012 
 RPT Level = 0.05  Analysis Date = 12/12/2012 
 RPT Level = 0.05  Analysis Date = 11/29/2012 
 RPT Level = 0.05  Analysis Date = 11/29/2012 
 RPT Level = 0.05  Analysis Date = 11/13/2012 
 RPT Level = 0.05  Analysis Date = 11/13/2012 
 RPT Level = 0.05  Analysis Date = 11/05/2012 
 RPT Level = 0.05  Analysis Date = 11/05/2012 
 RPT Level = 0.05  Analysis Date = 10/25/2012 
 RPT Level = 0.05  Analysis Date = 10/25/2012 
 RPT Level = 0.05  Analysis Date = 10/19/2012 
 RPT Level = 0.05  Analysis Date = 10/19/2012 
 RPT Level = 0.05  Analysis Date = 10/12/2012 
 RPT Level = 0.05  Analysis Date = 10/12/2012 
 RPT Level = 0.05  Analysis Date = 10/11/2012 
 RPT Level = 0.05  Analysis Date = 10/11/2012 
 RPT Level = 0.05  Analysis Date = 10/11/2012 
 RPT Level = 0.05  Analysis Date = 10/11/2012 
 RPT Level = 0.05  Analysis Date = 09/25/2012 
 RPT Level = 0.05  Analysis Date = 09/25/2012 
 RPT Level = 0.05  Analysis Date = 09/21/2012 
 RPT Level = 0.05  Analysis Date = 09/21/2012 
 RPT Level = 0.05  Analysis Date = 09/21/2012 
 RPT Level = 0.05  Analysis Date = 09/21/2012 
 RPT Level = 0.05  Analysis Date = 09/07/2012 
 RPT Level = 0.05  Analysis Date = 09/07/2012 
 RPT Level = 0.05  Analysis Date = 08/30/2012 
 RPT Level = 0.05  Analysis Date = 08/30/2012 
 RPT Level = 0.05  Analysis Date = 08/15/2012 
 RPT Level = 0.05  Analysis Date = 08/15/2012 
 RPT Level = 0.05  Analysis Date = 08/10/2012 
 RPT Level = 0.05  Analysis Date = 08/10/2012 
 RPT Level = 0.05  Analysis Date = 08/09/2012 
 RPT Level = 0.05  Analysis Date = 08/09/2012 
 RPT Level = 0.05  Analysis Date = 08/01/2012 
 RPT Level = 0.05  Analysis Date = 08/01/2012 
 RPT Level = 0.05  Analysis Date = 07/31/2012 
 RPT Level = 0.05  Analysis Date = 07/31/2012 
 RPT Level = 0.05  Analysis Date = 07/31/2012 
 RPT Level = 0.05  Analysis Date = 07/31/2012 
 RPT Level = 0.05  Analysis Date = 07/18/2012 
 RPT Level = 0.05  Analysis Date = 07/18/2012 
 RPT Level = 0.05  Analysis Date = 07/16/2012 
 RPT Level = 0.05  Analysis Date = 07/16/2012 
 RPT Level = 0.05  Analysis Date = 06/25/2012 
 RPT Level = 0.05  Analysis Date = 06/25/2012 
 RPT Level = 0.05  Analysis Date = 06/21/2012 
 RPT Level = 0.05  Analysis Date = 06/21/2012 
 RPT Level = 0.05  Analysis Date = 06/19/2012 
 RPT Level = 0.05  Analysis Date = 06/19/2012 
 RPT Level = 0.05  Analysis Date = 06/01/2012 
 RPT Level = 0.05  Analysis Date = 06/01/2012 
 RPT Level = 0.05  Analysis Date = 05/31/2012 
 RPT Level = 0.05  Analysis Date = 05/31/2012 
 RPT Level = 0.05  Analysis Date = 05/22/2012 
 RPT Level = 0.05  Analysis Date = 05/22/2012 
 RPT Level = 0.05  Analysis Date = 05/17/2012 
 RPT Level = 0.05  Analysis Date = 05/17/2012 
 RPT Level = 0.05  Analysis Date = 05/02/2012 
 RPT Level = 0.05  Analysis Date = 05/02/2012 
 RPT Level = 0.05  Analysis Date = 04/25/2012 
 RPT Level = 0.05  Analysis Date = 04/25/2012 
 RPT Level = 0.05  Analysis Date = 04/20/2012 
 RPT Level = 0.05  Analysis Date = 04/20/2012 
 RPT Level = 0.05  Analysis Date = 04/17/2012 
 RPT Level = 0.05  Analysis Date = 04/17/2012 
 RPT Level = 0.05  Analysis Date = 04/03/2012 
 RPT Level = 0.05  Analysis Date = 04/03/2012 
 RPT Level = 0.05  Analysis Date = 03/23/2012 
 RPT Level = 0.05  Analysis Date = 03/23/2012 
 RPT Level = 0.05  Analysis Date = 03/28/2012 
 RPT Level = 0.05  Analysis Date = 03/28/2012 
 RPT Level = 0.05  Analysis Date = 04/25/2012 
 RPT Level = 0.05  Analysis Date = 04/25/2012 
 RPT Level = 0.05  Analysis Date = 03/16/2012 
 RPT Level = 0.05  Analysis Date = 03/16/2012 
 RPT Level = 0.05  Analysis Date = 03/23/2012 
 RPT Level = 0.05  Analysis Date = 03/23/2012 
 RPT Level = 0.05  Analysis Date = 03/09/2012 
 RPT Level = 0.05  Analysis Date = 03/09/2012 
 RPT Level = 0.05  Analysis Date = 02/23/2012 
 RPT Level = 0.05  Analysis Date = 02/23/2012 
 RPT Level = 0.05  Analysis Date = 02/10/2012 
 RPT Level = 0.05  Analysis Date = 02/10/2012 
 RPT Level = 0.05  Analysis Date = 01/26/2012 
 RPT Level = 0.05  Analysis Date = 01/26/2012 
 RPT Level = 0.05  Analysis Date = 01/26/2012 
 RPT Level = 0.05  Analysis Date = 01/26/2012 
 RPT Level = 0.05  Analysis Date = 01/12/2012 
 RPT Level = 0.05  Analysis Date = 01/12/2012 
 RPT Level = 0.05  Analysis Date = 01/12/2012 
 RPT Level = 0.05  Analysis Date = 01/12/2012 
 RPT Level = 0.05  Analysis Date = 01/04/2012 
 RPT Level = 0.05  Analysis Date = 01/04/2012 
 RPT Level = 0.05  Analysis Date = 12/28/2011 
 RPT Level = 0.05  Analysis Date = 12/28/2011 
 RPT Level = 0.05  Analysis Date = 12/28/2011 
 RPT Level = 0.05  Analysis Date = 12/28/2011 
 RPT Level = 0.05  Analysis Date = 12/28/2011 
 RPT Level = 0.05  Analysis Date = 12/28/2011 
 RPT Level = 0.05  Analysis Date = 12/13/2011 
 RPT Level = 0.05  Analysis Date = 12/13/2011 
 RPT Level = 0.05  Analysis Date = 12/13/2011 
 RPT Level = 0.05  Analysis Date = 12/13/2011 
 RPT Level = 0.05  Analysis Date = 11/30/2011 
 RPT Level = 0.05  Analysis Date = 11/30/2011 
 RPT Level = 0.05  Analysis Date = 11/30/2011 
 RPT Level = 0.05  Analysis Date = 11/30/2011 
 RPT Level = 0.05  Analysis Date = 11/21/2011 
 RPT Level = 0.05  Analysis Date = 11/21/2011 
 RPT Level = 0.05  Analysis Date = 11/01/2011 
 RPT Level = 0.05  Analysis Date = 11/01/2011 
 RPT Level = 0.05  Analysis Date = 10/25/2011 
 RPT Level = 0.05  Analysis Date = 10/25/2011 
 RPT Level = 0.05  Analysis Date = 10/19/2011 
 RPT Level = 0.05  Analysis Date = 10/19/2011 
 RPT Level = 0.05  Analysis Date = 10/13/2011 
 RPT Level = 0.05  Analysis Date = 10/13/2011 
 RPT Level = 0.05  Analysis Date = 10/05/2011 
 RPT Level = 0.05  Analysis Date = 10/05/2011 
 RPT Level = 0.05  Analysis Date = 09/27/2011 
 RPT Level = 0.05  Analysis Date = 09/27/2011 
 RPT Level = 0.05  Analysis Date = 09/19/2011 
 RPT Level = 0.05  Analysis Date = 09/19/2011 
 RPT Level = 0.05  Analysis Date = 09/19/2011 
 RPT Level = 0.05  Analysis Date = 09/19/2011 
 RPT Level = 0.05  Analysis Date = 09/19/2011 
 RPT Level = 0.05  Analysis Date = 09/19/2011 
 RPT Level = 0.05  Analysis Date = 08/31/2011 
 RPT Level = 0.05  Analysis Date = 08/31/2011 
 RPT Level = 0.05  Analysis Date = 08/31/2011 
 RPT Level = 0.05  Analysis Date = 08/31/2011 
 RPT Level = 0.05  Analysis Date = 08/16/2011 
 RPT Level = 0.05  Analysis Date = 08/16/2011 
 RPT Level = 0.05  Analysis Date = 08/04/2011 
 RPT Level = 0.05  Analysis Date = 08/04/2011 
 RPT Level = 0.05  Analysis Date = 08/03/2011 
 RPT Level = 0.05  Analysis Date = 08/03/2011 
 RPT Level = 0.05  Analysis Date = 08/04/2011 
 RPT Level = 0.05  Analysis Date = 08/04/2011 
 RPT Level = 0.05  Analysis Date = 07/22/2011 
 RPT Level = 0.05  Analysis Date = 07/22/2011 
 RPT Level = 0.05  Analysis Date = 07/15/2011 
 RPT Level = 0.05  Analysis Date = 07/15/2011 
 RPT Level = 0.05  Analysis Date = 07/06/2011 
 RPT Level = 0.05  Analysis Date = 07/06/2011 
 RPT Level = 0.05  Analysis Date = 06/24/2011 
 RPT Level = 0.05  Analysis Date = 06/24/2011 
 RPT Level = 0.05  Analysis Date = 06/17/2011 
 RPT Level = 0.05  Analysis Date = 06/17/2011 
 RPT Level = 0.05  Analysis Date = 06/13/2011 
 RPT Level = 0.05  Analysis Date = 06/13/2011 
 RPT Level = 0.05  Analysis Date = 06/06/2011 
 RPT Level = 0.05  Analysis Date = 06/06/2011 
 RPT Level = 0.05  Analysis Date = 05/31/2011 
 RPT Level = 0.05  Analysis Date = 05/31/2011 
 RPT Level = 0.05  Analysis Date = 05/18/2011 
 RPT Level = 0.05  Analysis Date = 05/18/2011 
 RPT Level = 0.05  Analysis Date = 05/12/2011 
 RPT Level = 0.05  Analysis Date = 05/12/2011 
 RPT Level = 0.05  Analysis Date = 05/12/2011 
 RPT Level = 0.05  Analysis Date = 05/12/2011 
 RPT Level = 0.05  Analysis Date = 04/29/2011 
 RPT Level = 0.05  Analysis Date = 04/29/2011 
 RPT Level = 0.05  Analysis Date = 04/22/2011 
 RPT Level = 0.05  Analysis Date = 04/22/2011 
 RPT Level = 0.05  Analysis Date = 04/13/2011 
 RPT Level = 0.05  Analysis Date = 04/13/2011 
 RPT Level = 0.05  Analysis Date = 04/08/2011 
 RPT Level = 0.05  Analysis Date = 04/08/2011 
 RPT Level = 0.05  Analysis Date = 04/07/2011 
 RPT Level = 0.05  Analysis Date = 04/07/2011 
 RPT Level = 0.05  Analysis Date = 03/29/2011 
 RPT Level = 0.05  Analysis Date = 03/29/2011 
 RPT Level = 0.05  Analysis Date = 03/23/2011 
 RPT Level = 0.05  Analysis Date = 03/23/2011 
 RPT Level = 0.05  Analysis Date = 03/11/2011 
 RPT Level = 0.05  Analysis Date = 03/11/2011 
 RPT Level = 0.05  Analysis Date = 03/18/2011 
 RPT Level = 0.05  Analysis Date = 03/18/2011 
 RPT Level = 0.05  Analysis Date = 03/09/2011 
 RPT Level = 0.05  Analysis Date = 03/09/2011 
 RPT Level = 0.05  Analysis Date = 02/17/2011 
 RPT Level = 0.05  Analysis Date = 02/17/2011 
 RPT Level = 0.05  Analysis Date = 02/17/2011 
 RPT Level = 0.05  Analysis Date = 02/17/2011 
 RPT Level = 0.05  Analysis Date = 02/11/2011 
 RPT Level = 0.05  Analysis Date = 02/11/2011 
 RPT Level = 0.05  Analysis Date = 01/28/2011 
 RPT Level = 0.05  Analysis Date = 01/28/2011 
 RPT Level = 0.05  Analysis Date = 01/26/2011 
 RPT Level = 0.05  Analysis Date = 01/26/2011 
 RPT Level = 0.05  Analysis Date = 01/26/2011 
 RPT Level = 0.05  Analysis Date = 01/26/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 12/21/2010 
 RPT Level = 0.05  Analysis Date = 12/21/2010 
 RPT Level = 0.05  Analysis Date = 12/17/2010 
 RPT Level = 0.05  Analysis Date = 12/17/2010 
 RPT Level = 0.05  Analysis Date = 12/09/2010 
 RPT Level = 0.05  Analysis Date = 12/09/2010 
 RPT Level = 0.05  Analysis Date = 12/02/2010 
 RPT Level = 0.05  Analysis Date = 12/02/2010 
 RPT Level = 0.05  Analysis Date = 11/23/2010 
 RPT Level = 0.05  Analysis Date = 11/23/2010 
 RPT Level = 0.05  Analysis Date = 11/23/2010 
 RPT Level = 0.05  Analysis Date = 11/23/2010 
 RPT Level = 0.05  Analysis Date = 11/10/2010 
 RPT Level = 0.05  Analysis Date = 11/10/2010 
 RPT Level = 0.05  Analysis Date = 11/03/2010 
 RPT Level = 0.05  Analysis Date = 11/03/2010 
 RPT Level = 0.05  Analysis Date = 10/28/2010 
 RPT Level = 0.05  Analysis Date = 10/28/2010 
 RPT Level = 0.05  Analysis Date = 10/19/2010 
 RPT Level = 0.05  Analysis Date = 10/19/2010 
 RPT Level = 0.05  Analysis Date = 10/14/2010 
 RPT Level = 0.05  Analysis Date = 10/14/2010 
 RPT Level = 0.05  Analysis Date = 10/14/2010 
 RPT Level = 0.05  Analysis Date = 10/14/2010 
 RPT Level = 0.05  Analysis Date = 09/30/2010 
 RPT Level = 0.05  Analysis Date = 09/30/2010 
 RPT Level = 0.05  Analysis Date = 09/23/2010 
 RPT Level = 0.05  Analysis Date = 09/23/2010 
 RPT Level = 0.05  Analysis Date = 09/16/2010 
 RPT Level = 0.05  Analysis Date = 09/16/2010 
 RPT Level = 0.05  Analysis Date = 09/10/2010 
 RPT Level = 0.05  Analysis Date = 09/10/2010 
 RPT Level = 0.05  Analysis Date = 09/02/2010 
 RPT Level = 0.05  Analysis Date = 09/02/2010 
 RPT Level = 0.05  Analysis Date = 08/19/2010 
 RPT Level = 0.05  Analysis Date = 08/19/2010 
 RPT Level = 0.05  Analysis Date = 08/18/2010 
 RPT Level = 0.05  Analysis Date = 08/18/2010 
 RPT Level = 0.05  Analysis Date = 08/12/2010 
 RPT Level = 0.05  Analysis Date = 08/12/2010 
 RPT Level = 0.05  Analysis Date = 08/04/2010 
 RPT Level = 0.05  Analysis Date = 08/04/2010 
 RPT Level = 0.05  Analysis Date = 07/27/2010 
 RPT Level = 0.05  Analysis Date = 07/27/2010 
 RPT Level = 0.05  Analysis Date = 07/20/2010 
 RPT Level = 0.05  Analysis Date = 07/20/2010 
 RPT Level = 0.05  Analysis Date = 07/13/2010 
 RPT Level = 0.05  Analysis Date = 07/13/2010 
 RPT Level = 0.05  Analysis Date = 07/07/2010 
 RPT Level = 0.05  Analysis Date = 07/07/2010 
 RPT Level = 0.05  Analysis Date = 07/08/2010 
 RPT Level = 0.05  Analysis Date = 07/08/2010 
 RPT Level = 0.05  Analysis Date = 06/23/2010 
 RPT Level = 0.05  Analysis Date = 06/23/2010 
 RPT Level = 0.05  Analysis Date = 06/18/2010 
 RPT Level = 0.05  Analysis Date = 06/18/2010 
 RPT Level = 0.05  Analysis Date = 06/18/2010 
 RPT Level = 0.05  Analysis Date = 06/18/2010 
 RPT Level = 0.05  Analysis Date = 06/08/2010 
 RPT Level = 0.05  Analysis Date = 06/08/2010 
 RPT Level = 0.05  Analysis Date = 06/02/2010 
 RPT Level = 0.05  Analysis Date = 06/02/2010 
 RPT Level = 0.05  Analysis Date = 05/20/2010 
 RPT Level = 0.05  Analysis Date = 05/20/2010 
 RPT Level = 0.05  Analysis Date = 05/13/2010 
 RPT Level = 0.05  Analysis Date = 05/13/2010 
 RPT Level = 0.05  Analysis Date = 05/04/2010 
 RPT Level = 0.05  Analysis Date = 05/04/2010 
 RPT Level = 0.05  Analysis Date = 04/29/2010 
 RPT Level = 0.05  Analysis Date = 04/29/2010 
 RPT Level = 0.05  Analysis Date = 04/20/2010 
 RPT Level = 0.05  Analysis Date = 04/20/2010 
 RPT Level = 0.05  Analysis Date = 04/14/2010 
 RPT Level = 0.05  Analysis Date = 04/14/2010 
 RPT Level = 0.05  Analysis Date = 04/02/2010 
 RPT Level = 0.05  Analysis Date = 04/02/2010 
 RPT Level = 0.05  Analysis Date = 04/02/2010 
 RPT Level = 0.05  Analysis Date = 04/02/2010 
 RPT Level = 0.05  Analysis Date = 03/26/2010 
 RPT Level = 0.05  Analysis Date = 03/26/2010 
 RPT Level = 0.05  Analysis Date = 03/16/2010 
 RPT Level = 0.05  Analysis Date = 03/16/2010 
 RPT Level = 0.05  Analysis Date = 03/05/2010 
 RPT Level = 0.05  Analysis Date = 03/05/2010 
 RPT Level = 0.05  Analysis Date = 02/24/2010 
 RPT Level = 0.05  Analysis Date = 02/24/2010 
 RPT Level = 0.05  Analysis Date = 02/24/2010 
 RPT Level = 0.05  Analysis Date = 02/24/2010 
 RPT Level = 0.05  Analysis Date = 02/11/2010 
 RPT Level = 0.05  Analysis Date = 02/11/2010 
 RPT Level = 0.05  Analysis Date = 02/11/2010 
 RPT Level = 0.05  Analysis Date = 02/11/2010 
 RPT Level = 0.05  Analysis Date = 02/05/2010 
 RPT Level = 0.05  Analysis Date = 02/05/2010 
 RPT Level = 0.05  Analysis Date = 01/28/2010 
 RPT Level = 0.05  Analysis Date = 01/28/2010 
 RPT Level = 0.05  Analysis Date = 01/28/2010 
 RPT Level = 0.05  Analysis Date = 01/28/2010 
 RPT Level = 0.05  Analysis Date = 01/28/2010 
 RPT Level = 0.05  Analysis Date = 01/28/2010 
 RPT Level = 0.05  Analysis Date = 01/28/2010 
 RPT Level = 0.05  Analysis Date = 01/28/2010 
 RPT Level = 0.05  Analysis Date = 01/28/2010 
 RPT Level = 0.05  Analysis Date = 01/28/2010 
 RPT Level = 0.05  Analysis Date = 12/23/2009 
 RPT Level = 0.05  Analysis Date = 12/23/2009 
 RPT Level = 0.05  Analysis Date = 12/10/2009 
 RPT Level = 0.05  Analysis Date = 12/10/2009 
 RPT Level = 0.05  Analysis Date = 12/10/2009 
 RPT Level = 0.05  Analysis Date = 12/10/2009 
 RPT Level = 0.05  Analysis Date = 12/10/2009 
 RPT Level = 0.05  Analysis Date = 12/10/2009 
 RPT Level = 0.05  Analysis Date = 11/25/2009 
 RPT Level = 0.05  Analysis Date = 11/25/2009 
 RPT Level = 0.05  Analysis Date = 11/19/2009 
 RPT Level = 0.05  Analysis Date = 11/19/2009 
 RPT Level = 0.05  Analysis Date = 11/10/2009 
 RPT Level = 0.05  Analysis Date = 11/10/2009 
 RPT Level = 0.05  Analysis Date = 11/10/2009 
 RPT Level = 0.05  Analysis Date = 11/10/2009 
 RPT Level = 0.05  Analysis Date = 11/04/2009 
 RPT Level = 0.05  Analysis Date = 11/04/2009 
 RPT Level = 0.05  Analysis Date = 11/04/2009 
 RPT Level = 0.05  Analysis Date = 11/04/2009 
 RPT Level = 0.05  Analysis Date = 11/02/2009 
 RPT Level = 0.05  Analysis Date = 11/02/2009 
 RPT Level = 0.05  Analysis Date = 10/20/2009 
 RPT Level = 0.05  Analysis Date = 10/20/2009 
 RPT Level = 0.05  Analysis Date = 10/16/2009 
 RPT Level = 0.05  Analysis Date = 10/16/2009 
 RPT Level = 0.05  Analysis Date = 10/06/2009 
 RPT Level = 0.05  Analysis Date = 10/06/2009 
 RPT Level = 0.05  Analysis Date = 10/16/2009 
 RPT Level = 0.05  Analysis Date = 10/16/2009 
 RPT Level = 0.05  Analysis Date = 09/24/2009 
 RPT Level = 0.05  Analysis Date = 09/24/2009 
 RPT Level = 0.05  Analysis Date = 09/17/2009 
 RPT Level = 0.05  Analysis Date = 09/17/2009 
 RPT Level = 0.05  Analysis Date = 09/10/2009 
 RPT Level = 0.05  Analysis Date = 09/10/2009 
 RPT Level = 0.05  Analysis Date = 09/03/2009 
 RPT Level = 0.05  Analysis Date = 09/03/2009 
 RPT Level = 0.05  Analysis Date = 08/26/2009 
 RPT Level = 0.05  Analysis Date = 08/26/2009 
 RPT Level = 0.05  Analysis Date = 08/18/2009 
 RPT Level = 0.05  Analysis Date = 08/18/2009 
 RPT Level = 0.05  Analysis Date = 08/11/2009 
 RPT Level = 0.05  Analysis Date = 08/11/2009 
 RPT Level = 0.05  Analysis Date = 07/24/2009 
 RPT Level = 0.05  Analysis Date = 07/24/2009 
 RPT Level = 0.05  Analysis Date = 07/24/2009 
 RPT Level = 0.05  Analysis Date = 07/24/2009 
 RPT Level = 0.05  Analysis Date = 07/15/2009 
 RPT Level = 0.05  Analysis Date = 07/15/2009 
 RPT Level = 0.05  Analysis Date = 07/08/2009 
 RPT Level = 0.05  Analysis Date = 07/08/2009 
 RPT Level = 0.05  Analysis Date = 06/24/2009 
 RPT Level = 0.05  Analysis Date = 06/24/2009 
 RPT Level = 0.05  Analysis Date = 06/22/2009 
 RPT Level = 0.05  Analysis Date = 06/22/2009 
 RPT Level = 0.05  Analysis Date = 06/11/2009 
 RPT Level = 0.05  Analysis Date = 06/11/2009 
 RPT Level = 0.05  Analysis Date = 06/04/2009 
 RPT Level = 0.05  Analysis Date = 06/04/2009 
 RPT Level = 0.05  Analysis Date = 05/29/2009 
 RPT Level = 0.05  Analysis Date = 05/29/2009 
 RPT Level = 0.05  Analysis Date = 05/22/2009 
 RPT Level = 0.05  Analysis Date = 05/22/2009 
 RPT Level = 0.05  Analysis Date = 05/22/2009 
 RPT Level = 0.05  Analysis Date = 05/22/2009 
 RPT Level = 0.05  Analysis Date = 05/07/2009 
 RPT Level = 0.05  Analysis Date = 05/07/2009 
 RPT Level = 0.05  Analysis Date = 05/01/2009 
 RPT Level = 0.05  Analysis Date = 05/01/2009 
 RPT Level = 0.05  Analysis Date = 04/23/2009 
 RPT Level = 0.05  Analysis Date = 04/23/2009 
 RPT Level = 0.05  Analysis Date = 04/14/2009 
 RPT Level = 0.05  Analysis Date = 04/14/2009 
 RPT Level = 0.05  Analysis Date = 04/14/2009 
 RPT Level = 0.05  Analysis Date = 04/14/2009 
 RPT Level = 0.05  Analysis Date = 04/01/2009 
 RPT Level = 0.05  Analysis Date = 04/01/2009 
 RPT Level = 0.05  Analysis Date = 03/20/2009 
 RPT Level = 0.05  Analysis Date = 03/20/2009 
 RPT Level = 0.05  Analysis Date = 03/19/2009 
 RPT Level = 0.05  Analysis Date = 03/19/2009 
 RPT Level = 0.05  Analysis Date = 03/10/2009 
 RPT Level = 0.05  Analysis Date = 03/10/2009 
 RPT Level = 0.05  Analysis Date = 02/26/2009 
 RPT Level = 0.05  Analysis Date = 02/26/2009 
 RPT Level = 0.05  Analysis Date = 02/23/2009 
 RPT Level = 0.05  Analysis Date = 02/23/2009 
 RPT Level = 0.05  Analysis Date = 02/18/2009 
 RPT Level = 0.05  Analysis Date = 02/18/2009 
 RPT Level = 0.05  Analysis Date = 02/10/2009 
 RPT Level = 0.05  Analysis Date = 02/10/2009 
 RPT Level = 0.05  Analysis Date = 02/04/2009 
 RPT Level = 0.05  Analysis Date = 02/04/2009 
 RPT Level = 0.05  Analysis Date = 02/04/2009 
 RPT Level = 0.05  Analysis Date = 02/04/2009 
 RPT Level = 0.05  Analysis Date = 01/26/2009 
 RPT Level = 0.05  Analysis Date = 01/26/2009 
 RPT Level = 0.05  Analysis Date = 01/15/2009 
 RPT Level = 0.05  Analysis Date = 01/15/2009 
 RPT Level = 0.05  Analysis Date = 01/13/2009 
 RPT Level = 0.05  Analysis Date = 01/13/2009 
 RPT Level = 0.05  Analysis Date = 01/13/2009 
 RPT Level = 0.05  Analysis Date = 01/13/2009 
 RPT Level = 0.05  Analysis Date = 12/31/2008 
 RPT Level = 0.05  Analysis Date = 12/31/2008 
 RPT Level = 0.05  Analysis Date = 12/15/2008 
 RPT Level = 0.05  Analysis Date = 12/15/2008 
 RPT Level = 0.05  Analysis Date = 12/08/2008 
 RPT Level = 0.05  Analysis Date = 12/08/2008 
 RPT Level = 0.05  Analysis Date = 12/08/2008 
 RPT Level = 0.05  Analysis Date = 12/08/2008 
 RPT Level = 0.05  Analysis Date = 12/01/2008 
 RPT Level = 0.05  Analysis Date = 12/01/2008 
 RPT Level = 0.05  Analysis Date = 11/24/2008 
 RPT Level = 0.05  Analysis Date = 11/24/2008 
 RPT Level = 0.05  Analysis Date = 11/20/2008 
 RPT Level = 0.05  Analysis Date = 11/20/2008 
 RPT Level = 0.05  Analysis Date = 11/12/2008 
 RPT Level = 0.05  Analysis Date = 11/12/2008 
 RPT Level = 0.05  Analysis Date = 10/23/2008 
 RPT Level = 0.05  Analysis Date = 10/23/2008 
 RPT Level = 0.05  Analysis Date = 10/21/2008 
 RPT Level = 0.05  Analysis Date = 10/21/2008 
 RPT Level = 0.05  Analysis Date = 10/08/2008 
 RPT Level = 0.05  Analysis Date = 10/08/2008 
 RPT Level = 0.05  Analysis Date = 10/08/2008 
 RPT Level = 0.03  Analysis Date = 10/08/2008 
 RPT Level = 0.03  Analysis Date = 10/02/2008 
 RPT Level = 0.03  Analysis Date = 10/02/2008 
 RPT Level = 0.03  Analysis Date = 09/29/2008 
 RPT Level = 0.03  Analysis Date = 09/29/2008 
 RPT Level = 0.03  Analysis Date = 09/24/2008 
 RPT Level = 0.03  Analysis Date = 09/24/2008 
 RPT Level = 0.03  Analysis Date = 09/10/2008 
 RPT Level = 0.03  Analysis Date = 09/10/2008 
 RPT Level = 0.03  Analysis Date = 09/05/2008 
 RPT Level = 0.03  Analysis Date = 09/05/2008 
 RPT Level = 0.03  Analysis Date = 08/25/2008 
 RPT Level = 0.03  Analysis Date = 08/25/2008 
 RPT Level = 0.03  Analysis Date = 08/19/2008 
 RPT Level = 0.03  Analysis Date = 08/19/2008 
 RPT Level = 0.03  Analysis Date = 08/18/2008 
 RPT Level = 0.03  Analysis Date = 08/18/2008 
 RPT Level = 0.03  Analysis Date = 07/25/2008 
 RPT Level = 0.03  Analysis Date = 07/25/2008 
 RPT Level = 0.03  Analysis Date = 07/21/2008 
 RPT Level = 0.03  Analysis Date = 07/21/2008 
 RPT Level = 0.03  Analysis Date = 07/14/2008 
 RPT Level = 0.03  Analysis Date = 07/14/2008 
 RPT Level = 0.03  Analysis Date = 07/14/2008 
 RPT Level = 0.03  Analysis Date = 07/14/2008 
 RPT Level = 0.03  Analysis Date = 06/27/2008 
 RPT Level = 0.03  Analysis Date = 06/27/2008 
 RPT Level = 0.03  Analysis Date = 06/25/2008 
 RPT Level = 0.03  Analysis Date = 06/25/2008 
 RPT Level = 0.03  Analysis Date = 06/18/2008 
 RPT Level = 0.03  Analysis Date = 06/18/2008 
 RPT Level = 0.03  Analysis Date = 06/11/2008 
 RPT Level = 0.03  Analysis Date = 06/11/2008 
 RPT Level = 0.03  Analysis Date = 06/10/2008 
 RPT Level = 0.03  Analysis Date = 06/10/2008 
 RPT Level = 0.03  Analysis Date = 06/02/2008 
 RPT Level = 0.03  Analysis Date = 06/02/2008 
 RPT Level = 0.03  Analysis Date = 05/30/2008 
 RPT Level = 0.03  Analysis Date = 05/30/2008 
 RPT Level = 0.03  Analysis Date = 05/19/2008 
 RPT Level = 0.03  Analysis Date = 05/19/2008 
 RPT Level = 0.03  Analysis Date = 05/07/2008 
 RPT Level = 0.03  Analysis Date = 05/07/2008 
 RPT Level = 0.03  Analysis Date = 04/24/2008 
 RPT Level = 0.03  Analysis Date = 04/24/2008 
 RPT Level = 0.03  Analysis Date = 04/21/2008 
 RPT Level = 0.03  Analysis Date = 04/21/2008 
 RPT Level = 0.03  Analysis Date = 04/15/2008 
 RPT Level = 0.03  Analysis Date = 04/15/2008 
 RPT Level = 0.03  Analysis Date = 04/15/2008 
 RPT Level = 0.03  Analysis Date = 04/15/2008 
 RPT Level = 0.03  Analysis Date = 03/27/2008 
 RPT Level = 0.03  Analysis Date = 03/27/2008 
 RPT Level = 0.03  Analysis Date = 03/19/2008 
 RPT Level = 0.03  Analysis Date = 03/19/2008 
 RPT Level = 0.03  Analysis Date = 03/13/2008 
 RPT Level = 0.03  Analysis Date = 03/13/2008 
 RPT Level = 0.03  Analysis Date = 03/07/2008 
 RPT Level = 0.03  Analysis Date = 03/07/2008 
 RPT Level = 0.03  Analysis Date = 03/04/2008 
 RPT Level = 0.03  Analysis Date = 03/04/2008 
 RPT Level = 0.03  Analysis Date = 03/10/2008 
 RPT Level = 0.03  Analysis Date = 03/10/2008 
 RPT Level = 0.03  Analysis Date = 03/10/2008 
 RPT Level = 0.03  Analysis Date = 03/10/2008 
 RPT Level = 0.03  Analysis Date = 02/28/2008 
 RPT Level = 0.03  Analysis Date = 02/28/2008 
 RPT Level = 0.03  Analysis Date = 02/20/2008 
 RPT Level = 0.03  Analysis Date = 02/20/2008 
 RPT Level = 0.03  Analysis Date = 01/29/2008 
 RPT Level = 0.03  Analysis Date = 01/29/2008 
 RPT Level = 0.03  Analysis Date = 01/17/2008 
 RPT Level = 0.03  Analysis Date = 01/17/2008 
 RPT Level = 0.03  Analysis Date = 01/11/2008 
 RPT Level = 0.03  Analysis Date = 01/11/2008 
 RPT Level = 0.03  Analysis Date = 01/07/2008 
 RPT Level = 0.03  Analysis Date = 01/07/2008 
 RPT Level = 0.03  Analysis Date = 01/02/2008 
 RPT Level = 0.03  Analysis Date = 01/02/2008 
 RPT Level = 0.03  Analysis Date = 12/17/2007 
 RPT Level = 0.03  Analysis Date = 12/17/2007 
 RPT Level = 0.03  Analysis Date = 12/06/2007 
 RPT Level = 0.03  Analysis Date = 12/06/2007 
 RPT Level = 0.03  Analysis Date = 11/28/2007 
 RPT Level = 0.03  Analysis Date = 11/28/2007 
 RPT Level = 0.03  Analysis Date = 11/28/2007 
 RPT Level = 0.03  Analysis Date = 11/28/2007 
 RPT Level = 0.03  Analysis Date = 11/19/2007 
 RPT Level = 0.03  Analysis Date = 11/19/2007 
 RPT Level = 0.03  Analysis Date = 11/14/2007 
 RPT Level = 0.03  Analysis Date = 11/14/2007 
 RPT Level = 0.03  Analysis Date = 11/14/2007 
 RPT Level = 0.03  Analysis Date = 11/14/2007 
 RPT Level = 0.03  Analysis Date = 11/05/2007 
 RPT Level = 0.03  Analysis Date = 11/05/2007 
 RPT Level = 0.03  Analysis Date = 10/25/2007 
 RPT Level = 0.03  Analysis Date = 10/25/2007 
 RPT Level = 0.03  Analysis Date = 10/19/2007 
 RPT Level = 0.03  Analysis Date = 10/19/2007 
 RPT Level = 0.03  Analysis Date = 10/03/2007 
 RPT Level = 0.03  Analysis Date = 10/03/2007 
 RPT Level = 0.03  Analysis Date = 09/24/2007 
 RPT Level = 0.03  Analysis Date = 09/24/2007 
 RPT Level = 0.03  Analysis Date = 09/17/2007 
 RPT Level = 0.03  Analysis Date = 09/17/2007 
 RPT Level = 0.03  Analysis Date = 09/07/2007 
 RPT Level = 0.03  Analysis Date = 09/07/2007 
 RPT Level = 0.03  Analysis Date = 09/06/2007 
 RPT Level = 0.03  Analysis Date = 09/06/2007 
 RPT Level = 0.03  Analysis Date = 08/29/2007 
 RPT Level = 0.03  Analysis Date = 08/29/2007 
 RPT Level = 0.03  Analysis Date = 08/21/2007 
 RPT Level = 0.03  Analysis Date = 08/21/2007 
 RPT Level = 0.03  Analysis Date = 08/14/2007 
 RPT Level = 0.03  Analysis Date = 08/14/2007 
 RPT Level = 0.03  Analysis Date = 08/07/2007 
 RPT Level = 0.03  Analysis Date = 08/07/2007 
 RPT Level = 0.03  Analysis Date = 08/06/2007 
 RPT Level = 0.03  Analysis Date = 08/06/2007 
 RPT Level = 0.03  Analysis Date = 07/17/2007 
 RPT Level = 0.03  Analysis Date = 07/17/2007 
 RPT Level = 0.03  Analysis Date = 07/06/2007 
 RPT Level = 0.03  Analysis Date = 07/06/2007 
 RPT Level = 0.03  Analysis Date = 07/02/2007 
 RPT Level = 0.03  Analysis Date = 07/02/2007 
 RPT Level = 0.03  Analysis Date = 06/21/2007 
 RPT Level = 0.03  Analysis Date = 06/21/2007 
 RPT Level = 0.03  Analysis Date = 06/19/2007 
 RPT Level = 0.03  Analysis Date = 06/19/2007 
 RPT Level = 0.03  Analysis Date = 06/08/2007 
 RPT Level = 0.03  Analysis Date = 06/08/2007 
 RPT Level = 0.03  Analysis Date = 06/05/2007 
 RPT Level = 0.03  Analysis Date = 06/05/2007 
 RPT Level = 0.03  Analysis Date = 05/24/2007 
 RPT Level = 0.03  Analysis Date = 05/24/2007 
 RPT Level = 0.03  Analysis Date = 05/16/2007 
 RPT Level = 0.03  Analysis Date = 05/16/2007 
 RPT Level = 0.03  Analysis Date = 05/14/2007 
 RPT Level = 0.03  Analysis Date = 05/14/2007 
 RPT Level = 0.03  Analysis Date = 05/07/2007 
 RPT Level = 0.03  Analysis Date = 05/07/2007 
 RPT Level = 0.03  Analysis Date = 04/27/2007 
 RPT Level = 0.03  Analysis Date = 04/27/2007 
 RPT Level = 0.03  Analysis Date = 04/19/2007 
 RPT Level = 0.03  Analysis Date = 04/19/2007 
 RPT Level = 0.03  Analysis Date = 04/16/2007 
 RPT Level = 0.03  Analysis Date = 04/16/2007 
 RPT Level = 0.03  Analysis Date = 04/10/2007 
 RPT Level = 0.03  Analysis Date = 04/10/2007 
 RPT Level = 0.03  Analysis Date = 04/05/2007 
 RPT Level = 0.03  Analysis Date = 04/05/2007 
 RPT Level = 0.03  Analysis Date = 03/21/2007 
 RPT Level = 0.03  Analysis Date = 03/21/2007 
 RPT Level = 0.03  Analysis Date = 03/16/2007 
 RPT Level = 0.03  Analysis Date = 03/16/2007 
 RPT Level = 0.03  Analysis Date = 03/08/2007 
 RPT Level = 0.03  Analysis Date = 03/08/2007 
 RPT Level = 0.03  Analysis Date = 03/05/2007 
 RPT Level = 0.03  Analysis Date = 03/05/2007 
 RPT Level = 0.03  Analysis Date = 02/28/2007 
 RPT Level = 0.03  Analysis Date = 02/28/2007 
 RPT Level = 0.03  Analysis Date = 02/16/2007 
 RPT Level = 0.03  Analysis Date = 02/16/2007 
 RPT Level = 0.03  Analysis Date = 02/14/2007 
 RPT Level = 0.03  Analysis Date = 02/14/2007 
 RPT Level = 0.03  Analysis Date = 01/30/2007 
 RPT Level = 0.03  Analysis Date = 01/30/2007 
 RPT Level = 0.03  Analysis Date = 01/25/2007 
 RPT Level = 0.03  Analysis Date = 01/25/2007 
 RPT Level = 0.03  Analysis Date = 01/25/2007 
 RPT Level = 0.03  Analysis Date = 01/25/2007 
 RPT Level = 0.03  Analysis Date = 01/10/2007 
 RPT Level = 0.03  Analysis Date = 01/10/2007 
 RPT Level = 0.03  Analysis Date = 01/04/2007 
 RPT Level = 0.03  Analysis Date = 01/04/2007 
 RPT Level = 0.03  Analysis Date = 12/22/2006 
 RPT Level = 0.03  Analysis Date = 12/22/2006 
 RPT Level = 0.03  Analysis Date = 12/14/2006 
 RPT Level = 0.03  Analysis Date = 12/14/2006 
 RPT Level = 0.03  Analysis Date = 12/08/2006 
 RPT Level = 0.03  Analysis Date = 12/08/2006 
 RPT Level = 0.03  Analysis Date = 11/30/2006 
 RPT Level = 0.03  Analysis Date = 11/30/2006 
 RPT Level = 0.03  Analysis Date = 11/29/2006 
 RPT Level = 0.03  Analysis Date = 11/29/2006 
 RPT Level = 0.03  Analysis Date = 11/16/2006 
 RPT Level = 0.03  Analysis Date = 11/16/2006 
 RPT Level = 0.03  Analysis Date = 11/09/2006 
 RPT Level = 0.03  Analysis Date = 11/09/2006 
 RPT Level = 0.03  Analysis Date = 11/09/2006 
 RPT Level = 0.03  Analysis Date = 11/09/2006 
 RPT Level = 0.03  Analysis Date = 10/31/2006 
 RPT Level = 0.03  Analysis Date = 10/31/2006 
 RPT Level = 0.03  Analysis Date = 10/23/2006 
 RPT Level = 0.03  Analysis Date = 10/23/2006 
 RPT Level = 0.03  Analysis Date = 10/19/2006 
 RPT Level = 0.03  Analysis Date = 10/19/2006 
 RPT Level = 0.03  Analysis Date = 10/19/2006 
 RPT Level = 0.03  Analysis Date = 10/19/2006 
 RPT Level = 0.03  Analysis Date = 10/12/2006 
 RPT Level = 0.03  Analysis Date = 10/12/2006 
 RPT Level = 0.03  Analysis Date = 10/10/2006 
 RPT Level = 0.03  Analysis Date = 10/10/2006 
 RPT Level = 0.03  Analysis Date = 10/10/2006 
 RPT Level = 0.03  Analysis Date = 10/10/2006 
 RPT Level = 0.03  Analysis Date = 10/02/2006 
 RPT Level = 0.03  Analysis Date = 10/02/2006 
 RPT Level = 0.03  Analysis Date = 08/25/2006 
 RPT Level = 0.03  Analysis Date = 08/25/2006 
 RPT Level = 0.03  Analysis Date = 08/15/2006 
 RPT Level = 0.03  Analysis Date = 08/15/2006 
 RPT Level = 0.03  Analysis Date = 09/06/2006 
 RPT Level = 0.03  Analysis Date = 09/06/2006 
 RPT Level = 0.03  Analysis Date = 07/27/2006 
 RPT Level = 0.03  Analysis Date = 07/27/2006 
 RPT Level = 0.03  Analysis Date = 07/14/2006 
 RPT Level = 0.03  Analysis Date = 07/14/2006 
 RPT Level = 0.03  Analysis Date = 07/06/2006 
 RPT Level = 0.03  Analysis Date = 07/06/2006 
 RPT Level = 0.03  Analysis Date = 07/05/2006 
 RPT Level = 0.03  Analysis Date = 07/05/2006 
 RPT Level = 0.03  Analysis Date = 07/05/2006 
 RPT Level = 0.03  Analysis Date = 07/05/2006 
 RPT Level = 0.03  Analysis Date = 06/01/2006 
 RPT Level = 0.03  Analysis Date = 06/01/2006 
 RPT Level = 0.03  Analysis Date = 05/15/2006 
 RPT Level = 0.03  Analysis Date = 05/15/2006 
 RPT Level = 0.03  Analysis Date = 05/15/2006 
 RPT Level = 0.03  Analysis Date = 05/15/2006 
 RPT Level = 0.03  Analysis Date = 09/26/2005 
 RPT Level = 0.03  Analysis Date = 09/26/2005 
 RPT Level = 0.03  Analysis Date = 09/23/2005 
 RPT Level = 0.03  Analysis Date = 09/23/2005 
 RPT Level = 0.03  Analysis Date = 09/02/2005 
 RPT Level = 0.03  Analysis Date = 09/02/2005 
 RPT Level = 0.03  Analysis Date = 08/29/2005 
 RPT Level = 0.03  Analysis Date = 08/29/2005 
 RPT Level = 0.03  Analysis Date = 08/25/2005 
 RPT Level = 0.03  Analysis Date = 08/25/2005 
 RPT Level = 0.03  Analysis Date = 08/12/2005 
 RPT Level = 0.03  Analysis Date = 08/12/2005 
 RPT Level = 0.03  Analysis Date = 08/11/2005 
 RPT Level = 0.03  Analysis Date = 08/11/2005 
 RPT Level = 0.03  Analysis Date = 08/11/2005 
 RPT Level = 0.03  Analysis Date = 08/11/2005 
 RPT Level = 0.03  Analysis Date = 07/29/2005 
 RPT Level = 0.03  Analysis Date = 07/29/2005 
 RPT Level = 0.03  Analysis Date = 07/15/2005 
 RPT Level = 0.03  Analysis Date = 07/15/2005 
 RPT Level = 0.03  Analysis Date = 07/15/2005 
 RPT Level = 0.03  Analysis Date = 07/15/2005 
 RPT Level = 0.03  Analysis Date = 07/05/2005 
 RPT Level = 0.03  Analysis Date = 07/05/2005 
 RPT Level = 0.03  Analysis Date = 06/30/2005 
 RPT Level = 0.03  Analysis Date = 06/30/2005 
 RPT Level = 0.03  Analysis Date = 06/17/2005 
 RPT Level = 0.03  Analysis Date = 06/17/2005 
 RPT Level = 0.03  Analysis Date = 06/15/2005 
 RPT Level = 0.03  Analysis Date = 06/15/2005 
 RPT Level = 0.03  Analysis Date = 06/06/2005 
 RPT Level = 0.03  Analysis Date = 06/06/2005 
 RPT Level = 0.03  Analysis Date = 05/27/2005 
 RPT Level = 0.03  Analysis Date = 05/27/2005 
 RPT Level = 0.03  Analysis Date = 05/23/2005 
 RPT Level = 0.03  Analysis Date = 05/23/2005 
 RPT Level = 0.03  Analysis Date = 05/20/2005 
 RPT Level = 0.03  Analysis Date = 05/20/2005 
 RPT Level = 0.03  Analysis Date = 05/11/2005 
 RPT Level = 0.03  Analysis Date = 05/11/2005 
 RPT Level = 0.03  Analysis Date = 05/10/2005 
 RPT Level = 0.03  Analysis Date = 05/10/2005 
 RPT Level = 0.03  Analysis Date = 04/29/2005 
 RPT Level = 0.03  Analysis Date = 04/29/2005 
 RPT Level = 0.03  Analysis Date = 04/28/2005 
 RPT Level = 0.03  Analysis Date = 04/28/2005 
 RPT Level = 0.03  Analysis Date = 04/12/2005 
 RPT Level = 0.03  Analysis Date = 04/12/2005 
 RPT Level = 0.03  Analysis Date = 04/05/2005 
 RPT Level = 0.03  Analysis Date = 04/05/2005 
 RPT Level = 0.03  Analysis Date = 03/30/2005 
 RPT Level = 0.03  Analysis Date = 03/30/2005 
 RPT Level = 0.03  Analysis Date = 03/21/2005 
 RPT Level = 0.03  Analysis Date = 03/21/2005 
 RPT Level = 0.03  Analysis Date = 03/15/2005 
 RPT Level = 0.03  Analysis Date = 03/15/2005 
 RPT Level = 0.03  Analysis Date = 03/15/2005 
 RPT Level = 0.03  Analysis Date = 03/15/2005 
 RPT Level = 0.03  Analysis Date = 03/14/2005 
 RPT Level = 0.03  Analysis Date = 03/14/2005 
 RPT Level = 0.03  Analysis Date = 03/08/2005 
 RPT Level = 0.03  Analysis Date = 03/08/2005 
 RPT Level = 0.03  Analysis Date = 02/24/2005 
 RPT Level = 0.03  Analysis Date = 02/24/2005 
 RPT Level = 0.03  Analysis Date = 02/16/2005 
 RPT Level = 0.03  Analysis Date = 02/16/2005 
 RPT Level = 0.03  Analysis Date = 02/14/2005 
 RPT Level = 0.03  Analysis Date = 02/14/2005 
 RPT Level = 0.03  Analysis Date = 01/27/2005 
 RPT Level = 0.03  Analysis Date = 01/27/2005 
 RPT Level = 0.03  Analysis Date = 01/26/2005 
 RPT Level = 0.03  Analysis Date = 01/26/2005 
 RPT Level = 0.03  Analysis Date = 01/20/2005 
 RPT Level = 0.03  Analysis Date = 01/20/2005 
 RPT Level = 0.03  Analysis Date = 01/11/2005 
 RPT Level = 0.03  Analysis Date = 01/11/2005 
 RPT Level = 0.03  Analysis Date = 01/07/2005 
 RPT Level = 0.03  Analysis Date = 01/07/2005 
 RPT Level = 0.03  Analysis Date = 01/07/2005 
 RPT Level = 0.03  Analysis Date = 01/07/2005 
 RPT Level = 0.03  Analysis Date = 01/07/2005 
 RPT Level = 0.03  Analysis Date = 01/07/2005 
 RPT Level = 0.03  Analysis Date = 12/22/2004 
 RPT Level = 0.03  Analysis Date = 12/22/2004 
 RPT Level = 0.03  Analysis Date = 12/22/2004 
 RPT Level = 0.03  Analysis Date = 12/22/2004 
 RPT Level = 0.03  Analysis Date = 12/15/2004 
 RPT Level = 0.03  Analysis Date = 12/15/2004 
 RPT Level = 0.03  Analysis Date = 12/15/2004 
 RPT Level = 0.03  Analysis Date = 12/15/2004 
 RPT Level = 0.03  Analysis Date = 12/15/2004 
 RPT Level = 0.03  Analysis Date = 12/15/2004 
 RPT Level = 0.03  Analysis Date = 12/15/2004 
 RPT Level = 0.03  Analysis Date = 12/15/2004 
 RPT Level = 0.03  Analysis Date = 12/10/2004 
 RPT Level = 0.03  Analysis Date = 12/10/2004 
 RPT Level = 0.03  Analysis Date = 12/10/2004 
 RPT Level = 0.03  Analysis Date = 12/10/2004 
 RPT Level = 0.03  Analysis Date = 11/26/2004 
 RPT Level = 0.03  Y = 0
The SGPlot Procedure

False Positive Rate for Total Nitrogen (NH3+NO3+NO2+org N as N), FIL, CFA, ALK-P

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Total Nitrogen (NH3+NO3+NO2+org N as N), FIL, CFA, ALK-P 62854CL063 2004 17 0 0%
    2005 50 2 4%
    2006 15 2 13%
    2007 50 2 4%
    2008 50 0 0%
    2009 52 0 0%
    2010 52 0 0%
    2011 52 1 2%
    2012 52 1 2%
    2013 53 0 0%
    2014 47 0 0%
    2015 52 1 2%
    2016 50 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Total Nitrogen (NH3+NO3+NO2+org N as N), FIL, CFA, ALK-P, ACD -
Blind Blank Results
Lab: NWQL, PCode: 62854, MCode: CL062
Analysis dates: 06/09/04 through 07/14/11
Open Data Set

 Analysis Date = 03/17/2005 
 Lab Value = 0.076 
 RPT Level = 0.03 
 Lab Sample ID = 20050670011  Analysis Date = 03/17/2005 
 Lab Value = 0.076 
 RPT Level = 0.03 
 Lab Sample ID = 20050670011  Analysis Date = 07/14/2011 
 Lab Value = -0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20111920101  Analysis Date = 07/14/2011 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20111860061  Analysis Date = 07/14/2011 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20111780163  Analysis Date = 06/24/2011 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20111710110  Analysis Date = 06/17/2011 
 Lab Value = -0.048 
 RPT Level = 0.05 
 Lab Sample ID = 20111640065  Analysis Date = 06/13/2011 
 Lab Value = -0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20111570060  Analysis Date = 06/13/2011 
 Lab Value = -0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20111510148  Analysis Date = 05/31/2011 
 Lab Value = -0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20111430201  Analysis Date = 05/31/2011 
 Lab Value = -0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20111360139  Analysis Date = 05/12/2011 
 Lab Value = -0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20111290045  Analysis Date = 05/12/2011 
 Lab Value = -0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20111220084  Analysis Date = 04/29/2011 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20111150112  Analysis Date = 04/26/2011 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20111080074  Analysis Date = 04/13/2011 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20111010119  Analysis Date = 04/13/2011 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20110950055  Analysis Date = 04/06/2011 
 Lab Value = 0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20110870091  Analysis Date = 03/23/2011 
 Lab Value = -0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20110800058  Analysis Date = 03/23/2011 
 Lab Value = -0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20110750069  Analysis Date = 03/14/2011 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20110660030  Analysis Date = 03/04/2011 
 Lab Value = -0.041 
 RPT Level = 0.05 
 Lab Sample ID = 20110590069  Analysis Date = 03/04/2011 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20110530104  Analysis Date = 03/02/2011 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20110450035  Analysis Date = 03/02/2011 
 Lab Value = -0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20110410097  Analysis Date = 03/02/2011 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20110400068  Analysis Date = 01/28/2011 
 Lab Value = -0.038 
 RPT Level = 0.05 
 Lab Sample ID = 20110240064  Analysis Date = 01/28/2011 
 Lab Value = -0.036 
 RPT Level = 0.05 
 Lab Sample ID = 20110180058  Analysis Date = 01/14/2011 
 Lab Value = -0.041 
 RPT Level = 0.05 
 Lab Sample ID = 20110110017  Analysis Date = 01/14/2011 
 Lab Value = -0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20110030022  Analysis Date = 01/14/2011 
 Lab Value = -0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20103610055  Analysis Date = 01/14/2011 
 Lab Value = -0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20103540045  Analysis Date = 01/14/2011 
 Lab Value = -0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20103470075  Analysis Date = 12/21/2010 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20103400083  Analysis Date = 12/09/2010 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20103330098  Analysis Date = 12/09/2010 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20103260066  Analysis Date = 12/09/2010 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20103190067  Analysis Date = 11/18/2010 
 Lab Value = -0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20103120027  Analysis Date = 11/18/2010 
 Lab Value = -0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20103060009  Analysis Date = 11/18/2010 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20102990005  Analysis Date = 10/27/2010 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20102920007  Analysis Date = 10/27/2010 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20102850131  Analysis Date = 10/14/2010 
 Lab Value = -0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20102770103  Analysis Date = 10/14/2010 
 Lab Value = -0.044 
 RPT Level = 0.05 
 Lab Sample ID = 20102700153  Analysis Date = 09/29/2010 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20102640135  Analysis Date = 09/29/2010 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20102570022  Analysis Date = 09/16/2010 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20102510060  Analysis Date = 09/16/2010 
 Lab Value = 0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20102430251  Analysis Date = 09/01/2010 
 Lab Value = -0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20102350198  Analysis Date = 09/01/2010 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20102290051  Analysis Date = 09/01/2010 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20102230039  Analysis Date = 08/12/2010 
 Lab Value = -0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20102140089  Analysis Date = 08/04/2010 
 Lab Value = -0.038 
 RPT Level = 0.05 
 Lab Sample ID = 20102080018  Analysis Date = 07/29/2010 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20102000187  Analysis Date = 07/20/2010 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20101930105  Analysis Date = 07/20/2010 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20101870061  Analysis Date = 07/20/2010 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20101790122  Analysis Date = 07/01/2010 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20101730069  Analysis Date = 07/01/2010 
 Lab Value = -0.038 
 RPT Level = 0.05 
 Lab Sample ID = 20101660063  Analysis Date = 07/01/2010 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20101590013  Analysis Date = 06/09/2010 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20101530121  Analysis Date = 06/09/2010 
 Lab Value = -0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20101450016  Analysis Date = 06/09/2010 
 Lab Value = -0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20101380022  Analysis Date = 05/20/2010 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20101310096  Analysis Date = 05/20/2010 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20101240078  Analysis Date = 05/05/2010 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20101180040  Analysis Date = 05/05/2010 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20101090060  Analysis Date = 05/05/2010 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20101020074  Analysis Date = 04/15/2010 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20100950035  Analysis Date = 04/01/2010 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20100880050  Analysis Date = 04/01/2010 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20100850063  Analysis Date = 04/01/2010 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20100750001  Analysis Date = 03/16/2010 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20100680015  Analysis Date = 03/05/2010 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20100600068  Analysis Date = 02/24/2010 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20100530047  Analysis Date = 02/24/2010 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20100470026  Analysis Date = 02/18/2010 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20100390037  Analysis Date = 02/05/2010 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20100320021  Analysis Date = 02/05/2010 
 Lab Value = -0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20100260064  Analysis Date = 02/05/2010 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20100190104  Analysis Date = 01/20/2010 
 Lab Value = -0.063 
 RPT Level = 0.05 
 Lab Sample ID = 20100110097  Analysis Date = 01/20/2010 
 Lab Value = -0.041 
 RPT Level = 0.05 
 Lab Sample ID = 20100050015  Analysis Date = 01/20/2010 
 Lab Value = -0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20093620045  Analysis Date = 01/20/2010 
 Lab Value = -0.058 
 RPT Level = 0.05 
 Lab Sample ID = 20093560035  Analysis Date = 12/22/2009 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20093480065  Analysis Date = 12/11/2009 
 Lab Value = -0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20093420008  Analysis Date = 12/11/2009 
 Lab Value = -0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20093350069  Analysis Date = 12/11/2009 
 Lab Value = -0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20093280016  Analysis Date = 11/19/2009 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20093200089  Analysis Date = 11/19/2009 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20093130060  Analysis Date = 11/19/2009 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20093070203  Analysis Date = 11/19/2009 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20093000108  Analysis Date = 10/22/2009 
 Lab Value = -0.044 
 RPT Level = 0.05 
 Lab Sample ID = 20092920099  Analysis Date = 10/22/2009 
 Lab Value = -0.039 
 RPT Level = 0.05 
 Lab Sample ID = 20092870072  Analysis Date = 10/22/2009 
 Lab Value = -0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20092780069  Analysis Date = 10/07/2009 
 Lab Value = -0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20092720021  Analysis Date = 10/07/2009 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20092640045  Analysis Date = 10/07/2009 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20092570047  Analysis Date = 09/16/2009 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20092520131  Analysis Date = 09/16/2009 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20092430157  Analysis Date = 09/16/2009 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20092360172  Analysis Date = 09/16/2009 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20092290213  Analysis Date = 08/19/2009 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20092220153  Analysis Date = 08/11/2009 
 Lab Value = -0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20092150075  Analysis Date = 08/11/2009 
 Lab Value = -0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20092090265  Analysis Date = 07/22/2009 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20092010113  Analysis Date = 07/22/2009 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20091950024  Analysis Date = 07/22/2009 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20091870028  Analysis Date = 07/07/2009 
 Lab Value = -0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20091800171  Analysis Date = 07/07/2009 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20091730221  Analysis Date = 06/18/2009 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20091660209  Analysis Date = 06/18/2009 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20091590089  Analysis Date = 06/18/2009 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20091520153  Analysis Date = 06/02/2009 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20091460191  Analysis Date = 06/02/2009 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20091380124  Analysis Date = 05/20/2009 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20091320021  Analysis Date = 05/20/2009 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20091240122  Analysis Date = 05/20/2009 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20091170108  Analysis Date = 04/28/2009 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20091110107  Analysis Date = 04/28/2009 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20091030084  Analysis Date = 04/28/2009 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20090960052  Analysis Date = 04/01/2009 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20090890067  Analysis Date = 04/01/2009 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20090820026  Analysis Date = 03/25/2009 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20090750045  Analysis Date = 03/17/2009 
 Lab Value = -0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20090680047  Analysis Date = 03/17/2009 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20090610058  Analysis Date = 02/26/2009 
 Lab Value = -0.039 
 RPT Level = 0.05 
 Lab Sample ID = 20090540031  Analysis Date = 02/24/2009 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20090480056  Analysis Date = 02/12/2009 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20090400029  Analysis Date = 02/12/2009 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20090330036  Analysis Date = 02/12/2009 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20090260025  Analysis Date = 01/22/2009 
 Lab Value = -0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20090200033  Analysis Date = 01/15/2009 
 Lab Value = -0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20090120047  Analysis Date = 01/15/2009 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20090050018  Analysis Date = 01/15/2009 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20083650082  Analysis Date = 12/31/2008 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20083570035  Analysis Date = 12/18/2008 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20083520228  Analysis Date = 12/15/2008 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20083450059  Analysis Date = 12/10/2008 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20083360038  Analysis Date = 12/10/2008 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20083290063  Analysis Date = 11/24/2008 
 Lab Value = -0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20083220066  Analysis Date = 11/24/2008 
 Lab Value = -0.036 
 RPT Level = 0.05 
 Lab Sample ID = 20083150064  Analysis Date = 11/24/2008 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20083080098  Analysis Date = 11/04/2008 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20083010106  Analysis Date = 10/23/2008 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20082940060  Analysis Date = 10/20/2008 
 Lab Value = -0.05 
 RPT Level = 0.05 
 Lab Sample ID = 20082880038  Analysis Date = 10/09/2008 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20082800045  Analysis Date = 10/07/2008 
 Lab Value = -0.038 
 RPT Level = 0.03 
 Lab Sample ID = 20082730059  Analysis Date = 10/07/2008 
 Lab Value = -0.044 
 RPT Level = 0.03 
 Lab Sample ID = 20082660045  Analysis Date = 09/23/2008 
 Lab Value = -0.041 
 RPT Level = 0.03 
 Lab Sample ID = 20082590107  Analysis Date = 09/11/2008 
 Lab Value = -0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20082520009  Analysis Date = 09/11/2008 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20082460099  Analysis Date = 08/27/2008 
 Lab Value = -0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20082380078  Analysis Date = 08/27/2008 
 Lab Value = -0.019 
 RPT Level = 0.03 
 Lab Sample ID = 20082310132  Analysis Date = 08/27/2008 
 Lab Value = 0.025 
 RPT Level = 0.03 
 Lab Sample ID = 20082250012  Analysis Date = 08/07/2008 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20082190010  Analysis Date = 07/23/2008 
 Lab Value = -0.017 
 RPT Level = 0.03 
 Lab Sample ID = 20082030128  Analysis Date = 07/21/2008 
 Lab Value = -0.015 
 RPT Level = 0.03 
 Lab Sample ID = 20081970138  Analysis Date = 07/14/2008 
 Lab Value = 0.023 
 RPT Level = 0.03 
 Lab Sample ID = 20081890042  Analysis Date = 07/03/2008 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20081820062  Analysis Date = 07/03/2008 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20081750126  Analysis Date = 06/26/2008 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20081680068  Analysis Date = 06/11/2008 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20081620016  Analysis Date = 06/11/2008 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20081540110  Analysis Date = 06/11/2008 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20081480070  Analysis Date = 05/29/2008 
 Lab Value = -0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20081400059  Analysis Date = 05/29/2008 
 Lab Value = -0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20081330114  Analysis Date = 05/29/2008 
 Lab Value = 0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20081260069  Analysis Date = 04/30/2008 
 Lab Value = 0.018 
 RPT Level = 0.03 
 Lab Sample ID = 20081190056  Analysis Date = 04/22/2008 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20081120035  Analysis Date = 04/21/2008 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20081050115  Analysis Date = 04/15/2008 
 Lab Value = -0.021 
 RPT Level = 0.03 
 Lab Sample ID = 20080980082  Analysis Date = 04/04/2008 
 Lab Value = -0.027 
 RPT Level = 0.03 
 Lab Sample ID = 20080920084  Analysis Date = 03/26/2008 
 Lab Value = -0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20080840065  Analysis Date = 03/26/2008 
 Lab Value = -0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20080770123  Analysis Date = 03/26/2008 
 Lab Value = -0.02 
 RPT Level = 0.03 
 Lab Sample ID = 20080700073  Analysis Date = 03/26/2008 
 Lab Value = -0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20080630068  Analysis Date = 03/26/2008 
 Lab Value = -0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20080560071  Analysis Date = 02/26/2008 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20080510054  Analysis Date = 02/26/2008 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20080420073  Analysis Date = 01/31/2008 
 Lab Value = -0.019 
 RPT Level = 0.03 
 Lab Sample ID = 20080280049  Analysis Date = 01/25/2008 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20080230019  Analysis Date = 01/22/2008 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20080140026  Analysis Date = 01/08/2008 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20080070021  Analysis Date = 01/07/2008 
 Lab Value = -0.03 
 RPT Level = 0.03 
 Lab Sample ID = 20073620003  Analysis Date = 12/20/2007 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20073510100  Analysis Date = 12/18/2007 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20073440026  Analysis Date = 12/06/2007 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20073370067  Analysis Date = 11/28/2007 
 Lab Value = -0.02 
 RPT Level = 0.03 
 Lab Sample ID = 20073300043  Analysis Date = 11/28/2007 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20073230112  Analysis Date = 11/16/2007 
 Lab Value = -0.021 
 RPT Level = 0.03 
 Lab Sample ID = 20073170061  Analysis Date = 11/14/2007 
 Lab Value = -0.031 
 RPT Level = 0.03 
 Lab Sample ID = 20073100010  Analysis Date = 10/31/2007 
 Lab Value = -0.088 
 RPT Level = 0.03 
 Lab Sample ID = 20073020059  Analysis Date = 10/31/2007 
 Lab Value = -0.083 
 RPT Level = 0.03 
 Lab Sample ID = 20072960178  Analysis Date = 10/31/2007 
 Lab Value = -0.082 
 RPT Level = 0.03 
 Lab Sample ID = 20072890057  Analysis Date = 10/22/2007 
 Lab Value = -0.062 
 RPT Level = 0.03 
 Lab Sample ID = 20072850024  Analysis Date = 09/26/2007 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20072670055  Analysis Date = 09/20/2007 
 Lab Value = 0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20072600128  Analysis Date = 09/20/2007 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20072540014  Analysis Date = 09/11/2007 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20072480016  Analysis Date = 09/11/2007 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20072400019  Analysis Date = 08/27/2007 
 Lab Value = -0.025 
 RPT Level = 0.03 
 Lab Sample ID = 20072330110  Analysis Date = 08/27/2007 
 Lab Value = -0.018 
 RPT Level = 0.03 
 Lab Sample ID = 20072260199  Analysis Date = 08/21/2007 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20072210251  Analysis Date = 08/07/2007 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20072110163  Analysis Date = 08/07/2007 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20072040100  Analysis Date = 08/07/2007 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20071900106  Analysis Date = 07/05/2007 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20071830157  Analysis Date = 07/05/2007 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20071770202  Analysis Date = 06/27/2007 
 Lab Value = 0.025 
 RPT Level = 0.03 
 Lab Sample ID = 20071690115  Analysis Date = 06/27/2007 
 Lab Value = 0.02 
 RPT Level = 0.03 
 Lab Sample ID = 20071620049  Analysis Date = 06/08/2007 
 Lab Value = -0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20071560023  Analysis Date = 06/08/2007 
 Lab Value = -0.022 
 RPT Level = 0.03 
 Lab Sample ID = 20071500032  Analysis Date = 05/29/2007 
 Lab Value = 0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20071410090  Analysis Date = 05/16/2007 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20071340114  Analysis Date = 05/16/2007 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20071280017  Analysis Date = 05/07/2007 
 Lab Value = -0.019 
 RPT Level = 0.03 
 Lab Sample ID = 20071200085  Analysis Date = 05/07/2007 
 Lab Value = -0.018 
 RPT Level = 0.03 
 Lab Sample ID = 20071130123  Analysis Date = 04/24/2007 
 Lab Value = -0.015 
 RPT Level = 0.03 
 Lab Sample ID = 20071070019  Analysis Date = 04/18/2007 
 Lab Value = 0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20070990049  Analysis Date = 04/05/2007 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20070930069  Analysis Date = 04/05/2007 
 Lab Value = 0.024 
 RPT Level = 0.03 
 Lab Sample ID = 20070860216  Analysis Date = 03/26/2007 
 Lab Value = 0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20070780127  Analysis Date = 03/26/2007 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20070710074  Analysis Date = 03/15/2007 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20070650012  Analysis Date = 03/15/2007 
 Lab Value = 0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20070580140  Analysis Date = 03/15/2007 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20070540026  Analysis Date = 02/22/2007 
 Lab Value = -0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20070460018  Analysis Date = 02/14/2007 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20070400104  Analysis Date = 02/02/2007 
 Lab Value = -0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20070250021  Analysis Date = 01/25/2007 
 Lab Value = -0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20070180073  Analysis Date = 01/25/2007 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20070120011  Analysis Date = 09/22/2005 
 Lab Value = -0.025 
 RPT Level = 0.03 
 Lab Sample ID = 20052590036  Analysis Date = 09/22/2005 
 Lab Value = -0.024 
 RPT Level = 0.03 
 Lab Sample ID = 20052520007  Analysis Date = 09/22/2005 
 Lab Value = -0.021 
 RPT Level = 0.03 
 Lab Sample ID = 20052430005  Analysis Date = 08/31/2005 
 Lab Value = -0.03 
 RPT Level = 0.03 
 Lab Sample ID = 20052370001  Analysis Date = 08/31/2005 
 Lab Value = 0.015 
 RPT Level = 0.03 
 Lab Sample ID = 20052300008  Analysis Date = 08/16/2005 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20052210011  Analysis Date = 08/16/2005 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20052160008  Analysis Date = 08/16/2005 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20052160006  Analysis Date = 08/02/2005 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20052010006  Analysis Date = 07/18/2005 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20051940016  Analysis Date = 07/18/2005 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20051880017  Analysis Date = 07/08/2005 
 Lab Value = -0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20051800188  Analysis Date = 07/08/2005 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20051740018  Analysis Date = 06/24/2005 
 Lab Value = -0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20051660175  Analysis Date = 06/24/2005 
 Lab Value = -0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20051590026  Analysis Date = 06/08/2005 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20051530020  Analysis Date = 05/27/2005 
 Lab Value = -0.029 
 RPT Level = 0.03 
 Lab Sample ID = 20051440044  Analysis Date = 05/24/2005 
 Lab Value = -0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20051380015  Analysis Date = 05/24/2005 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20051320028  Analysis Date = 05/11/2005 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20051250004  Analysis Date = 04/29/2005 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20051170011  Analysis Date = 04/29/2005 
 Lab Value = -0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20051110005  Analysis Date = 04/14/2005 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20051020017  Analysis Date = 04/14/2005 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20050950045  Analysis Date = 04/05/2005 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20050880117  Analysis Date = 04/05/2005 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20050840097  Analysis Date = 04/05/2005 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20050750005  Analysis Date = 03/17/2005 
 Lab Value = -0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20050700006  Analysis Date = 03/17/2005 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20050700005  Analysis Date = 03/03/2005 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20050550023  Analysis Date = 02/24/2005 
 Lab Value = 0.019 
 RPT Level = 0.03 
 Lab Sample ID = 20050480006  Analysis Date = 02/16/2005 
 Lab Value = -0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20050410008  Analysis Date = 02/16/2005 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20050340022  Analysis Date = 02/03/2005 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20050260023  Analysis Date = 01/25/2005 
 Lab Value = 0.02 
 RPT Level = 0.03 
 Lab Sample ID = 20050200049  Analysis Date = 01/25/2005 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20050130092  Analysis Date = 01/11/2005 
 Lab Value = 0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20050070015  Analysis Date = 01/05/2005 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20043650003  Analysis Date = 01/05/2005 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20043580036  Analysis Date = 01/05/2005 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20043580034  Analysis Date = 12/23/2004 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20043520024  Analysis Date = 12/23/2004 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20043510017  Analysis Date = 12/23/2004 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20043450068  Analysis Date = 12/23/2004 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20043440148  Analysis Date = 12/10/2004 
 Lab Value = -0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20043380004  Analysis Date = 12/10/2004 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20043380003  Analysis Date = 12/01/2004 
 Lab Value = 0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20043310058  Analysis Date = 12/01/2004 
 Lab Value = 0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20043280049  Analysis Date = 11/23/2004 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20043240013  Analysis Date = 09/07/2004 
 Lab Value = -0.004 
 RPT Level =  
 Lab Sample ID = 20042450137  Analysis Date = 09/07/2004 
 Lab Value = -0.009 
 RPT Level =  
 Lab Sample ID = 20042400090  Analysis Date = 09/07/2004 
 Lab Value = -0.007 
 RPT Level =  
 Lab Sample ID = 20042370106  Analysis Date = 08/25/2004 
 Lab Value = 0.021 
 RPT Level =  
 Lab Sample ID = 20042330207  Analysis Date = 08/25/2004 
 Lab Value = 0.01 
 RPT Level =  
 Lab Sample ID = 20042320135  Analysis Date = 08/25/2004 
 Lab Value = 0.013 
 RPT Level =  
 Lab Sample ID = 20042320137  Analysis Date = 08/17/2004 
 Lab Value = 0.005 
 RPT Level =  
 Lab Sample ID = 20042240113  Analysis Date = 08/05/2004 
 Lab Value = 0.002 
 RPT Level =  
 Lab Sample ID = 20042170122  Analysis Date = 08/05/2004 
 Lab Value = -0.01 
 RPT Level =  
 Lab Sample ID = 20042110014  Analysis Date = 07/29/2004 
 Lab Value = 0.001 
 RPT Level =  
 Lab Sample ID = 20042040077  Analysis Date = 07/21/2004 
 Lab Value = 0.005 
 RPT Level =  
 Lab Sample ID = 20041960049  Analysis Date = 07/13/2004 
 Lab Value = 0.006 
 RPT Level =  
 Lab Sample ID = 20041900061  Analysis Date = 07/13/2004 
 Lab Value = 0.001 
 RPT Level =  
 Lab Sample ID = 20041820034  Analysis Date = 07/13/2004 
 Lab Value = -0.015 
 RPT Level =  
 Lab Sample ID = 20041750056  Analysis Date = 06/22/2004 
 Lab Value = 0.021 
 RPT Level =  
 Lab Sample ID = 20041700082  Analysis Date = 06/22/2004 
 Lab Value = 0.004 
 RPT Level =  
 Lab Sample ID = 20041610056  Analysis Date = 06/09/2004 
 Lab Value = 0.011 
 RPT Level =  
 Lab Sample ID = 20041550020  Analysis Date = 07/14/2011 
 RPT Level = 0.05  Analysis Date = 07/14/2011 
 RPT Level = 0.05  Analysis Date = 07/14/2011 
 RPT Level = 0.05  Analysis Date = 07/14/2011 
 RPT Level = 0.05  Analysis Date = 07/14/2011 
 RPT Level = 0.05  Analysis Date = 06/24/2011 
 RPT Level = 0.05  Analysis Date = 06/24/2011 
 RPT Level = 0.05  Analysis Date = 06/17/2011 
 RPT Level = 0.05  Analysis Date = 06/17/2011 
 RPT Level = 0.05  Analysis Date = 06/13/2011 
 RPT Level = 0.05  Analysis Date = 06/13/2011 
 RPT Level = 0.05  Analysis Date = 06/13/2011 
 RPT Level = 0.05  Analysis Date = 06/13/2011 
 RPT Level = 0.05  Analysis Date = 05/31/2011 
 RPT Level = 0.05  Analysis Date = 05/31/2011 
 RPT Level = 0.05  Analysis Date = 05/31/2011 
 RPT Level = 0.05  Analysis Date = 05/31/2011 
 RPT Level = 0.05  Analysis Date = 05/12/2011 
 RPT Level = 0.05  Analysis Date = 05/12/2011 
 RPT Level = 0.05  Analysis Date = 05/12/2011 
 RPT Level = 0.05  Analysis Date = 05/12/2011 
 RPT Level = 0.05  Analysis Date = 04/29/2011 
 RPT Level = 0.05  Analysis Date = 04/29/2011 
 RPT Level = 0.05  Analysis Date = 04/26/2011 
 RPT Level = 0.05  Analysis Date = 04/26/2011 
 RPT Level = 0.05  Analysis Date = 04/13/2011 
 RPT Level = 0.05  Analysis Date = 04/13/2011 
 RPT Level = 0.05  Analysis Date = 04/13/2011 
 RPT Level = 0.05  Analysis Date = 04/13/2011 
 RPT Level = 0.05  Analysis Date = 04/06/2011 
 RPT Level = 0.05  Analysis Date = 04/06/2011 
 RPT Level = 0.05  Analysis Date = 03/23/2011 
 RPT Level = 0.05  Analysis Date = 03/23/2011 
 RPT Level = 0.05  Analysis Date = 03/23/2011 
 RPT Level = 0.05  Analysis Date = 03/23/2011 
 RPT Level = 0.05  Analysis Date = 03/14/2011 
 RPT Level = 0.05  Analysis Date = 03/14/2011 
 RPT Level = 0.05  Analysis Date = 03/04/2011 
 RPT Level = 0.05  Analysis Date = 03/04/2011 
 RPT Level = 0.05  Analysis Date = 03/04/2011 
 RPT Level = 0.05  Analysis Date = 03/04/2011 
 RPT Level = 0.05  Analysis Date = 03/02/2011 
 RPT Level = 0.05  Analysis Date = 03/02/2011 
 RPT Level = 0.05  Analysis Date = 03/02/2011 
 RPT Level = 0.05  Analysis Date = 03/02/2011 
 RPT Level = 0.05  Analysis Date = 03/02/2011 
 RPT Level = 0.05  Analysis Date = 03/02/2011 
 RPT Level = 0.05  Analysis Date = 01/28/2011 
 RPT Level = 0.05  Analysis Date = 01/28/2011 
 RPT Level = 0.05  Analysis Date = 01/28/2011 
 RPT Level = 0.05  Analysis Date = 01/28/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 12/21/2010 
 RPT Level = 0.05  Analysis Date = 12/21/2010 
 RPT Level = 0.05  Analysis Date = 12/09/2010 
 RPT Level = 0.05  Analysis Date = 12/09/2010 
 RPT Level = 0.05  Analysis Date = 12/09/2010 
 RPT Level = 0.05  Analysis Date = 12/09/2010 
 RPT Level = 0.05  Analysis Date = 12/09/2010 
 RPT Level = 0.05  Analysis Date = 12/09/2010 
 RPT Level = 0.05  Analysis Date = 11/18/2010 
 RPT Level = 0.05  Analysis Date = 11/18/2010 
 RPT Level = 0.05  Analysis Date = 11/18/2010 
 RPT Level = 0.05  Analysis Date = 11/18/2010 
 RPT Level = 0.05  Analysis Date = 11/18/2010 
 RPT Level = 0.05  Analysis Date = 11/18/2010 
 RPT Level = 0.05  Analysis Date = 10/27/2010 
 RPT Level = 0.05  Analysis Date = 10/27/2010 
 RPT Level = 0.05  Analysis Date = 10/27/2010 
 RPT Level = 0.05  Analysis Date = 10/27/2010 
 RPT Level = 0.05  Analysis Date = 10/14/2010 
 RPT Level = 0.05  Analysis Date = 10/14/2010 
 RPT Level = 0.05  Analysis Date = 10/14/2010 
 RPT Level = 0.05  Analysis Date = 10/14/2010 
 RPT Level = 0.05  Analysis Date = 09/29/2010 
 RPT Level = 0.05  Analysis Date = 09/29/2010 
 RPT Level = 0.05  Analysis Date = 09/29/2010 
 RPT Level = 0.05  Analysis Date = 09/29/2010 
 RPT Level = 0.05  Analysis Date = 09/16/2010 
 RPT Level = 0.05  Analysis Date = 09/16/2010 
 RPT Level = 0.05  Analysis Date = 09/16/2010 
 RPT Level = 0.05  Analysis Date = 09/16/2010 
 RPT Level = 0.05  Analysis Date = 09/01/2010 
 RPT Level = 0.05  Analysis Date = 09/01/2010 
 RPT Level = 0.05  Analysis Date = 09/01/2010 
 RPT Level = 0.05  Analysis Date = 09/01/2010 
 RPT Level = 0.05  Analysis Date = 09/01/2010 
 RPT Level = 0.05  Analysis Date = 09/01/2010 
 RPT Level = 0.05  Analysis Date = 08/12/2010 
 RPT Level = 0.05  Analysis Date = 08/12/2010 
 RPT Level = 0.05  Analysis Date = 08/04/2010 
 RPT Level = 0.05  Analysis Date = 08/04/2010 
 RPT Level = 0.05  Analysis Date = 07/29/2010 
 RPT Level = 0.05  Analysis Date = 07/29/2010 
 RPT Level = 0.05  Analysis Date = 07/20/2010 
 RPT Level = 0.05  Analysis Date = 07/20/2010 
 RPT Level = 0.05  Analysis Date = 07/20/2010 
 RPT Level = 0.05  Analysis Date = 07/20/2010 
 RPT Level = 0.05  Analysis Date = 07/20/2010 
 RPT Level = 0.05  Analysis Date = 07/20/2010 
 RPT Level = 0.05  Analysis Date = 07/01/2010 
 RPT Level = 0.05  Analysis Date = 07/01/2010 
 RPT Level = 0.05  Analysis Date = 07/01/2010 
 RPT Level = 0.05  Analysis Date = 07/01/2010 
 RPT Level = 0.05  Analysis Date = 07/01/2010 
 RPT Level = 0.05  Analysis Date = 07/01/2010 
 RPT Level = 0.05  Analysis Date = 06/09/2010 
 RPT Level = 0.05  Analysis Date = 06/09/2010 
 RPT Level = 0.05  Analysis Date = 06/09/2010 
 RPT Level = 0.05  Analysis Date = 06/09/2010 
 RPT Level = 0.05  Analysis Date = 06/09/2010 
 RPT Level = 0.05  Analysis Date = 06/09/2010 
 RPT Level = 0.05  Analysis Date = 05/20/2010 
 RPT Level = 0.05  Analysis Date = 05/20/2010 
 RPT Level = 0.05  Analysis Date = 05/20/2010 
 RPT Level = 0.05  Analysis Date = 05/20/2010 
 RPT Level = 0.05  Analysis Date = 05/05/2010 
 RPT Level = 0.05  Analysis Date = 05/05/2010 
 RPT Level = 0.05  Analysis Date = 05/05/2010 
 RPT Level = 0.05  Analysis Date = 05/05/2010 
 RPT Level = 0.05  Analysis Date = 05/05/2010 
 RPT Level = 0.05  Analysis Date = 05/05/2010 
 RPT Level = 0.05  Analysis Date = 04/15/2010 
 RPT Level = 0.05  Analysis Date = 04/15/2010 
 RPT Level = 0.05  Analysis Date = 04/01/2010 
 RPT Level = 0.05  Analysis Date = 04/01/2010 
 RPT Level = 0.05  Analysis Date = 04/01/2010 
 RPT Level = 0.05  Analysis Date = 04/01/2010 
 RPT Level = 0.05  Analysis Date = 04/01/2010 
 RPT Level = 0.05  Analysis Date = 04/01/2010 
 RPT Level = 0.05  Analysis Date = 03/16/2010 
 RPT Level = 0.05  Analysis Date = 03/16/2010 
 RPT Level = 0.05  Analysis Date = 03/05/2010 
 RPT Level = 0.05  Analysis Date = 03/05/2010 
 RPT Level = 0.05  Analysis Date = 02/24/2010 
 RPT Level = 0.05  Analysis Date = 02/24/2010 
 RPT Level = 0.05  Analysis Date = 02/24/2010 
 RPT Level = 0.05  Analysis Date = 02/24/2010 
 RPT Level = 0.05  Analysis Date = 02/18/2010 
 RPT Level = 0.05  Analysis Date = 02/18/2010 
 RPT Level = 0.05  Analysis Date = 02/05/2010 
 RPT Level = 0.05  Analysis Date = 02/05/2010 
 RPT Level = 0.05  Analysis Date = 02/05/2010 
 RPT Level = 0.05  Analysis Date = 02/05/2010 
 RPT Level = 0.05  Analysis Date = 02/05/2010 
 RPT Level = 0.05  Analysis Date = 02/05/2010 
 RPT Level = 0.05  Analysis Date = 01/20/2010 
 RPT Level = 0.05  Analysis Date = 01/20/2010 
 RPT Level = 0.05  Analysis Date = 01/20/2010 
 RPT Level = 0.05  Analysis Date = 01/20/2010 
 RPT Level = 0.05  Analysis Date = 01/20/2010 
 RPT Level = 0.05  Analysis Date = 01/20/2010 
 RPT Level = 0.05  Analysis Date = 01/20/2010 
 RPT Level = 0.05  Analysis Date = 01/20/2010 
 RPT Level = 0.05  Analysis Date = 12/22/2009 
 RPT Level = 0.05  Analysis Date = 12/22/2009 
 RPT Level = 0.05  Analysis Date = 12/11/2009 
 RPT Level = 0.05  Analysis Date = 12/11/2009 
 RPT Level = 0.05  Analysis Date = 12/11/2009 
 RPT Level = 0.05  Analysis Date = 12/11/2009 
 RPT Level = 0.05  Analysis Date = 12/11/2009 
 RPT Level = 0.05  Analysis Date = 12/11/2009 
 RPT Level = 0.05  Analysis Date = 11/19/2009 
 RPT Level = 0.05  Analysis Date = 11/19/2009 
 RPT Level = 0.05  Analysis Date = 11/19/2009 
 RPT Level = 0.05  Analysis Date = 11/19/2009 
 RPT Level = 0.05  Analysis Date = 11/19/2009 
 RPT Level = 0.05  Analysis Date = 11/19/2009 
 RPT Level = 0.05  Analysis Date = 11/19/2009 
 RPT Level = 0.05  Analysis Date = 11/19/2009 
 RPT Level = 0.05  Analysis Date = 10/22/2009 
 RPT Level = 0.05  Analysis Date = 10/22/2009 
 RPT Level = 0.05  Analysis Date = 10/22/2009 
 RPT Level = 0.05  Analysis Date = 10/22/2009 
 RPT Level = 0.05  Analysis Date = 10/22/2009 
 RPT Level = 0.05  Analysis Date = 10/22/2009 
 RPT Level = 0.05  Analysis Date = 10/07/2009 
 RPT Level = 0.05  Analysis Date = 10/07/2009 
 RPT Level = 0.05  Analysis Date = 10/07/2009 
 RPT Level = 0.05  Analysis Date = 10/07/2009 
 RPT Level = 0.05  Analysis Date = 10/07/2009 
 RPT Level = 0.05  Analysis Date = 10/07/2009 
 RPT Level = 0.05  Analysis Date = 09/16/2009 
 RPT Level = 0.05  Analysis Date = 09/16/2009 
 RPT Level = 0.05  Analysis Date = 09/16/2009 
 RPT Level = 0.05  Analysis Date = 09/16/2009 
 RPT Level = 0.05  Analysis Date = 09/16/2009 
 RPT Level = 0.05  Analysis Date = 09/16/2009 
 RPT Level = 0.05  Analysis Date = 09/16/2009 
 RPT Level = 0.05  Analysis Date = 09/16/2009 
 RPT Level = 0.05  Analysis Date = 08/19/2009 
 RPT Level = 0.05  Analysis Date = 08/19/2009 
 RPT Level = 0.05  Analysis Date = 08/11/2009 
 RPT Level = 0.05  Analysis Date = 08/11/2009 
 RPT Level = 0.05  Analysis Date = 08/11/2009 
 RPT Level = 0.05  Analysis Date = 08/11/2009 
 RPT Level = 0.05  Analysis Date = 07/22/2009 
 RPT Level = 0.05  Analysis Date = 07/22/2009 
 RPT Level = 0.05  Analysis Date = 07/22/2009 
 RPT Level = 0.05  Analysis Date = 07/22/2009 
 RPT Level = 0.05  Analysis Date = 07/22/2009 
 RPT Level = 0.05  Analysis Date = 07/22/2009 
 RPT Level = 0.05  Analysis Date = 07/07/2009 
 RPT Level = 0.05  Analysis Date = 07/07/2009 
 RPT Level = 0.05  Analysis Date = 07/07/2009 
 RPT Level = 0.05  Analysis Date = 07/07/2009 
 RPT Level = 0.05  Analysis Date = 06/18/2009 
 RPT Level = 0.05  Analysis Date = 06/18/2009 
 RPT Level = 0.05  Analysis Date = 06/18/2009 
 RPT Level = 0.05  Analysis Date = 06/18/2009 
 RPT Level = 0.05  Analysis Date = 06/18/2009 
 RPT Level = 0.05  Analysis Date = 06/18/2009 
 RPT Level = 0.05  Analysis Date = 06/02/2009 
 RPT Level = 0.05  Analysis Date = 06/02/2009 
 RPT Level = 0.05  Analysis Date = 06/02/2009 
 RPT Level = 0.05  Analysis Date = 06/02/2009 
 RPT Level = 0.05  Analysis Date = 05/20/2009 
 RPT Level = 0.05  Analysis Date = 05/20/2009 
 RPT Level = 0.05  Analysis Date = 05/20/2009 
 RPT Level = 0.05  Analysis Date = 05/20/2009 
 RPT Level = 0.05  Analysis Date = 05/20/2009 
 RPT Level = 0.05  Analysis Date = 05/20/2009 
 RPT Level = 0.05  Analysis Date = 04/28/2009 
 RPT Level = 0.05  Analysis Date = 04/28/2009 
 RPT Level = 0.05  Analysis Date = 04/28/2009 
 RPT Level = 0.05  Analysis Date = 04/28/2009 
 RPT Level = 0.05  Analysis Date = 04/28/2009 
 RPT Level = 0.05  Analysis Date = 04/28/2009 
 RPT Level = 0.05  Analysis Date = 04/01/2009 
 RPT Level = 0.05  Analysis Date = 04/01/2009 
 RPT Level = 0.05  Analysis Date = 04/01/2009 
 RPT Level = 0.05  Analysis Date = 04/01/2009 
 RPT Level = 0.05  Analysis Date = 03/25/2009 
 RPT Level = 0.05  Analysis Date = 03/25/2009 
 RPT Level = 0.05  Analysis Date = 03/17/2009 
 RPT Level = 0.05  Analysis Date = 03/17/2009 
 RPT Level = 0.05  Analysis Date = 03/17/2009 
 RPT Level = 0.05  Analysis Date = 03/17/2009 
 RPT Level = 0.05  Analysis Date = 02/26/2009 
 RPT Level = 0.05  Analysis Date = 02/26/2009 
 RPT Level = 0.05  Analysis Date = 02/24/2009 
 RPT Level = 0.05  Analysis Date = 02/24/2009 
 RPT Level = 0.05  Analysis Date = 02/12/2009 
 RPT Level = 0.05  Analysis Date = 02/12/2009 
 RPT Level = 0.05  Analysis Date = 02/12/2009 
 RPT Level = 0.05  Analysis Date = 02/12/2009 
 RPT Level = 0.05  Analysis Date = 02/12/2009 
 RPT Level = 0.05  Analysis Date = 02/12/2009 
 RPT Level = 0.05  Analysis Date = 01/22/2009 
 RPT Level = 0.05  Analysis Date = 01/22/2009 
 RPT Level = 0.05  Analysis Date = 01/15/2009 
 RPT Level = 0.05  Analysis Date = 01/15/2009 
 RPT Level = 0.05  Analysis Date = 01/15/2009 
 RPT Level = 0.05  Analysis Date = 01/15/2009 
 RPT Level = 0.05  Analysis Date = 01/15/2009 
 RPT Level = 0.05  Analysis Date = 01/15/2009 
 RPT Level = 0.05  Analysis Date = 12/31/2008 
 RPT Level = 0.05  Analysis Date = 12/31/2008 
 RPT Level = 0.05  Analysis Date = 12/18/2008 
 RPT Level = 0.05  Analysis Date = 12/18/2008 
 RPT Level = 0.05  Analysis Date = 12/15/2008 
 RPT Level = 0.05  Analysis Date = 12/15/2008 
 RPT Level = 0.05  Analysis Date = 12/10/2008 
 RPT Level = 0.05  Analysis Date = 12/10/2008 
 RPT Level = 0.05  Analysis Date = 12/10/2008 
 RPT Level = 0.05  Analysis Date = 12/10/2008 
 RPT Level = 0.05  Analysis Date = 11/24/2008 
 RPT Level = 0.05  Analysis Date = 11/24/2008 
 RPT Level = 0.05  Analysis Date = 11/24/2008 
 RPT Level = 0.05  Analysis Date = 11/24/2008 
 RPT Level = 0.05  Analysis Date = 11/24/2008 
 RPT Level = 0.05  Analysis Date = 11/24/2008 
 RPT Level = 0.05  Analysis Date = 11/04/2008 
 RPT Level = 0.05  Analysis Date = 11/04/2008 
 RPT Level = 0.05  Analysis Date = 10/23/2008 
 RPT Level = 0.05  Analysis Date = 10/23/2008 
 RPT Level = 0.05  Analysis Date = 10/20/2008 
 RPT Level = 0.05  Analysis Date = 10/20/2008 
 RPT Level = 0.05  Analysis Date = 10/09/2008 
 RPT Level = 0.05  Analysis Date = 10/09/2008 
 RPT Level = 0.05  Analysis Date = 10/07/2008 
 RPT Level = 0.03  Analysis Date = 10/07/2008 
 RPT Level = 0.03  Analysis Date = 10/07/2008 
 RPT Level = 0.03  Analysis Date = 10/07/2008 
 RPT Level = 0.03  Analysis Date = 09/23/2008 
 RPT Level = 0.03  Analysis Date = 09/23/2008 
 RPT Level = 0.03  Analysis Date = 09/11/2008 
 RPT Level = 0.03  Analysis Date = 09/11/2008 
 RPT Level = 0.03  Analysis Date = 09/11/2008 
 RPT Level = 0.03  Analysis Date = 09/11/2008 
 RPT Level = 0.03  Analysis Date = 08/27/2008 
 RPT Level = 0.03  Analysis Date = 08/27/2008 
 RPT Level = 0.03  Analysis Date = 08/27/2008 
 RPT Level = 0.03  Analysis Date = 08/27/2008 
 RPT Level = 0.03  Analysis Date = 08/27/2008 
 RPT Level = 0.03  Analysis Date = 08/27/2008 
 RPT Level = 0.03  Analysis Date = 08/07/2008 
 RPT Level = 0.03  Analysis Date = 08/07/2008 
 RPT Level = 0.03  Analysis Date = 07/23/2008 
 RPT Level = 0.03  Analysis Date = 07/23/2008 
 RPT Level = 0.03  Analysis Date = 07/21/2008 
 RPT Level = 0.03  Analysis Date = 07/21/2008 
 RPT Level = 0.03  Analysis Date = 07/14/2008 
 RPT Level = 0.03  Analysis Date = 07/14/2008 
 RPT Level = 0.03  Analysis Date = 07/03/2008 
 RPT Level = 0.03  Analysis Date = 07/03/2008 
 RPT Level = 0.03  Analysis Date = 07/03/2008 
 RPT Level = 0.03  Analysis Date = 07/03/2008 
 RPT Level = 0.03  Analysis Date = 06/26/2008 
 RPT Level = 0.03  Analysis Date = 06/26/2008 
 RPT Level = 0.03  Analysis Date = 06/11/2008 
 RPT Level = 0.03  Analysis Date = 06/11/2008 
 RPT Level = 0.03  Analysis Date = 06/11/2008 
 RPT Level = 0.03  Analysis Date = 06/11/2008 
 RPT Level = 0.03  Analysis Date = 06/11/2008 
 RPT Level = 0.03  Analysis Date = 06/11/2008 
 RPT Level = 0.03  Analysis Date = 05/29/2008 
 RPT Level = 0.03  Analysis Date = 05/29/2008 
 RPT Level = 0.03  Analysis Date = 05/29/2008 
 RPT Level = 0.03  Analysis Date = 05/29/2008 
 RPT Level = 0.03  Analysis Date = 05/29/2008 
 RPT Level = 0.03  Analysis Date = 05/29/2008 
 RPT Level = 0.03  Analysis Date = 04/30/2008 
 RPT Level = 0.03  Analysis Date = 04/30/2008 
 RPT Level = 0.03  Analysis Date = 04/22/2008 
 RPT Level = 0.03  Analysis Date = 04/22/2008 
 RPT Level = 0.03  Analysis Date = 04/21/2008 
 RPT Level = 0.03  Analysis Date = 04/21/2008 
 RPT Level = 0.03  Analysis Date = 04/15/2008 
 RPT Level = 0.03  Analysis Date = 04/15/2008 
 RPT Level = 0.03  Analysis Date = 04/04/2008 
 RPT Level = 0.03  Analysis Date = 04/04/2008 
 RPT Level = 0.03  Analysis Date = 03/26/2008 
 RPT Level = 0.03  Analysis Date = 03/26/2008 
 RPT Level = 0.03  Analysis Date = 03/26/2008 
 RPT Level = 0.03  Analysis Date = 03/26/2008 
 RPT Level = 0.03  Analysis Date = 03/26/2008 
 RPT Level = 0.03  Analysis Date = 03/26/2008 
 RPT Level = 0.03  Analysis Date = 03/26/2008 
 RPT Level = 0.03  Analysis Date = 03/26/2008 
 RPT Level = 0.03  Analysis Date = 03/26/2008 
 RPT Level = 0.03  Analysis Date = 03/26/2008 
 RPT Level = 0.03  Analysis Date = 02/26/2008 
 RPT Level = 0.03  Analysis Date = 02/26/2008 
 RPT Level = 0.03  Analysis Date = 02/26/2008 
 RPT Level = 0.03  Analysis Date = 02/26/2008 
 RPT Level = 0.03  Analysis Date = 01/31/2008 
 RPT Level = 0.03  Analysis Date = 01/31/2008 
 RPT Level = 0.03  Analysis Date = 01/25/2008 
 RPT Level = 0.03  Analysis Date = 01/25/2008 
 RPT Level = 0.03  Analysis Date = 01/22/2008 
 RPT Level = 0.03  Analysis Date = 01/22/2008 
 RPT Level = 0.03  Analysis Date = 01/08/2008 
 RPT Level = 0.03  Analysis Date = 01/08/2008 
 RPT Level = 0.03  Analysis Date = 01/07/2008 
 RPT Level = 0.03  Analysis Date = 01/07/2008 
 RPT Level = 0.03  Analysis Date = 12/20/2007 
 RPT Level = 0.03  Analysis Date = 12/20/2007 
 RPT Level = 0.03  Analysis Date = 12/18/2007 
 RPT Level = 0.03  Analysis Date = 12/18/2007 
 RPT Level = 0.03  Analysis Date = 12/06/2007 
 RPT Level = 0.03  Analysis Date = 12/06/2007 
 RPT Level = 0.03  Analysis Date = 11/28/2007 
 RPT Level = 0.03  Analysis Date = 11/28/2007 
 RPT Level = 0.03  Analysis Date = 11/28/2007 
 RPT Level = 0.03  Analysis Date = 11/28/2007 
 RPT Level = 0.03  Analysis Date = 11/16/2007 
 RPT Level = 0.03  Analysis Date = 11/16/2007 
 RPT Level = 0.03  Analysis Date = 11/14/2007 
 RPT Level = 0.03  Analysis Date = 11/14/2007 
 RPT Level = 0.03  Analysis Date = 10/31/2007 
 RPT Level = 0.03  Analysis Date = 10/31/2007 
 RPT Level = 0.03  Analysis Date = 10/31/2007 
 RPT Level = 0.03  Analysis Date = 10/31/2007 
 RPT Level = 0.03  Analysis Date = 10/31/2007 
 RPT Level = 0.03  Analysis Date = 10/31/2007 
 RPT Level = 0.03  Analysis Date = 10/22/2007 
 RPT Level = 0.03  Analysis Date = 10/22/2007 
 RPT Level = 0.03  Analysis Date = 09/26/2007 
 RPT Level = 0.03  Analysis Date = 09/26/2007 
 RPT Level = 0.03  Analysis Date = 09/20/2007 
 RPT Level = 0.03  Analysis Date = 09/20/2007 
 RPT Level = 0.03  Analysis Date = 09/20/2007 
 RPT Level = 0.03  Analysis Date = 09/20/2007 
 RPT Level = 0.03  Analysis Date = 09/11/2007 
 RPT Level = 0.03  Analysis Date = 09/11/2007 
 RPT Level = 0.03  Analysis Date = 09/11/2007 
 RPT Level = 0.03  Analysis Date = 09/11/2007 
 RPT Level = 0.03  Analysis Date = 08/27/2007 
 RPT Level = 0.03  Analysis Date = 08/27/2007 
 RPT Level = 0.03  Analysis Date = 08/27/2007 
 RPT Level = 0.03  Analysis Date = 08/27/2007 
 RPT Level = 0.03  Analysis Date = 08/21/2007 
 RPT Level = 0.03  Analysis Date = 08/21/2007 
 RPT Level = 0.03  Analysis Date = 08/07/2007 
 RPT Level = 0.03  Analysis Date = 08/07/2007 
 RPT Level = 0.03  Analysis Date = 08/07/2007 
 RPT Level = 0.03  Analysis Date = 08/07/2007 
 RPT Level = 0.03  Analysis Date = 08/07/2007 
 RPT Level = 0.03  Analysis Date = 08/07/2007 
 RPT Level = 0.03  Analysis Date = 07/05/2007 
 RPT Level = 0.03  Analysis Date = 07/05/2007 
 RPT Level = 0.03  Analysis Date = 07/05/2007 
 RPT Level = 0.03  Analysis Date = 07/05/2007 
 RPT Level = 0.03  Analysis Date = 06/27/2007 
 RPT Level = 0.03  Analysis Date = 06/27/2007 
 RPT Level = 0.03  Analysis Date = 06/27/2007 
 RPT Level = 0.03  Analysis Date = 06/27/2007 
 RPT Level = 0.03  Analysis Date = 06/08/2007 
 RPT Level = 0.03  Analysis Date = 06/08/2007 
 RPT Level = 0.03  Analysis Date = 06/08/2007 
 RPT Level = 0.03  Analysis Date = 06/08/2007 
 RPT Level = 0.03  Analysis Date = 05/29/2007 
 RPT Level = 0.03  Analysis Date = 05/29/2007 
 RPT Level = 0.03  Analysis Date = 05/16/2007 
 RPT Level = 0.03  Analysis Date = 05/16/2007 
 RPT Level = 0.03  Analysis Date = 05/16/2007 
 RPT Level = 0.03  Analysis Date = 05/16/2007 
 RPT Level = 0.03  Analysis Date = 05/07/2007 
 RPT Level = 0.03  Analysis Date = 05/07/2007 
 RPT Level = 0.03  Analysis Date = 05/07/2007 
 RPT Level = 0.03  Analysis Date = 05/07/2007 
 RPT Level = 0.03  Analysis Date = 04/24/2007 
 RPT Level = 0.03  Analysis Date = 04/24/2007 
 RPT Level = 0.03  Analysis Date = 04/18/2007 
 RPT Level = 0.03  Analysis Date = 04/18/2007 
 RPT Level = 0.03  Analysis Date = 04/05/2007 
 RPT Level = 0.03  Analysis Date = 04/05/2007 
 RPT Level = 0.03  Analysis Date = 04/05/2007 
 RPT Level = 0.03  Analysis Date = 04/05/2007 
 RPT Level = 0.03  Analysis Date = 03/26/2007 
 RPT Level = 0.03  Analysis Date = 03/26/2007 
 RPT Level = 0.03  Analysis Date = 03/26/2007 
 RPT Level = 0.03  Analysis Date = 03/26/2007 
 RPT Level = 0.03  Analysis Date = 03/15/2007 
 RPT Level = 0.03  Analysis Date = 03/15/2007 
 RPT Level = 0.03  Analysis Date = 03/15/2007 
 RPT Level = 0.03  Analysis Date = 03/15/2007 
 RPT Level = 0.03  Analysis Date = 03/15/2007 
 RPT Level = 0.03  Analysis Date = 03/15/2007 
 RPT Level = 0.03  Analysis Date = 02/22/2007 
 RPT Level = 0.03  Analysis Date = 02/22/2007 
 RPT Level = 0.03  Analysis Date = 02/14/2007 
 RPT Level = 0.03  Analysis Date = 02/14/2007 
 RPT Level = 0.03  Analysis Date = 02/02/2007 
 RPT Level = 0.03  Analysis Date = 02/02/2007 
 RPT Level = 0.03  Analysis Date = 01/25/2007 
 RPT Level = 0.03  Analysis Date = 01/25/2007 
 RPT Level = 0.03  Analysis Date = 01/25/2007 
 RPT Level = 0.03  Analysis Date = 01/25/2007 
 RPT Level = 0.03  Analysis Date = 09/22/2005 
 RPT Level = 0.03  Analysis Date = 09/22/2005 
 RPT Level = 0.03  Analysis Date = 09/22/2005 
 RPT Level = 0.03  Analysis Date = 09/22/2005 
 RPT Level = 0.03  Analysis Date = 09/22/2005 
 RPT Level = 0.03  Analysis Date = 09/22/2005 
 RPT Level = 0.03  Analysis Date = 08/31/2005 
 RPT Level = 0.03  Analysis Date = 08/31/2005 
 RPT Level = 0.03  Analysis Date = 08/31/2005 
 RPT Level = 0.03  Analysis Date = 08/31/2005 
 RPT Level = 0.03  Analysis Date = 08/16/2005 
 RPT Level = 0.03  Analysis Date = 08/16/2005 
 RPT Level = 0.03  Analysis Date = 08/16/2005 
 RPT Level = 0.03  Analysis Date = 08/16/2005 
 RPT Level = 0.03  Analysis Date = 08/16/2005 
 RPT Level = 0.03  Analysis Date = 08/16/2005 
 RPT Level = 0.03  Analysis Date = 08/02/2005 
 RPT Level = 0.03  Analysis Date = 08/02/2005 
 RPT Level = 0.03  Analysis Date = 07/18/2005 
 RPT Level = 0.03  Analysis Date = 07/18/2005 
 RPT Level = 0.03  Analysis Date = 07/18/2005 
 RPT Level = 0.03  Analysis Date = 07/18/2005 
 RPT Level = 0.03  Analysis Date = 07/08/2005 
 RPT Level = 0.03  Analysis Date = 07/08/2005 
 RPT Level = 0.03  Analysis Date = 07/08/2005 
 RPT Level = 0.03  Analysis Date = 07/08/2005 
 RPT Level = 0.03  Analysis Date = 06/24/2005 
 RPT Level = 0.03  Analysis Date = 06/24/2005 
 RPT Level = 0.03  Analysis Date = 06/24/2005 
 RPT Level = 0.03  Analysis Date = 06/24/2005 
 RPT Level = 0.03  Analysis Date = 06/08/2005 
 RPT Level = 0.03  Analysis Date = 06/08/2005 
 RPT Level = 0.03  Analysis Date = 05/27/2005 
 RPT Level = 0.03  Analysis Date = 05/27/2005 
 RPT Level = 0.03  Analysis Date = 05/24/2005 
 RPT Level = 0.03  Analysis Date = 05/24/2005 
 RPT Level = 0.03  Analysis Date = 05/24/2005 
 RPT Level = 0.03  Analysis Date = 05/24/2005 
 RPT Level = 0.03  Analysis Date = 05/11/2005 
 RPT Level = 0.03  Analysis Date = 05/11/2005 
 RPT Level = 0.03  Analysis Date = 04/29/2005 
 RPT Level = 0.03  Analysis Date = 04/29/2005 
 RPT Level = 0.03  Analysis Date = 04/29/2005 
 RPT Level = 0.03  Analysis Date = 04/29/2005 
 RPT Level = 0.03  Analysis Date = 04/14/2005 
 RPT Level = 0.03  Analysis Date = 04/14/2005 
 RPT Level = 0.03  Analysis Date = 04/14/2005 
 RPT Level = 0.03  Analysis Date = 04/14/2005 
 RPT Level = 0.03  Analysis Date = 04/05/2005 
 RPT Level = 0.03  Analysis Date = 04/05/2005 
 RPT Level = 0.03  Analysis Date = 04/05/2005 
 RPT Level = 0.03  Analysis Date = 04/05/2005 
 RPT Level = 0.03  Analysis Date = 04/05/2005 
 RPT Level = 0.03  Analysis Date = 04/05/2005 
 RPT Level = 0.03  Analysis Date = 03/17/2005 
 RPT Level = 0.03  Analysis Date = 03/17/2005 
 RPT Level = 0.03  Analysis Date = 03/17/2005 
 RPT Level = 0.03  Analysis Date = 03/17/2005 
 RPT Level = 0.03  Analysis Date = 03/17/2005 
 RPT Level = 0.03  Analysis Date = 03/17/2005 
 RPT Level = 0.03  Analysis Date = 03/03/2005 
 RPT Level = 0.03  Analysis Date = 03/03/2005 
 RPT Level = 0.03  Analysis Date = 02/24/2005 
 RPT Level = 0.03  Analysis Date = 02/24/2005 
 RPT Level = 0.03  Analysis Date = 02/16/2005 
 RPT Level = 0.03  Analysis Date = 02/16/2005 
 RPT Level = 0.03  Analysis Date = 02/16/2005 
 RPT Level = 0.03  Analysis Date = 02/16/2005 
 RPT Level = 0.03  Analysis Date = 02/03/2005 
 RPT Level = 0.03  Analysis Date = 02/03/2005 
 RPT Level = 0.03  Analysis Date = 01/25/2005 
 RPT Level = 0.03  Analysis Date = 01/25/2005 
 RPT Level = 0.03  Analysis Date = 01/25/2005 
 RPT Level = 0.03  Analysis Date = 01/25/2005 
 RPT Level = 0.03  Analysis Date = 01/11/2005 
 RPT Level = 0.03  Analysis Date = 01/11/2005 
 RPT Level = 0.03  Analysis Date = 01/05/2005 
 RPT Level = 0.03  Analysis Date = 01/05/2005 
 RPT Level = 0.03  Analysis Date = 01/05/2005 
 RPT Level = 0.03  Analysis Date = 01/05/2005 
 RPT Level = 0.03  Analysis Date = 01/05/2005 
 RPT Level = 0.03  Analysis Date = 01/05/2005 
 RPT Level = 0.03  Analysis Date = 12/23/2004 
 RPT Level = 0.03  Analysis Date = 12/23/2004 
 RPT Level = 0.03  Analysis Date = 12/23/2004 
 RPT Level = 0.03  Analysis Date = 12/23/2004 
 RPT Level = 0.03  Analysis Date = 12/23/2004 
 RPT Level = 0.03  Analysis Date = 12/23/2004 
 RPT Level = 0.03  Analysis Date = 12/23/2004 
 RPT Level = 0.03  Analysis Date = 12/23/2004 
 RPT Level = 0.03  Analysis Date = 12/10/2004 
 RPT Level = 0.03  Analysis Date = 12/10/2004 
 RPT Level = 0.03  Analysis Date = 12/10/2004 
 RPT Level = 0.03  Analysis Date = 12/10/2004 
 RPT Level = 0.03  Analysis Date = 12/01/2004 
 RPT Level = 0.03  Analysis Date = 12/01/2004 
 RPT Level = 0.03  Analysis Date = 12/01/2004 
 RPT Level = 0.03  Analysis Date = 12/01/2004 
 RPT Level = 0.03  Analysis Date = 11/23/2004 
 RPT Level = 0.03  Y = 0
The SGPlot Procedure

False Positive Rate for Total Nitrogen (NH3+NO3+NO2+org N as N), FIL, CFA, ALK-P, ACD

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Total Nitrogen (NH3+NO3+NO2+org N as N), FIL, CFA, ALK-P, ACD 62854CL062 2004 17 0 0%
    2005 50 1 2%
    2007 36 0 0%
    2008 49 0 0%
    2009 52 0 0%
    2010 52 0 0%
    2011 41 0 0%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018



- Total Nitrogen (NH3+NO3+NO2+org N as N), UNF, CFA, ALK-P, ACD -
Blind Blank Results
Lab: NWQL, PCode: 62855, MCode: AKP01
Analysis dates: 06/23/04 through 09/26/16
Open Data Set

 Analysis Date = 11/02/2015 
 Lab Value = 0.181 
 RPT Level = 0.05 
 Lab Sample ID = 20152990071  Analysis Date = 07/27/2006 
 Lab Value = 1 
 RPT Level = 0.03 
 Lab Sample ID = 20061950008  Analysis Date = 11/02/2015 
 Lab Value = 0.181 
 RPT Level = 0.05 
 Lab Sample ID = 20152990071  Analysis Date = 07/27/2006 
 Lab Value = 1 
 RPT Level = 0.03 
 Lab Sample ID = 20061950008  Analysis Date = 09/26/2016 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20162640178  Analysis Date = 09/21/2016 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20162580021  Analysis Date = 09/15/2016 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20162520021  Analysis Date = 09/07/2016 
 Lab Value = -0.047 
 RPT Level = 0.05 
 Lab Sample ID = 20162440129  Analysis Date = 08/26/2016 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20162360202  Analysis Date = 08/22/2016 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20162290136  Analysis Date = 08/17/2016 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20162230012  Analysis Date = 08/11/2016 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20162150194  Analysis Date = 08/09/2016 
 Lab Value = -0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20162080237  Analysis Date = 07/29/2016 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20162010261  Analysis Date = 07/19/2016 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20161940115  Analysis Date = 07/08/2016 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20161870038  Analysis Date = 06/30/2016 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20161800089  Analysis Date = 06/24/2016 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20161740080  Analysis Date = 06/21/2016 
 Lab Value = 0.078 
 RPT Level = 0.05 
 Lab Sample ID = 20161660157  Analysis Date = 06/14/2016 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20161590161  Analysis Date = 06/03/2016 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20161520029  Analysis Date = 05/31/2016 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20161480203  Analysis Date = 05/12/2016 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20161270015  Analysis Date = 05/04/2016 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20161230047  Analysis Date = 04/29/2016 
 Lab Value = 0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20161160095  Analysis Date = 04/29/2016 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20161100131  Analysis Date = 04/15/2016 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20161020031  Analysis Date = 04/07/2016 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20160950050  Analysis Date = 04/01/2016 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20160880041  Analysis Date = 03/30/2016 
 Lab Value = 0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20160810071  Analysis Date = 03/16/2016 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20160740016  Analysis Date = 03/09/2016 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20160670017  Analysis Date = 03/03/2016 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20160600020  Analysis Date = 02/24/2016 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20160530019  Analysis Date = 02/17/2016 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20160470018  Analysis Date = 02/16/2016 
 Lab Value = 0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20160400086  Analysis Date = 02/05/2016 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20160320014  Analysis Date = 01/27/2016 
 Lab Value = -0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20160250029  Analysis Date = 01/22/2016 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20160190020  Analysis Date = 01/13/2016 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20160110012  Analysis Date = 01/08/2016 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20160050037  Analysis Date = 01/05/2016 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20153630051  Analysis Date = 12/23/2015 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20153550014  Analysis Date = 12/21/2015 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20153500167  Analysis Date = 12/11/2015 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20153420008  Analysis Date = 12/02/2015 
 Lab Value = 0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20153340010  Analysis Date = 11/30/2015 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20153270005  Analysis Date = 11/17/2015 
 Lab Value = 0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20153200028  Analysis Date = 11/16/2015 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20153140001  Analysis Date = 11/03/2015 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20153060024  Analysis Date = 10/29/2015 
 Lab Value = 0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20152920041  Analysis Date = 10/20/2015 
 Lab Value = 0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20152860162  Analysis Date = 10/15/2015 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20152780015  Analysis Date = 10/01/2015 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20152710074  Analysis Date = 09/28/2015 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20152640031  Analysis Date = 09/22/2015 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20152590168  Analysis Date = 09/28/2015 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20152510015  Analysis Date = 09/18/2015 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20152430087  Analysis Date = 09/01/2015 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20152360161  Analysis Date = 09/01/2015 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20152330023  Analysis Date = 08/19/2015 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20152230123  Analysis Date = 08/10/2015 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20152150081  Analysis Date = 07/31/2015 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20152080071  Analysis Date = 07/28/2015 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20152010054  Analysis Date = 07/16/2015 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20151940026  Analysis Date = 07/13/2015 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20151870013  Analysis Date = 07/01/2015 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20151800056  Analysis Date = 06/24/2015 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20151730017  Analysis Date = 06/22/2015 
 Lab Value = -0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20151660033  Analysis Date = 06/17/2015 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20151620206  Analysis Date = 06/05/2015 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20151530197  Analysis Date = 06/03/2015 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20151460122  Analysis Date = 05/28/2015 
 Lab Value = 0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20151390199  Analysis Date = 05/15/2015 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20151310072  Analysis Date = 05/07/2015 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20151240056  Analysis Date = 05/05/2015 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20151180075  Analysis Date = 05/01/2015 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20151140034  Analysis Date = 04/22/2015 
 Lab Value = 0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20151050043  Analysis Date = 04/15/2015 
 Lab Value = 0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20150970077  Analysis Date = 04/03/2015 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20150900047  Analysis Date = 04/03/2015 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20150850046  Analysis Date = 04/02/2015 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20150770030  Analysis Date = 03/16/2015 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20150690110  Analysis Date = 03/10/2015 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20150610108  Analysis Date = 03/05/2015 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20150540035  Analysis Date = 03/03/2015 
 Lab Value = 0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20150490026  Analysis Date = 02/19/2015 
 Lab Value = 0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20150400036  Analysis Date = 02/20/2015 
 Lab Value = -0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20150330028  Analysis Date = 02/10/2015 
 Lab Value = -0.054 
 RPT Level = 0.05 
 Lab Sample ID = 20150260018  Analysis Date = 02/05/2015 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20150200028  Analysis Date = 02/05/2015 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20150120025  Analysis Date = 02/10/2015 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20150050018  Analysis Date = 02/10/2015 
 Lab Value = 0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20143630011  Analysis Date = 01/07/2015 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20143560053  Analysis Date = 12/31/2014 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20143490027  Analysis Date = 12/16/2014 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20143420027  Analysis Date = 12/31/2014 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20143360081  Analysis Date = 12/04/2014 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20143300045  Analysis Date = 12/10/2014 
 Lab Value = -0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20143230052  Analysis Date = 12/31/2014 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20143160021  Analysis Date = 11/19/2014 
 Lab Value = -0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20143080076  Analysis Date = 11/05/2014 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20143010069  Analysis Date = 11/05/2014 
 Lab Value = -0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20142950130  Analysis Date = 10/24/2014 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20142880087  Analysis Date = 10/17/2014 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20142790035  Analysis Date = 10/16/2014 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20142720121  Analysis Date = 10/07/2014 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20142650111  Analysis Date = 09/30/2014 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20142590052  Analysis Date = 09/19/2014 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20142520006  Analysis Date = 09/17/2014 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20142470054  Analysis Date = 08/19/2014 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20142230083  Analysis Date = 08/19/2014 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20142160070  Analysis Date = 08/14/2014 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20142090218  Analysis Date = 08/05/2014 
 Lab Value = -0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20142030078  Analysis Date = 08/05/2014 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20141960043  Analysis Date = 07/24/2014 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20141890090  Analysis Date = 07/15/2014 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20141820108  Analysis Date = 07/09/2014 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20141750150  Analysis Date = 07/08/2014 
 Lab Value = 0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20141680086  Analysis Date = 07/01/2014 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20141620051  Analysis Date = 06/25/2014 
 Lab Value = 0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20141550065  Analysis Date = 06/16/2014 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20141470150  Analysis Date = 06/11/2014 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20141400016  Analysis Date = 05/28/2014 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20141340004  Analysis Date = 05/20/2014 
 Lab Value = 0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20141250088  Analysis Date = 05/15/2014 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20141190018  Analysis Date = 05/12/2014 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20141130029  Analysis Date = 04/24/2014 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20141050011  Analysis Date = 04/21/2014 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20140970031  Analysis Date = 04/11/2014 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20140900029  Analysis Date = 04/11/2014 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20140840094  Analysis Date = 03/27/2014 
 Lab Value = -0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20140760030  Analysis Date = 03/20/2014 
 Lab Value = -0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20140690028  Analysis Date = 03/20/2014 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20140630125  Analysis Date = 03/06/2014 
 Lab Value = -0.041 
 RPT Level = 0.05 
 Lab Sample ID = 20140550053  Analysis Date = 03/06/2014 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20140490016  Analysis Date = 02/19/2014 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20140410010  Analysis Date = 02/19/2014 
 Lab Value = -0.045 
 RPT Level = 0.05 
 Lab Sample ID = 20140340025  Analysis Date = 02/19/2014 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20140270198  Analysis Date = 02/11/2014 
 Lab Value = 0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20140210048  Analysis Date = 01/15/2014 
 Lab Value = 0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20140130052  Analysis Date = 01/15/2014 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20140070068  Analysis Date = 01/09/2014 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20133580057  Analysis Date = 01/09/2014 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20133500079  Analysis Date = 01/03/2014 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20133430112  Analysis Date = 12/18/2013 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20133360023  Analysis Date = 12/16/2013 
 Lab Value = 0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20133300014  Analysis Date = 11/27/2013 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20133230005  Analysis Date = 11/20/2013 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20133170106  Analysis Date = 11/14/2013 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20133090099  Analysis Date = 11/06/2013 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20133030024  Analysis Date = 10/31/2013 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20132970026  Analysis Date = 10/31/2013 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20132730139  Analysis Date = 10/25/2013 
 Lab Value = -0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20132660105  Analysis Date = 10/25/2013 
 Lab Value = -0.048 
 RPT Level = 0.05 
 Lab Sample ID = 20132600014  Analysis Date = 09/17/2013 
 Lab Value = -0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20132530114  Analysis Date = 09/09/2013 
 Lab Value = -0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20132410016  Analysis Date = 09/05/2013 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20132390009  Analysis Date = 09/05/2013 
 Lab Value = -0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20132350026  Analysis Date = 08/30/2013 
 Lab Value = -0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20132270020  Analysis Date = 08/29/2013 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20132180211  Analysis Date = 08/26/2013 
 Lab Value = -0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20132120021  Analysis Date = 08/13/2013 
 Lab Value = -0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20132040023  Analysis Date = 07/30/2013 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20131970026  Analysis Date = 08/02/2013 
 Lab Value = 0.068 
 RPT Level = 0.05 
 Lab Sample ID = 20131900089  Analysis Date = 07/23/2013 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20131830080  Analysis Date = 07/10/2013 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20131770012  Analysis Date = 07/08/2013 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20131700039  Analysis Date = 06/26/2013 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20131640007  Analysis Date = 06/14/2013 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20131550030  Analysis Date = 06/03/2013 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20131500023  Analysis Date = 06/03/2013 
 Lab Value = -0.039 
 RPT Level = 0.05 
 Lab Sample ID = 20131430201  Analysis Date = 05/23/2013 
 Lab Value = -0.046 
 RPT Level = 0.05 
 Lab Sample ID = 20131350119  Analysis Date = 05/21/2013 
 Lab Value = -0.024 
 RPT Level = 0.05 
 Lab Sample ID = 20131270023  Analysis Date = 05/08/2013 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20131220013  Analysis Date = 04/30/2013 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20131150033  Analysis Date = 05/02/2013 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20131120124  Analysis Date = 04/30/2013 
 Lab Value = 0.051 
 RPT Level = 0.05 
 Lab Sample ID = 20131090031  Analysis Date = 04/18/2013 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20130930088  Analysis Date = 04/04/2013 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20130840059  Analysis Date = 03/27/2013 
 Lab Value = -0.039 
 RPT Level = 0.05 
 Lab Sample ID = 20130770159  Analysis Date = 03/19/2013 
 Lab Value = -0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20130700012  Analysis Date = 03/11/2013 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20130630123  Analysis Date = 03/11/2013 
 Lab Value = -0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20130570008  Analysis Date = 02/26/2013 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20130520007  Analysis Date = 02/26/2013 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20130420053  Analysis Date = 02/21/2013 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20130350030  Analysis Date = 02/07/2013 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20130280040  Analysis Date = 02/07/2013 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20130230100  Analysis Date = 01/31/2013 
 Lab Value = 0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20130140072  Analysis Date = 01/18/2013 
 Lab Value = -0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20130070057  Analysis Date = 01/18/2013 
 Lab Value = -0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20130020011  Analysis Date = 01/11/2013 
 Lab Value = -0.04 
 RPT Level = 0.05 
 Lab Sample ID = 20123620012  Analysis Date = 01/11/2013 
 Lab Value = -0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20123530085  Analysis Date = 01/11/2013 
 Lab Value = -0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20123480060  Analysis Date = 12/20/2012 
 Lab Value = -0.07 
 RPT Level = 0.05 
 Lab Sample ID = 20123390114  Analysis Date = 12/20/2012 
 Lab Value = -0.07 
 RPT Level = 0.05 
 Lab Sample ID = 20123330011  Analysis Date = 12/14/2012 
 Lab Value = -0.041 
 RPT Level = 0.05 
 Lab Sample ID = 20123250064  Analysis Date = 12/14/2012 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20123200055  Analysis Date = 11/15/2012 
 Lab Value = -0.065 
 RPT Level = 0.05 
 Lab Sample ID = 20123120067  Analysis Date = 11/07/2012 
 Lab Value = -0.071 
 RPT Level = 0.05 
 Lab Sample ID = 20123040118  Analysis Date = 11/06/2012 
 Lab Value = -0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20122980125  Analysis Date = 10/29/2012 
 Lab Value = -0.036 
 RPT Level = 0.05 
 Lab Sample ID = 20122900095  Analysis Date = 10/19/2012 
 Lab Value = -0.103 
 RPT Level = 0.05 
 Lab Sample ID = 20122830035  Analysis Date = 10/19/2012 
 Lab Value = -0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20122750026  Analysis Date = 10/12/2012 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20122700109  Analysis Date = 10/11/2012 
 Lab Value = -0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20122690152  Analysis Date = 09/21/2012 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20122550014  Analysis Date = 09/18/2012 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20122490101  Analysis Date = 09/05/2012 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20122410012  Analysis Date = 09/04/2012 
 Lab Value = 0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20122350176  Analysis Date = 09/05/2012 
 Lab Value = 0.111 
 RPT Level = 0.05 
 Lab Sample ID = 20122280091  Analysis Date = 08/21/2012 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20122190097  Analysis Date = 08/21/2012 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20122140053  Analysis Date = 08/15/2012 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20122050102  Analysis Date = 08/08/2012 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20121990078  Analysis Date = 08/03/2012 
 Lab Value = -0.053 
 RPT Level = 0.05 
 Lab Sample ID = 20121910040  Analysis Date = 07/26/2012 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20121870019  Analysis Date = 07/18/2012 
 Lab Value = 0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20121780034  Analysis Date = 07/09/2012 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20121710007  Analysis Date = 06/25/2012 
 Lab Value = -0.071 
 RPT Level = 0.05 
 Lab Sample ID = 20121650053  Analysis Date = 06/14/2012 
 Lab Value = -0.044 
 RPT Level = 0.05 
 Lab Sample ID = 20121560124  Analysis Date = 06/05/2012 
 Lab Value = -0.051 
 RPT Level = 0.05 
 Lab Sample ID = 20121510025  Analysis Date = 06/08/2012 
 Lab Value = -0.049 
 RPT Level = 0.05 
 Lab Sample ID = 20121430022  Analysis Date = 05/29/2012 
 Lab Value = -0.041 
 RPT Level = 0.05 
 Lab Sample ID = 20121370052  Analysis Date = 05/25/2012 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20121290073  Analysis Date = 05/17/2012 
 Lab Value = -0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20121210122  Analysis Date = 05/03/2012 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20121150088  Analysis Date = 04/26/2012 
 Lab Value = -0.054 
 RPT Level = 0.05 
 Lab Sample ID = 20121080010  Analysis Date = 04/19/2012 
 Lab Value = -0.044 
 RPT Level = 0.05 
 Lab Sample ID = 20121010027  Analysis Date = 04/04/2012 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20120930055  Analysis Date = 04/04/2012 
 Lab Value = -0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20120870033  Analysis Date = 04/04/2012 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20120790084  Analysis Date = 03/29/2012 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20120730078  Analysis Date = 03/29/2012 
 Lab Value = 0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20120660074  Analysis Date = 03/15/2012 
 Lab Value = -0.111 
 RPT Level = 0.05 
 Lab Sample ID = 20120580060  Analysis Date = 01/12/2012 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20113610088  Analysis Date = 12/29/2011 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20113530138  Analysis Date = 12/22/2011 
 Lab Value = -0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20113490074  Analysis Date = 12/22/2011 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20113460138  Analysis Date = 12/15/2011 
 Lab Value = -0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20113320114  Analysis Date = 12/06/2011 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20113250125  Analysis Date = 11/23/2011 
 Lab Value = -0.034 
 RPT Level = 0.05 
 Lab Sample ID = 20113180163  Analysis Date = 11/16/2011 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20113110061  Analysis Date = 11/08/2011 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20113050093  Analysis Date = 11/01/2011 
 Lab Value = -0.022 
 RPT Level = 0.05 
 Lab Sample ID = 20112970117  Analysis Date = 10/25/2011 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20112910136  Analysis Date = 10/19/2011 
 Lab Value = -0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20112840072  Analysis Date = 10/13/2011 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20112760062  Analysis Date = 10/04/2011 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20112690122  Analysis Date = 09/27/2011 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20112630060  Analysis Date = 09/21/2011 
 Lab Value = -0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20112560022  Analysis Date = 09/20/2011 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20112510035  Analysis Date = 09/20/2011 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20112500187  Analysis Date = 08/30/2011 
 Lab Value = -0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20112360062  Analysis Date = 08/24/2011 
 Lab Value = 0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20112300037  Analysis Date = 08/12/2011 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20112200050  Analysis Date = 08/04/2011 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20112130155  Analysis Date = 08/02/2011 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20112060093  Analysis Date = 07/27/2011 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20112010021  Analysis Date = 07/19/2011 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20111920101  Analysis Date = 07/14/2011 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20111860061  Analysis Date = 07/06/2011 
 Lab Value = -0.042 
 RPT Level = 0.05 
 Lab Sample ID = 20111780163  Analysis Date = 06/23/2011 
 Lab Value = -0.074 
 RPT Level = 0.05 
 Lab Sample ID = 20111710110  Analysis Date = 06/17/2011 
 Lab Value = -0.064 
 RPT Level = 0.05 
 Lab Sample ID = 20111640065  Analysis Date = 06/09/2011 
 Lab Value = -0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20111570060  Analysis Date = 06/09/2011 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20111510148  Analysis Date = 06/14/2011 
 Lab Value = -0.041 
 RPT Level = 0.05 
 Lab Sample ID = 20111430201  Analysis Date = 05/25/2011 
 Lab Value = -0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20111360139  Analysis Date = 05/12/2011 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20111290045  Analysis Date = 05/06/2011 
 Lab Value = 0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20111220084  Analysis Date = 04/29/2011 
 Lab Value = -0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20111150112  Analysis Date = 04/22/2011 
 Lab Value = 0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20111080074  Analysis Date = 05/06/2011 
 Lab Value = -0.025 
 RPT Level = 0.05 
 Lab Sample ID = 20111010119  Analysis Date = 04/07/2011 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20110950055  Analysis Date = 03/30/2011 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20110870091  Analysis Date = 04/06/2011 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20110800058  Analysis Date = 03/28/2011 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20110750069  Analysis Date = 03/11/2011 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20110660030  Analysis Date = 03/11/2011 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20110590069  Analysis Date = 03/02/2011 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20110530104  Analysis Date = 03/01/2011 
 Lab Value = 0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20110450035  Analysis Date = 02/17/2011 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20110410097  Analysis Date = 02/17/2011 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20110400068  Analysis Date = 01/28/2011 
 Lab Value = -0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20110240064  Analysis Date = 01/19/2011 
 Lab Value = -0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20110180058  Analysis Date = 01/14/2011 
 Lab Value = -0.036 
 RPT Level = 0.05 
 Lab Sample ID = 20110110017  Analysis Date = 01/13/2011 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20110030022  Analysis Date = 01/13/2011 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20103610055  Analysis Date = 01/19/2011 
 Lab Value = -0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20103540045  Analysis Date = 12/21/2010 
 Lab Value = -0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20103470075  Analysis Date = 12/17/2010 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20103400083  Analysis Date = 12/09/2010 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20103330098  Analysis Date = 12/09/2010 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20103260066  Analysis Date = 11/23/2010 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20103190067  Analysis Date = 11/18/2010 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20103120027  Analysis Date = 11/10/2010 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20103060009  Analysis Date = 11/05/2010 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20102990005  Analysis Date = 10/27/2010 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20102920007  Analysis Date = 10/19/2010 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20102850131  Analysis Date = 10/19/2010 
 Lab Value = -0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20102770103  Analysis Date = 10/14/2010 
 Lab Value = -0.04 
 RPT Level = 0.05 
 Lab Sample ID = 20102700153  Analysis Date = 09/29/2010 
 Lab Value = 0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20102640135  Analysis Date = 09/23/2010 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20102570022  Analysis Date = 09/23/2010 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20102510060  Analysis Date = 09/10/2010 
 Lab Value = -0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20102430251  Analysis Date = 09/02/2010 
 Lab Value = -0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20102350198  Analysis Date = 08/26/2010 
 Lab Value = 0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20102290051  Analysis Date = 08/19/2010 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20102230039  Analysis Date = 08/11/2010 
 Lab Value = -0.036 
 RPT Level = 0.05 
 Lab Sample ID = 20102140089  Analysis Date = 08/03/2010 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20102080018  Analysis Date = 07/27/2010 
 Lab Value = -0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20102000187  Analysis Date = 07/20/2010 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20101930105  Analysis Date = 07/13/2010 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20101870061  Analysis Date = 07/13/2010 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20101790122  Analysis Date = 07/01/2010 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20101730069  Analysis Date = 06/23/2010 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20101660063  Analysis Date = 06/18/2010 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20101590013  Analysis Date = 06/18/2010 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20101530121  Analysis Date = 06/09/2010 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20101450016  Analysis Date = 06/02/2010 
 Lab Value = 0.015 
 RPT Level = 0.05 
 Lab Sample ID = 20101380022  Analysis Date = 05/20/2010 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20101310096  Analysis Date = 05/13/2010 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20101240078  Analysis Date = 05/05/2010 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20101180040  Analysis Date = 04/30/2010 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20101090060  Analysis Date = 04/20/2010 
 Lab Value = -0.035 
 RPT Level = 0.05 
 Lab Sample ID = 20101020074  Analysis Date = 04/15/2010 
 Lab Value = -0.013 
 RPT Level = 0.05 
 Lab Sample ID = 20100950035  Analysis Date = 04/07/2010 
 Lab Value = -0.001 
 RPT Level = 0.05 
 Lab Sample ID = 20100880050  Analysis Date = 04/07/2010 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20100850063  Analysis Date = 03/25/2010 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20100750001  Analysis Date = 03/16/2010 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20100680015  Analysis Date = 03/05/2010 
 Lab Value = 0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20100600068  Analysis Date = 02/24/2010 
 Lab Value = -0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20100530047  Analysis Date = 02/24/2010 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20100470026  Analysis Date = 02/11/2010 
 Lab Value = -0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20100390037  Analysis Date = 02/11/2010 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20100320021  Analysis Date = 02/05/2010 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20100260064  Analysis Date = 01/27/2010 
 Lab Value = -0.045 
 RPT Level = 0.05 
 Lab Sample ID = 20100190104  Analysis Date = 01/27/2010 
 Lab Value = -0.069 
 RPT Level = 0.05 
 Lab Sample ID = 20100110097  Analysis Date = 01/22/2010 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20100050015  Analysis Date = 01/22/2010 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20093620045  Analysis Date = 01/22/2010 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20093560035  Analysis Date = 12/22/2009 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20093480065  Analysis Date = 12/16/2009 
 Lab Value = 0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20093420008  Analysis Date = 12/16/2009 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20093350069  Analysis Date = 12/11/2009 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20093280016  Analysis Date = 11/24/2009 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20093200089  Analysis Date = 11/24/2009 
 Lab Value = -0.02 
 RPT Level = 0.05 
 Lab Sample ID = 20093130060  Analysis Date = 11/19/2009 
 Lab Value = -0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20093070203  Analysis Date = 11/13/2009 
 Lab Value = 0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20093000108  Analysis Date = 11/05/2009 
 Lab Value = -0.023 
 RPT Level = 0.05 
 Lab Sample ID = 20092920099  Analysis Date = 10/30/2009 
 Lab Value = -0.01 
 RPT Level = 0.05 
 Lab Sample ID = 20092870072  Analysis Date = 10/22/2009 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20092780069  Analysis Date = 10/22/2009 
 Lab Value = -0.032 
 RPT Level = 0.05 
 Lab Sample ID = 20092720021  Analysis Date = 10/07/2009 
 Lab Value = -0.009 
 RPT Level = 0.05 
 Lab Sample ID = 20092640045  Analysis Date = 10/08/2009 
 Lab Value = 0 
 RPT Level = 0.05 
 Lab Sample ID = 20092570047  Analysis Date = 10/02/2009 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20092520131  Analysis Date = 09/24/2009 
 Lab Value = -0.014 
 RPT Level = 0.05 
 Lab Sample ID = 20092430157  Analysis Date = 09/18/2009 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20092360172  Analysis Date = 09/09/2009 
 Lab Value = -0.029 
 RPT Level = 0.05 
 Lab Sample ID = 20092290213  Analysis Date = 08/31/2009 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20092220153  Analysis Date = 08/19/2009 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20092150075  Analysis Date = 08/19/2009 
 Lab Value = -0.021 
 RPT Level = 0.05 
 Lab Sample ID = 20092090265  Analysis Date = 08/05/2009 
 Lab Value = -0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20092010113  Analysis Date = 07/28/2009 
 Lab Value = -0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20091950024  Analysis Date = 07/22/2009 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20091870028  Analysis Date = 07/16/2009 
 Lab Value = -0.033 
 RPT Level = 0.05 
 Lab Sample ID = 20091800171  Analysis Date = 06/30/2009 
 Lab Value = -0.018 
 RPT Level = 0.05 
 Lab Sample ID = 20091730221  Analysis Date = 06/26/2009 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20091660209  Analysis Date = 06/22/2009 
 Lab Value = -0.044 
 RPT Level = 0.05 
 Lab Sample ID = 20091590089  Analysis Date = 06/09/2009 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20091520153  Analysis Date = 06/05/2009 
 Lab Value = -0.017 
 RPT Level = 0.05 
 Lab Sample ID = 20091460191  Analysis Date = 06/02/2009 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20091380124  Analysis Date = 06/02/2009 
 Lab Value = 0.028 
 RPT Level = 0.05 
 Lab Sample ID = 20091320021  Analysis Date = 05/20/2009 
 Lab Value = -0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20091240122  Analysis Date = 05/15/2009 
 Lab Value = -0.026 
 RPT Level = 0.05 
 Lab Sample ID = 20091170108  Analysis Date = 05/04/2009 
 Lab Value = 0.011 
 RPT Level = 0.05 
 Lab Sample ID = 20091110107  Analysis Date = 04/23/2009 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20091030084  Analysis Date = 04/21/2009 
 Lab Value = 0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20090960052  Analysis Date = 04/03/2009 
 Lab Value = 0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20090890067  Analysis Date = 04/01/2009 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20090820026  Analysis Date = 03/25/2009 
 Lab Value = -0.031 
 RPT Level = 0.05 
 Lab Sample ID = 20090750045  Analysis Date = 03/13/2009 
 Lab Value = -0.007 
 RPT Level = 0.05 
 Lab Sample ID = 20090680047  Analysis Date = 03/13/2009 
 Lab Value = 0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20090610058  Analysis Date = 03/10/2009 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20090540031  Analysis Date = 02/23/2009 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20090480056  Analysis Date = 02/12/2009 
 Lab Value = -0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20090400029  Analysis Date = 02/12/2009 
 Lab Value = -0.006 
 RPT Level = 0.05 
 Lab Sample ID = 20090330036  Analysis Date = 02/04/2009 
 Lab Value = 0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20090260025  Analysis Date = 01/26/2009 
 Lab Value = -0.044 
 RPT Level = 0.05 
 Lab Sample ID = 20090200033  Analysis Date = 01/21/2009 
 Lab Value = -0.027 
 RPT Level = 0.05 
 Lab Sample ID = 20090120047  Analysis Date = 01/14/2009 
 Lab Value = -0.043 
 RPT Level = 0.05 
 Lab Sample ID = 20090050018  Analysis Date = 01/08/2009 
 Lab Value = -0.004 
 RPT Level = 0.05 
 Lab Sample ID = 20083650082  Analysis Date = 01/08/2009 
 Lab Value = 0.005 
 RPT Level = 0.05 
 Lab Sample ID = 20083570035  Analysis Date = 01/07/2009 
 Lab Value = -0.003 
 RPT Level = 0.05 
 Lab Sample ID = 20083520228  Analysis Date = 12/15/2008 
 Lab Value = -0.008 
 RPT Level = 0.05 
 Lab Sample ID = 20083450059  Analysis Date = 12/08/2008 
 Lab Value = -0.037 
 RPT Level = 0.05 
 Lab Sample ID = 20083360038  Analysis Date = 12/04/2008 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20083290063  Analysis Date = 11/25/2008 
 Lab Value = 0.002 
 RPT Level = 0.05 
 Lab Sample ID = 20083220066  Analysis Date = 11/24/2008 
 Lab Value = -0.046 
 RPT Level = 0.05 
 Lab Sample ID = 20083150064  Analysis Date = 11/12/2008 
 Lab Value = -0.019 
 RPT Level = 0.05 
 Lab Sample ID = 20083080098  Analysis Date = 11/04/2008 
 Lab Value = 0.012 
 RPT Level = 0.05 
 Lab Sample ID = 20083010106  Analysis Date = 10/23/2008 
 Lab Value = -0.016 
 RPT Level = 0.05 
 Lab Sample ID = 20082940060  Analysis Date = 10/17/2008 
 Lab Value = -0.046 
 RPT Level = 0.05 
 Lab Sample ID = 20082880038  Analysis Date = 10/09/2008 
 Lab Value = -0.03 
 RPT Level = 0.05 
 Lab Sample ID = 20082800045  Analysis Date = 10/09/2008 
 Lab Value = -0.028 
 RPT Level = 0.03 
 Lab Sample ID = 20082730059  Analysis Date = 10/01/2008 
 Lab Value = -0.036 
 RPT Level = 0.03 
 Lab Sample ID = 20082660045  Analysis Date = 09/30/2008 
 Lab Value = 0.021 
 RPT Level = 0.03 
 Lab Sample ID = 20082590107  Analysis Date = 09/24/2008 
 Lab Value = -0.028 
 RPT Level = 0.03 
 Lab Sample ID = 20082520009  Analysis Date = 09/11/2008 
 Lab Value = -0.027 
 RPT Level = 0.03 
 Lab Sample ID = 20082460099  Analysis Date = 08/28/2008 
 Lab Value = -0.017 
 RPT Level = 0.03 
 Lab Sample ID = 20082380078  Analysis Date = 08/27/2008 
 Lab Value = -0.035 
 RPT Level = 0.03 
 Lab Sample ID = 20082310132  Analysis Date = 08/19/2008 
 Lab Value = 0.023 
 RPT Level = 0.03 
 Lab Sample ID = 20082250012  Analysis Date = 08/14/2008 
 Lab Value = -0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20082190010  Analysis Date = 07/29/2008 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20082030128  Analysis Date = 07/21/2008 
 Lab Value = -0.026 
 RPT Level = 0.03 
 Lab Sample ID = 20081970138  Analysis Date = 07/14/2008 
 Lab Value = 0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20081890042  Analysis Date = 07/09/2008 
 Lab Value = -0.035 
 RPT Level = 0.03 
 Lab Sample ID = 20081820062  Analysis Date = 06/27/2008 
 Lab Value = -0.046 
 RPT Level = 0.03 
 Lab Sample ID = 20081750126  Analysis Date = 06/26/2008 
 Lab Value = -0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20081680068  Analysis Date = 06/20/2008 
 Lab Value = 0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20081620016  Analysis Date = 06/11/2008 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20081540110  Analysis Date = 06/05/2008 
 Lab Value = -0.034 
 RPT Level = 0.03 
 Lab Sample ID = 20081480070  Analysis Date = 05/30/2008 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20081400059  Analysis Date = 05/19/2008 
 Lab Value = -0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20081330114  Analysis Date = 05/15/2008 
 Lab Value = -0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20081260069  Analysis Date = 04/30/2008 
 Lab Value = 0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20081190056  Analysis Date = 04/24/2008 
 Lab Value = -0.024 
 RPT Level = 0.03 
 Lab Sample ID = 20081120035  Analysis Date = 04/21/2008 
 Lab Value = -0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20081050115  Analysis Date = 04/15/2008 
 Lab Value = -0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20080980082  Analysis Date = 04/04/2008 
 Lab Value = -0.029 
 RPT Level = 0.03 
 Lab Sample ID = 20080920084  Analysis Date = 03/27/2008 
 Lab Value = -0.069 
 RPT Level = 0.03 
 Lab Sample ID = 20080840065  Analysis Date = 03/21/2008 
 Lab Value = -0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20080770123  Analysis Date = 03/26/2008 
 Lab Value = -0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20080700073  Analysis Date = 03/12/2008 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20080630068  Analysis Date = 03/06/2008 
 Lab Value = -0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20080560071  Analysis Date = 03/06/2008 
 Lab Value = -0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20080510054  Analysis Date = 03/04/2008 
 Lab Value = -0.031 
 RPT Level = 0.03 
 Lab Sample ID = 20080420073  Analysis Date = 02/21/2008 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20080360050  Analysis Date = 01/31/2008 
 Lab Value = -0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20080280049  Analysis Date = 01/25/2008 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20080230019  Analysis Date = 01/24/2008 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20080140026  Analysis Date = 01/08/2008 
 Lab Value = -0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20080070021  Analysis Date = 01/07/2008 
 Lab Value = -0.023 
 RPT Level = 0.03 
 Lab Sample ID = 20073620003  Analysis Date = 12/26/2007 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20073510100  Analysis Date = 12/17/2007 
 Lab Value = -0.019 
 RPT Level = 0.03 
 Lab Sample ID = 20073440026  Analysis Date = 12/06/2007 
 Lab Value = -0.033 
 RPT Level = 0.03 
 Lab Sample ID = 20073370067  Analysis Date = 11/28/2007 
 Lab Value = -0.03 
 RPT Level = 0.03 
 Lab Sample ID = 20073300043  Analysis Date = 11/28/2007 
 Lab Value = -0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20073230112  Analysis Date = 11/16/2007 
 Lab Value = -0.038 
 RPT Level = 0.03 
 Lab Sample ID = 20073170061  Analysis Date = 11/14/2007 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20073100010  Analysis Date = 10/31/2007 
 Lab Value = -0.084 
 RPT Level = 0.03 
 Lab Sample ID = 20073020059  Analysis Date = 11/01/2007 
 Lab Value = -0.069 
 RPT Level = 0.03 
 Lab Sample ID = 20072960178  Analysis Date = 10/22/2007 
 Lab Value = -0.071 
 RPT Level = 0.03 
 Lab Sample ID = 20072890057  Analysis Date = 10/22/2007 
 Lab Value = -0.074 
 RPT Level = 0.03 
 Lab Sample ID = 20072850024  Analysis Date = 10/05/2007 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20072670055  Analysis Date = 10/05/2007 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20072600128  Analysis Date = 09/20/2007 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20072540014  Analysis Date = 09/07/2007 
 Lab Value = 0.02 
 RPT Level = 0.03 
 Lab Sample ID = 20072480016  Analysis Date = 09/05/2007 
 Lab Value = -0.026 
 RPT Level = 0.03 
 Lab Sample ID = 20072400019  Analysis Date = 08/27/2007 
 Lab Value = -0.04 
 RPT Level = 0.03 
 Lab Sample ID = 20072330110  Analysis Date = 08/21/2007 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20072260199  Analysis Date = 08/16/2007 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20072210251  Analysis Date = 08/09/2007 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20072110163  Analysis Date = 08/02/2007 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20072040100  Analysis Date = 07/12/2007 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20071900106  Analysis Date = 07/09/2007 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20071830157  Analysis Date = 07/03/2007 
 Lab Value = 0.031 
 RPT Level = 0.03 
 Lab Sample ID = 20071770202  Analysis Date = 06/22/2007 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20071690115  Analysis Date = 06/14/2007 
 Lab Value = -0.015 
 RPT Level = 0.03 
 Lab Sample ID = 20071620049  Analysis Date = 06/08/2007 
 Lab Value = -0.028 
 RPT Level = 0.03 
 Lab Sample ID = 20071560023  Analysis Date = 06/05/2007 
 Lab Value = -0.016 
 RPT Level = 0.03 
 Lab Sample ID = 20071500032  Analysis Date = 05/24/2007 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20071410090  Analysis Date = 05/17/2007 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20071340114  Analysis Date = 05/11/2007 
 Lab Value = 0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20071280017  Analysis Date = 05/07/2007 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20071200085  Analysis Date = 04/27/2007 
 Lab Value = -0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20071130123  Analysis Date = 04/19/2007 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20071070019  Analysis Date = 04/16/2007 
 Lab Value = -0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20070990049  Analysis Date = 04/05/2007 
 Lab Value = -0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20070930069  Analysis Date = 04/05/2007 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20070860216  Analysis Date = 03/26/2007 
 Lab Value = 0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20070780127  Analysis Date = 03/15/2007 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20070710074  Analysis Date = 03/08/2007 
 Lab Value = -0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20070650012  Analysis Date = 03/08/2007 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20070580140  Analysis Date = 02/28/2007 
 Lab Value = -0.026 
 RPT Level = 0.03 
 Lab Sample ID = 20070540026  Analysis Date = 02/22/2007 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20070460018  Analysis Date = 02/14/2007 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20070400104  Analysis Date = 01/30/2007 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20070250021  Analysis Date = 01/25/2007 
 Lab Value = -0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20070180073  Analysis Date = 01/25/2007 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20070120011  Analysis Date = 01/10/2007 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20070040014  Analysis Date = 01/04/2007 
 Lab Value = 0.026 
 RPT Level = 0.03 
 Lab Sample ID = 20063610085  Analysis Date = 12/28/2006 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20063520073  Analysis Date = 12/18/2006 
 Lab Value = -0.021 
 RPT Level = 0.03 
 Lab Sample ID = 20063450082  Analysis Date = 12/07/2006 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20063380054  Analysis Date = 12/04/2006 
 Lab Value = -0.018 
 RPT Level = 0.03 
 Lab Sample ID = 20063310046  Analysis Date = 11/30/2006 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20063240080  Analysis Date = 11/21/2006 
 Lab Value = -0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20063180102  Analysis Date = 11/13/2006 
 Lab Value = 0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20063100081  Analysis Date = 11/09/2006 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20063030095  Analysis Date = 10/31/2006 
 Lab Value = -0.022 
 RPT Level = 0.03 
 Lab Sample ID = 20062960134  Analysis Date = 10/23/2006 
 Lab Value = -0.026 
 RPT Level = 0.03 
 Lab Sample ID = 20062910014  Analysis Date = 10/19/2006 
 Lab Value = 0.018 
 RPT Level = 0.03 
 Lab Sample ID = 20062850013  Analysis Date = 10/18/2006 
 Lab Value = 0.023 
 RPT Level = 0.03 
 Lab Sample ID = 20062780051  Analysis Date = 10/16/2006 
 Lab Value = 0.024 
 RPT Level = 0.03 
 Lab Sample ID = 20062620014  Analysis Date = 10/13/2006 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20062540015  Analysis Date = 10/10/2006 
 Lab Value = -0.012 
 RPT Level = 0.03 
 Lab Sample ID = 20062500007  Analysis Date = 10/03/2006 
 Lab Value = 0.015 
 RPT Level = 0.03 
 Lab Sample ID = 20062350181  Analysis Date = 09/27/2006 
 Lab Value = 0.159 
 RPT Level = 0.03 
 Lab Sample ID = 20062270274  Analysis Date = 08/17/2006 
 Lab Value = -0.05 
 RPT Level = 0.03 
 Lab Sample ID = 20062220040  Analysis Date = 07/31/2006 
 Lab Value = -0.053 
 RPT Level = 0.03 
 Lab Sample ID = 20062020318  Analysis Date = 07/17/2006 
 Lab Value = -0.05 
 RPT Level = 0.03 
 Lab Sample ID = 20061880010  Analysis Date = 07/10/2006 
 Lab Value = -0.037 
 RPT Level = 0.03 
 Lab Sample ID = 20061730015  Analysis Date = 06/27/2006 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20061670022  Analysis Date = 06/26/2006 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20061580019  Analysis Date = 06/02/2006 
 Lab Value = -0.01 
 RPT Level = 0.03 
 Lab Sample ID = 20061370015  Analysis Date = 05/31/2006 
 Lab Value = -0.031 
 RPT Level = 0.03 
 Lab Sample ID = 20061280112  Analysis Date = 05/12/2006 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20061220100  Analysis Date = 09/28/2005 
 Lab Value = -0.026 
 RPT Level = 0.03 
 Lab Sample ID = 20052590036  Analysis Date = 09/14/2005 
 Lab Value = -0.019 
 RPT Level = 0.03 
 Lab Sample ID = 20052520007  Analysis Date = 09/02/2005 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20052430005  Analysis Date = 08/29/2005 
 Lab Value = -0.018 
 RPT Level = 0.03 
 Lab Sample ID = 20052370001  Analysis Date = 08/24/2005 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20052300008  Analysis Date = 08/15/2005 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20052210011  Analysis Date = 08/12/2005 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20052160008  Analysis Date = 08/12/2005 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20052160006  Analysis Date = 07/21/2005 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20052010006  Analysis Date = 07/18/2005 
 Lab Value = -0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20051940016  Analysis Date = 07/12/2005 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20051880017  Analysis Date = 07/08/2005 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20051800188  Analysis Date = 06/30/2005 
 Lab Value = -0.018 
 RPT Level = 0.03 
 Lab Sample ID = 20051740018  Analysis Date = 06/21/2005 
 Lab Value = -0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20051660175  Analysis Date = 06/14/2005 
 Lab Value = 0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20051590026  Analysis Date = 06/06/2005 
 Lab Value = 0.014 
 RPT Level = 0.03 
 Lab Sample ID = 20051530020  Analysis Date = 05/27/2005 
 Lab Value = -0.024 
 RPT Level = 0.03 
 Lab Sample ID = 20051440044  Analysis Date = 05/23/2005 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20051380015  Analysis Date = 05/18/2005 
 Lab Value = -0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20051320028  Analysis Date = 05/11/2005 
 Lab Value = -0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20051250004  Analysis Date = 05/06/2005 
 Lab Value = -0.015 
 RPT Level = 0.03 
 Lab Sample ID = 20051170011  Analysis Date = 04/29/2005 
 Lab Value = 0.005 
 RPT Level = 0.03 
 Lab Sample ID = 20051110005  Analysis Date = 04/14/2005 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20051020017  Analysis Date = 04/12/2005 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20050950045  Analysis Date = 04/05/2005 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20050880117  Analysis Date = 03/30/2005 
 Lab Value = 0.019 
 RPT Level = 0.03 
 Lab Sample ID = 20050840097  Analysis Date = 03/18/2005 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20050750005  Analysis Date = 03/17/2005 
 Lab Value = 0 
 RPT Level = 0.03 
 Lab Sample ID = 20050700006  Analysis Date = 03/17/2005 
 Lab Value = 0.013 
 RPT Level = 0.03 
 Lab Sample ID = 20050700005  Analysis Date = 03/17/2005 
 Lab Value = 0.061 
 RPT Level = 0.03 
 Lab Sample ID = 20050670011  Analysis Date = 03/08/2005 
 Lab Value = 0.027 
 RPT Level = 0.03 
 Lab Sample ID = 20050550023  Analysis Date = 02/24/2005 
 Lab Value = -0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20050480006  Analysis Date = 02/16/2005 
 Lab Value = 0.009 
 RPT Level = 0.03 
 Lab Sample ID = 20050410008  Analysis Date = 02/14/2005 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20050340022  Analysis Date = 01/27/2005 
 Lab Value = -0.022 
 RPT Level = 0.03 
 Lab Sample ID = 20050260023  Analysis Date = 01/25/2005 
 Lab Value = 0.015 
 RPT Level = 0.03 
 Lab Sample ID = 20050200049  Analysis Date = 01/20/2005 
 Lab Value = -0.026 
 RPT Level = 0.03 
 Lab Sample ID = 20050130092  Analysis Date = 01/12/2005 
 Lab Value = -0.018 
 RPT Level = 0.03 
 Lab Sample ID = 20050070015  Analysis Date = 01/07/2005 
 Lab Value = 0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20043650003  Analysis Date = 01/07/2005 
 Lab Value = 0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20043580036  Analysis Date = 01/07/2005 
 Lab Value = 0.006 
 RPT Level = 0.03 
 Lab Sample ID = 20043580034  Analysis Date = 12/21/2004 
 Lab Value = 0.008 
 RPT Level = 0.03 
 Lab Sample ID = 20043520024  Analysis Date = 12/21/2004 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20043510017  Analysis Date = 12/16/2004 
 Lab Value = 0.002 
 RPT Level = 0.03 
 Lab Sample ID = 20043450068  Analysis Date = 12/21/2004 
 Lab Value = -0.02 
 RPT Level = 0.03 
 Lab Sample ID = 20043440148  Analysis Date = 12/10/2004 
 Lab Value = 0.003 
 RPT Level = 0.03 
 Lab Sample ID = 20043380004  Analysis Date = 12/10/2004 
 Lab Value = -0.004 
 RPT Level = 0.03 
 Lab Sample ID = 20043380003  Analysis Date = 12/01/2004 
 Lab Value = 0.001 
 RPT Level = 0.03 
 Lab Sample ID = 20043310058  Analysis Date = 11/26/2004 
 Lab Value = -0.011 
 RPT Level = 0.03 
 Lab Sample ID = 20043280049  Analysis Date = 11/23/2004 
 Lab Value = -0.007 
 RPT Level = 0.03 
 Lab Sample ID = 20043240013  Analysis Date = 09/09/2004 
 Lab Value = -0.003 
 RPT Level =  
 Lab Sample ID = 20042450137  Analysis Date = 09/03/2004 
 Lab Value = 0.008 
 RPT Level =  
 Lab Sample ID = 20042400090  Analysis Date = 09/02/2004 
 Lab Value = -0.01 
 RPT Level =  
 Lab Sample ID = 20042370106  Analysis Date = 08/25/2004 
 Lab Value = 0.023 
 RPT Level =  
 Lab Sample ID = 20042330207  Analysis Date = 08/24/2004 
 Lab Value = 0.001 
 RPT Level =  
 Lab Sample ID = 20042320135  Analysis Date = 08/24/2004 
 Lab Value = -0.003 
 RPT Level =  
 Lab Sample ID = 20042320137  Analysis Date = 08/16/2004 
 Lab Value = 0.001 
 RPT Level =  
 Lab Sample ID = 20042240113  Analysis Date = 08/09/2004 
 Lab Value = 0.004 
 RPT Level =  
 Lab Sample ID = 20042170122  Analysis Date = 08/03/2004 
 Lab Value = 0.008 
 RPT Level =  
 Lab Sample ID = 20042110014  Analysis Date = 07/27/2004 
 Lab Value = -0.014 
 RPT Level =  
 Lab Sample ID = 20042040077  Analysis Date = 07/19/2004 
 Lab Value = -0.017 
 RPT Level =  
 Lab Sample ID = 20041960049  Analysis Date = 07/15/2004 
 Lab Value = 0.005 
 RPT Level =  
 Lab Sample ID = 20041900061  Analysis Date = 07/14/2004 
 Lab Value = -0.028 
 RPT Level =  
 Lab Sample ID = 20041820034  Analysis Date = 07/09/2004 
 Lab Value = -0.015 
 RPT Level =  
 Lab Sample ID = 20041750056  Analysis Date = 06/30/2004 
 Lab Value = -0.026 
 RPT Level =  
 Lab Sample ID = 20041700082  Analysis Date = 06/28/2004 
 Lab Value = -0.002 
 RPT Level =  
 Lab Sample ID = 20041610056  Analysis Date = 06/23/2004 
 Lab Value = -0.001 
 RPT Level =  
 Lab Sample ID = 20041550020  Analysis Date = 09/26/2016 
 RPT Level = 0.05  Analysis Date = 09/21/2016 
 RPT Level = 0.05  Analysis Date = 09/21/2016 
 RPT Level = 0.05  Analysis Date = 09/15/2016 
 RPT Level = 0.05  Analysis Date = 09/15/2016 
 RPT Level = 0.05  Analysis Date = 09/07/2016 
 RPT Level = 0.05  Analysis Date = 09/07/2016 
 RPT Level = 0.05  Analysis Date = 08/26/2016 
 RPT Level = 0.05  Analysis Date = 08/26/2016 
 RPT Level = 0.05  Analysis Date = 08/22/2016 
 RPT Level = 0.05  Analysis Date = 08/22/2016 
 RPT Level = 0.05  Analysis Date = 08/17/2016 
 RPT Level = 0.05  Analysis Date = 08/17/2016 
 RPT Level = 0.05  Analysis Date = 08/11/2016 
 RPT Level = 0.05  Analysis Date = 08/11/2016 
 RPT Level = 0.05  Analysis Date = 08/09/2016 
 RPT Level = 0.05  Analysis Date = 08/09/2016 
 RPT Level = 0.05  Analysis Date = 07/29/2016 
 RPT Level = 0.05  Analysis Date = 07/29/2016 
 RPT Level = 0.05  Analysis Date = 07/19/2016 
 RPT Level = 0.05  Analysis Date = 07/19/2016 
 RPT Level = 0.05  Analysis Date = 07/08/2016 
 RPT Level = 0.05  Analysis Date = 07/08/2016 
 RPT Level = 0.05  Analysis Date = 06/30/2016 
 RPT Level = 0.05  Analysis Date = 06/30/2016 
 RPT Level = 0.05  Analysis Date = 06/24/2016 
 RPT Level = 0.05  Analysis Date = 06/24/2016 
 RPT Level = 0.05  Analysis Date = 06/21/2016 
 RPT Level = 0.05  Analysis Date = 06/21/2016 
 RPT Level = 0.05  Analysis Date = 06/14/2016 
 RPT Level = 0.05  Analysis Date = 06/14/2016 
 RPT Level = 0.05  Analysis Date = 06/03/2016 
 RPT Level = 0.05  Analysis Date = 06/03/2016 
 RPT Level = 0.05  Analysis Date = 05/31/2016 
 RPT Level = 0.05  Analysis Date = 05/31/2016 
 RPT Level = 0.05  Analysis Date = 05/12/2016 
 RPT Level = 0.05  Analysis Date = 05/12/2016 
 RPT Level = 0.05  Analysis Date = 05/04/2016 
 RPT Level = 0.05  Analysis Date = 05/04/2016 
 RPT Level = 0.05  Analysis Date = 04/29/2016 
 RPT Level = 0.05  Analysis Date = 04/29/2016 
 RPT Level = 0.05  Analysis Date = 04/29/2016 
 RPT Level = 0.05  Analysis Date = 04/29/2016 
 RPT Level = 0.05  Analysis Date = 04/15/2016 
 RPT Level = 0.05  Analysis Date = 04/15/2016 
 RPT Level = 0.05  Analysis Date = 04/07/2016 
 RPT Level = 0.05  Analysis Date = 04/07/2016 
 RPT Level = 0.05  Analysis Date = 04/01/2016 
 RPT Level = 0.05  Analysis Date = 04/01/2016 
 RPT Level = 0.05  Analysis Date = 03/30/2016 
 RPT Level = 0.05  Analysis Date = 03/30/2016 
 RPT Level = 0.05  Analysis Date = 03/16/2016 
 RPT Level = 0.05  Analysis Date = 03/16/2016 
 RPT Level = 0.05  Analysis Date = 03/09/2016 
 RPT Level = 0.05  Analysis Date = 03/09/2016 
 RPT Level = 0.05  Analysis Date = 03/03/2016 
 RPT Level = 0.05  Analysis Date = 03/03/2016 
 RPT Level = 0.05  Analysis Date = 02/24/2016 
 RPT Level = 0.05  Analysis Date = 02/24/2016 
 RPT Level = 0.05  Analysis Date = 02/17/2016 
 RPT Level = 0.05  Analysis Date = 02/17/2016 
 RPT Level = 0.05  Analysis Date = 02/16/2016 
 RPT Level = 0.05  Analysis Date = 02/16/2016 
 RPT Level = 0.05  Analysis Date = 02/05/2016 
 RPT Level = 0.05  Analysis Date = 02/05/2016 
 RPT Level = 0.05  Analysis Date = 01/27/2016 
 RPT Level = 0.05  Analysis Date = 01/27/2016 
 RPT Level = 0.05  Analysis Date = 01/22/2016 
 RPT Level = 0.05  Analysis Date = 01/22/2016 
 RPT Level = 0.05  Analysis Date = 01/13/2016 
 RPT Level = 0.05  Analysis Date = 01/13/2016 
 RPT Level = 0.05  Analysis Date = 01/08/2016 
 RPT Level = 0.05  Analysis Date = 01/08/2016 
 RPT Level = 0.05  Analysis Date = 01/05/2016 
 RPT Level = 0.05  Analysis Date = 01/05/2016 
 RPT Level = 0.05  Analysis Date = 12/23/2015 
 RPT Level = 0.05  Analysis Date = 12/23/2015 
 RPT Level = 0.05  Analysis Date = 12/21/2015 
 RPT Level = 0.05  Analysis Date = 12/21/2015 
 RPT Level = 0.05  Analysis Date = 12/11/2015 
 RPT Level = 0.05  Analysis Date = 12/11/2015 
 RPT Level = 0.05  Analysis Date = 12/02/2015 
 RPT Level = 0.05  Analysis Date = 12/02/2015 
 RPT Level = 0.05  Analysis Date = 11/30/2015 
 RPT Level = 0.05  Analysis Date = 11/30/2015 
 RPT Level = 0.05  Analysis Date = 11/17/2015 
 RPT Level = 0.05  Analysis Date = 11/17/2015 
 RPT Level = 0.05  Analysis Date = 11/16/2015 
 RPT Level = 0.05  Analysis Date = 11/16/2015 
 RPT Level = 0.05  Analysis Date = 11/03/2015 
 RPT Level = 0.05  Analysis Date = 11/03/2015 
 RPT Level = 0.05  Analysis Date = 11/02/2015 
 RPT Level = 0.05  Analysis Date = 11/02/2015 
 RPT Level = 0.05  Analysis Date = 10/29/2015 
 RPT Level = 0.05  Analysis Date = 10/29/2015 
 RPT Level = 0.05  Analysis Date = 10/20/2015 
 RPT Level = 0.05  Analysis Date = 10/20/2015 
 RPT Level = 0.05  Analysis Date = 10/15/2015 
 RPT Level = 0.05  Analysis Date = 10/15/2015 
 RPT Level = 0.05  Analysis Date = 10/01/2015 
 RPT Level = 0.05  Analysis Date = 10/01/2015 
 RPT Level = 0.05  Analysis Date = 09/28/2015 
 RPT Level = 0.05  Analysis Date = 09/28/2015 
 RPT Level = 0.05  Analysis Date = 09/22/2015 
 RPT Level = 0.05  Analysis Date = 09/22/2015 
 RPT Level = 0.05  Analysis Date = 09/28/2015 
 RPT Level = 0.05  Analysis Date = 09/28/2015 
 RPT Level = 0.05  Analysis Date = 09/18/2015 
 RPT Level = 0.05  Analysis Date = 09/18/2015 
 RPT Level = 0.05  Analysis Date = 09/01/2015 
 RPT Level = 0.05  Analysis Date = 09/01/2015 
 RPT Level = 0.05  Analysis Date = 09/01/2015 
 RPT Level = 0.05  Analysis Date = 09/01/2015 
 RPT Level = 0.05  Analysis Date = 08/19/2015 
 RPT Level = 0.05  Analysis Date = 08/19/2015 
 RPT Level = 0.05  Analysis Date = 08/10/2015 
 RPT Level = 0.05  Analysis Date = 08/10/2015 
 RPT Level = 0.05  Analysis Date = 07/31/2015 
 RPT Level = 0.05  Analysis Date = 07/31/2015 
 RPT Level = 0.05  Analysis Date = 07/28/2015 
 RPT Level = 0.05  Analysis Date = 07/28/2015 
 RPT Level = 0.05  Analysis Date = 07/16/2015 
 RPT Level = 0.05  Analysis Date = 07/16/2015 
 RPT Level = 0.05  Analysis Date = 07/13/2015 
 RPT Level = 0.05  Analysis Date = 07/13/2015 
 RPT Level = 0.05  Analysis Date = 07/01/2015 
 RPT Level = 0.05  Analysis Date = 07/01/2015 
 RPT Level = 0.05  Analysis Date = 06/24/2015 
 RPT Level = 0.05  Analysis Date = 06/24/2015 
 RPT Level = 0.05  Analysis Date = 06/22/2015 
 RPT Level = 0.05  Analysis Date = 06/22/2015 
 RPT Level = 0.05  Analysis Date = 06/17/2015 
 RPT Level = 0.05  Analysis Date = 06/17/2015 
 RPT Level = 0.05  Analysis Date = 06/05/2015 
 RPT Level = 0.05  Analysis Date = 06/05/2015 
 RPT Level = 0.05  Analysis Date = 06/03/2015 
 RPT Level = 0.05  Analysis Date = 06/03/2015 
 RPT Level = 0.05  Analysis Date = 05/28/2015 
 RPT Level = 0.05  Analysis Date = 05/28/2015 
 RPT Level = 0.05  Analysis Date = 05/15/2015 
 RPT Level = 0.05  Analysis Date = 05/15/2015 
 RPT Level = 0.05  Analysis Date = 05/07/2015 
 RPT Level = 0.05  Analysis Date = 05/07/2015 
 RPT Level = 0.05  Analysis Date = 05/05/2015 
 RPT Level = 0.05  Analysis Date = 05/05/2015 
 RPT Level = 0.05  Analysis Date = 05/01/2015 
 RPT Level = 0.05  Analysis Date = 05/01/2015 
 RPT Level = 0.05  Analysis Date = 04/22/2015 
 RPT Level = 0.05  Analysis Date = 04/22/2015 
 RPT Level = 0.05  Analysis Date = 04/15/2015 
 RPT Level = 0.05  Analysis Date = 04/15/2015 
 RPT Level = 0.05  Analysis Date = 04/03/2015 
 RPT Level = 0.05  Analysis Date = 04/03/2015 
 RPT Level = 0.05  Analysis Date = 04/03/2015 
 RPT Level = 0.05  Analysis Date = 04/03/2015 
 RPT Level = 0.05  Analysis Date = 04/02/2015 
 RPT Level = 0.05  Analysis Date = 04/02/2015 
 RPT Level = 0.05  Analysis Date = 03/16/2015 
 RPT Level = 0.05  Analysis Date = 03/16/2015 
 RPT Level = 0.05  Analysis Date = 03/10/2015 
 RPT Level = 0.05  Analysis Date = 03/10/2015 
 RPT Level = 0.05  Analysis Date = 03/05/2015 
 RPT Level = 0.05  Analysis Date = 03/05/2015 
 RPT Level = 0.05  Analysis Date = 03/03/2015 
 RPT Level = 0.05  Analysis Date = 03/03/2015 
 RPT Level = 0.05  Analysis Date = 02/19/2015 
 RPT Level = 0.05  Analysis Date = 02/19/2015 
 RPT Level = 0.05  Analysis Date = 02/20/2015 
 RPT Level = 0.05  Analysis Date = 02/20/2015 
 RPT Level = 0.05  Analysis Date = 02/10/2015 
 RPT Level = 0.05  Analysis Date = 02/10/2015 
 RPT Level = 0.05  Analysis Date = 02/05/2015 
 RPT Level = 0.05  Analysis Date = 02/05/2015 
 RPT Level = 0.05  Analysis Date = 02/05/2015 
 RPT Level = 0.05  Analysis Date = 02/05/2015 
 RPT Level = 0.05  Analysis Date = 02/10/2015 
 RPT Level = 0.05  Analysis Date = 02/10/2015 
 RPT Level = 0.05  Analysis Date = 02/10/2015 
 RPT Level = 0.05  Analysis Date = 02/10/2015 
 RPT Level = 0.05  Analysis Date = 01/07/2015 
 RPT Level = 0.05  Analysis Date = 01/07/2015 
 RPT Level = 0.05  Analysis Date = 12/31/2014 
 RPT Level = 0.05  Analysis Date = 12/31/2014 
 RPT Level = 0.05  Analysis Date = 12/16/2014 
 RPT Level = 0.05  Analysis Date = 12/16/2014 
 RPT Level = 0.05  Analysis Date = 12/31/2014 
 RPT Level = 0.05  Analysis Date = 12/31/2014 
 RPT Level = 0.05  Analysis Date = 12/04/2014 
 RPT Level = 0.05  Analysis Date = 12/04/2014 
 RPT Level = 0.05  Analysis Date = 12/10/2014 
 RPT Level = 0.05  Analysis Date = 12/10/2014 
 RPT Level = 0.05  Analysis Date = 12/31/2014 
 RPT Level = 0.05  Analysis Date = 12/31/2014 
 RPT Level = 0.05  Analysis Date = 11/19/2014 
 RPT Level = 0.05  Analysis Date = 11/19/2014 
 RPT Level = 0.05  Analysis Date = 11/05/2014 
 RPT Level = 0.05  Analysis Date = 11/05/2014 
 RPT Level = 0.05  Analysis Date = 11/05/2014 
 RPT Level = 0.05  Analysis Date = 11/05/2014 
 RPT Level = 0.05  Analysis Date = 10/24/2014 
 RPT Level = 0.05  Analysis Date = 10/24/2014 
 RPT Level = 0.05  Analysis Date = 10/17/2014 
 RPT Level = 0.05  Analysis Date = 10/17/2014 
 RPT Level = 0.05  Analysis Date = 10/16/2014 
 RPT Level = 0.05  Analysis Date = 10/16/2014 
 RPT Level = 0.05  Analysis Date = 10/07/2014 
 RPT Level = 0.05  Analysis Date = 10/07/2014 
 RPT Level = 0.05  Analysis Date = 09/30/2014 
 RPT Level = 0.05  Analysis Date = 09/30/2014 
 RPT Level = 0.05  Analysis Date = 09/19/2014 
 RPT Level = 0.05  Analysis Date = 09/19/2014 
 RPT Level = 0.05  Analysis Date = 09/17/2014 
 RPT Level = 0.05  Analysis Date = 09/17/2014 
 RPT Level = 0.05  Analysis Date = 08/19/2014 
 RPT Level = 0.05  Analysis Date = 08/19/2014 
 RPT Level = 0.05  Analysis Date = 08/19/2014 
 RPT Level = 0.05  Analysis Date = 08/19/2014 
 RPT Level = 0.05  Analysis Date = 08/14/2014 
 RPT Level = 0.05  Analysis Date = 08/14/2014 
 RPT Level = 0.05  Analysis Date = 08/05/2014 
 RPT Level = 0.05  Analysis Date = 08/05/2014 
 RPT Level = 0.05  Analysis Date = 08/05/2014 
 RPT Level = 0.05  Analysis Date = 08/05/2014 
 RPT Level = 0.05  Analysis Date = 07/24/2014 
 RPT Level = 0.05  Analysis Date = 07/24/2014 
 RPT Level = 0.05  Analysis Date = 07/15/2014 
 RPT Level = 0.05  Analysis Date = 07/15/2014 
 RPT Level = 0.05  Analysis Date = 07/09/2014 
 RPT Level = 0.05  Analysis Date = 07/09/2014 
 RPT Level = 0.05  Analysis Date = 07/08/2014 
 RPT Level = 0.05  Analysis Date = 07/08/2014 
 RPT Level = 0.05  Analysis Date = 07/01/2014 
 RPT Level = 0.05  Analysis Date = 07/01/2014 
 RPT Level = 0.05  Analysis Date = 06/25/2014 
 RPT Level = 0.05  Analysis Date = 06/25/2014 
 RPT Level = 0.05  Analysis Date = 06/16/2014 
 RPT Level = 0.05  Analysis Date = 06/16/2014 
 RPT Level = 0.05  Analysis Date = 06/11/2014 
 RPT Level = 0.05  Analysis Date = 06/11/2014 
 RPT Level = 0.05  Analysis Date = 05/28/2014 
 RPT Level = 0.05  Analysis Date = 05/28/2014 
 RPT Level = 0.05  Analysis Date = 05/20/2014 
 RPT Level = 0.05  Analysis Date = 05/20/2014 
 RPT Level = 0.05  Analysis Date = 05/15/2014 
 RPT Level = 0.05  Analysis Date = 05/15/2014 
 RPT Level = 0.05  Analysis Date = 05/12/2014 
 RPT Level = 0.05  Analysis Date = 05/12/2014 
 RPT Level = 0.05  Analysis Date = 04/24/2014 
 RPT Level = 0.05  Analysis Date = 04/24/2014 
 RPT Level = 0.05  Analysis Date = 04/21/2014 
 RPT Level = 0.05  Analysis Date = 04/21/2014 
 RPT Level = 0.05  Analysis Date = 04/11/2014 
 RPT Level = 0.05  Analysis Date = 04/11/2014 
 RPT Level = 0.05  Analysis Date = 04/11/2014 
 RPT Level = 0.05  Analysis Date = 04/11/2014 
 RPT Level = 0.05  Analysis Date = 03/27/2014 
 RPT Level = 0.05  Analysis Date = 03/27/2014 
 RPT Level = 0.05  Analysis Date = 03/20/2014 
 RPT Level = 0.05  Analysis Date = 03/20/2014 
 RPT Level = 0.05  Analysis Date = 03/20/2014 
 RPT Level = 0.05  Analysis Date = 03/20/2014 
 RPT Level = 0.05  Analysis Date = 03/06/2014 
 RPT Level = 0.05  Analysis Date = 03/06/2014 
 RPT Level = 0.05  Analysis Date = 03/06/2014 
 RPT Level = 0.05  Analysis Date = 03/06/2014 
 RPT Level = 0.05  Analysis Date = 02/19/2014 
 RPT Level = 0.05  Analysis Date = 02/19/2014 
 RPT Level = 0.05  Analysis Date = 02/19/2014 
 RPT Level = 0.05  Analysis Date = 02/19/2014 
 RPT Level = 0.05  Analysis Date = 02/19/2014 
 RPT Level = 0.05  Analysis Date = 02/19/2014 
 RPT Level = 0.05  Analysis Date = 02/11/2014 
 RPT Level = 0.05  Analysis Date = 02/11/2014 
 RPT Level = 0.05  Analysis Date = 01/15/2014 
 RPT Level = 0.05  Analysis Date = 01/15/2014 
 RPT Level = 0.05  Analysis Date = 01/15/2014 
 RPT Level = 0.05  Analysis Date = 01/15/2014 
 RPT Level = 0.05  Analysis Date = 01/09/2014 
 RPT Level = 0.05  Analysis Date = 01/09/2014 
 RPT Level = 0.05  Analysis Date = 01/09/2014 
 RPT Level = 0.05  Analysis Date = 01/09/2014 
 RPT Level = 0.05  Analysis Date = 01/03/2014 
 RPT Level = 0.05  Analysis Date = 01/03/2014 
 RPT Level = 0.05  Analysis Date = 12/18/2013 
 RPT Level = 0.05  Analysis Date = 12/18/2013 
 RPT Level = 0.05  Analysis Date = 12/16/2013 
 RPT Level = 0.05  Analysis Date = 12/16/2013 
 RPT Level = 0.05  Analysis Date = 11/27/2013 
 RPT Level = 0.05  Analysis Date = 11/27/2013 
 RPT Level = 0.05  Analysis Date = 11/20/2013 
 RPT Level = 0.05  Analysis Date = 11/20/2013 
 RPT Level = 0.05  Analysis Date = 11/14/2013 
 RPT Level = 0.05  Analysis Date = 11/14/2013 
 RPT Level = 0.05  Analysis Date = 11/06/2013 
 RPT Level = 0.05  Analysis Date = 11/06/2013 
 RPT Level = 0.05  Analysis Date = 10/31/2013 
 RPT Level = 0.05  Analysis Date = 10/31/2013 
 RPT Level = 0.05  Analysis Date = 10/31/2013 
 RPT Level = 0.05  Analysis Date = 10/31/2013 
 RPT Level = 0.05  Analysis Date = 10/25/2013 
 RPT Level = 0.05  Analysis Date = 10/25/2013 
 RPT Level = 0.05  Analysis Date = 10/25/2013 
 RPT Level = 0.05  Analysis Date = 10/25/2013 
 RPT Level = 0.05  Analysis Date = 09/17/2013 
 RPT Level = 0.05  Analysis Date = 09/17/2013 
 RPT Level = 0.05  Analysis Date = 09/09/2013 
 RPT Level = 0.05  Analysis Date = 09/09/2013 
 RPT Level = 0.05  Analysis Date = 09/05/2013 
 RPT Level = 0.05  Analysis Date = 09/05/2013 
 RPT Level = 0.05  Analysis Date = 09/05/2013 
 RPT Level = 0.05  Analysis Date = 09/05/2013 
 RPT Level = 0.05  Analysis Date = 08/30/2013 
 RPT Level = 0.05  Analysis Date = 08/30/2013 
 RPT Level = 0.05  Analysis Date = 08/29/2013 
 RPT Level = 0.05  Analysis Date = 08/29/2013 
 RPT Level = 0.05  Analysis Date = 08/26/2013 
 RPT Level = 0.05  Analysis Date = 08/26/2013 
 RPT Level = 0.05  Analysis Date = 08/13/2013 
 RPT Level = 0.05  Analysis Date = 08/13/2013 
 RPT Level = 0.05  Analysis Date = 07/30/2013 
 RPT Level = 0.05  Analysis Date = 07/30/2013 
 RPT Level = 0.05  Analysis Date = 08/02/2013 
 RPT Level = 0.05  Analysis Date = 08/02/2013 
 RPT Level = 0.05  Analysis Date = 07/23/2013 
 RPT Level = 0.05  Analysis Date = 07/23/2013 
 RPT Level = 0.05  Analysis Date = 07/10/2013 
 RPT Level = 0.05  Analysis Date = 07/10/2013 
 RPT Level = 0.05  Analysis Date = 07/08/2013 
 RPT Level = 0.05  Analysis Date = 07/08/2013 
 RPT Level = 0.05  Analysis Date = 06/26/2013 
 RPT Level = 0.05  Analysis Date = 06/26/2013 
 RPT Level = 0.05  Analysis Date = 06/14/2013 
 RPT Level = 0.05  Analysis Date = 06/14/2013 
 RPT Level = 0.05  Analysis Date = 06/03/2013 
 RPT Level = 0.05  Analysis Date = 06/03/2013 
 RPT Level = 0.05  Analysis Date = 06/03/2013 
 RPT Level = 0.05  Analysis Date = 06/03/2013 
 RPT Level = 0.05  Analysis Date = 05/23/2013 
 RPT Level = 0.05  Analysis Date = 05/23/2013 
 RPT Level = 0.05  Analysis Date = 05/21/2013 
 RPT Level = 0.05  Analysis Date = 05/21/2013 
 RPT Level = 0.05  Analysis Date = 05/08/2013 
 RPT Level = 0.05  Analysis Date = 05/08/2013 
 RPT Level = 0.05  Analysis Date = 04/30/2013 
 RPT Level = 0.05  Analysis Date = 04/30/2013 
 RPT Level = 0.05  Analysis Date = 05/02/2013 
 RPT Level = 0.05  Analysis Date = 05/02/2013 
 RPT Level = 0.05  Analysis Date = 04/30/2013 
 RPT Level = 0.05  Analysis Date = 04/30/2013 
 RPT Level = 0.05  Analysis Date = 04/18/2013 
 RPT Level = 0.05  Analysis Date = 04/18/2013 
 RPT Level = 0.05  Analysis Date = 04/04/2013 
 RPT Level = 0.05  Analysis Date = 04/04/2013 
 RPT Level = 0.05  Analysis Date = 03/27/2013 
 RPT Level = 0.05  Analysis Date = 03/27/2013 
 RPT Level = 0.05  Analysis Date = 03/19/2013 
 RPT Level = 0.05  Analysis Date = 03/19/2013 
 RPT Level = 0.05  Analysis Date = 03/11/2013 
 RPT Level = 0.05  Analysis Date = 03/11/2013 
 RPT Level = 0.05  Analysis Date = 03/11/2013 
 RPT Level = 0.05  Analysis Date = 03/11/2013 
 RPT Level = 0.05  Analysis Date = 02/26/2013 
 RPT Level = 0.05  Analysis Date = 02/26/2013 
 RPT Level = 0.05  Analysis Date = 02/26/2013 
 RPT Level = 0.05  Analysis Date = 02/26/2013 
 RPT Level = 0.05  Analysis Date = 02/21/2013 
 RPT Level = 0.05  Analysis Date = 02/21/2013 
 RPT Level = 0.05  Analysis Date = 02/07/2013 
 RPT Level = 0.05  Analysis Date = 02/07/2013 
 RPT Level = 0.05  Analysis Date = 02/07/2013 
 RPT Level = 0.05  Analysis Date = 02/07/2013 
 RPT Level = 0.05  Analysis Date = 01/31/2013 
 RPT Level = 0.05  Analysis Date = 01/31/2013 
 RPT Level = 0.05  Analysis Date = 01/18/2013 
 RPT Level = 0.05  Analysis Date = 01/18/2013 
 RPT Level = 0.05  Analysis Date = 01/18/2013 
 RPT Level = 0.05  Analysis Date = 01/18/2013 
 RPT Level = 0.05  Analysis Date = 01/11/2013 
 RPT Level = 0.05  Analysis Date = 01/11/2013 
 RPT Level = 0.05  Analysis Date = 01/11/2013 
 RPT Level = 0.05  Analysis Date = 01/11/2013 
 RPT Level = 0.05  Analysis Date = 01/11/2013 
 RPT Level = 0.05  Analysis Date = 01/11/2013 
 RPT Level = 0.05  Analysis Date = 12/20/2012 
 RPT Level = 0.05  Analysis Date = 12/20/2012 
 RPT Level = 0.05  Analysis Date = 12/20/2012 
 RPT Level = 0.05  Analysis Date = 12/20/2012 
 RPT Level = 0.05  Analysis Date = 12/14/2012 
 RPT Level = 0.05  Analysis Date = 12/14/2012 
 RPT Level = 0.05  Analysis Date = 12/14/2012 
 RPT Level = 0.05  Analysis Date = 12/14/2012 
 RPT Level = 0.05  Analysis Date = 11/15/2012 
 RPT Level = 0.05  Analysis Date = 11/15/2012 
 RPT Level = 0.05  Analysis Date = 11/07/2012 
 RPT Level = 0.05  Analysis Date = 11/07/2012 
 RPT Level = 0.05  Analysis Date = 11/06/2012 
 RPT Level = 0.05  Analysis Date = 11/06/2012 
 RPT Level = 0.05  Analysis Date = 10/29/2012 
 RPT Level = 0.05  Analysis Date = 10/29/2012 
 RPT Level = 0.05  Analysis Date = 10/19/2012 
 RPT Level = 0.05  Analysis Date = 10/19/2012 
 RPT Level = 0.05  Analysis Date = 10/19/2012 
 RPT Level = 0.05  Analysis Date = 10/19/2012 
 RPT Level = 0.05  Analysis Date = 10/12/2012 
 RPT Level = 0.05  Analysis Date = 10/12/2012 
 RPT Level = 0.05  Analysis Date = 10/11/2012 
 RPT Level = 0.05  Analysis Date = 10/11/2012 
 RPT Level = 0.05  Analysis Date = 09/21/2012 
 RPT Level = 0.05  Analysis Date = 09/21/2012 
 RPT Level = 0.05  Analysis Date = 09/18/2012 
 RPT Level = 0.05  Analysis Date = 09/18/2012 
 RPT Level = 0.05  Analysis Date = 09/05/2012 
 RPT Level = 0.05  Analysis Date = 09/05/2012 
 RPT Level = 0.05  Analysis Date = 09/04/2012 
 RPT Level = 0.05  Analysis Date = 09/04/2012 
 RPT Level = 0.05  Analysis Date = 09/05/2012 
 RPT Level = 0.05  Analysis Date = 09/05/2012 
 RPT Level = 0.05  Analysis Date = 08/21/2012 
 RPT Level = 0.05  Analysis Date = 08/21/2012 
 RPT Level = 0.05  Analysis Date = 08/21/2012 
 RPT Level = 0.05  Analysis Date = 08/21/2012 
 RPT Level = 0.05  Analysis Date = 08/15/2012 
 RPT Level = 0.05  Analysis Date = 08/15/2012 
 RPT Level = 0.05  Analysis Date = 08/08/2012 
 RPT Level = 0.05  Analysis Date = 08/08/2012 
 RPT Level = 0.05  Analysis Date = 08/03/2012 
 RPT Level = 0.05  Analysis Date = 08/03/2012 
 RPT Level = 0.05  Analysis Date = 07/26/2012 
 RPT Level = 0.05  Analysis Date = 07/26/2012 
 RPT Level = 0.05  Analysis Date = 07/18/2012 
 RPT Level = 0.05  Analysis Date = 07/18/2012 
 RPT Level = 0.05  Analysis Date = 07/09/2012 
 RPT Level = 0.05  Analysis Date = 07/09/2012 
 RPT Level = 0.05  Analysis Date = 06/25/2012 
 RPT Level = 0.05  Analysis Date = 06/25/2012 
 RPT Level = 0.05  Analysis Date = 06/14/2012 
 RPT Level = 0.05  Analysis Date = 06/14/2012 
 RPT Level = 0.05  Analysis Date = 06/05/2012 
 RPT Level = 0.05  Analysis Date = 06/05/2012 
 RPT Level = 0.05  Analysis Date = 06/08/2012 
 RPT Level = 0.05  Analysis Date = 06/08/2012 
 RPT Level = 0.05  Analysis Date = 05/29/2012 
 RPT Level = 0.05  Analysis Date = 05/29/2012 
 RPT Level = 0.05  Analysis Date = 05/25/2012 
 RPT Level = 0.05  Analysis Date = 05/25/2012 
 RPT Level = 0.05  Analysis Date = 05/17/2012 
 RPT Level = 0.05  Analysis Date = 05/17/2012 
 RPT Level = 0.05  Analysis Date = 05/03/2012 
 RPT Level = 0.05  Analysis Date = 05/03/2012 
 RPT Level = 0.05  Analysis Date = 04/26/2012 
 RPT Level = 0.05  Analysis Date = 04/26/2012 
 RPT Level = 0.05  Analysis Date = 04/19/2012 
 RPT Level = 0.05  Analysis Date = 04/19/2012 
 RPT Level = 0.05  Analysis Date = 04/04/2012 
 RPT Level = 0.05  Analysis Date = 04/04/2012 
 RPT Level = 0.05  Analysis Date = 04/04/2012 
 RPT Level = 0.05  Analysis Date = 04/04/2012 
 RPT Level = 0.05  Analysis Date = 04/04/2012 
 RPT Level = 0.05  Analysis Date = 04/04/2012 
 RPT Level = 0.05  Analysis Date = 03/29/2012 
 RPT Level = 0.05  Analysis Date = 03/29/2012 
 RPT Level = 0.05  Analysis Date = 03/29/2012 
 RPT Level = 0.05  Analysis Date = 03/29/2012 
 RPT Level = 0.05  Analysis Date = 03/15/2012 
 RPT Level = 0.05  Analysis Date = 03/15/2012 
 RPT Level = 0.05  Analysis Date = 01/12/2012 
 RPT Level = 0.05  Analysis Date = 01/12/2012 
 RPT Level = 0.05  Analysis Date = 12/29/2011 
 RPT Level = 0.05  Analysis Date = 12/29/2011 
 RPT Level = 0.05  Analysis Date = 12/22/2011 
 RPT Level = 0.05  Analysis Date = 12/22/2011 
 RPT Level = 0.05  Analysis Date = 12/22/2011 
 RPT Level = 0.05  Analysis Date = 12/22/2011 
 RPT Level = 0.05  Analysis Date = 12/15/2011 
 RPT Level = 0.05  Analysis Date = 12/15/2011 
 RPT Level = 0.05  Analysis Date = 12/06/2011 
 RPT Level = 0.05  Analysis Date = 12/06/2011 
 RPT Level = 0.05  Analysis Date = 11/23/2011 
 RPT Level = 0.05  Analysis Date = 11/23/2011 
 RPT Level = 0.05  Analysis Date = 11/16/2011 
 RPT Level = 0.05  Analysis Date = 11/16/2011 
 RPT Level = 0.05  Analysis Date = 11/08/2011 
 RPT Level = 0.05  Analysis Date = 11/08/2011 
 RPT Level = 0.05  Analysis Date = 11/01/2011 
 RPT Level = 0.05  Analysis Date = 11/01/2011 
 RPT Level = 0.05  Analysis Date = 10/25/2011 
 RPT Level = 0.05  Analysis Date = 10/25/2011 
 RPT Level = 0.05  Analysis Date = 10/19/2011 
 RPT Level = 0.05  Analysis Date = 10/19/2011 
 RPT Level = 0.05  Analysis Date = 10/13/2011 
 RPT Level = 0.05  Analysis Date = 10/13/2011 
 RPT Level = 0.05  Analysis Date = 10/04/2011 
 RPT Level = 0.05  Analysis Date = 10/04/2011 
 RPT Level = 0.05  Analysis Date = 09/27/2011 
 RPT Level = 0.05  Analysis Date = 09/27/2011 
 RPT Level = 0.05  Analysis Date = 09/21/2011 
 RPT Level = 0.05  Analysis Date = 09/21/2011 
 RPT Level = 0.05  Analysis Date = 09/20/2011 
 RPT Level = 0.05  Analysis Date = 09/20/2011 
 RPT Level = 0.05  Analysis Date = 09/20/2011 
 RPT Level = 0.05  Analysis Date = 09/20/2011 
 RPT Level = 0.05  Analysis Date = 08/30/2011 
 RPT Level = 0.05  Analysis Date = 08/30/2011 
 RPT Level = 0.05  Analysis Date = 08/24/2011 
 RPT Level = 0.05  Analysis Date = 08/24/2011 
 RPT Level = 0.05  Analysis Date = 08/12/2011 
 RPT Level = 0.05  Analysis Date = 08/12/2011 
 RPT Level = 0.05  Analysis Date = 08/04/2011 
 RPT Level = 0.05  Analysis Date = 08/04/2011 
 RPT Level = 0.05  Analysis Date = 08/02/2011 
 RPT Level = 0.05  Analysis Date = 08/02/2011 
 RPT Level = 0.05  Analysis Date = 07/27/2011 
 RPT Level = 0.05  Analysis Date = 07/27/2011 
 RPT Level = 0.05  Analysis Date = 07/19/2011 
 RPT Level = 0.05  Analysis Date = 07/19/2011 
 RPT Level = 0.05  Analysis Date = 07/14/2011 
 RPT Level = 0.05  Analysis Date = 07/14/2011 
 RPT Level = 0.05  Analysis Date = 07/06/2011 
 RPT Level = 0.05  Analysis Date = 07/06/2011 
 RPT Level = 0.05  Analysis Date = 06/23/2011 
 RPT Level = 0.05  Analysis Date = 06/23/2011 
 RPT Level = 0.05  Analysis Date = 06/17/2011 
 RPT Level = 0.05  Analysis Date = 06/17/2011 
 RPT Level = 0.05  Analysis Date = 06/09/2011 
 RPT Level = 0.05  Analysis Date = 06/09/2011 
 RPT Level = 0.05  Analysis Date = 06/09/2011 
 RPT Level = 0.05  Analysis Date = 06/09/2011 
 RPT Level = 0.05  Analysis Date = 06/14/2011 
 RPT Level = 0.05  Analysis Date = 06/14/2011 
 RPT Level = 0.05  Analysis Date = 05/25/2011 
 RPT Level = 0.05  Analysis Date = 05/25/2011 
 RPT Level = 0.05  Analysis Date = 05/12/2011 
 RPT Level = 0.05  Analysis Date = 05/12/2011 
 RPT Level = 0.05  Analysis Date = 05/06/2011 
 RPT Level = 0.05  Analysis Date = 05/06/2011 
 RPT Level = 0.05  Analysis Date = 04/29/2011 
 RPT Level = 0.05  Analysis Date = 04/29/2011 
 RPT Level = 0.05  Analysis Date = 04/22/2011 
 RPT Level = 0.05  Analysis Date = 04/22/2011 
 RPT Level = 0.05  Analysis Date = 05/06/2011 
 RPT Level = 0.05  Analysis Date = 05/06/2011 
 RPT Level = 0.05  Analysis Date = 04/07/2011 
 RPT Level = 0.05  Analysis Date = 04/07/2011 
 RPT Level = 0.05  Analysis Date = 03/30/2011 
 RPT Level = 0.05  Analysis Date = 03/30/2011 
 RPT Level = 0.05  Analysis Date = 04/06/2011 
 RPT Level = 0.05  Analysis Date = 04/06/2011 
 RPT Level = 0.05  Analysis Date = 03/28/2011 
 RPT Level = 0.05  Analysis Date = 03/28/2011 
 RPT Level = 0.05  Analysis Date = 03/11/2011 
 RPT Level = 0.05  Analysis Date = 03/11/2011 
 RPT Level = 0.05  Analysis Date = 03/11/2011 
 RPT Level = 0.05  Analysis Date = 03/11/2011 
 RPT Level = 0.05  Analysis Date = 03/02/2011 
 RPT Level = 0.05  Analysis Date = 03/02/2011 
 RPT Level = 0.05  Analysis Date = 03/01/2011 
 RPT Level = 0.05  Analysis Date = 03/01/2011 
 RPT Level = 0.05  Analysis Date = 02/17/2011 
 RPT Level = 0.05  Analysis Date = 02/17/2011 
 RPT Level = 0.05  Analysis Date = 02/17/2011 
 RPT Level = 0.05  Analysis Date = 02/17/2011 
 RPT Level = 0.05  Analysis Date = 01/28/2011 
 RPT Level = 0.05  Analysis Date = 01/28/2011 
 RPT Level = 0.05  Analysis Date = 01/19/2011 
 RPT Level = 0.05  Analysis Date = 01/19/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 01/14/2011 
 RPT Level = 0.05  Analysis Date = 01/13/2011 
 RPT Level = 0.05  Analysis Date = 01/13/2011 
 RPT Level = 0.05  Analysis Date = 01/13/2011 
 RPT Level = 0.05  Analysis Date = 01/13/2011 
 RPT Level = 0.05  Analysis Date = 01/19/2011 
 RPT Level = 0.05  Analysis Date = 01/19/2011 
 RPT Level = 0.05  Analysis Date = 12/21/2010 
 RPT Level = 0.05  Analysis Date = 12/21/2010 
 RPT Level = 0.05  Analysis Date = 12/17/2010 
 RPT Level = 0.05  Analysis Date = 12/17/2010 
 RPT Level = 0.05  Analysis Date = 12/09/2010 
 RPT Level = 0.05  Analysis Date = 12/09/2010 
 RPT Level = 0.05  Analysis Date = 12/09/2010 
 RPT Level = 0.05  Analysis Date = 12/09/2010 
 RPT Level = 0.05  Analysis Date = 11/23/2010 
 RPT Level = 0.05  Analysis Date = 11/23/2010 
 RPT Level = 0.05  Analysis Date = 11/18/2010 
 RPT Level = 0.05  Analysis Date = 11/18/2010 
 RPT Level = 0.05  Analysis Date = 11/10/2010 
 RPT Level = 0.05  Analysis Date = 11/10/2010 
 RPT Level = 0.05  Analysis Date = 11/05/2010 
 RPT Level = 0.05  Analysis Date = 11/05/2010 
 RPT Level = 0.05  Analysis Date = 10/27/2010 
 RPT Level = 0.05  Analysis Date = 10/27/2010 
 RPT Level = 0.05  Analysis Date = 10/19/2010 
 RPT Level = 0.05  Analysis Date = 10/19/2010 
 RPT Level = 0.05  Analysis Date = 10/19/2010 
 RPT Level = 0.05  Analysis Date = 10/19/2010 
 RPT Level = 0.05  Analysis Date = 10/14/2010 
 RPT Level = 0.05  Analysis Date = 10/14/2010 
 RPT Level = 0.05  Analysis Date = 09/29/2010 
 RPT Level = 0.05  Analysis Date = 09/29/2010 
 RPT Level = 0.05  Analysis Date = 09/23/2010 
 RPT Level = 0.05  Analysis Date = 09/23/2010 
 RPT Level = 0.05  Analysis Date = 09/23/2010 
 RPT Level = 0.05  Analysis Date = 09/23/2010 
 RPT Level = 0.05  Analysis Date = 09/10/2010 
 RPT Level = 0.05  Analysis Date = 09/10/2010 
 RPT Level = 0.05  Analysis Date = 09/02/2010 
 RPT Level = 0.05  Analysis Date = 09/02/2010 
 RPT Level = 0.05  Analysis Date = 08/26/2010 
 RPT Level = 0.05  Analysis Date = 08/26/2010 
 RPT Level = 0.05  Analysis Date = 08/19/2010 
 RPT Level = 0.05  Analysis Date = 08/19/2010 
 RPT Level = 0.05  Analysis Date = 08/11/2010 
 RPT Level = 0.05  Analysis Date = 08/11/2010 
 RPT Level = 0.05  Analysis Date = 08/03/2010 
 RPT Level = 0.05  Analysis Date = 08/03/2010 
 RPT Level = 0.05  Analysis Date = 07/27/2010 
 RPT Level = 0.05  Analysis Date = 07/27/2010 
 RPT Level = 0.05  Analysis Date = 07/20/2010 
 RPT Level = 0.05  Analysis Date = 07/20/2010 
 RPT Level = 0.05  Analysis Date = 07/13/2010 
 RPT Level = 0.05  Analysis Date = 07/13/2010 
 RPT Level = 0.05  Analysis Date = 07/13/2010 
 RPT Level = 0.05  Analysis Date = 07/13/2010 
 RPT Level = 0.05  Analysis Date = 07/01/2010 
 RPT Level = 0.05  Analysis Date = 07/01/2010 
 RPT Level = 0.05  Analysis Date = 06/23/2010 
 RPT Level = 0.05  Analysis Date = 06/23/2010 
 RPT Level = 0.05  Analysis Date = 06/18/2010 
 RPT Level = 0.05  Analysis Date = 06/18/2010 
 RPT Level = 0.05  Analysis Date = 06/18/2010 
 RPT Level = 0.05  Analysis Date = 06/18/2010 
 RPT Level = 0.05  Analysis Date = 06/09/2010 
 RPT Level = 0.05  Analysis Date = 06/09/2010 
 RPT Level = 0.05  Analysis Date = 06/02/2010 
 RPT Level = 0.05  Analysis Date = 06/02/2010 
 RPT Level = 0.05  Analysis Date = 05/20/2010 
 RPT Level = 0.05  Analysis Date = 05/20/2010 
 RPT Level = 0.05  Analysis Date = 05/13/2010 
 RPT Level = 0.05  Analysis Date = 05/13/2010 
 RPT Level = 0.05  Analysis Date = 05/05/2010 
 RPT Level = 0.05  Analysis Date = 05/05/2010 
 RPT Level = 0.05  Analysis Date = 04/30/2010 
 RPT Level = 0.05  Analysis Date = 04/30/2010 
 RPT Level = 0.05  Analysis Date = 04/20/2010 
 RPT Level = 0.05  Analysis Date = 04/20/2010 
 RPT Level = 0.05  Analysis Date = 04/15/2010 
 RPT Level = 0.05  Analysis Date = 04/15/2010 
 RPT Level = 0.05  Analysis Date = 04/07/2010 
 RPT Level = 0.05  Analysis Date = 04/07/2010 
 RPT Level = 0.05  Analysis Date = 04/07/2010 
 RPT Level = 0.05  Analysis Date = 04/07/2010 
 RPT Level = 0.05  Analysis Date = 03/25/2010 
 RPT Level = 0.05  Analysis Date = 03/25/2010 
 RPT Level = 0.05  Analysis Date = 03/16/2010 
 RPT Level = 0.05  Analysis Date = 03/16/2010 
 RPT Level = 0.05  Analysis Date = 03/05/2010 
 RPT Level = 0.05  Analysis Date = 03/05/2010 
 RPT Level = 0.05  Analysis Date = 02/24/2010 
 RPT Level = 0.05  Analysis Date = 02/24/2010 
 RPT Level = 0.05  Analysis Date = 02/24/2010 
 RPT Level = 0.05  Analysis Date = 02/24/2010 
 RPT Level = 0.05  Analysis Date = 02/11/2010 
 RPT Level = 0.05  Analysis Date = 02/11/2010 
 RPT Level = 0.05  Analysis Date = 02/11/2010 
 RPT Level = 0.05  Analysis Date = 02/11/2010 
 RPT Level = 0.05  Analysis Date = 02/05/2010 
 RPT Level = 0.05  Analysis Date = 02/05/2010 
 RPT Level = 0.05  Analysis Date = 01/27/2010 
 RPT Level = 0.05  Analysis Date = 01/27/2010 
 RPT Level = 0.05  Analysis Date = 01/27/2010 
 RPT Level = 0.05  Analysis Date = 01/27/2010 
 RPT Level = 0.05  Analysis Date = 01/22/2010 
 RPT Level = 0.05  Analysis Date = 01/22/2010 
 RPT Level = 0.05  Analysis Date = 01/22/2010 
 RPT Level = 0.05  Analysis Date = 01/22/2010 
 RPT Level = 0.05  Analysis Date = 01/22/2010 
 RPT Level = 0.05  Analysis Date = 01/22/2010 
 RPT Level = 0.05  Analysis Date = 12/22/2009 
 RPT Level = 0.05  Analysis Date = 12/22/2009 
 RPT Level = 0.05  Analysis Date = 12/16/2009 
 RPT Level = 0.05  Analysis Date = 12/16/2009 
 RPT Level = 0.05  Analysis Date = 12/16/2009 
 RPT Level = 0.05  Analysis Date = 12/16/2009 
 RPT Level = 0.05  Analysis Date = 12/11/2009 
 RPT Level = 0.05  Analysis Date = 12/11/2009 
 RPT Level = 0.05  Analysis Date = 11/24/2009 
 RPT Level = 0.05  Analysis Date = 11/24/2009 
 RPT Level = 0.05  Analysis Date = 11/24/2009 
 RPT Level = 0.05  Analysis Date = 11/24/2009 
 RPT Level = 0.05  Analysis Date = 11/19/2009 
 RPT Level = 0.05  Analysis Date = 11/19/2009 
 RPT Level = 0.05  Analysis Date = 11/13/2009 
 RPT Level = 0.05  Analysis Date = 11/13/2009 
 RPT Level = 0.05  Analysis Date = 11/05/2009 
 RPT Level = 0.05  Analysis Date = 11/05/2009 
 RPT Level = 0.05  Analysis Date = 10/30/2009 
 RPT Level = 0.05  Analysis Date = 10/30/2009 
 RPT Level = 0.05  Analysis Date = 10/22/2009 
 RPT Level = 0.05  Analysis Date = 10/22/2009 
 RPT Level = 0.05  Analysis Date = 10/22/2009 
 RPT Level = 0.05  Analysis Date = 10/22/2009 
 RPT Level = 0.05  Analysis Date = 10/07/2009 
 RPT Level = 0.05  Analysis Date = 10/07/2009 
 RPT Level = 0.05  Analysis Date = 10/08/2009 
 RPT Level = 0.05  Analysis Date = 10/08/2009 
 RPT Level = 0.05  Analysis Date = 10/02/2009 
 RPT Level = 0.05  Analysis Date = 10/02/2009 
 RPT Level = 0.05  Analysis Date = 09/24/2009 
 RPT Level = 0.05  Analysis Date = 09/24/2009 
 RPT Level = 0.05  Analysis Date = 09/18/2009 
 RPT Level = 0.05  Analysis Date = 09/18/2009 
 RPT Level = 0.05  Analysis Date = 09/09/2009 
 RPT Level = 0.05  Analysis Date = 09/09/2009 
 RPT Level = 0.05  Analysis Date = 08/31/2009 
 RPT Level = 0.05  Analysis Date = 08/31/2009 
 RPT Level = 0.05  Analysis Date = 08/19/2009 
 RPT Level = 0.05  Analysis Date = 08/19/2009 
 RPT Level = 0.05  Analysis Date = 08/19/2009 
 RPT Level = 0.05  Analysis Date = 08/19/2009 
 RPT Level = 0.05  Analysis Date = 08/05/2009 
 RPT Level = 0.05  Analysis Date = 08/05/2009 
 RPT Level = 0.05  Analysis Date = 07/28/2009 
 RPT Level = 0.05  Analysis Date = 07/28/2009 
 RPT Level = 0.05  Analysis Date = 07/22/2009 
 RPT Level = 0.05  Analysis Date = 07/22/2009 
 RPT Level = 0.05  Analysis Date = 07/16/2009 
 RPT Level = 0.05  Analysis Date = 07/16/2009 
 RPT Level = 0.05  Analysis Date = 06/30/2009 
 RPT Level = 0.05  Analysis Date = 06/30/2009 
 RPT Level = 0.05  Analysis Date = 06/26/2009 
 RPT Level = 0.05  Analysis Date = 06/26/2009 
 RPT Level = 0.05  Analysis Date = 06/22/2009 
 RPT Level = 0.05  Analysis Date = 06/22/2009 
 RPT Level = 0.05  Analysis Date = 06/09/2009 
 RPT Level = 0.05  Analysis Date = 06/09/2009 
 RPT Level = 0.05  Analysis Date = 06/05/2009 
 RPT Level = 0.05  Analysis Date = 06/05/2009 
 RPT Level = 0.05  Analysis Date = 06/02/2009 
 RPT Level = 0.05  Analysis Date = 06/02/2009 
 RPT Level = 0.05  Analysis Date = 06/02/2009 
 RPT Level = 0.05  Analysis Date = 06/02/2009 
 RPT Level = 0.05  Analysis Date = 05/20/2009 
 RPT Level = 0.05  Analysis Date = 05/20/2009 
 RPT Level = 0.05  Analysis Date = 05/15/2009 
 RPT Level = 0.05  Analysis Date = 05/15/2009 
 RPT Level = 0.05  Analysis Date = 05/04/2009 
 RPT Level = 0.05  Analysis Date = 05/04/2009 
 RPT Level = 0.05  Analysis Date = 04/23/2009 
 RPT Level = 0.05  Analysis Date = 04/23/2009 
 RPT Level = 0.05  Analysis Date = 04/21/2009 
 RPT Level = 0.05  Analysis Date = 04/21/2009 
 RPT Level = 0.05  Analysis Date = 04/03/2009 
 RPT Level = 0.05  Analysis Date = 04/03/2009 
 RPT Level = 0.05  Analysis Date = 04/01/2009 
 RPT Level = 0.05  Analysis Date = 04/01/2009 
 RPT Level = 0.05  Analysis Date = 03/25/2009 
 RPT Level = 0.05  Analysis Date = 03/25/2009 
 RPT Level = 0.05  Analysis Date = 03/13/2009 
 RPT Level = 0.05  Analysis Date = 03/13/2009 
 RPT Level = 0.05  Analysis Date = 03/13/2009 
 RPT Level = 0.05  Analysis Date = 03/13/2009 
 RPT Level = 0.05  Analysis Date = 03/10/2009 
 RPT Level = 0.05  Analysis Date = 03/10/2009 
 RPT Level = 0.05  Analysis Date = 02/23/2009 
 RPT Level = 0.05  Analysis Date = 02/23/2009 
 RPT Level = 0.05  Analysis Date = 02/12/2009 
 RPT Level = 0.05  Analysis Date = 02/12/2009 
 RPT Level = 0.05  Analysis Date = 02/12/2009 
 RPT Level = 0.05  Analysis Date = 02/12/2009 
 RPT Level = 0.05  Analysis Date = 02/04/2009 
 RPT Level = 0.05  Analysis Date = 02/04/2009 
 RPT Level = 0.05  Analysis Date = 01/26/2009 
 RPT Level = 0.05  Analysis Date = 01/26/2009 
 RPT Level = 0.05  Analysis Date = 01/21/2009 
 RPT Level = 0.05  Analysis Date = 01/21/2009 
 RPT Level = 0.05  Analysis Date = 01/14/2009 
 RPT Level = 0.05  Analysis Date = 01/14/2009 
 RPT Level = 0.05  Analysis Date = 01/08/2009 
 RPT Level = 0.05  Analysis Date = 01/08/2009 
 RPT Level = 0.05  Analysis Date = 01/08/2009 
 RPT Level = 0.05  Analysis Date = 01/08/2009 
 RPT Level = 0.05  Analysis Date = 01/07/2009 
 RPT Level = 0.05  Analysis Date = 01/07/2009 
 RPT Level = 0.05  Analysis Date = 12/15/2008 
 RPT Level = 0.05  Analysis Date = 12/15/2008 
 RPT Level = 0.05  Analysis Date = 12/08/2008 
 RPT Level = 0.05  Analysis Date = 12/08/2008 
 RPT Level = 0.05  Analysis Date = 12/04/2008 
 RPT Level = 0.05  Analysis Date = 12/04/2008 
 RPT Level = 0.05  Analysis Date = 11/25/2008 
 RPT Level = 0.05  Analysis Date = 11/25/2008 
 RPT Level = 0.05  Analysis Date = 11/24/2008 
 RPT Level = 0.05  Analysis Date = 11/24/2008 
 RPT Level = 0.05  Analysis Date = 11/12/2008 
 RPT Level = 0.05  Analysis Date = 11/12/2008 
 RPT Level = 0.05  Analysis Date = 11/04/2008 
 RPT Level = 0.05  Analysis Date = 11/04/2008 
 RPT Level = 0.05  Analysis Date = 10/23/2008 
 RPT Level = 0.05  Analysis Date = 10/23/2008 
 RPT Level = 0.05  Analysis Date = 10/17/2008 
 RPT Level = 0.05  Analysis Date = 10/17/2008 
 RPT Level = 0.05  Analysis Date = 10/09/2008 
 RPT Level = 0.05  Analysis Date = 10/09/2008 
 RPT Level = 0.05  Analysis Date = 10/09/2008 
 RPT Level = 0.03  Analysis Date = 10/09/2008 
 RPT Level = 0.03  Analysis Date = 10/01/2008 
 RPT Level = 0.03  Analysis Date = 10/01/2008 
 RPT Level = 0.03  Analysis Date = 09/30/2008 
 RPT Level = 0.03  Analysis Date = 09/30/2008 
 RPT Level = 0.03  Analysis Date = 09/24/2008 
 RPT Level = 0.03  Analysis Date = 09/24/2008 
 RPT Level = 0.03  Analysis Date = 09/11/2008 
 RPT Level = 0.03  Analysis Date = 09/11/2008 
 RPT Level = 0.03  Analysis Date = 08/28/2008 
 RPT Level = 0.03  Analysis Date = 08/28/2008 
 RPT Level = 0.03  Analysis Date = 08/27/2008 
 RPT Level = 0.03  Analysis Date = 08/27/2008 
 RPT Level = 0.03  Analysis Date = 08/19/2008 
 RPT Level = 0.03  Analysis Date = 08/19/2008 
 RPT Level = 0.03  Analysis Date = 08/14/2008 
 RPT Level = 0.03  Analysis Date = 08/14/2008 
 RPT Level = 0.03  Analysis Date = 07/29/2008 
 RPT Level = 0.03  Analysis Date = 07/29/2008 
 RPT Level = 0.03  Analysis Date = 07/21/2008 
 RPT Level = 0.03  Analysis Date = 07/21/2008 
 RPT Level = 0.03  Analysis Date = 07/14/2008 
 RPT Level = 0.03  Analysis Date = 07/14/2008 
 RPT Level = 0.03  Analysis Date = 07/09/2008 
 RPT Level = 0.03  Analysis Date = 07/09/2008 
 RPT Level = 0.03  Analysis Date = 06/27/2008 
 RPT Level = 0.03  Analysis Date = 06/27/2008 
 RPT Level = 0.03  Analysis Date = 06/26/2008 
 RPT Level = 0.03  Analysis Date = 06/26/2008 
 RPT Level = 0.03  Analysis Date = 06/20/2008 
 RPT Level = 0.03  Analysis Date = 06/20/2008 
 RPT Level = 0.03  Analysis Date = 06/11/2008 
 RPT Level = 0.03  Analysis Date = 06/11/2008 
 RPT Level = 0.03  Analysis Date = 06/05/2008 
 RPT Level = 0.03  Analysis Date = 06/05/2008 
 RPT Level = 0.03  Analysis Date = 05/30/2008 
 RPT Level = 0.03  Analysis Date = 05/30/2008 
 RPT Level = 0.03  Analysis Date = 05/19/2008 
 RPT Level = 0.03  Analysis Date = 05/19/2008 
 RPT Level = 0.03  Analysis Date = 05/15/2008 
 RPT Level = 0.03  Analysis Date = 05/15/2008 
 RPT Level = 0.03  Analysis Date = 04/30/2008 
 RPT Level = 0.03  Analysis Date = 04/30/2008 
 RPT Level = 0.03  Analysis Date = 04/24/2008 
 RPT Level = 0.03  Analysis Date = 04/24/2008 
 RPT Level = 0.03  Analysis Date = 04/21/2008 
 RPT Level = 0.03  Analysis Date = 04/21/2008 
 RPT Level = 0.03  Analysis Date = 04/15/2008 
 RPT Level = 0.03  Analysis Date = 04/15/2008 
 RPT Level = 0.03  Analysis Date = 04/04/2008 
 RPT Level = 0.03  Analysis Date = 04/04/2008 
 RPT Level = 0.03  Analysis Date = 03/27/2008 
 RPT Level = 0.03  Analysis Date = 03/27/2008 
 RPT Level = 0.03  Analysis Date = 03/21/2008 
 RPT Level = 0.03  Analysis Date = 03/21/2008 
 RPT Level = 0.03  Analysis Date = 03/26/2008 
 RPT Level = 0.03  Analysis Date = 03/26/2008 
 RPT Level = 0.03  Analysis Date = 03/12/2008 
 RPT Level = 0.03  Analysis Date = 03/12/2008 
 RPT Level = 0.03  Analysis Date = 03/06/2008 
 RPT Level = 0.03  Analysis Date = 03/06/2008 
 RPT Level = 0.03  Analysis Date = 03/06/2008 
 RPT Level = 0.03  Analysis Date = 03/06/2008 
 RPT Level = 0.03  Analysis Date = 03/04/2008 
 RPT Level = 0.03  Analysis Date = 03/04/2008 
 RPT Level = 0.03  Analysis Date = 02/21/2008 
 RPT Level = 0.03  Analysis Date = 02/21/2008 
 RPT Level = 0.03  Analysis Date = 01/31/2008 
 RPT Level = 0.03  Analysis Date = 01/31/2008 
 RPT Level = 0.03  Analysis Date = 01/25/2008 
 RPT Level = 0.03  Analysis Date = 01/25/2008 
 RPT Level = 0.03  Analysis Date = 01/24/2008 
 RPT Level = 0.03  Analysis Date = 01/24/2008 
 RPT Level = 0.03  Analysis Date = 01/08/2008 
 RPT Level = 0.03  Analysis Date = 01/08/2008 
 RPT Level = 0.03  Analysis Date = 01/07/2008 
 RPT Level = 0.03  Analysis Date = 01/07/2008 
 RPT Level = 0.03  Analysis Date = 12/26/2007 
 RPT Level = 0.03  Analysis Date = 12/26/2007 
 RPT Level = 0.03  Analysis Date = 12/17/2007 
 RPT Level = 0.03  Analysis Date = 12/17/2007 
 RPT Level = 0.03  Analysis Date = 12/06/2007 
 RPT Level = 0.03  Analysis Date = 12/06/2007 
 RPT Level = 0.03  Analysis Date = 11/28/2007 
 RPT Level = 0.03  Analysis Date = 11/28/2007 
 RPT Level = 0.03  Analysis Date = 11/28/2007 
 RPT Level = 0.03  Analysis Date = 11/28/2007 
 RPT Level = 0.03  Analysis Date = 11/16/2007 
 RPT Level = 0.03  Analysis Date = 11/16/2007 
 RPT Level = 0.03  Analysis Date = 11/14/2007 
 RPT Level = 0.03  Analysis Date = 11/14/2007 
 RPT Level = 0.03  Analysis Date = 10/31/2007 
 RPT Level = 0.03  Analysis Date = 10/31/2007 
 RPT Level = 0.03  Analysis Date = 11/01/2007 
 RPT Level = 0.03  Analysis Date = 11/01/2007 
 RPT Level = 0.03  Analysis Date = 10/22/2007 
 RPT Level = 0.03  Analysis Date = 10/22/2007 
 RPT Level = 0.03  Analysis Date = 10/22/2007 
 RPT Level = 0.03  Analysis Date = 10/22/2007 
 RPT Level = 0.03  Analysis Date = 10/05/2007 
 RPT Level = 0.03  Analysis Date = 10/05/2007 
 RPT Level = 0.03  Analysis Date = 10/05/2007 
 RPT Level = 0.03  Analysis Date = 10/05/2007 
 RPT Level = 0.03  Analysis Date = 09/20/2007 
 RPT Level = 0.03  Analysis Date = 09/20/2007 
 RPT Level = 0.03  Analysis Date = 09/07/2007 
 RPT Level = 0.03  Analysis Date = 09/07/2007 
 RPT Level = 0.03  Analysis Date = 09/05/2007 
 RPT Level = 0.03  Analysis Date = 09/05/2007 
 RPT Level = 0.03  Analysis Date = 08/27/2007 
 RPT Level = 0.03  Analysis Date = 08/27/2007 
 RPT Level = 0.03  Analysis Date = 08/21/2007 
 RPT Level = 0.03  Analysis Date = 08/21/2007 
 RPT Level = 0.03  Analysis Date = 08/16/2007 
 RPT Level = 0.03  Analysis Date = 08/16/2007 
 RPT Level = 0.03  Analysis Date = 08/09/2007 
 RPT Level = 0.03  Analysis Date = 08/09/2007 
 RPT Level = 0.03  Analysis Date = 08/02/2007 
 RPT Level = 0.03  Analysis Date = 08/02/2007 
 RPT Level = 0.03  Analysis Date = 07/12/2007 
 RPT Level = 0.03  Analysis Date = 07/12/2007 
 RPT Level = 0.03  Analysis Date = 07/09/2007 
 RPT Level = 0.03  Analysis Date = 07/09/2007 
 RPT Level = 0.03  Analysis Date = 07/03/2007 
 RPT Level = 0.03  Analysis Date = 07/03/2007 
 RPT Level = 0.03  Analysis Date = 06/22/2007 
 RPT Level = 0.03  Analysis Date = 06/22/2007 
 RPT Level = 0.03  Analysis Date = 06/14/2007 
 RPT Level = 0.03  Analysis Date = 06/14/2007 
 RPT Level = 0.03  Analysis Date = 06/08/2007 
 RPT Level = 0.03  Analysis Date = 06/08/2007 
 RPT Level = 0.03  Analysis Date = 06/05/2007 
 RPT Level = 0.03  Analysis Date = 06/05/2007 
 RPT Level = 0.03  Analysis Date = 05/24/2007 
 RPT Level = 0.03  Analysis Date = 05/24/2007 
 RPT Level = 0.03  Analysis Date = 05/17/2007 
 RPT Level = 0.03  Analysis Date = 05/17/2007 
 RPT Level = 0.03  Analysis Date = 05/11/2007 
 RPT Level = 0.03  Analysis Date = 05/11/2007 
 RPT Level = 0.03  Analysis Date = 05/07/2007 
 RPT Level = 0.03  Analysis Date = 05/07/2007 
 RPT Level = 0.03  Analysis Date = 04/27/2007 
 RPT Level = 0.03  Analysis Date = 04/27/2007 
 RPT Level = 0.03  Analysis Date = 04/19/2007 
 RPT Level = 0.03  Analysis Date = 04/19/2007 
 RPT Level = 0.03  Analysis Date = 04/16/2007 
 RPT Level = 0.03  Analysis Date = 04/16/2007 
 RPT Level = 0.03  Analysis Date = 04/05/2007 
 RPT Level = 0.03  Analysis Date = 04/05/2007 
 RPT Level = 0.03  Analysis Date = 04/05/2007 
 RPT Level = 0.03  Analysis Date = 04/05/2007 
 RPT Level = 0.03  Analysis Date = 03/26/2007 
 RPT Level = 0.03  Analysis Date = 03/26/2007 
 RPT Level = 0.03  Analysis Date = 03/15/2007 
 RPT Level = 0.03  Analysis Date = 03/15/2007 
 RPT Level = 0.03  Analysis Date = 03/08/2007 
 RPT Level = 0.03  Analysis Date = 03/08/2007 
 RPT Level = 0.03  Analysis Date = 03/08/2007 
 RPT Level = 0.03  Analysis Date = 03/08/2007 
 RPT Level = 0.03  Analysis Date = 02/28/2007 
 RPT Level = 0.03  Analysis Date = 02/28/2007 
 RPT Level = 0.03  Analysis Date = 02/22/2007 
 RPT Level = 0.03  Analysis Date = 02/22/2007 
 RPT Level = 0.03  Analysis Date = 02/14/2007 
 RPT Level = 0.03  Analysis Date = 02/14/2007 
 RPT Level = 0.03  Analysis Date = 01/30/2007 
 RPT Level = 0.03  Analysis Date = 01/30/2007 
 RPT Level = 0.03  Analysis Date = 01/25/2007 
 RPT Level = 0.03  Analysis Date = 01/25/2007 
 RPT Level = 0.03  Analysis Date = 01/25/2007 
 RPT Level = 0.03  Analysis Date = 01/25/2007 
 RPT Level = 0.03  Analysis Date = 01/10/2007 
 RPT Level = 0.03  Analysis Date = 01/10/2007 
 RPT Level = 0.03  Analysis Date = 01/04/2007 
 RPT Level = 0.03  Analysis Date = 01/04/2007 
 RPT Level = 0.03  Analysis Date = 12/28/2006 
 RPT Level = 0.03  Analysis Date = 12/28/2006 
 RPT Level = 0.03  Analysis Date = 12/18/2006 
 RPT Level = 0.03  Analysis Date = 12/18/2006 
 RPT Level = 0.03  Analysis Date = 12/07/2006 
 RPT Level = 0.03  Analysis Date = 12/07/2006 
 RPT Level = 0.03  Analysis Date = 12/04/2006 
 RPT Level = 0.03  Analysis Date = 12/04/2006 
 RPT Level = 0.03  Analysis Date = 11/30/2006 
 RPT Level = 0.03  Analysis Date = 11/30/2006 
 RPT Level = 0.03  Analysis Date = 11/21/2006 
 RPT Level = 0.03  Analysis Date = 11/21/2006 
 RPT Level = 0.03  Analysis Date = 11/13/2006 
 RPT Level = 0.03  Analysis Date = 11/13/2006 
 RPT Level = 0.03  Analysis Date = 11/09/2006 
 RPT Level = 0.03  Analysis Date = 11/09/2006 
 RPT Level = 0.03  Analysis Date = 10/31/2006 
 RPT Level = 0.03  Analysis Date = 10/31/2006 
 RPT Level = 0.03  Analysis Date = 10/23/2006 
 RPT Level = 0.03  Analysis Date = 10/23/2006 
 RPT Level = 0.03  Analysis Date = 10/19/2006 
 RPT Level = 0.03  Analysis Date = 10/19/2006 
 RPT Level = 0.03  Analysis Date = 10/18/2006 
 RPT Level = 0.03  Analysis Date = 10/18/2006 
 RPT Level = 0.03  Analysis Date = 10/16/2006 
 RPT Level = 0.03  Analysis Date = 10/16/2006 
 RPT Level = 0.03  Analysis Date = 10/13/2006 
 RPT Level = 0.03  Analysis Date = 10/13/2006 
 RPT Level = 0.03  Analysis Date = 10/10/2006 
 RPT Level = 0.03  Analysis Date = 10/10/2006 
 RPT Level = 0.03  Analysis Date = 10/03/2006 
 RPT Level = 0.03  Analysis Date = 10/03/2006 
 RPT Level = 0.03  Analysis Date = 09/27/2006 
 RPT Level = 0.03  Analysis Date = 09/27/2006 
 RPT Level = 0.03  Analysis Date = 08/17/2006 
 RPT Level = 0.03  Analysis Date = 08/17/2006 
 RPT Level = 0.03  Analysis Date = 07/31/2006 
 RPT Level = 0.03  Analysis Date = 07/31/2006 
 RPT Level = 0.03  Analysis Date = 07/27/2006 
 RPT Level = 0.03  Analysis Date = 07/27/2006 
 RPT Level = 0.03  Analysis Date = 07/17/2006 
 RPT Level = 0.03  Analysis Date = 07/17/2006 
 RPT Level = 0.03  Analysis Date = 07/10/2006 
 RPT Level = 0.03  Analysis Date = 07/10/2006 
 RPT Level = 0.03  Analysis Date = 06/27/2006 
 RPT Level = 0.03  Analysis Date = 06/27/2006 
 RPT Level = 0.03  Analysis Date = 06/26/2006 
 RPT Level = 0.03  Analysis Date = 06/26/2006 
 RPT Level = 0.03  Analysis Date = 06/02/2006 
 RPT Level = 0.03  Analysis Date = 06/02/2006 
 RPT Level = 0.03  Analysis Date = 05/31/2006 
 RPT Level = 0.03  Analysis Date = 05/31/2006 
 RPT Level = 0.03  Analysis Date = 05/12/2006 
 RPT Level = 0.03  Analysis Date = 05/12/2006 
 RPT Level = 0.03  Analysis Date = 09/28/2005 
 RPT Level = 0.03  Analysis Date = 09/28/2005 
 RPT Level = 0.03  Analysis Date = 09/14/2005 
 RPT Level = 0.03  Analysis Date = 09/14/2005 
 RPT Level = 0.03  Analysis Date = 09/02/2005 
 RPT Level = 0.03  Analysis Date = 09/02/2005 
 RPT Level = 0.03  Analysis Date = 08/29/2005 
 RPT Level = 0.03  Analysis Date = 08/29/2005 
 RPT Level = 0.03  Analysis Date = 08/24/2005 
 RPT Level = 0.03  Analysis Date = 08/24/2005 
 RPT Level = 0.03  Analysis Date = 08/15/2005 
 RPT Level = 0.03  Analysis Date = 08/15/2005 
 RPT Level = 0.03  Analysis Date = 08/12/2005 
 RPT Level = 0.03  Analysis Date = 08/12/2005 
 RPT Level = 0.03  Analysis Date = 08/12/2005 
 RPT Level = 0.03  Analysis Date = 08/12/2005 
 RPT Level = 0.03  Analysis Date = 07/21/2005 
 RPT Level = 0.03  Analysis Date = 07/21/2005 
 RPT Level = 0.03  Analysis Date = 07/18/2005 
 RPT Level = 0.03  Analysis Date = 07/18/2005 
 RPT Level = 0.03  Analysis Date = 07/12/2005 
 RPT Level = 0.03  Analysis Date = 07/12/2005 
 RPT Level = 0.03  Analysis Date = 07/08/2005 
 RPT Level = 0.03  Analysis Date = 07/08/2005 
 RPT Level = 0.03  Analysis Date = 06/30/2005 
 RPT Level = 0.03  Analysis Date = 06/30/2005 
 RPT Level = 0.03  Analysis Date = 06/21/2005 
 RPT Level = 0.03  Analysis Date = 06/21/2005 
 RPT Level = 0.03  Analysis Date = 06/14/2005 
 RPT Level = 0.03  Analysis Date = 06/14/2005 
 RPT Level = 0.03  Analysis Date = 06/06/2005 
 RPT Level = 0.03  Analysis Date = 06/06/2005 
 RPT Level = 0.03  Analysis Date = 05/27/2005 
 RPT Level = 0.03  Analysis Date = 05/27/2005 
 RPT Level = 0.03  Analysis Date = 05/23/2005 
 RPT Level = 0.03  Analysis Date = 05/23/2005 
 RPT Level = 0.03  Analysis Date = 05/18/2005 
 RPT Level = 0.03  Analysis Date = 05/18/2005 
 RPT Level = 0.03  Analysis Date = 05/11/2005 
 RPT Level = 0.03  Analysis Date = 05/11/2005 
 RPT Level = 0.03  Analysis Date = 05/06/2005 
 RPT Level = 0.03  Analysis Date = 05/06/2005 
 RPT Level = 0.03  Analysis Date = 04/29/2005 
 RPT Level = 0.03  Analysis Date = 04/29/2005 
 RPT Level = 0.03  Analysis Date = 04/14/2005 
 RPT Level = 0.03  Analysis Date = 04/14/2005 
 RPT Level = 0.03  Analysis Date = 04/12/2005 
 RPT Level = 0.03  Analysis Date = 04/12/2005 
 RPT Level = 0.03  Analysis Date = 04/05/2005 
 RPT Level = 0.03  Analysis Date = 04/05/2005 
 RPT Level = 0.03  Analysis Date = 03/30/2005 
 RPT Level = 0.03  Analysis Date = 03/30/2005 
 RPT Level = 0.03  Analysis Date = 03/18/2005 
 RPT Level = 0.03  Analysis Date = 03/18/2005 
 RPT Level = 0.03  Analysis Date = 03/17/2005 
 RPT Level = 0.03  Analysis Date = 03/17/2005 
 RPT Level = 0.03  Analysis Date = 03/17/2005 
 RPT Level = 0.03  Analysis Date = 03/17/2005 
 RPT Level = 0.03  Analysis Date = 03/17/2005 
 RPT Level = 0.03  Analysis Date = 03/17/2005 
 RPT Level = 0.03  Analysis Date = 03/08/2005 
 RPT Level = 0.03  Analysis Date = 03/08/2005 
 RPT Level = 0.03  Analysis Date = 02/24/2005 
 RPT Level = 0.03  Analysis Date = 02/24/2005 
 RPT Level = 0.03  Analysis Date = 02/16/2005 
 RPT Level = 0.03  Analysis Date = 02/16/2005 
 RPT Level = 0.03  Analysis Date = 02/14/2005 
 RPT Level = 0.03  Analysis Date = 02/14/2005 
 RPT Level = 0.03  Analysis Date = 01/27/2005 
 RPT Level = 0.03  Analysis Date = 01/27/2005 
 RPT Level = 0.03  Analysis Date = 01/25/2005 
 RPT Level = 0.03  Analysis Date = 01/25/2005 
 RPT Level = 0.03  Analysis Date = 01/20/2005 
 RPT Level = 0.03  Analysis Date = 01/20/2005 
 RPT Level = 0.03  Analysis Date = 01/12/2005 
 RPT Level = 0.03  Analysis Date = 01/12/2005 
 RPT Level = 0.03  Analysis Date = 01/07/2005 
 RPT Level = 0.03  Analysis Date = 01/07/2005 
 RPT Level = 0.03  Analysis Date = 01/07/2005 
 RPT Level = 0.03  Analysis Date = 01/07/2005 
 RPT Level = 0.03  Analysis Date = 01/07/2005 
 RPT Level = 0.03  Analysis Date = 01/07/2005 
 RPT Level = 0.03  Analysis Date = 12/21/2004 
 RPT Level = 0.03  Analysis Date = 12/21/2004 
 RPT Level = 0.03  Analysis Date = 12/21/2004 
 RPT Level = 0.03  Analysis Date = 12/21/2004 
 RPT Level = 0.03  Analysis Date = 12/16/2004 
 RPT Level = 0.03  Analysis Date = 12/16/2004 
 RPT Level = 0.03  Analysis Date = 12/21/2004 
 RPT Level = 0.03  Analysis Date = 12/21/2004 
 RPT Level = 0.03  Analysis Date = 12/10/2004 
 RPT Level = 0.03  Analysis Date = 12/10/2004 
 RPT Level = 0.03  Analysis Date = 12/10/2004 
 RPT Level = 0.03  Analysis Date = 12/10/2004 
 RPT Level = 0.03  Analysis Date = 12/01/2004 
 RPT Level = 0.03  Analysis Date = 12/01/2004 
 RPT Level = 0.03  Analysis Date = 11/26/2004 
 RPT Level = 0.03  Analysis Date = 11/26/2004 
 RPT Level = 0.03  Analysis Date = 11/23/2004 
 RPT Level = 0.03  Y = 0
The SGPlot Procedure

False Positive Rate for Total Nitrogen (NH3+NO3+NO2+org N as N), UNF, CFA, ALK-P, ACD

parmdesc Pcode
Mcode
Water Year # of
Samples
# of
False Pos.
*False
Positive Rate
Total Nitrogen (NH3+NO3+NO2+org N as N), UNF, CFA, ALK-P, ACD 62855AKP01 2004 17 0 0%
    2005 50 1 2%
    2006 15 2 13%
    2007 50 1 2%
    2008 50 0 0%
    2009 52 0 0%
    2010 52 0 0%
    2011 52 0 0%
    2012 44 1 2%
    2013 53 2 4%
    2014 47 0 0%
    2015 52 0 0%
    2016 50 2 4%
*Highlighted if false positive rate > 5 %

Hover over any data point for detailed info.
Chart generated 03/08/2018